Loading...
HomeMy WebLinkAboutPackets - Planning and Zoning Commission (193)       AGENDA ORO VALLEY PLANNING AND ZONING COMMISSION SPECIAL SESSION August 4, 2022 ORO VALLEY COUNCIL CHAMBERS 11000 N. LA CAÑADA DRIVE The Town has modified its public comment procedures in the newly renovated Town Council Chambers. For more details, please see the instructions for in person and/or virtual speakers at the end of the agenda.   To watch and/or listen to the public meeting online, please visit https://www.orovalleyaz.gov/town/departments/town-clerk/meetings-and-agendas Executive Sessions – Upon a vote of the majority of the Planning and Zoning Commission, the Commission may enter into Executive Sessions pursuant to Arizona Revised Statutes §38-431.03 (A)(3) to obtain legal advice on matters listed on the Agenda.        SPECIAL SESSION AT OR AFTER 6:00 PM   CALL TO ORDER   ROLL CALL   PLEDGE OF ALLEGIANCE   CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or respond to criticism made by speakers. However, the Commission may not discuss or take legal action on matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what you wish to discuss when completing the blue speaker card.   COUNCIL LIAISON COMMENTS   SPECIAL SESSION AGENDA   1.REVIEW AND APPROVAL OF THE JUNE 7, 2022 REGULAR SESSION MEETING MINUTES   2.DISCUSSION AND POSSIBLE ACTION REGARDING A CONCEPTUAL SITE AND LANDSCAPE PLAN FOR A PROPOSED 64-LOT SUBDIVISION KNOWN AS NARANJA TRAILS, LOCATED SOUTH OF THE NARANJA DRIVE AND HIGHLANDS WASH INTERSECTION, APPROXIMATELY 1/4-MILE WEST OF N. FIRST AVENUE   3.DISCUSSION AND POSSIBLE ACTION REGARDING A NEW SIGN CRITERIA FOR THE PROPERTY LOCATED ON THE NORTHWEST CORNER OF ORACLE ROAD AND LINDA VISTA BLVD   4.DISCUSSION ONLY REGARDING THE PROPOSED SCOPE FOR A HOUSING STUDY   PLANNING UPDATE (INFORMATIONAL ONLY)   ADJOURNMENT     POSTED: 7/28/2022 at 5:00 p.m. by dt When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours prior to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m. The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission meeting at 229-4700.     PUBLIC COMMENT ON AGENDA ITEMS   The Town has modified its public comment procedures for its public bodies to allow for limited remote/virtual comment via Zoom. The public may provide comments remotely only  on items posted as required Public Hearings, provided the speaker registers 24 hours prior to the meeting. For all other items, the public may complete a blue speaker card to be recognized in person by the Chair, according to all other rules and procedures. Written comments can also be emailed to Recording Secretary Jeanna Ancona at jancona@orovalleyaz.gov, for distribution to the Board of Adjustment prior to the meeting. Further instructions to speakers are noted below.     INSTRUCTIONS TO IN-PERSON SPEAKERS Members of the public shall be allowed to speak on posted public hearings and during Call to Audience when attending the meeting in person. The public may be allowed to speak on other posted items on the agenda at the discretion of the Chair. If you wish to address the Board on any item(s) on this agenda, please complete a blue speaker card located on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the blue speaker card which item number and topic you wish to speak on, or, if you wish to speak during Call to Audience, please specify what you wish to discuss. Please step forward to the podium when the Chair calls on you to address the Commission.  For the record, please state your name and whether or not you are a Town resident.1.Speak only on the issue currently being discussed by the Board. You will only be allowed to address the Commission one time regarding the topic being discussed.2. Please limit your comments to 3 minutes.3.During Call to Audience, you may address the Commission on any matter that is not on the agenda.4.Any member of the public speaking, must speak in a courteous and respectful manner to those present. 5. INSTRUCTIONS TO VIRTUAL SPEAKERS FOR PUBLIC HEARINGS    Members of the public may attend the meeting virtually and request to speak virtually on any agenda item that is listed as a Public Hearing.  If you wish to address the Board virtually during any listed Public Hearing, please complete the online speaker form by clicking here  https://forms.orovalleyaz.gov/forms/bluecard at least 24 hours prior to the start of the meeting. You must provide a valid email address in order to register. Town Staff will email you a link to the Zoom meeting the day of the meeting. After being recognized by the Chair, staff will unmute your microphone access and you will have 3 minutes to address the Commission. Further instructions regarding remote participation will be included in the email.    Thank you for your cooperation.    Planning & Zoning Commission Special Session 1. Meeting Date:08/04/2022   Requested by: Bayer Vella, Community and Economic Development  Case Number: N/A SUBJECT: REVIEW AND APPROVAL OF THE JUNE 7, 2022 REGULAR SESSION MEETING MINUTES RECOMMENDATION: Staff recommends approval. EXECUTIVE SUMMARY: N/A. BACKGROUND OR DETAILED INFORMATION: N/A. FISCAL IMPACT: N/A. SUGGESTED MOTION: I MOVE to approve (approve with changes), the June 7, 2022 meeting minutes. Attachments 6/7/22 Draft Minutes  D R A F T MINUTES ORO VALLEY PLANNING AND ZONING COMMISSION REGULAR SESSION June 7, 2022 ORO VALLEY COUNCIL CHAMBERS 11000 N. LA CAÑADA DRIVE            REGULAR SESSION AT OR AFTER 6:00 PM   CALL TO ORDER Chair Gambill called the meeting to order at 6:00 p.m.   ROLL CALL Present: Hal Bergsma, Commissioner Jacob Herrington, Vice Chair Joe Nichols, Commissioner Skeet Posey, Commissioner Daniel Sturmon, Commissioner Celeste Gambill, Chair Staff Present:Michael Spaeth, Principal Planner Joe Andrews, Chief Civil Deputy Attorney  Commissioners Bergsma and Posey attended via Zoom.   PLEDGE OF ALLEGIANCE Chair Gambill led the Commission and audience in the Pledge of Allegiance.   CALL TO AUDIENCE There were no speaker requests.   COUNCIL LIAISON COMMENTS The council liaison was not present.   REGULAR SESSION AGENDA   1.REVIEW AND APPROVAL OF THE MAY 3, 2022 REGULAR SESSION MEETING MINUTES       Motion by Commissioner Joe Nichols, seconded by Commissioner Daniel Sturmon to approve the  Motion by Commissioner Joe Nichols, seconded by Commissioner Daniel Sturmon to approve the May 3, 2022 meeting minutes as written.    Vote: 6 - 0 Carried   2.DISCUSSION AND POSSIBLE ACTION ON A CONCEPTUAL ARCHITECTURE REQUEST FOR A NEW URGENT CARE AND MEDICAL OFFICE BUILDING LOCATED IN THE SAN DORADO SHOPPING CENTER, 2200689       Senior Planner Hannah Oden provided a presentation the included the following: - Purpose - Location - Front and rear elevations - Side elevations - Photos of surrounding architecture - Summary and recommendation Sheila Schmidt with The Meridian 'Buildings for Life' Team, introduced the project. Architects Julie Highton and Gary Highton with Highton Company provided a presentation that included the following: - How locations have changed for medical care facilities - Adjacent views from the location - Photos of current plaza architecture - Architectural design context - Rendering of building - Site plan - Floor plan Discussion ensued among the Commission and staff.    Motion by Commissioner Joe Nichols, seconded by Commissioner Skeet Posey to recommend approval of the Conceptual Architecture for the proposed medical service building at the San Dorado Commercial Center, based on the findings that the request complies with the Design Principles and Design Standards of the Zoning Code.    Vote: 6 - 0 Carried   3.DISCUSSION AND POSSIBLE ACTION ON A REQUEST FOR A REVISION TO THE APPROVED CONCEPTUAL MODEL HOME ARCHITECTURE FOR A NEW RESIDENTIAL SUBDIVISION LOCATED NORTH OF MOORE ROAD AND EAST OF LA CANADA DRIVE ADJACENT TO LA CHOLLA AIRPARK       Senior Planner Hannah Oden provided a presentation that included the following: - Purpose - Location - Proposed option to Desert Modern elevations - Proposed color and material revision - Surrounding development - Summary and recommendation Jeff DeSpain with Fairfield Homes, provided a presentation that included the following: - Requested changes are response to homeowner requests - Revised color schemes - Images depicting individual differences on each plan for Desert Elevation Discussion ensued among the Commission and applicant.    Motion by Vice Chair Jacob Herrington, seconded by Commissioner Daniel Sturmon to approve the revision to the Conceptual Model Home Architecture for the Desert Modern elevations, based on the findings that the request complies with the Design Principles and Design Standards of the Zoning Code.    Vote: 6 - 0 Carried   4.PUBLIC HEARING: DISCUSSION AND POSSIBLE ACTION FOR PROPOSED CODE AMENDMENTS TO ALIGN AND CLARIFY STANDARDS IN THE MULTI-FAMILY ZONING DISTRICTS, CHAPTER 23, PROVISIONS FOR RECREATION AREA, CHAPTER 26, DEFINITIONS, CHAPTER 31 AND OTHER RELATED ITEMS       Principal Planner Milini Simms provided a presentation that included the following: - Purpose - Proposed code amendment - Define housing types - definitions include related industry terms - Align existing parking & design standards and clarify rec/open space standards - Align R-6 perimeter setbacks with adjacent uses - Clarify application of R-6 internal setbacks - General Plan compliance - Summary and recommendation Chair Gambill opened the public hearing. There were no speaker requests. Chair Gambill closed the public hearing. Discussion ensued among the commission and staff. Chair Gambill stated that she would like to add an amendment when a motion is made to include the housing types image graphics as presented, or similar graphics, as part of the code update.    Motion by Commissioner Joe Nichols, seconded by Commissioner Daniel Sturmon to recommend approval of the proposed code amendments to revise Chapter 23, multifamily standards, Chapter 26, provisions for recreation area standards, Chapter 31, definitions and other related sections based on the finding the code amendments are in conformance with the General Plan, and include the amendment as stated by Chair Gambill.    Vote: 6 - 0 Carried   PLANNING UPDATE (INFORMATIONAL ONLY) Principal Planner Michael Spaeth spoke on two upcoming neighborhood meetings and the next Commission meeting scheduled in July.     ADJOURNMENT    Motion by Vice Chair Jacob Herrington, seconded by Commissioner Daniel Sturmon to adjourn the meeting.    Chair Gambill adjourned the meeting at 7:01 p.m.     I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the Town of Oro Valley Planning and Zoning Commission of Oro Valley, Arizona held on the 7th day of June 2022. I further certify that the meeting was duly called and held and that a quorum was present. ___________________________ Jeanna Ancona Senior Office Specialist    Planning & Zoning Commission Special Session 2. Meeting Date:08/04/2022   Requested by: Bayer Vella, Community and Economic Development  Case Number: 2002761 SUBJECT: DISCUSSION AND POSSIBLE ACTION REGARDING A CONCEPTUAL SITE AND LANDSCAPE PLAN FOR A PROPOSED 64-LOT SUBDIVISION KNOWN AS NARANJA TRAILS, LOCATED SOUTH OF THE NARANJA DRIVE AND HIGHLANDS WASH INTERSECTION, APPROXIMATELY 1/4-MILE WEST OF N. FIRST AVENUE RECOMMENDATION: Staff recommends approval. EXECUTIVE SUMMARY: The purpose of this item is to consider a Conceptual Site and Landscape Plan (Attachments 1 and 2, respectively) for a proposed 64-lot residential subdivision located south of the Naranja Drive and Highlands Wash intersection, approximately 1/4-mile west of N. First Avenue as shown in blue below. Conceptual Site and Landscape Plans The proposed subdivision (shown at right) will be gated and incorporates:  64 single-family detached lots as permitted by a 1987 Pima County zoning action. Mix of 1- and 2-story buildings with a maximum height of 28 feet. The site sits substantially lower than the nearest subdivision (Pusch Ridge Vistas) to the east and will not impact existing viewsheds. Two access points: Full access onto Naranja Drive to the north and exit only on Shore Cliff Drive to the south. The subdivision has been designed to minimize impacts to surrounding slopes with engineered retaining walls and landscaped terraces where cuts (removal of dirt) were necessary. Pedestrian connections throughout the subdivision Regional drainage improvements in Highlands Wash that will help provide an improved drainage solution for the entire region. A portion of the property includes the Highlands Wash (one of the larger washes in Town in terms of annual water volume) which has been a focal issue for neighbors and staff for some time. The Wash extends both north and south of the property, eventually draining into the CDO south of Lambert Lane after passing through the Highlands Mobile Home Park. The proposed subdivision does not increase downstream flows or impacts. In fact, the design increases control of downstream flows. The existing drainage channel in the mobile home park have been insufficient to accommodate the amount of drainage coming through the wash, which has caused a number of lots to be within the 100-year floodplain. The regional drainage improvements proposed as part of this proposal are Phase 1 of a larger drainage solution for the area that will better control downstream flows and help remove these lots from the floodplain. The proposed Conceptual Landscape Plan includes landscaping in all disturbed areas, at least one (1) tree per front yard and hydroseeding the regional basin, as required per the River's Edge Planned Area Development (PAD). Additionally, the landscape plan includes enhanced landscaping surrounding the basin to help screen it from the view. Two neighborhood meetings were conducted regarding the applicant's requests. Both were well attended and questions focused on building heights, traffic and impacts to Highlands Wash, which have all been addressed in the proposed site plan. Neighborhood meeting summaries have been included as Attachment 3. The Town must ultimately approve a code compliant Conceptual Site Plan. This area and site was rezoned by Pima County in 1986. As a result, the subdivision and associated density is a permitted use. This review is focused on site design and compliance with Town's design principles and standards. BACKGROUND OR DETAILED INFORMATION: The purpose of this item is to consider a Conceptual Site and Landscape Plan for a proposed 64-lot  residential subdivision located south of the Naranja Drive and Highlands Wash intersection, approximately 1/4-mile west of N. First Avenue as shown in blue below at right. The subject property is located in the River's Edge Planned Area Development (PAD) which encompasses approximately 293-acres (area within black outline in image right). Prior to annexation in 1994, with several subdivisions within the PAD already under construction (Pusch Ridge Vistas I and II), a concept plan (shown below right) as part of the rezoning was approved by the Pima County Board of Supervisors for the remaining vacant parcels, including this one. This established the rezoning entitlement or property right, to develop the property as approved by the County.   If this were a rezoning in Oro Valley, development so close to Highlands Wash would not be allowed as the subject property includes Environmentally Sensitive Land categories (Critical Resource Area and Resource Management Area 1) that require high amounts of open space conservation. However, because the entitlement to develop and general design was approved by the County prior to annexation, a code compliant subdivision must be approved. There have been multiple development concepts proposed on this site over the years. The primary challenge is obvious. How does one safely and securely accommodate Highland Wash drainage for both adjacent and future homeowners? Staff has worked extensively with the applicant and the Highland Mobile Home Park HOA over the past few years to bring forth a regional drainage improvement. As a result, the proposed design does not increase downstream drainage and improves control of flows. This development does not exacerbate existing downstream drainage challenges in the area nor does it entirely alleviate current issues in the Mobile Home Park. The Town will continue to seek additional remedies, federal funding etc., to improve drainage challenges adjacent and within the Highlands Mobile Home Park.  Conceptual Site Plan The proposed subdivision will be gated and incorporates:    64 single-family detached lots Mix of 1- and 2-story buildings with a maximum height of 28 feet. The site sits substantially lower than the nearest subdivision (Pusch Ridge Vistas) to the east and will not have impacts on existing viewsheds. The subdivision has been designed to minimize impacts to surrounding slopes and has provided retaining walls and landscaped terraces where cuts (removal of dirt) were necessary. Two access points: Full access onto Naranja Drive to the north and exit only on Shore Cliff Drive to the south. Pedestrian connections throughout the subdivision Regional drainage improvement in Highlands Wash (more information provided below) Currently, the Highlands Wash (shown in red at right) handles one of the highest annual volumes of stormwater within the Town. In its natural (current) configuration, a number of lots within the Highlands Mobile Home Park to the south (built in 1960) are within the existing 100-year floodplain limits. While there is an existing stormwater drainage issue in the area, per Code, the applicant is not permitted to increase or decrease the amount of drainage leaving the property. The regional drainage concept included as part of the property owner's request, will not only meet this requirement, but it will also serve as the 1st of several improvements that will be needed to remove these existing homes from the floodplain. This concept includes a regional basin which will help stormwater flows percolate better into the existing soils and will better control the outflow of excess water into the existing built channel in the mobile home park. The property owner will be constructing the basin that will serve not only their property, but downstream properties in the region. Lastly, the property owner is proposing to dedicate the drainage basin to the Town for two reasons:  The improvements serve the downstream region and not just one development. Requiring a single development to maintain an improvement that serves a regional drainage function is an equity concern. When large scale improvements are maintained by a relatively small HOA, regular maintenance (sediment removal) is difficult to monitor and continue over a long period of time. With this in mind, the Town is much better suited to maintain the basin. In addition, the Town and Pima County already have maintenance responsibilities in upstream and downstream portions of Highlands Wash.  