HomeMy WebLinkAboutPackets - Council Packets (1698)Town Council Meeting
Regular and Study Session
April 6, 2022
Town Council Meeting
Announcements
Upcoming Meetings
Meetings are subject to change. Check the Town website for meeting status.
Water Utility Regular Session –CANCELED
April 11 at 5 p.m.
Hopi Conference
Budget and Finance Commission Regular Session
April 19 at 4 p.m.
Council Chambers
Town Council Regular Session
April 20 at 6 p.m.
Council Chambers
Town Council Meeting
Regular and Study Session
April 6, 2022
Town Council Meeting
Regular and Study Session
April 6, 2022
The 24th Annual Community Academy –March 2022
A fun, unique and award-winning opportunity to learn about the community and local government.
Class Topics
Classes Speaker(s)*
Welcome and Overview of Town Governance Mary Jacobs, Town Manager
Oro Valley Finances David Gephart, Chief Financial Officer
The History of Oro Valley Dick Eggerding, OV resident and volunteer
Growth Trends and Economic Development Paul Melcher, Community and Economic Development
Director
Bayer Vella, Planning and Zoning Administrator
Zoning 101 and Development Review Michael Spaeth, Current Planning Principal Planner
Kyle Packer, Planner
Roadways and Stormwater Management Paul Keesler, Town Engineer/Public Works Director
John Spiker, Stormwater Division Manager
Implementation of the Parks and Recreation Master Plan Kristy Diaz-Trahan, Parks and Recreation Director
Town Water Resource Planning Peter Abraham, Water Utility Director
Public Safety Chief Kara Riley, OVPD
Sgt. Marshall Morris, OVPD
*Presentations by various board and commission members were included throughout the program.
Town Council Meeting
Regular and Study Session
April 6, 2022
Dedication of Westward Look Drive Areas
from Private to Public
April 6, 2022
Annexation of the Westward Look Resort
Officially annexed into the
Town of Oro Valley in May
2021
Per the Annexation PADA:
“Town agrees to accept into
its network of public
roadways a portion of
Westward Look Drive from
Ina Road to Via Oeste Drive,
subject to mutually
agreeable right-of-way
dedication terms.”
Right of Way Dedication
ROW acceptance is outlined within Town
Code, Section 7-8-1
This proposal meets all code requirements as
evaluated by the Town Engineer
This section of road will be reconstructed by
the end of May as a part of the commitment
by the Town within the PADA
Staff recommends that the Town Council
accept right-of-way for a portion of Westward
Look Drive from private to public pending
necessary documentation as verified by the
Town Manager.
Town Council Meeting
Regular and Study Session
April 6, 2022
Parks Bond Projects
Update
Town Council Study Session
April 6, 2022
Brief Background
$25M Bond for Parks and Recreation projects added to final FY21/22 budget on June 16,
2021, with preliminary projects discussed
July 7, Town Council voted to include the following projects from the bond:
Naranja Park expansion (at least 50%; specific projects on next slides)
Community Center exterior improvements
Additional multiuse paths
Council authorized the bond issuance on September 22
Progress reviewed in monthly Executive Report
Last presented progress to Council in November of 2021
Note: The Community Center Elevator is not a bond-
funded project. The $750,000 approved by Council in the
FY20/21 budget remains budgeted in the CIP fund.
Elevator will be installed once Council finalizes layout of
future Community Center improvements/renovation.
Golf Course Irrigation Replacement
Contract signed and executed with Wadsworth
Golf Construction Company
Construction materials currently arriving and
being stored onsite
Purchasing materials for both courses now
Start main construction Conquistador Course
May 2, to finish this October
Could start non-course construction sooner, IE:
road crossings in April
On/ahead of schedule
On budget
Cañada course: May thru October 2023
Community Center Exterior Improvements
Tennis Courts Reconstruction and Expansion
Design complete, with the original 15 tennis
courts, 6 pickleball courts and the addition
of 4 more pickleball courts in base project
scope plus:
Tennis court #12 will operate normally as 4 temporary
pickleball courts –but be permanently striped as tennis
Additional alternate 1 -two additional pickleball courts
Additional alternate 2 –event staging area
Additional alternate 3 –new shade canopies
Currently in the bidding process to secure a
contractor
Presently on schedule
Community Center Exterior Improvements
Parking Lot Reconstruction and Expansion
Construction expected summer 2023
Continue to negotiate and work with the adjacent dirt lot property owner for incorporation into this project
Design underway
Existing spaces –235
Proposed –305
With dirt lot –415
Community Center Exterior Improvements
Multiuse Path Connections
