HomeMy WebLinkAboutPackets - Council Packets (1722)Town Council Meeting
Regular and Special Session
June 15, 2022
Town Council Meeting
Announcements
Upcoming Meetings
Meetings are subject to change. Check the Town website for meeting status.
Stormwater Utility Commission Meeting
June 16 at 4 p.m.
Hopi Conference Room
Budget and Finance Commission Regular Session
June 21 at 4p.m.
Council Chambers
Board of Adjustment –CANCELED
June 28 at 3 p.m.
Council Chambers
Planning and Zoning Commission –CANCELED
July 5 at 6 p.m.
Council Chambers
Town Council Regular Session
July 6 at 6 p.m.
Council Chambers
Town Council Meeting
Regular and Special Session
June 15, 2022
Before After
Vista Del Oro Wash
Canyon Shadows Wash
Before After
Town Council Meeting
Regular and Special Session
June 15, 2022
Fiscal Year 2021/22
Financial Update Through April 2022
June 15, 2022
GENERAL FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Local Sales Taxes $ 21,157,707 $ 20,740,860 98.0%$ 26,070,335 Trending higher than expected; continued growth and
strong recovery in categories impacted by COVID.
State Shared Revenues 13,729,923 12,250,040 89.2%14,271,621 Trending higher than expected; new Smart & Safe
funds received this year.
Charges for Services 2,387,776 2,177,972 91.2%2,514,733 Trending higher than expected; improvement in
recreation revenue.
Licenses & Permits 1,849,000 2,136,446 115.5%2,381,500
Trending higher than budgeted due to several large
commercial projects; SFR permits, which slowed
considerably for first half of year, now picking up.
Grant Revenue 6,065,290 3,613,696 59.6%6,143,448 Year -end estimate includes amount of American
Rescue Plan Act (ARPA) funds recognized this year.
All Other 1,883,500 1,477,441 78.4%1,888,525 Includes other intergovernmental revenue, interest
income and miscellaneous revenue.
TOTAL GENERAL FUND
REVENUES $ 47,073,196 $ 42,396,455 90.1%$ 53,270,162
Budget variance due to outperforming sales tax
collections, state shared revenue and permit
revenue.
GENERAL FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Personnel $ 30,775,632 $ 23,645,835 76.8%$ 29,547,575
Year to date actuals are slightly below budget due
to timing of payroll and vacancy savings. Reduced
year-end estimate due to personnel vacancies in
several departments.
Operations &
Maintenance 21,981,773 18,257,205 83.1%22,098,831 Includes $10M PSPRS payment from reserves.
Added Smart & Safe funds to year-end estimate.
Capital 1,095,175 395,388 36.1%666,219
Budget includes Westward Look improvements; IT
needs and Parks & Recreation improvements.
Added Smart & Safe funds to year-end estimate.
Transfers Out 7,408,264 4,424,073 59.7%6,262,832
Actuals reflect a transfer for debt service and
budgeted transfers to the Capital Fund. No principal
payment due in FY 21/22 for pension obligation
bonds.
TOTAL GENERAL FUND
EXPENDITURES $ 61,260,844 $ 46,722,501 76.3%$ 58,575,458 Budget variance mainly due to debt service
transfer for pension obligation bonds.
Budgeted Use of Fund Balance:
($14.2M)
Estimated Use of Fund Balance =
($5.9M)
Estimated Ending Fund
Balance: $26.5M
49.2% of budgeted expenditures
Exceeds Council 25% Policy by
$13.0M
GENERAL FUND
$41.3M
$33.4M
$42.4M
$46.7M$47.1M
$61.3M
$M
$10M
$20M
$30M
$40M
$50M
$60M
$70M
Revenues Expenditures
General Fund
FY 21/22 Through April
PY Actual
CY Actual
CY Budget
HIGHWAY FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Licenses & Permits $ 25,000 $ 24,776 99.1%$ 30,000 Trending above budget at this time.
State Shared Revenues 3,614,922 3,228,827 89.3%3,870,000 Trending higher than expected.
All Other 8,000 15,165 189.6%16,000 Additional revenues attributable to insurance
recoveries and interest income.