Town ownership and responsibility for maintenance is recommended to ensure it continues to function as designed. The 2nd and future improvement, enhancing this existing channel to facilitate flows to the CDO Wash to the south, is dependent upon Federal Grant monies the Town is seeking. These two improvements, when combined, will remove all Highlands Mobile Home Park homes from the existing floodplain and provide an improved drainage solution for the entire region. Finally, the subdivision is anticipated to produce a relatively low volume of traffic with the primary ingress/egress point off Naranja Drive  (Shore Cliff Drive restricted to egress only in response to neighbor concerns). The expected increase to Naranja Drive traffic does not meet the threshold for a new traffic signal or right-turn lane as both Naranja Drive and Shore Cliff Drive have sufficient capacity to handle the expected increase in traffic.  However, a left-turn lane is warranted and will be installed with the project. Conceptual Landscape Plan The proposed Conceptual Landscape Plan includes landscaping in all disturbed areas, at least one (1) tree per front yard and hydroseeding the regional basin, as required per the PAD. Additionally, the landscape plan includes enhanced landscaping surrounding the basin to help screen it from the view. All disturbed slopes within the basin will be treated with grouted rock that matches surrounding soil color or, where necessary due to slope, soil cement painted to match the same. The proposed Conceptual Landscape Plan is consistent with all code requirements. Conceptual Design Principles and Standards The proposed site and landscape plans are subject to the code requirements listed in the River's Edge PAD. Where the PAD is silent, the Conceptual Design Principles and Standards of the Zoning Code have been applied. Several key Principles or Standards applied are listed below (italics) followed by staff commentary: Location, orientation and size of structures shall promote a complementary relationship of structures to one another. The subdivision design includes lots that are complementary to one another and are consistent with the design of the original concept plan approved by Pima County. The proposed site plan is consistent with this standard. Significant cuts [removal of dirt] and fills [adding dirt] in relation to natural grade shall be avoided or minimized to the extent practical given property constraints As previously discussed, the site has been designed to avoid or minimize impacts to the existing slopes as much as possible. Where cuts were necessary, they include code required retaining walls and landscaped terraces to minimize impacts to neighbors.  Detention areas shall have natural appearance by using one or more of the following design standards:  a. Construct spillways with indigenous rock and natural materials b. Integrate retention areas into the Open Space Plan whenever possible and/or utilize as Riparian Habitat The site has been designed with the regional detention basin incorporated into the open space to help it function both as a drainage improvement and riparian habitat. Further, enhanced landscaping has been included to help screen the basin from surrounding properties, while the bottom will be hydroseeded to help it return to a native landscape. The proposed landscape plan are consistent with all applicable Design Principles and Standards. PUBLIC PARTICIPATION Two well attended neighborhood meetings were conducted regarding the property owners request where the focus included building heights, traffic and impacts to Highlands Wash. A brief summary addressing each of the primary neighbor concerns is provided below:  Building Heights - The site sits substantially lower than surrounding subdivisions to the east and west (see graphic below) and will have little to no impact on existing viewsheds of the Catalina Mountains.   1. Traffic - The applicant revised the site design to restrict the southern connection (Shore Cliff Drive) to exit only in an effort to address neighbor concerns during the 1st neighborhood meeting. The applicant provided a Traffic Impact Statement which indicates that Naranja Drive has ample capacity to handle the relatively minor increase in subdivision traffic. 2. Drainage  - As mentioned previously, Town Stormwater Utility staff have been aware of the ongoing drainage issues effecting this area for some time. Staff has been working with members of the Highlands Mobile Home Park Homeowners Association on the design and implications of the regional drainage concept for Highlands Wash. Again, when all phases area complete, all homes within Highlands Mobile Home Park will be removed from the 100-year floodplain. 3. Neighborhood meeting summaries have been included as Attachment 3. Staff has also received neighborhood correspondence that has been provided as Attachment 4.   FISCAL IMPACT: The property owner will be responsible for the initial construction of the basin and associated improvements (e.g. bank protection, soil cement, rock rip-rap, landscaping, maintenance access road, etc.). This represents a significant benefit for the Town as this area has long been experiencing drainage issues. The property owner is proposing to dedicate the basin (once complete) to the Town to regularly maintain. Staff recommends this approach as the Town is much better suited to keeping up the regular maintenance to ensure the basin functions as designed. This is expected to cost approximately $4,200 annually and will be part of the Stormwater Utilities regular operating budget. SUGGESTED MOTION: The Planning and Zoning Commission may wish to consider one of the following motions: I MOVE to recommend APPROVAL of the proposed Conceptual Site and Landscape Plan, based on a finding it is in conformance with the Design Principals and Design Standards of the Zoning Code. OR I MOVE to recommend DENIAL of the proposed Conceptual Site and Landscape Plan, based on a finding that it is ______________________. Attachments ATTACHMENT 1 - CONCEPTUAL SITE PLAN  ATTACHMENT 2 - CONCEPTUAL LANDSCAPE PLAN  ATTACHMENT 3 - NEIGHBORHOOD MEETING SUMMARIES  ATTACHMENT 4 - NEIGHBOR CORRESPONDENCE  NW COR SEC 12, T.12S., R.13E. FND 2" GENERAL LAND OFFICE MONUMENT STAMPED T12S R13E S2 S1 S12 1913 N. SHORE CLIFF DR. (PRIVATE)N. SHORE CLIFF DR. (PUBLIC) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 27 28 45 44 43 42 41 40 39 38 37 36 30 34 29 31 32 58 59 33 60 NARANJA DRIVE (PUBLIC) 35 46 47 48 49 50 51 52 53 54 55 56 5721 22 23 24 25 26 SANTILLAN MARTIN GAPN 224-28-157B,PAD: MELCORFINAL PLAT OF THE HIGHLANDS, BK 15, PG 21, P.C.R. PAD: MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 PAD: MELCOR PARCEL 1ADAVIS DEVEOPMENT &PROPERTIES LLCAPN 224-28-156B,OPEN SPACETOMBER FAMILY LPAPN 224-28-1550,PAD:MELCORDONNELLY F JAMES & PAMELAFAMILY REVOC TRAPN 224-28-1540PAD:MELCORFINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 RIORDAN GARY STUART APN 224-28-1530, PAD:MELCOR FINAL PLAT OF PUSCH RIDGE VISTAS, BK 55, PG 99, P.C.R PAD:MELCORSADEGHI ALE DAVIDAPN 224-28-156D,PAD:MELCORPIMA COUNTY FLOOD CONTROL DISTRICT APN: 224-01-0194B ZONING: PAD, MONTERRA HILLS PARCEL 3A DAVIS DEVELOPMENT & PROPERTIES LLC APN: 224-28-156H PARCEL 4 & 5 DAVIS DEVELOPMENT & PROPERTIES LLC APN: 224-28-156G & 224-28-156J PARCEL 6 "BLOCK 6" DAVIS DEVELOPMENT AND PROPERTIES LLC APN 224-03-3640 PARCEL 2 DAVIS DEVELOPMENT & PROPERTIES LLC APN:224-28-156F N89°20'16"E 2738.54' 61 62 63 64 JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-cs01.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc4700 E. SOUTHERN AVENUE MESA, AZ 85206 520.268.6322 13 JS D.ROBERTS TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 19000587NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 01 COVER SHEET ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA CONCEPTUAL SITE PLAN FOR NARANJA TRAILS 2002761 A PORTION OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST, OF THE GILA AND SALT RIVER BASE AND MERIDIAN, PIMA COUNTY, ARIZONA CIVIL ENGINEER ATWELL 4700 E. SOUTHERN AVENUE MESA, ARIZONA 85206 PHONE: (520-268-6322) CONTACT: FRANCIS HEMMAH FHEMMAH@ATWELL-GROUP.COM REGISTRATION #52508 BOUNDARY CENTERLINE EXISTING SECTION LINE PUBLIC UTILITY EASEMENT EASEMENT EXISTING EASEMENT EXISTING FENCEX EXISTING LOT EXISTING PUBLIC UTILITY EASEMENT EXISTING RIGHT OF WAY SIGHT VISIBILITY TRIANGLE : 25MPH 5 PAD & FINISHED FLOOR ELEVATION LOT NUMBER WATER VALVE SEWER MANHOLE LEGEND LINE TYPES PAD=17.5 FF=18.17 RIGHT OF WAY PROPOSED LOT 5 EXISTING PROPOSED PAD=17.5 FF=18.17 BC OR B/C BACK OF CURB CENTERLINECL ELEVATIONEL EXISTINGEX FINISH FLOORFF MANHOLEMH PROPERTY LINEPL PUBLIC UTILITY EASEMENTPUE RIGHT OF WAYR/W SEWERS or SWR SIDEWALKS/W TOP OF CURBTC WATERW EOP EDGE OF PAVEMENT ABBREVIATIONS SITE VISIBILITY TRIANGLESVT (AB)AS-BUILT ARIZONA DEPARTMENT OF TRANSPORTATIONADOT EASEMENTESMT FACE OF CURBFC PIMA COUNTY ASSOCIATION OF GOVERNMENTSP.A.G. STANDARDSTD RIP RAP STREET SIGN MAJOR CONTOUR MINOR CONTOUR 13 5 0 13 5 0 13 5 0 13 5 0 EXISTING SEWER LINEEX 8"S SEWER LINE SIDE SLOPE4:1 TEMPORARY DRAINAGE EASEMENT SEWER FLOW LINE 8"S PROPOSEDPROP WATER LINE 8"W 6 FINAL LOT NUMBER CA COMMON AREA 4:1 6 GRAPHIC SCALE 0100200 400200 1" = 200' CRITICAL RESOURCE AREA CATAGORY RIVERS EDGE PAD MAP NTS EXISTING Q100 FLOODPLAIN OWNER PREMIER BUILDING GROUP 3191 E. 44th STREET TUCSON, AZ 85713 CONTACT: ROD DAVIS PHONE: 520.293.0300 DEVELOPER: MERITAGE HOMES 5326 N. LA CHOLLA BLVD. TUCSON, AZ 85741 CONTACT: LISA HOSKIN PHONE: 520.225.6853 EXISTING 15% SLOPE Sheet List Table Sheet Number Sheet Title 01 COVER SHEET 02 NOTES 03 DEDICATION MAP 04 HORIZONTAL CONTROL 05 DETAILS 06 DETAILS 07 DETAILS 08 SITE PLAN 09 SITE PLAN 10 SITE PLAN 11 SITE PLAN 12 SITE PLAN 13 SITE PLAN 12 12 11 NARANJA DR THIS PROJECT CANADA DEL WASH ORO HIGHLAND WASH BK55/PG99 BK58/PG70 BK62/PG37 BK42/PG30 BK47/PG10 BK45/PG22 BK26/PG21 BK25/PG59 BK56/PG11 BK27/PG99 BK41/PG43 BK15/PG21 BK25/PG79 BK59/PG71 BK47/PG41 BK46/PG32 BK47/PG58 UNSUBDIVIDED N. SHORE CLIFF DR.UNSUBDIVIDED VICINITY MAP NTS SECTION 12 TOWNSHIP 12 SOUTH RANGE 13 EAST PROPOSED BUILDING ENVELOPE PROPOSED Q100 FLOODPLAIN PRV PRESSURE REDUCING VALVE*SUGGESTED DRIVEWAY LOCATION 06.09.2022APPROXIMATE SUBJECT PROPERTY BOUNDARY JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-nt02.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 02 GENERAL NOTES ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GENERAL NOTES 1.GROSS AREA: 58.015 ACRES OR 2,527,152 SF± 2.RESIDENTIAL UNITS PER ACRE = 1.10 3.RESIDENTIAL LOTS: 64 4.TOTAL MILES OF NEW PUBLIC STREET IS 0.1 5.TOTAL MILES OF NEW PRIVATE STREETS IS 0.44 6.ASSURANCES FOR WATER SERVICE, SITE STABILIZATION AND LANDSCAPING MUST BE POSTED PRIOR TO THE ISSUANCE OF GRADING PERMITS PLANNING GENERAL NOTES 1.MAXIMUM ALLOWED BUILDING HEIGHT: 25' MAX AND NOT TO EXCEED 2 STORIES. 2.NO PROPOSED LOTS ARE AFFECTED BY CRITICAL/SIGNIFICANT RESOURCE AREAS. 3.MINIMUM LOT SITE: 6,598 SF (LOT 33) 4.TOTAL AMOUNT OF OPEN SPACE REQUIRED: 334,402 SF 5.TOTAL AMOUNT OF OPEN SPACE PROVIDED: 1,860,291 SF 6.TOTAL AMOUNT OF LANDSCAPED COMMON AREAS: 572,302 SF 7.OPEN SPACE TO REMAIN AS NATURAL OPEN SPACE: 1,287,989 SF 8.BUILDING SETBACKS REQUIRED: 15' FRONT MINIMUM, NO REQUIRED SIDE YARD EXCEPT WHEN ADJACENT TO A STREET (10') AND A 15' MINIMUM REAR YARD. 9.ALL OPEN SPACE AND COMMON AREAS WILL BE OWNED AND MAINTAINED BY THE HOA. 10.THE EXISTING ZONING FOR THIS DEVELOPMENT IS: PAD: RIVER'S EDGE (MELCOR): CR-2 11.ALL SIGNAGE AND LIGHTING TO BE ADDRESSED AS PART OF A SEPARATE REVIEW AND APPROVAL PROCESS 12.ALL NAMING AND SIGNAGE OF STREETS SHALL CONFORM TO PIMA COUNTY'S ADDRESSING ORDINANCE AND POLICIES, SECTIONS 18.83.060 THROUGH 18.83.080. ENGINEERING GENERAL NOTES 1.DESIGN SPEED IS 25 MPH. THE DESIGN VEHICLE IS SU-30. 2.ALL NEW PUBLIC ROADS WITHIN AND ADJACENT TO THIS PROJECT WILL BE CONSTRUCTED IN ACCORDANCE WITH APPROVED PLANS. SEPARATE PUBLIC IMPROVEMENT AND CONSTRUCTION PLANS WILL BE SUBMITTED TO THE TOWN ENGINEER’S OFFICE FOR REVIEW AND APPROVAL. 3.ANY RELOCATION OR MODIFICATION OF EXISTING UTILITIES AND/OR PUBLIC IMPROVEMENTS NECESSITATED BY THE PROPOSED DEVELOPMENT WILL BE AT NO EXPENSE TO THE PUBLIC ORO VALLEY WATER UTILITY GENERAL NOTES 1.THIS DEVELOPMENT MUST COMPLY WITH THE ORO VALLEY WATER UTILITY SPECIFICATIONS MANUAL DURING ALL PHASES OF CONSTRUCTION 2.THIS PROJECT WILL BE SERVED BY ORO VALLEY WATER UTILITY WHICH HAS BEEN DESIGNATED AS HAVING AN ASSURED 100 YEAR WATER SUPPLY BY THE DIRECTOR OF WATER RESOURCES. ANY AND ALL WELLS MUST BE ABANDONED PER ADWR REGULATIONS 3.A LINE EXTENSION AGREEMENT MUST BE IN PLACE PRIOR TO ANY WORK ON THE WATER INFRASTRUCTURE FOR THIS PROJECT BEGINS. 4.ORO VALLEY WATER UTILITY WILL BE THE WATER SERVICE PROVIDER GENERAL UTILITY GENERAL NOTES 1.SHOULD AN EASEMENT BE IN CONFLICT WITH ANY PROPOSED BUILDING LOCATION, VACATION OF THE EASEMENT IS TO OCCUR PRIOR TO ISSUANCE OF BUILDING PERMITS. 2.ALL DRAINAGE STRUCTURES SHALL BE INSPECTED AND A SUMMARY REPORT PREPARED AT A MINIMUM OF ONCE EACH YEAR IN ACCORDANCE WITH THE PROCEDURES IN THE APPROVED DRAINAGE REPORT. COPIES OF THE ANNUAL INSPECTION REPORTS SHALL BE MADE AVAILABLE TO THE TOWN UPON REQUEST. 3.ALL DRAINAGE STRUCTURES SHALL BE INSPECTED AND A SUMMARY REPORT PREPARED BY AN ARIZONA REGISTERED CIVIL ENGINEER A MINIMUM OF ONCE EACH FIVE YEARS IN ACCORDANCE WITH THE PROCEDURES IN THE APPROVED DRAINAGE REPORT. COPIES OF THE 5-YEAR ANNUAL INSPECTION REPORTS SHALL BE MADE AVAILABLE TO THE TOWN UPON REQUEST. THE REPORT SHALL IDENTIFY THE MAINTENANCE NEEDS FOR THE NEXT 5-YEAR PERIOD, INCLUDING ANTICIPATED ANNUAL COSTS OF MAINTENANCE AND REPAIR. GOLDER RANCH FIRE GENERAL NOTES 1.FIRE HYDRANTS CONNECTED TO AN APPROVED WATER SUPPLY OF 1500 GPM FOR FIRE PROTECTION MUST BE INSTALLED AND IN SERVICE PRIOR TO COMBUSTIBLE MATERIAL DELIVERY TO THE SITE. TEMPORARY CONSTRUCTION OFFICE TRAILERS ARE CONSIDERED COMBUSTIBLE MATERIAL. 2.APPROVED FIRE APPARATUS ACCESS ROADS MUST BE INSTALLED AND IN SERVICE PRIOR TO COMBUSTIBLE MATERIAL DELIVERY TO THE SITE” 3.AUTOMATIC FIRE SPRINKLERS ARE REQUIRED IN ALL NEWLY CONSTRUCTED COMMERCIAL BUILDINGS. RESIDENTIAL FIRE SPRINKLERS ARE REQUIRED IN A NEWLY CONSTRUCTED HOME OF 3600 SQUARE FEET OR LESS WHEN THE REQUIRED FIRE FLOW OF 1000GPM IS NOT WITHIN 600 FEET OF THE HOME. HOMES OF 3601+ SQUARE FEET SHALL BE PROVIDED WITH RESIDENTIAL FIRE SPRINKLERS WHEN THE REQUIRED FIRE FLOW PRESCRIBED BY IFC TABLE B105.1 IS NOT AVAILABLE WITHIN 600 FEET OF THE HOME. ALL HOMES, REGARDLESS OF SIZE, WITHIN A SUBDIVISION OF 30 LOTS OR MORE SHALL BE PROVIDED WITH RESIDENTIAL FIRE SPRINKLERS WHEN THERE IS ONLY ONE FIRE APPARATUS ACCESS POINT AVAILABLE TO THE SUBDIVISION. 4.TEMPORARY STREET SIGNS MUST BE INSTALLED AT EACH STREET INTERSECTION WHEN CONSTRUCTION OF NEW ROADWAYS ALLOWS PASSAGE OF VEHICLES. ALL STRUCTURES UNDER CONSTRUCTION MUST BE CLEARLY IDENTIFIED WITH AN APPROVED ADDRESS 5.THE INSTALLATION OF TRAFFIC CONTROL SIGNALING DEVICES AND/OR ELECTRICALLY OPERATED GATES ON FIRE APPARATUS ACCESS ROADS SHALL INCLUDE PREEMPTIVE CONTROL EQUIPMENT COMPATIBLE WITH THE FIRE DEPARTMENT’S EXISTING SYSTEM PERMITTING DIVISION - BUILDING CODES ·THE FOLLOWING CODES AND STANDARDS SHALL BE APPLICABLE TO THIS DEVELOPMENT: ·INTERNATIONAL BUILDING CODES WITH LOCAL AMENDMENTS ·NATIONAL ELECTRICAL CODE ·ADA STANDARDS FOR ACCESSIBLE DESIGN ·GOLDER RANCH FIRE DISTRICT STANDARDS AND FORMS ·TOWN OF ORO VALLEY POOL CODE ·PAG STANDARD SPECIFICATIONS AND DETAILS FOR PUBLIC IMPROVEMENTS ·TOWN OF ORO VALLEY DRAINAGE CRITERIA MANUAL ·TOWN OF ORO VALLEY SUBDIVISION STREET STANDARDS AND POLICIES MANUAL ·TOWN OF ORO VALLEY ZONING CODE, CURRENT REVISED ·ORO VALLEY TOWN CODE, CURRENT REVISED PAD CONDITIONS 1.ALL DEVELOPMENT DESIGN PROPOSALS SHALL COMPLY WITH OR EXCEED PIMA COUNTY LANDSCAPING, PARKING, GRADING AND HDZ ORDINANCES, AS APPLICABLE. 2.NO BUILDING NORTH OF LAMBERT LANE SHALL EXCEED 24 FEET IN-HEIGHT ABOVE FINISHED GRADE. 3.BUILDING WALLS, EXCEPT FOR TRIM, SHALL BE MASONRY OR STUCCO IN EARTHTONE COLORS, AND MAJOR ELEMENTS SHALL NOT HAVE A SMOOTH TEXTURE. REFLECTIVITY SHALL BE LESS THAN 80 PERCENT. BUILDING DESIGN SHALL BE FOUR-SIDED TO PROVIDE VARYING PLANES, INTERPLAY OF LIGHT AND SHADOW, ALTERNATING TEXTURES AND VISUAL INTEREST. EXPOSED WOOD SHALL BE STAINED OR PAINTED. EXTERIOR APPEARANCES SHALL BLEND WITH THE NATURAL SURROUNDINGS AND THE LANDSCAPING. COLORS OTHER THAN EARTHTONES SHALL BE APPLIED ONLY TO LIMITED AREAS AND SHALL BE SUBJECT TO DESIGN REVIEW COMMITTEE APPROVAL. NATURAL CLAY TILE ROOFS, ALTERNATIVE ROOFING MATERIALS HAVING BULK, TEXTURE AND SUBDUED TONE, AND SPECIAL ROOFING MATERIALS HAVING UNIQUE ARCHITECTURAL APPLICABILITY SHALL BE ENCOURAGED AND SHALL BE USED AS ROOF ELEMENTS RATHER THAN AS DECORATION. ROOF PITCH SHALL NOT EXCEED 6 IN PARAPET ROOFS SHALL BE CONTINUOUS AROUND THE ROOF PERIMETER. WHITE OR REFLECTIVE ROOFS ARE PROHIBITED. MATERIALS, COLORS AND TEXTURES SHALL BE COMPATIBLE WITH ARCHITECTURAL FORM; I.E., NO BIZARRE OR COMMERCIAL "THEME" BUILDINGS WILL BE PERMITTED. 4.ALL MECHANICAL EQUIPMENT, LOADING AREAS, STORAGE AREAS AND TRASH COLLECTION AREAS SHALL BE SHIELDED FROM VIEW BY ARCHITECTURAL DESIGN, FENCING, WALLS OR LANDSCAPING. RECEIVING OR TRANSMITTING ANTENNAE, EXCEPT CUSTOMARY ROOFTOP TV/RADIO ANTENNAE OR FULLY SCREENED DISH ANTENNAE, SHALL BE PROHIBITED. STORAGE OF RECREATION VEHICLES INCLUDING BOATS AND TRAILERS IS PROHIBITED. 