La Cañada Drive between Lambert Lane and Naranja
Drive
Design on hold while the Water Utility evaluates existing mains located
within the same area
Great partnership with the Water Utility to maximize efficiency of both
projects and minimize disruption to the community and overall cost
Naranja Drive from La Cañada Drive to Park entry
Design and construction to align with Naranja Park project
Planned for summer of 2023
CDO Wash to James D. Kriegh Park
Currently evaluating extent of multiuse path
Presently working with adjacent property owners near Greenock to
secure portions of this path system
Planned for summer of 2024
Naranja Park Expansion Project
Mayor and Council Update
April 6, 2022
Naranja Park Expansion Project Update –April 6, 2022
Current and Completed Activities
•Program Verification
•Site Survey
•Hydrology Study
•Geotechnical Investigations
•Traffic Study
•Parking Study
•Utility Demand Study
•Coordination with Outside Agencies
•Earthwork and Mass Grading
Evaluations
•Site Planning
Site Development Plan
NORTH
Site Development Plan
SOUTH POD
NORTH POD
NORTH
Site Development Plan
NORTH
SOUTH POD
NORTH POD
ACCESS &
PARKING
Site Development Plan
SOUTH POD
NORTH POD
ACCESS &
PARKING
EX. ARCHERY
RANGE
AZ HERO’S
MEMORIAL
DOG
PARK
RC FIELD
O&M
FACILITY
Place holder:
To be funded/constructed
by a non-profit
NORTH
Site Development Plan
SOUTH POD
NORTH POD
ACCESS &
PARKING
NATURAL OPEN SPACE
NATURAL OPEN SPACE
EX. ARCHERY
RANGE
DOG
PARK
O&M
FACILITY
AZ HERO’S
MEMORIAL
NORTH
RC FIELD
Naranja Park Expansion Project Update –April 6, 2022
•New Multi-Sport Fields
•Pickleball Courts
•Splash Pad
•Skate Park, Pump Track, and Basketball
Courts
•Dog Park
•Model Airplane Facility*
•Shared-Use Pathway
Planned Facilities
•Pedestrian Walkways and Trails
•Musette Drive Extension to
Tangerine Road
•Operations and Maintenance
Facility –East Side Park
Improvements
Naranja Park Expansion Project Update –April 6, 2022
New Multi-Sport Fields
1 –New Lighted Sports Fields
2 –Restroom
3 –Ramadas
4 –Spectator and Assembly Area
5 –Parking
6 –Sloped Walkways to Terraced Fields
7 –Maintenance Access Drive
NORTH
1
1
1
1
6
6
2
3
3 4
5
5
7
Pickleball Courts
Naranja Park Expansion Project Update –April 6, 2022
NORTH
1 –Lighted Pickleball Courts (6)
2 –Ramada
3 –User Gathering Area
4 –Parking
12
3
4
1
1
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Skate Park, Pump Track, and
Basketball Courts
1 –Lighted Skate Park
2 –Lighted Pump Track
3 –Lighted Basketball Courts
4 –Ramada and Gathering Area
5 –Expanded Parking
6 –Existing Parking
7 –Existing Restroom
8 –Existing Field No. 1
2 3
4
1
5
7
8
6
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Dog Park –(Relocated)
1 –Dog Park (Multiple Enclosures)
2 –Ramada –and Park / City Overlook
3 –Restroom
4 –Parking
5 –Slope up to Native Soil Trail
6 –Slope down to Fields 7 and 8
2
34
1
56
1
1
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Splash Pad
1 –Splash Pad
2 –Play Area
3 –Existing Playground
4 –Mechanical Equipment Enclosure
5 –Expanded Walkway System
6 –Ramada
7 –Restroom
8 –Existing Field No. 3
9 –Perimeter Fencing
2
3
4
8
5
6
7
1
9
3 3
2
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Radio Control Airplane Field
2 3 4
5
1 1 –RC Runway
2 –Parking Area
3 –Pilot Operating Area
4 –Approach/Departure Zones
5 –Access Drive
4
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Shared-Use Pathway
2
1
1 –Shared-Use Pathway
2 –Designated Crossings for
Access to Park Facilities
3 –Connection to Bike Lane/Future
Shared-Use Path at Naranja Drive
4 –Connection to Existing Shared-Use
Path at Tangerine Road
2 2
3
4
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Pedestrian Walkways and Trails
1 1 –Paved, Accessible Walkway
2 –Native Soil Trail
2
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Musette Drive Extension
1 1 –Musette Drive Extension
2 –Planted Berms and/or Screen Wall
3 –Musette Dr. –Tangerine Rd. Intersection
4 –Shared-Use Pathway
5 –Trail Connection Tangerine Terrace
2
34
5
Park drive relocated to the west to
provide greater separation between
park drive and adjacent subdivision
Naranja Park Expansion Project Update –April 6, 2022
NORTH
East Side Improvements
5
1 –Ramada
2 –Rest Room
3 –Food Truck Access Lane
4 –User Group Storage
5 –Parking
6 –Overflow Parking
3
21
4 6
Naranja Park Expansion Project Update –April 6, 2022
NORTH
Operations and Maintenance Facility
1
1 –Maintenance Shop/Office
2 –Equipment Storage Area
3 –Bulk Materials Storage
4 –Parking
5 –Roll -Off Dumpster
2
3 4
5
NORTH
•Finalize Mass Grading Scheme
•Begin Earthwork/Grading Operations
•Complete Design of Underground Utility Systems
•Begin Construction of Underground Utility Systems
•Complete Design of Park Improvements
•Construct Park Improvements
Naranja Park Expansion Project Update –April 6, 2022
Next Steps
Parks Bond Projects Update
Questions
Comments