Loading...
HomeMy WebLinkAboutOV1701617oPOJp�1EY q�?o29 TOWN OF ORO VALLEY DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARTMENT 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.orovallevaz.gov/dis ��UNDED 19�A 1.2 GENERAL APPLICATION FORM nffiro Use Only OV Case #: Application Type ..._.�� ❑ Major General Plan Amendment ❑ Final Plat ® Rezoning/PAD Amendment ❑ Pre -Application ❑ Planned Area Development ❑ Zoning Verification ❑ Conditional Use Permit ` VIE, ❑ Sign Criteria ❑ Zoning Code Amendment AJUN ❑ Sign - PAD Exemption ❑ Conceptual Site Plan 2 3 2017 1 ❑ Master Sign Program ❑ Conceptual Public Art ❑ Communication Facility — Tier 1 and 2 Minor ❑ Conceptual Architecture BY ❑ Communication Facility — Major El Final Site Plan • """"°"""'••••••• ❑ Revised Development Plan ❑ Conceptual Landscape Plan ❑ Other Subject Property Information: Address: Parcel/Tax Code: 224-21-0020, 0030, 0040, 0050 Subdivision / Commercial Center Name: Book / Page or Sequence Number: Lot Num Legal Description: S2 NW4 SEC 9-12-13 Section/Township/Range: Section 9. Township 12S Range 13E Area of Property: 76.4+/- Ac. Existing Land Use: undeveloped Proposed Land Use: Single -Family Residential Applicant Information: Applicant *: * If more than one, attach list Name: David Williamson Firm: Shannon 77 LLC Address: 700 E. Broadway Blvd. Suite 200 City: Tucson State: AZ Zip: 85719 Telephone: 520-404-7681 Fax: Property Owner(s) if different from Applicant *: Name: Firm: Address: Telephone: Consultant: Fax: (Discipline) Email: davidwWairfieldhomes. net City: _ Email: State: Zip: Name: Paul Oland Firm: The WLB Group, Inc. Address: 4444 E Broadway Blvd. City: Tucson State: AZ Zip: 85711 Telephone: 520-881-7480 Fax: 520-881-7490 Email g op landQwlbgroup-com 1 Proiect Description/Narrative: This request is to rezone the property from the current R1-144 to R1-36 to enable the development of a single-family residential cluster subdivision. I hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The approval of this application does not presume to give authority to violate or cancel the provisions of any other federal, state or local law for which this project may be subject to. Notice: It is the applicant/owner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions & Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners Association or property management to determine applicable requirements. It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance. Failure to do so may delay issuance of permits. See attached list of agencies. - _ Paul Oland 6/22/2017 AD icant's Signature Print Name Date Important Note: All submittals received after 4:00 p.m. will be processed the next day Submittals will be reiected if: • Not folded using Pima County fold & collated; • There are missing items on the checklist unless otherwise approved by Planning Division Manager or Town Engineer. • Re -submittals cannot be accepted without a transmittal and a written narrative summary describing the purpose of submittal. 2 OQOVN,I.EV Aq/Z�y7 7 • 1 ► d ► 4 1. s�oLNOs.� Town of Oro Valley Community Development and Public Works June 23, 2017 Mark Highlen All Seasons of Oro Valley, LLC 31731 Northwestern HWY, STE 250 W Farmington Hills, MI 48334 Sent via email: mhighlene@beztak.com Re: Zoning Verification Letter All Seasons of Oro Valley 1734 E. Innovation Park Road OV1701591 Mr. Highlen, Thank you for submitting a zoning verification for All Seasons of Oro Valle, located in Innovation Park. Below is the requested information with general inquiries in bold followed by the researched information. Current Zoning Designation: Campus Park/industrial (CPI) per the Rancho Vistoso Planned Area Development. Conformance with Zoning District: Senior care is a permitted use by right per Ordinance (0)08-02 (see enclosed), which amended the Rancho Vistoso PAD to include, "Assisted living /skilled nursing/ continuum of care facilities shall be permitted on Parcels 3-1313, 3-CC, and within the Innovation Corporate Center." The current structure legal conforming (complies with, or is otherwise exempt from, applicable zoning regulations, including parking). Overlay Districts: The property is located in the Town of Oro Valley's Economic Expansion Zone. Variances, Exceptions, Conditions and Code Violations: There does not appear to be any variances, special permits, exceptions or conditions that apply to the subject property. Also, there do not appear to be any outstanding/ open zoning code violations that apply to the subject property. Right to Rebuild following Casualty: Chapter 29 of the Zoning Code reads: If, at any time, any building or land in existence or maintained at the time of the adoption of this ordinance which does not conform to the regulations for the district in which it is located shall be destroyed by fire, explosion. act of God or act of the public enemy to the extent of 50 percent of its value as determined by three (3) competent appraisers, then and without further action by the Town Council, the said building and the land on which said building was located or maintained shall, from and after the date of such destruction, be subject to all the regulations specified by this Code for the district in which such land and building are located. Site Plan Approval: The final site plan for this property was approved by the Town of Oro Valley on March 10, 2015 (see enclosed). Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 Town of Oro Valley Community Development and Public Works Final Site Plan Expiration: Section 22.9 of the Zoning Code reads: Approval shall expire if improvements have not been started within two (2) years of the date of approval of the final design. A request to extend the time beyond two (2) years must be submitted in writing to the Town Council within two (2) years of the date of approval. Before such extension is granted, the Town Council shall review the existing financial assurances to ensure that the required improvements have been made. If the approved final design is abandoned, the Town will return the financial assurances less any expenses the Town has incurred. This information was researched by the undersigned, per request and as a public service. The undersigned certifies that the above information contained herein is believed to be accurate and is based upon, or relates to the information supplied by the requestor. The Authority assumes no liability for errors and omissions. All information was obtained from public records, which may be inspected during regular business hours. If you have any questions, please contact me at msimms@orovalleyaz.gov or 520.229.4836. Sincerely, Milini Simms Planner Msimms(a7oroval1eyaz.gov 520-229-4836 CC: File Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 OQO JP�yEY g9�O�9 AOUNDED 19lA Town of Oro Valley Community Development and Public Works March 5, 2018 Paul Oland WLB Group 4444 E. Broadway Tucson, Arizona 85711 Re: OV1701617, Engineering Acceptance Letter for Shannon 80 Residential Subdivision General Plan Amendment / Rezoning Site Analysis (3'd Submittal) Permitting Engineering review has completed its review of the referenced project and has no additional comments at this stage of the process. If you have any questions, please call me at (520) 229-4824. Sincerely, Esteban Tineo, P.E. Senior Civil Engineer Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 TOWN OF ORO VALLEY DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARTMENT 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.orovallevaz.gov/dis 1.2 GENERAL APPLICATION FORM Application Type: ❑ Major General Plan Amendment ® Final Plat MAR 2 7 2018; ❑ Rezoning/PAD Amendment ❑ Pre -Application ❑ Planned Area Development ❑ Zoning Verification, ❑ Conditional Use Permit ❑ Sign Criteria ❑ Zoning Code Amendment ❑ Sign - PAD Exemption ❑ Conceptual Site Plan ❑ Master Sign Program ❑ Conceptual Public Art ❑ Communication Facility — Tier l and 2 Minor ❑ Conceptual Architecture ❑ Communication Facility — Major ❑ Final Site Plan ❑ Revised Development Plan ❑ Conceptual Landscape Plan ❑ Other Subject Property Information: Address: RV Neigh 10 Parcel T Parcel/Tax Code: 219-22-422H Subdivision / Commercial Center Name: Book / Page or Sequence Number: Lot Number(s) Lots 1-19 Legal Description: SWLY PTN SE4 SW4 E of Ado to La Canada Drive Section/Township/Range: Section 26, T11 S, 13E Area of Property: 5.74 Ac Existing Land Use: Vacant Proposed Land Use: Single Family Residential Applicant Information: Applicant *: Name: Dick Maes * If more than one, attach list Firm: Grace Holdings, LLC & J.D.W. Investments Management, LLC Address: 1121 Warner Rd, Suite 109 City: Tempe State: AZ Zip: 85284 Telephone: 480-831-2000 Fax: Email: Richardm(o)wholdings.com Property Owner(s) if different from Applicant *: Name: Firm: Address: Telephone: Fax: Consultant*: Civil Engineer (Discipline) City: — Email: State: Zip: Name: Paul Oland Firm: The WLB Group, Inc. Address: 4444 E. Broadway Blvd. City: Tucson State: AZ Zip: 85711 Telephone: 520-881-7480 Fax: Email: gpoland@wlbgroup.com el Project Description/Narrative: We propose a small 19 lot single family subdivision on 5.74 ac. I hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The approval of this application does not presume to give authority to violate or cancel the provisions of any other federal, state or local law for which this project may be subject to. Notice: It is the applicant/owner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions & Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners Association or property management to determine applicable requirements. It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance. Failure to do so may delay issuance of permits. See attached list of agencies. r-1for Paul Oland 3/27/18 Applicant's Signature Print Name Date Important Note: All submittals received after 4:00 p.m. will be processed the next day Submittals will be rejected if: • Not folded using Pima County fold & collated; • There are missing items on the checklist unless otherwise approved by Planning Division Manager or Town Engineer. • Re -submittals cannot be accepted without a transmittal and a written narrative summary describing the purpose of submittal. 7 1.3 FINAL PLAT - SUBMITTAL CHECKLIST NO APPLICATION FOR FINAL PLAT WILL BE ACCEPTED UNTIL THE APPLICANT HAS SCHEDULED AND COMPLETED A PRE -APPLICATION CONFERENCE WITH PLANNING AND ENGINEERING STAFF MEMBERS. All applications for Final Plat must include the following materials to be accepted for processing: 0 Fees To be submitted under separate cover 21 A completed General Application Form ❑ Approved Final Site Plan with all conditions addressed (3 copies) ❑ Approved Landscape, Irrigation and Rainwater Harvesting Plan (3 copies) 14 Final Plat (5 copies) (electronic copy will be required, after initial staff review, for agenda packets) ❑ All items included in Section 2.0 of this process guide (5 copies). A Signed Notification of Potential State and Federal Issues ❑ Improvement Plans (2 copies) 14 Lot closure and street centerline calculations with coordinate references to identifiable points shown on plat (1 copy) ❑ Approved Hydrology Report (2 copies) 0 Complete Title Report, current to within 45 days of submittal (2 copies) ❑ Covenants, Conditions and Restrictions (CC&R's) (2 copies; 1 original and 1 copy) ❑ Aerial photograph (8.5" x 11" format), showing size and location of property and existing streets. (5 copies) 7 I , CLERK OF THE TOWN OF ORO VALLEY, HEREBY CERTIFY THAT THIS PLAT WAS APPROVED BY THE MAYOR AND COUNCIL OF THE TOWN OF ORO VALLEY ON THE DAY OF . 20 CLERK, TOWN OF ORO VALLEY DATE PIMA COUNTY REGIONAL WASTEWATER DATE RECLAMATION DEPARTMENT TOWN ENGINEER DATE PLANNING AND ZONING ADMINISTRATOR DATE WATER UTILITY DIRECTOR DATE ASSURANCES ASSURANCES IN THE FORM OF FROM AS REr'_ DED IN SEQUENCE NO. HAS BEEN PROVIDED TO GUARANTEE DRAINAGE AND STREET IMPROVEMENTS (INCLUDING MONUMENTS) AND U11UTY IMPROVEMENTS (ELECTRIC, TELEPHONE, GAS, SEMR, WATER) IN THE SUBDIVISION. BY: MAYOR - TOWN OF ORO VALLEY DATE ASSURANCES IN THE FORM OF FROM , IN THE AMOUNT OF HAVE BEEN PROVIDED TO GUARANTEE THE RESEEDING OF THIS SUBDIVISION IN THE EVENT THE PROJECT IS ABANDONED. WATER ADEQUALTI11117 THE TOWN OF ORO VALLEY HAS BEEN DESIGNATED BY THE ARIZONA DEPARTMENT WATER RESOURCES AS HAVING AN ASSURED WATER SUPPLY, PURSUANT TO ARS §45-576 AND HEREBY CERTIFIES IN WRITING TO SUPPLY WATER TO THIS SUBDIVISION. BY: WATER UTILITY DIRECTOR DATE RECORDING ATA STATE OF ARIZONA) SS FEE ) COUNTY OF PIMA ) No. THIS INSTRUMENT WAS FILED FOR RECORD AT THE REQUEST OF THE WLB GROUP, INC., ON THIS DAY OF 20 AT M. IN SEQUENCE NO. . THEREOF. F. ANN RODRIGUEZ, PIMA COUNTY RECORDER BY: DEPUTY FOR PIMA COUNTY RECORDER DATE CERTIFICATION i HERESY CERTIFY THAT THE BOUNDARY SURVEY SHOWN ON THIS PLAT WAS PERFORMED UNDER MY DIRECTION AND THAT ALL EXISTING AND/OR PROPOSED SURVEY MONUMENTS AND MARKERS SHOWN ARE CORRECTLY DESCRIBED. I FURTHER CERTIFY THAT THIS PLAT WAS PREPARED UNDER MY DIRECTION. Q a TE SG�� 44121 � PETER D. COTE, RLS 44121 PETER E D. OTD o� T Z' t �NED i no EXPIRES EXPIRES 3/31/2018 ROBERT W. SCHLICHER, PE 54544 EXPIRES 6/30/2019 SHEET INDEX SHEET 1 COVER SHEET SHEET 2 PLAN SHEET SHEET 3 TABLES & DETAILS GRACE HOLDINGS, LLC & J.D.W. INVESTMENTS MANAGEMENT, LLC 1121 WARNER RD. #109 TEPE, AZ 8524 ATTN: DICK MAES RICHARDM@WHOLDINGS.COM ENGINEER THE WLB GROUP 4444 E. BROADWAY BLVD. TUCSON, AZ 86711 (520) 881-7480 ATTN:PETER COTE PCOTE@WLBGROUP.COM FINAL PLAT RANCHO VISTOSO PARCEL 10-T OV1800xxx 2 �b - A" P 2 23 NEf 2 26 - NEIGH.10 I PARCEL B i { 4 rP/ J Q Q a ►Za U 3"=1 MILE 0\o0 G ��. �0 �oA'9,e TOWN LIMITS I SUNRIDGE It RANCHO VISTOSO MOONRIDGE LOTS 1-65 /NEIGH. 7 UNIT 1 LOTS 1_48 48/033 M&PI LOTS 1-317 411100 51/072 M&P 4 All r r •i .•. t :1 ,i ,, a • ! k 1 i • t • � t t �•, ! i •' a 1 It t i' i tr tit t t. i i. �, r / � ,.., � k• a _. 1 i : •ate i 1 1 _ • r: i f t• a • i r i .r i t ,r :, :1 ! .►t / 1 '1 / i ■ t ! • t a r - r r . r r : t "t , • , • - / 1 1 + . r,. � 1 ! r i t t' 1 1 t : � i +r' ! ' ..t.,• i x r. i t ! ,• •i ! a •`• •. •. • f •�i r.r •` ra x • a r i i a! t a ! � � 1 #ir i ■ :! * , •,• / , � r r t . ,...t ■! � i' Ix k I ■ it/ /- ■+ i ■ ii1 a ! i t•i t, t • r , a -x r•k i `. r ! •: r i' �: • 1 t x a �` i. • 1. , � a • t a 4. � • k • • +. r , # i � , . , 1, x i • i.. x -:'. ! r � a . a . � • � r. t • • • x 1 !: i t . t. a •. •t � rrt.• r t c � • i'.. ••�•.' '.':i �,.: • 4.: r x: • is t 4 k t k t t a � x k r . t .i.: 1 • , , ` , , , .. ■ , r . k t k: • � k. 1 • • . i • x. a !. • a. i • ••i i t t•1 i i� r � f ,r � : r _ . • a - �, ; i i i • . a r , / , i. � r 1 . a i r •. i t r t t t t * • r ! t � ! • a ! • i !' r ! i'' � • k t r � x r!. t r r r i ,r LOCATION MAP PORTION OF • TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA LEGEND SUBDIVISION BOUNDARY RIGHT OF WAY PARCEL LINE - - - - - - - EASEMENT LINE - - SECTION LINE ZONING BOUNDARY P.U.E. PUBLIC UTILITY EASEMENT ® BRASS DISK SURVEY MONUMENT TO BE SET BY AN RLS UPON COMPLETION OF ROAD CONSTRUCTION ■ FOUND MONUMENT 1 /2" REBAR W/ TAG TO BE SET BY AN RLS UPON COMPLETION OF IMPROVEMENTS FOUND 1 /2" REBAR W/ TAG 12214 FND GLO BRASS CAP AT SECTION CORNER f QUARTER SECTION CORNER ®li � 1►► '�I►' s�� rv: _� rr,,,1�. _ r�� I .► 18. NO IMPROVEMENTS BETWEEN THIRTY (30) AND SEVENTY-TWO (72) INCHES IN HEIGHT RELATIVE TO THE OF ALL COMMON AREAS AND PRIVATE DRAINAGEWAYS WITHIN THIS SUBDIVISION AS SHOWN HEREON. P. A. D. ZONING MAP ADJACENT ROADWAY WHICH MIGHT INTERFERE WITH THE PURPOSE AND INTENT OF THE SIGHT VISIBILITY RANCHO VISTOSO TRIANGLE SHALL BE PERMITTED, PLACED OR MAINTAINED WITHIN THE SIGHT VISIBILITY TRIANGLES SHOWN ON THIS PLAT. THIS .PROJECT 3"=1 MILE 19. PROPERTY OWNERS SHALL MAINTAIN PLANTINGS TO ENSURE UNOBSTRUCTED VISIBILITY TO MOTORISTS. ALL SHRUBS, ACCENTS AND GROUNDCOVERS SHALL NOT EXCEED THIRTY (30) INCHES IN HEIGHT WITHIN THE SIGHT VISIBILITY TRIANGLES. TREES WITHIN THE SIGHT VISIBILITY TRIANGLES WILL BE MAINTAINED TO TITLE SECURITY AGENCY, LLC A DELAWARE LIMITED LIABILITY DATE ENSURE THAT BRANCHES/FOLIAGE IS NOT BELOW A HEIGHT OF SEVENTY-TWO (72) INCHES. COMPANY. 20. ORO VALLEY WATER UTILITY SHALL BE THE WATER SERVICE PROVIDER. 21. INTERIOR PROPERTY CORNERS AND CENTERLINE MONUMENTATION SHALL BE SET AS SOON AS NOTARY COMPLETION OF THE INFRASTRUCTURE AND IMPROVEMENTS MAKE IT PRACTICAL TO DO SO. IF SUCH MONUMENTS SHOULD DIFFER FROM THE TYPE DESCRIBED ON THE FINAL PLAT, A RECORD OF SURVEY STATE OF ARIZONA ) )SS FEE - PLAT SHALL BE RECORDED SHOWING THESE DIFFERENCES. COUNTY OF PIMA ) No. '1 2018 22. ALL PROSPECTIVE BUYERS OF LOTS WITHIN THIS SUBDIVISION SHALL BE INFORMED OF THE PRESENCE MAR AND ACTIVITY OF THE LA CHOLLA AIRPARK, A PRIVATE AIRPARK LOCATED SOUTHWEST OF THE PROJECT. ALL PERSPECTIVE BUYERS SHALL BE INFORMED THAT LOW FLYING AIRCRAFT MAY BE A ON THIS, THE DAY OF . 2018, BEFORE ME, THE UNDERSIGNED OV1800xxx BY: •....................., NUISANCE. PERSONALLY APPEARED, WHO ACKNOWLEDGED SELF TO BE FINAL T 23. NO FINAL INSPECTION FOR ANY LOT WITHIN THIS SUBDIVISION SHALL BE APPROVED UNTIL A BUILDING THE LOT IS COMPLETE AND SIDEWALKS HAVE EXECUTED THE FORGOING OF BEING AUTHORIZED SO TO DO$ INSTRUMENT FOR THE PURPOSE THEREIN CONTAINED BY THEMSELVES AS OWNERS, RANCHO VISTOSO10-- T CODES OFFICIAL HAS VERIFIED THAT CONSTRUCTION ON BEEN INSTALLED, PROPERTY LINE TO PROPERTY LINE. LOTS I THRU 19., AND COMMON AREA "A" 24. THE AREA BETWEEN THE 100 YEAR FLOOD LIMITS REPRESENTS AN AREA THAT MAY BE SUBJECT TO FLOODING FROM A 100 YEAR FREQUENCY FLOOD AND ALL LAND IN THIS AREA WILL BE RESTRICTED TO MY COMMISSION EXPIRES: NOTARY PUBLIC A PORTION OF SECTION 26 TOWNSHIP 11 SOUTH, RANGE 13 EAST, G.&.S.R.M., USES THAT ARE COMPATIBLE WITH FLOOD PLAIN MANAGEMENT AS APPROVED BY THE TO ENGINEER. Ref#: OV1913-001 TOWN OF ORO VALLEY, PIMA COUNTY, ARI ZONA OV1500657 SHEET 1 OF 3 OV1701671 MARCH, 2018 140' O• 23 24 26 25 FND BCSM SW COR SEC 26 T-11 S, R-13E 1 RANCHO VISTOSO NEIGH 10 PARCEL U -� 88 SEQ. #20060220003 I - ZONING: P.A.D. MHDR j 18 90 } 19 S89'5051"W 380.81' - NEST ESMT - -, 378.72' DKT. 1 Z802, PG. 1098 Cy/ 023 20 o - J N89'49'52"E S89'49'S2"W - 21.26' 55.00' 0 46.26' _ "'�� •01,21�� , � 21.2 ' cyT \ P,200, C1p r✓g SFF 0 / 9`` 'S / !� FTS 411 �.6 5,666 sq.ft. NEW SW GAS ESMT -I yNG� 90.13 or; r� r BY SEPARA INSTRUMENT I 6> 2 10' BUFFERYARD 'A' l24 5,158 sq.ft. �- - ,N ' �6 mod'- 0.12 or-- 1)00 21 i 10 55.00 55.00 I �w S6�• 10 5,460 sq.ft. C25 �'� \ \\ �N69p1 o -1/2 ROW 1/2 ROW 4358 11 acres ►oo`L'un i. 3 -� N //��o \:r C20 5,041 sq.ft. LU 00 / _� �' � Sg�,/ / � a , ti SIGHT 0.12 v �- 1'\2', � \ 18 ti VISIBILITY �`\ ,p121 5,773 sq.ft. / -� �\ �N69 \ o G `� ( S74'Ol'S "113 acres /^ ��/ TRIANGLE �\ y RANCHO VISTOSO NEIGH 10 Q I " �N� ` 4 E >> / ��,^ v SEE DETAIL \ 5 040 sq.ft. ' "'�•. PARCEL S V J I N ` SHEET 3 \2 \ o SEQ. #20060220003 Q a o / o C36 Q0. \ 0.1221„� / i �+ oo� ZONING: P.A.D. MHDR VZ " 17 I �� Y m I 6,907 sq.ft. 5 ss cli00 �. 0.16 acres 1 25.00 25.0 ' 2 \ 5,040 sq.ft. J L - - _j /2 ROW 1 2 0 `�� J\ �'� �, \ 0.12 Z L w" /ROW '�, o gp121 i o o ,, o, In cli 00 r-N90 00 00 W 117.09 C29 Q a, �''s \ �N6 � - CA A rn N. o o 16 I N I v \ QVE 6 58,355 sq.ft. o 5,194 sq.ft. I ov 'c' CA A 5,040 sq.ft. 1.34 acres v' rn `� 0.12 acres I 6,071 sq.ft. \� 0.12 a� Op - - _j i � L2 0.14 acres ^ Ns o\\ o r--N90'0O'00"W 113.68' I L5 •3g1 �E ��, o_ \ �N6gp j i \o vi r 6 \ 0 00 z C�8 N 23.p4' \ 5,040 sq.ft. , ZI i�l 0 15 I o \ a 112pp v� :- 6,623 sq.ft. 13 10 - 1g.g2 \as �\ 0.12 a "w 1, rZ cn 0.15 acres 3g 00 A p •o 'Sp»� 119 c� N OAKHURST LOOP L1 C5 \ -N120s • Q�� (PUBLIC) p"VS �3 " �� ,P \ 5,08 40 sq.ft. p C34 00 \ 0.12 v�- NNT i E y�y � cs:\ .p1,21 � �s C33 wN <' ors C19�-N69 �o r- �; \ `''s \ 5,113 sq.ft. ' DR�1�1� WrESMT r� N 0.12 AT � ,-o v •p1' 21 i v' �\ > \ THIS PL ^§°' \ ,,�.299 sq.ft.` '012 acres ooj, ^,� W 12 �, N ; v 6,295 sq.ft. ` r 10 •�S8/Oy 8775 s .ft. 0 0.14 acres rI 5,481 sq.ft. ' q I T_ N 0 25.00 i 0.13 acres 0 I ���, \ 0.20 acres 325.0 " 1 I ,\12� CA A �oQy, goo\ I I ,-p� /2 Row 1 /2 Row I •1, 21E • �23,543 sq.ft. / \ N89'49'52" E N89'49'52"E �� �36 C16- N69� 10' BUFFERYARD 'A 0.54 acres 1 � - � L_ -.' rW �5 I 0 • \ - - - I T 47.46 41.34 _ S ,�.�p 44 - L L3 C40 - -- L ..�'" 263.10' 1 V�50.00 `= 50.00' 203.72' R=25.00� N89'49'52"E 566.81' ELECTRIC ESMT L=39.27 ELECTRIC ESMT 10 BUFFERYARD A DKT. 12925, PG. 5204 A--90600'00" PUBLIC DRAINAGE DKT. 12925, PG. 5204 ESMT PER THIS PLAT w 100 YEAR FLOOD LINE SEE DETAIL SHEET 3 N ,cvr 00 o _a SEE DETAIL SHEET 3 C) o o f 0 SEWER ESMT V) W MOORE ROAD 1318.49393.10' DKT. 11036, PG. 448 (PUBLIC) 303.77' FND BCSM S89'4952"W 2636.99' (DKT. 12284, PG. 2006) RLS 12214 Engineering • Planning • Surveying Th le Landscape Architecture • Urban Design �� Offices located in Tucson, Phoenix, Flagstaff, AZ. and Las Vegas, NV. 4444 East Broadway Group Tucson, Arizona (520) 881-7480 0' 40' 80' 120' N 0 cn 0 0 EXPIRES 3/31/2018 EXPIRES 6/30/2019 VISTOSO HIGHLANDS m j 23 i i r: FND BCSM RLS 12214 27 24 410 zs / 621.62' AfI �25 224 FND BCSM Sj COR SEC 26 T-11 S, R-13E SEQ. #20040930020 OV 1800xxx ZONING: R1-20 FINAL PLAT RANCHO VISTOSO PARCEL 10-- T LOTS 1 THRU 19, AND COMMON AREA "A" A PORTION OF SECTION 26 TOWNSHIP 11 SOUTH, RANGE 13 EAST, G.&S.R.M., Ref#:OV1913-001 TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA I OV1500657 OV1701671 MARCH, 2018 1» = 40' SHEET 2 OF 3 CURVE TABLE CURVE # LENGTH RADIUS DELTA C1 72.28' 200.00' 20°42'25" C2 83.31' 50.00' 95027'59" C3 39.27' 25.00' 90'00'00" C4 63.25' 175.00' 20'42'25" C5 35.98' 25.00' 82*28'13" C6 123.68' 60.00' 118'06'36" C7 126.26' 206.00' 35'07'05" C8 36.68' 25.00' 84'04'31" C9 133.97' 175.00' 43'51'46" C10 39.27' 25.00' 90'00'00" C11 28.98' 25.00' 66'25'30" C12 272.11' 225.00' 6917'35" C13 81.32' 225.00' 20o42'25" C14 39.27' 25.00' 90'00'00" C15 12.47' 25.00' 28*35'10" C16 5.75' 25.00' 13*11'10" C17 34.84' 225.00' 8*52'17" C18 45.33' 225.00' 11'32'35" C19 1.15' 225.00' O'17'33" C20 9.13' 225.00' 2'19'26" LINE TABLE LINE # LENGTH DIRECTION L1 3.79' S76'39'14"W L2 3.82' S07'52'47"E L3 17.04' S89'49'52"W L4 2.09' S89050'51 "W L5 3.82' N07'52'47"W CURVE TABLE CURVE # LENGTH RADIUS DELTA C21 45.53' 225.00' 11'35'42" C22 47.99' 225.00' 12*13'12" C23 169.47' 225.00' 43*09'15" C24 26.45' 25.00' 60'36'30" C25 10.24' 25.00' 23'28'01" C26 35.50' 206.00' 9'52'25" C27 42.88' 206.00' 11'55'39" C28 41.02' 206.00' 11'24'33" C29 6.86' 206.00' 1'54'29" C30 20.81' 60.00' 19*52'19" C31 36.03' 60.00' 34'24'08" C32 35.97' 60.00' 34*21'10" C33 30.87' 60.00' 29'28'59" C34 0.10' 25.00' 013'58" C35 35.88' 25.00' 82*14'15" C36 62.73' 25.00' 143'45'54" C37 42.56' 25.00' 97'31'47" C38 41.66' 25.00' 95'27'59" C39 63.27 156.00' 23#14'20" 100 YEAR FLOOD LINE TABLE LINE # LENGTH DIRECTION FL6 30.36' N72'24'36"E FL7 7.88' N07'46'20"W FL8 4.88' N39'07'02'E FL9 4.78' N07'05'33"E FL10 25.25' N63'29'14"W FL11 18.37' N54'45'46"W FL12 31.02' N56'14'43"W FL13 16.27' N87'19'43"W FL14 33.80' S01'05'02'W FL15 1.43' S29'41'05"W FL16 18.34' S01'42'58"E FL17 7.95' S37'29'43"E FL18 8.00' S89"3857"E FL19 6.05' N82'29'37"E FL20 14.05' S85'14'22"E FL21 13.56' S73'25'30"E FL22 3.36' S65'24'00"E ThQ Engineering • Planning • Surveying 1. Landscape Architecture • Urban Design Wt�� Offices located in Tucson, Phoenix, Flagstaff, AZ. and Las Vegas, NV. Group JIR 4444 East Broadway Tucson, Arizona (520) 881-7480 wl EXPIRES 3/31/2018 1 0 o \ 00 re ;001 u"A 'A' e-0� j S44'28'12"W 26.63' SVT TIE f 11 SIGHT VISIBILITY TRIANGLE DETAIL SCALE: 1'=30' ' 54544 ' ROBERT W SCHUCHER 3®2,2-d EXPIRES 6/30/2019 rialmlia'I� SIGHT VISIBILITY TRIANGLE DETAIL SCALE: 1'=30' �r- u7 00 e SVT 11E SO FL13 •�•\ \ , Spp, �� 2 •�• �� ' S 13 I� ` ��/ //`` ®, kFL15 100 YEAR FLOOD LINE F �0®••• �`�,3 �� FL8 o I o ®I l FL18 �• z `J - rr LFL2 FI-19FL20'30.48 l S89'49'52"W 71.02' PUBLIC DRAINAGE EASEMENT ANI I>! YEAR FLOOD LINE DETAIL ReW OV 1913-001 OV1500657 OV1701671 SIGHT VISIBILITY TRIANGLE DETAIL SCALE: 1'=30' OV 18 0x FINAL PLAT RANCHO VISTOSO PARCEL 10- T LOTS 1 THRU 19, AND COMMON AREA "A" A PORTION OF SECTION 26 TOWNSHIP 11 SOUTH, RANGE 13 EAST, G.&S.R.M., TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA MARCH, 2018 1" = 40' SHEET 3 OF 3 W D Grop�up� � Engineering • Planning • Surveying • Urban Design • Landscape Architecture Offices located in Tucson, Phoenix, Flagstaff, Las Vegas • E-mail tucson@wlbgroup.com 4444 East Broadway, Tucson, Arizona • (520) 881-7480 • (520) 881-7492 fax Transmittal To: Milini Simms Date: March 1, 2018 Town of Oro Valley Job No.: 181057-YO03-0200 �F nTF'a 11,000 N. La Canada Drive' MAR 0 1 2018 Subject: Nakoma Sky — Rainwater Harvestinq Plan, Final Submittal OV1601351 We Transmit Z Herewith ❑ Under Separate Cover ❑ Via Material Format Requested Action ❑ Letter O Redlines ❑ For Your Approval 21 Your Review ❑ Memo ❑ Clarification Drawing ❑ For Your Signature ❑ Please Comment ❑ Report ❑ Modification Drawing ❑ Information ❑ Make Recommendation ❑ Check ❑ Myars ❑ Resubmit ❑ Issue Construction Order ❑ Disk ❑ Draft Drawings ❑ As Requested Comments: Attached, please find: ■ Three (3) sets of blacklines of the Final Rainwater Harvesting Plan per your 12/22/17 letter --- ■ One (1) CD containing a PDF copy of the Final Rainwater Harvesting Plan Milini — per our FLIP response letter dated 2/20/18 attached are the 3 sets of blacklines of the final RWH plan. Please give me a call at 390-1086 if you have any questions or require additional information. Thank vou! Copies To: Received Signed: Linda Thompson Date: GENERAL NOTES 1. TOTAL AREA 01F ALL NEW IMPERVIOUS SURFACES INCLUDING PAVEMENTS, SIDEWALKS, HARDSCAPE AND BUILDINGS IS 18.4 AC (801,504 S.F.) 2. TOTAL VOLUME OF RAINWATER HARVESTING PROVIDED IS 9,048 CUBIC FEET. 3. RAINWATER HARVESTING MEASURES EMPLOYED FOR THIS DEVELOPMENT CONSISTS OF THE FOLLOWING: • RAINWATER HARVESTING BASINS • DEPRESSED LANDSCAPE AREAS, 4" 4. ALL RAINWATER HARVESTING MEASURES SHOWN ON THIS PLAN SHALL BE INTERGRATED INTO THE LANDSCAPE INSTALLATION AS WELL AS THE SITE GRADING CONSTRUCTION. 5. EIGHTY (80) PERCENT OF ALL AREAS WITHIN LINEAR BUFFER YARDS, RECREATION AREAS AND COMMON AREAS TO BE GRADED TO A MINIMUM FOUR (4) INCHES FOR RAINWATER HARVESTING PURPOSES. RAINWATER HARVESTING REQUIRED 18.4 AC X 3,000 GAL/AC=55,200 GALLONS =7,380 CUBIC FEET RAINWATER HARVESTING PROVIDED RAINWATER HARVESTING BASIN #1: 2,626 GALLONS = 351 CUBIC FEET DEPRESSED LANDSCAPE AREAS: 65,058 GALLONS = 8,697 CUBIC FEET TOTAL: 67,684 GALLONS = 9,048 CUBIC FEET un w w I Q cl- v J CD z o m CD <c O N O <c m z Q U FND f" REBAR >W COR SEC 6 T-12S, R-14E 126 7 _ '.— o ' N I cN o 1 � 1 0,1,fjk•1 ADMINISTRATIVE ADDRESS: 10930 N 1ST AVE N89'10'07"W 2517.66' TEMPORARY PARKING ---- -- -- LOT (FUTURE PARKINGFff�� STRUCTURE) 0 FACILITIES MANAGEMENT BUILDING 6 WEST INDEPENDENT LIVING APARTMENT MEET 4 PROJECT BUILDING 5 SHEET 8 BOUNDA(TYP.) CENTRAL INDEPENDENT 3 LIVING APARTMENTS 6 � PARKING GARAGE Ij / BUILDING 4 rn o k` SOUTH INDEPENDENT c� LIVING APARTMENTS c \ BUILDING 3 \\ \ SOUTH INDEPENDENT I > \ LIVING APARTMENTS \ BUILDING 1 SOUTH INDEPENDENT LIVING APARTMENTS SHEET 6 ' 6 ° \ SHEET 7 I ZONING: PAD (COMMERCIAL/OFFICE) VACANT LAND �¢ Ps1 p0 \G QGr Gam/ ss, / •,�I z / `. ZONING: PAD ',ccq�,�j }7 tic (COMMERCIAL/OFFICE)`,- VACANT LAND ®' 200' 400' 600' PROJECT OVERVIEW SHEET INDEX SHEET 1........... COVER SHEET SHEET 2........... PLANT LEGEND SHEET 3-9...... RAINWATER HARVESTING PLAN ENGINEER THE WLB GROUP, INC. 4444 E. BROADWAY BLVD. TUCSON, AZ. 85711 (520) 881-7480 ATTN: ROBERT SCHLICHER, P.E. RSCHLICHER@WLBGROUP.COM EXISTING CANADA DEL ORO BANK PROTECTION OWNER/DEVELOPER APN 220-09-016A: LA POSADA HOLDING CO LLC 350 EAST MORNINGSIDE GREEN VALLEY, AZ 85614 (520) 648-7912 ATTN: JONI CONDIT JONI@LAPOSADAGV.COM OTHER APNS: FIRST AMERICAN TITLE TR 9319 ATTN: LA POSADA HOLDING CO LLC 350 EAST MORNINGSIDE GREEN VALLEY, AZ 85614 (520) 648-7912 ATTN: JONI CONDIT JONI@LAPOSADAGV.COM Q:\181057\Y-003 — NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-01.DWG 2/27/2018 1: 45 Plv ZONING: R1-144 MERITAGE HOMES OF �. ARIZONA INC APN 220-06-0590 BUILDING 8 ASSISTED LIVING AND I l EMORY CARE POOL BUILDING/ I �o• / I l I _ t EE_T 5_ UILDING 7 EET 9 r !� INDEPENDENT LIVING APARTMENTS ( I ! FITNESS BUILDING I ARTISAN BUILDING a CANADA DEL ORO WASH (DKT. 7571, PG. 800) ZONING: PAD PIMA COUNTY UNSUBDIVIDED /c SOUTH INDEPENDENT LIVING APARTMENTS -PUBLIC TRAIL HEAD-DEV. AREA "C" PROPOSED CANADA DEL ORO BANK PROTECTION COVER SHEET LO 00 co 0 N O z FND GLO STONE Si COR SEC 6 T_12S, R-14E n ZONING: R1-1 z PIMA COUNTY FL CONTROL DISTRI UNSUBDIVIDEC xr, xA Z� Z1 LUU"A1 1 U1V MAY A PORTION OF SECTION 7 T12S, R14E, G & S.R.M., TOWN OF ORO VALLEY, 3" = 1 MILE PIMA COUNTY, ARIZONA x1 32 7 ■ a LEGEND EXIST. MAJOR CONTOUR IF TOP OF SLOPE �2849__ -' EXIST. MINOR CONTOUR BOTTOM OF SLOPE PROJECT BOUNDARY - - EXISTING LOT LINE --zz -- EXIST. PAVEMENT �---� �--� EXISTING 100 YR FLOOD PLAIN PROPOSED CURB �---., . , • ,�� PROPOSED 100 YR FLOOD PLAIN — - - - - EXIST. PUBLIC SEWER LINE & MANHOLE EROSION HAZARD SETBACK -- NEW PUBLIC SEWER LINE &MANHOLE '�'•���':�'����,��---..", " �' 404 JURISDICTION WASH AREA _14 12" -$-- EXIST. PUBLIC WATERLINE & VALVE PROPOSED RIPRAP EXISTING EASEMENT LINE PROPOSED MULTI -USE PATH BUILDING SETBACKS 771 PROPOSED CONCRETE SIDEWALK — — SECTION LINE RIGHT OF WAY CENTERLINE PROPOSED STORM DRAIN •52 PROPOSED SPOT ELEVATION PROPOSED WALL FG -• DIRECTION OF FLOW WATERSHED BOUNDARY SECTION CORNER OR 1 /4 CORNER FFE=74.15 FINISHED FLOOR ELEVATION PHASE 1 GRADING LIMIT FPE=73.48 FINISHED PAD ELEVATION MATCHLINE -=- GRADE BREAK (GB/HP/LP) --� EX. STORM DRAIN SYSTEM �O— ASPHALT PAVEMENT BY: PLANNING & ZONING ADMINISTRATOR DATE BY: TOWN ENGINEER DATE r -m r rf 11 GAF DSC,4 MAR 0 1 2a1B ', F q 34712 y°ny OV1601351 w... .