5.LIGHTING OF BUILDINGS, GROUNDS AND PARKING AREAS SHALL BE SUBJECT TO THE FOLLOWING: A.MAXIMUM WATTAGE - 150 WATT HIGH PRESSURE SODIUM B.MAXIMUM HEIGHT OF STANDARD - 20 FEET C.MAXIMUM HEIGHT OF STANDARD AT PERIMETER - 14 FEET D.TYPE OF STANDARD - DOWN-THROW E.TYPE OF STANDARD AT PERIMETER - HOUSE SIDE SHIELD, SHARP CUT-OFF, FORWARD-THROW F.AVERAGE LEVEL OF ILLUMINATION - ONE-HALF FOOT-CANDLE G.MINIMUM LEVEL OF ILLUMINATION - ONE-FOURTH AVERAGE THERE SHALL BE NO NIGHT LIGHTING IN ANY DESIGNATED BUFFER AREA. 6.THE DISTURBED SHOULDERS OF LAMBERT LANE SHALL BE RE-LANDSCAPED BY SEEDING WITH NATIVE GRASSES AND WILDFLOWERS. ANY NON-DEVELOPMENT AREAS DISTURBED TEMPORARILY DURING CONSTRUCTION SHALL BE RE-LANDSCAPED/RESEEDED.06/09/2022 N. SH O R E C L I F F D R . ( P R I V A T E )N. SHORE CLIFF DR. (PUBLIC)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 27 28 454443 42 41 4039 38 37 36 30 34 29 31 32 58 59 33 60 NARANJA DRIVE (PUBLIC)35 46 47 48 49 50 51 52 53 54 55 56 57 21 22 23 24 25 26 SANTILLAN MARTIN G APN 224-28-157B,PAD: MELCOR FINAL PLAT OF THE HIGHLANDS,BK 15, PG 21, P.C.R.PAD: MELCORFINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 PAD: MELCOR PARCEL 1A DAVIS DEVEOPMENT & PROPERTIES LLC APN 224-28-156B, OPEN SPACE TOMBER FAMILY LP APN 224-28-1550, PAD:MELCORDONNELLY F JAMES & PAMELA FAMILY REVOC TR APN 224-28-1540 PAD:MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 RIORDAN GARY STUART APN 224-28-1530, PAD:MELCOR FINAL PLAT OF PUSCH RIDGE VISTAS, BK 55, PG 99, P.C.R PAD:MELCOR SADEGHI ALE DAVID APN 224-28-156D,PAD:MELCOR PIMA COUNTY FLOOD CONTROL DISTRICT PARCEL 3A DAVIS DEVELOPMENT & PROPERTIES LLC APN: 224-28-156H PARCEL 4 & 5 DAVIS DEVELOPMENT & PROPERTIES LLC APN: 224-28-156G & 224-28-156J PARCEL 6 "BLOCK 6" DAVISDEVELOPMENT ANDPROPERTIES LLCAPN 224-03-3640PARCEL 2 DAVIS DEVELOPMENT & PROPERTIES LLC APN:224-28-156F L18 L20 L21 L22 L2 3 L24 L2 5 L26 L2 7 L28 L2 9 L30 L3 1 L32 L3 3 L34 L3 5 L36 L37 L38 L39 L40 L41 L42 L43 L45 L46 L47 L48 L49 L50 L51 L52 L53L54L55L56L57 L58L59L 6 0L61L62L63L64L65L66 L67L68L69L70L71L72L1 L 2 L3 L4L5 L6 L7 L8 L9 L10 L11 L13 L15 L17 L12L14L16L19 L44 61 62 63 64 LINE DATA LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 BEARING S0°33'47"E S41°25'18"W S0°33'47"E N77°00'09"W S12°59'51"W S77°00'09"E S12°59'51"W S29°32'51"E S12°59'51"W S77°00'09"E S12°59'51"W S77°00'09"E S12°59'51"W S77°00'09"E S12°59'51"W S77°00'09"E S12°59'51"W S10°33'22"W S12°59'51"W S77°00'09"E S12°59'51"W S63°25'19"E S26°34'41"W S63°25'19"E S26°34'41"W S13°03'21"E S26°34'41"W S63°25'19"E S26°34'41"W S63°25'19"E S26°34'41"W S63°25'19"E S26°34'41"W S63°25'19"E S26°46'51"W S0°52'59"E S18°10'40"W S72°51'11"E S18°19'53"W S15°06'19"W DISTANCE 93.61' 103.10' 120.00' 49.06' 55.00' 13.27' 55.00' 27.15' 55.00' 18.59' 55.00' 26.15' 55.00' 35.11' 55.00' 33.29' 110.00' 20.02' 110.00' 14.09' 55.39' 37.17' 55.00' 12.15' 55.00' 25.97' 55.00' 12.15' 55.00' 12.15' 55.00' 12.15' 55.00' 12.40' 71.99' 49.71' 55.01' 2.54' 220.48' 68.07' LINE DATA LINE # L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L52 L53 L54 L55 L56 L57 L58 L61 L62 L63 L64 L65 L66 L67 L68 L69 L70 L71 L72 BEARING S8°52'20"W S4°36'57"W S0°21'35"W S5°53'01"E S12°07'36"E S18°22'12"E S24°25'29"E S26°33'35"E S26°33'56"E S26°48'37"E S31°07'27"E S37°06'59"E S41°56'47"E S46°46'30"E S52°46'17"E S89°10'27"W S0°38'05"E S89°10'27"W N89°10'27"E N0°34'35"W S85°52'54"E N23°23'40"E N2°19'52"W N1°26'07"E N13°46'53"W N10°04'58"E N10°17'09"W N79°43'17"E N16°12'23"E N89°20'13"E DISTANCE 68.07' 24.75' 68.07' 68.07' 68.07' 68.07' 65.61' 55.00' 55.00' 58.26' 67.57' 67.49' 41.07' 67.49' 82.70' 681.71' 100.00' 775.41' 516.54' 1214.69' 293.53' 39.95' 176.20' 130.22' 155.93' 159.31' 51.20' 101.64' 682.00' 252.92' JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-bs03.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 03 DEDICATION MAP ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 050100 200100 1" = 100' LAND TO BE DEDICATED TO THE TOWN OF ORO VALLEY AREA = 1,287,997.7 SQFT = 29.57 AC 06/09/2022 23.81'7.08'6.85'11.64'12.00'7.48'1.03'5.10'75'11.0'11.0'11.00'11.00'11.00'11.00'30.00'12.00'6'11.00'11'24.00'33.20'6.00'11.00'11.00'13.24'7.00'5.72'0.51'14.97'UPPER HIGHLAND WASH END CONTROL PER SCE ENGINEERING'S HIGHLAND WASH CHANNEL & BASIN IMPROVEMENTS HORIZONTAL GEOMETRY PLAN STA: 29+00.00 N=511,929.1845 E=991,242.6989 UPPER HIGHLAND WASH BEGIN CONTROL PER SCE ENGINEERING'S HIGHLAND WASH CHANNEL & BASIN IMPROVEMENTS HORIZONTAL GEOMETRY PLAN STA: 14+90.00 N=510,519.5497 E=991,257.2989 N. SHORE CLIFF DR.N. SHORE CLIFF DR. (PUBLIC) NARANJA DRIVE (PUBLIC) FINAL PLAT OF THE HIGHLANDS, BK 15, PG 21, P.C.R. PAD: MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 PAD: MELCOR TOMBER FAMILY LP APN 224-28-1550, PAD:MELCOR DONNELLY F JAMES & PAMELA FAMILY REVOC TR APN 224-28-1540 PAD:MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. R1-144 RIORDAN GARY STUART APN 224-28-1530, PAD:MELCOR FINAL PLAT OF PUSCH RIDGE VISTAS, BK 55, PG 99, P.C.R PAD:MELCOR SANTILLAN MARTIN G APN 224-28-157B,PAD: MELCOR SADEGHI ALE DAVID APN 224-28-156D,PAD:MELCOR N89°20'13"E 2639.21' 2283.94'296.40'L1C1L2C2L3C3C4L5L4 C5C6L7 L8C 7L6(PRIVATE)L11 L12 L13 C11C10 L20 L19L18C9 L17429.43'F21 F22 F23 F24 F25 F26 F27F28F29F30F31 F32 F33F34F35 F36F37F38F39 F40 F41 F42 F43 F44F45F46F47 F48 F49F50F51 F52 F 5 3 F54F5 5F56F57 F58 F59 F60 F61 F62F63F64F65F66F67F68 F69 F70 F71F72F73F74 F75 F76F77 F78 F79 F80 F81 F82 F83 F84 F85 F86 F87 F88 F89F90 F91 F92 F93 F94 F95 F96 F97 F98F99F100F101 F102F103 F104F105 F106F107 F108F109 F110 F111 F112 F113 F114 F115 F116 F117 F118 F119 F120 F121 F122 F123F124 F125 F126 F127 F128 F129 F130 F131F132 F133F134F135 F136 F137 F138 F139 F140 F141F142 F143F144 F145F146 F147F148 F149F15 0 F151 F152F153 F154F155 F156F157 F158 F159 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 77.43'N89°10'27"E 1714.28'N89°10'27"E 236.95' N89°10'27"E 4.57' L183 C16 L185C17L187 L188 PARCEL 6 "BLOCK 6" DAVIS DEVELOPMENT AND PROPERTIES LLC APN 224-03-3640 S00°38'05"E 100.00' S89°10'27"W 134.64' N89°12'37"E 133.69' C22 C23 C24 C25 L202 L203 L204 L205 NW COR SEC 12, T.12S., R.13E. FND 2" GENERAL LAND OFFICE MONUMENT STAMPED T12S R13E S2 S1 S12 1913 W 1 4 COR SEC 12, T.12S., R.13E. FND 2" GENERAL LAND OFFICE MONUMENT STAMPED S11 S12 1913BASIS OF BEARINGS00°32'11"E2640.20'CENTER LINE CURVE DATA CURVE # C1 C2 C3 C4 C5 C6 C7 LENGTH 93.51' 93.20' 186.24' 309.29' 74.36' 374.47' 555.46' RADIUS 181.00' 181.00' 480.00' 480.00' 1000.00' 480.00' 500.00' DELTA 29°36'04" 29°30'14" 22°13'49" 36°55'09" 4°15'37" 44°41'55" 63°39'03" CENTER LINE DATA LINE # L1 L2 L3 L4 L5 L6 L7 L8 BEARING S0°39'47"E S28°56'17"W S0°33'57"E S78°36'49"E S14°07'23"W S18°23'00"W S83°51'06"E S26°33'56"E DISTANCE 100.00' 100.00' 134.22' 25.00' 576.64' 200.43' 25.00' 163.13' HIGHLAND WASH HORIZONTAL CONTROL LINE DATA LINE # L13 L17 L18 L19 L20 L183 L185 L187 L188 L202 L203 L204 L205 BEARING S73°42'26"E N1°05'15"W N3°09'15"E N0°49'13"W N1°09'04"W N69°14'28"W S33°09'24"W S35°58'41"E S43°57'13"E S38°44'22"E S48°27'12"E S41°56'47"E S89°10'27"W DISTANCE 75.53' 741.14' 102.77' 506.86' 67.14' 120.08' 207.56' 104.12' 118.48' 37.51' 16.50' 52.32' 68.58' HIGHLAND WASH HORIZONTAL CONTROL CURVE DATA CURVE # C9 C16 C17 C22 C23 C24 C25 LENGTH 59.22' 83.79' 630.23' 69.94' 22.35' 51.40' 31.51' RADIUS 800.00' 60.78' 857.22' 50.00' 15.00' 50.00' 25.00' DELTA 4°14'30" 78°59'35" 42°07'26" 80°08'49" 85°21'41" 58°53'58" 72°13'16" PROPOSED FLOODPLAIN LINE DATA LINE # F21 F22 F23 F24 F25 F26 F27 F28 F29 F30 F31 F32 F33 F34 F35 F36 F37 F38 F39 F40 BEARING N7°56'07"E N85°44'18"W N54°50'50"W N77°32'56"E N88°18'15"E N61°28'03"E N33°55'15"W N12°24'27"W N18°27'47"E N2°16'00"E N0°05'44"W N0°17'35"W N3°28'28"E N18°07'58"E N64°15'09"E N4°27'58"E N7°42'50"W N9°47'59"E N57°19'18"E N64°50'11"E DISTANCE 10.66' 110.18' 29.20' 44.93' 95.04' 36.64' 30.13' 81.91' 152.87' 180.14' 75.00' 110.00' 105.19' 67.48' 33.31' 26.49' 138.76' 27.91' 37.79' 33.15' PROPOSED FLOODPLAIN LINE DATA LINE # F41 F42 F43 F44 F45 F46 F47 F48 F49 F50 F51 F52 F53 F54 F55 F56 F57 F58 F59 F60 BEARING N45°05'23"E N71°50'03"E N53°16'10"E N21°42'27"E N6°12'18"W N11°02'39"W N14°12'17"E N0°15'15"W N17°21'14"E N28°53'21"E N26°54'36"E N2°59'15"W N45°19'53"W N79°37'21"W N38°57'52"W N8°48'02"W N0°02'28"W N12°36'32"E N0°13'44"E N7°31'51"W DISTANCE 28.24' 10.52' 23.12' 127.49' 52.62' 40.95' 41.26' 77.50' 78.58' 39.97' 83.55' 25.18' 78.74' 15.44' 42.07' 65.79' 43.97' 46.03' 41.07' 80.62' PROPOSED FLOODPLAIN LINE DATA LINE # F61 F62 F63 F64 F65 F66 F67 F68 F69 F70 F71 F72 F73 F74 F75 F76 F77 F78 F79 F80 BEARING N23°21'31"E N21°28'34"E N4°28'02"E N15°42'31"E N2°17'26"E N17°01'53"E N40°02'38"E N8°47'25"E N23°38'23"E N0°13'13"W N24°22'35"E N6°52'21"E N31°46'05"E N29°02'44"E N55°40'14"E N39°46'20"E N80°48'10"E N89°50'33"E S89°00'39"E S25°02'30"E DISTANCE 30.75' 33.72' 40.12' 20.78' 25.02' 38.73' 20.21' 96.72' 37.56' 32.50' 21.96' 37.61' 56.98' 76.53' 83.89' 75.91' 38.97' 13.88' 46.22' 26.28' PROPOSED FLOODPLAIN LINE DATA LINE # F81 F83 F84 F85 F86 F87 F88 F89 F90 F91 F92 F93 F94 F95 F96 F97 F98 F99 F100 F101 BEARING S40°09'22"E S11°11'42"E S27°40'31"E S32°58'45"W S6°19'28"W S5°25'51"E S56°13'39"W N76°01'52"W S79°51'55"W S48°15'09"W S18°04'55"W S5°00'02"W S19°09'44"E S8°17'50"W S57°18'55"W S5°28'00"W S20°51'51"W S19°18'20"W S9°48'59"E S29°26'29"W DISTANCE 39.25' 61.16' 19.03' 18.65' 75.46' 17.83' 6.02' 12.88' 12.70' 22.20' 65.75' 12.55' 26.47' 15.16' 17.04' 25.91' 63.69' 74.68' 96.41' 37.32' PROPOSED FLOODPLAIN LINE DATA LINE # F102 F103 F104 F105 F106 F107 F108 F109 F110 F111 F112 F114 F115 F116 F117 F118 F119 F120 F121 F122 BEARING S11°05'29"W S13°49'43"E S7°24'03"W S8°58'33"W S0°31'19"E S3°36'18"W S9°23'27"W S19°17'24"W S26°56'45"E S15°26'23"E S44°08'47"E N78°49'40"E N27°41'18"E N59°19'12"E S16°11'29"W S3°34'35"W S18°01'35"E S18°31'25"W S27°08'07"E S26°58'22"W DISTANCE 104.45' 34.52' 51.92' 27.84' 78.89' 48.71' 32.94' 23.84' 33.65' 40.85' 25.22' 25.48' 14.26' 9.74' 26.00' 7.51' 24.94' 38.26' 14.05' 39.27' PROPOSED FLOODPLAIN LINE DATA LINE # F123 F124 F125 F126 F127 F128 F129 F130 F131 F132 F133 F134 F135 F136 F137 F138 F139 F140 F141 F142 BEARING S81°38'57"W S71°30'22"W S24°40'43"W S3°13'10"W S7°51'45"W S9°55'34"E S75°44'21"E S0°14'19"W S16°08'04"W S18°11'25"W S16°17'25"W S15°49'50"W S17°53'46"W S6°03'54"W S15°55'47"W S4°17'21"W S9°55'34"W S28°21'18"W S8°21'53"W S1°15'11"W DISTANCE 34.43' 167.82' 12.95' 20.03' 53.00' 17.77' 7.74' 7.50' 36.44' 41.64' 35.65' 42.84' 31.53' 10.06' 31.20' 10.03' 35.53' 2.24' 48.55' 20.00' PROPOSED FLOODPLAIN LINE DATA LINE # F143 F144 F145 F146 F147 F148 F149 F150 F151 F152 F153 F154 F155 F156 F157 F158 F159 BEARING S0°42'58"W S0°50'08"E S7°49'45"E S8°51'14"E S13°44'21"E S47°09'57"E S31°40'02"E S37°34'54"E S41°02'33"E S18°38'58"E S29°46'04"W S5°26'44"E S19°30'09"E S17°01'51"W S42°20'31"W S16°18'38"W S62°43'43"E DISTANCE 40.00' 90.01' 35.33' 65.78' 64.34' 23.10' 49.11' 116.72' 56.35' 58.05' 38.77' 49.07' 39.78' 38.52' 21.20' 25.59' 13.61' JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-hc04.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 04 HORIZONTAL CONTROL ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 080160 320160 1" = 160'06/09/2022 JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-dt05.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 05 DETAILS ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA STREET GRADEWEDGE CURB EDGE OF PAVEMENT9'HP=PE HP=PE HP=PE PAD ELEV. = PE PAD ELEV. = PE PAD ELEV. = PE 1.0%MIN1.0%MIN1.0%MIN1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%VARIESVARIESVARIESHINGE POINTHINGE POINTHINGE POINT BSLBSLBSL ROW SIDEWALK ROW PROPERTY CORNER TC +0.14' PROPERTY CORNER TC +0.14' 1 TYPE "A" LOT GRADING NOTE: 1.NO WALLS AND/OR GATES SHALL BE CONSTRUCTED ACROSS THE REAR YARD UNTIL THE FINAL LOT GRADING HAS BEEN ESTABLISHED TO MEET THE 1% MIN. DRAINAGE REQUIREMENTS. OUTLET INVERTS SHALL BE DESIGNED TO MEET THE FINAL GRADES. 2.SEE PLAN FOR STREET GRADE DIRECTION. LOT LINE LOT SCREEN WALL PAD PER PLAN PAD PER PLAN2'MINRETAINING WALL BY OTHERS REQUIRED ON 2 FEET AND OVER GRADE DIFFERENCE 2 LOT TO LOT SECTION 2' MIN OVERBUILD 2' MIN OVERBUILD 1:1 MAX LOT 45 LOT 44 2.5'-3' RETAINING WALL 1 : 1 M A X 3 CHANNEL SECTION 1 NTSLOT 44 - 45 4' 2' MIN OVERBUILD 2' MIN OVERBUILD 1:1 MAX LOT 50 3.5'-4' RETAINING WALL 1 : 1 M A X 4 CHANNEL SECTION 2 NTSLOT 50 - 51 LOT 51 2'-2.5' RETAINING WALL 2' MIN OVERBUILD 2' MIN OVERBUILD 1:1 MAX LOT 56 2.5'-2.8' RETAINING WALL 1 : 1 M A X 5 CHANNEL SECTION 3 NTSLOT 56 - 57 LOT 57 1.6'-1.8' RETAINING WALL SLOPE PROTECTION PER DTL G/06 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. SLOPE PROTECTION PER DTL G/06 4'8'4' DUMPED RIP-RAP 4' SLOPE PROTECTION PER DTL G/06 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. SLOPE PROTECTION PER DTL G/06 4'8'4' DUMPED RIP-RAP 4' SLOPE PROTECTION PER DTL G/06 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. 1' X1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. SLOPE PROTECTION PER DTL G/06 4'8'4' DUMPED RIP-RAP NTS NTS 06/09/20222:16 CHANNEL SECTION NTS 3' 6'16'6' MIRAFI FILTER FABRIC TYPE 140N TOP OF SLOPE EXIST. OR DESIGN GRADE 18" 2 : 112"18"12"FINISHED GRADE SLOPE PROTECTION PER DTL G, SHEET 6 DUMPED RIP-RAP D50=6" 0.62' Q100=72.4 CFS SLOPE=5.3% V=6.7 FPS D=0.62' C B PROPOSED NARANJA DRIVE STREET SECTION OVERLAID ON TOP OF THE EXISTING STREET SECTION D EXISTING NARANJA DRIVE STREET SECTION 11'2' 4' S/W 2' ℄ 50' COMMON AREA 'A' 1.5%1.5%VARIESVARIES 2.5" AC OVER 6" ABC 4' WIDE CONC. SIDEWALK PER PAG STD DET. 200 A PROPOSED TYPICAL ROADWAY CROSS SECTION JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-dt06.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 06 DETAILS ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA ±1' ℄ ±6' SHLDR ±13' CONCRETE SLOPE ±6' CLEAR ℄ ±7'±5.5' SHLDR ±11.25' TL ±11.25' TL ±6' SHLDR ±15'18.5' ±0.5' 75' R/W℄ 6' SHLDR NORTH SHORE CLIFF DR. EXISTING NARANJA DRIVE STREET SECTION NARANJA DRIVE LOCAL STREET 15' 740' 15' 580' E SITE VISIBILITY TRIANGLE 50 MPH DESIGN SPEED NTS EXTEND TOE-DOWN TO MAX ANTICIPATED SCOUR DEPTH (REFER TO PLANS) CONSTRUCT 2"X4" KEY EXTEND REBAR MIN, 12" ABOVE KEY, BEND REBAR AND TIE TO WWF NATURAL GRADE #3 REBAR @ 6" OR #4 REBAR @ 12" BOTH WAYS CUTOFF WALL 2500 PSI CONCRETE (SEE NOTE 2) CUTOFF WALL BELOW GRADE (REFER TO PLANS) RIP RAP GRADATION % PASSING SIZE 100 1.50 D50 0 0.67 D50 NOTES 1.FOR D50 = 6", USE W3.5XW3.5. FOR D50 = 9" AND GREATER, USE W5.5XW5.5. 2.UNLESS NOTED OTHERWISE ON THE PLANS, ALL MATERIAL & INSTALLATION PER PAG STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, CURRENT ED. 3.CUT AND FILL SLOPES LESS THAN 7 FEET IN HEIGHT ARE RECOMMENDED TO HAVE A MAXIMUM GRADIENT OF 1 TO 1. F HIGHLAND WASH ROCK-FACED CONCRETE SLOPE PAVING NTS GROUTED ROCK RIPRAP W/ WIRE MESH (SEE NOTE 1)1 (SEE NOTE 3) X G ONSITE SLOPE STABILIZATION DETAILS EXIST. OR DESIGN GRADE MIRAFI FILTER FABRIC TYPE 140N D50=PER PLAN T=2D50 FINISHED GRADE TOP OF SLOPE EXIST. OR DESIGN GRADE NOTE 312" 1 2 12"18" 1' CONCRETE TOEDOWN W/ 6" X6", W1.4 X W1.4, WWF. (DEPTH PER PLAN) EMBED ROCK TO A DEPTH OF 1/2 (D50) D50=PER PLAN FINISHED GRADE TOP OF SLOPE 6 " CO N C . B A S EW/ 6 X 6 , W 1 . 4 X W 1 . 4 ,WWF .1.5'1.5'NOTE 31' 1 1 EXIST. OR DESIGN GRADE EXIST. OR DESIGN GRADE SLOPES BETWEEN 2:1<2.99:1 OR FLATTER SLOPES BETWEEN 1:1<1.99 NOTES 1.IN AREAS OF CUT, WHERE HAMMERING OR CARVING ROCK IS REQUIRED, ADDITIONAL RIP RAP OR BOULDER WALL CONSTRUCTION MAY NOT BE REQUIRED, AS DETERMINED BY THE SOILS ENGINEER. STACKED BOULDER WALLS MAY BE UTILIZED AS DIRECTED BY THE STRUCTURAL ENGINEER. 2.GROUTED ROCK RIP RAP IS REQUIRED IN ALL AREAS CONCENTRATED FLOW REGARDLESS OF SLOPE. 3.TO BE DETERMINED IN FINAL DESIGN. SLOPE GRADIENT SLOPE PROTECTION 3:1 OR FLATTER REVEGETATE WITH NATIVE SPECIES PER LANDSCAPE PLAN STEEPER THAN 3:1 TO 2:1 RIP-RAP WITH FILTER FABRIC CLOTH, JUTE, OR EXCELSIOR NETTING AND THEN REVEGETATE WITH NATIVE SPECIES OR PROVIDE OTHER GROUND COVERS. STEEPER THAN 2:1 TO 1:1 GROUTED OR WIRE-TIED RIP RAP STEEPER THAN 1:STABILITY ANALYSIS OR RETAINING WALL DESIGNED BY A STRUCTURAL ENGINEER. REFERENCE GEOTECHNICAL EVALUATION FOR THE NARANJA TRAILS, PROJECT NUMBER 20-098 PER PATTISON ENGINEERING, L.L.C. SLOPE PROTECTION NEEDS TO BE REVEGETATE WITH NATIVE PLANTS OR IN AREAS THAT ARE TOO STEEP, ROCK RIPRAP. NTSNTS NTS NTS NTS EX. GRADE DIVERSION SWALE LINED WITH RIP RAPTOE OF SLOPE PROTECTED WITH RIP RAP PROTECT SLOPE PER DETAIL G ON THIS SHEET. TOP OF CUT SLOPE LOT 3' * *CONTINUOUS SLOPE LENGTHS PREFERABLY LESS THAN 15 FEET. SLOPE LENGTHS CAN BE REDUCED BY PROVIDING FREQUENT INTERCEPTING BENCHES. 2' MIN OVERBUILD 3' LOT 3:1 EX. G R A D E 1:1J REAR LOT TO EXISTING HILL SIDEPER PLANNTSIN FILL LOT DIVERSION SWALE LINED WITH RIP RAP H REAR LOT TO EXISTING HILL SIDE NTSIN CUT RETAINING WALL BY OTHERS I REAR LOT TO EXISTING HILL SIDE IN CUT PROTECT SLOPE PER DETAIL G ON THIS SHEET.PER PLAN *WHEN ADJACENT TO LOTS DAYLIGHT SURFACE CUT CONDITIONS FORESLOPE SLOPE (4:1)BACKSLOPE SLOPE (4:1) CUT SLOPE (1:1) 4' PER PLAN 4' 50' CA A FILL CONDITIONS FILL SLOPE (3:1) PER PLAN 50' CA A EX. GRADESEE CUT AND FILL DETAILS FOR WHEN ADJACENT TO OPEN SPACE EX. GRADE PER PLAN 8.5" 6" ABC 2.5" AC PAVEMENT COMPACTED SOIL PER GEOTECHNICAL INVESTIGATION REPORT PAVEMENT STRUCTURE SINGLE CURB ±5' GROUTED RIP RAP ±11' TL ±11' TL 75' R/W ± 11' TL ±6' SHLDR ±2' CLEAR ±4' CLEAR 75' R/W ±7' SHLDR ±12' TL ±12' TL ±11' TL ±11' TL ±11' TL ±5' 6' SHLDR ±7' SHLDR 7' CLEAR ±5' CLEAR ±19' EX. GUARDRAIL EX. GUARDRAIL EX. SINGLE CURB ±7' OF NEW PAVEMENT ALONG NARANJA DRIVE NEEDED TO WIDEN EX. STREET SECTION ±3:1 14' TRAVEL LANE *10' PUE 14' TRAVEL LANE 3'*10' PUE 2' WIDE CONC. WEDGE CURB PER PAG STD DET. 209 W/6" REVEAL (TYP.) 6' (TYP.) LANDSCAPE AREA 10'MAX.EX. GRADE 5'MAX.15'MAX.DUMPED RIP-RAP T=2*D50 OVER MIRAFI FILTER FABRIC TYPE 140Nd=1.5'MIN.GROUTED RIP-RAP PER DETAIL G1'FLNTS 06/09/2022RETAINING WALL, LAYOUT PER PLAN JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-dt07.dwg Plotdate:6/9/2022COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc250 N. MEYER AVENUE, SUITE B TUCSON, AZ 85701 520.784.3816 13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 07 DETAILS ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GENERAL NOTES FOR WEIR AND CHANNEL STRUCTURES: 1.ENGINEERING DESIGN COMPLIES WITH AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, LATEST EDITION. 2.CONSTRUCTION SHALL COMPLY WITH PAG STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, LATEST EDITION. 3.STANDARD DETAILS REFERRED TO ON PLANS SHALL BE IN ACCORDANCE WITH PAG STANDARD DETAILS FOR PUBLIC IMPROVEMENTS, LATEST EDITION. 4.CONTRACTOR SHALL VERIFY CONDITIONS AND DIMENSIONS AT THE JOBSITE PRIOR TO COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER. 5.DIMENSIONS SHALL NOT BE SCALED FROM DRAWINGS. 6.FOUNDATIONS FOR WEIR STRUCTURE AND CONCRETE DRAINAGE CHANNEL SHALL BEAR ON SCARIFIED AND CECOMPACTED NATIVE SOILS. SCARIFY SOIL TO MINIMUM DEPTH OF 8 INCHES AND COMPACT TO 95 PERCENT OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR ASTM D698. 7.MATERIALS OF CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING: a.CONCRETE - ASTM C150, TYPE V, CLASS "S", F'C=3,000 PSI. b.REINFORCING STEEL - ASTM A 615, GRADE 60. 8.REINFORCING STEEL BENDS AND HOOKS SHALL COMPLY WITH AASHTO SECTION 5.10.2. SPLICE BARS 40 BAR DIAMETERS, UNLESS NOTED OTHERWISE. 