TOTAL HIGHWAY FUND
REVENUES $ 3,647,922 $ 3,268,768 89.6%$ 3,916,000 Expected to exceed budget due to additional HURF
revenues.
HIGHWAY FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Personnel $ 1,208,870 $ 950,314 78.6%$ 1,188,023 Trending slightly lower than expected; % of budget
reflects timing of payrolls; slight savings projected.
Operations &
Maintenance 616,655 428,574 69.5%616,655
Trending as expected; larger line-items include
striping, field supplies, electricity and traffic signal
maintenance.
Capital 2,265,000 2,009,657 88.7%2,265,000 Trending as expected; timing of pavement
preservation program.
TOTAL HIGHWAY FUND
EXPENDITURES $ 4,090,525 $ 3,388,545 82.8%$ 4,069,678 Slight savings in personnel projected for year-end.
Budgeted Use of Fund Balance:
($443,000)
Estimated Use of Fund Balance =
($154,000)
Estimated Ending Fund
Balance: $1.1M
HIGHWAY FUND
$3.1M
$2.5M
$3.3M $3.4M
$3.6M
$4.1M
$.0M
$.5M
$1.0M
$1.5M
$2.0M
$2.5M
$3.0M
$3.5M
$4.0M
$4.5M
$5.0M
Revenues Expenditures
Highway Fund
FY 21/22 Through April
PY Actual
CY Actual
CY Budget
COMMUNITY CENTER FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Contracted Operating
Revenues $ 3,622,385 $ 4,148,729 114.5%$ 4,474,329
All revenues sources trending higher than expected.
Strong performance particularly in golf revenues
and member dues.
Town Operating Revenues 697,480 1,094,134 156.9%1,208,500
Exceeding budget in member dues, recreation
program revenue, facility rental income and daily
drop-ins.
Other Revenues 3,078,400 3,109,751 101.0%3,633,460
Includes 1/2 cent sales tax revenues, HOA
contributions, interest income and other
miscellaneous revenues. Higher than expected local
sales tax.
TOTAL COMM. CENTER
FUND REVENUES $ 7,398,265 $ 8,352,614 112.9%$ 9,316,289
Total revenues projected to exceed budget by $1.9
million or 25.9%, due to sales tax, fitness and
recreation program revenue, and golf revenue.
COMMUNITY CENTER FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 4/2022 % of Budget Year -End
Estimate Notes
Contracted Operating
Expenditures $ 4,701,528 $ 3,801,981 80.9%$ 4,510,501
Trending better than expected. O&M and personnel
costs are expected to come in under budget by
$144,000 and $101,000 respectively, per contractor.
Town Operating
Expenditures 1,086,581 842,687 77.6%1,122,436 Estimating higher than previously expected due to
additional grounds maintenance costs.
Capital Outlay 132,500 92,782 70.0%132,500 Projected on budget at this time.
Transfers Out 1,868,519 168,519 9.0%315,658 Actuals reflect transfers for debt service. Interest
only payment due on Parks & Rec bonds.
TOTAL COMM. CENTER
FUND EXPENDITURES $ 7,789,128 $ 4,905,969 63.0%$ 6,081,095
Budget savings of $1.6 million in transfers out.
Outperformance in contracted operating
expenditures.
COMMUNITY CENTER FUND
Budgeted Use of Fund Balance:
($0.4M)
Estimated Surplus: $3.2M
Estimated Ending Fund
Balance: $5.9M
$6.3M
$4.5M
$8.4M
$4.9M
$7.4M
$7.8M
$M
$1M
$2M
$3M
$4M
$5M
$6M
$7M
$8M
$9M
Revenues Expenditures
Community Center Fund
FY 21/22 Through April
PY Actual
CY Actual
CY Budget
MONTHLY FINANCIAL UPDATE
QUESTIONS?