® P ETER can NICHOLAS 0 o R21 RAINWATER HARVESTING PLAN S, ' R�zOUSP NA III NAKOA SKY PHASE I on A ROONEY ArF �� RANCH AREA Z RECORDED IN BOOK 62 �> >p "A", M&P, PAGE >► REFERENCE CASE , # S: 54544 tiQ �R., 4, LOTS 1-68 AND COMMON AREAS B , AND C AND OV115-027 ROBERT W A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 OV914-008 SCHLICHER EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA ARIZONA COUNTY, OV914-007A q��?ONp OV903-03A 'V• FEBRUARY 2018 (0)15-14 WLB NO. 181057-Y-003 EXPIRES 6/30/2019 CONTOUR INTERVAL: 1' SCALE: AS SHOWN SHEET 1 OF 9 PLANT LEGEND SYMBOL ' `A t ` EI I INFOOTHILL - - Ev '; ' TREES CELTIS RETIC:ULATA WESTERN / NETLEAF HACKBERRY CERCIDUM FL_ORIDUM BLUE PALO VERDE CERCIDUM HYBRID'DESERT MUSUEM' DESERT MUSEUM PALO VERDE CERCIDIUM MICROPHYLLUM PALO VERDE CERCIDUM PRAECOX PAL0 BREA CHILOPSIS LINEARIS 'WARREN JONES' /'BUBBA' DESERT WILLOW WARREN JONES /'BUBBA' OLNEYA TESOTA IRONWOOD- PISTACIA CHINENSIS'RED PUSH' RED PUSH PISTACHE PITTECELLOBIUM FLEXICAULE (EBENOPSIS) TEXAS E.._ BONY PROSOPIS GLANDULOSA MAVERICK MAVERICK 11 HYBRID MEQUITE PROSOPIS HYBRID PHOENIX PHOENIX HYBRID THORN11 LES11 S MESQUITE PROSOPIS VELUTINA VELVET MESQUITE PROSOPIS VELUTINA VELVET MESQUITE SYM m SYMBOL AGAVE VICTORIAE REGINAE ORIA AGAVE AGAVE VILMORINIANA OCTOPUS AGAVE ASCLEPIAS SUBULATA DESERT MILKWEED CARNEGIEA GIGANTEA (2 TRANSPLANT SAGUARO DASYLIRION LONGISSIMUM TOOTHLESS SPOON DASYLIRION WHEELERI DESERT SPOON ECHINOCACTUS GRUSONII GOLDEN BARREL EUPHORBIA ANTISYPHILLITICA CANDELILLA rl Ell 13 CVRARAI FEROCACTUS WISLIZENII FISH—HOOK BARREL -- FOUQUIERIA SPLENDENS OCOTILLO HESPERALOE FUNIFERA GIANT HESPERALOE HESPERALOE PARVIFLORA RED YUCCA HESPERALOE PARVIFLORA'BRAKELIGHTS' BRAKELIGHTS RED YUCCA MUHLENBERGIA LINDHEIMERI AUTUMN GLOW DEER GRASS MUHLENBERGIA RIGENS DEER GRASS NOLINA MICROCARPA BEAR GRASS OPUNTIA ENGLEMANII PRICKLY PEAR OPUNTIA VERSICOLOR BUCKHORN CHOLLA PEDILANTHUS MACROCARPUS LADY'S SLIPPER YUCCA ELATA SOAPTREE YUCCA YUCCA RIGIDA BLU11 E YUCCA (TOTAL WATER AT MATURITY ' ° COURTYARDS ALOE BARBADENSIS BARBADOS ALOE ALOE FEROX / MARTLOTHII TREE / CAPE ALOE ASPARAGUS DENSIFLORUS SPRENGERI ASPARAGUS FERN BRACHYCHITON POPULNEUS BOTTLE TREE CALLIANDRA HYBRID SIERRA STARR SIERRA STARR RED FAIRY DUSTER CALLISTEMON CITRINUS BOTTLEBRUSH CASSIA PHYLLODINEA SILVER CASSIA CERCIS CANADENSIS V. MEXICANA MEXICAN REDBUD Q:\181057\Y-003 — NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-02.DWG 2/27/2018 11: 41 AM PLANTING LEGEND 93 8 mu COURTYARDS HESPERALOE FUNIFERA GIANT HESPERALOE TRAILING INDIGO EREMOPHILA MACULATA'VALENTINE' EMU BUSH 'VALENTINE' EUPHORBIA RESINFERA MOROCCAN MOUND EUPHORBIA RIGIDA GOPHER PLANT FICUS PUMILA CREEPING FIG FRAXINUS GREGGII GREGG'S ASH JUSTICIA SPICIGERA MEXICAN HONEYSUCKLE LANTANA MONTEVIDENSIS PURPLE TRAILING LANTANA LANTANA SPECIES 'GOLD MOUND'/'NEW GOLD' 'NEW GOLD' / GOLD MOUND LANTANA LEUCOPHYLLUM FRUTESCENS 'GREEN CLOUD' GREEN CLOUD TEXAS RANGER LEUCOPHYLLUM FRUTESCENS 'HEAVENLY CLOUD' HEAVENLY CLOUD TEXAS RANGER LEUCOPHYLLUM PRUINOSUM 'SIERRA BOUQUET' FRAGRANT CLOUD MALEPHORA LUTEA ROCKY POINT ICE PLANT MYRTUS COMMUNIS COMPACTA COMPACT MYRTLE ._..___........__. _.._.._.. .....y _ .......... NANDINA DOMESTICA HEAVENLY BAMBOO NANDINA DOMESTICA COMPACTA'GULF STREAM' GULF STREAM COMPACT NANDINA OLEA EUROPAEA'SWAN HILL' SWAN HILL OLIVE (FRUITLESS) OLIVE PUNICA GRANATUM 'CALIFORNIA SUNSET' CALIFORNIA SUNSET FLOWERING' POMEGRANATE QUERCUS VIRGINIANA'HERITAGE' HERITAGE LIVE OAK ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET' HUNTINGTON CARPET ROSEMARY SALVIA CLEVELANDII CLEVELAND SAGE SOPHORA SECUNDIFLORA TEXAS MOUINTAIN LAUREL TECOMA X'SUNRISE' YELLOW BELLS TECOMARIA CAPENSIS CAPE HONEYSUCKLE YUCCA PALLIDA PALE LEAF YUCCA YUCCA RECURVIFOLIA (PENDULA) SOFT LEAF YUCCA JNICUHOLAS ®V1601351 RAINWATER HARVESTING PLAN NAKOMA SILL PHASE I '"r'oiFo ROONEY RANCH AREA Z RECORDED IN BOOK 62 M&P, PAGE nrF ti o� ►► ►� ►> >► REFERENCE CASE #'S: 4, LOTS 1-68 AND COMMON AREAS TOWNSHIP 12 SOUTH A , B , AND C AND OV115-027 � ROBERT w� � A PORTION OF SECTION 7, , RANGE 14 SCHICHER EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, OV914-008 OV914-007A 9�e spa P ARIZONA OV903-03A �ZONA S FEBRUARY 2018 WLB NO. 181057—Y-003 (0)15-14 EXPIRES 6/30/2019 CONTOUR INTERVAL: 1' N/A SHEET 2 OF 9 - I - I 1 l Y/ l , It 1 8 SCUPPER :. _ � �:_:.. •:::•; . ,/ / I / I 27.79___;.: A , I 2 CELL 7- ., ... s.Y . � - • - • ...: _.: • � ! . <� ' v I \ F I 6 ( 1 E :L ,= l .�.--- — `:NEW HOWL 12.93 ,. •V a •. / .:..:. INV.-2621.25 ..ww J I r i i s B.6 1 , a , � I I Y \ ( �j NEW HD I + \ — _.. INV 26 .34 \ / OPEN SP E I t : . � 4 SCUPPER ,, ... .: .: �% .,.. . 1 \. \ NEW HDWL ' . / _ 12 0' 9 � EL 16.17 � ` / -i , r t y 1 L I Cox" H ATER t. 9; , { 1 V —A/ t C^ • \�..� , , 0 010 MICA , , ' 1 LLJ � •: ;.. , : � ., .... .. �-:. 34712 PETER OV1601351 , ,NICHOLAS wl oo RUMN a RAINWATER HARVESTING PLAN iA l NAKOMA S.KY 1 4 r , i � PHASE \ \ \ 1 - i' ROONEY RANCH AREA Z RE R BOOK 62 MBcP PAGE j � ' ' � . •� ; �: scar \ iREFERENCE CASE S. _ # f R 54544 tiQ �., 4, LOTS 1 68 AND COMMON AREAS A , B , AND C AND - y ROB OV115-027 \ ® ml ;: _ ERT W A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 ■ ®-ii i i�'~■■ ■■■ ■ ■ ■ ■ �■■■ ■ �■i ■ ■ ■■■■■ ■ ■ �■� a..- �, SCHLICHER OV914-008 Engineering Planning Surveying MATCHLINE, SEE SHT. 5 or $� �,.�t�•I® — EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, OV914-007A The � 'x `� Landscape Architecture Urban Design 9�e s ARIZONA - ` Offices located in: Tucson, Phoenix, and P OV903-03A WLB Flagstaff Arizona and Las Vegas Nevada. �ZONA V FEBRUARY 2018 (0)15-14 x , g 4444 E. Broadway Tucson, Az. 85711 WLB NO. 181057—Y-003 G r0up .. (520) 8$1IBM- -748o Q:\181057\Y-003 — NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-03.DWG 2/26/2018 2:02 PM RAINWATER HAE : PIA EXPIRES CONTOUR INTERVAL: 1' SCALE: 1"=40' SHEET 3 01= INC. Engineering - Planning . Surveying The Landscape Architecture Urban Design Offices located in: Tucson, Phoenix, and WLB Flagstaff, Arizona and Los Vegas, Nevada. G roup 4444 E. Broadway Tucson, Az. 85711 (520) 881-7480 NC, 09 1 1 409 120 34712 -..Az 4w, 12' PETER slyi XV-1 A m m F 0 01,7160135 FFE=94.50 1 I ATCHLINE, SEE SHT. 8 - r PAD=93.50 V Q:\181057\Y-003 — NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-04.DWG 2/27/2018 1:38 PM V EXPIRES 6/30/2019 A .NAKOMA SKY PI-RASEI ROONEY RANCH AREA Z RECORDED IN BOOK 62 M&P PAGE I REFERENCE CASE f S: 4, LOTS 1-68 AND COMMON AREAS "A", "B", AND "C" AND OV115-027 A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 OV914-008 EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, OV914-007A ARIZONA OV903-03A FEBRUARY 2018 WLB NO. 181057-Y-003 (0)15-14 C014TOUR INTERVAL: 1' SCALE: 1"=40' SHEET �.� / L W /jj r Zi J ii R 1. 0.0 d PROPOSED TRAIL WATERSHED =° I - BOUNDARY, .= . TYPICAL . 1 126101 S C4 \ I I. . �-F 1.= 0,78 WSCs ` --�-26 2600 9 " LAND AC5 PE :r - MAINTEIXA YAR 01.01 1 EASEMENT I• �t M CS 17 WSE: 2602.E CS 16 WSE: 2601.7 - — CS 15 WSE.2600.7 _ — CS 13 _S, .-11 1 WSE:2597.9 1 A■■■�■■ il he Engineering . Planning • . Surveying f �r Landscape Architecture Urban Design /� /� � Offices located in: Tucson, Phoenix, and 4 V V L �h Flagstaff, Arizona and Las Vegas, Nevada f ' 4444 E. Broadway Tucson, Az. 85711 INC. - a.F ,. (520) 881-7480 IQ: \181057\Y-003 — NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-05.DWG 2/27/2018 1:51 PM RAINWATER HARVESTING PLAN 0' 4 0' 805 12 0' k JNICHUOLAS V1601351 RAINWATE HARVESTING PLAN NAKOMA SKY PHASE i . ROONEY RANCH AREA Z RECORDED iN BOOK 62 M&P, PAGE rF % �► REFERENCE CASE #'S: 54544 tiQ ��., 4, LOTS 1-68 AND COMMON AREAS "A", B , AND C AND OV115-027 ROBERT W A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 SCHUCHER EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, OV914-008 $r a-2.b-t� OV914-007A ARIZONA OV903-03A �ZONA U s FEBRUARY 2018 WLB NO. 181057-Y-003 (0)15-14 EXPIRES 6/30/2019 CONTOUR INTERVAL: 1' SCALE: 1"=40' SHEET ! T i 1 1 LJOJ.V .\ \ L , ■ 7 9 9 \181057\Y-003 - NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-06.DWG 2/27/2018 2:08 PM RAINWATER HARV --�i�1 i, PLAN 0 40 80 I zu Mow a 34712 PETER v c 0 013 51 z NICHOLAS RUMNEY INAI N A 1 LR HARVESTING PLAN Sj A NAKOMA SJLii PHASE ASS' I Arf�FROONEY RANCH AREA Z RECORDED IN BOOK 62 M&P, PAGE , 4, LOTS 1-68 AND COMMON AREAS "A", "B", AND "C" AND REFERENCE CASE # S: S4544 �4 ��., ROBERT W A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 OV115-027 SCHUCHER EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, OV914-008 -m. ARIZONA OV914-007A 9 � �'�° P• NA 5 FEBRUARY 2018 OV903-03A WLB NO. 181057-Y-003 (0)15-14 EXPIRES 6/30/2019 CONTOUR INTERVAL: 1' SCALE: 1 "=40' SHEET �, , i / �AIt- REFERENCE CASE #'S: 4 LOTS 1-68 AND COMMON AREAS A, ,r B �, AND C„ AND OV115-027 ROBERT W A PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 _ 008 t EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, Q Engineering Planning Surveying \ ` \' �` j \ Oar@ �E OV914-007A R .� The �t AN Landscape Architecture • 1Fban Design � `� \ �/ \ \ sp \ \ \ SP OV903 03A S, ARIZONA �p Offices located m Tucs n/ Phoenix and pNq w• FEBRUARY 2018 _ WLB WLB NO 181057 Y Q Flagstaff, Arizona and Lbs Vegas, Nevada. \� �£ i 4444 E. Broadway Tucson, Az. 85711 EXPIRES 6 30 2019 Q03 _ (0)15 14 V ��� t 3 • ;x: (s20) 881-7480 Ct: 181057 Y-003 - NAKOMA SKY 02 LANDSCAPE 10 RWHP NAKOMA RWHP-07.DWG 2 27 2018 2:15 PM CONTOUR INTERVAL: 1 SCALE: 1 =40 SHEET EET 7 OF \ \ \ \ \ / / RAINWATER HARVESTING PLAN \-LOW FLOW CROSSING (PHASE 1A� �� fd �� - -V�i� ��� �i -- -. / �* I PEDESTRIAN BRIDGE (PHASE 1B) TEngineering - Planning . Surveying he rw Rav Landscape Architecture• Urban Design tap WLB Offices located in: Tucson, Phoenix, and Q. k Flagstaff, Arizona and Los Vegas, Nevada. 4444 E. Broadway Tucson, Az. 85711 G roup NC. (520) 881-7480 2. S t 113K. --97 404 JURISDICTION 9( k7n TO BE ADONTI) Al WASH AREA (TYP) tN IN R BUfLDING #1 SOUTH• 'INDEPENDENT # LIVING APARTMENTS FIRE ACCESS LANE-J 41 1 TO 4—STORIES W 01 FFE=83.00 IPAD=82.061- -Z a - t J: "l, I OO-YR FEM A FLO DPLAIN * BUILDING #2 k SOUTHEAS 70'x12' PEDESTRIAN BRIDGE/' S INDEPENDENT -b "00 LIVING APARTMENTS 50' N5URALI BUFFERYARD C6 2 1 TO 5—STORIES d 34712 o PROJECT BOUNDARY PETER ....... .. . .. NICHOLAS S EY Itj S i%\\ IVA vSP FIRE ACCESS LANE . ........... /001 R Q11 0 P, A 4, 54544 ;9 ROBERT W A PROPOSED 16' WIDE ........... . ... ... -A 50' OPEN SPACE AREA WITH .0e MULTI —USE PATH OVER SOIL SCHLICHER /10' ENHANCED BUFFERYARP C 000, CEMENT BANK PROTECTION EXPIRES 6/30/2019 Q:\181057\Y-00,3 NAKOMA SKY\02 LANDSCAPE\10 RWHP\NAKOMA RWHP-08.DWG 2/27/2018 2:29 PmRAINWATER HARVESTING PL 01 9 40' 80' 120 0V1601351 0 RAINWATER HARVESTING PLAN V AKOMA SKY PHASE I -) WF RANCH PF 7 RECORDED IN BOOK 62 M&P PAGE I REFERENCE CASE #'S: LOTS 1-68 AND COMMON AREAS "A", "B", AND "C" AND OV115-027 PORTION OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 OV914-008 EAST, G & S.R.M. TOWN OF ORO VALLEY, PIMA COUNTY, ARIZONA OV914-007A OV903-03A FEBRUARY 2018 (0)15-14 WLB NO. 181057—Y-003 CONTOUR INTERVAL: 1' SCALE: 1"=40' SHEET 13 777 xx Community Development and Public Works October 16, 2017 Paul Oland The W LB Group, Inc. 4444 E. Broadway Blvd Tucson, AZ 85711 gpoland(a)wlbgroup.com Re: Shannon Road Type 2 General Plan Amendment and Rezoning East side of Shannon Road, south of Ironwood Ridge High School Action Letter, OV1701072 & OV1701617 Dear Mr. Oland, During their regularly scheduled meeting on October 3, 2017, the Planning and Zoning Commission recommended approval of the following applications related to the aforementioned project: Type 2 General Plan Amendment to change the land use designation from Rural Low Density Residential to Low Density Residential -1, subject to the following conditions: a. The entry gate to the proposed development shall be located no further than 75' from the rear property line of Lot 1. b. The large Saguaro Cactus with multiple arms, located along Shannon Road and across from Sahuaro Divide, shall be preserved in place. 2. Rezoning request to change the zoning district from R1-144 to R1-36, which includes ESL Flexible Design Options and is subject to the enclosed conditions. The next step is for both items to be considered by Town Council on December 6, 2017 at 6 PM in Council Chambers. The applicant is expected to attend this meeting. If you have any questions, please contact me at Msimms(aa)orovalleyaz.gov or 520-229-4836. Best regards,, Milini Simms Planner Msimms(aborovalleyaz.gov 520-229-4836 cc: File Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 Shannon Rd. Rezoning Conditions of Approval 1. Flat roof homes shall be limited to 18', one-story and gable -roof homes shall be limited to 23', one-story. 2. A rustic or western design typically used in a rural -ranch context, using steel, wood or other materials compatible to the surrounding area, shall be used for the entry gate and entryway sign. Only native landscaping found in the immediate area shall also be used at the entrance. 3. The entry gate to the proposed development shall be located no further than 75' from the rear property line of Lot 1. 4. Streetlights shall not be permitted on internal streets within the development. 5. The Native Plant Preservation Waiver has been partially approved to not include any Ironwood Trees or Saguaro Cacti. 6. The design shown on the Tentative Development Plan represents a condition of Rezoning. Noteworthy elements for neighborhood compatibility include: a. Density restricted to a maximum of 80 lots. b. Minimum lot size shall be 8,750 square feet. c. Lots along the western perimeter and nearest to Shannon Rd. shall be a minimum of one-third acre. d. The area preserved as Environmentally Sensitive Open Space (ESOS), ranging from 300' to 600' feet from the southern property line and 300' to 450' from the western property line, shall be owned and maintained by the HOA and protected by the Town of Oro Valley, through a conservation easement on the Final Plat. 7. The developer shall construct a south -bound left -turn lane with associated widening at the Shannon Road/Sahuaro Divide intersection as recommended by the Traffic Impact Analysis. Construction of the turn lane is to be completed prior to the subdivision's public opening for home sales. 8. The developer shall construct a south -bound left -turn lane at the Shannon Road/Owl Vista Place intersection. Construction of the turn lane is to be completed prior to the subdivision's public opening for home sales. 9. The developer shall construct a north -bound left -turn lane with associated widening at the Shannon Road/Sahuaro Divide intersection as agreed to by the developer in coordination with the surrounding neighbors. Construction of the turn lane is to be completed prior to the subdivision's public opening for home sales. 10.The developer shall provide an in -lieu fee for the construction of a 10-foot wide asphalt shared -use path on the east side of Shannon Road, along the entirety of the project's right-of-way frontage. The fee for the multi -use path must be provided to the Town, prior to building permits being issued. 11.On-site detention basins shall be required to be designed and constructed so as to have the effect of decreasing the 2-, 10-, 50- and 100-year pre-existing storm water flow rates by 15%-25%, as deemed appropriate relative to design constraints by the Town Engineer, for drainage exiting the property along the southern boundary. The private detention basins shall be required to be regularly maintained by the subdivision's homeowner's association per a Town approved drainage maintenance plan. 12.The developer shall construct off -site drainage improvements along Owl Vista Place, as agreed to by the developer in coordination with the surrounding neighbors. Construction of the Owl Vista Place improvements are to be completed prior to the subdivision's public opening for home sales. Improvements required within flood prone areas shall include: a. Replacing existing culvert crossings with larger capacity culverts b. Raising the elevation of the drive and armoring the drive embankment(s) for erosion protection where required so as to have the effect of providing all-weather access along the private drive. c. Redirecting existing stormwater drainage to be conveyed back into historical, concentrated crossing locations along Owl Vista Place. 13.A private drainage and maintenance easement shall be dedicated per the Final Plat for an area along the project's southern property line, adjacent to Owl Vista Place. The easement shall be granted to the owners of the properties along Owl Vista Place for ongoing maintenance of drainageways, conveyance structures, and erosion protection. 14. The proposed development shall not increase pre-existing storm water flows within the FEMA floodplain exiting the property along the western boundary. 15.The large Saguaro Cactus with multiple arms, located along Shannon Road and across from Sahuaro Divide, shall be preserved in place. OQOJP\yEY Aq�0+1 "'OuMDED 191� Town of Oro Valley Community Development and Public Works October 6, 2017 Paul Oland WLB Group 4444 E. Broadway Tucson, Arizona 85711 Re: OV1701617, Rezoning request for a proposed residential subdivision located on the east side of Shannon Road between Lambert Lane and Naranja Drive (2"d Submittal) Permitting Engineering review has determined that the previous engineering review comments have been addressed. However, in accordance to the plan process, additional Engineering comments may be forthcoming, as deemed applicable by the Town. If you have any questions, please call me at (520) 229-4824. SincerelyZ',E. Esteban Senior Civil Engineer Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 ' NOTICE FORM CHECKLIST OV Number: O �/jI-70 I 0-7Z a QVI 7 0 Meeting Name & Date: Application Type: 6 PA 15-day�ot� PIDEADLINE: - -ADS Publish in Daily Territorial? Ye No Day of Publishing: MT"W !q' 1I - q ) 3 2pm submission deadline: —� Date/Time emailed: a�% a'yV-% il Publishing #: %1,�gCost: Paper copy (attached): X Scanned to OV file: Affidavit scanned to OV file: HOA Notification? No HOAs: Original to Town Clerk All Affected Total: Date mailed out: Notification Boundary? Yes No Notification radius: feet Spreadsheet into file: n 3 Total residents: 1 Z��' 1 - - �SDate mailed out: "lLg I -7 Property Posting? (,Yes) No Posting on Town property? Yes No Post on Planning Page? Yes No P Notes: Stickers given to Planner: r 64 L Date posted: Date posted: Vl -760/ 1D� o�rOF l � A Town of Oro Valley Community Development and Public Works The Planning and Zoning Commission invites the community to attend a public hearing on Tuesday, October 3, 2017, 6:00 p.m Icagen, Inc., 2090 E. Innovation Park Drive PUBLIC HEARING: Shannon Road General Plan Amendment and Rezoning for a 76-acre property, located on the east side of Shannon Road, immediately south of Ironwood Ridge High School. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Rural Low Density Residential TO Low Density Residential-1 (OV1701072). 2. Rezoning FROM large -lot residential, R1-144 TO small -lot cluster residential, R1-36 (OV1701617). QUESTIONS? Please contact Planner Milini Simms at 520-229-4836 or msimms@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Shannon Road General Plan Amendment and Rezoning Posted: 9/8/2017 Time: 5:00 p.m. By: jma Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022 ' wj : SEPTEMBER 11, 2017- 19 parental rights based upon the record and the ocladc a.m. at the Pima County Courts Build- a.m. at the Plena County Superior Court, case manager is Stephanie Badilla and maybe. Publication hearing on evidence presented to the Court. ing,110 West Congress, Tucson, Arizona in 2225 East Ajo Way, Tucson, Arizona 95713. reached by telephone at 520-2094M& mbe 2017, at 10 a m . 5. ffyou are receiving this Notice by publica- 'Division 64, the Honorable Julia K. Connors before Judge Pennington for the purpose of S. Requests for reasonable accommodation upe&r Court, 2225 E. - tion, you may obtain a copy of the Motion Presiding. This is an [z] appearance hearing. determining whether any parent or guardian for persona with disabil must be made zona 85713. before the for Termination of Parent -Child Relationship DATEM 8/9117It/ Petitioner or Petitioner's named herein is contesting the allegations in to the court by parties at least three Work- isWU for the purpose and Notice of Hearing by submitting a Attorney the Petition. ing days in advance of a scheduled court t ur any parent named written request to. KATHRYN M. MARTIN, WARNING: This is a legal notice; your rights 2. You and your children are entitled to have proceeding and an be made by tailing (520) 1 he allegations in the Office ofthe Attorney General. 4211 S. may be affected. Este es on aviso legal Sus an anotneypresent at the hearing. You may 740-2000. Santa Rita Ave., Tucson, Arizona 85714. derechos poddan ser afectados.If you object hire your own attorney or, ifyou cannot DATED this _ day of August, 2017. (arc entitled to have an The assigned child safety worker is Annette to any part of this petition or motion that ac- afford an attorney and want to be represented MARK BRNOVICH AttorneyGeneral Ie heating. You may hire Brass, and maybe reached by telephone at companies this notice, you must file with the by an attorney, one maybe appointed by Darktr M. Cortina AsdateotAttosney - - i If you cannot afford an 520-407-2904. court a written objection describing the legal the Court. - - - General be represented by an at- tl Requests for reasonable accommodation basis for your objection at least three days 3. You have a right to appear as a party in PUBLISH: TiseDallyTenitorisl I =pointed by the Court. for persona with disslinities must be made before the hearing date or you must appear in this proceeding. You are advised that your Aug. 21, 28, Sept 5,11, 2017 appear as a party in this , to the court by parties at least three work- person or through an attorney at the time and failure to personally appear in court at the } advised that your failure ing days in advance of a scheduled court place set forth in the notice of hearing, initial hearing, pretrial conf rence, settlement NOTICE OP HEARING f In court at the initial proceeding and can be made by calling (520) PUBLISH:'Ihe Daffy Territorial conference or dependency adjudication, IN THE SUPERIOR COURT OF THE ; iermce, status confer- 724.2000. Aug.28, SepL 5,11, 2017 without good ease shown, may result in STATE OF ARIZONA j fdjudicatlon, without 7. You have the dot to make a request or a finding that you have waived your legal IN AND FOR THE COUNTY OF PIMA j ;ayresult in a finding motion prior to any hearing that the hearing NOTICE OF HEARING rights and have admitted the allegations in In the Matter ok NUNEZ, GABRIEL your legal rights and be closed to the public. IN THE SUPERIOR COURT OF THE the Petition. In addition, if you fail to appear; ADRIAN d.o1%12/09/10 egations In the Motion. DATED this _ day of August 7017. STATE OF ARIZONA IN AND FOR THE without good cause, the hearing may go Person(s) under 18 years of age. No, t to appear without good MARK BRNOVICH Attorney General COUNTY OF PIMA forward in your absence and may result in an ID20170440 -� ry go forward in youzab- KATHRYN M. MARTINAssistant Attorney In the matter of PENA, JASSLYNN JANETH adjudication of dependency, termination of DC.S'S NOTICE OF PUBLICATION HEAR in termination of your General MENDOZA d ob.12/11/2014 PENA. YAJ- your parental rob or the establishment of a ING ON DEPENDENCY PETITION upon the record and the PUBLISH: The Daily Territorial AIRA JISSELL MENDOZA dab. 01/26/2016 permanent guardianship based upon the it- (The Hmiorabk Alyce L Pennington) i the Court Aug. 28, Sept S. 11, 18,2017 Person(s) under 18 years of age. No. cord and the evidence presented to the Court TO: JASMINE NIICOLE GREEN, parent and/ this Notice by publia- JD20170424 DCS'S NOTICE OF PUBLICA- as well as an order of paternity, custody, or or guardian ofthe above -named child. a copy of the Motion NOTICE OP BEARING TION HEARING ON DEPENDENCY PETI- change of custody in a consolidated family 1. The Department of Child Safety, (DO: Trent -Child Relationship Linda A Bell 58M B Edwin Rd Tucson TION (The Honorable Alyce Pennington) law matter and an order for child support if or the Department), by and through ' - ] g by submitting a writ- Arizona 85739 Representing [z] Self TO: Jeanette margarita Mendoza, Pwro Hen- paternity has been established. undersigned cou" has Bed s Dependency S. CHAPMAN, Office of ARIZONA SUPERIOR COURT, PIMA army Pena and John Doe (a fictitious name). 4- If you are receiving this Notice by Petition pursuant to Title 8, ofthe Arizona l. 4211 S. Santa Rita Ave, COUNTY parents of the above -named children. publication, you may obtain a copy ofthe Revised Statotea, Rules 4.1 and 42 ofthe , 14. The assigned child In the Muter of the Estate o@ Audrey J. Mer- The Department of Child Safety (DCS or the Dependency Petition. Nodes of Hearing, and Arizona Rules of CM Procedure; and Rule Walker, and maybe runs- Date of Birth: 03.02-1937 Deceased Department), by and through undersigned Temporary Order by submitting a written 48(D) of the Arzona Ruks of Procedure for , i at 520-209-3509. NO. PB20170349 NOTICE OF HEARING counsel, has filed a Dependency Petition request to: Darlene hL Cortina; Office of the the JuymEe Court oabk accommoda-_ NOTICE IS GIVEN that the Court will pursuant to Title 8. of the Arizona Revised Attorney General, 4211 South Santa Rita Av- 2. The Court has set a Publication hearing on j Idinebilities must be consider the Febtionds Petition For Formal Statues, and Rule 48 of the Rules of Procedure coup, Tucson, Arizona 85714. The assigned the 21at day of November, 2017 at 1:30 p m, at i parties at least three Probate of Will and Appointment of Personal for the Juvenile Court nice of a scheduled Representative copy of which is attached 1. The Court has set a Publication hearing I an be made by ailing hereto. on September 25, 2017, at 10.00 on the 2nd day of Novembe . 2017 or 9.00 The Planning and Zoning Commission Invites the community to attend a _ ' public hearing on i to make a request or tearing that the hearing ic. y of August 2017. ;Attontey General (Assistant Attorney ITerritorial 2,2017 NG COURT OF THE }.OUNTY OF PIMA'.. MERO TEMPLE- - .. TELdob.12/05/11 YA JASMIN dab. finder 18 yearsof age. No. 40TICF OF HEARING TERMINATION OF 31ATIONSH M (PUBLi- }e Jennifer P. Langford) fictitious name, parent of Ildren. dCbild Safety, (DCS or ;and thmugh I has fried a Motion for of -Child Relationship rhonsArizona iolesoRevised statutes The Planningand Zoning Commission Invites the community to attend a rizona Rules of Pence- 9 tY a Publication hearing lovember, 2017, at 10A0 natty Superior Court, cson, Arizona 85713. e Jennifer R Langford for mining whether any par - contesting the allepd— oren are entitled to have at the heart* You may ley o; ifyou cannot id want to be represented stay be appointed by 0 appear as a party 3n this t advised that your failure in court at the initial dunce, status confer- 1 adjudication, without ry resultl a finding our Legal rights and legations in the Motion. in to appear without good . Tay go forward in your ab- in termination of your Tuesday, October 3, 2017, 6:00 PM Icagen, Inc., 2090 E. Innovation Park Drive 1 PUBLIC HEARING: Innovation Park Drive General Plan Amend- I ment for a 15-acre property, located at the northwest comer of Rancho Vistoso Blvd. and Vistoso Commerce Loop. d The request seeks to change the existing land use on the prop- erty FROM Commerce/Office Park TO Medium Density Residential (OV1701076). QUESTIONS? Please contact Long Range Principal Planner Elisa Hamblin at 520-229-4847 or ehamblin63orovalleyazgov For more information, go to OVprojects.com under the project name: Innovation Park Drive General Plan Amendment 7 childr entitled SEPTEMBER 14.2017 3uled court rights based upon the record and evidence hire your own attorney o, if you cannot General initial hearing, pretrial conference, settlement Eing (520). presented afford an attorney and want to be represented PUBLISH: The Daily Territorial:...... conference or dependenryadjudiation,... Dated: August 28. 2017 /sl Julia K. Palfrey- - - by anattorney, one maybe appointed by Aug. 29, Sept. 5,12,19, 2017 .- _ without good cause shown, may result in • - - r Ervin man, Esq. Attorney for Petitioner the Court. a finding that you have waived your legal _ y HAND PUBLISH; The Daily Territorial 4. You have a right to appear as a party in this NOTICE Op HEARING rights and have admitted the allegations in 017 SUPE- • SepL 12,19, 26, Oct. 3, 2017 '_ - proceeding, You are advised that your failure - - IN THE SUPERIOR COURT OF THE - -- - the Petition. In addition, if you fail to appear, " to personally appear in court at the initial STATE OF ARIZONA without good cause, the hearing may go NOTICE OF HEARING hearing, pretrial conference, status confer IN AND FOR THE COUNTY OF PIMA forward in your absence and may result in an IN THE SUPERIOR COURT OF THE ence, or termination adjudication, without In the matter of: TORO, NINA MARIE adjudication of dependency, termination of, STATE OF ARIZONA - good cause shown, may result in a fording d o b.12/09/11 TORO, LAYLA JANINE your parental rights or the establishment of a IN AND FOR THE COUNTY OF PIMA that you have waived your legal rights and dab. 02/12/14 Person(s) under 18 years permanent guardianship based upon the re - rite 303, In the matter of MALLOY, EVANGELINE - have admitted the allegations in the Motion. of age. No. ID20338l Reactivated DCS'S cord and the evidence presented to the Court, 1802 Fan FAUSTINA dab.07/08/OS CUETO, FELIX- In addition, if you fail to appear without good NOTICE OF PUBLICATION HEARING ON as well as an order ofpatemity, custody, or &drew CIANO DANIEL do b. 07/05/07 CUETO, cause, the hearing may go forward in your ab- DEPENDENCY PETITION (The Honorable change of custody in a consolidated family for Peti- MEKAYELIA MARIE dab. 06/02/10 Bence and may result in termination of your Patricia Green) lawmatter and an order for child support if Persons under 18 years of age. No. JD192448 parental rights based upon the record and the TO. ELDON SYE TORO, parent and/or paternity has been established rHE DCS'S NOTICE OF PUBLICATION HEAR evidence presented to the Court. guardian of the above -named child 4. Ifyou are receiving this Notice by IR TIDI ING ON MOTION FOR TERMINATION 5. If you are receiving this Notice by publica. The Department of Child Safety (DCS or the publication, you may obtain a copy of the XVISION OF PARENT -CHILD RELATIONSHIP (The tion, you may obtain a copy of the Motion Department), by and through undersigned Dependency Petition, Notice of Hearing, and 'HONY Honorable Susan A. Kettlewell) . far Termination of Parent -Child Relationship counsel, has fried a Dependency Petition Temporary Order by submitting a written ) Minors TO: FREDERICK JACKSON A.K.A. and Notice of Hearing by submitting a pursuant to Title 8. of the Arizona Revised request to: RANDI E. ALEXANDER. Office �= PUBLI- FREDERICK O. JACKSON, III, patent of the written request to: Loretta A. Jaquet, Office Statues, and Rule 48 of the Rules of Procedure of the Attorney General. 