9.CHAMFER ALL EXPOSED CORNERS OF WEIR STRUCTURE CONCRETE WALL 3 4 INCH. 10.CONSTRUCTION JOINT: FOR THE CONCRETE DRAINAGE CHANNELS, PROVIDE EXPANSION JOINTS AT 45-FOOT INTERVALS AND EAKENED PLANE JOINTS AT 15-FOOT INTERVALS EVENLY SPACED BETWEEN EXPANSION JOINTS, IN ACCORDANCE WITH SECTION 912-3.06 OF THE STANDARD SPECIFICATIONS, HORIZONTAL WEAKENED PLAN JOINTS SPACED VERTICALLY ALONG THE FACE OF THE SLOPE PAVING OR CHANNEL LINING ARE NOT REQUIRED. 11.CONCRETE FINISHES: FOR THE WEIR STRUCTURE, EXPOSED CONCRETE WALL SURFACES SHALL RECEIVE A CLASS II FINISH IN ACCORDANCE WITH SECTION 601-3.05 OF THE STANDARD SPECIFICATIONS. FOR THE DRAINAGE CHANNEL STRUCTURE, EXPOSED SURFACES SHALL RECEIVED A CLASS I FINISH. 12.HANDRAIL SHALL BE PAINTED WITH A THREE-COAT PAINTING SYSTEM COMPLYING WITH SECTION 610 OF THE STANDARD SPECIFICATIONS. VERIFY PAINT COLOR WITH THE OWNER. 18'1'5'2'7.5' 16'VARIES 80'-100' EXISTING GRADE LOT 2% 2% 2% 2% 12'18' 18:1 30'30'  FL=72.5 EX=86 12'18' FG=73.5 LOW-FLOW CHANNEL 5' LOW-FLOW CHANNEL VEGETATION BUFFER ON BOTH SIDES 1.5 (TYP) 1 2'16' MAINT. ACCESS ROAD TOP OF BANK NEW PAG STD DET 105 HANDRAIL (TYP) 2" CLR 6" 6" 2" CLR #4@12" EW CHANNEL REINFORCINGPER PLAN2' 1' LOT 2' 2' OVERBUILD J PROPOSED HIGHLAND WASH CHANNEL SECTION NTS FLOW 4 1 ROCK RIP-RAP D50 PER PLAN OVER MIRAFI FILTER FABRIC TYPE 140N 4 1 1'1'SPLASH PAD (L)W2W1B B A FLOW MITER PIPE TO MATCH SLOPE ROCK RIP-RAP D50 PER PLAN OVER MIRAFI FILTER FABRIC TYPE 140N 3:1 PLAN SECTION A SECTION B L SPLASH PAD @ STORM DRAIN OUTLETS NTS RIP-RAP APRON DIMENSIONS CP CULVERT DESCIPTION APRON LENGTH (FT) L APRON WIDTH (FT) W1 APRON WIDTH (FT) W2 APRON DEPTH (IN)RECOMMENDED ROCK SIZE (IN) NOTE: TABLE TO BE COMPLETED ON FINAL SITE PLAN SUBMITTAL 16' VARIES PER PLAN 100' CHANNEL BOTTOM 30'30'100' CHANNEL BOTTOMVARIES 1.5:1 MAX VARIES 3:1 MAX CULVERT SPILLWAY/ CHANNEL CULVERT SPILLWAY/ CHANNEL SPLASH PAD (L)DEPTH(D)SPLASH PAD (W) VARIES DEPTH(D)3 1 PER PLAN MATCH EXISTING EXISTING GROUND GROUTED ROCK RIPRAP OR COLORED GUNITE SLOPE FACE (PER PLAN) TOEDOWN DEPTH PER FINAL DESIGN TOEDOWN DEPTH PER FINAL DESIGN O SECTION AT EXISTING WASH TO PROPOSED IMPROVEMENTS NTS N PROPOSED HIGHLAND WASH SOUTH EDGE TREATMENT NTS MATCH EXIST.2:1MAX.PER PLAN 2567 EXIST. GROUND DETENTION/ SEDIMENT BASIN COMPACT EMBANKMENT TO 100% OF MAXIMUM DRY DENSITY USING METHODS OUTLINED IN PAG STANDARD SPECIFICATION 203-9 06/09/2022DUMPED ROCK RIPRAP D50=9", TH=18" 10' MIN. RIPRAP PAD DUMPED ROCK RIPRAP D50=9", TH=18" 1' WIDE CONCRETE TOEDOWN W/ 6"X6" WIRE MESH DEPTH PER FINAL DESIGN 1' WIDE CONCRETE TOEDOWN W/ 6"X6" WIRE MESH DEPTH PER FINAL DESIGN GROUTED ROCK RIPRAP/COLORED GUNITE. SEE CHANNEL REINFORCING DTL LEFT GROUTED ROCK RIPRAP INLAID 50% OR COLORED GUNITE 150.00'90.00'GAP150.00'STORAGE120.0'55.0'139.6'55.0'147.3'55.0'156.1'55.0' 55.0'151.8'142.5'135.0'55.0' 55.0'120.0'55.0'138.6'55.0'146.2'55.0' 55.0'155.1'153.3'55.0' 55.0'143.8'159.1'N89°20'13"E670.45'55.0'133.3'120.0'55.0'120.0'133.3'IN-LIEU FEE OF ±255LF OF SIDEWALKIN-LIEU FEE OF ±320LF OF SIDEWALK120.0' 81.6'17.6'55.0'WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMNARANJA DRIVESEE SHT 11 PARCELS 4 & 5 DAVIS DEVELOPMENT & PROPERTIES LLC APN 224-28-156G & 224-28-156J PAD:MELCOR HIGH L A N D S W A S H TRACT B OPEN SPACE Q100=2,139cfs NOT A PART FINAL PLAT OF PUSCH RIDGE VISTAS, BK 55, PG 99, P.C.R. PAD:MELCOR PIMA COUNTY FLOOD CONTROL DISTRICTAPN: 224-01-0194BZONING: PAD, MONTERRA HILLS2 3 4 5 6 7 8 9 45 4443 42 414039 TRACT A (SEE SHEET 3 FOR AREA OF DEDICATION AND OWNERSHIP) EX P=70.67 EX P=63.12 EX P=61.99 EX P=60.54 EX P=60.22 EX P=59.34 EX P=59.15 2 6 7 5 2 6 7 0 2 6 6 5 2660265526502645262526 3 0 26 3 0 2 6 3 5 264 0 2645 2650 26462690268526802670 2675 2665 26 6 0 2 6 7 5 2 6 6 5 2670266 0 2660 2655 2645 2640 2635 2630 2625 SEE SHT 09SEE SHT 09EX P=67.45 EX P=64.17 FL=62.10 1 FF=40.30 PAD=39.30 FF=38.10 PAD=37.10 FF=35.70 PAD=34.70 FF=33.70 PAD=32.70 FF=32.20 PAD=31.20 FF=31.50 PAD=30.50 FF=43.40 PAD=42.40 FF=46.50 PAD=45.50 FF=46.50 PAD=45.50 FF=41.70 PAD=40.70 FF=39.30 PAD=38.30 FF=36.90 PAD=35.90 FF=34.50 PAD=33.50 FF=32.90 PAD=31.90 FF=31.60 PAD=30.60 FF=30.00 PAD=29.00 FL=34.03FL=38.56 FL= 43.50 FL=43.04 FL=54.06 FL=42.20 FL=40.86 FL=40.44 FL= 36.41 FL=30.84 FL=28.77 FL=27.44 FL=24.90 FL=23.91 FL=23.39 FL=23.91 FL=24.95 FL=25.22 FL=22.06 P=59.92 P=59.16 P=56.15 P=51.20 P=44.90 P=38.16 P=31.09 P=26.45 FL=32.79 3.2% 3.2 % 5. 4 % 6.8% 4.8% 4.0% 2.0%9.3%26452643264226502655740' X 15' SVT CRITICAL RESOURCE AREA (CRA) EXISTING FLOODPLAIN 580' X 15' SVT EXISTING STRIPING EXISTING SLOPE, DRAINAGE AND MAINTENANCE EASEMENT PER DKT 9908M PG 1961, P.C.R. EXISTING SLOPE, DRAINAGE AND MAINTENANCE EASEMENT PER DKT 9908M PG 1961, P.C.R. FND 1.5" ALUMINUM CAP STAMPED RLS 35111 ACCEPTED AS A REFERENCE POINT ON LINE EXISTING GUARD RAIL EXISTING SINGLE CURB EXISTING EDGE OF PAVEMENT PROPOSED PRIVACY GATE PAD OPEN SPACE LINE EXISTING - 3 10'x5' BOX CULVERTS INV= 2641± LIMITS OF GRADING LIMITS OF GRADING LIMITS OF GRADING LIMITS OF GRADING PROPOSED STRIPING PROPOSED EDGE OF PAVEMENT EXISTING OVERHEAD ELECTRIC ADJUST EXIST. MH RIMS TO FINISHED GRADE PROPOSED 24" RCP CULVERT RIP RAP LINED CHANNEL PAG 310 CATCH BASIN RIP RAP LINED CHANNEL HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL PAG 310 CATCH BASIN PAG 310 CATCH BASIN HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL START OF STRIPING START OF NEW PAVEMENT START OF STORAGE LEFT TURN LANE START OF GAP FOR LEFT TURN LANE 36" RCP CULVERT 36" RCP CULVERT PAG 310 CATCH BASIN Q100=4.2 CFS Q100= 13 CFS Q100=9.6 CFS REMOVE EXIST. GUARDRAIL. INSTALL NEW GUARDRAIL PER ADOT STANDARDS. PROPOSED MAINTENANCE ACCESS ROAD DTL L/07 DTL L/07 DTL L/07PROPOSED FLOODPLAIN N. SHO R E C L I F F D R . ( P R I V A T E ) EX ±38.85' EOP 75' R/W PER BK OF ROAD MAPS, PG 89, P.C.R.50' R/W16'B/C16'B/C4'S/W3'LS4'S/WEX 40.00' SWR. ESMT.PER DKT 12342,PG 623, P.C.R.3'LSEX. 50.00' INGRESS/EGRESS& UTILITY DKT 13781, PG. 3510, P.C.R.PROP . 2 0 ' DRAI N A G E ESMT . 20' PR O P . DRAI N A G E E S M T .EX. 12" SEX. 12" SEX. 12" S 25% SLO P E 11'6'3:1EX. 12" S 3:13:13:1 3:13:13:13:1 3:13:13:13:150' EHS PROPOSED MAILBOXES 16'R14'*TOP OF MAIN CHANNEL BANK 2.0% JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp08.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 08 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) 6 C 13 12 11 08 09 10 KEYMAP NTS 6 J 5 3 6 A 6 B 6 D 6 G 06/09/2022 120.9'59.1'126.9'68.8' 66. 0 '132.5'132.1'55. 0 '132.1'120.0'55. 0 '132.1'55. 0 ' 55. 0 ' 55. 0 ' 55. 0 '132.1'132.1'55. 0 '132.1'132.1'132.1'120.0'55. 0 ' 55. 0 ' 55. 0 ' 55. 0 ' 55. 0 ' 55. 0 '130.4'128.1'127.9'127.9'128.0'120.0'159.1'156.3'55.0'120.0'132.9'55.4'157.2'55. 0 '132.1'55. 0 '132.1'120.0'55. 0 '132.1'55. 0 '132.1'55. 0 '132.1'55. 0 '122.5'55.2'120.0'120.0'55.0'120.0'55.0'120.0'55.3'120.0'120.0'68.1' 68.0' 72. 0 '132.1'120.0'135.9'120.0'55.0'120.0'55.0'WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMEX. 1 2 " S S18 ° 3 4 ' 2 9 " W 4 9 4 . 8 2 ' S24°5 9' 0 4 " E 2 0 1. 0 7' S03°35'49"W 565.43'L1C1 CRITICAL RESOURCE AREA EXISTING FLOODPLAIN EX 40.00' SWR. ESMT.PER DKT 12342, PG 623, P.C.R.EX. 1 2 " S EX. 1 2 " S EX 30.00' SWR. ES MT.PER PUSCH RIDGE VISTAS2620261526 0 5 2600 26 0 0 2595 2605 262 5 2630 263 5 2640 2645 N89°03'04"E 420.06'S71°44'32"E 100.00' S75°15'47"E 121.75' N18 ° 3 1 ' 3 3 " E 5 3 1 . 1 4 ' N08°55'2 5 " E 3 2 1 . 8 6 ' PAD OPEN SPACE LINE HIGHLANDS WASH 25% S L O P E FINAL PLAT OF PUSCH RIDGE VISTAS, BK 55, PG 99, P.C.R. PAD:MELCOR D E S E R T K N O L L P L A C E LIMITS OF GRADING LIMITS OF GRADING LIMITS OF GRADING 10 11 12 13 14 15 16 17 18 21 22 23 48 47 61 49 50 51 52 53 54 55 56 57 58 59 60 EX. 50.00' INGRESS/EGRESS& UTILITY DKT 13781, PG. 3510, P.C.R.24 25 N. SH O R E C L I F F D R . ( P R I V A T E )3:13:13:13:13:11.5:1LIMITS OF GRADING PROPOSED PAG 310 CATCH BASIN PROPOSED PAG 310 CATCH BASIN HEADWALL W/HANDRAIL HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL PROPOSED 36" RCP CULVERT SEE SHT 10EX. 12" S SEE SHT 12SEE SHT 08SEE SHT 0846 19 20 EX 30.00' PARCEL 1B UTL. ESMT. TO BE ABANDONED DUMPED RIPRAP W/ 3' TOEDOWN (TYP.) FF=29.30 PAD=28.30 FF=27.20 PAD=26.20 FF=26.50 PAD=25.50 FF=23.80 PAD=22.80 FF=23.10 PAD=22.10 FF=19.80 PAD=18.80 FF=16.70 PAD=15.70 FF=14.30 PAD=13.30 FF=12.60 PAD=11.60 FF=11.80 PAD=10.80 FF=10.80 PAD=9.80 FF=9.00 PAD=8.00 FF=6.30 PAD=5.30 FF=4.00 PAD=3.00 FF=2.50 PAD=1.50 FF=1.80 PAD=0.80 FF=2.40 PAD=1.40 FF=3.90 PAD=2.90 FF=6.20 PAD=5.20 FF=8.80 PAD=7.80 FF=10.60 PAD=9.60FF=11.60 PAD=10.60 FF=12.10 PAD=11.10 FF=13.40 PAD=12.40FF=15.40 PAD=14.40 FF=18.30 PAD=17.30 FF=22.00 PAD=21.00 FF=23.50 PAD=22.50 FF=24.70 PAD=23.70 FF=25.40 PAD=24.40 FF=26.70 PAD=25.70 FF=28.40 PAD=27.40 36" RCP CULVERT PAG 310 CATCH BASIN PROPOSED PAG 310 CATCH BASIN Q100=8.2 CFS Q100=6.2 CFS FL=24.57 FL=20.67 FL=18.83 FL=17.68 FL=14.94 FL=14.37 FL=18.33 FL=16.72 FL= 14.35 FL=13.80 FL=12.32 FL=12.17 FL=11.00 FL=10.71 FL=9.05 FL=8.24 FL=4.05 FL=3.59 FL= 9.56 FL=9.33 FL=6.26 FL=7.12 FL=6.19 FL=5.98 FL=5.20 FL=12.88 FL=21.84 P=24.23 P=24.25 P=20.94 P=12.79 P=7.95 P=98.93 DTL L/07 DTL L/0714'TL14'TL14'TL14'TLPROP . 2 0 ' DRAI N A G E EASE M E N T FL=20.5 PR O P . 2 0 ' DR A I N A G E ES M T . PR O P . 2 0 ' D R A I N A G E ES M T . PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV PRV 2605 2600 2595 2590 25852590259526002605261026102.9% 3.6% 2.6% 2.0% FF=1.30 PAD=0.30 26******HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL FL=99.61 P=23.56 5 0 ' EHS Q100=2,139 CFS BASIN MAINTENACE ACCESS ROUTE FG=2616.17 FG=2615.16 FG=2625.36 FG=2632.39 FG=2628.85 FG=2622.82 FL=4.80 FG=2615.40 FG=2616.90 FG=2618.35 FG=2607.26 FG=2602.459.0%10 . 3 % FG=2589.27 FG=2607.47 FG=2601.12 FG=2597.724:14:13:13:1 1 6 . 4% 3:1 3:1 TOP OF MAIN CHANNEL BANK DUMPED RIPRAP D50=6", TH=12" OVER FILTER FABRIC JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp09.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 09 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) 13 12 11 08 09 10 KEYMAP NTS 6 G 6 J 6 I 6 H 6 J 5 4 5 5 6 A HIGHLANDS WASH LOT FILL TABLE LOT #EXIST. 100-YR CWSEL PROP. 100-YR CWSEL PAD ELEV. 17 2606.90 2610.60 2613.30 18 2606.40 2609.50 2611.60 19 2604.80 2609.60 2610.80 20 2603.10 2590.60 2609.80 21 2601.00 2586.40 2608.00 22 2597.50 2579.20 2605.30 23 2596.70 2579.10 2603.00 24 2594.50 2578.80 2601.50 25 2592.90 2578.70 2600.80 56 2600.30 2609.60 2610.60 57 2599.80 2590.60 2609.60 58 2598 2586.40 2607.80 59 2597.10 2579.20 2605.20 60 2596.40 2578.80 2602.90 61 2593.80 2578.70 2601.40 06/09/2022 SANTILLAN MARTIN G APN 224-28-157B PAD:MELCOR FINAL PLAT OF THE HIGHLANDS, BK 15, PG 21, P.C.R. PAD:MELCORN. SHORE CLIFF DR.(PUBLIC)S62°08'18"E 285.58'S00°36'12"E 589.40'S89°47'01"W 91.37'S00°12'59"E 50.00'S89°10'27"W 736.19'C2C1SEE SHT 09FINAL PLAT OF RIVERS EDGE II, BK 59, PG 71, P.C.R. PAD:MELCOR PARCEL 2 DAVIS DEVELOPMENT & PROPERTIES LLC APN 224-28-156F CR-2 CURVE DATA CURVE # C1 C2 LENGTH 257.84' 251.91' RADIUS 500.00' 505.15' DELTA 29°32'49" 28°34'22"S62°08'18"E 197.06'Q 1 0 0 = 7 2 . 4 C F S N. APPALACHIAN ST.(PRIVATE)PARCEL 3A DAVIS DEVELOPMENT & PROPERTIES LLC APN 224-28-156H 30 31 33 37 32 34 35 36 38 27 28 29 S2 8 ° 4 0 ' 2 1 " W 9 2 . 4 0 ' SEE SHT 13 SEE SHT 12120.0'120.0'120.0'120.0'120.0'120.0 '120.0 '120.0 '120.0 '120.0 '120.0 ' 1 2 0 . 0 ' 1 2 0 . 0 ' 1 2 0 . 0 '57.5'1 1 2 . 5 ' 67.5' 67.6' 58.3' 55.0' 55.0' 65.6' 68.1' 68.1' 68.1'68.1'55.0'33.4'5 5 .0 '5 5 .0 '55.0' 20.0' 5 5 .0 '5 5 .0 ' 5 5 .0 ' 5 5 .0 '5 5 .0 '55.0' 55.0' 40.7' 1 4 .3 '55.0'148.6'62.7'212.9 ' 35.4' 299 . 1 ' 171 . 7 '116.4'20 3 . 5 '67.5'12.2'WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWM258525702570256525 8 0 2580 25852585260526102 6 1 5 26 2 0 26 2 5 26 3 0 26 3 5 2590 2595 2 6 3 5 2 6 3 5 2 6 3 0 262526202 6 1 5 2 6 1 0 2 6 0 5 2 6 0 0 2 5 9 5 2590 26 3 0 2625 2620 2615 2610 2605 2600 2595 2590 2610 26052600259526102615262026252 6 3 0 2630 2625 2620 2615 2610 2580257025652566256725702569256825672564EX. 12" S EX. 1 5 " S EX. 15" S25% SLOPE 25% SLOPE EX. 15" S EX. 15" S3:1EX. 30'SWR ESMT. PERDK. 11774, PG 4, P.C.R.3 ' L / S 4 'S/WEX 40'SWR ESMTDKT 12342,PG 623, P.C.R.1 6 ' B/ C 1 6 ' B/ C 5 0 ' R/ W EX 40' SWR ESMT.PER DKT 12342,PG 623, P.C.RTO BE ABANDONEDL=264.71'R=525.00'Δ=28°53'20"FF=99.80 PAD=98.80 FF=97.70 PAD=96.70 FF=94.70 PAD=93.70 FF=91.90 PAD=90.90 FF=90.10 PAD=89.10 FF=89.40 PAD=88.40 FF=87.90 PAD=86.90 FF=86.60 PAD=85.60 FF=85.90 PAD=84.90 FF=84.50 PAD=83.50 FF=84.50 PAD=83.50 FF=85.80 PAD=84.80 FL=4.45 FL= 2.84 FL=92.44 FL=87.32 FL=83.77 FL=80.41 FL=77.25 FL=85.81 FL=90.21 FL=6.00 FL=85.95 FL=90.33 P=97.75 P=96.84 P=86.64 P=83.14 P=84.88 P= 95.08 FG=88.23 FG=84.85 FG=82.28 FG= 82.87 26 FF=1.30 PAD=0.30 EXISTING FLOODPLAIN EXISTING FLOODPLAIN REMOVE EXISTING ROAD BARRICADE LIMITS OF GRADING LIMITS OF GRADING EXISTING SLOPE, DRAINAGE AND MAINTENANCE ESMT. PER DKT 12502, PG576, P.C.R. EXISTING UNDERGROUND ELECTRIC EX. CULVERT TO BE REMOVED SD MANHOLE DEPRESSED SIDEWALK FOR DRAINAGE 4'-5' TERRACED RETAINING WALL Q100=3.4 CFS MAINTENANCE ACCESS ROAD N. SHORE CLIFF DR.(PRIVATE)2 5 8 3 2 5 8 2 2 5 8 3 PRV PRO P. 30' DRAI N A G E E S MT. PRV PRV PRV PRV PRV PRV PRV PRV PRVPRV PROP. 20' DRAINAGE ESM T . PRVPRV14'TL14'TL14'TLPRIVACY GATE (EGRESS ONLY)Q1 0 0 = 7 2 . 4 C FS 25822577 BASIN MAINTENACE ACCESS ROUTE 2600 2595 2590 2585 259 0 258 5 30'x30' DRAINAGE EASEMENT 1.7% 2.1%1.9%5.6%1.7% 48" RCP STORM DRAIN & HEADWALL W/HANDRAIL **POTENTIAL BUILDING PAD POTENTIAL BUILDING PADPOTENTIAL BUILDING PAD HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL DTL L/07 FG=67.39 FG=75.49 FG=79.53 FG=66.68FG=66.72 FG=66.76 FG=66.59 FG=66.59 FG=66.59 FG=73.69 FG=73.32 FG=70.74 FG=76.19 FG=75.16 FG=73.54 FG=66.59 PROPOSED FLOODPLAIN FG=66.59 PAD OPEN SPACE LINE FG= 79.83 FG= 77.38 FG= 75.88 FG= 72.62 BASIN MAINTENACE ACCESS ROUTE 62 (CUSTOM LOT GRADING PER SEPARATE PLAN) 63 (CUSTOM LOT GRADING PER SEPARATE PLAN)5.3%8.1%10.5%4.8%EMERGENCY TURN-AROUND AREA R43. 0 0' FL=89.99 FL=89.63 LIMITS OF GRADING FG=88.81 FG=90.61 64 (CUSTOM LOT GRADING PER SEPARATE PLAN) 36" RCP CULVERT HEADWALL PER ADOT DWG NO. SD 6.30 ON SHEET 5 W/HANDRAIL FL=90.30 **APPROX. 20%PROP. 40' S L O P E & D R A I N A G E EASEMENT REFER TO LANDSCAPE PLAN FOR GROUND TREATMENT SHARED ACCESS ESMT. REQUIRED FOR LOTS 62 & 63, TO BE NOTED ON FINAL PLAT. JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE. PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp10.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 10 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) 7 N 13 12 11 08 09 10 KEYMAP NTS 6 A HIGHLANDS WASH LOT FILL TABLE LOT #EXIST. 100-YR CWSEL PROP. 100-YR CWSEL PAD ELEV. 26 2592.70 2610.60 2578.70 27 2591.30 2609.50 2578.10 28 2589.30 2609.60 2578.00 29 2588.00 2590.60 2577.30 30 2586.50 2586.40 2577.20 31 2585.10 2579.20 2577.10 32 2583.70 2579.10 2577.00 33 2581.90 2578.80 2577.00 34 2579.70 2578.70 2577.00 35 2579.50 2609.60 2577.00 36 2579.80 2590.60 2577.00 37 2579.20 2586.40 2577.00 38 2579.30 2579.20 2577.00 06/09/20226 H 5 6 10' TRANS x 50 MPH =500.00'IN-LLFDONNELLY F JAMES & PAMELA FAMILY REVOC TR APN 224-28-1540 PAD:MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. ZONE: R1-144 RIORDAN GARY STUART APN 224-28-1530 PAD:MELCOR NOT A PART SADEGHI ALE DAVID APN 224-28-156D PAD:MELCOR EX. 12" SEX. 12" SEXISTING/PROPOSED FLOODPLAIN N10°04' 5 8 " E 1 5 9 . 3 1 ' N10°17'09" W 51.20'N79°43'17"E 101.64'N16° 1 2 ' 2 3 " E 6 8 2 . 0 0 ' N89°20'13"E 670.45' CRITICAL RESOURCE AREA EXISTING/PROPOSED FLOODPLAIN PARCELS 4 & 5 DAVIS DEVELOPMENT & PROPERTIES LLC APN 224-28-156G & 224-28-156J PAD:MELCOR EX. 12" SEX. 12" SNARANJA DRIVE (PUBLIC)EX ±34.86' EOP EXISTING SLOPE, DRAINAGE AND MAINTENANCE EASEMENT PER DKT 9908M PG 1961, P.C.R. EXISTING GUARD RAIL 75' R/W PER BK OF ROAD MAPS, PG 89, P.C.R. EXISTING SINGLE CURB EXISTING EDGE OF PAVEMENT N2 5 ° 1 9 ' 5 6 " E 1 6 6 . 3 5 ' N11°09' 3 0 " E 1 7 1 . 7 9 ' N 2 9 ° 5 6 ' 2 0 " E 1 3 7 . 1 5 ' N04°33'44"E 112. 7 4 ' N10°13'08"W 45.65' N10°17'09" W 7 7 . 7 2 'S51 ° 4 5 '0 0 "W 1 6 6 .80 ' S43°15'00" E 218.50' N00°34'35"W 1346.75'2620262526302630 2 6 3 5 2625 2630 2640 2645 2650 2655 2660 2665 2670 2675 268 0 268 5 26902 6 9 0 2685 26 8 0 26752 6 7 0 2 6 6 5 2 6 6 0 26702665266026552650264526402635 SEE SHT 08 SEE SHT 12EXISTING STRIPING EXISTING OVERHEAD ELECTRIC Q100=2,139 CFS EX. 50.00' SLOPE, DRNG. & MAINT. ESMT. PER DKT. 9908M PG 1961, P.C.R 50' EHSTOP OF MAIN CHANNEL BANK JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE: PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp11.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 11 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) 13 12 11 08 09 10 KEYMAP NTS 06/09/2022 55.0' 55.0'155.3 '120.0'120.0'68.1' 68.0'120.0'PARCEL 1A DAVIS DEVEOPMENT & PROPERTIES LLC APN 224-28-156B CR-6 TOMBER FAMILY LP APN 224-28-1550 PAD:MELCOR FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. ZONE: R1-144 DONNELLY F JAMES & PAMELA FAMILY REVOC TR APN 224-28-1540 PAD:MELCOR CRITICAL RESOURCE AREA PARCELS 4 & 5 DAVIS DEVELOPMENT & PROPERTIES LLC APN 224-28-156G & 224-28-156J PAD:MELCOR CRITICAL RESOURCE AREA EXISTING/PROPOSED FLOODPLAIN 26002610 26 1 5 263 0 2625 2620 2615 2 6 1 0 26 0 5 SEE SHT 09 SEE SHT 13SEE SHT 10 SEE SHT 11PARCEL 3A DAVIS DEVEOPMENT & PROPERTIES LLC APN 224-28-156H PAD:MELCOR S85°52'54"E 293.53'N2 3 ° 2 3 ' 4 0 " E 39. 9 5 ' N02°19'52"W 176.20'N01°26'07"E 130.22'N14°01'5 7 " W 26.13' N13°43'5 1 " W 1 2 9 . 8 0 ' N00°34'35"W 1214.69' S00°47'29"E 1189.38'N89°03'04"E 420.06'PAD OPEN SPACE LINE N00°34'35"W 1346.75'S89°26'44"W 301.87'EXISTING FLOODPLAIN 26052610261526201'-1.5' TRAINING BERM 3' DIVERSION BERM BEGIN CHANNEL GRADING TOE-DOWN DEPTH TO BE DETERMINED AT FINAL DESIGN COLORED GUNITE SLOPE FACE GROUTED ROCK RIP-RAP W/ TOEDOWN DEPTH PER FINAL DESIGN DUMPED RIPRAP D50=6"-12" 2:12:1 5:1 3.5 : 1 4:11.5:13:1 25802585259025952600260526062610261026052600259525902605 2600 2595 2590 2585 2580 2579 FG=5.14 FG=2.84 FG=0.63 FG=0.11 FG=98.02 FG=96.98 FG=10.80 2595 2590 GROUTED ROCK RIP-RAP W/ TOEDOWN DEPTH PER FINAL DESIGN FG=10.50 FG=7.12 FG=8.35 PARCEL 1B 30' EASEMENT UTILITY EASEMENT TO BE ABANDONED 2726 252423 2600259525902585258025782585 2580 EXISTING/PROPOSED FLOODPLAIN PROPOSED FLOODPLAIN PROPOSED FLOODPLAIN Q100=2,139 CFS BASIN MAINTENANCE PATH FG=81.17 1:1FG=2.45 FG=76.17 FG=77.27 FG=76.00 FG=76.00 FG=4.60 FG=5.66 FG=5.93 FG=4.93 FG=6.16 FG=10.00 FG=7.00 FG=99.82 FG=2.90 FG=2.61 FG=98.36 FG=89.24 FG=75.30 FG=75.19 FG=74.97 FG=78.00 FG=80.90 FG=3.00 FG=3.12 FG=96.57 FG=4.91 FG=0.28 FG=78.12 FG=78.00 FG=76.68 FG=75.69 FG=75.51 FG=75.45 FG=84.62 FG=84.48 FG=97.00 FG=97.00 FG=95.62 FG=94.11 FG=95.00 FG=76.02 FG=74.50 FG=71.64 FG=76.96 TOEDOWN DEPTH TO BE DETERMINED AT FINAL DESIGN GROUTED ROCK RIP-RAP W/ TOEDOWN DEPTH TO BE DETERMINED AT FINAL DESIGN DUMPED ROCK RIPRAP D50=6", TH=12" OVER FILTER FABRIC 10 . 