Town Council Meeting
Regular and Special Session
June 15, 2022
Five-Year Financial Forecast
June 15, 2022
OVERVIEW
General Fund, Highway Fund, Capital Fund, and Community Center Fund
Snapshot based upon known current information
Serves as planning document for future budgets
Forecast is updated annually as part of the budget process
Sources: University of Arizona, AZ Department of Revenue, Joint Legislative
Budget Committee, AZ Department of Transportation, as well as the
knowledge, expertise and professional judgment by Town management and
staff
GENERAL FUND SOURCES -ASSUMPTIONS
Assumes continued economic recovery with no major economic downturns
All revenue sources at or above pre-pandemic levels
Continued growth of 3-5% in most local sales tax categories
Construction sales tax and permitting revenues reflect continued, stable activity in near term, with
slight declines beginning FY 2026/27 due to reduced available land for new development
Conservative, status quo commercial permitting activity forecast
Single family residential permits
State shared revenues
One-time increase in FY 2022/23 due to filing deadline extension in 2020
Increase in FY 2023/24 attributable to state allocation adjustment from 15% to 18%
Income tax rate reduction and cap of 2.5% expected to affect FY 2024/25 onward
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
171 232 328 210 84 78
GENERAL FUND SOURCES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
SOURCES
Taxes 26,070,335$ 25,270,959$ 26,590,131$ 27,519,371$ 28,241,563$ 28,925,823$ 29,643,113$
State Shared Revenue 14,271,621 17,605,693 20,316,178 19,734,694 20,348,199 20,941,110 21,545,758
Charges for Services 2,514,733 3,046,515 3,155,553 3,246,630 3,331,573 3,418,720 3,509,098
Licenses & Permits 2,197,500 2,223,824 2,352,884 2,427,924 2,359,413 1,896,287 1,871,813
Intergovernmental 1,364,700 1,613,000 1,628,480 1,644,115 1,659,906 1,675,855 1,691,964
Grants 6,143,448 455,000 459,550 464,146 468,787 473,475 478,210
Miscellaneous 248,825 249,000 261,450 271,908 282,784 294,096 305,860
Fines 125,000 125,000 131,250 132,563 133,888 135,227 136,579
Interest Income 150,000 150,000 151,500 153,015 154,545 157,636 160,789
Total Sources 53,086,162 50,738,991 55,046,975 55,594,365 56,980,658 57,918,228 59,343,182
GENERAL FUND
GENERAL FUND USES -ASSUMPTIONS
Employee merit and Police step increases included in all years of forecast
Modest capacity for new FTEs
Continued capacity for normal increases in employee-related personnel costs (ERE)
Continuation of PSPRS payments at 41.65% until FY 24/25, with a 30% decrease expected
O&M assumes current service levels and ongoing inflation
Transfers for CIP projects assumed at 5% of sales tax collections per Town Council financial
policies, plus all fund balance over 25% reserve
GENERAL FUND USES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
USES
Personnel 30,147,575 34,926,773 36,106,538 35,517,801 36,251,183 37,273,520 38,495,493
O&M 22,053,707 11,809,548 11,955,654 12,447,574 12,868,034 13,187,931 13,518,660
Capital Outlay 666,219 1,387,725 770,000 830,397 826,266 569,502 568,639
Transfers Out 6,262,832 16,446,977 6,539,074 6,807,698 6,747,747 6,615,909 6,372,430
Total Uses 59,130,333 64,571,023 55,371,266 55,603,470 56,693,230 57,646,861 58,955,222
Surplus/(Use of Fund Balance)(6,044,171) (13,832,032) (324,291) (9,105) 287,428 271,367 387,960
Beginning Fund Balance 32,408,542 26,364,371 12,532,339 12,208,048 12,198,943 12,486,370 12,757,738
Ending Fund Balance 26,364,371$ 12,532,339$ 12,208,048$ 12,198,943$ 12,486,370$ 12,757,738$ 13,145,698$
Reserve as % of Expenditures 44.6%26.0%25.0%25.0%25.0%25.0%25.0%
GENERAL FUND
GENERAL FUND FORECAST
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
$40,000,000
$45,000,000
$50,000,000
$55,000,000
$60,000,000
$65,000,000