4211 S Santa Rita N FOR above -named children. of the Attorney General. - 4211 S. Santa for the Juvenile Court Avenue, Tucson, Arizona 85714. The as- HILD - 1. The Department of Child Safety, (DCS or Rita Avenue. Tucson. Arizona 85714. The 1. The Court has set a Publication hearing signed case manager Is Isela Leon and may be the Department), by and through assigned child safety worker is T'eresita on November 17, 2017 at 10.00 a.m. at the reached by telephone at (520) 6384772. parent of undersigned counsel, has filed a Motion for Fragoso and may be reached by telephone at Pima County Superior Court, 2225 East Ajo S. Requests for reasonable accommodation - Termination of Parent -Child Relationship 520-2094839. Way, Tucson. Arizona 85713, before Judge . for persons with disabilities must be made kndigo, by _' under Title 8, of the Arizona Revised Statutes 6. Requests for reasonable accommoda- Patricia Green for the purpose of determining .' to the court by parties at least three work- , , has filed and Rule 64 of the Arizona Rules of Proce- tion for persons with disabilities must be whether any parer or guardian named herein ing clays in advance of a scheduled court it -Child dure for the Juvenile Court. - .. made to the court by parties at least three is contesting the allegations in the Petition. proceeding and can be made by calling (520) he Arizona 2. The Court has set a Publication Sever. working days in advance of a scheduled 2. You and your child are entitled to have an 740-2000, e Arizona ance hearing on the 13th day of Novem- court proceeding and an be made by ailing allomey present at the hearing. You may hire DATED this 24th day of August, 2017. m Court. her, 2017, at 8:30 am. at the Pima County 520-724-2000. )our own attorney or, if you cannot afford an MARK BRNOVICI I Attorney General 3ctobcr 26, Superior Court, Pima County Juvenile Court, 7. You have the right to make a request or attorney and want to be represented by an at- RANDI E. ALEXANDER Assistant Attorney my Supe- 2225 East Ajo Way, Tucson, Arizona 85713, motion prior to any hearing that the hearing tomey; one may be appointed by the Court. General in, Arizona before the Honorable Susan A. Kettlewell for be closed to the public. 3. You harm: a right to appear as a party in PUBLLSII The DailyTerrhodat t Deborah the purpose of determining whether any par. DATED this 18th day of August, 2017. this proceeding. You are addled that your Aug. 29, Sept. 5,12,19, 2017 ring ent or guardian named herein is contesting MARK BRNOVICI I Attorney General Eailtmre to personally appear in court at the e contest- the allegations in the Motion. 3 You and to have LORENA A. JAQUEf Assistant Attorney your en are :o have an an attomeypresent at the hearing. You may u may We n afford anted by Ibythe adY In oat your - rt at the , status action, a finding tins and a Motion. ithout good I in your ab- m of your ord and the T publica- Motion relationship ng RPM nucon, nodation be made e work- court tiling (520) luest or he hearing ty in this dation for nade to the a assigned efore your t the Initial the Status ijudia- order tottshyp of trltmg, rencc or without g that the tau has to have me absence ustodian ofpsrental The Planning and Zoning Commission Invites the community to attend a public hearing on Tuesday, October 3, 2017 6:00 p.m. ' leagen, Inc. 2090 E. innovation Park Drive PUBLIC HEARING: Tangerine - State Land General Plan Amend- ment presentation and discussion regarding a State of Arizona owned property comprising approximately 302-acres located at the northwest intersection of W. Tangerine Road and N. Coyote Crossing Trail and bordered by W. Moore Road and N.Thornydale Road. The purpose of the request Is to extend the General Plan Planning Boundary and add a land use designation of Master Planned Community. The Amendment does not include a potential annexation of the property or ownership change of the State land (OV1701699). QUESTIONS? Please contact Constituent Services Coordinator Jessica Hynd at 520-229-4711 orjhynd@orovalloyaz.gov. For more Information, go to OVprojects.com under the project name: Tangerine -State Land General Plan Amendment The Planning and Zoning Commission invites the community to attend a public hearing on Tuesday, October 3, 2017, 6:00 p.m Icapen, Inc., 2090 E. Innovation Park Drive PUBLIC HEARING: Shannon Road General Plan Amendment and Rezoning for a 76-acre property, located on the east side of Shannon Road, immediately south of Ironwood Ridge High School. The requests seek to change the existing development rights on the property as fol- lows: . 1. General Plan Amendment FROM Rural Low Density Residential TO Low Density Residential-1 (OV1701072). 2. Rezoning FROM large -lot residential, Rl-144 TO small -lot cluster residential, R1-36 (OV1701617). QUESTIONS? Please contact Planner Milini Simms at 520-229-4836 or msimms@orovalloyaz.gov. For more information, go to OVprojects.com under the project name: Shannon Road General Plan Amendment and Rezoning The Planning and Zoning Commission Invites the community to attend a public hearing on Tuesday, October 3, 2017, 6:00 p.m. _ Icagen, Inc., 2090 E. Innovation Park Drive PUBLIC HEARING: Big Wash General Plan Amendment and Rezon Ing presentation and discussion for approximately 108-acres located north of Tangerine Road, between the future Moore Road loop on the west and Rancho Vistoso Boulevard on the east The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Open Space, Park, Resort/Golf Course, and Medium Density Residential TO Open Space, Park, Medium Density Residential and Medium High Density Residential (OV1701068). 2. Rezoning FROM Open Space, Recreation Area/Golf Course, Medium High Density Residential, Commercial (C-1) TO Open Space, Medium Density Residential, and Medium High Density Residential (OV1701630). QUESTIONS? Please contact Senior Planner, Roseveit Areilano at 52D- 229-4817 or mrellano@orovaileyaz.gov. For more information, go to OVprojects.com under the project name: Big Wash General Plan and Planned Area Development (PAD) Amendments www.dailyt i orial..Com alleptioas in the Petition. 2. Yoaaodyata cht7dren ate -tf tled to have an attorney Ptesematthe hearim You may him your own attorney oL if ym csenot atEtedan attomeyandwautto be mpnwated o --ybcby the C 3..You have aright to appearmaparty in tbia Pmaeeding. Youamadv}aedthatyonrfa&m to FmomBy appear iamart at the initial hearing, prettW coeferma, staRns coa6erea¢ xdepmdeocy-Vudiatkw wWxxd®noel ceuaaahown.mayawdtinafindingthat s}msh�cwairadyoackgalcightsaadhve admitkdtheallegetiomintluPetition. In aA,E ioa,If yonf & to appeacwithout good cuurg the hearing mygoforward inyour . absent andmayreadsisaoadjadi"u= do" ortbe ItufaPerarstient gaaodf4mhip baxd upon the record.aodthe evidence pramtedto the Cow%as wdlaa an order of paternity: assb* or change of custody in awnsolida..d family law matter and an order for chili support if paternity has been enatt;_t d 4, If Von are receiving this Notice by puhliwtion,you, may obtain acopy of the Dependency Pebtil-.Notwe ofacartog and Temporaty Order byauhmiuing a writdm request to Amy ampman.Olficce of the Attorney General. 4211 S. Sim" RIM Am_ Ttucsoo.Arizooa 85714. Tbt assigned ,,, taaaegeris jeaTcRasf andmr be reached by te4hootit510-204-4733- 5. Regtusts for reasonable acconumoda- don forpesons with diaabiiitira must be made to the court by parties atimt.three —king days in advance of asdxtmled court procee&*and anbemade by calling. 52D`724-29M 6. You have the rigid to make a requator motlonpdor to any hearing that the hearing be closed to the pubhe DATED this 23thday ofAupst:2017- - MARK BRNOVICH AMYS.CHAPMAN Assatant Attorney General. . PUBLISH_The Daily Terntarid AU& 30, Srpt..6.13, ZO, Z017 NOTICE OF HEARING IN THESUERIOR COURT OF THE JTATEOFARIZ.ONA 1'4 AND FORTIIR C0UIlTY OF PI%Lt In the Mattes oS.LOPE4 DAVID ANTONIO d LOS/1112015 Persons) under 18 years of a6c. No. jD 20170299 DOSS NOTICE OF HEARLNG ON DEPE.Y- DENCYPETfTION (PUBLISHED) (Ironorabk kale jolmsoa) TO: FRANCSCO DOE'JO13N DOE. a ficthious name. rarenu of the abrn'e-namcd Chu The Departracid of CbW Safety (DCS or the Departaunt) basfiled a Dependency Petltba pursuant to Title 8, of the Arizona &-Asa Statue, and Rule 48 of the Arizona Rules of Procedure for the Juvenile Gaut 1.TheCourt LusctaPublicatioaHaring for Me 16th day of Odober. 2017. at 11:30 am. to be hcld at the Pima County Superior Court atZ2 2.5 E Aja etay,Tucsa•4 Arizuaa S5,13. before the Honorable 1 ec i jd� le_ the Pu paw of.' tcrmm; ;g whethrr any rare-1 or suardfaa n_.-x d h=!n is Qa=i ^o the aL'cgii,-in the Peti:iaa. 2. Ye as tyaur c:ualren arc e:,ra:cal to L: v Tha Planning and Zoning Commission invites the ccrmm"ty to a :end a . pubic.- hearing on Tuesday, October 3, 2017 6:00 p-m-' kagen, Inc. 2090 E. Innovation Park Drive PUBLIC HEARING:Tangertne - State Land Genarat Plan Amand- ment presentation and discussion regarding a Stara of Arizona owned property comprising approximately 302 acres located at the northwest intersection of W. Tangerine Road and N. Coyote Crossing Trait and bordered by W. Moore Road and N. Thomydals Road -The purpose of the requestia to extend the General Plan Planning Boundary and add a land use designation of Master Planned Community. The Amendment does not include a potential annexation of the property or ownership change of the State land (OV1701699). QUESTIONS? Please contact Constituent Services Coordinator Jessica Hynd at 520-229-4711 or jhynd®omva11eya7_gov ,For morn information, go to OVprojects.com under the projectname. Tengedna-State Land General. Plan Amendment The Planning and Zoning Commission invites the community to attard a public hearing on Tuesday, October 3, 2017, 6:00 p m Icagerl, Inc., 2090 E. h=vation Park Drive PUBLIC HEARING_ Shannon Road General Plan Amendment and Reacting for, a 76-acre property, located on the ea3t dde'of Shannon Road, immediately south of Ironwood Ridge High School.The requests seek to change the existing development rights on the property as fel- lows 1. Generai.Plan Amendment FROM Rural Low Density Residential TO Low Density Residental-1 (OV1701072). 2. Rezoning FROfit large4at residential, RI-144 TO small4ot cluster residential, RI-36 ((:YV1701617). QUEST1101W Please contact Planner MOW Simms at 520-229-4836 or msimms®orovalleyazrgov. For more information, go to OVprojects com under the project name: Shannon Road General Plan Amendment and Rezoning -111:iL[C ►[itlT[NES SRgEMBER 13120171 anaitamgpresentatthe hearing Youmay 52D-77A-2900- IOUJIM-tIbIdTWIWili@ hire your am attorney or. ifymaumt 6.Yon Ism the rot tomakearequest or admiloedthe ha tb4 affordmattomryandwaottoberepnunted modonpriaztioauyheadngthat the hearing F: addYim`lfyaufditQ:aFpn,� by and-ney;aneMay heappoimedby- the Court. be closed to thepablia a ataCthehetde�mganfioel 3- Ym bave a d& to appcw as aputy in this proaedirg Youareadviseddutpurfi bum DATED this 2sthday ofAugus4201Z MARKBYNOVICiI Attorney General tthaeooetmdm►re�itiaaa! o[dapaodtoeytte a s , X%bb ottheab6Wi®meq topmonaltyappear incourt atthe ldtid ERICAAFORSCH a:, garu htaatrtpmthel 1190—&l coafa'mx,statocor6ra= AssstaatAttomryGeneral C%ldmceptmmtedtatheCaj ordepmdeayadjudicatian.witlsoutguoa PUBLTSiLUeDagyTemtarial x. asaderaEpi astaod care ebaaw.may rmkinafinding that Aug. 30. Sept. 613,20.2017 cwd*jWamaaoBdreadlim you base wwlssdlour legdrights andbata asdaaaNaford�ilda admittmthealleptimsintbeperuk'n..a NOTICE OF HEARING :additim.ifyoufail toarpeaewithoutpod INTHESL'PERIOSCOL=0FnM cause.the luearingmay gofurwardinyatr STATEOFARIZWLk abscaaandnixymu:tiaaua.iju3LatLut IN AND FORTHE COLN rY OF PUM, a f delcrideng, trm in'thl"ufyourgareaul. httheAlatterof.RAMtttt7Ft?VRAY E 10� righMorthe & tit ti� cnzofapermaaaot. dwh0111312016 guardiaas':.r baxd upon the record and the Ferwu(s) under 13 yeas of age. No. )D evidcate pmsented to the Cant, as well as 20170448 1 an order of paternity; custody, or clatsge of DCS'S NOTICE OF PUBUCAUON HEAR- custody in a cunsohil ed fan* law matter andanordcrfordiidaTpurtifpaternitphas ING ON DEPE.NDE\CY PEr=j4 MicHoccrableDeiinfiristoffr!) 1 been estot.R,t,..t TO- JOWN DOE, parmi of the abam-naina j 4.Ifyou are recelsingthis Notice by chil& j puhlisatiun, youmay obtain a [ropy of the I. The Department of Chili Siddy (DCS or DepmdencyPctit:on,tictisoflleadng, the Dcpa==)hasa-_j and TeotporaryOrderbystsbmdtiaga Petition Pursuant tuTie3.ofthe Adr..ua � wrktca roquest to: EacaForsch, Ol%e of the Rmised Statues, ar iRnk 45 of the Ari— - ♦ L �{ a Attorney GencraL 42 11 S. Santa Rita Ave, RulesafProc*L xf�the yuveciL-Cosa, Z/i►!�K TbOL44 Ariasna 85714. The assigned cam -mamgerisDayMMX&T 2. Ut Coati az set a pubacuf=n Hta::,- oc _ and may bereached the Silt day of&nerhGZCl7,at930a,m., by tekyhunn at 5ZO-209-1733. to be i c;.i a LLt P:cm Cuualy juveace Court. _ ,-„5LCHo , ti nforrRvratsfffor withabkacrc..aeadr lion-forpezxws withd'.•M:.•t.Kmutbe "AhleDanI beS;rethrlioaurahltDrauC1:RNING nun:e to t..e court by pat" at least ti;ree pa prose of •iaemuxangwheiluer any : woai:- days inadraxcofaS;4_-4u's1 parcu orpzdiarrnamedhc=1ecaot='ti::gL`e i I rmut prateei:aa, a :! r..a I= r'W::. h; EMNG NonCE _ Tha Planning and Zorn Ccmmisscn invites the c:carmunity, to a :ard a PLAN AMENDIiENE ; pt bi. c hearing on ttttYiapttitiabee ttpaa; tntci Cttetrthera, ttletana Mtadd{ Tuesday, October 3, 201T, 6:00 PM °a't° antldar,twtik ing:l Icagen, Inc., 2090 E. Innovation Park Drive feadc PIM boundary j Parcetddf®bac219-3&4a4Ci PUBLIC HEARING: Innovation Park Drive General PianAnt;.nd- d. ne Rood a (M tatrter of Tattgetioe Road end G cent for a 15-ar:re property, located at the norti sea corner ci Rancid SMRaope 13.Eaet . Vistcso Bird. and Vlstcso Commerce Lccp y a mktor• Gummal Plan atnerAnent im Rural Detsi4r FtnWWM (RDRj The recr est sacks to c' wry_ the exist rig land use on the prop-,t enwtded tapeeihc p(trq arty FROM Ccr--.•rarce:v,.xe Park TO Mtediunt Density Residential aid GPA1708.00t (OV1701Z�7 c). Id hem helots ltts irteot" C+uq QUESTIONS? Please cc -act Long Rar,ae Principal Planner Elisa ` attar;[ Cyndit Roea,attto Tal Hambi., iat52C-u�-;S47oreharnblinCorovalleyazgov. For more information, go to OVpmjacts eom under the project name - Innovation Park Drive General Plan Amendment t �.. The Planning and Zoning Commissicn invites the community to atlerxt a pubtac hearing on (X i Tuesday, October 3, 2017, 6.00 P.M. a _ � Icagen, Inc., 2080 E innovation Park Drive � l� j PUBLIC HEARING: Big Wash General Plan Amendment and Rezcn- I i r Ing prasentatiort and discusslon for arpr xima:a!j 103-acres located : north of Tangerine Road, between the flu.•-e Moore Road loop on thei west and Rancho Vistoso Boufavard on the casLThe requests seek th ehanga the existing development rights on the property as foiicwrs: y t General Plan Amendment FROM Open Space Park Resort Ga# Course, and Medium Density Residential TO Open Spate, Parkes Medium Density Residential ' and Medium High Density Residential (OV1701068). , c 2. Rezoning FROM Open Space, Recreation ArearGolf Cour.-e, t>editan f High Density Residential, Commercial (C-1) TO Open Space, Idedium,44 k � Density Residential, and Medium High Density Residential (OV130 7016).: �' QUESTIONS? Please contact Senior Planner, Rosevelt Aretiano at 520- pam d irie at ercom o ���6 229-4817 or rareilano0oroval IeYazgov seitaatr caeread,lloalleeetrYaaetk aMotfaa flonAresQitwj Oa areal For more information, go to OVprojecta com under the project name: PWL Big Wash General Plan and Planned Area Development (PAD) Amendments Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act Classifieds -Announcements - Legals Search the classifieds Search There are 6 ads in this category: KTtWAFt'L't'I The Planning and Zoning Commission invites the community to attend a publichearingon Tuesday October 3, 2017 6:00 PM Icagen, Inc. 2090 E. Innovation Park Drive PW�'�'t't't7 PUBLIC HEARING: Innovation Park Drive General Plan Amendment for a 15-acre property, located at the northwest corner of Rancho Vistoso Blvd. and Vistoso Commerce Loop. The request seeks to change the existing land use on the property FROM Commerce/Office Park TO Medium Density Residential (OV1701076). QUESTIONS? Please contact Long Range Principal Planner Elisa Hamblin at 520-229-4847 or ehamblin@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Innovation Park Drive General Plan Amendment Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721730-01 [Permalink] ►�+► Via_, �. �1 h� c.�: , The Oro Valley Planning and Zoning Commission invites the community to attend Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive PUBLIC HEARING: Tangerine - State Land General Plan Amendment presentation and discussion regarding a State of Arizona owned property comprising approximately 302- acres located at the northwest intersection of W. Tangerine Road and N. Coyote Crossing Trail and bordered by W. Moore Road and N. Thornydale Road. The purpose of the request is to extend the General Plan Planning Boundary and add a land use designation of Master Planned Community. (OV1701699). QUESTIONS? Please contact Constituent Services Coordinator Jessica Hynd at 520-229-4711 orjhynd@orovalleyaz.gov. _r•14W-"� For more information, go to OVprojects.com under the project name: Tangerine -State Land General Plan Amendment Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721172-01 [Permalink] VVVV✓fV V The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive VVVVVV V PUBLIC HEARING: Big Wash General Plan Amendment and Rezoning presentation and discussion for approximately 108-acres Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act located north of Tangerine Road, between the future Moore Road loop on the west and Rancho Vistoso Boulevard on the east. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Open Space, Park, Resort/Golf Course, and Medium Density Residential TO Open Space, Park, Medium Density Residential and Medium High Density Residential (OV1701068). 2. Rezoning FROM Open Space, Recreation Area/ Golf Course, Medium High Density Residential, Commercial (C-1) TO Open Space, Medium Density Residential, and Medium High Density Residential (OV1701630). QUESTIONS? Please contact Senior Planner, Rosevelt Arellano at 520-229-4817 or rrellano@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Big Wash General Plan and Planned Area Development (PAD) Amendments Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721772-01 [Permalink] ■■■ ■a■a The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m Icagen, Inc. 2090 E. Innovation Park Drive M E M E N E E PUBLIC HEARING: Shannon Road General Plan Amendment and Rezoning for a 76-acre property, located on the east side of Shannon Road, immediately south of Ironwood Ridge High School. The requests Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Rural Low Density Residential TO Low Density Residential-1(OV1701072). 2. Rezoning FROM large -lot residential, R1-144 TO small -lot cluster residential, R1-36 (OV1701617). QUESTIONS? Please contact Planner Milini Simms at 520-229-4836 or msimms@orovalleyaz.gov. -"r1tirr For more information, go to OVprojects.com under the project name: Shannon Road General Plan Amendment and Rezoning Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721901-01 [Permalink] PUBLICATION OF NOTICE OF SOLICITATION FOR QUALIFICATIONS: Publish: Arizona Daily Star - August 25, and September 11, 2017 NOTICE OF SOLICITATION FOR QUALIFICATIONS NO.270243 DESIGN ENGINEERING FOR: SIGN INVENTORY AND PANEL REPLACEMENT FEDERAL PROJECT NO.: HSIP-PPM-0(264)D ADOT TRACS NO.: T0146 03D Pima County is seeking Statements of Qualifications (SOQ) from qualified firms to provide Engineering Consulting services for the following project. The design engineering consultant will be responsible for all work and deliverables associated with a comprehensive sign inventory for the procurement of replacement sign panels for the Pima County Department of Transportation. The scope of services involves inventorying all signs on roadways owned by Pima County and preparing Plans, Specifications and Estimates (PS&E) for the procurement of replacement sign panels. Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&ac Classifieds - Announcements - Legals Search the classifieds Search There are 5 ads in this category: TO The Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 PM Icagen, Inc. 2090 E. Innovation Park Drive [WAFAF PUBLIC HEARING: Innovation Park Drive General Plan Amendment for a 15-acre property, located at the northwest corner of Rancho Vistoso Blvd. and Vistoso Commerce Loop. The request seeks to change the existing land use on the property FROM Commerce/Office Park TO Medium Density Residential (OV1701076). QUESTIONS? Please contact Long Range Principal Planner Elisa Hamblin at 520-229-4847 or ehamblin@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Innovation Park Drive General Plan Amendment Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721730-01 [Permalink] Vlr VV 1/V V The Oro Valley Planning and Zoning Commission Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&ace invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive V VO V V/ ✓ ✓ V0 PUBLIC HEARING: Big Wash General Plan Amendment and Rezoning presentation and discussion for approximately 108-acres located north of Tangerine Road, between the future Moore Road loop on the west and Rancho Vistoso Boulevard on the east. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Open Space, Park, Resort/Golf Course, and Medium Density Residential TO Open Space, Park, Medium Density Residential and Medium High Density Residential (OV1701068). 2. Rezoning FROM Open Space, Recreation Area/ Golf Course, Medium High Density Residential, Commercial (C-1) TO Open Space, Medium Density Residential, and Medium High Density Residential (OV1701630). QUESTIONS? Please contact Senior Planner, Rosevelt Arellano at 520-229-4817 or rrellano@orovalleyaz.gov. �r �r For more information, go to OVprojects.com under the project name: Big Wash General Plan and Planned Area Development (PAD) Amendments Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721772-01 [Permalink] The City of Tucson is accepting comments on the draft FY 2017 Consolidated Annual Performance and Evaluation Report (CAPER). The report provides information on City expenditures from July 1, 2016 through June 30, 2017 for the following U.S. Department of Housing and Urban Development (HUD) Classifieds - Announcements - Legals I tucson.com http://speedwaytucson.com/classifieds/?template=star&type=full&act entitlement grants: Community Development Block Grant (CDBG); HOME Investment Partnership (HOME); Emergency Solutions Grant (ESG); and Housing Opportunities for Persons with Aids (HOPWA). This DRAFT report is available for comment beginning on Tuesday, September 12, 2017 on the City's web site: http://www.tucsonaz.gov/hcd. Comments will be accepted through September 27, 2017 at 5:00 PM and may be sent by email: HCDComment@tucsonaz.gov faxed to (520) 791-5407, or delivered to: Housing and Community Development Department, Attn: Leticia Carpio 310 Commerce Park Loop, Tucson, AZ 85745 El Gobierno de la Ciudad de Tucson solicita comentarios El Gobierno de la Ciudad de Tucson solicita comentarios y recomendaciones al Reporte Anual de Rendimiento y Evaluaci6n del plan de Acci6n del siclo 2017. Este reporte preliminar proporciona informaci6n acerca de los gastos realizados durante el periodo del fro de Julio del 2016 hasta el 30 de Junio del 2017. Esta informaci6n pertinente de los fondos proporcionados por el Departamento de Vivienda y Desarrollo Urbano de los Estados Unidos en los siguientes programas: Asistencia Financiera para Desarrollo Comunitario (CDBG por sus siglas in ingles); Asociaci6n para la Inversi6n en Vivienda (HOME siglas en ingles); Asistencia Financiera para Albergues de Emergencia (ESG siglas en ingles); Asistencia Financiera para Desarrollo Comunitario (CDBG por sus siglas in ingles); y Oportunidades de Vivienda para personas con SIDA (HOPWA, siglas in ingles). El reporte anual preliminar estara disponible al publico a partir del martes 12 de Septiembre del 2017 en la pagina de Internet de la Ciudad de Tucson. Lo comentarios y recomendaciones remitidos seran aceptados hasta el dia 27 de Septiembre del 2017 a las 5:00 p.m. Los comentarios podran ser remitidos via fax al (520) 791-5407, en persona, o por correo a: Housing and Community Development Department, Attn: Leticia Carpio 310 Commerce Park Loop Tucson, AZ 85745 HCDComment@tucsonaz.gov Publish September 12, 2017 Arizona Daily Star Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act Ad #0008722512-01 [Permalink] 'rye `!':�?•i<• 'hr ,�� ;�. The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive �a• PUBLIC HEARING: Tangerine - State Land General Plan Amendment presentation and discussion regarding a State of Arizona owned property comprising approximately 302- acres located at the northwest intersection of W. Tangerine Road and N. Coyote Crossing Trail and bordered by W. Moore Road and N. Thornydale Road. The purpose of the request is to extend the General Plan Planning Boundary and add a land use designation of Master Planned Community. (OV1701699). QUESTIONS? Please contact Constituent Services Coordinator Jessica Hynd at 520-229-4711 orjhynd@orovalleyaz.gov. -w-o"P" For more information, go to OVprojects.com under the project name: Tangerine -State Land General Plan Amendment 4 J_-&— 4b-4b-dh� Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721172-01 [Permalink] ENN EWEN The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act Icagen,Inc. 2090 E. Innovation Park Drive E M E N E E N PUBLIC HEARING: Shannon Road General Plan Amendment and Rezoning for a 76-acre property, located on the east side of Shannon Road, immediately south of Ironwood Ridge High School. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Rural Low Density Residential TO Low Density Residential-1(OV1701072). 2. Rezoning FROM large -lot residential, R1-144TO small -lot cluster residential, R1-36 (OV1701617). QUESTIONS? Please contact Planner Milini Simms at 520-229-4836 or msimms@orovalleyaz.gov. _r•1"r For more information, go to OVprojects.com under the project name: Shannon Road General Plan Amendment and Rezoning Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721901-01 [Permalink] ((Back to Classifieds - Announcements ((Back to Classifieds Classifieds - Announcements - Legals tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&acl AZ Da,lvl S�c� Classifieds - Announcements - Legals Search the classifieds Search There are 8 ads in this category: EWAFAWAETM The Planning and Zoning Commission invites the community to attend a publichearingon Tuesday October 3, 2017 6:00 PM Icagen,Inc. 2090 E. Innovation Park Drive PUBLIC HEARING: Innovation Park Drive General Plan Amendment for a 15-acre property, located at the northwest corner of Rancho Vistoso Blvd. and Vistoso Commerce Loop. The request seeks to change the existing land use on the property FROM Commerce/Office Park TO Medium Density Residential (OV1701076). QUESTIONS? Please contact Long Range Principal Planner Elisa Hamblin at 520-229-4847 or ehamblin@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Innovation Park Drive General Plan Amendment Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721730-01 [Permalink] The Oro Valley Planning and Zoning Commission invites the community to attend Classifieds - Announcements - Legals tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&ac a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive ���� +,Y•.:. ��i�� �.�*ma's_ PUBLIC HEARING: Tangerine - State Land General Plan Amendment presentation and discussion regarding a State of Arizona owned property comprising approximately 302- acres located at the northwest intersection of W. Tangerine Road and N. Coyote Crossing Trail and bordered by W. Moore Road and N. Thornydale Road. The purpose of the request is to extend the General Plan Planning Boundary and add a land use designation of Master Planned Community. (OV1701699). QUESTIONS? Please contact Constituent Services Coordinator Jessica Hynd at 520-229-4711 orjhynd@orovalleyaz.gov. '"PlIV For more information, go to OVprojects.com under the project name: Tangerine -State Land General Plan Amendment Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721172-01 [Permalink] M E N E W E E The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m Icagen,Inc. 2090 E. Innovation Park Drive PUBLIC HEARING: Shannon Road General Plan Amendment and Rezoning Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&ac for a 76-acre property, located on the east side of Shannon Road, immediately south of Ironwood Ridge High School. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Rural Low Density Residential TO Low Density Residential-1(OV1701072). 2. Rezoning FROM large -lot residential, R1-144TO small -lot cluster residential, R1-36 (OV1701617). QUESTIONS? Please contact Planner Milini Simms at 520-229-4836 or msimms@orovalleyaz.gov. -ir•�+Ir For more information, go to OVprojects.com under the project name: Shannon Road General Plan Amendment and Rezoning Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721901-01 [Permalink] V V V V 1f Vr 1OO The Oro Valley Planning and Zoning Commission invites the community to attend a public hearing on Tuesday October 3, 2017 6:00 p.m. Icagen, Inc. 2090 E. Innovation Park Drive VVV✓✓V PUBLIC HEARING: Big Wash General Plan Amendment and Rezoning presentation and discussion for approximately 108-acres located north of Tangerine Road, between the future Moore Road loop on the west and Rancho Vistoso Boulevard on the east. The requests seek to change the existing development rights on the property as follows: 1. General Plan Amendment FROM Open Space, Park, Resort/Golf Course, and Medium Density Residential TO Open Space, Park, Medium Density Residential Classifieds - Announcements - Legals I tucson.com http://speedway.tucson.com/classifieds/?template=star&type=full&act and Medium High Density Residential (OV1701068). 2. Rezoning FROM Open Space, Recreation Area/ Golf Course, Medium High Density Residential, Commercial (C-1) TO Open Space, Medium Density Residential, and Medium High Density Residential (OV1701630). QUESTIONS? Please contact Senior Planner, Rosevelt Arellano at 520-229-4817 or rarellano@orovalleyaz.gov. For more information, go to OVprojects.com under the project name: Big Wash General Plan and Planned Area Development (PAD) Amendments Publish September 11,12 and 13, 2017 Arizona Daily Star Ad #0008721772-01 [Permalink] Susan Lynne Walka 5219 W. Grouse Way Tucson, AZ 85742 520-730-9743 ARIZONA SUPERIOR COURT, PIMA COUNTY NO. NOTICE TO CREDITORS (For Publication) In the Matter of the Estate of: Robert Edward Dick, Jr. Date of Birth: 7-14-1947 Deceased NOTICE IS GIVEN that Susan Lynne Walka has been appointed Personal Representative of this estate. All persons having claims against the estate are required to present their claims within four (4) months after the date of the first publication of this Notice or the claims will be forever barred. Claims must be presented by delivering or mailing a written statement of the claim to the Personal Representative or his/her attorney at the address listed below. DATED: 9/11/2017 Susan Lynne Walka Personal Representative 5219 W. Grouse Way Tucson, AZ 85742 Publish September 13, 20 and 27, 2017 Arizona Daily Star Ad #0008723136-01 [Permalink] APC Towers, LLC Prepared for: Prepared Bv: Shannon 77 LLC 700 E Broadway Boulevard Suite 200 Tucson, AZ 85711 The WLB Group, Inc. 4444 East Broadway Blvd. Tucson, Arizona 85711 Contact: Paul Oland 520.881.7480 gpoland@wlbgroup.com WLB No. 116028-A-001 MMIX TABLE OF CONTENTS A. Project Summary............................................................................................................. 