Loading...
HomeMy WebLinkAboutMinutes - Water Resources Subcommittee - 4/27/2010 ACTION SUMMARY MINUTES TOWN OF ORO VALLEY WATER UTILITY COMMISSION RENEWABLE WATER RESOURCES SUBCOMMITTEE April 27, 2010 TOWN OF ORO VALLEY WATER UTILITY CONFERENCE ROOM 11000 N. LA CANADA DRIVE ORO VALLEY, ARIZONA CALL TO ORDER— Chair Hoffmann called the meeting to order at 6:00 p.m. Attendance: John Hoffmann — Chair Rick Reynolds - Commissioner Philip Saletta —Water Utility Director Robert Jacklitch —Project Manager CALL TO AUDIENCE —There were no speakers in attendance. ITEM #1 UPDATE ON IGA WITH TUCSON WATER FOR CAP DELIVERY An update on discussions with Tucson Water regarding the Cost of Service Study for a short term interim agreement for delivering Oro Valley's CAP water through the TW system (wheeling) was given to the subcommittee by Mr. Saletta. A meeting was held on April 19, 2010 with the consultant CH2M Hill, Tucson Water (TW), Metro and Oro Valley Water Utility (OVWU). This meeting discussed the study approach with respect to capital and operating costs. Tucson Water provided information regarding the amount of water delivery available. The study will include flat rate deliveries. TW has capability of delivering 2,000 acre-feet per year to OVWU and 2,000 acre-feet per year to Metro. This may increase depending on the location of delivery point to Metro. The study is on schedule and is expected to be completed by July 30, 2010. There was no action taken on this item. ITEM #2 UPDATE ON NORTHWEST WATER PROVIDERS An update was given by Mr. Saletta on discussions regarding the delivery of CAP water to Oro Valley. It was discussed that Metro recently under took a study and has shared the.information from that study with OVWU and the other Northwest Water Providers regarding recharge and recovery. In addition the Metro Board recently took action to direct their staff to pursue recharge and recovery. A letter from Mark Stratton of Metro regarding this action was discussed. OVWU has contracted with Carollo Engineers to perform a study to evaluate some additional alternatives for delivery of its CAP water including recharge and recovery. Cost estimates for these alternatives prepared for comparison. The location of potential recharge and recovery facilities will be at the Lower Santa Cruz Recharge Facility. There was no action taken on this item. ITEM #3 UPDATE ON CAP WATER STUDIES An update was given by Mr. Jacklitch regarding the preliminary work performed on Phase 1 of the water quality and distribution studies for the delivery of CAP water to Oro Valley. Phase 1 includes the delivery of OVWU's CAP recharged water through the TW water system. CH2M Hill has prepared some preliminary results which indicated that the amount of water that could be delivered is about 3,000 acre-feet per year. The average water quality would be higher in total dissolved solids, but there were no significant reversal of flows or potential corrosion impacts. Phase 2 will include the delivery of CAP water at higher volumes. The study is currently on schedule. There was no action taken on this item. The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any type of accommodation,please notify Kathryn Cuvelier at phone number 229-4700 a minimum of four hours in advance of the meeting so that proper arrangements may be made. CALL TO AUDIENCE —There were no speakers in attendance FUTURE AGENDA ITEMS —Additional uses of Reclaimed Water NEXT MEETING —There was no meeting date set at this time. ADJOURNMENT—The meeting adjourned at 7:06 p.m. pcs The 'Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any type of accommodation,please notify Kathryn Cuvelier at phone number 229-4700 a minimum of four hours in advance of the meeting so that proper arrangements may be made.