$70,000,000
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
General Fund
Sources, Uses and Fund Balance
USES
SOURCES
FUND BALANCE
HIGHWAY FUND SOURCES -ASSUMPTIONS
Arizona Department of Transportation forecasts moderate growth, about 4%,
in highway user gas tax (HURF) revenues
Other revenue sources assume modest and incremental growth
Transfers in from the Capital Fund supplement HURF revenues for roadway
projects identified in the tentative, ten-year CIP
First Avenue mill/overlay -$1.7 million
La Cañada bridge deck repair -$2.3 million
Tangerine Road mill/overlay -$2.6 million
HIGHWAY FUND SOURCES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
SOURCES
State Shared Revenue 3,870,000$ 4,127,100$ 4,296,797$ 4,470,613$ 4,646,900$ 4,822,363$ 5,001,122$
Licenses & Permits 30,000 25,000 25,250 25,275 25,781 26,296 26,822
Interest Income 8,000 8,000 8,080 8,161 8,242 8,407 8,575
Miscellaneous 5,069 3,000 3,150 3,276 3,407 3,543 3,685
Transfers In from Capital Fund - - 1,000,000 2,000,000 2,000,000 2,000,000 -
Total Sources 3,913,069 4,163,100 5,333,277 6,507,325 6,684,330 6,860,610 5,040,205
HIGHWAY FUND
HIGHWAY FUND USES -ASSUMPTIONS
Personnel and O&M figures reflect similar assumptions to General Fund
Pavement preservation funding is included at $1.9 –$2.4 million per year
Capital outlay reflects ten-year, tentative CIP schedule
HIGHWAY FUND USES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
USES
Personnel 1,188,023 1,190,057 1,284,923 1,305,219 1,324,846 1,350,863 1,377,232
O&M 616,655 823,615 824,796 874,283 900,512 918,522 932,300
Capital Outlay 2,265,000 2,626,000 2,940,000 4,835,000 4,383,000 4,744,000 2,207,000
Total Uses 4,069,678 4,639,672 5,049,719 7,014,502 6,608,358 7,013,385 4,516,532
Surplus/(Use of Fund Balance)(156,609)(476,572)283,557 (507,178)75,972 (152,775)523,673
Beginning Fund Balance 1,242,978 1,086,369 609,797 893,354 386,177 462,149 309,374
Ending Fund Balance 1,086,369$ 609,797$ 893,354$ 386,177$ 462,149$ 309,374$ 833,046$
HIGHWAY FUND
HIGHWAY FUND FORECAST
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
Highway Fund
Sources, Uses and Fund Balance
USES
SOURCES
FUND BALANCE
CAPITAL FUND SOURCES -ASSUMPTIONS
Capital Fund is supported by General Fund transfers, vehicle reserves for fleet
replacements, bond proceeds and grants
1-2% growth for miscellaneous revenues, including sale of assets and insurance
recoveries
Non-enterprise fund vehicle reserves charged to General Fund based on
replacement cost of each vehicle over useful life and includes 5-6% cost inflation
Transfers annually from the General Fund reflect 5% of sales tax and excess fund
balance over 25% reserve
$2.1 million transfer from the Community Center Fund in FY 22/23 for golf course
irrigation
CAPITAL FUND SOURCES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
SOURCES
State Grants -$ 420,000$ -$ -$ -$ -$ -$
Bond Proceeds 25,367,224 - - - - - -
Miscellaneous 255,227 225,000 227,250 229,523 231,818 236,454 241,183
Vehicle Reserves 741,010 820,010 892,061 908,073 925,046 942,529 960,361
Transfers from General Fund 5,216,277 13,500,000 4,257,431 4,528,518 4,469,314 4,648,750 4,548,945
Transfer from Community Center Fund - 2,057,314 - - - - -
Total Sources 31,579,738 17,022,324 5,376,742 5,666,114 5,626,178 5,827,733 5,750,489
CAPITAL FUND
CAPITAL FUND USES -ASSUMPTIONS
Two temporary CIP project managers through FY 23/24; one in FY 24/25 through FY
25/26; no personnel costs after FY 25/26
Capital outlay reflects ten-year, tentative CIP schedule, excluding the new police
station as specific funding has not yet been identified
New vehicle purchases (in addition to replacements) assumed at one patrol vehicle
and two other vehicles annually
5-6% inflation for vehicle replacements
Transfers out to the Highway Fund for roadway CIP projects