1 B. Property Data.................................................................................................................. 2 C. Your Voice, Our Future General Plan Amendment Criteria ............................................ 2 D. General Plan Policy Conformance.................................................................................... 6 Exhibits • Location Map • Existing General Plan Land Use Designations • Proposed General Plan Land Use Designations M��%� Shannon 80 — General Plan Amendment IN" WLB No. 116028-A-001 0 A. Project Summary The Town of Oro Valley is growing, not only in size but also in desirability. Since the year 2000, the population of Oro Valley has increased roughly 45%, to over 43,500 residents (Source: 2015 American Community Survey). In addition, demand for housing is growing in the area. According to Multiple Listing Service of Southern Arizona Statistics 2016 Year End Review, Tucson experienced a total unit sales of 16,842 which is more units than have been sold in the last ten years. Average list and sold prices for 2016 increased over the year 2015 while days on the market saw a significant decrease from 2015. Furthermore, the number of building permits pulled in Oro Valley have been steadily rising over the past three years signifying an increased demand for housing. There were 176 permits pulled in 2016 up 15 from 2015 and up 42 from 2014. The Town of Oro Valley's recent economic and physical growth, as well as its need for more housing, make our request a necessary and reasonable amendment to the "Your Voice, Our Future" Oro Valley General Plan. The subject property is located on the east side of Shannon Road between Lambert Lane and Naranja Drive. The request is to modify the General Plan Land Use Designation from Rural Low - Density Residential (R-LDR) to Low Density Residential 1 (LDR1, 0.4-1.2 DU/AC), to allow for a single-family residential cluster subdivision. The proposed change in land use designation and density is highly supported by several factors, including: • The Town of Oro Valley General Plan "Your Voice, Your Future" ratified by voters in November 2016, has expanded the Town's Planning Area westward from Shannon to Thornydale Road, signaling that this property is no longer on the fringe of the Town. • The Urban Services Boundary has expanded west to Thornydale Road, positioning the site away from the urban edge. • The subject property is within a 1.5 mile proximity to two Tier 2 growth areas, located at the intersections of Tangerine Road and La Cholla Boulevard, and Lambert Lane and La Canada Drive. • Naranja Drive road improvements have been made between Shannon Road and La Cholla Boulevard. • The changing transportation conditions of La Cholla Boulevard to a major north -south corridor will increase the viability and accessibility of the site, creating demand for medium density residential development. • The adjoining Capella property to the east, is undergoing a rezoning from R144 to Planned Area Development. Capella includes a mixture of uses and residential densities from low density residential to high density residential, commercial areas, recreation areas, and open space. The requested change in land use designation will allow a residential cluster subdivision, with large amounts of open space, and the preservation of Critical Resource Areas and Core Resource Areas onsite. A significant open space buffer will be provided along the entire southern and western boundaries to help mitigate any impacts created by this development. Additionally, this ��]� Shannon 80 — General Plan Amendment ow_ nisi/ WLB No.116028-A-001 Plan Amendment is fully compliant with Oro Valley's Environmentally Sensitive Lands Ordinance (ESLO). Under this Amendment, development of this property will result in approximately 66% of the property being left in its natural condition. In order to make this project a reality, the appropriate land entitlements must be acquired for the property. The property owner is focused on acquiring the necessary entitlement in the Town of Oro Valley and the first step in achieving the necessary land entitlements involves a Type 2 amendment to the Oro Valley General Plan. As such, this application for a Type 2 amendment is being submitted. B. Property Data Location: The property is located immediately east of Shannon Road, south of Ironwood Ridge High School, and north of Owl Vista Place, approximately one half mile west of La Cholla Boulevard. The property can be described as the south half of the northwest quarter of Section 9, Township 12 South, Range 13 East. Area of Properties/General Plan Amendment: Parcel 224-21-0020: 9.8± Ac. Parcel 224-21-0030: 9.8± Ac. Parcel 224-21-0040: 18.3± Ac. Parcel 224-21-0050: 38.5± Ac. Total = 76.4± Ac. Existing Land Uses: The site is currently vacant. Existing Zoning: The property is currently zoned Single Family Residential District, 111-144. Existing Oro Valley General Plan Designations: The property is designated as Rural Low Density Residential (R-LDR). Requested Oro Valley General Plan Designations: Low Density Residential 1 (LDR1, 0.4-1.2 DU/AC). C. Your Voice, Our Future General Plan Amendment Criteria In accordance with OVZCR Section 22.2.D.4 the General Plan amendment proposed shall, on balance, be consistent with the vision, guiding principles, goals, and policies of the General Plan as demonstrated by the following criteria. The request shall not: 1.a. Significantly alter existing development character and land use patterns without adequate and appropriate buffers and graduated transitions in density and land use. TyvryL�B Shannon 80 — General Plan Amendment C��P� WLB No. 116028-A-001 • The development will include landscaping, architectural themes, and open space treatments that comply with Oro Valley Code and Design Guidelines. This development will contain landscape buffers around the entire perimeter of the project and will provide a generous natural open space buffer for the lower density neighborhood to the south and west. The project will also include significant preservation of the onsite Critical Resource and Core Resource Areas. At minimum 95% of the Critical Resource Areas and 80% of the Core Resource areas will be preserved in their natural condition on site. These areas along the southern and western boundaries of the site will be permanently protected within a conservation easement to be granted to the Town of Oro Valley. The proposed density is approximately 1.0 homes per acre. In addition, the building height will be limited to single -story for the entire development with a maximum of twenty-three (23') feet height for gable roofed residences only to lessen the impact on views from the surrounding neighborhood. This density is sensitive to the surrounding developments, and will create a density transition between the lower density developments to the south and west, and the higher intensity developments that are being planned to the east. In addition, clustering development closer to the high school is appropriate from a land use planning perspective. 1.b. Impact existing uses with increased infrastructure without appropriate improvements to accommodate planned growth. • With this development being on Shannon Road, an arterial roadway, much of the utility infrastructure is already in place to accommodate this project. Sewer capacity is available to serve this property. Sewer and any other necessary utility extensions will be installed. Presently, water infrastructure is not in place to serve this parcel; however, offsite infrastructure extensions of the Oro Valley Water system will be made to serve this development. This development will have a net positive long-term fiscal impact to the Town and its taxpayers. Given the recent extension of the urban service boundary, the property lies well within the service limits of the Town and is in a position to accommodate planned growth. 1.c. Impact other public services including police, fire, parks, water and drainage unless careful analysis and explanation of anticipated impacts is provided to the Town. • Being essentially infill, the location of this development and the proposed home sites will not negatively impact public services such as police, fire and parks. • Drainage will be carefully analyzed according to Town drainage design requirements. Once developed, the site will have detention basins that will retain storm water runoff and meter it out at less than pre -developed conditions. Additional onsite drainage attenuation through larger basins will be completed to reduce the flow of existing run- off. The following off -site drainage improvements will be implemented as agreed upon with neighbors: Shannon 80—General Plan Amendment O1p WLB No. 116028-A-001 o Improvements along Owl Vista Place, which include larger culverts, armoring the road, and raising the road in necessary areas. o Working with Pima County to identify possible drainage improvements along Saguaro Divide. o Working with Amphitheater School District to identify possible drainage improvements to Ironwood Ridge High School Property. Capacity is available to serve the project site with water and sewer utilities. Additional information on the type and amount of infrastructure extensions will be provided during the platting process. According to the Traffic Impact Analysis findings, all intersections adjacent to the subject property currently operate, and with the addition of the project, are predicted to continue to experience an adequate level of service for all movements on weekday and weekend peak hours. By clustering the homes of this development in less environmentally significant areas, it will allow for significant open space and buffering. There will be connectivity to the arterial road network for emergency services and convenient access to nearby goods and services. The subject property will have one access point that will connect this neighborhood directly to Shannon Road, aligning with Sahuaro Divide. Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road and Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. A Traffic Impact Analysis (TIA) has been provided as part of the Rezoning Application. 1.d. Impact the natural beauty and environmental resources without suitable mitigation. • Prior to development, this site will be inventoried for all significant vegetation. Town of Oro Valley Native Plant Preservation ordinance requirements will be followed. Flexible Design Options are being requested as part of the rezoning. A Native Plant Preservation Waiver has been submitted but per the Zoning Code, the waiver does not apply to significant ironwood trees or saguaro cacti within the developable area. Plants that are suitable for transplanting will be transplanted on -site and be included within the buffer yards and other open spaces of the site. The Critical Resource Areas that run through the site will be preserved in their natural condition, except for necessary roadway crossings. Both the Critical Resource Areas and the Core Resource Areas will be preserved per ESOS Conservation Guidelines. The proposed residential development will preserve surrounding views in the neighborhood through the use of a natural bufferyard along the perimeter of the property and the preservation of significant open space on the western portion of the site and the Core Resources Area to the south. 2. Implement effective public outreach efforts to help identify neighborhood concerns and respond by incorporating measure to avoid or minimize development impacts, and mitigate unavoidable adverse impacts. Shannon 80—General Plan Amendment M " WLB No. 116028-A-001 • A Public Outreach Plan was developed and followed in accordance with Town requirement. The first formal neighborhood meeting was held on April 25th, 2017, at Casas Church. This meeting was held to increase public awareness of the proposal and identify any initial concerns that surrounding neighborhoods may have with the development of this property. The meeting was very productive and allowed surrounding neighbors a chance to voice comments and suggestions, and any questions answered. • Some concerns raised during the neighborhood meeting were regarding: o The density of the proposed development and the proposed number of lots and the small lot size. o The perceived loss of rural character within the neighborhood. o The anticipated increase in traffic. • In response to the above comments the following responses have been offered: o A reduced density and reduced number of lots is being proposed. Lot size has also increased in size from the previous proposal. o The site will maintain a large amount of open space on the west and south of the development in effort to preserve the views and rural character of the area. We will work with neighbors to identify conservation methods. o According to the Traffic Impact Analysis, all intersections adjacent to the subject property currently operate and are predicted to continue to experience an adequate level of service for all movements on weekday and weekend peak hours. Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road and Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. • A second formal neighborhood meeting was held on July 18th 2017, at Casas Church. • An informal on -site tour was held on August 9, 2017 to better understand the layout of the proposal. Survey poles with flags were set up to simulate the proposed building heights and showed the proposed building envelope of the property. Residents attended a guided tour to discuss the proposed development. At each checkpoint discussions took place which addressed building heights, setbacks and drainage along edges of the property. Residents who attended expressed their concerns related to: o Drainage and ongoing damage to Owl Vista Place. o Planning for on -site detention. o Vehicular access and safety. o Design of the homes. o Location and design of the entry gate and sign. o Preservation natural character of the project area. As a result of the meetings held on July 18th 2017 and August 9, 2017 the following agreements were made with neighbors: o To mitigate for existing flooding issues an easement will be provided for maintenance improvements to Owl Vista Place. Improvements along Owl Shannon 80—General Plan Amendment WLB No. 116028-A-001 Vista Place will include larger culverts, armoring the road, and raising the road in flood prone areas. o This development will attenuate pre-existing storm water flow rates by 15%- 25% by constructing larger than code -required onsite basins which are to be landscaped within open space areas of the site. o Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road and Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. o The design of homes will be compatible to the surrounding areas using natural colors that blend with the desert landscape. o The location and design of the entry gate will be compatible to the rural, desert atmosphere of the area with a rustic western design and located a safe distance from the Shannon Road right-of-way in order to prevent the back up of traffic onto Shannon. o Conservation of 96% of Critical Resource Areas, 97% of Core Resource Areas, and 45% in the remaining Resource Management Area Tier 1. Preservation of ESOS areas along the southern (300'-600') and western (300'-400') edges which will be protected within an open space easement to be granted to the Town. • A third formal neighborhood meeting was held on August 28t" 2017. o The meeting provided a good opportunity to review the latest site plan which reflected revisions as agreed upon during previous meetings. D. General Plan Policy Conformance The proposed General Plan Amendment is in conformance with the following Town policies in the Community chapter of the General Plan: • CC.2. Provide appropriate park facilities and services for residents of all ages in the community. In addition to natural undeveloped open space, a neighborhood park will be built onsite to serve the neighborhood. The exact type of amenities will be determined during the development process. • CC.3. Link existing and planned neighborhoods with parks and open spaces by incorporating path and trail facilities. Developer will provide an in -lieu fee to the Town for constructing a future multi -use path along Shannon Road. • CC.4. Provide public open space and park space where there is an existing park shortage or a need to preserve open space, natural areas or scenic views. 0WLBShannon 80 — General Plan Amendment .%.P WLB No. 116028-A-001 The project will have a neighborhood park and ESLO open space will be preserved per Town requirements. • CC.B. Foster development of complete neighborhoods with easy access to transportation and employment options, and commercial areas that offer amenities and services for residents' daily needs. In addition to its ideal location south of Ironwood Ridge High School and along an arterial roadway, the project will be within close proximity of the Capella Master Planned Community (currently in the rezoning process) which will provide commercial areas, additional amenities and services. The project is also within a 1.5 mile proximity to two growth areas identified as Tier 2 Growth Areas located at the intersections of Tangerine Road and La Cholla Boulevard and Lambert Lane and La Canada Drive. • CC.9. Promote community interaction by planning for public land uses, such as parks, schools and other civic uses to act as the focus of neighborhoods. Community interaction will be supported based on the project's location adjacent to Ironwood Ridge High School, and through the use of a neighborhood park. The proposed General Plan Amendment is in conformance with the following Town policies in the Environment chapter of the General Plan: • SD.1. Identify, preserve and manage an integrated and connected open space system that protects Oro Valley's natural resources and provides enjoyment for residents and visitors while recognizing our place in the larger ecosystem. The development of this property will preserve the three Critical Resource Areas to the greatest extent possible as required by the ESLO, and will minimize topographic changes. The project will also be in conformance with the native plant preservation requirements to minimize the disturbance of significant vegetation (including ironwood tree stands and significant saguaros) and mitigate for any disturbances. • SD.2. Protect and provide connections between contiguous, environmentally sensitive lands within the Town, including key habitat areas and significant natural resource areas. The Critical Resource Areas and the Core Resource Areas on the property will be preserved, except for necessary roadway crossings and required infrastructure, including areas of significant vegetation (containing significant saguaros and ironwood tree stands). The preservation of these key habitat areas will provide contiguous connections between offsite habitat areas and allow for wildlife movement throughout the site. Shannon 80 — General Plan Amendment WLB No. 116028-A-001 • SD.4. Protect and conserve healthy native vegetation during the development process. The development of this property will be in conformance with the native plant preservation requirements to minimize the disturbance of significant vegetation and mitigate for any disturbances. A Native Plant Preservation Waiver has been submitted, but per the Zoning Code the waiver does not apply to significant Ironwood Trees or Saguaro Cacti within the developable area. Denser areas of Ironwood Trees exist along the southern half of the property, which will be preserved in its natural state within a conservation easement. • SD.6. Protect scenic corridors, public park and trail view sheds, and the distinctive visual character and visual appeal of Oro Valley. The proposed residential development will preserve surrounding views in the neighborhood through the use of a natural bufferyard along the perimeter of the property which will soften any visual impacts to the surrounding landowners. The project site is located outside of scenic corridors. • SD.7. Enhance, protect, create and restore native biological habitats, especially along washes, groundwater basins, recharge areas and wildlife corridors, in order to benefit native plant and wildlife habitats and species movement, minimize the negative impacts of invasive species and provide protection from flood risk. The vast majority of Critical Resource Areas and the Core Resource Areas on the property will be preserved in their natural condition, which will help reduce impacts to onsite floodplains. The preservation of these key habitat areas will provide contiguous connections between offsite habitat areas and allow for wildlife movement throughout the site. • SD.B. Encourage development project designs that connect wildlife habitat areas, avoid disturbing significant wildlife habitats and minimize the overall impacts on wildlife habitat areas. By clustering the home sites along the northern property boundary, the impact to the Critical Resource and Core Resource Areas will be minimized allowing for greater wildlife habitats and habitat connectivity. In addition, the property was designed to minimize the impact of road crossings to the Critical Resource and Core Resource Areas. • SD.10. Strive to protect the public and environment from the threats and risks of stormwater surges and potential negative impacts of contaminants from runoff. In accordance with Town policy, post -developed 100-year stormwater discharges 7 Shannon 80—General Plan Amendment WLB No. 116028-A-001 exiting the site will be maintained in their current condition and reduced as required by the Town Engineer. The following "neighbor agreements" relative to off -site drainage improvements, are to be completed to further reduce stormwater run-off. o Improvements along Owl Vista Place, which include larger culverts, armoring the road, and raising the road in necessary areas. o Working with Pima County to identify possible improvements along Saguaro Divide. o Working with Amphitheater School District to identify possible improvements to Ironwood Ridge High School Property. • CRA. Identify, preserve and interpret significant cultural resources within Oro Valley and the larger planning area. As part of the rezoning process a records check has been solicited from the Arizona State Museum. The museum's findings indicate that no sites are located within the project area. Local and State regulations will be followed if any cultural resources are identified onsite. The proposed General Plan Amendment is in conformance with the Town's policies in the Development chapter of the General Plan: • LUA. Promote land use development practices and programs that conserve and minimize impacts to natural and cultural resources. Development of the property will be done with a focus on preserving its environmentally sensitive areas, and will conserve the percentages of land required by the Town's ESLO guidelines. To do this, the development will protect the property's three washes, as well as clustering development in the less environmentally sensitive areas of the site and avoiding a majority of the Core Resource Area. • LUA. Promote outdoor lighting that enhances safety and circulation, beautifies landscapes, minimizes impacts to adjacent properties and does not reduce public enjoyment of the night sky. The proposed development will comply with Oro Valley Town Code and utilize dark sky compliant lighting. • LU.S. Provide diverse land uses that meet the Town's overall needs and effectively transition in scale and density adjacent to neighborhoods. This plan focuses on minimizing the impact of development on the neighbors by providing large areas of open space in the southern and western portions of the Shannon 80 — General Plan Amendment WLB No. 116028-A-001 property. This will serve as a buffer between this development and the existing residences to the south and west. By increasing the density on this property to LDR1, it will act as an appropriate and effective transition from the higher density developments to the north and east and the lower density developments to the west and south. • LU.6. Maintain the small-town, neighborly character and improve the design and safety of the built environment. By clustering the homes of this development in less environmentally significant areas, it will allow for significant open space and buffering. There will be connectivity to the arterial road network for emergency services and convenient access to nearby goods and services. The subject property will have one access point that will connect this neighborhood directly to Shannon Road, aligning with Sahuaro Divide. The Traffic Impact Analysis recommended a southbound left-hand turn lane into the project. Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road and Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. • LU.8. Encourage the development of master planned communities which include suitable residential and commercial uses. The proposed LDR1 development will be planned so that it will fit within the larger context of the area, providing an appropriate transition between the higher densities to the east and north and the lower densities to the west and south. The areas of the property near existing low density residential neighborhoods will be preserved as open space while development will be clustered in areas of the property closer to the public school and nearby lands planned for higher density development. This will allow the development to better integrate with the existing neighborhoods and activity centers. • DG.1. Require new development to pay its share toward the cost of additional public facility and service needs generated by new development, while balancing public and private interests in cost allocation. As part of the rezoning of the property, a Traffic Impact Analysis has been completed. The Traffic Impact Analysis recommended a southbound left-hand turn lane into the project be considered. Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road/Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. The developer will pay its share toward the cost of additional public infrastructure needs generated by new development. Shannon 80—General Plan Amendment WLB No. 116028-A-001 • 1.1. Accommodate community services and utilities that meet the larger community needs and goals. Developer will provide an in -lieu fee to the Town for constructing a future multi -use path along Shannon Road. • 1.2. Consider aesthetics and visual impacts of utilities and infrastructure during the planning, design or upgrade process, to the extent reasonably possible. The development of the property will provide the appropriate buffers for the washes as well as for the surrounding neighborhoods and school. All utilities will be installed underground. • 1.6. Provide for safety, efficiency and environmentally -sensitive design in stormwater systems. Stormwater systems will meet Town code requirements. Drainage will be carefully analyzed according to Town drainage design requirements. Once developed, the site will have detention basins that will retain storm water runoff and meter it out at less than pre -developed conditions. Shannon 80 — General Plan Amendment MUMBWLB No. 116028-A-001 • ��iiii�l Wilson K-8 School � �■ ���ii11: , 11III■11 oI/gloom � . t .I - ' ■ �,■_ II 11'1111� �,'• -Ironwood - MEN ,,,� • High School i �� WWI �■ I■� ENEMIES = l = 11111► I■E,.- �IIIIIIIIIIr � �.i,�i __■■■ r Subject - rty IIIIII ���■� r �� II■■ Fm IIII: �0 NONE IIII� � � ■■��■■ soon oil■ ���OEs■ son ■■ oil�1 Location Map ® 0' 1/4mile The Shannon 80 - General Plan Amendment Group_ WLB No. 116028-A-001 Rural Low Density Low Density Residential Residential (0-0.3 DU/AC) (0.4-1.2DU/AC) NARANJA DR School Rural Low Density Residential (0-0.3 DU/AC) SUBJECT Z PROPERTY 0 Z U 2 C/) � d N U_ � Z a 0 O U , J E a O K O 3 Rural Low Density W H 0 L Z D Residential (0-0.3 DU/AC) [ , - Public/Semi Public Master Plan Community Existing General Plan Land Use Designations Ell 01 600' The Shannon 80 - General Plan Amendment c o PUIM WLB No.116028-A-001 Rural Low Density Low Density Residential Residential (0-0.3 DU/AC) (0.4-1.2DU/AC) F- NARANJA DR - r � School Rural Low Density . x Residential (0-0.3 DU/AC) SUBJECT z PROPERTY z Q Low Density Residential Cn (0.4-1.2DU/AC) a a� U) U_ Z Z 0 w U E a 0 W K H O 3 Rural Low Density Residential (0-0.3 DU/AC) Z Public/Semi Public Master Plan Community Proposed General Plan Land Use Designations E!9 0 600' The IIFM Shannon 80 General Plan Amendment c v_ WLB No.116028-A-0 A 001 SHANNON SO REZONING SITEANALYSIS OV1701677 AS APPROVED 721612017 17 PREPARED FOR: Shannon 77 LLC 700 E. Broadway Blvd. STE 200 Tucson, Arizona 85719 PREPARED BY: The WLB Group, Inc. Attn: Paul Oland 4444 East Broadway Tucson, Arizona 85711 WLB No. 116028-A-001 February 14, 2018 The Groupu QA116028 Shannon 80\A-001\01 Planning\04 Rezone or GPA\Site Analysis\Shannon 80 Rezoning Site Analysis.docx CONTENTS Introduction....................................................................................................................................1 PartI — Inventory & Analysis............................................................................................................ 3 1. Existing Land Uses........................................................................................................................................ 5 A. Regional Context..................................................................................................................................................5 B. Onsite Uses..........................................................................................................................................................5 C. Project Vicinity..................................................................................................................................................... 5 2. Environmentally Sensitive Lands.................................................................................................................. 6 A. ESL Categories Onsite.......................................................................................................................................... 