3 % 1 6 . 4% GROUND TREATMENT & PLANTINGS PER LANDSCAPE PLAN 50' EHS TOP OF MAIN CHANNEL BANK JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE: PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp12.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 12 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) 13 12 11 08 09 10 KEYMAP NTS 7 J 7 O 06/09/2022 68.1' 68.1' 68.1'68.1' FINAL PLAT OF NARANJA, ESTATES, BK 56, PG 11, P.C.R. ZONE: R1-144 NOT A PART FINAL PLAT OF THE HIGHLANDS, BK 15, PG 21, P.C.R. PAD:MELCOR S89°10'27"W 775.41'N89°10'27"E 516.54'N00°34'35"W 1214.69'S89°10'27"W 736.19'CRITICAL RESOURCE AREA EX 40' SWR. ESMT PER DKT 12342, PG 623, P.C.R. PARCEL 1A DAVIS DEVEOPMENT & PROPERTIES LLC APN 224-28-156B2590 258525802575256525652 6 4 0 26 3 5 2630 262 5 2620 2615 2610 2605 2600 2595 2590 2585 2 5 8 0 2575SEE SHT 12PAD OPEN SPACE LINE S00°38'05"E 100.00' PROPOSED DETENTION/SEDIMENT BASIN PEAK 100-YR INFLOW=2162.6 PEAK 100-YR OUTFLOW=2159.4 BOT. ELEV.=2566.6 LOWEST OUTFALL ELEV.=2570.0 MAX. 100-YR WSEL=2573.9 MAX. 100-YR DET. VOL.=34.3 AF RET. VOL.=10.0 AF 2570HIGHLAND WASH W. APPALACHIAN ST. (PRIVATE)N. KILIMANJARO AVE. (PRIVATE) EXISTING UNDERGROUND ELECTRIC 256725662566 256 525 6 6 256 6 256 3 2 5 6 2 25 6 3 2564256525 6 62570 25592562 PARCEL 3A DAVIS DEVEOPMENT & PROPERTIES LLC APN 224-28-156H PAD:MELCOR Q100=2,159 CFS GROUTED ROCK RIP-RAP W/ TOEDOWN DEPTH PER FINAL DESIGN GROUTED ROCK RIP-RAP W/ TOEDOWN DEPTH PER FINAL DESIGN MAINTENANCE/ACCESS CENTERLINE FG=2596.52 FG=2593.51 FG=2590.73 FG=2588.93 PROPOSED FLOODPLAIN 2:130 27 28 29 2568 2570 2 5 8 5 2595 2590 2585 2580 2575 256825712585 2585 2580 2575 2580 2575 257 0 45.6' EXISTING/PROPOSED FLOODPLAIN EXISTING FLOODPLAIN PROPOSED FLOODPLAIN 2:1 2:1 2:1 2:1 2:1 1:11:11:1FG=2576.69 FG=2573.76 FG=2570.14 FG=2567.38 FG=2566.76 FG=2566.72 FG=2566.68 FG=2566.63 FG=2566.59 FG=2566.71 FG=2566.71 FG=2566.66 FG=2566.70 FG=2566.71 FG=2566.69 FG=2566.62 FG=2566.66 FG=2566.70 FG=2566.67 FG=2566.70 FG=2566.71 FG=2566.59 FG=2566.63 FG=2566.99 FG=2567.05 FG=2568.19 FG=2572.75 MATCH EG=2572.9 MATCH EG=2572.1 MATCH EG=2571.9 MATCH EG=2571.8 MATCH EG=2572.0 MATCH EG=2571.3 MATCH EG=2570.2 MATCH EG=2571.7 MATCH EG=2572.2 MATCH EG=2573.0 MATCH EG=2572.8 MATCH EG=2572.6 MATCH EG=2571.9 MATCH EG=2570.5 MATCH EG=2572.1 MATCH EG=2570.0 MATCH EG=2570.3 MAINTENANCE/ACCESS TO BASIN GROUND TREATMENT AND PLANTINGS PER LANDSCAPE PLAN GROUND TREATMENT AND PLANTINGS PER LANDSCAPE PLAN LOW CREST POINT FINAL PLAT OF THE HIGHLANDS, BK 15, PG 21, P.C.R PAD:MELCOR N61°39'34"W24.49'N 4 3 ° 1 4 ' 0 0 " E 1 2 2 . 5 5 ' JOB NO. DR. Know what's below. Call before you dig. OF SHEET NO. DATE: PM.s:\20000103 - naranja trails\dwg\plan sets\site plan\20000103-sp13.dwg Plotdate:6/9/20224700 E. SOUTHERN AVENUE MESA, AZ 85206 480.218.8831COPYRIGHT 2020 ATWELL LLC. NO REPRODUCTION SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF ATWELL LLCc13 F. HEMMAH F. HEMMAH TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LOTS 1 THROUGH 64 & COMMON AREAS A THROUGH B 20000103NARANJA TRAILS CONCEPTUAL SITE PLAN 09.23.2021 13 SITE PLAN ORO VALLEY CASE No: 2002761, 20000939 LOCATION DESCRIPTION A PORTION OF THE EAST HALF OF THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 12 SOUTH, RANGE 13 EAST,OF THE GILA AND SALT RIVER BASE AND MERIDIAN TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA GRAPHIC SCALE 02040 8040 1" = 40' CONTOUR INTERVAL 1' (FOOT) SEE SHT 10 13 12 11 08 09 10 KEYMAP NTS 7 N 7 J 6 G 06/09/2022 WMWM WM WM WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWM2565257025652570256525652562 25752580 25782580257125722572257525742 5 7 0 25952600266026352645265026552625262026232622 26252613261526102 6 2 0 2610 2 6 1 5 2620 261 0 2605 259525922590 2595263 8 26 3 5 -1.98%242 lf of 60' Buffer per PAD320 lf of 60' Buffer per PADNARANJA DRIVE (Public)60'GRADE LIMIT andLIMIT OF NPPOZONING:PADZONING:PADZONING:PADGRADE LIMIT andLIMIT OF NPPOPUSCH RIDGE VISTAS DRIVEPUSCH RIDGE VISTAS DRIVEZONING:R1-144ZONING:R1-144ZONING:SDH-6ZONING: PAD 2345678910111213141516171819202155545352515049484746453435363739404142384462GRADE LIMIT andLIMIT OF NPPOSHORE CLIFF DRIVE(Public)1222324252627282930313233436364565758596061GRADE LIMIT andLIMIT OF NPPOGRADE LIMIT andLIMIT OF NPPOTRACT ATRACT BTRACT BGENERAL NOTES1.Zoning = River's Edge / MELCOR PAD: C-22.Gross Site Area = 2,527,152 sf (58.02 acres)3.Land Use = Residential4.Per River's Edge PAD, as approved by Pima County and formattedper Oro Valley PAD regulations, Section 10-302, parts D and E,which in part states, "In all instances the Pima County developmentstandards in force and effect as of the date of approval of this PAD,which are incorporated herein as Appendix B, shall prevail."5.In accordance with Appendix C-2 of the River's Edge PAD, a 60'wide buffer yard shall be used along the north boundary of theproperty, and will remain as natural desert subject to minor alterationfor drainage, landscaping and irrigation. Additionally, this is also aconservation easement but may be initially altered substantially bythe developer and then regraded and relandscaped to enhancebuffering and aesthetic appearance. No further grading is permittedin this area.6.The vegetation, salvage and inventory requirements for this PADare referenced on page 6 of Appendix C-2 of the PAD document.Additionally, salvage recommendations, including planting onesalvage tree per lot, are referenced in Appendix C-4 VegetationSalvage Plan of the PAD document. These standards were adoptedin 1994, prior to NPPO standards currently used. Inventoryrequirements per this PAD are to list each major plant, by speciesand size, and include whether it is to be salvaged.7.Area Calculations:a.Gross site area = 2,527,152 sf (58.02 acres)b.Total area graded = 1,385,105 sf (31.80 acres)c.Total Natural Open Space (NOS) = 26.22 acresd.Total Common Area = 572,302.117 sf (13.14 acres)e.Total Landscaped Open Space = 177,291 sf (4.07 acres)8.Bufferyard elements within sight visibility triangles shall be placed soas not to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade of theroadway surface.9.One (1) tree transplanted from on site is required on each lot per thePAD requirement (referred to as street tree). Location of the streettree may vary based on driveway location. Each tree will beirrigated from water service at the house.10.Street trees to be planted prior to final issuance of permit.ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRThe hydroseed mix shall consist of the following seeds:BOTANICAL NAMECOMMON NAMEPLS lbs/ac.Encelia farinosaBrittlebush2.0Baileya multiradiataDesert Marigold2.0Atriplex lentiformisQuail Bush2.0Sphaeralcea ambiguaDesert Globemallow2.0Aristida purpureaPurple Threeawn2.0Cassia covesiiDesert Senna2.0Atriplex canescensFourwing SaltBush4.0Plantago insularisIndian Wheat4.0Haplopappus laricifoliusTurpentine Bush2.0Sporobolus airoidesAlkali Sacaton2.0Schismus barbatusSix Weeks Grass1.5Bouteloua aristidoidesNeedle Grama3.0PIMA COUNTY DESERT SEED MIXLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.NARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.comNARANJA TRAILSCONCEPTUAL LANDSCAPE PLANFOROV2002761CONCEPTUAL LANDSCAPE PLAN1 14L-1CONTOUR INTERVAL = 12"SCALE: 1" = 150-0"2-13 OF 141 OF 14COVER SHEETLANDSCAPE PLANINDEX OF SHEETSOWNERDEVELOPER14 OF 14CONSTRUCTION DETAILSNorthSCALE: 1"=150'C.I. = 1.0'CIVIL ENGINEERSHEET L-2SHEET L-3SHEET L-4SHEET L-5ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo Verde - Transplanted on Site72KEY -- COVER SHEETAdditional(Required for Entry and Revegetation Areas)15 Gal & 5 Gal499SHEET L-6SHEET L-7SHEET L-8SHEET L-9SHEET L-10SHEET L-11SHEET L-12SHEET L-13Blue Palo Verde - Additional as Req'd415 Gal WMNARANJA DRIVE(Public)320 lf of 60' wide Buffer per Uplands at River's Edge PAD242 lf of 60' wide Buffer per Uplands at River's Edge PADSRSRSRGRADE LIMIT andLIMIT OF NPPOSRSR21TRACT BPROPOSEDMAINTENANCE ROADPADOpen SpacePADOpen SpaceDUMPED RIPRAPDUMPED RIPRAPDUMPED RIPRAPTREES THIS AREA TO BE 15GAL MIN; ALL OTHER PLANTMATERIALS TO BE 5 GAL, MIN.TREES THIS AREA TO BE 15GAL MIN; ALL OTHER PLANTMATERIALS TO BE 5 GAL, MIN.15 Gal15 Gal15 Gal-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com2 14L-2CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-3NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. WMWMWMWMWMWMWMWMWMWMWM266026352645265026552625 GRADE LIMIT and LIMIT OF NPPO23456783940414243PADOpen SpacePADOpen SpaceDUMPEDRIPRAPRIPRAP LINEDCHANNELGROUTED ROCKRIPRAPTREES THIS AREA TO BE 15GAL MIN; ALL OTHER PLANTMATERIALS TO BE 5 GAL, MIN.-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDLANDSCAPE NOTESAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com3 14L-3CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-2MATCHLINE -- SEE SHEET L-4NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. WMWMWMWMWMWMWMWMWMWMWMWMWM2620 26232622262526132615-1.98%ROUNDABOUT #1GRADE LIMIT and LIMIT OF NPPOSR910111213144445464748498PADOpen SpacePADOpen SpaceGROUTED RIP RAPSLOPE TREATMENTGROUTED RIPRAPGROUTEDRIPRAPDUMPED RIPRAPTREES THIS AREA TO BE 15GAL MIN; ALL OTHER PLANTMATERIALS TO BE 5 GAL, MIN.-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com4 14L-4CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-3MATCHLINE -- SEE SHEET L-5NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. WMWMWMWMWMWMWMWMWMWMWMWM26102 6 2 0 2610 2 6 1 5GRADE LIMIT and LIMIT OF NPPO1516171819505152535455PROPOSEDMAINTENANCEROADPADOpen SpaceGROUTED RIPRAPSLOPE TREATMENTGROUTEDRIPRAPDUMPED RIPRAPDUMPED RIPRAPGROUTED RIPRAPSLOPE TREATMENTRIPRAP LINEDCHANNEL-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com5 14L-5CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-4MATCHLINE -- SEE SHEET L-6MATCHLINE -- SEE SHEET L-9 NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. WMWMWMWMWMWMWMWMWMWMWMWM259526002620 26 1 0 2605 2 5 9 5 259526 3 8 2 6 3 5 GRADE LIMIT and LIMIT OF NPPOROUNDABOUT #2SRSR20212223242526565758596061PROPOSEDMAINTENANCE ROADPADOpen SpaceGROUTED RIPRAPSLOPE TREATMENTDUMPEDRIPRAPGROUTEDROCK RIPRAPDUMPED RIPRAPRETAINING WALLRIPRAP LINEDCHANNELHYDROSEEDTREES THIS AREA TO BE 15GAL MIN; ALL OTHER PLANTMATERIALS TO BE 5 GAL, MIN.-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDLANDSCAPE NOTESAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com6 14L-6CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-7MATCHLINE -- SEE SHEET L-5MATCHLINE -- SEE SHEET L-9MATCHLINE -- SEE SHEET L-9MATCHLINE -- SEE SHEET L-10 NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. WMWMWMWMWMWMWMWMWM25922590GRADE LIMIT and LIMIT OF NPPOSR2728293031323333626364PROPOSEDMAINTENANCE ROADGROUTEDROCK RIPRAPDUMPED RIPRAP-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com7 14L-7CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-8MATCHLINE -- SEE SHEET L-6MATCHLINE -- SEE SHEET L-12MATCHLINE -- SEE SHEET L-10MATCHLINE -- SEE SHEET L-11 NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. W M WMWMWMWMWM2570257825802571333435363738GRADE LIMIT andLIMIT OF NPPO64PROPOSEDMAINTENANCEROADPROPOSEDMAINTENANCEROADDUMPED RIPRAPDUMPED RIPRAPGROUTEDROCK RIPRAPPROPOSEDMAINTENANCEROADPROPOSEDMAINTENANCEROADRETAINING WALLDUMPED RIPRAPDUMPED RIPRAPHYDROSEED BOTTOMOF SEDIMENT BASINPROPOSEDMAINTENANCEROAD-1.98%NARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com8 14L-8CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-7MATCHLINE -- SEE SHEET L-13 MATCHLINE -- SEE SHEET L-12 NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. -1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRGRADE LIMIT and LIMIT OF NPPOPROPOSEDMAINTENANCE ROADDUMPED RIPRAPCOLORED GUNITEGROUTED ROCKRIPRAPGROUTED ROCKRIPRAPDUMPED RIPRAPDUMPEDRIPRAPDUMPED RIPRAPGROUTEDROCK RIPRAPHYDROSEED BOTTOMOF SEDIMENT BASINLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.NARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com9 14L-9CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-5MATCHLINE -- SEE SHEET L-10MATCHLINE -- SEE SHEET L-6MATCHLINE -- SEE SHEET L-6 NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. -1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.Additional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRGRADE LIMIT and LIMIT OF NPPOGROUTED ROCKRIPRAPGROUTED ROCKRIPRAPDUMPED RIPRAPGROUTEDROCK RIPRAPHYDROSEED BOTTOMOF SEDIMENT BASINHYDROSEED BOTTOMOF SEDIMENT BASINNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com10 14L-10CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-11MATCHLINE -- SEE SHEET L-7 MATCHLINE -- SEE SHEET L-6 MATCHLINE -- SEE SHEET L-9NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. HYDROSEED BOTTOMOF SEDIMENT BASIN-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.Additional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com11 14L-11CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-7MATCHLINE -- SEE SHEET L-12MATCHLINE -- SEE SHEET L-10NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. 2570257025752580 25712572257225752574GRADE LIMIT and LIMIT OF NPPODUMPED RIPRAPDUMPED RIPRAPHYDROSEED BOTTOMOF SEDIMENT BASINHYDROSEED BOTTOMOF SEDIMENT BASIN-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDAdditional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.NARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com12 14L-12CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANNorthSCALE: 1"=20'C.I. = 1.0'MATCHLINE -- SEE SHEET L-8 MATCHLINE -- SEE SHEET L-11NOTE:All Blue Palo Verde to be TOSunless otherwise indicated. SHORE CLIFF DRIVE(Public)GRADE LIMIT and LIMIT OF NPPODUMPED RIPRAPDUMPED RIPRAPHYDROSEEDHYDROSEED-1.98%ALL PLANT MATERIAL TO MEET OR EXCEED ARIZONANURSERY ASSOCIATION SPECIFICATIONSTREESSIZEQTYBlue Palo VerdeLarge Shrub5 Gal & 1 GalAccent PlantGround Cover Accent Plant1/2" - 3/4" Screened RockApache Brown - 2" min thicknessSHRUBS / ACCENTSSIZEQTYGROUND COVER / HARDSCAPE41293336116CONCEPTUAL LANDSCAPE LEGENDLANDSCAPE NOTES1.Where plant materials shown in legend with two sizes, those plantmaterials at entry off Naranja Drive and those at roundabouts (areasindicated on plan) to be planted at the larger sizes.2.All bare dirt areas to be covered with minimum 2" thick, 1/2" - 3/4" screened rock, including areas within the right-of-way.3.All plants shall be irrigated with a permanent undergroundirrigation system. Irrigation shall be reduced by 50% after 5 (five)years, with vegetation in buffer yards completely removed fromsupplemental irrigation after five years (100% reduction), from thedate of issuance of the certificate of occupancy.4.The Property Owner shall be responsible for maintenance of therequired landscape and irrigation system in perpetuity.5.Materials within the sight visibility triangles shall be placed so asnot to interfere with a visibility plane described by two horizontallines located 30 inches and 72 inches above finished grade ofthe roadway surface.Additional (Required for Entry and Revegetation Areas)15 Gal & 5 Gal499Small Shrub1701OcotilloMin 3' High,414 CanesBarrel Cactus322Prickly Pear Cactus908Native BoulderHydroseed Mix - All Disturbed Areas and Bottom of BasinSee Sheet L-1 for SpecificationsHackberry, Transplant2Saguaro, Transplant3Blue Palo Verde 7215 GalTOS5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal5 Gal & 1 Gal(Transplants to be used at Entry and other focal points) SRNARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.com13 14L-13CONTOUR INTERVAL = 12"SCALE: 1" = 20'-0"NorthSCALE: 1"=20'C.I. = 1.0'KEY MAP -- No ScaleTHIS SHEETCONCEPTUAL LANDSCAPE PLANMATCHLINE -- SEE SHEET L-8 NTSTREE PLANTING DETAILROOT BALL"D"REFER TONOTE 3REFER TO PLANTING KEYAND STANDARDSOF ROOT BALL (MIN.) OR TO EDGE OF CURB/WALKTYPICAL TREEFINISH GRADEPLANT PITCOMPACT SUBGRADETO 85% IF DISTURBEDMIN. DISTANCE VARIESSCARIFIED/DISTURBED SOIL 5 x WIDTHCLEAN SITE SOILREMOVE ALL ROCKSOVER 2" IN DIAMETERSIDES OF PIT SHALL BE ROUGH& SLOPINGUNDISTURBED SITE SOILDRAINAGECHIMNEY IFREQUIREDNOTES:1. NO PLANTS SHALL BE PRUNED EXCEPT @ THE DIRECTION OF THE OWNER'S REPRESENTATIVE.2. STAKE TREE ONLY IF NEEDED, PER DIRECTION OF OWNERS REPRESENTATIVE (SEE TREE STAKING DETAIL).3. DEPTH (D") OF PLANT PIT TO BE EQUAL TO DEPTH OF ROOTBALL.EDGE OF CURB OR SIDEWALKFINISHED GRADETREE STAKE TREE STAKING DETAILNATIVE SOILN.T.S.TYPICAL TREETIE WIREPREPARED SOILTREE TRUNK(ALLOW ROOM TO6" EQEQ5" MIN. KEEP ROUNDPRESSURE TREATED2"x2" DOUGLAS FIR OR2" DIA LODGEPOLEPINE STAKES; 8'-0" LONG;TWO (2) PER TREESET TIE @APPROXIMATELY 1/2HEIGHT OF TREE(TYP.)3/4" DIA. VINYL TWO-PLYFABRIC-BEARING HOSESTAPLE WIRETO STAKEDOUBLE-STRAND, 12-GUAGEGALVANIZED TIE WIRES (TYP.)NOTES:1. NO PLANTS SHALL BE PRUNED EXCEPT @ THE DIRECTION OF THE OWNER'S REPRESENTATIVE2. STAKE TREE ONLY IF NEEDED, PER DIRECTION OF OWNER'S REPRESENTATIVE3. SET STAKES PARALLEL TO SIDEWALK AND STREETMIN.MOVE FREELY INSIDE)ROOTBALLFINISH GRADESHRUBPLANT PITNTSSHRUB PLANTING: 1- GALLON PLANTSCLEAN SITE SOILREMOVE ALL ROCKS2" IN DIAMETERSIDES OF PIT SHALLBE ROUGH AND SLOPINGMIN. 5X WIDTH OFROOTBALL OR TOEDGE OF PAVEMENTCOMPACT DISTURBED SITEUNDER ROOT BALLDRAINAGE CHIMNEYIF REQUIRED60°12345660°TREE ROOT BALLNTSEMITTER LOCATION DETAIL-TREES1/2" MAX.EQ.EQEMISSION POINT(TYP.)DISTRIBUTIONTUBE (TYP.)PLANT PIT PERIMETER--5X ROOTBALLNOTES:1. MAXIMUM LENGTH OF ONE DISTRIBUTION TUBE SHALL BE 15'2. EMISSION POINTS ARE NUMBERED IN ORDER OF PLACEMENT (1-6)3. IF ONLY ONE EMITTER-PLACE UPHILL OF TREEMULTI-PORTEMITTER NTSDISTRIBUTION TUBINGSINGLE-PORT EMITTER INSTALLATIONFINISH GRADEEMITTER.580 POLYETHYLENETUBINGSELECT BACKFILL AROUNDTUBING AND EMITTERS1"-2" MAXNOTES:1.LENGTH OF DISTRIBUTION TUBINGNOT TO EXCEED 6'-0".2.SELECT BACKFILL SHALL BE SANDOR SOIL FREE OF STONES LARGERTHAN 12" IN DIAMETER.ROOTBALLSHRUBPVC PIPEPVC PIPE12" MINLOCK BY OWNER2%2%NOTE: INSTALL PER C.O.T. WATER STANDARD 1802ELBOW - BOTH SIDESINSULATION WRAPUNION (TYP.)BACKFLOW PREVENTION UNITNTSFINISHTHRUST BLOCKSAS NEEDEDGALVANIZED FITTINGSTYP.6" MIN.4" MIN.REDUCED PRESSUREBACKFLOW PREVENTOR4" THICK CONCRETEPAD 12" LARGER THAN ENCLOSURE.SLOPE TO DRAIN.PIPE DIA. + 2"PVC SLEEVEPVC MALEADAPTORPIPE DIA. + 2"P.V.C. SLEEVEPVC MALE ADAPTORSTEEL ENCLOSURE--REFER TO IRRIGATION KEY.GRADEMULTI-PORT EMITTERNTS1/2" PVC RISERPVC EMITTER LATERALGEOTEXTILE FABRICS1/2" 6"PVC TEE (SxSxT) W/1/2" RISER(LENGTH AS REQ'D.)6" DEEP PEAGRAVEL SUMP7" DIAMETER VALVE BOX-HIGH ROUND BOX WITHCONTINUOUS LIP FORLID SUPPORTFINISH GRADE - 1/2"BELOW TOP OF BOXMULTI-PORT EMITTERRAINBIRD XBT-10 OR 201/2" PVC ELLMPT X FPTLATERAL END CAPNTSFINISH GRADEPVC 90 ELLPVC RISERPVC EMITTER SUB-LATERALGEOTEXTILE FABRICSPEA GRAVEL SUMP6"10"1/2"10" DIA. PLASTICASSEMBLY BOX WITHCONTINUOUS LIPFOR LID SUPPORTMHT ADAPTOR WITH FHT CAPAT ENDS OF ALL LINESNTSPVC LATERAL LINE(MAX.)IRRIGATION TRENCHINGWIDTHCLFINISH GRADE(24" WHERE NOT UNDER PAVEMENT)PVC MAINLINETRENCH8"1'0"1'6"30" UNDER PAVEMENT COMPACTBACKFILL TO 85%95% OVER ALLSLEEVINGPVC EMITTER SUB-LATERALLINE OR POLY LINE, AS APPLICABLECONTROL WIRES (TAPEDAND BUNDLED EVERY 10')NOTES:1. ALL PIPE SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.2. NO PIPE OR WIRE SHALL BE LOCATED UNDER PAVING UNLESS IT IS SLEEVED.UNDISTURBED OR 85%COMPACTED SUBGRADEDIRT OR SAND FINE ENOUGH TO PASS 1/2" SLEEVESCH. 