CAPITAL FUND USES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
USES
Personnel 111,824 261,962 269,862 134,931 134,931 - -
Capital Outlay 5,379,649 28,673,613 14,300,542 6,153,763 2,315,154 4,126,676 5,397,937
Transfers to Highway Fund - - 1,000,000 2,000,000 2,000,000 2,000,000 -
Total Uses 5,491,473 28,935,575 15,570,404 8,288,693 4,450,085 6,126,676 5,397,937
Surplus/(Use of Fund Balance)26,088,265 (11,913,251)(10,193,662)(2,622,580)1,176,092 (298,943)352,552
Beginning Fund Balance 2,504,028 28,592,293 16,679,042 6,485,380 3,862,800 5,038,892 4,739,949
Ending Fund Balance 28,592,293$ 16,679,042$ 6,485,380$ 3,862,800$ 5,038,892$ 4,739,949$ 5,092,501$
CAPITAL FUND
CAPITAL FUND FORECAST
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
Capital Fund
Sources, Uses and Fund Balance
USES
SOURCES
FUND BALANCE
COMMUNITY CENTER FUND SOURCES -ASSUMPTIONS
Local sales tax figures follow same growth as General Fund for relevant categories
Operations assumed on 18 holes for six months of the year in FY 2022/23 and FY
2023/24 for irrigation project
Conservative 1% growth for Parks & Recreation related revenues to account for
potential discretionary spending decreases as result of inflation
HOA contributions end after FY 2024/25, upon completion of five-year contracts
COMMUNITY CENTER FUND SOURCES -FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
SOURCES
Taxes 3,430,364$ 3,477,236$ 3,658,752$ 3,786,613$ 3,885,985$ 3,980,138$ 4,078,836$
Charges for Services 5,396,499 4,868,049 4,968,794 4,996,194 5,662,211 5,774,272 5,873,771
Miscellaneous 177,981 162,050 170,153 176,959 25,037 26,038 27,080
Total Sources 9,004,844 8,507,335 8,797,698 8,959,766 9,573,234 9,780,449 9,979,687
COMMUNITY CENTER FUND
COMMUNITY CENTER FUND USES -ASSUMPTIONS
Personnel and O&M figures reflect similar assumptions to General Fund
Contracted expenditures include Pusch 9-hole course
Capital outlay reflects ten-year, tentative CIP schedule
$100K annually for Vistoso Trails Nature Preserve maintenance
$100,000 -$250,000 annually for building improvements and minor assets (non-CIP)
Debt service transfers for Parks and Recreation bonds and energy efficiency bonds
$2.1 million transfer to the Capital Fund in FY 2022/23 to fund golf course irrigation
COMMUNITY CENTER FUND USES –FORECAST
Town of Oro Valley
Five-Year Forecast
FY 21/22
Estimated
FY 22/23
Tentative
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
FY 26/27
Projected
FY 27/28
Projected
USES
Personnel 891,376 916,806 1,000,570 1,033,586 1,065,951 1,099,761 1,134,725
O&M 4,681,634 5,498,918 5,585,263 5,704,727 5,800,880 5,890,170 5,969,227
Capital Outlay 132,500 2,666,700 1,464,500 495,000 761,500 350,000 1,600,000
Transfers Out 315,658 4,085,380 1,717,203 1,717,149 1,716,268 1,717,435 1,711,661
Total Uses 6,021,168 13,167,804 9,767,536 8,950,462 9,344,599 9,057,366 10,415,613
Surplus/(Use of Fund Balance)2,983,676 (4,660,469) (969,838) 9,304 228,635 723,083 (435,926)
Beginning Fund Balance 2,676,793 5,660,469 1,000,000 30,162 39,466 268,101 991,183
Ending Fund Balance 5,660,469$ 1,000,000$ 30,162$ 39,466$ 268,101$ 991,183$ 555,257$
COMMUNITY CENTER FUND
COMMUNITY CENTER FUND FORECAST
Questions?
Town Council Meeting
Regular and Special Session
June 15, 2022
TRANSPORTATION ART BY YOUTH
ORO VALLEY 2022
Southern Arizona Arts & Cultural Alliance
A project funded by the Pima Association of Governments, with support from the Town of Oro Valley
Project administration by the Southern Arizona Arts & Cultural Alliance
HISTORY OF THE TABY PROJECT
New public art installed along transportation improvements not only beautifies
the region’s landscape, it also offers an opportunity for youth artists to showcase
their skills and gain valuable work ethic through Pima Association of
Governments’ Transportation Art by Youth program.