6 B. Additional ESL Characteristics.............................................................................................................................. 7 C. Total acreage present on -site for each Conservation Category ........................................................................... 7 3. Topography..................................................................................................................................................7 A. Topographic Character & Features......................................................................................................................7 4. Cultural /Archaeological / Historic Resources.............................................................................................. 8 A. Archaeological Survey Status / Results................................................................................................................ 8 5. Hydrology..................................................................................................................................................10 A. Offsite Watersheds............................................................................................................................................10 B. Balanced / Critical Basins...................................................................................................................................10 C. Offsite Features Affecting or Affected by the Property.....................................................................................10 D. Area of Upstream Watersheds Greater than 100 CFS.......................................................................................10 E. Location / Ownership of Well Sites within 100' of Site......................................................................................10 F. Onsite Hydrology Characteristics.......................................................................................................................10 G. Existing Drainage Conditions along the Downstream Property Boundary .........................................................11 6. Wildlife...................................................................................................................................................... 12 A. Arizona Game & Fish Dept. Letter.....................................................................................................................12 7. Viewsheds..................................................................................................................................................23 8. Traffic.........................................................................................................................................................24 A. Connection to Arterial Roadway Network......................................................................................................... 24 B. Arterial Roadways within One Mile of the Property..........................................................................................24 9. Recreation /Trails...................................................................................................................................... 26 A. Trails, Parks and Recreation Areas within One Mile of the Property.................................................................26 10. Schools....................................................................................................................................................... 27 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 A. Schools within One Mile of the Property........................................................................................................... 27 B. Schools Expected to Serve the Project............................................................................................................... 27 11. Water......................................................................................................................................................... 28 A. Water Service Provider...................................................................................................................................... 28 12. Wastewater............................................................................................................................................... 29 A. Sewer Service Connection................................................................................................................................. 29 13. Exhibits...................................................................................................................................................... 30 Exhibit 1-1-A: Site Location Map................................................................................................................... 31 Exhibit 1-1-8: Aerial Photograph.................................................................................................................. 32 Exhibit 1-1-C. Existing General Plan Future Land Use Designations.............................................................. 33 Exhibit1-1-D: Existing Zoning....................................................................................................................... 34 Exhibit 1-1-E: Existing Land Uses.................................................................................................................. 35 Exhibit 1-2-A: Environmentally Sensitive Lands............................................................................................ 36 Exhibit1-3-A: Topography............................................................................................................................ 37 Exhibit 1-5-A: Offsite Watersheds................................................................................................................. 38 Exhibit 1-5-8: Onsite Hydrology Characteristics............................................................................................ 39 Exhibit 1-8-A: Transportation....................................................................................................................... 40 Exhibit 1-9-A: Trails, Parks & Recreation...................................................................................................... 41 Exhibit 1-10-A: Existing & Proposed Schools................................................................................................. 42 Exhibit1-12-A: Sewer Service....................................................................................................................... 43 Exhibit 1-13-A: McHorg Composite Map...................................................................................................... 44 PartII — Land Use Plan...................................................................................................................45 1. Land Uses................................................................................................................................................... 47 A. Project Description............................................................................................................................................47 B. General Plan Conformance................................................................................................................................47 C. Flexible Design Options / Conservation Subdivision Design...............................................................................47 D. Effect on Existing Land Uses..............................................................................................................................48 2. Environmentally Sensitive Lands................................................................................................................ 49 A. ESOS Selection & Preservation Methods...........................................................................................................49 3. Topography................................................................................................................................................50 A. Design Response to Site Topography.................................................................................................................50 B. Slope Encroachment..........................................................................................................................................50 C. Hillside Conservation Areas...............................................................................................................................50 D. Quantified Site Disturbance...............................................................................................................................50 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 4. Cultural / Archaeological / Historic Resources............................................................................................ 51 A. Resource Protection..........................................................................................................................................51 B. Treatment Plan..................................................................................................................................................51 5. Hydrology.................................................................................................................................................. 52 A. Design Response to Site Hydrology....................................................................................................................52 B. Modifications of Drainage Patterns...................................................................................................................52 C. Mitigation..........................................................................................................................................................52 D. Town Policy Conformance.................................................................................................................................52 6. Wildlife...................................................................................................................................................... 53 A. Mitigation..........................................................................................................................................................53 7. Viewsheds..................................................................................................................................................54 A. Design Response to Site Viewsheds................................................................................................................... 54 B. ORSCOD / TRCOD Conformance........................................................................................................................ 54 8. Traffic.........................................................................................................................................................55 A. Traffic Impact Analysis.......................................................................................................................................55 B. Proposed Rights-of-Way....................................................................................................................................56 C. Proposed Pedestrian / Bicycle Circulation......................................................................................................... 56 9. Recreation / Trails...................................................................................................................................... 57 A. Offsite Trail Access.............................................................................................................................................57 B. Open Space Ownership......................................................................................................................................57 10. Schools....................................................................................................................................................... 58 A. Student Generation...........................................................................................................................................58 B. School Capacity..................................................................................................................................................58 11. Water......................................................................................................................................................... 61 A. Water Demand.................................................................................................................................................. 61 B. Water Service Provider & Capacity.................................................................................................................... 61 12. Wastewater............................................................................................................................................... 64 A. Sewer Service Method.......................................................................................................................................64 13. Bufferyards................................................................................................................................................ 66 A. Mitigation (if applicable)....................................................................................................................................66 14. Exhibits...................................................................................................................................................... 67 Exhibit 11-1-A: Tentative Development Plan................................................................................................. 68 Exhibit 11-2-A: Proposed ESOS Map.............................................................................................................. 69 Exhibit 11-3-A: Proposed Grading Limits....................................................................................................... 70 Shannon 80 - Rezoning Site Analysis M WLB No. 116028-A-001 Exhibit 11-4-A: Proposed Zoning.................................................................................................................... 71 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Introduction Introduction This site analysis has been prepared in support of a proposed rezoning of Shannon 80. This project is a proposed 76.4± acre residential subdivision located on the east side of Shannon Road between Lambert Lane and Naranja Drive. Currently the subject property remains undeveloped. The proposed project will increase the density on the subject property but remain substantially out of Critical Resource and Core Resource Areas identified through the Town's Environmentally Sensitive Lands Ordinance (ESLO). The proposed density increase is supported by several factors including its proximity to activity hubs such as Ironwood Ridge High School, Wilson K-8 School, Casas Church, Casas Christian School and the Capella Master Planned Development. This project will help act as a buffer between the lower density neighborhoods to the south and west, and the higher density land uses to the east and north. This request is to rezone the property from the current R1-144 to R1-36. The vision is to develop three clusters of homes, separated by the Critical Resource Areas running through the site and surrounded by large swaths of open space along the southern and western edges of the property. In order to make this residential project a reality, the appropriate land entitlements must be acquired for the property. The property owner is focused on acquiring the necessary entitlements in Oro Valley through a rezoning of the subject property. (Please refer to Exhibit A: Location Map.) Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Introduction (This i)ooe intentionally blonl.) Tlk Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis Part I — Inventory & Analysis Shannon 80 - Rezoning Site Analysis 0.%V-WM WLB No. 116028-A-001 Part 1— Inventory & Analysis (This page intentionally blank) TyrnLeB Shannon 80 - Rezoning Site Analysis MN" WLB No. 116028-A-001 Part I — Inventory & Analysis 1. Existing Land Uses A. Regional Context The property subject to this rezoning request consists of 76.4± acres located in the Town of Oro Valley in Section 9, Township 11S, Range 13E, Pima County Arizona. The property is located immediately east of Shannon Road, south of Ironwood Ridge High School, north of Owl Vista Place, and approximately a half mile west of La Cholla Boulevard. The Pima County Tax Assessor designates the subject property as parcel numbers 224-21-0020, 0030, 0040, and 0050. Please refer to Exhibit 1-1-A: Site Location Map and Exhibit 1-1-B: Aerial Photograph. B. Onsite Uses The subject property is currently undeveloped and vacant, and zoned R1-144. The Town of Oro Valley is currently reviewing a General Plan Amendment request on the subject property to redesignate the property from Rural Low Density Residential (R-LDR) to Low Density Residential LDR1 on the General Plan land use map. Please refer to Exhibit 1-1-C: Existing General Plan Future Land Use Designations. C. Project Vicinity Please refer to Exhibit 1-1-D: Existing Zoning and Exhibit 1-1-E: Existing Land Uses. The subject property is surrounded by the following existing zonings and land uses: a/b: Existing Zoning and Land Uses North: Existing zoning: R1-36 (Single -Family Residential —Town of Oro Valley) R1-144 (Single -Family Residential —Town of Oro Valley) Existing land use: Ironwood Ridge High School LDR (low Density Residential) R-LDR (Rural -low Density Residential) East: Existing zoning: 111-7 (Single -Family Residential —Town of Oro Valley) R1-144 (Single -Family Residential —Town of Oro Valley) Existing land use: Medium Density Residential (MDR) Public/Semi Public LDR (low Density Residential) R-LDR (Rural -low Density Residential) T Shannon 80 - Rezoning Site Analysis soap-WLB WLB No. 116028-A-001 Southeast: Existing zoning Existing land use South: Existing zoning: Existing land use West: Existing zoning: Existing land use Northwest: Existing zoning: Existing land use Part I — Inventory & Analysis R1-144 (Single -Family Residential — Town of Oro Valley) Public / Semi Public LDR (low Density Residential) R1-144 (Single -Family Residential — Town of Oro Valley) R-LDR (Rural -Low Density Residential) SR (Suburban Ranch — Pima County) LIU-0.3 (Low Intensity Urban — Pima County) SR (Suburban Ranch — Pima County) LIU-0.3 (Low Intensity Urban — Pima County) c: Number of Stories of Surrounding Structures Adjacent structures within a quarter mile of the subject property include both one and two-story single-family detached homes, and schools facilities up to three stories in height. d: Pending Rezonings The adjoining Capella property to the east is undergoing a rezoning from R1-144 to Planned Area Development for a project that includes a mixture of residential densities from low density residential to high density residential, commercial, and open space. Additionally, Saguaros Viejos Phase 2 northeast of the proposed development, requests to rezone the subject property from R1- 20 to R1-7. e: Conditionally Approved Zonings There are no conditionally approved zonings within a quarter mile of the subject property. f: Subdivisions and/or Development Plans Approved There are several residential developments along La Cholla Boulevard that are in various stages of construction and platting. These include the Estates at Capella (120 lots) east of Ironwood Ridge High School, Saguaros Viejos (118 lots) on the north side of Naranja Drive, and Rancho de Plata (50 lots) and Rancho del Cobre (68 lots) to the north near Glover Road. g: Architectural Styles Used in Adjacent Projects The architectural styles used in adjacent projects are mainly wood frame or block homes that utilize a stucco and/or stone veneer and have either a flat or tiled roof. 2. Environmentally Sensitive Lands A. ESL Categories Onsite The subject property consists of three Environmentally Sensitive Land categories. Approximately 31% or 23.8± acres of the property is within the Core Resource Area. Approximately 60% or 45.4 ± acres of the 7Wt Shannon 80 - Rezoning Site Analysis Grasp WLB No. 116028-A-001 Part 1— Inventory & Analysis property is within the Resource Management Area Tier 1. The remaining 9% or 7.2 acres of the site is within in the Critical Resource Area. The vegetation community on the property is typical of the Sonoran Desert scrub Paloverde-Mixed Cacti, which includes Saguaro, Ironwood, Palo Verde, Mesquite, Cholla, Prickly pear, Ocotillo, and Barrel Cactus. B. Additional ESL Characteristics No regulated rock outcrops occur on site. Please refer to Exhibit 1-2-A: Environmentally Sensitive Lands. C. Total acreage present on -site for each Conservation Category. Major Wildlife Linkage ----------- 0 -------------------------------------------- ------------- ....................................... Critical Resource Area - - - - ------------------ ........................................... - - 7.2± ........- ..------------------ -- Core Resource Area ........ -.... ------------------------- --------- 23.8± RMA Tier 1 - - .......... .......... ......... ................ 45.4± RMA Tier 2 ........................................--------.._..-�-----..�—.._-..............--------------------------------------------.......... ........ -.............................................. 0 RMA Tier 3 0 3. Topography A. Topographic Character & Features The topography of the subject property is characterized by relatively flat terrain and some undulating areas adjacent to the washes that run across the site. The property generally slopes downward from northeast to southwest. Elevations range from approximately 2,664 feet at the highest point on the northeast side to 2,628 feet at the lowest point on the southwest side of the property. The site contains no areas of regulated slopes greater than 15%. The site does not contain any restricted peaks, ridgelines or other significant topographic features. No areas of this development are subject to the ESL Hillside Area Category. Please refer to Exhibit 1-3-A: Topography. 15%to less than 18% --------------...................................................... - - - - 0 ......----------- 18% less than 20% ..--------------------------------------------------------------------------- ................... -- ........... 0 20% to less than 25% .... ....... ...............................--------------------------------------------------------- 0 25%to less than 33% -----------------------------.....------------------.........................---..................... ----------....... 0 33% or greater ............................ .....-.._..__.._.._..........------............----------- - - --- ........ .0 ---- .......... --------------------------------------....................................----------- ....... 0 Rock Outcrops & Boulders 0 iTyy Shannon 80 - Rezoning Site Analysis GrouP4a" WLB No. 116028-A-001 Part I — Inventory & Analysis 4. Cultural / Archaeological / Historic Resources A. Archaeological Survey Status / Results i. The project site has been surveyed for cultural resources by Westland Resources, and the report has been submitted to the Town for review. ii. No significant cultural resources meeting the Arizona or the National Register of Historic Places eligibility criteria have been found on the property. iii. In the unlikely event that cultural resources are uncovered during construction, a professional archaeologist will evaluate the exposed material before any work continues in the area of the discovery. If any human remains or funerary objects are discovered during the construction of this project, all work will stop within the area of the remains and all such discoveries will be treated in accordance with Arizona Revised Statute §41-865 TvShannon 80 - Rezoning Site Analysis fOuP WLB No. 116028-A-001 Part 1— Inventory & Analysis Prepared by: Erma Gruner Reviewed and submitted by: John M. Lrndly, Ph.D. Cultural Resources Report 2017-77 September 15, 2017 Project Number 2019.01 WestLand Resources WPsil and 14-•sana•s, Inc • 4(N!1 t Pawdnt' IJlls Omw • Im—n Att:Ona KV11 •'•Ill• Ub•'!1Hi Tw Shannon 80 - Rezoning Site Analysis w� W LB No. 116028-A-001 Part I — Inventory & Analysis 5. Hydrology A. Offsite Watersheds The primary off -site watershed impacting the project site feeds to an unnamed wash that follows a southwesterly route across the Property's northwestern corner. This portion of the property is designated as being within Zone 'A' while the remaining site is within a Clear Zone 'X' per the FEMA Flood Insurance Rate Map (FIRM) Panel 04019C1070L, Revised June 16, 2011. The off -site terrain of the upstream watersheds is mostly native desert vegetation, several roadway crossings and some lower to medium density residential development. Ironwood Ridge High School has significantly affected the drainage patterns immediately north of the project. Two minor watersheds also impact the property Please refer to Exhibit 1-5-A: Offsite Watersheds. B. Balanced / Critical Basins The entire Town of Oro Valley is classified as a critical basin. C. Offsite Features Affecting or Affected by the Property Ironwood Ridge High School is located directly upstream of the site. Downstream of the site are large lot single-family residential homes. The low density nature of the existing development generally allows most drainage to flow naturally. The northwestern side of the project site is impacted by an unnamed wash which is mapped by FEMA as subject to 1% annual chance of flood, and which is estimated by Pima County to have a 100-year discharge of approximately 1000-2000 cfs. D. Area of Upstream Watersheds Greater than 100 CFS The wash running through the center of the property ("Wash A") has a watershed area of approximately 155 acres. The wash running through the eastern portion of the property ("Wash B") has a watershed area of approximately 98 acres. The major watershed impacting the western portion of the sites has a watershed area of approximately 1,656 acres. Please refer to Exhibit 1-5-B: Onsite Hydrology Characteristics. E. Location / Ownership of Well Sites within 100' of Site According to the Arizona Department of Water Resources, there is one (1) well located in the southwest portion of the project site. Well registry ID: 55-206095. F. Onsite Hydrology Characteristics Three braided washes run through the site in a south -southwesterly direction. The wash along the northwest corner of the site is classified as a FEMA floodplain. The entire site is typical of the upland desert biome, featuring a mix of cactus, mesquites, palo verde, and other species. Pima County GIS data describes the soils as a mixed hydrological soil group. Onsite hydrologic analysis has been performed using the Rational Method. The runoff coefficients were prepared using the Town of Oro Valley Drainage Criteria Manual, and are based on soil types noted in the National Resource Conservation Service soils study. The hydrologic soil type within the project boundary is comprised of soils: Hayhook-Sahuarita complex A-60% Shannon 80 - Rezoning Site Analysis WUMBWLB No.116028-A-001 Part I — Inventory & Analysis and C-40%. The vegetative cover and density have been determined using recent aerial photographs and field reconnaissance. The rainfall data was determined using the NOAA 14 (upper 90% confidence) and Generalized I-D-F Curves as found within Figure 3-3 of the TOV Drainage Criteria Manual. Please refer to Exhibit 1-5-B: Onsite Hydrology Characteristics Approximate 100-year floodplains with discharges equal to or greater than 50 cfs. The project site contains three 100 year floodplains with discharges equal to or greater than 50 cfs. On the northwest corner of the site is an unnamed wash that contributes approximately 1000-2000 cfs at the downstream outlet. Two other washes dividing the site contribute less than 500 cfs at their downstream outlets. ii. Areas of sheet flooding, with average depths The project site is not subject to sheet flooding. iii. Federally mapped floodways and floodplains The site has a federally mapped floodplain located on the northwest corner of the project site, as illustrated with the FEMA FIRM Panel: 04019C1070L iv. Calculation of all 100-year peak discharges exceeding 50 cfs There are no on -site sub -basins with 100-year peak discharges exceeding 50 cfs. G. Existing Drainage Conditions along the Downstream Property Boundary The existing low density nature of development along the downstream property boundary allows the drainage to flow naturally. yLg Shannon 80 - Rezoning Site Analysis 7��MRIP_� WLB No. 116028-A-001 Part I — Inventory & Analysis A. Arizona Game & Fish Dept. Letter Arizona Environmental Online Review Tool Report Arizona Game and Ftsh .?eparfrnent Mssion To conserve Arizona's disuse w 1dkfe resources and manage for safe, compatrbke outdoor recreation opportuneties forcurnsrrl and fu!ure gene•atrons Project Name Shannon 80 User Project Number iieo28-A-001 Project Description Single-family residential deuelopment,mth appio<imately 121lots Protect Type C,e,,elopmentVYdhm Municipalities (Urban Grouath), Residential subdivision and associated infrastructure. New, construction Contact Person Brian Sabn Organization The 1r1rL6 Croup C-h Behalf l7 PI MA Project ID WAS-0.3%6 Akeasereweµ theerfrrereload for project type andior cpecresrecomrnerrdatrons for the ,bcvtron fveformatron entered Fkease retain a copy for future reference Page 1 oY 11 T, Shannon 80 - Rezoning Site Analysis W WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Attzona0ameand FishDepxfrnent ptojectreport shannon 80_�1090 21fi02.pdf Project ID: H01S.O4W5 Review Date: IZ-1V2010 MAO:10 PM Disclaimer: 1. This Environmental Review is based on the projectstudy area thatwis entered. The report must be updated If the ptojectstudy area, location, or the type of project changes. 2. This is a preliminary environmental screening tool. It Is not asubstlutefor the poterdialknowledge gained by having a biologist conduct afield survey of the project area. This review is also not intended to replace environmental consultation (including federal consultation under the Endangered Species ACO. land use permitting, or the Departments review ofsde•specfic projects. 