40 SLEEVE AT ALLLOCATIONS UNDER PAVEMENT (TYP.)3" MIN.PVC LATERAL - FROM RCV6" MAX.NTSPVC PIPEPVC ELL-SXTPRESSURE REGULATOR RISERPVC EMITTERPVC UNION SCH. 80PVC ELL-SXTFINISH GRADEPVC PIPEALL PIPE SCH. 40 EXCEPT SCH. 80 UNIONS PVC FITTING - SXSXSPLASTIC VALVE BOX6"4" MIN,PRESET PRESSUREREGULATORPVC UNION SCH. 80TYP. 2" GRANITEMULCH WHERE SHOWN ON PLANSEAL OPENINGS ANDBOTTOM WITHGEOTEXTILE FABRICPEA GRAVEL SUMP(1-CU.FT.EACH)SUBLATERALBRICK UNDERNEATHEACH CORNER (TYP.)PVC UNION BOTH SIDESPVC MAINLINEPVC MAINLINE3" (MIN.)UNDISTURBED SUBGRADEBACKFILL (TYP.)8" PEA GRAVEL SUMPBALL VALVE (LINESIZE)ISOLATION VALVENTS8" MAX.1'-0"3" MIN.PLASTIC VALVE BOXBRICK, ONE AT EACHCORNER (TYP.)SEAL OPENINGS ANDBOTTOM WITHGEOTEXTILE FABRICFINISH GRADE 1/2"BELOW TOP OF BOX OF VALVEPVC MALE ADAPTOR(TYP. BOTH SIDES)FLOWREMOTE CONTROL VALVEINLINE FILTERFINISH GRADEPVC MAINLINEREMOTE CONTROL VALVENTS1/2"PVC UNION BOTHSIDES OF VALVE6" DEEP-3/4"PEA GRAVELSUMP (TYP.)PLASTIC BOXSCH. 80 UNION(BOTH SIDES)BRICK AT CORNER(TYP.)GEOTEXTILE FABRIC(TYP.)SEAL ALL BOX CUTOUTS AND BOTTOMOUTSIDE WALLJUNCTION BOXDEPTH PERTRENCHINGDETAILWALL MOUNTED CONTROLLERNTSPVC ELBOWWALL MOUNTED CONTROLLER(OUTDOOR WALL MOUNT)1.5-INCH PVC SCH 40 CONDUITAND FITTINGSWIRES TO REMOTE CONTROLVALVES1-INCH PVC SCH 40ELECTRICAL CONDUITAND FITTINGS TOPOWER SUPPLY1. CONTROLLER SHALL BE A MIN OF 18" AND A MAX OF 54" ABOVE FINISH GRADE.2. CONTROLLER BOX TO BE SECURITY MOUNTED TO WALL AS RECOMMENDED BY CONTROLLER MANUFACTURER.FLOWREMOTE CONTROL VALVEPVC MAINLINEREMOTE CONTROL VALVENTS1/2"PVC UNION BOTHSIDES OF VALVE6" DEEP-3/4"PEA GRAVELSUMP (TYP.)FINISH GRADEPLASTIC BOXBRICK AT CORNER(TYP.)GEOTEXTILE FABRIC(TYP.)SEAL ALL BOX CUTOUTS AND BOTTOM1234567891011121314NARANJA TRAILSLOTS 1-64 & COMMON AREAS A THROUGH B,TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONAA Portion of the East Half of the Northwest Quarter of Section 12, T-12-S,R-13-E, G&SRM, Town of Oro Valley, Pima County, AZ35974 S. Desert Sun DriveTucson, AZ 85739(520) 909-4678gregs@grslandscapearchitects.comCONSTRUCTION DETAILS14 14L-14 Neighborhood Meeting Summary Propose Conceptual Site and Landscape Plan South of the Naranja Drive and Highlands Wash intersection, approximately ¼-mile west of N. First Ave. September 22, 2020 6 – 7:30 pm On-line via Zoom 1.Introduction and Welcome Meeting facilitator and Town’s primary staff reviewer, Principal Planner Michael Spaeth, summarized the purpose and structure of the meeting, and where we are in the process. Approximately 52 residents and other interested parties were in attendance. 2.Staff Presentation Michael Spaeth, the Town’s primary staff reviewer, provided a presentation that included: Location of the subject property History of the property Brief summary of the applicant’s site plan Town’s review criteria 3.Applicant Presentation The applicant, Paul Oland of Paradigm Land Design, provided a presentation detailing the proposal, including: Project location and area information Revised site design for the property Cross-section of proposed homes to illustrate building heights 4.Questions Following the presentations, meeting facilitator Michael Spaeth opened the meeting to questions and comments. A list of the questions or comments is provided below: What are the projected lot sizes? How much will the homes cost? Do we have any idea what the building characteristics will be? Zoning allows a max building height of 34 feet, but the applicant is proposing a max building height of 24 feet. Could the applicant come back and increase heights in the future? Will the open space ever be developed? Will this proposal impact the floodplain for the Highlands Mobile Home Park? What specific changes are proposed for Highlands Wash? Who will be responsible for the Highlands Wash after construction? Will the existing slopes be reinforced following development? What is the timeline for construction? Specifically, the access on Naranja. What is the plan to make sure hillsides don’t erode over time? Is the HOA responsible for maintenance of Highlands Wash? Where does the HOA’s initial funding come from? What impacts are there for homeowner’s views to the west? How far are these homes from Highlands Mobile Home Park? How will erosion in Highlands Mobile Home Park be controlled? Does the Town have enough water for these additional homes? Why is Shore Cliff Drive egress only? Where will the construction traffic be routed? How does the Town assure the open space will be preserved? Will the grade of the wash or development be raised? Will the posted speed limit on Naranja be reduced to handle the additional traffic? The Traffic Impact Analysis needs to be updated. Is the existing levee part of this design or will it go away? Can roof-mounted solar panels of HVAC be restricted? What size of backyards will the homes have? Room for pools? Who enforces lighting, noise, trash? Can neighbor’s weigh-in on the CC&R’s? What is the “true” height of homes after the grade is raised? Can you restrict the number of 2-story homes along the east side? Are there plans to plan the basin? The extent of grading will have a negative impact on wildlife. Mr. Oland and Town staff provided more detail and answered questions related to the proposal and process. Mr. Spaeth closed the meeting, thanked everyone for their attendance and encouraged everyone to email ask@orovalleyaz.gov with any additional thoughts, comments or questions and to visit OVprojects.com for additional information. He indicated there would be a second neighborhood meeting following the formal submittal and code compliance. Neighborhood Meeting Summary Propose Conceptual Site and Landscape Plan South of the Naranja Drive and Highlands Wash intersection, approximately ¼-mile west of N. First Ave. June 26, 2022 6 – 7:30 pm Oro Valley Town Council Chambers 1.Introduction and Welcome Meeting facilitator, Milini Simms, Principal Planner, summarized the purpose and structure of the meeting, and where we are in the process. Approximately 35 residents and other interested parties were in attendance. 2.Staff Presentation Michael Spaeth, the Town’s primary staff reviewer, provided a presentation that included: Location of the subject property Brief summary of the applicant’s revised site plan Summary of history of the property 3.Applicant Presentation The applicant, Paul Oland of Paradigm Land Design, provided a presentation detailing the proposal, including: Project location and area information Revised site design for the property Cross-section of proposed homes to illustrate building heights 4.Questions Following the presentations, meeting facilitator Michael Spaeth opened the meeting to questions and comments. A list of the questions or comments is provided below: What are the projected lot sizes? How much will the homes cost? Do we have any idea what the building characteristics will be? Zoning allows a max building height of 34 feet, but the applicant is proposing a max building height of 24 feet. Could the applicant come back and increase heights in the future? Will the open space ever be developed? Will this proposal impact the floodplain for the Highlands Mobile Home Park? What specific changes are proposed for Highlands Wash? Who will be responsible for the Highlands Wash after construction? What’s the minimum distance of the proposed homes to the Naranja Estates subdivision? How does the access from Naranja Drive avoid the existing bridge? Will the existing slopes be reinforced following development? What is the timeline for construction? Specifically, the access on Naranja. What is the plan to make sure hillsides don’t erode over time? What processes’ does the Town have to make sure things are designed/constructed correctly and safely? Is the HOA responsible for maintenance of Highlands Wash? Where does the HOA’s initial funding come from? What impacts are there for homeowner’s views to the west? How far are these homes from Highlands Mobile Home Park? How will erosion in Highlands Mobile Home Park be controlled? Does the Town have enough water for these additional homes? Why is Shore Cliff Drive egress only? Where will the construction traffic be routed? How does the Town assure the open space will be preserved? Will the grade of the wash or development be raised? Will the posted speed limit on Naranja be reduced to handle the additional traffic? The Traffic Impact Analysis needs to be updated. Is the existing levee part of this design or will it go away? Can roof-mounted solar panels of HVAC be restricted? What size of backyards will the homes have? Room for pools? Who enforces lighting, noise, trash? Can neighbor’s weigh-in on the CC&R’s? What is the “true” height of homes after the grade is raised? Can you restrict the number of 2-story homes along the east side? What is the drainage basin constructed of? When was the most recent Environmental Impact Statement done? Having Shore Cliff Drive be exit only, will negatively impact Naranja Dr. Are there plans to plan the basin? The extent of grading will have a negative impact on wildlife. Mr. Oland and Town staff provided more detail and answered questions related to the proposal and process. Ms. Simms closed the meeting, thanked everyone for their attendance and encouraged everyone to email ask@orovalleyaz.gov with any additional thoughts, comments or questions and to visit OVprojects.com for additional information. She announced the project would be on the Planning and Zoning Commissions August agenda. July 23, 2022 To Oro Valley Town Council, Special Attention: Joyce Ivey-Jones From: Jim & Pam Donnelly, 257 W Naranja Dr, fjamesdonnelly@comcast.net , pameladonnelly@comcast.net RE: Meritage Homes misconduct in relation to Naranja Trails development I am writing this as a homeowner directly affected by the proposed development at the very bottom of Highlands Wash. The developer involved is Meritage Homes. As a theme, Meritage’s methods of dealing with the community can only be described as a continuous “sleight of hand”. Meritage has shown that it cannot be trusted, and the Town Council should think clearly before allowing it to despoil one of the last and largest washes in Oro Valley. I’ll start with the largest “sleight of hand”. In an open Town Meeting about 19 months ago, Meritage announced its plan to place 46 homes in the wash. I, along with other homeowners contiguous to the wash, examined the proposal in terms of flooding, traffic, possible erosion and other factors. Now, after slumbering for almost 2 years, Meritage, at a time many of us were away, submitted their amended proposal, a proposal for 64 homes, a whopping 39% increase of pressure on the wash. Additionally, after delaying for a long enough time that most of us felt the project was abandoned, Meritage set the pace at rocket speed. Another hearing was set for 5 weeks away, and construction to commence in early October. The ‘rush to judgment” after such a long period of dormancy, is too convenient to Meritage to be coincidental. Meritage has waived its right to proceed with an additional 18 homes. At a minimum, Meritage should be held to its original proposal. The “sleights of hand” by no means end there. The original plans for the project from Pima County had all traffic entering and exiting from both Naranja and Lambert Drives (Lambert via Shorecliff Drive). Now, a careful, but not obvious, reading of Meritage’s plan has traffic only exiting on Shorecliff but not entering. This will, of course, increase the traffic pressure on Naranja. There has already been one traffic fatality at or about the proposed entry/exit of the development. At a minimum, Meritage should be required to place a stoplight and entrance and exit lanes to the development on Naranja. Drainage is yet another area where Meritage hopes to fake its way through. At the 2020 hearing, Meritage was proud to tout the open space it was planning for outdoor recreation. Now, the open space seems to mostly be dedicated to a “water basin”, so most of the natural desert plants and trees will be removed. It is not clear how water will get into the “basin”. Last summer we had relatively heavy rains and there was water left in the wash. This was a breeding ground for mosquitos and other flying insects. In rainy years, the proposed “water basin” will only compound that problem. The opaqueness of Meritage’s plans leaves those of us who will likely be impacted unable to determine the extent of that impact. Please take a look at the OV website pertaining to the project. Predictably, there is little helpful information. We saw no information concerning the engineering plan on a project that is scheduled to commence a few weeks from now. While it appears nowhere on the website, the lots in the development will be substantially smaller that Oro Valley’s minimum requirement. Any fair review of the record of this proposed development shows that Meritage plans on pulling a fast one on the citizens of Oro Valley. The Council should not let them get away with it.    Planning & Zoning Commission Special Session 3. Meeting Date:08/04/2022   Requested by: Bayer Vella, Community and Economic Development  Case Number: 2201557 SUBJECT: DISCUSSION AND POSSIBLE ACTION REGARDING A NEW SIGN CRITERIA FOR THE PROPERTY LOCATED ON THE NORTHWEST CORNER OF ORACLE ROAD AND LINDA VISTA BLVD RECOMMENDATION: Staff recommends approval.  EXECUTIVE SUMMARY: The purpose of the applicant's request is to consider a new sign criteria for the Linda Vista Plaza located on the west side of Oracle Road between Desert Sky Road and Linda Vista Blvd as shown in the aerial photo and development plan below.  The approved site contains a mix of rental homes, future commercial building pads, an existing memory care facility The approved site contains a mix of rental homes, future commercial building pads, an existing memory care facility and an existing fire department. This sign criteria will apply to all the buildings on the site, existing and proposed.   A sign criteria is a document that determines the sign designs used in a multi-tenant development. The proposed sign criteria is provided in Attachment 1 and includes:  Monument sign designs for the commercial lots Entryway signs for the rental homes Wall sign colors Monument sign  Entryway signs  Wall sign The focus of the sign criteria review is for signage only. The aim is to ensure the proposal meets the design standards and principles of the zoning code and also a rezoning condition that reads "All building signage shall be consistent in design and color.  All signage must be uniform in copper patina color".  However, the sign criteria also contains language that allows registered logos as the Town cannot require any copyrighted logos to be copper patina The Planning and Zoning Commission is the review and approving body for a sign criteria. The Town must ultimately approve a code compliant sign criteria. Permanent signs are measured in relation to the Town Design Standards and Principals. After approval of sign criteria, an applicant must obtain sign permits for the installation of individual signs as needed.   BACKGROUND OR DETAILED INFORMATION: Related Approvals:  2001:  Property rezoned from R1-144 to CN 2009:  Development plan for the fire station approved (existing) 2013:  Development plan for the memory care facility approved (existing) 2021:  Development plan and architecture approved for the rental homes and two future commercial buildings approved Existing Site Conditions:  Zoning is Neighborhood Commercial (CN) Site is 13 acres The fire station and memory care facility are built and have been occupied for several years. The site work currently under construction is for the rental homes and future commercial buildings. The existing fire department and memory care facilities were built independently at different times with future connectively planned. The new rental home and commercial property development link the entire site together which makes this site considered a multi-tenant development. The zoning code requires multi-tenant developments establish a sign criteria.  Monument sign (existing): There is an existing monument sign on the corner of Desert Sky Road and Oracle Road for the Catalina Memory Care facility as shown in the following photo. This sign was originally installed with copper patina letters.  Monument Signs (proposed): The proposed sign criteria include three monument signs; One on Linda Vista Blvd and one on Desert Sky Road as shown in Attachment 1 labeled as signs A. The third monument sign is located on the corner of Linda Vista Blvd and Oracle Road and is labeled sign C in Attachment 1. Monument signs are freestanding signs placed at the entrances to the development that identify the commercial development and its tenants. The proposed sign criteria also include two entryway signs for the rental homes located interior to the development at the entrance to the homes as shown in Attachment 1 labeled as signs B. Entryway signs identify the entrance to a subdivision, complex, facility, or commercial development.  The proposed monument signs incorporate the earth tone colors, materials and design from the buildings and existing signs on the site. The signs will also contain copper patina letters and incorporate copper patina into the tenant panels or in the address panel as shown in Attachment 1. The proposed monument signs meet the size and location standards of the zoning code.     