HomeMy WebLinkAboutMinutes - Water Resources Subcommittee - 8/26/2010 ACTION SUMMARY MINUTES
TOWN OF ORO VALLEY WATER UTILITY COMMISSION
RENEWABLE WATER RESOURCES SUBCOMMITTEE
AUGUST 26, 2010
TOWN OF ORO VALLEY HOPI CONFERENCE ROOM
11000 N. LA CANADA DRIVE
ORO VALLEY, ARIZONA
CALL TO ORDER— Chair Hoffmann called the meeting to order at 5:08 p.m.
Attendance: John Hoffmann — Chair
Dave Powell - Commissioner
Rick Reynolds— Commissioner
Philip Saletta —Water Utility Director
David Ruiz— Engineering Division Manager
Robert Jacklitch —Project Manager
CALL TO AUDIENCE —There were no members of the audience that requested to speak.
ITEM #1 UPDATE ON NORTHWEST WATER PROVIDERS (P. Saletta)
There was discussion regarding the concept of delivering our Central Arizona Project Water
through recharge and recovery. A PowerPoint presentation was given by Mr. Saletta that
described the possibilities for recharge and recovery in the vicinity of the Lower Santa Cruz
Recharge Facility. Costs are being developed for this alternative by Carollo Engineers. The
discussion included the well locations, well production, the delivery to the facilities and the
delivery to the Oro Valley water Service Area. It was discussed how the project could be
developed jointly with other NW Water Providers. The project would be phased with the first
phase not having a treatment plant but using the natural characteristic of the aquifer to filter
the CAP Water. It was also discussed that reliability for the delivery of CAP water can also
be developed for a recharge and recovery option.
There was no action taken on this item.
ITEM #3 UPDATE ON CAP WATER STUDIES (D. Ruiz and R. Jacklitch)
An update was given by Mr. Jacklitch regarding the preliminary work performed on Phase 1
of the water quality and distribution studies for the delivery of CAP water to Oro Valley.
Phase 1 includes the delivery of OVWU's CAP recharged water through the TW water
system. CH2M Hill has prepared some preliminary results which indicated that the amount
of water that could be delivered is about 3,000 acre-feet per year. The average water quality
would be higher in total dissolved solids than what is the existing, but there were no
significant reversal of flows or potential corrosion impacts. There was discussion regarding
the improvements to the water system that would be required to blend the CAP Water.
Phase 2 will look into higher levels of TDS from the CAP Canal.
There was no action taken on this item.
1
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any
type of accommodation,please notify Kathryn Cuvelier at phone number 229-4700 a minimum of four hours in advance of the
meeting so that proper arrangements may be made.
ACTION SUMMARY MINUTES
TOWN OF ORO VALLEY WATER UTILITY COMMISSION
RENEWABLE WATER RESOURCES SUBCOMMITTEE
AUGUST 26, 2010
TOWN OF ORO VALLEY HOPI CONFERENCE ROOM
M
11000 N. LA CANADA DRIVE
ORO VALLEY, ARIZONA
CALL TO AUDIENCE
Mr. Scott Larson, Consulting Engineer, spoke to the Commission regarding Reverse
Osmosis and the treatment issues that were looked at by Cave Creek, specifically the
disposal of the brine concentrate.
NEXT MEETING —There was no meeting date set at this time.
ADJOURNMENT—The meeting adjourned at 6:16 p.m.
pcs
2
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any
type of accommodation,please notify Kathryn Cuvelier at phone number 229-4700 a minimum of four hours in advance of the
meeting so that proper arrangements may be made.