3. The Departments Heritage Data Managemerd System(HDMS) data is not intended to include potential distribution of special status species.Artzona is large and diversewith plants, animals, and envaonmental conditions that are ever changing. Consequently, many areas may containspecies that biologists do notknow abort or species previously noted in a particular area may no longer occur there. HDMS data contains information about species occurrences that have actually been reported to the Department Not all of Arizona has been surveyed for special status species, and surveys that have been conducted have varied greatly in scope and intensity. Such surveys may reveal previously undocumented population of species of special concern. 4. HabiMapArcona data, specifically Species of Oreatest Conservation Need (SOCt) under our State Wildlife Action Plan (SVVAP) and Species of Economic and R ecreational Importance (SERI). represerd potential species distribution models for the State of Arizona which ate subject to ongoing change, modification and refinement. The status of awildlfe resource can change quickly, and the availability of new data will necessitate a refined assessment Locations Axuracy Discla mer: Project locations are assumed to be both precise and accurate for the purposes of environmental review. The creator/owner of the Project R eview Report is solely responsible for the project location and thus the correctness of the Project Review Report content PV 2of11 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish Department projecLrepod_shannon 80-. 0IM 211502.pdf Project ID. HGIS,O4565 Review Data: 1215W003:40:18PM Recommendations 04sclamer. t The Department is interested in the corisen�aton of all tsh and vvildlfe resources, inoluding nose speaes listed in this report and those that may have not been documented within the projectvioinity as well as other game and nongame wildlife 2. Recommendations have been made by the Department, under authority of Arizona Revised Statutes Title 5 jAmusements and Sports), 17 (Game and F ish), and 28 (Transportation). 3. Potential impacts to fish and wildlife resources may be minimized or avoided by Ore recommendations generated from information subrrvted for your proposed project. These recommendations are preliminary in scope, designed to provide early considerations on alspecies ofwildlife 4. Making this Information directly avigable does notsubstlutefor the Departments review of projed proposals, Andshouid not decrease our opportunity to review and evaluate additional project information and/or new project proposals. 5 Further coordination with the Department requires the submittal of this Environmental Review Reportwith a cover letter and project plans or documentation that includes project narrative, acreage to be impacted, hour construction of project activity(s) are to be accomplished. and project locality into fin afionConctoding site map) OnceAGFD had receivedthe information, please allow 30 days for completion of project ievieios Send requests to Project Evaluation Program, Habitat Branch Arizona Oame and Fish Depart inert 50DO West Carefree Highway Phoenix, Arizona8OD86-5000 Phone Number: (1823)2367600 Fax Number (623)236.7366 Or PFPOPAZOM aov 6 Coordination may also be neoessary under the National Environmental Policy Act(NEPA) and/or Endangered Spooks Aot(ESA). Sitespecific recommendations may be proposed duringfurther NEPA+ESA analysls orthrough coordinationvvfh affected agencies P age 30111 rwr& Shannon 80 - Rezoning Site Analysis NrrwP" WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish Department proiect_report_shannon 80 21093_21602 pdf Protect ID HGIS-04565 Review Date 12/5/2016 03 40 16 PM Shannon 80 Aerial Image Basemap With Locator Map Protect Boundary Buffered Project Boundary Project sae (arias) 77 W L&O-ong (DD) 12 4044 r 111.0255 CoLoty(a) Pirm AGFD Rapian(a) Tuaon TwmsMplRar"a) T17S RIM USGS Oued(s): RUELAS CANYON 6W= Layor CM" 5ftrM Eon. NEW OeLOMW Tom7wr. InWrop. moMff*M P Cory GEBC0. LMGB FAQ, NPB. NRCAN OsoeaM, ON Kbd"W NL. OnZW" 91Kgy EeR JepaR. METI. En CP v (Meng KORO). Page 4 of 11 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish Department prolect_report_stlannon 80 21093 21602 pdf Pro)ect ID HGIS-04565 Review Date 12l5/2016 03 40 16 PM Shannon 80 Web Map As Submitted By User LJ Pro)ed Boundary ProWA Stze (acres) 77.80 Buffered Propct Boundary LaULonq (DD) 32 40441-111.0255 County(s) Pima AGFD Reg)on(s) Tucson Townsnp?tarpels) T12S R13E USGS Oued(s) RLIVELAS CANYON -- e..- tw——....v.r u..ww u�aw ua u.w� 'age ` of 11 Tr e� Shannon 80 - Rezoning Site Analysis Ao� WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Anzona Game and Fish Department pro)ect_report_stlanrton 8C0 21093 21602 pdt Project ID HGIS-04565 Review Date 12/5/2016 03 40 16 PM Shannon 80 Tono Baseman With Township/Ranoes and Land Ownership lJ tsamew "opci nounaary TownshiyRarpes AZ Game and rMh Dept UiM ROR Indun Res Mastery neaonai "rmwn LaULonq (DD). 32.4044 1 •111,0255 Private C,ounty(s). Pima State aro Ragtona Pesos AGED Region(s) Tucson State Trust Town NPIRanpe(s) T12S R13E US For"I Service USGS Ouod(a) RUEIAS CANYON VVMbfo Areat"upe Yea. brawe Ow.awr iw c'sa { Guy Ga(ti IIM:Y NL 0 —i .. 6A r�Mar M a o..Q ..w Ew 6 � Ev om iwa AUW ramEo M� a OEwWtayyp ca�ewry w r AA — Page 6 of 1 I Tom, Shannon 80 -Rezoning Site Analysis soup WLB No. 116028-A-001 Arizona Game & Fish Dept. Letter (cont'd) At¢ona Game and Fah Department ProiectlD 1-16ISO4555 Part I — Inventory & Analysis projecLreport_shannon 80 21043 21eO2 pill Review Date: IZW01803.40 15 PM Special Status Specie_- and Special Areas Documented vAhin =: A41ec of Project Vicinity Ssientiic,Nama Common Name FWS USFS BLM NPL SGCN Aquila chrysaetos Golden Eagle BOA S 18 Glauci hum brasilianum cactorum Cactus Ferruginous Pygmy -owl SC S 5 18 Gopherus moratkai Sonoran Desert Tortoise C CA S 1A Leptonyctera curasoae Lesser Longnosed Bat lF 1A yerbabuenae Tucson • Tortolita • Santa Catalina Wildlife Corridor Mountains Lhkage Design Nete. Status cod& defowterrs can be found at h%s JAwww x?g1d torts ddlire/n a n in g&yildlitag odelrn cktigutdoti nifin nil Specfesof Greatest Conservation Need Predicted v,4thin Project 1016nity based on Predicted Range Models Sciertllic Name Common Name FWS USFS BLM NPL SGCN Abcsponsa Wood1)uok 1B Ammaspermophilus ha itsii Harra'Antalope Squirrel 1B Anarcyrus retitormis Sonoran (keen Toad S 18 Anthus spragueti Sprague'$ Pipit C. 1A Anttestomus ridgwayi Buff -collared Nighle S 18 Aquila chrysaetas Golden Eagle BOA S 11) Aspidcacelis stictogramma Gard Spotted Whiptat Sc S 18 Athene cunicularia hypugaea Western Burrowing Owl SC S S 18 Botaurus lentiginosus American Bittern 18 Buteo regAis Ferruginous Hawk Sc S 18 CNlomenkcusstramineus Variable Sandsnake 18 Colaptes chrysoides Gilded Flicker S 18 Coluber birneatus Sonoran tWhlpsnake 1B Corynorhinus townsendii pakscens Pale Towweend's Big. eared Bat SC S S 19 Crotalus 10"s Tiger RAdesnake 1B Cynarthus latirostra Broad -billed Hummingbird S 18 Cyprinodonmaoularius DesertPupfah LE 1A D ip od omys s p ecta bi Is Banner•taikdKangaroo Rat S 18 Euderma maculatum Spotted Bat Sc S S 1B Eumops perotis calitornicus Greater Western Bonntted Bat SC S 16 Falco peregrinus anatum American Peregrine Falcon SC S S 1A Olaucidium brasibanum cactorum Cactus ferruginous Pygmy -owl SC S S 18 Gopherus moratkai Sonoran Desert Tortoise CCA S 1A Halueetus leucocephalus Bald Eagle SC. S S 1A BOA Helodermasuspectum Gila Monster 1A Hypsiglena sp. nov. Hooded NrghtsnAce 18 Pap T 0111 T Shannon 80 - Rezoning Site Analysis ` 1 WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish Department projecLraport shannon 8021093 21002pdf ProjectiD: HGIS-O45B5 Review Date: 12JU201803.40.10 PM Species of Greatest Conservation Need Predicted within Project Mcinity based on Prodded Rwge Models Scientific Name Common Name FWS USFS BLM NPL SOCH Incilius aivarkas Sonoran Desert Toad 10 14nostamonsonoriensesonoriense Desert Mud Turtle S 18 Laskaus blosseviil6 Western Red Bat S 18 Las iwus xardhinus W astern Yellow Bat S 19 Leopardus pardalis Ocelot LE 1A Leptonyduis curwose Lesser Lonpnosed Bat LE 1A yubabuenae Le pus allanI Arde lop a J a ck is bb it 1B Lith ob stes ya v a pa ions is LoMand Leopard Frog SC S S 1A Mauotus caldornicus Caldornia Leaf -nosed Bat SC S 1B Melanupas uropyg W GIs Woodpecker 1B Weagtts gatopavornwicuu GouWzTurkey S 1B Mel ospiza IincoInii Lincoln's Sparrow 18 Wozone abut Aberfs Towhee S 18 Micruroides euryxant us Sonoran Coraisnake 1B Myotis occult" Arizona Myots SC S 1B Myota voider Cave MyotG SC S 1B Myots yumanerals Yuma Myotc SC 1B Nyctinomops femorosaccus Pocketed Free -tailed Bat 18 PAnth ata once Jaguar LE 1A Pass uculussandovkhensis Savannah Sparrow 1B Petognathus amplus Arizona PockatMousa 1B Patognathus longirnembrG L1ttePocket Mouse 1B Peucata botterii arizonae Arizona Botterfs Spartan S 18 Peucau catpalc Rufous -winged Sparrow 18 Phrynosomasolare Regal Horned Lizard 18 Phylothynchus browni Saddled Laaf-nosed Snake 1B Poecifiopsis occidentafis Grla Toprninnary LE 1A occidentalis Prognasubis hasperia Desert Purple Martin S 113 Setophaga petechia YelkwWarbier 18 Sonoiatla papagorum Black Mourdain Takrssnail 18 Tad xWa tuasAions is Brazilian Free-taikd Bat 1B Thomonys umbrirwu Wormedius Southern Pocket Gopher 1B Troglodytes pacdicus PacitcWten 1B Vireo betla arizonse Arizona Begs Vireo 1B Vulpes mactotis Kit Foot 1B rVaof11 Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish Department project report_shannon 8021OD3 21O02.pdf ProjectlD: HGIS04M8 Review Date: 12AM2O115O3:4O:10 PM Species of Economc and Recreation Importance Predicted within Project Ycirdty SciwtIic Name Common Nam FWS USES BLM NPL SGCN Callipeplagambelit Garnbefs Quail Odocodeus hemionus hAule [Neer Pecarl talacU 13!telina Puma concolot fotourdam Lwn Zenaida asiatica '11Yhde tomnged Dove Zen atda macroura M,oirninq Do e Project Type Development %Vithrn Munrapalrti~-1 Urbar, Gro.,dhl, Re:7,denti�l=ubdioDon and assooiated infrastructure. Newconstruction Project Type Recommendations Fence recommendations will be dependard uponthe goats ofthefence project and thewildlfe species expectedto be impacted by the project General guidelines tot ensuringwildlife. *fondly fences Include barbless wire on lhetop and bottom with the maximum fence height42", minimum height for bottom 18". Moddicat ions to thus design may be considered for fencing anticipated to be routinely encountered by ek, bighorn sheep or pronghorn (e.g., Pronghorn fencing would require 1f3' minimum height on the bottom). Please refer to the Departments fencing Guidelines boated on Wildlife F riendly Guidelines page, which is part of the WIIdWe Planning button at hle.r N.w., i�rlA r.i enAnul frills lnl�nn,n nhn,i lAl/.ntn A. I,n nc! During the planning stages ofyour project, please consider the local or regional needs ofwitdlife in regards to movement, connectivity, and access to habitat needs Loss of this permeability prevents wildlife from accessing resorxces, finding mates, reduces gene low, prevents wildlrfe trom re•colonaing areas where local extirpations may have occurred, and ultirnatety prevents wildlife from contributing to ecosystem functions, such as pollination, seed dispersal, control of pray numbers, and retistance to invasrve species In many cases, streams andwashes provide natural movement corridors tot wildlife and should be maintained in their natural state. Uplands also support a large diverstj of species, and should be contained within importantwildirfe movement corridors In addition, maintaining biodiversity and ecosystem functions can be facilitated through improving designs of structures, fences, roadways, and culverts to promote passage for a variety of wildlife Guidelines tot many of these can be found at httw Aw ura_azaid_c_,muvildtfeiclannindwiAdenuidehnesi Consider impacts of outdoor fighting on wildlife and develop measures or afternatives that can betaken to increase human safety while minimizing potential impact to wildlife C onductwildifesurveys to determine speeieswdhin project area, and evaluate proposed activities based on species biology and natural history to determine A artificial lighting may disrupt behavior patterns or habitat use Use only the minimum amount of light needed for safety Narrayspeckum bulbs should be used as often as possible to laver the range otspecres affected by fighting. At lightingshould beshielded, cantered, or cut to ensure that light reaches orgy areas needing illumination Minimize potential introduction or spread of exotic invasive species Invasive species can be plants, animals (exotic snaib), and other organisers (e.g.. microbes), which may cause alteration to ecological lunettons or compete with or prey upon native species and can cause social impacts (e g., livestock forage reduction, inertssewiWfit risk) The terms noxious weed or invasive plants are often ured Interchangeably. Precautions should betaken towash all equipment utilized in tax project activities before leaving the site. Arizona has noxious weed regulations (Arizona Revised Statutes, Rules R3.4.244 and 143-4248) See Arizona Department of Agriculture webs de for restricted plants. httW lragrkuLL ALgart Additionally. the U.S. Department of Agriculture has information regarding pest and invasive plard control methods including pesticide, herbicide, biological cont of agents, and mechanical control, http;Awimm usda Coy" rytino alrusdahome The Department regulates the importation, purchasing, and transportation of wildlife and fish(R estricted Live Wildlife), please refer to the hunting regulations for further rnorrnatim hfiM fAmnu, a7gld com(hunt_ba re r iN c pay 4or11 Tr % Shannon 80 - Rezoning Site Analysis , roue WLB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fish D epariment project report shannon 80_�1M 21a02.pdf ProiectlD: HGIS045D5 Review Date: 12/61201t)03.40:10PM The construetlon or maintenance of water development should include incorporation of aspects ofthe natural ennronment and the visual resources, maintaining the water for a variet/ ofspecies, water surface area(e.g., bats require a greater area due to in. fight drinking), accessibility, year-round avarlabilty, minimizing potential for water quAV problems, frequency of flushing, shading of natural features, regular clean-up of debris, escaper amps. minimizing obstacles, and minifnizing accumulation of silt and mud. lnmimcahon and mitigationof impacts towildlrre and fishspecies dueto changes inwater quality, quantity, chemistry. temperature, and attrition to flow regimes (timing. magnitude. duration, and frequency of floods) should be evaluated tultmnm¢e impacts tosprings, in -stream flow. and consider irrigation improvements to decreasevoater use If dredging is a project component, consider timing ofthe project in order to minimize impact to sparoningfish and other aquatic species (include spawningseasons), and to reduce spread of exotic invasive species We recommend early direct coordination with Project Evaluation Program tot protects that could impactwater resources, wetlands, streams, springs, andvor riparian habitats The Department recommends that wildlife surveys are conducted to determine A noise-sensRroe species occur vvrthin the protect area A�ordance or minimization measures could include conducting project activities outside of breeding seasons Based on the project type entered, co ofdinator. with State Historic Preservation Office may be required I h"t.;; _ a}on , MSHP— I >r Mmll Trenches should be covered or back-Alled as soon as possible Incorporate escape rampc in ditches or fencing along the penrrieter to deter small mammals and herptetauna(sn4es, lizards, tortoise)from entering ditches Communities can actively support the sustainabilrN and mobility of wddlte by incot poratingwrldWe planning into their regionaYcompithensive plans, their regional transportation plans, and their open spacerconservation Ixndsystem programs. An effective approach to wildlife planning begins with the identification ofthe wildlife resources in need of protection, an Assessment of important habitat blocks and connective corridors, and the incorporation of these etitical wildlife components into the communctir plans and programs Community planners should identify open spaces and habitat blocks that can be maintained in their area, and the necessary connections between those blocks to be preserved or protected. C ommunity planners should also woe. with State and local transportation planning erddres, and planners from other communities, to roster coordination and cooperation in developing compatible developmerd plans to ensure wildlife hablatconnectroitv The Departments guidelines tot incorporating wildlife considerations into community planning and development can be found on the Wndlte Friendly Guidelines portion ofthe Wildlife Planning page at hfinclAwwu a,a[d corn uvtl,il nrnMMeeldldegu dehnesl. Design culverts to rrinmiize impacts to channel geometry, or design channel geometry (low tow, overbark. Aoodplais) and substrates to carry expected discharge using local drainages of appropriate size as templates R educe minimize barriers to slow movement of ampMbians offish( a. 9, el"ifle falls). Also tot tot rest ialvaldlAe, washes and stream corridors often provide inportuntcorridots for movement. Overal culvertwidth, height and Iengthshould be optmized tot movement of the greatest number and diversity of species expected to utilize the passage. Culvert designs should consider moisture. light and noise, whit providing clear views at both ends to maximize utilization- For rmarlysptoits, fencing is an important design feature that can be uttized with culverts to funnel wildide into these areas and rnWmize the potential for roadway collisions. Guidelines for culvert designs to tacildate wildfire passage can be found on the hone page of this application at htips f_ MAwwxznfd_corr.Mhildlrrapl nrnng uiid R guidelinesf Based on the project type entered, coordrnationwith Arizona Department of Environmental Quality may be required Based on the project type entered, coordrnabonwAh.Arizona Department of Nnlater Resources may be required (htttpl. ,u o+ Azi,valikf govia-nirtldefa httac „1 Based on the project type entered, coordination rwdh U S Army l ofps of Engineermay be required Vain fact ii MA"TyyrLeg Shannon 80 - Rezoning Site Analysis W LB No. 116028-A-001 Part I — Inventory & Analysis Arizona Game & Fish Dept. Letter (cont'd) Arizona Game and Fah Department project ieport_shannon 80 21093 21602 pdf Project ID. HGIS04865 Review Date. IZM5Q01603.4016 PM Based on lie project type entered, coordination w,rth County F lood Control districts) may be required Development plate should provide for open natural space for wildlife movement, while also minimizing the potential for wildlife -human interactions through design features Please contact Project Evaluation Program for more information on living with urban wildlife at PEPQazatd oov or at hftrig LkmA._a, a dd co milovil ditteini an ninaku iidIR o Litil hne51 and httrs vror—afd_corr.MlddhtelLiuv,allUith Vegetation restoration projects (including treatments of invasive or exotic species) should have a completed =rte- evaluation plan (identifying environmental conditions necessary to to. establish native vegetatronj, a rev egetaLon plan (species, density, method of establishment,, a short and longterm monitoring plan, including adaptive managernent guidelines to address needs for replacement vegetation Project Location andior Species Recommendations HDMS records indicate that one or more listed, proposed, or candidate species or Critical Habitat (Des ignated or Proposed) have been documented in the vicinity of your project The Endangered Species Act (ESA) gives the US F ah and Wildlife Service(USFW S) regulatory authority over all tederally hsted species Please contact USFWS Ecological Services Offices at /Air-ifin hms�ggy1southivectfasim izu uor Phoenix Man Office 2321 W. Royal Palm Rd. Suite 103 Phoenix. AZ 85021 Phone: OM-242.0210 Fax: 602.242.2513 Tucson Sub -Office 201 N. Bonita Suite 141 Tucson, AZ 85745 Phone 520.670-6144 Fax 520-870.6155 Flagstaff Sub -Office SW Forest Science Complex 2WO S. Pine Knoll Dr Flagstaff, AZ 860D1 Phone: 92& 55& 2157 Fax 928-556-2121 HDMS records indicate that Sonoran Desert Tortoise have been documented within the vicnity of your project area Please review the Tortoise Handling Guidehnes found at h ins Auumw afd o Lvddl/elnon lamemanaaemertftorto�el HDMS records indicate that Lesser Long -nos ed Bats have been documented within the vicinity of your project area Please review the Lesser Long nosed Bat Management Guidelines at e=R I !vvldh Jnl nninaF �rAro lit R F ti milli •nil mes1FINA Ie Ha ,I iln edf Analysis indicates that your project is located in the vicinity of an i dentified wildlife habitat ltrdt age corridor Project planning and imp lementatror, efforts should focus or, maintaining adequate opportunities for wildlife permeabihtq. For information pertaining to the I,H,age assessment andutnldidespeaes that may be affected, please refer to http Mrig_ro co endorde=rg_n '�go na Please contact your local Ancona C ame and Fah Department R egional Office for specific project recornmendatron: - pay 110111 yTh Shannon 80 - Rezoning Site Analysis Group v" WLB No. 116028-A-001 Part I — Inventory & Analysis 7. Viewsheds Due to the relatively flat character of the project site, the perimeter areas are the only locations of high visibility from adjacent roadways and properties. The areas of higher vegetation densities along the site perimeter reduce visibility into and across the property. A. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor Overlay District, provide a Viewshed Analysis as defined in Section 27.10.D.3.f.iv.o.1. The subject property does not fall within either Overlay district. B. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor Overlay District, provide a View Preservation Plan (VPP) for nonresidential developments that meet the criteria defined in Section 27.10.D.3.f.iv.2. Not Applicable C. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor Overlay District, map and identify all Core Character Vegetation (CCV), in accordance with Section 2 7. 10. D. 3.f. iv. b. Not Applicable Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis 8. Traffic A. Connection to Arterial Roadway Network Access to the project site will be from Shannon Road. The proposed access point aligns with the existing intersection of Sahuaro Divide and Shannon Road. B. Arterial Roadways within One Mile of the Property i. Existing and proposed right-of-way widths. See tables below. ii. Whether or not said widths conform to Oro Valley minimum requirements. See tables below. iii. Ownership (public or private). See tables below. iv. Whether or not rights -of -way jog or are continuous. See tables below. V. Number of travel lanes, theoretical capacity and design speed for existing streets. See tables below. vi. Present Average Daily Traffic (ADT) for existing streets. See tables below. vii. Describe surface conditions on existing streets providing access to the site. See tables below. viii. Program for completion of roadway and intersection improvements. See tables below. Road Segment: Shannon Road to La Cholla Boulevard La Cholla Blvd. to La Canada Existing ROW: .......... -.......................................... ------------------------------ --- ----- 150, --------------.......----------.....----.....-----..........-.-.. 150, - -- -............. --................ ......... ......... Ultimate ROW: ---------------- ---------- 150' -- 150' Travel Lanes: --------------------------------------------------------------------------------------- - -- --...-----------------------------------------.--- - --- ------------..-........2 --------------..........----.........----...---- ..-..---- ............ ..... 2 Theoretical Capacity*: ..............................................................---------------- --------------------..........----.........--------.....-...... 15 040 . - -- - - - -- .-..-.. - --------------------------- .._._-..................----....... _..--------•- ......----•_--------- 15 040 -------------------------------------------- ...-----..-..-----------.---------- ADT (PAG 2014): ..........................................................._..................-.-_•-----------......_..._......------------------------------------ 5,098 ----------------------....-- 7,714 - - ........ - - - ....------. Speed Limit: .................................................................----------- . 35 45 Condition: ------------------------------------------------------------------------------------------------- ----............- ---• Paved ............ -....... --............... ................. .-----------..--------------....... -----...---------.... ................. -................ -............. -- --Paved Scheduled Improvements: Completed 2015 -- --.----..............------................................ - ... ..-- - - None Scheduled Road Segment: Naranja to Lambert Lane Existing ROW: ... .. ... .................................._......---..........-------------------- 60' .................. ... .-----............................. -................. . Ultimate ROW: 150' ----------------........................._...------------------ -- ........-- Travel Lanes: .................................................................... ................ ...................... .......................................... ......_.... 2 Theoretical Capacity*: .. ......... ................. ... -- ---------------- ......... -.... -... _..--... ........................................... ......... .......... 15,040 - -..... ADT (PAG 2013): .................................... - - --- ---------------------- .. 7,366 Speed Limit: .... ........................................................................... .....-.......... 45 Condition: ....... ...... _...-----..... .......-----------------.................................................... Paved --------------------------------------------- Scheduled Improvements: --------------............---------------------------........... Scheduled 2018-2020 Naranja to Tangerine 150' ---........ -........... -- .................................... 150' _- ........ -------------- -- 2 - ........ .... .......---------------------------- ---1----5,040 - ----------------------------------------------- 8,723 ............. -........ ......-......................... --._..... 45 -------------------------- ----------------------- ------ - Paved .......................................................... Scheduled 2018-2020 SIN" Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 ix x Part 1— Inven & Analysis Road Segment: Shannon Rd. to La Cholla Blvd. Thornydale Rd. to Shannon Rd. Existing ROW: ............. ................................. .............. _............ -... -.......... ----- 150' ------.....--------------------............--------------...---------------------------.... 60'-150' ---------------------------------------....------.....-...__.......... _.......... Ultimate ROW: ..................................... 150' 150' ............................. Travel Lanes: 2 -----------------.------ -- _.... --- .... ........ ................. .... 2 ------------*--.-..--------------- Theoretical Capacity ------------------------------------------ - - -- - ......--....................------..............................----------...............-----------...-.-.------ ------------- 15,040 --------- .....................-----...........---------------....------------. 15,040 -----------.....---..............-----------------------.--- - ..... _.._.... ADT (PAG 2015): -------------------------------------------------------------- - ...... 6,228 .................. .........................-------------......----..._.. 3,826 ---------------------------�._-.._._.� Speed Limit: 45 45 -....-..--------..........:..................----- Condition: --------------------------_- .......------------.........._.......- - - Paved -__..........-----.....................---------------------------------. - Paved ......................................._.....----------...........-------------------- Scheduled Improvements: ...... None Scheduled ------------------------------------------------ -----........ ---- None Scheduled Road Segment: Naranja Drive. to Lambert Lane Lambert Lane to Overton Road Existing ROW: .......... -............................................................ --... - ............... --- 150' --............... _—............................... ... -.............. ------........ 150' .............................. ---...................... ............................... ..- Ultimate ROW: ............... -...................................... -----..... -...... -... -........... ... 150' -----........-----.------------------------------....._...........---------------....------------------------------------------. 150' ................... ...---.._....... Travel Lanes: 2 2 ........ ..................................................................................... .... Theoretical Capacity*: .............................................................. _.... ......................... .... ................. -................................................... .......................... 15,040 ----------------- ...... - .............-----------------------._.....------------........---------------........--------- ......................................................... _.-...... - 15,040 ----------- ADT (PAG 2014): .......................................................... ...................... ---.............. 2,805 ....... ----..... _......................................... ........ --........................ 4,798 .....-- ............. ..... ... - - --- Speed Limit: 45 45 ............ ........................ -........ -.......... -...... ---........ -.... -........... Condition: .-................. -----....... .................................. -............ -........... Paved --------------------------------------------------------------------- -----------......------------------------------ ----- - - -- Paved --------------------------------------------------------------------------------------- Scheduled Improvements: --------- None Scheduled ---. - - - - - - - - - ...