To provide context, the approved architecture for the future commercial and the under construction residential units is shown in the renderings below: Wall signs: The proposed sign criteria also includes standards for wall signs. Wall signs are individual letters and/or logos attached to the exterior wall of the building over a tenant space identifying the occupants of the commercial development as shown in the photo below.  This site is unique because of the rezoning condition on the property that limits signs to copper patina in color. Therefore, any wall signs, except for federally or state registered logos, must be copper patina in color as this photo demonstrates.  The Planning and Zoning Commission's primary focus is to consider the proposed sign designs with the zoning code's applicable design principles (section 22.9.D.5.b) and design standards (addendum A, section 2.1.F). DISCUSSION/ANALYSIS: Applicable Design Standards and Design Principals are below in italics followed by staff commentary: Sign colors, design and placement shall be complementary and integral to the projects architectural and site design themes (zoning code section 22.9.D.5.b.iv). The structural components of the monument sign incorporate colors and materials from the buildings and existing sign while also incorporating the required copper patina in the panels and/or lettering.   Project identification and sign elements shall incorporate architectural treatment and project unifying elements which are integrated with the overall design of the project in terms of style, materials, color and theme . (Addendum A, section 2.1.F.2.) The applicant proposes monument sign designs with similar linear lines, dark trim and earth tone stucco elements of the buildings. The applicant provided two design proposals for the corner sign that will allow them flexibility in the use of the panel color and base.  Either color choice will meet match the color of the buildings. The proposed signs meet the current size and illumination standards of the zoning code.  As feasible, sign colors shall utilize the project color palette approved as part of the Conceptual Design for the project (Addendum A, section 2.1.F.2). The earth tone colors of the commercial and residential buildings are used in the monument sign design. As mentioned earlier, the development's rezoning condition reads "All building signage shall be consistent in design and color.  All signage must be uniform in copper patina color". However, the Town must also allow for registered logos. The proposed sign criteria follow the color requirement of the rezoning by incorporating copper patina as primary element of the signs while also including language that allows registered logos.  GENERAL PLAN CONFORMANCE The proposed sign criteria was reviewed for conformance with the General Plan’s Goals and Policies. Listed below are relevant policies within the General Plan relating to signage: Goal Q: A built environment that creatively integrates landscape, architecture, open space and conservation elements to increase the sense of place, community interaction and quality of life. Policy Land Use 6: Maintain the small town, neighborly character and improve the design and safety of the built environment. Action item #125: Maintain the unique character of Oro Valley by studying and updating: Signage regulations to emphasize identification and direction over advertising goods or services to maintain compatibility and minimal intrusiveness. The proposed sign criteria will provide signs for businesses to be identified to the public while maintaining cohesive non-intrusive signage.   Summary The proposed sign criteria complies with the zoning code standards and rezoning condition, while providing a cohesive sign program for the property and its tenants. Recommendation The proposed sign criteria (Attachment 1) meets the design principles and standards of the zoning code. Therefore, staff recommends approval. FISCAL IMPACT: N/A SUGGESTED MOTION: The focus of this item is for signs only. The Planning and Zoning Commission may consider the following motions: I MOVE to approve the sign criteria for the subject property based on the finding it is in conformance with the applicable Design Principles and Standards of the zoning code.  OR  I MOVE to deny the sign criteria for the subject property based on the finding:_______________________________.  Attachments Attachment 1 Sign Criteria  NARRATIVE FOR LINDA VISTA SIGN CRITERIA PACKAGE Linda Vista Sign criteria creates a cohesive sign package that requires tenants and owners to maintain design themes that compliment and integrate well with Oro Valley’s sign codes and the project’s architectural theme. All of the sign elements and identification items must incorporate the indicated finishes, colors, materials and themes outlined in the sign criteria package and must meet the size requirements of the Oro Valley sign code. Linda Vista Plaza Sign Criteria Management Signage 1 of 6 375 E. Linda Vista Blvd., Oro Valley, AZ 85704 Prepared for PROPERTY LINE Sign Criteria Management Signage 2 of 6 375 E. Linda Vista Blvd., Oro Valley, AZ 85704 A A B B Linda Vista Plaza C Sign Criteria Management Signage 3 of 6 LINDA VISTA LUXURY RENTALS0'-4.75"4'-4"0'-6.75"375 E. Linda Vista Blvd., Oro Valley, AZ 85704 A B Linda Vista Plaza ACRYLIC BOTTOM OF METAL BOX BAND FOR INTERNAL LIGHTING. METAL BOX BAND TO WRAP CORNER TO BACK OF SIGN ROUTERED ALUMINUM FACE WITH PLEX BACKING, LED ILLUMINATED, FAUX PATINA PAINTED FINISH REVERSE PAN CHANNEL LETTERS PIN MOUNTED TO WALL METAL BOX BAND SIGN PANEL COLOR: TO MATCH ARCHITECTURE ALTERNATE COLOR OPTIONS TBDTENANT PLAQUES/SLIDERS WITH 4” HT LETTERING. FONT: TBD CHANNEL SIGN BOX MOUNTED TO WALL. ALUMINUM BOX FRONT, BACK, AND SIDES WITH LASER CUT LETTERS IN CREAM COLORED ACRYLIC. LIGHTING: STANDARD FRONT LIT CHANNEL SIGN. COLOR: TO MATCH ARCHITECTURE. FONT SIZE: 6.75” HT AND 4.75” HT FONT: TBDDIMENSIONAL LOGO PANEL PIN MOUNTED TO SIGN BOX. ACCENT COLOR PANEL WITH CUT OUT LETTERS (CREAM BACKING EPOXIED TO PANEL). ELECTRICAL/LIGHTING DESIGN (TRANSFORMER, HOUSING, RACEWAY, ETC.) BY SIGN CONTRACTOR/ MANUFACTURER ARCHITECTURAL ELEMENT CAN BE UP TO 10’ TALL. SIGN IS ALLOWED TO BE UP TO 8’ TALL. HEIGHT OF SIGN CAN INCREASE, IF DESIRED. SIGN IS ALLOWED TO BE UP TO 8’ TALL. HEIGHT OF SIGN CAN INCREASE, IF DESIRED. Sign Criteria Management Signage 4 of 6 Sign Criteria This criteria has been developed to ensure that colors, placement and materials are consistent with the projects architectural and site design themes. Tenant Store Front criteria 1. Type of signage. Illuminated reverse pan channel letters. 2. Letterface colors copper patina. Registered trademarks and logos are permitted. 3. All signs shall conform to the Town of Oro Valley sign code. 4. Sign permits must be obtained by Town of Oro Valley. 5. Sign size shall conform to the Town of Oro Valley. Freestanding Sign Criteria 1. Freestanding signs shall be monument style as per the Town of Oro Valley Zoning Code. Sign is allowed to be up to 8’ tall. Architectural element can be up to 10’ tall. 375 E. Linda Vista Blvd., Oro Valley, AZ 85704 Linda Vista Plaza Sign Criteria Management Signage 5 of 6 375 E. Linda Vista Blvd., Oro Valley, AZ 85704 TYPICAL ORO VALLEY RETAIL SIGNAGE IN AREA PROPOSED LINDA VISTA PLAZA SIGNS IN PATINA Linda Vista Plaza Sign Criteria Management Signage 6 of 6 375 E. LINDA VISTA 375 E. Linda Vista Blvd., Oro Valley, AZ 85704 DOUBLE-FACED INTERNALLY ILLUMINATED TENANT ID MONUMENT (COLOR AND LAYOUT OPTIONS) Freestanding Sign Criteria 1. Freestanding signs shall be monument style as per the Town of Oro Valley Zoning Code. Linda Vista Plaza C PAN CHANNEL FACES WITH PATINA, ROUTERED WITH TENANT LOGO. LED ILLUMINATED WITH PLEX BACKING WITH TRANSLUCENT TAN VINYL TO MATCH EXISTING BUILDING SCHEME. PAN CHANNEL FACES PAINTED BRONZETONE, ROUTERED WITH TENANT LOGO. LED ILLUMINATED WITH PLEX BACKING WITH TRANSLUCENT TAN VINYL TO MATCH EXISTING BUILDING SCHEME. ROUTERED ALUMINUM FACE WITH PLEX BACKING, LED ILLUMINATED, FAUX PATINA PAINTED FINISH ROUTERED ALUMINUM FACE WITH PLEX BACKING, LED ILLUMINATED, FAUX PATINA PAINTED FINISH REVERSE PAN CHANNEL LETTERS PIN MOUNTED TO WALL REVERSE PAN CHANNEL LETTERS PIN MOUNTED TO WALL REVERSE PAN CHANNEL LETTERS PIN MOUNTED TO WALL REVERSE PAN CHANNEL LETTERS PIN MOUNTED TO PATINA BACK PANEL AFFIXED TO WALL    Planning & Zoning Commission Special Session 4. Meeting Date:08/04/2022   Requested by: Bayer Vella, Community and Economic Development  Case Number: N/A SUBJECT: DISCUSSION ONLY REGARDING THE PROPOSED SCOPE FOR A HOUSING STUDY RECOMMENDATION: This item is for information and discussion purposes only.  EXECUTIVE SUMMARY: The purpose of this item is to discuss and gather feedback on the proposed housing study scope of work (Attachment 1), prior to commencing work with a consultant. Conducting a housing study is an objective in the Town Council's Strategic Leadership and an action item in the Your Voice, Our Future (YVOF) General Plan. Additionally, it will provide critical information to address the State law required housing element in the next General Plan (2026). Preparation for the next General Plan is underway with work on a Public Participation Plan starting early this fall. Essential to setting a vision, goals and polices for the next 10-years is establishing the Town's baseline through a background report on key General Plan topics. The report will be compiled over the next year to include information about economic development, environment, public safety, community resources, land use and development. The housing study is one component of this larger report.    Initially staff was awaiting the full release of the 2020 Census data to begin work on the housing study. Unfortunately, the data release has been unexpectedly delayed multiple times (now anticipated in Spring 2023). However, recent 5-year estimates have been released that include the datasets recommended for the study. This new information combined with impending work for next General Plan has spurred the need to start working on the housing study now. The proposed scope was derived from the following sources:  Town Council's Strategic Leadership Plan and YVOF General Plan State law parameters for the housing element required in the 2026 General Plan Planning resources from nationally known sources (e.g. American Planning Association) Analysis of other jurisdictions' housing studies Preliminary feedback from Town Council received during a study session in December 2021 Based on this research, the proposed scope is divided into four parts, to answer the following questions:  Existing Guidance and Inventory (What is our current housing inventory?). This part compiles the Town's existing policies related to housing and economic development for guidance. It also includes an inventory of the amount, type and quality of housing in Oro Valley and baseline information about the Town's economy.  1. Factors in Housing Demand (Who are we, and where are we headed?). This part provides information to project the Town's future housing needs based on key demographic, housing and economic trends. This information will be compared to the existing housing inventory (part 1) to understand the amount, type and cost of housing needed to support current/future residents and a thriving economy.  2. Housing Needs and Supportable Retail Demand (What are our housing needs?). Based on the first two parts, this section provides an analysis to identify gaps, if any, between the Town's housing stock (current and projected) and needs. Additionally, it will identify how much retail is supportable by the existing and projected housing demand.   3. Action Plan (How do we meet our housing needs?). This part provides recommended goals, policies and actions to address any gaps identified in part 3. It also includes an analysis of any opportunities or unintended impacts in implementing the recommended actions (e.g. impacts to Town infrastructure and resources or trade-off in zoning, like reducing commercial land to increase land available for housing).  4. In summary, the proposed housing study scope will meet the Town Council's Strategic Leadership Plan's objective, YVOF action and provide important research for the next General Plan. This item is presented for information and discussion purposes only. Once feedback is received from the Planning and Zoning Commission and Town Council, a consultant will be contracted through the Town's standard procurement process. The results of the housing study, along with the full background report will be presented to the Commission and Council in 2023.     BACKGROUND OR DETAILED INFORMATION: Completion of a housing study was included in the Your Voice, Our Future  (YVOF) General Plan and further prioritized by the Town Council through the Strategic Leadership Plan FY21/22 – 22/23.  General Plan, Action 135: Respond to and plan for the present and future housing needs of the community, while considering changes in demographics and overall growth by conducting a housing inventory, developing a housing plan that addresses the needs of a diverse community, developing zoning strategies that implement the housing plan. Town council Strategic Leadership Plan (SLP): Conduct an assessment to determine the types of residential opportunities necessary to successfully promote a thriving and diverse economic base. The housing study will not only help fulfill the goals of these policy documents but provide critical research for the State-required housing element in the next General Plan. State law requires different elements in the General Plan based on a jurisdictions' population. With the Town projected to reach 50,000 people by 2026, the General Plan must include "standards and programs for":  Elimination of substandard dwelling conditions Improvement of housing quality Variety and affordability and for provision of adequate sites for housing. This element shall contain an identification and analysis of existing and forecasted housing needs. This element shall be designed to make equal provision for the housing needs of all segments of the community regardless of race, color, creed or economic level. The image below shows which of the proposed parts of the housing study meet each item's objectives:   Preparation for the next General Plan, which must be ratified by 2026 is underway. Initial work will begin this fall to prepare a Public Participation Plan. In addition to working on a Public Participation Plan, compiling a background report is also a key first step in the General Plan 10-year update process. The background report will establish the Town's baseline (where are we now) for economic development, environmental resources, public safety, community development and land use.  The housing study represents one component of this larger background report.  Initially staff was waiting for all the 2020 Census data to be released to begin work on the study. Unfortunately, the data release has been delayed several times and is now projected to be released in Spring 2023. However, recent 5-year estimates have been released that includes the data needed to complete the housing study.  The need to start preparing for the next General Plan and availability of recent estimates outweighs the benefits of waiting for the 2020 Census data release.  DISCUSSION In addition to the Town's guiding documents and State requirements, staff reviewed planning resources and several jurisdictions' housing studies to develop the proposed scope (Attachment 2). Sources included:  American Planning Association Urban Land Institute Attainable Housing  National Community of Practice on Local Housing Policies Tempe Housing Inventory and Affordability Analysis Tempe Urban Core Market Study Tucson/Pima County MAP Town of Sahuarita and Green Valley Housing Feasibility  Tucson Comprehensive Housing Market Analysis  Sedona Housing Needs Assessment and Five-year Action Plan Flagstaff 10-year Housing Plan Based on staff's research and to meet the requirements established in the guiding documents and State law, the proposed study is divided into the four parts. As depicted in the image below, the first two parts provide the data needed to identify any housing needs (part three). Based on the identified needs (if any), part 4 will include recommended goals, policies and actions to address the identified needs. More information and specifics about each part is included in Attachment 1.  SUMMARY AND NEXT STEPS Although initially waiting for the full release of 2020 Census data to begin on the housing study, the recent release of 5-year estimates will provide the data needed to complete the study. Of great importance, is completing the housing study in preparation for the next General Plan, which must be ratified by 2026. This includes compiling a background report to establish a baseline for the Town of Oro Valley.  The housing study is a core component of this background information and foundational to addressing the State-required housing element in the next General Plan. The proposed scope is being presented for information and discussion. Once feedback is received from the Commission and Town Council, a consultant will be contracted through the Town's standard procurement process.  The results of the housing study, along with the full background report will be presented to the Commission and Council in 2023.     