HomeMy WebLinkAboutMinutes - Water Resources Subcommittee - 5/28/2008 MEETING SUMMARY
THE ORO VALLEY WATER UTILITY COMMISSION
RENEWABLE WATER RESOURCES SUBCOMMITTEE
MAY 28,2008
ORO VALLEY WATER UTILITY CONFERENCE ROOM
11000 N.LA CANADA DRIVE
ORO VALLEY,ARIZONA
CALL TO ORDER—Chair Hoffman called the meeting to order at 5:30 p.m.
Attendance: John Hoffman—Chair
Dave Powell—Commissioner
Philip Saletta—Water Utility Director
David Ruiz—Water Utility Engineering&Planning Manager
CALL TO AUDIENCE—No one in the audience wished to speak.
ITEM#1 WATER RESOURCE PLANNING
Chair Hoffman asked Mr. Saletta to discuss water resource planning efforts. Mr. Saletta opened with the Water
Uses and Sources of Supply graph and discussed the relationship of existing and future water needs. All sources
of water supply available to Oro Valley were discussed which included groundwater,reclaimed water and CAP
Water. There was also discussion on the projected water use required to meet existing and future demands.
There was discussion regarding the requirements under our Assured Water Supply Designation and that it must
be renewed in 2010. Central Arizona Groundwater Replenishment District obligations were discussed and that
this is an increasing obligation. It was discussed that we have Long Term Groundwater Storage Credits that can
be applied to recovery wells to partially reduce our CAGRD obligations. This was an informational item,no
actions were taken and no recommendations to the Water Utility Commission were made.
ITEM#2 CENTRAL ARIZONA PROJECT WATER DEVELOPMENT PLAN
Chair Hoffman asked Mr. Saletta and Mr. Ruiz to discuss plans for the development of CAP water. Mr. Saletta
gave a project overview and discussed that the Colorado River is approximately 125%of normal snowpack. Mr.
Ruiz and Mr. Saletta discussed the possible pipeline alignments and cost estimates. A table of costs were handed
out that defined the options for pipe size,treatment options and concentrate management options. This
information was included in the Alternatives Review and Cost Estimate Study completed by Carollo Engineers.
Land issues in the area of the proposed NW Reliability reservoir were discussed indicating that land would be
needed for the reservoir. Land would also be need for treatment facilities. The Northwest Water Providers have
been working with the U.S.Bureau of Reclamation on reliability for Southern Arizona. This was an informational
item,no action was taken and no recommendations to the Water Utility Commission were made.
CALL TO AUDIENCE—There were no members of the audience in attendance.
FUTURE AGENDA ITEMS— Public participation and a report on the SSF/RO Study will be placed on the
next agenda.
NEXT MEETING— There was no date set for the next meeting.
ADJOURNMENT—The meeting adjourned at 6:55 p.m.
pcs
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any type of
accommodation,please notify Kathryn Cuvelier at phone number 229-4700 a minimum of four hours in advance of the meeting so that
proper arrangements may be made.