-. None Scheduled *Theoretical capacity based on City of Peoria, TIA Criteria Table 4 assuming a L.O.S. "C". Please refer to Exhibit 1-8-A: Transportation. Existing and proposed intersections on arterials within 1 mile of the site most likely to be used by traffic from the site. Arterial intersections within one mile of the site that will likely carry traffic generated by this development include Shannon Road and Lambert Lane, Thornydale Road and Lambert Lane, Naranja Drive and La Cholla Boulevard, La Cholla and Lambert Lane, and La Cholla and Tangerine Boulevard. Existing bicycle and pedestrian ways adjacent to the site and their connections with arterial streets, parks and schools. A half mile east of the subject property, there is a signed bike route with a striped shoulder along La Cholla Boulevard that extends from Lambert Lane to Tangerine Road. There is also a signed bike route with striped bike lane along Tangerine Road. These routes provide connectivity to Casas Church and Christian School, and numerous neighborhoods to the East of La Cholla Boulevard. Two shared -use paths are also within proximity of the site located along Naranja Drive extending from Shannon Road to La Canada Drive along La Cholla Boulevard, north of Naranja Drive. These shared use paths provided connections to additional bike routes, notably the Canada Hills Drive bike route and the Naranja Drive bike route. Refer to Exhibit 1-8-A: Transportation. V171 t f • Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part I — Inventory & Analysis 9. Recreation / Trails A. Trails, Parks and Recreation Areas within One Mile of the Property There are no neighborhood parks within one mile of the subject property. The El Conquistador Country Club is a public golf course that offers 36-holes of golf and is located approximately % of a mile to the east of the project site. West Lambert Lane Park is just over one mile southeast of the project site. Multi -use pathways are located along Naranja Drive, extending from Shannon Road to La Canada Drive and along La Cholla Boulevard, north or Naranja Drive. Park Name: Park Size (in Acres) Park Type (Active of Passive) El Conquistador Country Club 252± Active West Lambert Lane Park 40± Passive Refer to Exhibit 1-9-A: Trails, Parks & Recreation. r Shannon 80 - Rezoning Site Analysis µ Groupv" WLB No. 116028-A-001 Part I — Inventory & Analysis 10. Schools A. Schools within One Mile of the Property Ironwood Ridge High School is located immediately north of the subject property. Wilson K-8 School is of a mile to the north. Casas Christian School neighbors the subject property to the east. Refer to Exhibit 1-10-A: Existing & Proposed Schools. B. Schools Expected to Serve the Project Shannon 80 is located within the Amphitheater Public School District. Existing schools in the District that may serve this project include: • Ironwood Ridge High School located immediately north of the subject property. The school accommodates 9th through 12th grades • Wilson K-8 school located to the north of the project site. The school accommodates Kindergarten through 8th grades. • Copper Creek Elementary School located 2.5 miles northeast of the subject property. The school accommodates Kindergarten through 5th grades. • Casas Christian School to the east of the property. The school accommodates Kindergarten through 8th grades. • Basis Oro Valley, a charter school not part of Amphi School District, located 4 miles east. The school accommodates Kindergarten through 12th grades. 7ry� Shannon 80 - Rezoning Site Analysis WP WLB No. 116028-A-001 Part I — Inventory & Analysis 11. Water A. Water Service Provider This project falls within the Oro Valley water service area. The closest water main is a 12" line near the intersection of Naranja Drive and Shannon Road. The exact nature of necessary offsite improvements will be determined during the platting process, and will be the financial responsibility of the developer. B. Other Information Tucson Water abuts the site to the west and to the south. There is a 16" transmission main within Shannon Road and a 6" line to the south of the property serving the existing residential areas. ��yy Shannon 80 - Rezoning Site Analysis 1N" WLB No. 116028-A-001 Part I — Inventory & Analysis 12. Wastewater A. Sewer Service Connection There is an existing 8" PVC sewer line and manhole to the east of the property (G-97-129). Based on sewer depth and existing site topography it is estimated that the site can be serviced by gravity sewer to that location. Refer to Exhibit 1-12-A: Sewer Service. Shannon 80 - Rezoning Site Analysis M-UMBWLB No. 116028-A-001 Part I — Inventory & Analysis 13. Exhibits P��%� Shannon 80 - Rezoning Site Analysis ow AMB WLB No. 116028-A-001 31 NARANJA DR o O � 1 z - I Q IRONWOOD _ 4 RIDGE: HIGH SCHOOL �e SAHUARO DIVIDE i IV D 9 Q < ll.l J J d Q F O 0 a LL O O Z 3: O Z O � z SUBJECT PROPERTY 1 :I �E CASAS CHURCH fps Exhibit 1-1-B ® 01 500' Aerial Photo The Shannon 80 - Rezoning Site Analysis Gr oup WLB No. 116028-A-001 0 MILE FROM NARANJA DR PROJECT SITE .000 1 � I Z SUBJECT O I Z PROPERTY I = I U I � z O U IQ W I Z J a ¢ I 1 0 > F O / 0 O LL / a O ` O � U O / Z� z Rural Low Density Residential (0-0.3 DU/AC) Low Density Residential (0.4-1.2 DU/AC) Medium Density Residential (2.1-5 DU/AC) Public/Semi Public School Master Planned Community Exhibit 1-1-C ® 0. 700' Existing General Plan Land Use Designations The Shannon 80 -Rezoning Site Analysis Group_ WLB No. 116028-A-001 R1-144 Single Family Residential (Oro Valley) R1-20 R1-36 Single Family Residential Single Family (Oro Valley) Residential (Oro Valley) MILE FROM _ _ _ _ _PROJECT SITE NARANJA DR .000 / o � Z Z R1-7 Z Single Family = Residential ro (Oro Valley) 1 I I I � SR I I Suburban SUBJECT Ranch I (Pima County) PROPERTY I I ]Residential Single II I I I ro Valley) Z I D I 1 Ov w Q J , Q a > O 0O a- Z Z °0011 z / R1-144 Single Family Residential (Oro Valley) CXnlblt I-7 —V ® 0' 700' Existing Zoning The Shannon 80 - Rezoning Site Analysis , c ow WLB No. 116028-A-001 a MILE FROM PROJECT SITE `\ --� — ---_ �NARANJADR---_ __— —� w Ironwood Ridge / Q x High School'Y _ The Estates a 2.47apella DU/Ac. I Single Family Residential f SUBJECT vacant I PROPERTY Casas .� Church Single Famliy` Residential 1 Q J o Df Po Single Family _ o Residential s o. o o ,o z Existing Land Uses The WLGroup Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 ESLO Critical Resource Area (t7 Acres) ESLO Core Resource Area (t24 Acres) NARANJA DR - ESLO Resource Management Area Tier 1 (t46 Acres) ESLO Resource Management Area Tier 2 Allow a Z 0 Z SUBJECT Q (n PROPERTY Z D 0 Q W o > 0 O L a 0 IX Z O L-L) O _Z Z Exhibit 1-2-A m 0, 500' Environmentally Sensitive Lands The WLB Group- M Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 4 2 Exhib NARANJA DR- ' r ( f • v,.+ � � � n^ ,a w.r � R { 1.1 � l { w 7� T � 1 � S � -" -`^`., ✓u /i � � -w ti � L i �! � ? � r" "" `.' -_ , ^ � T .tr�d i 6 S 2670 %+ 4� +1,�(�lr�..�- "ti .�.5 r. 1�..� ` "•� 6 `"Z ; -.� ,r> > ��� ��a► �`.+ �^ " J yw { P % l r 7 fy/� /�Lf 4f i t 'r Z, ✓n�`TyrA�Y1T�y✓lit � f � tJ�����r�}y �r� ✓�T C� �'fti.r����/, � y�� �. ° 2660 L45 ?�L r5la�alj iL, - ■�y�{1 LJ� �� // �.� a '�I�iLl X.r:�� `+ a r la✓�� �J� rr� 2650-+. >W S�� LOL �` *t{ 1.�rJ1} �/ f�C n�-�__�.' r"L r✓ J ~e .•� 5 � r.t�.� i"I `Z i ` -..,_ ,.,.✓S j ✓d � 4 � r.,,"'� {`!` F� �.�'1 f• "r t'`�� d � f � AfZ �.�- ^ `f-1•'�t l L'. �'�� } • f rz ' i rr, � r ✓ (� f-•'' ` ' ✓ f �, `r}i7 y r � ►• 3 � ti;� f t'Y ,, ti '�. L} P ....r1�1 � { �., f t mil) t'l}e,�,�R�7 � r y �,� }�„a,r� �•I1'► r �� jt rq r `2640;��b I; �Y `)&?rf rt°�� f (1; J (91 ?� gs�� />•) 7) 4 YL `a P f f d4.g r � ALr fs � ¢�� i� tcb t"�� ?L}f11 J 3 \ fJNr ,L 4✓ a✓�? sL ��' s SUBJECT � r ��� tt�JAPROPERTY L���� /"fr �t'tif { `f "L7�a 4 �� 4..�► � "� �i r Ir' 4+. � rrFP tir ,t t{ ty h srJ �`'� Y ?i^\.F1' r �. � Z r> � � !$ ii^••( { ,,,e` L-.s r �r ti � �,e 1, { ��m.rr�^•. r...?,, H' 1` 41^`.,} y�� q,t i b �-k t`2630•• JL �i • .W -.+ Z L• R o \.,• fy yy T2 m 1 a'!" .1 Y1. ? GJ.� ' �1'l�L { 4y I Sya� ti r i4 y; j�� i rr , i✓ti t o- y� i^yw # Aj a ^. ,,� 1 ^ i 1 U JIB Ny1 H 1jRR f 1-•." /i \ ..tt' s �� ^r L y-n 1 Q4 �� N �'4 ' J f {.t i.�J\"i',�3 `, �M1 f t^�( ^,'1 `g �ti ✓/ ��.. a �....,y y P, '��1� �,% { i� - > a OQ,b 2620� r k-1 �� 0 Z �' i y�`i }1 (r —=+ti�� t s �i �0.0 ns �r �lr a�f t h Z✓ �1 t �t �f U Q f �t ��t f� S`Ll cn-' ~��� r✓ �1I 1 t Ivf�l 1 �,,5t'/7� 1QS a� U H a r" G 1' 11l z f 261a f� f nu 9 f�l✓ F i ( %+ �t s� "s�, f:I[ n> } 2 �Z� r' y�v y ti r '`E L✓;^ � .s • '� s� ' i i .` j' �. j 1... r �.nr. z �,{ -tl ; yr^ r4 y1 a "i j BLS✓ t' �'W~� f� w "�v��t��� r� jf h� tiffs 1, i� p �� s °r� ti� � a i� l d✓ 7 ~�� �' S J I n f� p ,F�' �r.��.,,. t� avx c- y � � Try rat � 'i''`,,, i"'t rr t �� \ \ j i�!)t sr\r t i} E '*,� r r c N) t 1, r �` 7•�• "` w✓ T b �j°' w r(!� o yeti ��y1 j 14 '2 �� �✓fr �� ... � r Us n .. !: .�?�� d(� � S �., i, t� � >r jai � �^mot 1 TSr 4 � j J,'`...♦ it 1-3 -A m o soo, Topogra The WM WLB Group_ Contour Interval = 2 Ft Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Exhibit 1-5-A Offsite Watersheds N.T.S. The Shannon 80 - Rezoning Site Analysis c o vu. WLB No. 116028-A-001 FEMA FLOODPLAIN ZONE W NARANJA DR � ti, 100 YEAR LOCAL FLOODPLAIN d 2670� .�.� GENERAL FLOW DIRECTION EXISTING CULVERT Z z' -2660 a a 2650 640, WASH A ` WASH B, Rs fit. SUBJECT � PROPERTY f '� 2630 �- EXISTING 0 CULVERTS /2620 3x12" PIPES� a a o s(� 0 0 o- 0 0 Z �- I . - /T-I Z 2610 hit 1-5-8 Onsite Hydrology Characteristics The WLB Group m 0, 500' Contour Interval = 2 Ft. In 6mmm?m" Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 NOTE: 40 41 42 NARANJA DR IRONWOOD RIDGE HIGH SCHOOL 0 40 Z Z SUBJECT PROPERTY co CASAS ANHOL 4685-04 CHURCH z O w 8. J d W 0 F X O a O Z O 3: U O Z 7 Exhibit 1-12-A Ill 0, 600' Existing Sewer Service m The 1147 M Shannon 80 - Rezoning Site Analysis cog iii� WLB No. 116028-A-001 00e NARANJA DR 0 Z 0 Z Z U) ....... ............... ................. . V ........... .......... ■ SUBJECT PROPERTY Z 2630 < W ................... ................... ............. ......... W < > 6. < 0 Of C�— 0 LL 0 Z 1 0 �: 0 0 ESLO Critical Resource Area Z Z ESLO Core Resource Area ESLO Resource Management Area Tier 1 —FEMA Floodplain Zone'A' 100 Year Floodplain General Flow Direction -71 High Visibility C- Dense Vegetation Exhibit 1-13-A m 0, 500, McHarg Composite Ma The -IF WLB IF -If -M Group A Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 C Part 11 — Land Use Plan Part II — Land Use Plan M7yy�g Shannon 80 - Rezoning Site Analysis - WLB No. 116028-A-001 Part 11— Land Use Plan (This page intentionoll�j blonh) Shannon 80 - Rezoning Site Analysis MAMBWLB No. 116028-A-001 Part 11 — Land Use Plan 1. Land Uses A. Project Description This request is to rezone the subject property from R1-144 to R1-36. The project proposes a low density cluster residential subdivision with 1.0 DU/AC, consisting of 80 single-family detached homes on 76.4+/- acres. Most of the lots will have a minimum size of 70' x 125', though the home sizes will vary. A row of lots closest to Shannon Road will be a minimum of one third acre in order to reduce the visual impact of this development. The architectural design of the homes will be consistent with surrounding residential developments and will adhere to the Town of Oro Valley Design Guidelines. They will be constructed out of materials such as stucco, adobe, and wood frame, and will have either a gabled, tiled or flat roof. Property line walls will meet the Town of Oro Valley Design Guidelines, and landscape treatments and design will utilize native desert vegetation. Refer to Exhibit II-1-A: Tentative Development Plan. B. General Plan Conformance The proposed development of the property is consistent with the General Plan, as it will maintain a balance among the variety of uses and characteristics of the area. First, the development will preserve significant open spaces, will comply with the ESLO, and will provide appropriate bufferyards and density transition between land uses. Next, this development will also bring new, quality housing to an area located in close proximity to several activity centers including two public schools, three churches, a private school, and a golf course. Finally, the development will allow for appropriate and sensitive infill to a growing area of Oro Valley. C. Flexible Design Options / Conservation Subdivision Design As part of this rezoning application, the subject property seeks to utilize some of the Flexible Development provisions available as part of the site's compliance with the Environmentally Sensitive Lands Ordinance (ESLO) (Section 27.10.F.2.c). ESL Incentives Request: ZONING INCENTIVES Section 27.101 (a) Building Setbacks (b) Landscape Buffer Yards (c) Minimum Lot Size (d) Minimum Lot Width (e) Alternative Parking Analysis (f) Building Height (g) Open Space (h) Mixed Use (i) Modified Review Process (J) Recreation Area Credit (k) Native Vegetation Preservation Section 2 7. 10. F. 2. b — Applicability i. The following design options may be applied to property or portions of property when ESOS is applied to twenty-five (25%) or more of a project site, except as provided herein. Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part 11— Land Use Plan ESOS Total for site = 66% (a) Building Setbacks: Per Section 27.10(F)(2)(a) — We request that the side setbacks be reduced to no less than five (5) feet, front setbacks shall be reduced to no less than ten (10) feet for the use of side entry garages and non -garage elements only, and the rear setbacks be reduced to fifteen (15) feet — consistent with zoning districts with comparable lot sizes. This request will not result in an on -lot driveway length of less than twenty (20) feet. This request will allow for a residential subdivision to incorporate more diverse details and massing conditions, which will lead to a more attractive and varied streetscape. (c) Minimum Lot Size: Per Section 27.10(F)(2)(c) —We request the ability to reduce the minimum lot size to no less than 8,750 square feet. The reduction in lot size allows for the clustering of development, an instrumental element of the Conservation Subdivision Design. Lot Size Reduction allows for the maximization of contiguous protected open space, as well as reduce the amount and improve the efficiency of necessary, critical infrastructure systems. (d) Minimum Lot Width: Per Section 27.10(F)(2)(d) — We request the ability to reduce the minimum lot width to 70 feet. (f) Building Height: Per Section 27.10(F)(2)(f) — We request the ability to raise the building height limit of 18 feet (per the R1-36 zoning), to 23 feet for single -story gable -roofed residences only. The increase in in building height allows the future developer/builder to meet the current market demands of homebuyers wants and needs in terms of both living space and design, while adequately providing enough pitch for structural integrity and drainage. The building height in reference to this request is appropriate due to the significant buffer area provided in the project. (g) Open Space: Per Section 27.10(F)(2)(g) — We request the ability to reduce the required open space of the Resource Management Area 1 by 25% percent in exchange for preserving more than the required amount of Critical (96%) and Core (97%) Resources. (j) Recreation Area Credit: Per Section 27.10(F)(2)(j) — We request the use of the Recreation Area Credit to allow for passive and active recreational amenities located within resource management area 1. The proposed rec area meets the locational requirements and criteria outlined in Section 26.5. (k) Native Vegetation Preservation: Per Section 27.10(F)(2)(k) — We request the right to waive the requirements for native plant salvage and mitigation within the development envelope. The site contains —66% ESOS, exceeding the 50% minimum requirement. This modification cannot be applied to areas of distinct vegetation which are designated as a core resource area or native plants that are considered threatened or endangered under the Endangered Species Act or highly safeguarded by the Arizona Department of Agriculture. D. Effect on Existing Land Uses Since the subject property is currently vacant, there will be no negative impact to existing land uses. Developing this property as single-family residential will unify existing neighborhoods, increase the sense of community, and provide needed housing in a rapidly growing area of town. Shannon 80 - Rezoning Site Analysis 91IMM WLB No. 116028-A-001 Part 11— Land Use Plan 2. Environmentally Sensitive Lands A. ESOS Selection & Preservation Methods This project will be in conformance with the ESL guidelines of the Zoning Code. The site plan provides 50.5± acres of ESOS (66% of the site) and it avoids the existing three washes and associated Critical Resource Areas except for necessary roadway and utility crossings. The designated Critical Resource Areas crossing project site will be preserved with 96% open space. The Core Resource Areas will be preserved with 97% open space. The remaining Resource Management Area Tier 1 will contain all of the lots, and will preserve 45% open space. The onsite ESOS areas maintain open space connectivity within and beyond the project site, and will allow for minimal impact to wildlife movement. These ESOS areas along the southern (300'- 600') and western (300'-450') edges will be permanently protected within an open space easement to be granted to the Town. Additionally, any vegetation that is disturbed will meet the mitigation requirements as set forth in the Town of Oro Valley Zoning Code. TrLPh Shannon 80 - Rezoning Site Analysis ilia 8,t WLB No. 116028-A-001 Part fl — Land Use Plan 3. Topography A. Design Response to Site Topography Due to the relatively flat character of the subject property and the lack of challenging topographic constraints, the development of this property can proceed without special grading considerations. B. Slope Encroachment The subject property does not contain any regulated 15% or greater slopes, and as such there are no areas of encroachment. C. Hillside Conservation Areas There are no Hillside Conservation Areas on the subject property. D. Quantified Site Disturbance Approximately 30.6± acres (40.1%) of the site will be developed/unrestored, and 45.8 acres (59.9%) of the site will be left in its natural condition or restored condition. Approximately 3.7± acres (4.8%) of the graded area will be revegetated with native vegetation and will become landscaped common area, and the 1 acre rec area abutting the CRA will be improved and credited towards RMA1 per Town Code Section 27.10.E.3.c bringing the effective open space area to approximately 50.5± acres (66%). Shannon 80 - Rezoning Site Analysis i`LA" WLB No. 116028-A-001 Part II — Land Use Plan 4. Cultural / Archaeological / Historic Resources A. Resource Protection If any cultural resources are discovered during construction, State and local rules will be followed regarding the handling and treatment of such cultural resources. B. Treatment Plan The project site has been surveyed for cultural resources by Westland Resources, and the report has been submitted to the Town for review. No significant cultural resources meeting the Arizona or the National Register of Historic Places eligibility criteria have been found on the property. In the unlikely event that cultural resources are uncovered during construction, a professional archaeologist will evaluate the exposed material before any work continues in the area of the discovery. If any human remains or funerary objects are discovered during the construction of this project, all work will stop within the area of the remains and all such discoveries will be treated in accordance with Arizona Revised Statute §41-865 P411 Shannon 80 - Rezoning Site Analysis P WLB No. 116028-A-001 Part 11 — Land Use Plan 5. Hydrology A. Design Response to Site Hydrology The low density nature of this development will have a minimal impact on the hydrological characteristics of the site. Additionally this project will incorporate appropriate mitigation measures in accordance with the Town of Oro Valley Floodplain Management Code and the Drainage Criteria Manual. B. Modifications of Drainage Patterns There is one federally mapped floodplain crossing the northwest corner of the site located in FEMA floodplain Zone A with a 1% annual chance of flood. Minimal encroachment into the existing drainage patterns on site will occur. The project includes three crossings into the mapped local floodplains only where necessary to provide access to the site. There will also be slight encroachment into the FEMA floodplain at the entrance of the site where it aligns with the existing intersection of Sahuaro Divide and Shannon Road. The low density nature of the existing offsite upstream development allows most drainage to flow in its natural state. Offsite flows from upstream watersheds will for the most part be allowed to flow in their natural state. Excess runoff created by this development will be collected in detention basins, channels and/or culverts directing the runoff through the project site, and will be metered out at less than pre -developed flows for the local non-FEMA floodplains. This development will attenuate pre-existing storm water flow rates by 15%-25%. Basins onsite are to be owned and maintained by the HOA. Drainage will be designed in such away to provide all-weather access to each lot within the proposed subdivision. C. Mitigation Drainage design within the proposed development will convey offsite and onsite flows using constructed channels, storm drain pipes, and onsite detention basins in accordance with the Town of Oro Valley Floodplain Management Code and the Drainage Criteria Manual. Channel and basin geometry and construction will follow accepted standards regarding erosion and flow velocity control as well as maintenance access. Horizontal elements constructed within the project will be set at or near existing grade so as to minimize impacts to existing drainage patterns. Finished floor elevations will be set to one foot above the established base flood elevations of adjacent floodplains. Lots will be graded according to Town standards, which will provide adequate room and grades to handle stormwater runoff. In order to mitigate for existing flooding issues adjacent to the project, an easement will be provided for maintenance improvements to Owl Vista Place. Improvements along Owl Vista Place will include larger culverts, armoring the road, and raising the road in flood prone areas. D. Town Policy Conformance Town policy requires all development to conform to "critical basin" requirements and not result in any adverse impacts for adjacent or downstream property owners. The Town Engineer has determined that this development should detain more than the stormwater runoff increase created by development, thus reducing the flows exiting the southern property boundary. As such, not only will this development avoid adverse impacts to downstream properties, it will actually benefit them by reducing existing flooding issues south of the project. Shannon 80 - Rezoning Site Analysis RLIPULBWLB No. 116028-A-001 Part 11— Land Use Plan 6. Wildlife A. Mitigation This development will preserve a minimum 96% of the onsite Critical Resource Areas crossing the site in the wash areas. These areas will be designated as open space and will maintain open space connectivity within and beyond the project site, which will allow for uninterrupted wildlife movement. Additionally, Core Resource Areas on the southern portion of the site will remain largely undeveloped serving as a buffer between the proposed project and its neighbors to the south, while at the same time, providing open space for the movement of wildlife. Shannon 80 - Rezoning Site Analysis -IN" WLB No. 116028-A-001 Part 11— Land Use Plan 7. Viewsheds A. Design Response to Site Viewsheds With the subject property being relatively flat, the internal roadway network and homesites within this project will minimally disturb viewsheds. Expansive bufferyards of approximately 300' t0 600' will be provided along the southern and western boundaries of the property to help mitigate views into the site from Shannon Road and Owl Vista Place. The proposed building height is 23 feet, and development will be limited to one story homes. B. ORSCOD / TRCOD Conformance This property does not fall within the Tangerine Road Corridor Overlay District (TRCOD) and/or Oracle Road Scenic Corridor Overlay District (ORSCOD). The Shannon 80 - Rezoning Site Analysis 8rLouup WLB No. 116028-A-001 Part 11— Land Use Plan 8. Traffic A. Traffic Impact Analysis Provide a traffic analysis report to include: i. The proposed internal circulation and access to/from arterial streets, explaining location and rationale for placement. The subject property will have one ingress/egress point that will connect this neighborhood directly to Shannon Road. Access to the project site will align with the existing intersection of Sahuaro Divide and Shannon Road. ii. If off -site road improvements are required, indicate which roads and time frame for improvements. The following off -site road improvements will be installed to reflect the traffic analysis and agreement with neighbors: Northbound and southbound left -turn lanes on Shannon Road at the project entrance (Shannon Road/ Sahuaro Divide intersection). Southbound left -turn lane at the Shannon Road/ Owl Vista Place intersection. iii. Projected ADTfor internal circulation system at build out and level of service to all streets. Include a projection of traffic volumes and capacity analysis for intersections. When fully completed, the proposed Shannon 80 development is predicted to generate an additional 856 vehicle trips per day (vtpd) on weekdays to the adjacent street system from the new project site. Fifty percent of these new trips (428 vehicle trips) will be into the project and fifty percent will be out of the project. iv. Impact to existing development abutting off -site streets. All intersections adjacent to the subject property currently operate and are predicted to continue to experience an adequate level of service (LOS) for all movements on weekday and weekend peak hours. v. Capacity analyses for proposed internal and off -site streets, including right-of-way and pavement widths, geometrics, design speeds and traffic control improvements needed. Shannon Road Shannon Road is a two-lane paved arterial road with a posted speed limit of 45 mph. The existing and ultimate right-of-way is 150 feet, which is continuous. According to the Pima Association of Governments (PAG) 2014 Traffic Volumes, the average daily trip volume (ADT) for this arterial roadway between Lambert Lane and Naranja Drive ranges from 2,702 to 2,908 ADT. Using a 2% growth rate as used in the Traffic Impact Analysis the 2018 volumes are estimated to range from 2,983 to 3,211 ADT, which is roughly 20% of the roadway's theoretical capacity.. YMMBShannon 80 - Rezoning Site Analysis O1 P W LB No. 116028-A-001 Part 11 — Land Use Plan vi. A description of improvements required for those streets described in sub -paragraph v. above. Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon Road/ Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors. In addition, the developer will provide an in -lieu fee to the Town for constructing a future multi- use path along Shannon Road. vii. The party/agency that the applicant believes to be responsible for making necessary improvements. The developer will be responsible for making necessary improvements. viii. Evidence that proposed turning movements will meet safety standards in relationship to traffic volumes. The proposed ingress/egress point aligned with Sahuaro Divide is located a safe distance from neighboring intersections. Vegetation adjacent to these ingress/egress points will be maintained to provide safe site visibility for vehicles exiting the site and will allow safe turning movements to and from the site. The proposed residential roadways meet the Town of Oro Valley Minimum Design Standards. B. Proposed Rights -of -Way The proposed roadways within this development will have a right-of-way width of 50 feet and will meet the Town of Oro Valley Minimum Design Standards. The internal roads of this development will be private and maintained by an HOA if gated, otherwise they will be public. The gated entry will be designed and located a safe distance from the Shannon Road right-of-way line in order to prevent the back up of traffic onto Shannon. C. Proposed Pedestrian / Bicycle Circulation the developer will provide an in -lieu fee to the Town for constructing a future multi -use path along Shannon Road. Recent road improvements to Naranja Drive include sidewalks, a multi -use path, and a striped bike lane. Also within the vicinity is the La Cholla Boulevard multi -use path which lies within a % mile of the site and heads north to Glover Road. Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part 11— Land Use Plan 9. Recreation / Trails A. Offsite Trail Access There aren't any public or neighborhood parks located within one mile of the subject property. However, West Lambert Lane Park is located just over a mile away. The 40 acre park provides just under one mile of natural hiking trails. Additionally, there are approximately 3.9± miles of sidewalks and paved walking paths that exist within one mile of the Shannon 80 property. The Oro Valley community and recreation center also provides golf and tennis recreational facilities and is open to the public. B. Open Space Ownership The future HOA of this proposed development will own and maintain the common area within this project. The open space tracts along the southern and western boundaries of the site will be permanently protected within a conservation easement, to be granted to the Town of Oro Valley. Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part 11— Land Use Plan 10. Schools A. Student Generation This proposed development is expected to generate approximately 17 elementary students, 18 middle school students, and 11 high school students (using the accepted standard student multiplier of 0.2075 elementary school students per home, 0.2197 middle school students per home, and 0.1282 high school students per home). B. School Capacity According to the letter supplied by the Amphitheater School District, there is available capacity for this proposed development. T,% Shannon 80 - Rezoning Site Analysis Groupl" WLB No. 116028-A-001 Part 11— Land Use Plan Amphitheater Capacity Letter OFFICE OF LEGAL COUNSEL (520) 696-0153 • FAX (520) ".50741 w�Mllma�wn■ r r h ! 