FISCAL IMPACT: N/A SUGGESTED MOTION: This item is for information and discussion only. Attachments ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE  ATTACHMENT 2 - RESEARCH AND ANALYSIS  ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE PROPOSED HOUSING STUDY SCOPE PART 1: EXISTING GUIDANCE AND INVENTORY (What is our current housing inventory?) PURPOSE: This part compiles the Town’s existing policies related to housing and economic development. It also provides an inventory of the existing housing stock and baseline information about Oro Valley’s economy. CATEGORIES IMPORTANCE AND OVERVIEW INFORMATION AND DATA Guidance Entails compiling the community’s existing vision and goals regarding housing and economic development. Additionally, it provides the parameters from State law to ensure the study meets the needs for the next General Plan. Detailed list of existing Town goals, policies and future guidance for the General Plan 2026 related to housing and economic development. Housing inventory analysis Provides an inventory of housing in Oro Valley. The data in this section and Part 2 will be used to identify any gaps in the OV housing market (Part 3). Distribution of housing in Oro Valley and nearby region by type and size: • Types - range from detached single-family homes, attached single- family homes (townhomes, duplexes), apartments to mobile homes. • Size – a breakdown of single-family home lot sizes and multi-family homes dwelling units (the number of bedrooms) in Oro Valley. Quality of housing in Oro Valley: • Age – a breakdown of when homes were built • Conditions – an overview of the physical characteristics of homes and amenities Economic base analysis Establishes the existing economic base for Oro Valley. Data from this section and Part 2 will be used to identify the number and type of housing needed to support a thriving economy (Part 3). Distribution of economic activity in Oro Valley and nearby region: • Type of industries – a breakdown Oro Valley’s top industries (e.g., health services and social assistance, professional, scientific management, administrative and waste management services, manufacturing, retail trade and educational services) • Quantity - built square footage for each industry type ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE PART 2: FACTORS IN HOUSING DEMAND (Who are we, and where are we headed?) PURPOSE: This part provides information to the project the Town’s future housing needs based on key demographic, housing and economic trends. This information will be compared to the existing housing inventory (part 1) to understand the amount, type and cost of housing needed to support current/future residents and a thriving economy. CATEGORIES IMPORTANCE AND OVERVIEW INFORMATION AND DATA Demographic Trends Provides information to project the Town’s future housing needs based on key demographic trends. • Population and migration trends • Age – includes age distribution and median age • Race and ethnicity • Disability – status and types of disabilities reported • Income and Poverty – includes a distribution of income and median income for the Town • Disposable income – remaining income after home and transportation costs are removed • Educational attainment – level of education completed amongst different age groups Housing Market Trends In addition to the existing policies (Part 1), this section will provide more context about residents’ preferences and housing needs. It also includes information to project the type and cost of housing available to current and future residents. Consumer preferences and needs • Occupancy type (renter or owner) • Population living in group quarter facilities (senior care, etc.) • Household characteristics – size (for rentals and owned homes), number of household with people over 65, children, grandparents raising children, households with families or individuals. Home sales market conditions • Current conditions and trends regarding home sales and prices for existing and new construction, housing turnover, delinquent mortgages, absentee sales, and absorption rates of new homes Rental market conditions • Current conditions and trends regarding rental construction activity and vacancy Home trends and forecasts - changes in the supply through new construction (permits issued per year), conversions, and demolitions. Market trends and forecasts for rentals and homes. Land availability and capacity of home builders. ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE Economic Market Trends This section will help project the amount of employment opportunities available in Oro Valley. • Forecast for Oro Valley and regional economic base industries • Workforce characteristics – commute times, salaries, and educational attainment/skills for those working in Oro Valley • Land availability and construction costs PART 3: HOUSING NEEDS AND SUPPORTABLE RETAIL DEVELOPMENT (What are our housing needs?) PURPOSE: Based on the first two parts, this section provides an analysis to identify gaps, if any, between the Town's housing stock (current and projected) and needs. Additionally, it will identify how much retail is supportable by the existing and projected housing demand. CATEGORIES IMPORTANCE AND OVERVIEW INFORMATION AND DATA Housing market gaps Using the data collected in the previous parts, this section identifies any gaps between Oro Valley’s housing stock and projected needs. • Number of units needed based on existing inventory, population, and employment projections • Any mismatches in consumer needs or preferences (age, disability, and income) to the existing housing stock and land availability • Comparison between income levels of residents and the Town’s workforce to home sales prices and rental rates Supportable retail demand This section will identify how much retail is supportable by the existing and projected housing demand. • Amount of disposable income per home • Existing and projected number of housing units remaining and needed • Existing and projected amount of supportable retail PART IV: ACTION PLAN PURPOSE: This part provides recommended goals, policies, and actions to address any gaps identified in part 3. It also includes an analysis of any intended or unintended impacts of implementing the recommended actions. CATEGORIES IMPORTANCE AND OVERVIEW INFORMATION AND DATA Goals and policy recommendations This part recommends goals and policies to be considered with the next General Plan that address any identified housing market gaps and support a thriving economy. Recommended goals and policies to fulfill any gaps identified in Part 3. This may include goals and policies to address the following: • Adjust the number of housing units to support the projected population • Accommodate housing types to support a diverse population and economic base • Support housing affordability to include all residents and workers • Encourage quality housing Actions to meet policies Specific and measurable actions to meet the proposed goals and policies. Action steps to meet goals and policies ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE Review possible opportunities or impacts to Town resources (e.g., water, roads, public safety) and overall Town growth by implementing the proposed actions • Analysis of any unintended impacts of implementing the recommended actions (e.g., trade-off in zoning, Town resources and infrastructure) ATTACHMENT 1 - PROPOSED HOUSING STUDY SCOPE ATTACHMENT 2 – RESEARCH AND ANALYSIS FOR HOUSING STUDY GENERAL POINTS/ ELEMENTS Existing inventory of housing stock Economic and demographic trends used to predict housing needs Focus on consumer preferences and affordability to identify housing needs Information for both housing and rental markets Action plans that are measurable and accountable through evaluations JURISDICTION ELEMENTS KEY POINTS Tempe Housing Inventory and Affordability Analysis (2018) BBC Research and Consulting Demographic Analysis • Population; Ownership rate; Household composition (size and type, e.g., family or non-family); Age; Income Housing Market Analysis • Housing stock; Product type; Occupancy; Age Homeownership Market • Trends in value; Market prices; Affordability Rental Market • Distribution of rents; Market rates; Affordability and public assistance Housing Market Gaps • Mismatch in the rental market (Rental Gap); Gaps in the sales market; Options for renters wanting to buy Includes consumer needs (such as affordability) and preferences. Tucson-Pima County MAP (2020) Neighborhood Vulnerability • Percent of residents that identify as anything other than “non-Hispanic white alone”; Percent of households who rent, rather than own, their homes; Percent of residents aged 25 and over who lack a four-year bachelor’s degree or higher; Percent of households with incomes below 80% of Area Median Income (as determined by HUD); Share of children that live in households below the official poverty line Housing Market Assessment • Owned home price trends; Rental home price trends; Housing cost burden for owners and renters; Housing characteristics: age, type, and vacancy; New home construction trends; Affordable housing trends Gap Analysis • Population; Income and affordability; Older adults; Housing by ethnicity and race; Vulnerability • Describes and provides data for vulnerable populations and housing needs • Interactive analysis to show housing needs in the region (current and future) ATTACHMENT 2 – RESEARCH AND ANALYSIS FOR HOUSING STUDY Town of Sahuarita and Green Valley Housing Feasibility (2020) Consultants: Crystal & Company Socio-economic profile • Employment and labor force; Population growth; Household and median income; Population by age, gender, race/ethnicity; Household type and educational attainment; Poverty and disability status Housing supply and market conditions • Overview of Residential Inventory by Type, Age, Tenure and Bedroom Mix; Inventory by Tenure & Type; Housing Turnover & Vehicles Available; Existing Residential Homeownership Values, Vacancy Rates and Gross Rents; Residential Market Conditions; Housing Distress in The Region; Assisted Housing Inventory in the region Residential market demand and site development analysis and prioritization • Key Area Labor Force Estimates and Projections; Market Demand Assumptions/Approach & Commute; Study Area Gross For-Sale Housing Demand Estimates; Study Area Gross Rental Housing Demand Estimates; Study Area Market Penetration Issues; Study Area Residential Development Sites & Prioritization, Financial Considerations and Land Use Ordinance Considerations; Findings for Sahuarita and Green Valley Affordable housing strategies • Introduction & Goals; Town of Sahuarita Housing Strategy; Green Valley Affordable Housing Strategy • Assisted living included in the inventory • Land use and site development analysis included to develop strategies. Comprehensive Housing Market Analysis – Tucson, Arizona (April 2019) US department of Housing and Urban Development Economic Conditions • Major Employers; Trends; Current conditions – payroll, unemployment; Commuting patterns; Employment forecast Population and households • Population trends (migration); Age cohort trends; Population by geography; Household trends; Households by tenure; Population and household growth forecast Home Sales Market Conditions • Current conditions; REO Sales and Delinquent mortgages; Existing homes sales and prices; Absentee sales; New home sales and prices; Affordability; Sales construction activity; Forecast Rental Market Conditions • Current conditions and recent trends; Student housing; Military housing; Rental construction activity; Recent completions; Affordability; Forecast • Relates economic development with housing • Housing for different temporary target groups (e.g., students) ATTACHMENT 2 – RESEARCH AND ANALYSIS FOR HOUSING STUDY Tempe Urban Core Market Study - Projected through 2040 Demographic trends • Population and households; Household Composition; Age Distribution; Race and Ethnicity; Household Income; Educational Attainment; Students; Resident Employment; Workers; Commute Flow; Households by Tenure; Households by Size; Occupancy; Overcrowding; Housing Stock Real Estate Trends • MFR Residential; Residential ownership; Retail; Office; Hotels and Conference Space Projections for supportable demand • Employment and Office Space projections; Population and retail projections; Hotel demand projections Affordable Housing • Housing cost burdens; Current need for affordable units; Affordability needs in projected housing development; Current policies and programs to address affordability; Additional tools to explore further Includes the amount of retail, office, and hotel space supportable by the existing and future housing amount Sedona Housing Needs Assessment and Five-Year Plan Elliott D. Pollack & Company Volume I – Existing Conditions and Housing Gap Analysis Demographic and Economic Analysis • Population, households, household size, migration, income, educational attainment; employment; commute time; occupations; inflow/outflow of workforce; per capita taxable sales; forecasts Housing analysis • Occupancy type; year built; short-term rentals; prices and rents; housing costs; apartments; overcrowding; Gap Analysis • Affordable housing for existing residents; different approaches (affordability and housing costs burden) Volume II – Affordable Housing Action Plan • Objectives, funding sources and toolkit • Includes information about the workforce population (e.g., commute time) with a focus on housing for the workforce • Action plan with tools and proposed funding sources to implement Flagstaff 10-year Housing Plan Purpose, vision, goals and policies related to housing Housing data and needs assessment • Housing affordability and cost burdens; racial disparities and housing justice; homelessness Housing first, housing equity, continuum and affordability Thorough research conducted for action plan and analysis of infrastructure, zoning, etc. needs to support affordable housing. ATTACHMENT 2 – RESEARCH AND ANALYSIS FOR HOUSING STUDY Housing Gap Analysis • Affordability; market rate housing Housing survey and working group results. Other resources/articles reviewed: • American Planning Association – Housing Assessment • ULI Attainable Housing: America’s Missed Opportunities • APA Job-Housing Balance (PAS Report 516) • APA Data-driven Housing Assessments and action plans, Part I & II (PAS Memo) • National Community of Practice on Local Housing Policies • US Census • American Housing Survey (AHS) • Consolidated Housing Affordability Survey (CHAS) • Bureau of Applied Economics (BAE) • Bureau of Labor Statistics (BLS) • Paycheck to paycheck (data on employment salaries vs. income to own or rent a home): https://nhc.org/paycheck-to-paycheck/ 1 Ancona, Jeanna From:Ancona, Jeanna Sent:Wednesday, August 10, 2022 2:31 PM To:Ancona, Jeanna Subject:FW: Thoughts on housing study From: Hal Bergsma Sent: Wednesday, August 3, 2022 8:59 AM To: Simms, Milini <msimms@orovalleyaz.gov> Subject: Thoughts on housing study Hi Milini, As promised, here are my thoughts on the housing study that I conveyed to you earlier. Affordable Housing Supply Impediments There are several things that could affect the ability to provide affordable housing in Oro Valley, beyond a limited supply of land for residential development, including: 1. Short term rentals - as a vacation community, some owners may find it to be more lucrative to rent their homes to visitors than residents. The town should take advantage of a recent change in state law and at least require owners of short term rentals to register their properties so there is an inventory of residences being used as short term rentals. 2. Part time residents - many people who own or rent in Oro Valley only reside part of the year, leaving for the summer. This means a portion of the town’s housing stock is unoccupied for part of year, impacting the local economy. It may be possible to determine which residences are vacant part of the year by looking at water bills. 3. HOA restrictions - even if the town chooses to allow missing middle housing types such as ADUs, HOAs may restrict them. 4. Competition for use of the limited supply of developable land on the town - the Council seems focused on job growth, possibly to the detriment of providing more land for affordable housing. Consideration should be given to using land for residential development fhat might otherwise be eventually developed for employment generating uses. 5. The cost of providing parking - excessive on-site parking requirements can increase the cost of housing development. Consideration should be given to reduced on-site parking requirements, especially in areas where adequate on-street parking is available. 6. Perceived infrastructure impacts, especially on the road system - standard trip generation analysis may not accurately reflect what will happen if a residential project is approved. Denial of a project, or downsizing doesn’t reduce demand, it just means potential residents of the project are forced to go elsewhere to live, often in a location that requires a longer commute to work, increasing VMT and adding to congestion on local arterials. The proximity of affordable residences to places of employment needs to be considered. 7. Equating smaller and larger dwellings in impact analysis - the present practice of measuring residential density by dwellings per acre, equating small apartments with large single family detached residences, needs to change. Small units do not have the same impacts as larger units. 8. A long entitlement process - extending the timeline for approval of residential projects increases development costs and ultimately the cost of housing. The public review process should be shortened as much as possible. Supply Opportunities 2 1. Many of the single family detached residences in the town are on large lots, providing an opportunity to allow development of accessory dwelling units, which can be affordable and offer a choice of housing type not available now in Oro Valley. 2. Many of the residences in Oro Valley are occupied by small households. This may be an opportunity for shared housing if a program such as the one being considered by the Pima Council on Aging is implemented. 3. With the increasing trend toward employees working from home, office parks may not be as fully occupied as previously. Under-occupied buildings might be converted to residential use, or under-used parking lots could be developed with residences. This also applies to retail areas that become vacant due to increasing on-line shopping. Demand Considerations 1. The already large population of older adults in Oro Valley will continue to grow. Residential projects developed in Oro Valley should be designed to accommodate them, including adequate accessibility. 2. Assuming decreasing household sizes, limited incomes and lack of time for home maintenance, many people will want to be able to reside in smaller, more affordable residences. Land use regulations should how for this housing choice. Other documents to consider There is a lot happening on the affordable housing front. As I mentioned during our phone conversation, the group I am working with has completed a document titled “Affordable Housing for Older Adults”. This is a link to it https://online.flippingbook.com/view/442925402/. Also, committees are working on affordable housing issues for the City of Tucson and Pima County. The Housing Affordability Strategy for Tucson (HAST) should be reviewed. Finally, the Arizona Housing Supply Study Committee established by the legislature in the last session is meeting bi-weekly and should have a report out by the end of the year which should be interesting reading.