WWW.SAACA.ORG
STUDENTS
•Kat Trahan
•Isabel Corona Wadleigh
•Grace Sun
•Shelby Fredrickson
•Josiah Tucker
•Mackenzie Shniderman
•Claire Hartigan
•Ema Aros
•Micah Carlson
•Jacob Schoene
•Christian Jones
TEACHING ARTISTS
•Angie Hitt (Mosaic & Primary Teaching Artist)
•Ignacio Garcia (Muralist)
•Eric Richardson (Project Manager)
HOW DID WE GET HERE
•Learning: Exposure to past and public art projects that function
as community activation opportunities. Students also learned
more about their strengths, and how to apply the lessons learned
from this project into their professional careers.
•Community Feedback: Listening to the Oro Valley Community
through information gathering. Over 35 surveys were submitted by
a diverse group of residents and community leaders. Their
feedback was incorporated into the final design.
•Discussion: Learning positive communication skillsets
•Creative Conceptualization: Working with artists and in groups
to conceive a public art piece that is both reflective of the
community, functional in its space, as well as meaningful to you.
PROJECT INTRODUCTION
HOW THE STUDENTS AND TEACHING ARTISTS LANDED ON A FINAL DESIGN
PROJECT MOVING FORWARD
WHAT HAPPENS NOW
•Planning: Creating a planning calendar that includes supplies,
materials, fabrication and installation objectives
•Creative: Utilizing skillsets in mixed media to creatively
conceptualize a finished piece of public art, ideation, digital
design, renderings, etc
•Community Outreach & Media: Planning PR, Social Media,
Ribbon Cutting, Press Release Writing, Community Outreach
•Personal Journaling: Students are given daily journal prompts
to expand and reflect on the development of their skillset
ADDITIONAL SKILLSETS THAT WILL BE LEARNED
Marketing & Communications
Applied Artistic Practice
Project Management & Construction Fundamentals
2022 PROJECT SITE DESIGN –MAIN WALL
791 W Tangerine Rd
THEME
DAY to NIGHT
The wall is located at the future main entrance of the Naranja Park
The project will be mainly utilizing a large mural to cover the wall, with mosaic highlights and designated
bench space
2022 PROJECT SITE DESIGN-SECONDARY WALL
791 W Tangerine Rd
2022 PROJECT INTERACTIVE QUALITIES
•Hidden images placed throughout mural to create a “seek and
find” for those interacting up close.
•QR codes will be printed on tiles within the mural, linked to a
website with facts, history, summary of project by students, both
audio recording and text will be accessible from the QR code.
•Seating Element: By placing the bench strategically it can be a
“selfie spot” for those walking, running or biking
THANK YOU TO THE TOWN OF ORO VALLEY PUBLIC WORKS, PARKS & RECREATION, AND COMMUNICATIONS STAFF FOR SUPPORTING THIS PROJECT!
PLEASE JOIN US ON JULY 27 FOR A PROJECT UNVEILING AND DEDICATION RECEPTION
Town Council Meeting
Regular and Special Session
June 15, 2022
FY 2022/23
Final Budget Adoption
June 15, 2022
FY 2022/23 FINAL BUDGET
Tentative Budget adopted on June 1, 2022 which set the expenditure limitation of $147,704,287
Per Council direction, final budget includes $2,057,314 transfer from of the Community Center Fund to the Capital Fund to be used for the golf course irrigation capital project, leaving a $1 million fund balance in the Community Center Fund
Budget remains unchanged
Adoption of Final Budget includes approval of 10-Year Capital Improvement Program (CIP)
Council has authority to amend budget throughout the fiscal year
FINAL NOTES AND NEXT STEPS
Establish the overall expenditure limitation at $147,704,287
Publish Final Budget figures as required by the State of Arizona’s Auditor
General’s Office
Budget will be submitted to the Government Finance Officers Association
(GFOA) for consideration of the Distinguished Budget Presentation Award
Budget reflects the careful allocation of available resources
Questions?