1 . S . b • • ! e 701 W. Wcuuute Rod • Tuck a, AZ 857W • (520) 69C-5000 • IDD (520)696.5033 Ckmiunt4GLVAt'D1kmms DC mw I'L Div. 14Ed ;.QYA F-tFadB—A.tJhD 3.4.ckc kMEd S-aA.LWA Pmadmd %t H= 0A SUi ikN1iN:,EXf F'snck 2:elsoe December 22, 2016 Via email Linda Thompson Subdivision Coordinator The WLB Group 4444 E Broadway Tucson AZ 85711 RE Proposed Development of 124t single family homes on approximately 771 acres within the Amphitheater District Southeast corner of Naranja Drive and Shannon Road Dear Ms. Thompson: I am responding to your request for information regarding the capacity of Amphitheater schools impacted by your proposed development Using 2000 demographic multipliers developed by the U.S. Department of Census, Bureau of Census, and adjusted for Amphitheater Districts school organizational patterns, we project the following student populations to result from this project when built Academic Level 124 Single FamW Homes Elementary 3 Middle 27 High School 16 The census multipliers we use to obtain these projections are 0.2075 elementary students per household, 0.2197 middle school students per household and 0.1282 high school students per household. The capacity of our schools noted below is based on our last confirmed enrollment calculations. The schools which would be impacted by this population are listed below, along with the physical capacity available at each school presently. Please note that these schools will also be impacted by other developments in this area which may have already been approved by the County but which are not yet built Aa4htt.ww14h•CanpmddOro 14h•[rmt 4Lte[[t! Amphthecte Mihiedo ScJ.ad • Ccem e,io [;S School • Cton ).L 6!c Scko 1 • La Q ma )LSIt Scbod •Firm F.� Sc1wd Cgje QeekE—mtr7•Dor�tm Eemer trT•Iinlcm£emmtJt7•[idaw�£e.emtnF.e •d,ny 17etnatar7•MwVerde £rmetGsy 1:a� £emett:r7 • Faetai 517 ilxxrsar� • Ineu Eemmtr7 • F+o Y,tu E7cmet..at7 • Miia Llancct.ry • FiLio Cmta Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Amphitheater Capacity Letter (cont'd) Part 11— Land Use Plan Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Part 11 — Land Use Plan 11. Water A. Water Demand A reasonable estimate for domestic water usage is 230 gallons per day per lot dry weather flow. With 80 lots being proposed in this development, the total domestic water use is projected at 20,930 gallons per day. B. Water Service Provider & Capacity Oro Valley Water has water service available to the property under the conditions stated in a capacity letter received December 20`h, 2016. Shannon 80 - Rezoning Site Analysis EL-UMBWLB No.116028-A-001 Water Service Provider Letter > iµL AA O. •ram► w�VA`D[D �f•� Oro Vallee Water Utility December 20, 2016 WLB 4444 East Broadway Tucson, AZ 85711 Part II — Land Use Plan Subject: WATER AVAILABILITY Parcel: Pima County Parcel numbers 224-21-0020, 224-21-0030, 224-21-0040, 224-21-0050 To whom it may concern The Town of Oro Valley Water Utility currently has water service available to the above property under the following conditions: A Water Plan is submitted by the applicant and approved by the Water Utility A Line Extension Agreement is executed by the applicant. All construction is in accordance with the approved Water Plan and the new facilities are accepted by the Water Utility in accordance with the requirement s of the Line Extension Agreement. Payment of all water development impact fees, meter fees and other required fees and charges. (A water meter for residential and/or commercial use cannot be sold until after the issuance of an approved building permit) WATER SUPPLY The Town of Oro Valley Water Utility has been designated by the State of Arizona, Department of Water Resources, as having an Assured Water Supply (AWS No. 2003-001 Decision and Order No, 26-400765). This development lies within the boundary of the Oro Valley Water Utility's planned water service area Once the property is platted, it will be noted on the plat(s) for these properties that the property meets the State requirement of an Assured Water Supply because it will be served by Oro Valley Water Utility, WWW.0f0ValleyaZ,&0V 11000 N La CaAada Drive • Oro Valley, Arizona 83737 Phone (520) 229.5000 •tax: (520) 229-5029 The Shannon 80 - Rezoning Site Analysis MIN" WLB No. 116028-A-001 � Part II — Land Use Plan `4�o v4' Oro Valley Water 111ility WATER SERVICE The developer shall be required to submit a Water Plan identifying water system improvements These include but are not limited to: Water Use Fire Flow Requirements Offsite/ Onsite Water Facilities Loops and Proposed Connection Points to Existing Water System Easements/Common Areas Once a Water Plan is submitted, 1t will be determined if the proposed plan can meet the water requirements of the proposed development The developer shall be fiscally and financially responsible for all water system improvements and modifying/enhancing the existing water system to meet those needs. It is recommended that the applicant contact the Water Utility to discuss the construction of water system improvements prior to submitting a Water Plan for the property. This letter and the comments herein regarding water availability are valid for a period of one year only through December 20, 2017 Issuance of this letter is not to be construed as approval of a Water Plan and/or acceptance of any construction for water service. If you have any questions or would like more details regarding any construction improvements that may be required in a Water Plan, please call me at 229-5017. Sincerely, Mark Moore New Development Coordinator cc Phillip C Saletta, P.E Water Utility Director 'A W%4.orovallcyaz.gov 11000 N la Canada Drive • Oro Valley, Arizona 85737 Phone. (520)229-5000 • fax :(520)229-5029 Shannon 80 - Rezoning Site Analysis v" WLB No. 116028-A-001 Part II — Land Use Plan 12. Wastewater A. Sewer Service Method Pima County Regional Wastewater Reclamation Department will provide sewer service to this development. Capacity is currently available for this project in the public sewer G-97-129, downstream from manhole 4685-04. Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 Port II — Land Use Plan Wastewater Service Provider Letter A pTMA COUNTY WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (570) 724-650- DIRECrOk FAX: (520) 724-%35 December 21, 2016 Linda Thompson The WLB Group. Inc 4444 E Broadway Tucson, Arizona 85711 Sewerage Capacity Investigation No. 2014-118 Type I RE: Shannon 80,124 Lots on Parcels 224210020, 224210030, 224210040. Estimated Flow 26,784 gpd (ADWF). Greetings: The above referenced project is tributary to the Tres Rios Water Reclamation Facility via the Cahada Del Oro Interceptor Capacity is currently available for this project in the public sewer G-97-129, downstream from manhole 4685-04. This letter is not a reservation or commitment of treatment or conveyance capacity for this project. It is not an approval of point and method of connection. It is an analysis of the system as of this date and valid for one year. Allocation of capacity is made by the Type III Capacity Response. If further information is needed, please feel free to contact us at (520) 724-6642 Reviewed by: Kurt Stemm, CEA %� Shannon 80 - Rezoning Site Analysis �P�IMB WLB No. 116028-A-001 Part 11 — Land Use Plan 13. Bufferyards A. Mitigation (if applicable) A landscape bufferyard will be provided around the entire perimeter of the project site to help soften any visual impacts to surrounding landowners. The bufferyards will be composed from a variety of native vegetation and will help blend this residential neighborhood with the surrounding developments. They will be a minimum of 20-40 feet wide and will be in accordance with the Bufferyard "A" and "B" criteria in the Town of Oro Valley Zoning Code. T✓ _% Shannon 80 - Rezoning Site Analysis 'OUP WLB No. 116028-A-001 14. Exhibits Part 11— Land Use Plan Shannon 80 - Rezoning Site Analysis WLB No. 116028-A-001 IRONWOOD RIDGE • PARCEL SIZE: 76.4± AC. - - "' HIGH SCHOOL E • EXISTING ZONING: SINGLE-FAMILY RESIDENTIAL (R1-144) • PROPOSED ZONING: SINGLE-FAMILY RESIDENTIAL (R1-36) x' THE ESTATES • PROPOSED NUMBER OF LOTS WITH BASE MIN. LOT SIZE: 0 ". • PROPOSED NUMBER OF LOTS WITH REDUCED MIN. LOT SIZE: 80._ AT CAPELLA • PROPOSED MINIMUM LOT SIZE: 70' x 125' • PROPOSED DENSITY: 1.0 D.U./Ac. • PROPOSED OPEN SPACE: 50.5 ± AC. (66% OF THE SITE) • ONSITE ESOS WILL BE OWNED AND MAINTAINED BY THE HOA • BASIN IMPROVEMENTS TO BE INCLUDED IN RESOURCE MANAGEMENT - d, AREA1 PER TOWN ZONING CODE SECTION 27.10.E.c AND 17.10.F.2.f.vi _ OL_q7. , 78 1 Q\ 31 ') a 63 83 e )49 6 # ze OL • ,,. o a 35 CAPELLA T 3<�..: 66 )1 Z 0 21 Z 33 1 1 • 53 55 58 _ 5] S6 59 a D I Q 3 p rD), o C, a J I M, r .�7. SAHUARO DIVIDE µ. I t h y.I :d.. • t .c �.. .j CASAS CHURCH ,a I OWL VISTA PL. - •_'* k s _ . ..! ) .. RMA 1 PROVIDED ONSITE: 20.6_ Ac. CORE RESOURCE AREA PROVIDED ONSITE: 23.0± Ac. ► `Y� + ►' y�" CRITICAL RESOURCE AREA PROVIDED ONSITE: 6.9± Ac. �''�h . je _ .. 7• � a EXISTING FEMA FLOODPLAIN �•S>` r,�;."�.. CAP ELL PROPOSED SCHEMATIC BASIN LOCATION +�� ; „� ,, � � ; ., Holi PARCEL L Exhibit 11-1-A ® 01 300' Tentative Development Plan The 14,91M Shannon 80 - Rezoning Site Analysis WLB Group WLB No. 116028-A-001 NARANJA DR ESL Area Minimum ESOS Category Onsite Required Total ESOS Provided CRA (7.2± Ac.) 6.8± Ac. (95%) 6.9± Ac. (96%) CORE (23.8± Ac.) 19.0 (80%) 23.0 (97%) RMA1 (45.4 Ac.) 22.5(49.5%) 20.6 (45%) Total (76.4± Ac.) 48.3± Ac. (63.4%) 50.5± Ac. (66.0%) Eel Exhibit 11-2-A ® 01 500, Proposed ESOS Map wha Shannon 80 - Rezoning Site AnalysisM Group-WLB No. 116028-A-001 PROPOSED UNDISTURBED / RESTORED AREA (45.8± Ac. or 59.9%) MAX. PROPOSED DEVELOPED / UNRESTORED (30.6± Ac. or 40.1 %) CRITICAL RESOURCE AREA O PROPOSED SCHEMATIC BASIN LOCATION �1 1 ♦♦ / i i ♦ IL / I I / I� Z Z ♦�/// / Z / APPROXIMATE / t 2 �/ GRADING LIMITS / 1 � / ♦/ 1 1 I 1 1 1 J a J o > w 0 0 CifO O LL d O tr Z O �: 0 0 Z_ Z Z) IW7 r—+ 1 r I / ♦ I I / I ♦ / 1 1 1 � 1 � r I ♦ / t t , 51 t. 'I r' / -----� 1 1 � 1 1 1 1 1 11 40 1 / 1 � 1 1 1 1 1 1 1 I 1 NOTE: Basins will be constructed outside of the graded area shown and will be revegetated. Exhibit 11-3-A ® 01 500' Proposed Grading Limits The Shannon 80 - Rezoning Site Analysisno Group_ iiL� WLB No. 116028-A-001 R1-144 Single Family Residential (Oro Valley) R1-20 R1-36 Single Family Residential Single Family (Oro Valley) Residential (Oro Valley) MILE FROM PROJECT SITE NARANJA DR — — — — — — — — Q � tY Z O R1-7 Z Single Family Z Q Residential (Oro Valley) 1 I I I � SR I I Suburban SUBJECT Ranch I I (Pima County) PROPERTY R1-36 I I Single Family Residential I I (Oro Valley) I I I Z I 1 OU w Q � i a O / EL Z ° ° / z 1000, Capella PAD Pending Rezoning Exhibit 11-4-A n 01 700' Proposed Zoning The Shannon 80 - Rezoning Site Analysis c oe WLB No. 116028-A-001 n 0 Prepared by: Erina Gruner Reviewed and submitted by: John M. Lindly, Ph.D. Cultural Resources Report 2017-77 September 15, 2017 Project Number: 2019.01 Bye ....................... Westland Resources West Land Resources, Inc. • 4001 E. Paradise Falls Drive • Tucson, Arizona 85712. 520.206.9585 DUl1Dluli STATE HISTORIC PRESERVATION OFFICE 1 SURVEY REPORT SUMMARY FORM I. REPORT TITLE Ia. Report Title: A Cultural Resources Inventory of Approximately 77 Acres of Privately Owned Land East of Shannon Road, between Naranja Drive and Lambert Lane, Pima County, Arizona b. Report Author(s): Erina Gruner c. Date: September 15, 2017 1 d. Report No.: 2017-77 2. PROJECT REGISTRATION/PERMITS 2a. ASM Accession Number: n/a 2b. AAA Permit Number: n/a 2c. ASLD Lease Application Number(s): n/a 2d. Other Permit Number(s): n/a 3. ORGANIZATION/CONSULTING FIRM 3a. Name: Westland Resources, Inc. 3b. Internal Project Number: 2019.01 3c. Internal Project Name: Shannon 77 3d. Contact Name: Frederick W. Huntington 3e. Contact Address: 4001 East Paradise Falls Drive, Tucson, Arizona 85712 3f. Contact Phone: (520) 206-9585 3g. Contact Email: funtington@wesdandresources.com 4. SPONSOR/LEAD AGENCY 4a. Sponsor: Shannon 77, LLC 4b. Lead Agency: Town of Oro Valley 4c. Agency Project Number(s): n/a 4d. Agency Project Name: n/a 4e. Funding Source(s): Private 4f. Other Involved Agencies: n/a 4g. Applicable Regulations: National Historic Preservation Act §106, Arizona Antiquities Act (§41-841, et seq.), Arizona Historic Preservation Act (§41-861, et seq.), Oro Valley Historic Preservation Ordinance Article 6-10 S. DESCRIPTION OF PROJECT OR UNDERTAKING: Shannon 77, LLC, proposes to develop a 77-acre parcel of land east of Shannon Road between Naranja Drive and Lambert Lane (Figures 1 and 2). Following guidance from the Town of Oro Valley and the Arizona State Museum (ASM), Shannon 77, LLC, contracted Westland Resources, Inc. (WestLand), to conduct a cultural resources inventory of the property (the "project area") prior to any development. % January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE 2 SURVEY REPORT SUMMARY FORM 6. PROJECT AREA/AREA OF POTENTIAL EFFECTS: The project is a rectangular parcel (Parcel Nos. 224210050, 224210040, 224210020, and 224210030) of undeveloped land measuring approximately 1,320 feet north -south by 2,540 feet east -west. The parcel is bounded on the west by Shannon Road, on the south by Owl Vista Place, on the east by privately owned, undeveloped, or vacant parcels, and on the north by a series of athletic fields associated with Ironwood Ridge High School. 7. PROJECT LOCATION 7a. Address: Southwest comer of Shannon Road and Owl Vista Place 7b. Route: 7d. Nearest City/Town: 7f. Project Locator UTM: 7i. Baseline & Meridian: 7k. Legal Description(s): 8. PROJECT AREA 8a. Total Acres: 77 8b. Project Area: n/a 7c. Mileposts Limits: n/a Oro Valley 7e. County: Pima 497599 mE 3585270 mN 7g. NAD: 83 7h. Zone:12 Gila. and Salt River 7j. USGS Quadrangle(s): Ruelas Canyon Township 12 South, Range 13 East, Section 9 I. Land Jurisdiction 2. Total Acres Surveyed 3. Total Acres Not Surveyed 4. Justification for Areas Not Surveyed Private 77 0 n/a 9. ENVIRONMENTAL CONTEXTS 9a. Landform: The project area is located on a broad alluvial fan extending south from the Tortolita Mountains. Shallow braided drainages run northeast -southwest across the property. 9b. Elevation: Elevations in the project area range from 2,600 to 2,660 feet above mean sea level. 9c. Surrounding Topographic Features: Located in the northern Tucson Basin, the project area is situated approximately 7.25 miles east of the Santa Cruz River, 5 miles west of the Santa Catalina Mountains, and 3.5 miles south of the Tortolita Mountains. 9d. Nearest Drainage: Several small seasonal drainages bisect the project area. The nearest named drainage is Canada del Oro Wash, which is approximately 2 miles southeast of the property. 9e. Local Geology: The project area lies on a broad alluvial fan derived from granitic bedrock in the Tortolita Mountains (MRCS 2017). The surface sediments are characterized as coarse sands, gravels, and cobbles that overlie an argillic paleosol, likely Late Pleistocene or Early Holocene in age. 9f. Vegetation: The vegetation is characteristic of the Arizona Upland subdivision of the Sonoran Desertscrub biotic community (Brown 1994) and includes creosote bush, foothills paloverde, desert broom, bursage, prickly pear, velvet mesquite, chain fruit cholla., saguaro, and barrel cactus. January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE 3 SURVEY REPORT SUMMARY FORM 9g. Soils/Deposition: Soils are composed of well -drained gravelly and sandy loams derived from mixed alluvium (MRCS 2017). While located at the terminus of a shifting alluvial fan, the project area is not subject to significant sediment deposition as would be found on riverine floodplains. 9h. Buried Deposits: The potential for buried cultural deposits in the project area is low. 9i. Justification: Cultural deposits on the bajada landform in this portion of the Tucson Basin are generally located on the surface or at shallow depths. In the vicinity of the project area, these mainly include small surface artifact scatters, roasting pits, and agricultural rock piles (Madsen et al. 1993). No surficial evidence was observed to suggest the presence of buried cultural deposits. 10. BUILT ENVIRONMENT: The project area is undeveloped open desert bordered on the west, east, and south by in -use roads, vacant parcels, or modern residences. It is bordered on the north by the Ironwood High School property and athletic fields. A modem single-family residential housing development is located immediately south of the project area. Many of these residences were built in the 1990s. 11. INVENTORY CLASS COMPLETED I I a. Class I Inventory: ❑ 11 b. Researcher(s): I I c. Class II Survey: ❑ I I d. Sampling Strategy: 1 I e. Class III Inventory: 12. BACKGROUND RESEARCH SOURCES 12a. AZSITE: 12b. ASM Archaeological Records Office: ❑ 12c. SHPO Inventories and/or SHPO Library: ❑ 12d. NRHP Database: 12e. ADOT Portal: ❑ 12f. GLO Maps: 12g. Land -Managing Agency Files: n/a 12h. Tribal Cultural Resources Files: n/a 12i. Local Government Websites: n/a 12j. Other: USGS maps (Figure 4: Cortaro 1947 1:62,500; Cortaro 1957 1:62,500) January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE 4 SURVEY REPORT SUMMARY FORM 13. BACKGROUND RESEARCH RESULTS 13a. Previous Projects within Study Area (study area = the project area + a 1.6-km (I -mile] buffer): 1. Project Reference No. 2. Project Name 3. Author(s) 4. Year 1981-174.ASM* The Northern Tucson Basin Survey, Phase I the North Madsen et al. 1993 1980-150.ASM Linda Vista Terrace Urban 1980 1991-76.ASM Flying Diamond Connections Eppley 1991 1992-61.ASM Oro Valley-Naranja Scott 1992a 1992-69.ASM Oro Valley/Naranja (II) Scott 1992b 1995-53.ASM Glover & La Cholla Survey Carpenter 1995 1995-436.ASM Amphitheater School Site Survey Heuett 1995 1997-102.ASM La Cholla/Lambert Survey Stephen 1997 2000-24.ASM Naranja Sewer Survey Hayes 2000 2001-552.ASM Well Sites Stephen 2001 2001-583.ASM Qwest Shannon Fuller 2001 2001-682.ASM Lambert -Shannon Survey Hayes 2001 2002-360.ASM Oro Valley 40 Acre Davis 2002 2006-593.ASM Naranja Ranch Estates Survey Jones 2006 2008-295.ASM 1.4 Miles along Lambert Lane Harris Environmental Group 2008 2009-65.ASM Shannon Road R.O.W. Stephen 2009 2009-479.ASM Naranja Road Improvements Barr 2009 2012-698.ASM Town of Oro Valley Engineer Support — C.A.P. Phase II Integration King 2013 2014-71.ASM Atlas 0673 Copperstone 2014 2014-125.ASM AAREPL Atlas 0682 Moses and Luchetta 2014 * Intersects the project area. January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE SURVEY REPORT SUMMARY FORM 61 13b. Previously Recorded Cultural Resources in the I -Mile Buffer* Surroundin-a the Project Area: 1. Site No./ 2. Affiliation 3. Site Type 4. Eligibility Status S. Associated Name [all ASM] Not evaluated Reference(s) AZ AA:12:180 Ceramic period A.D. 200-1500 Hohokam Artifact scatter ASM site card AZ AA:12:297 Ceramic period Artifact scatter and Not evaluated Stephen (2003) A.D. 200-1500 Hohokam rock pile AZ AA:12:778 Unknown Hohokam Artifact scatter Not evaluated Stephen (2005) AZ AA:12:817 Ceramic period Artifact scatter and Considered eligible (d) Stephen (1997) A.D. 200-1500 Hohokam rock clusters AZ AA:12:1120/ Historic Euroamerican Road Not considered King (2013) La Cholla Boulevard eligible AZ AA:12:1134/ Historic Euroamerican Road Not considered King (2013) Naranja Drive eligible * No previously recorded archaeological sites are located in the project area. 13c. Historic Buildings/Districts/Neighborhoods: 1. Property Name or Address j n/a 2. Year 3. Eligibility Status 14. CULTURAL CONTEXTS 14a. Prehistoric Culture: Archaic, Hohokam 14b. Protohistoric Culture: O'odham, Apache 14c. Indigenous Historic Culture: O'odham, Apache 14d. Euro-American Culture: Spanish, Mexican, Anglo-American IS. FIELD SURVEY PERSONNEL 15a. Principal Investigator: 15b. Field Supervisor: 15c. Crew: 15d. Fieldwork Date(s): 16. SURVEY METHODS 16a. Transect Intervals: 16b. Coverage (%): 16c. Site Recording Criteria: John M. Lindly Erina Gruner Stephanie Brown September 6, 2017 20 m apart 100 Arizona State Museum I6d. Ground Surface Visibility: 40 to 90 percent I6e. Observed Disturbances: Modern trash dumps —likely from the surrounding residences —are present throughout the site area. Some disturbance in the way of limited ground clearance is evident along the property's northern boundary near the Ironwood High School athletic fields. A historical road that is maintained as a foot path crosses the western half of the property (see Figures 4 and 5). January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE SURVEY REPORT SUMMARY FORM 17. FIELD SURVEY RESULTS 17a. No Cultural Resources Identified: ❑ 17b. Isolated Occurrences (IOs) Only: 17c. Number of IOs Recorded: 2 17d. Table of IOs: 6 1.10 No. 2. Description 3. Date Range 4. UTMs Unnamed historical road depicted on 1947 Cortaro 1:62,500 USGS quadrangle. The road is presently partially cleared and maintained as a footpath that leads from the residential development south of the 1 property to Ironwood High School. The path is sandy -bottomed and MN 3585152 approximately 5 feet wide and 1,425 feet long. Road berms are visible 1947—present ME 497253 in some areas, running parallel to the path. Off -road vehicle use was noted. Trash observed near the road/footpath dates to between the 1970s and the present day (Figure 5). Prehistoric- 2 Basalt multi -directional core; measures 5 x 4.5 x 2.5 cm Protohistoric, MN 3585278 (see Figure 5) 11,000 B.C.— ME 497917 A.D. 1500 18. COMMENTS: The cultural resources inventory was conducted on September 6. 2017, by WestLand archaeologists Erina Groner and Stephanie Brown. The survey located one isolated prehistoric artifact and identified a segment of one road depicted on a historical map. The road is no longer accessible to vehicular traffic and is presently maintained as a cleared footpath. These isolates do not define or reflect significant cultural resources in terms of the Arizona or the National Register of Historic Places eligibility criteria. Westland recommends that the proposed project will have no impact on cultural resources and may proceed with no further archaeological work. WestLand provides the general recommendation that all ground -disturbing activities have the potential to unearth. archaeological sites or human remains and that all such discoveries on private land must be treated in accordance with Arizona Revised Statute §41-865. 19. ATTACHMENTS 19a. Project Location Map: ® Figure 1. Vicinity map 19b. Land Jurisdiction Map: ® Figure 2. Project location showing surface management 19c. Background Research Map(s): ® Figure 3. Previously recorded archaeological sites and projects within 1.6 km (1 mile) of the project area 19d. G LO Map(s): ® Figure 4. Overlay of project area on the 1947 Cortaro 1:62,500 USGS Quadrangle [Note: Figure shows the location of IO 1.] 9e. Results of Survey Map: ® Figure 5. Results of survey 19f. References: ® Page 8 January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE 7 SURVEY REPORT SUMMARY FORM SECTION 20. CONSULTANT CERTIFICATION: I certify the information provided herein has been reviewed for content and accuracy and all work meets applicable agency standards. 64 rVt� q Date: September 15, 2017 Signature John M. Lindly, Ph.D. Sr. Principal Investigator Title SECTION 21. DISCOVERY CLAUSE: In the event that previously unreported cultural resources are encountered during ground -disturbing activities, all work must immediately cease within 30 meters (100 feet) until a qualified archaeologist has documented the discovery and evaluated its eligibility for the Arizona or National Register of Historic Places in consultation with the lead agency, the SHPO, and Tribes, as appropriate. Work must not resume in this area without approval of the lead agency. If human remains are encountered during ground -disturbing activities, all work must immediately cease within 30 meters (100 feet) of the discovery and the area must be secured. The Arizona State Museum, lead agency, SHPO, and appropriate Tribes must be notified of the discovery. All discoveries will be treated in accordance with NAGPRA (Public Law 101-601; 25 U.S.C. 3001-3013) or Arizona Revised Statutes (A.R.S. § 41-844 and A.R.S. § 41-865), as appropriate, and work must not resume in this area without authorization from ASM and the lead agency. January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE SURVEY REPORT SUMMARY FORM REFERENCES: Barr, David M. R. 2009 Archaeological Survey of Naranja Drive from Shannon Road to La Cholla Boulevard, Town of Oro Valley, Pima County, Arizona. Cultural Resources Report No. 09-215. SWCA Environmental Consultants, Tucson. Brown, David E. (ed.) 1994 Biotic Communities of the American Southwest. University of Arizona Press, Tucson. Carpenter, John P. 1995 An Archaeological Assessment of a 40 Acre Parcel at the Southeast Corner of the Intersection of Glover Road and La Cholla, in Tucson, Arizona. Tierra Right of Way Services, Ltd., Tucson. Copperstone, Chance 2014 A Class III Cultural Resource Survey of Proposed Natural Gas Line Rights -of -way along Shannon Road, Gymkhana Wlay, Appaloosa Road, and Oasis Road for Southwest Gas in Pima County, AriZona. Report No. 2014-015. Tierra Right of Way Services, Tucson. Davis, Erin 2002 A Cultural Resource Survey of a 40 Acre Parcel of Land Owned by the Town of Oro Valley for the Proposed West Lambert Lane Park, Oro Valley, Pima County, Arizona Report No. 2002-008. Entranco, Phoenix. Eppley, Lisa G. 1991 Archaeological Survey of Flying Diamond Connections Plan No. 1-178-084-90. Letter Report 91-129. Desert Archaeology, Tucson. Fuller, Megan S. 2001 A Cultural Resource Assessment of a Proposed Qwest Trenching Location on Shannon Drive in Oro Valley, Pima County, Arizona. Engineering and Environmental Consultants, Inc., Arizona. Harris Environmental Group, Inc. 2008 A Class III Cultural Resources Survey of 1.4 Miles along Lambert Lane in Oro Valley, Pima County, Arizona. Project No. 08-003, Task 4. Harris Environmental Group, Inc., Tucson. Hayes, John 2000 An Archaeological Assessment Survey of a 2,250-Foot Right-of-way South of Naranja Road in Oro Valley, Pima County, Arizona. Survey Report No.2-OTO-001A. Tierra Archaeological & Environmental Consultants, Tucson. 2001 A Cultural Resources Assessment Survey of 4.5 Acres at the Corner of Shannon and Lambert Roads in Northwest Tucson, Pima County, Arizona. Survey Report No.2000-(1)88A. Tierra Archaeological & Environmental Consultants, Tucson. Heuett, Mary Lou 1995 A Cultural Resource Inventory of the Proposed Glover Road School Site for the Amphitheater School District, Pima County, Arizona. Cultural and Environmental Systems, Inc., Tucson. January 2016 (Rev. 1) STATE HISTORIC PRESERVATION OFFICE 9 SURVEY REPORT SUMMARY FORM Jones, Jeffrey T. 2006 A Class III Cultural Resources Survey of 31.64 Acres North of Naranja Drive and East of Shannon Road in Oro Valley, Pima County, Arizona. Archaeological Report No. 2006-50. Tierra Right of Way Services, Ltd., Tucson. King, Anna M. 2013 A Cultural Resources Inventory of 11.1 Acres along La Cholla Boulevard and Naranja Drive in the Town of Oro Valley, Pima County, Arizona. Cultural Resources Report No. 2013-09. WestLand Resources, Inc., Tucson. Madsen, John H., Paul R. Fish, and Suzanne K. Fish 1993 The Northern Tucson Basin Survey: Research Directions and Background Studies. Archaeological Series 182. Arizona State Museum, Tucson. Moses, James, and Sarah Luchetta 2014 A Class I and Class III Cultural Resources Assessment Survy of 6.35 Acres of Pima County Rzght-of- way along Camino de Norte, Montgomery Strzet, Turkey Lane, Sahuaro Divide, Potmn Lane, Camino Alto, Camino Central, Flying Diamond Drive, Camino Christy, Lambert Lane, and Camino de la Tierra in Tucson, Pima County, Arizona. Antigua Archaeology, LLC, Prescott. Natural Resources Conservation Service (MRCS) 2017 Web Soil Survey. United States Department of Agriculture. Natural Resources Conservation Service. Available online at http://websoilsurvey.nres.usda.gov/. Accessed September 6, 2017. Scott, Barry G. 1992a An Archaeological Survey of a Proposed Fory Acre Development, Oro Valley, Pima County, Arizona. Iguana Archaeological Research Consultants, Tucson. 1992b An Archaeological Survey of a Proposed Sixty Acre Development in Oro Valley, Pima County, Arizona. Iguana Archaeological Research Consultants, Tucson. Stephen, David V. M. 1997 Preliminary Report for La Cholla/Lambert Archaeological Survy. PAST Job No. 97776. Letter report to Mr. Hector Martin, Casas Adobes Baptist Church, March 3, 1997. Professional Archaeological Services and Technologies, Tucson. 2001 Letter Report for Well Sites Project. PAST Report No. 011334. Professional Archaeological Services and Technologies, Tucson. 2003 Cultural Resources Survey of the Tangerine -La Cholla Intersection Prgiect near Oro Valley, Pima County, Arizona. PAST Report No. 031575. Professional Archaeological Services of Tucson, Tucson. 2005 Cultural Resources Survey of the Red Rock Ridge Project near Oro Valley, Pima County, Arkona. PAST Report No. 051763. Professional Archaeological Services of Tucson, Tucson. 2009 Archaeological Survey of the Shannon Road R.O. W. Project near Oro Valley, Pima County, Arizona. PAST Report No. 081935. Professional Archaeological Services of Tucson, Tucson. Urban, Sharon F. 1980 Letter Report for the Linda Vista Terrace Project. Clearinghouse Number 80-85-0187. Arizona State Museum, Tucson. January 2016 (Rev. 1) ARIZONA PROJECT LOCATION Pinal County'` - �A aran a Pima County' Saguaro ' Natphal Perk-N��f. r.: . otaltn� ate F• t. - lei Tanque Verde J, a r � NAM 11•0am .r..,„ T12S, R13E, a Portion of Section 9, Pima County, Arizona Silver Bell Mountains USGS 1:100,000 Quadrangle Projection: UTM NAD83, Zone 12 Legend Data Source: ArcGIS Online World Streetmap 0 0.5 1 N Q Project Area Miles West Land Resources o 1 2Kilometers Figure 1. Vicinity map 'tkhC R!N °` Ri D r �• t f • N 3585467 _ E497217 - NM3585461 E 497991 r 1113585065'•� N'3585062 • E 497218 • - E,497988 , R n r i4 a f � �R f'� (' • `J i/� (t fj r T12S, R13E, a Portion of Section 9, Legend Pima County, Arizona Ruelas Canyon USGS 7.5' Quadrangle Project Area Projection: UTM NAD83, Zone 12 Data Source: BLM Surface Management (2017) Surface Management Bureau of Land Management (BLM) o 1,000 2,000 N Feet Private Land (No Color) /�\\ West Land Resources 0 500 1,0 Meters / `1 State Trust Land Figure 2. Project location showing surface management Figure 3. Previously recorded archaeological sites and projects within 1.6 km (1 mile) of the project area 1 3D 44�� 1 1 1 , C yy yyiM i77a� B Y ♦r 2 `B r r • a'.� � II • i . Y � \, 16 2BIIC. \ i so `rW � `• g !1, 0 y '•��,'• '' Jurho 3]epchY i ' B� 4 33a.. �,S area Mti7 yy" .......,.- w.0 1 Y Sooeie 977 I • Q 24. r.�e� 18 asns, YN20 _.�..-a`.2�3 ,.if 22 1 .990 29 28 O S 27p— 30n ra a} T12S, R13E, a Portion of Section 9, Pima County, Arizona Cortaro USGS 15' Quadrangle Projection: UTM NAD83, Zone 12 Legend = Project Area 0 0.5 1 N Miles WestLand Resources 1 2 Kilometers Figure 4. Overlay of project area on the 1947 Cortaro 1:62,500 USGS Quadrangle 0 Awl N ##, Two iv, .. _4 C ^` fi �.N ����+� ^wF�� of :•, �l a h . L VIS PLy: .OW TA q,• , M• s �,l .14�,� J v �r 4 sut � I • I'� 'ffaa��L '� ,�a` •�' Z dx `�+r d''��'� ��,T•� �n.�:�� ;:''"'.x, � '� �'��•�.r l�=i� a'£ �a .. ,�`. iF Q 1 s4 i : Z Wk6 X•e < s►. ,,'# im ,�,t �' e x} e.'INt. '. �> �.A�a'2 .y y,�. ' a ixeM; H 1} 6e� DESERT SPLENDOR CT L' hT k�R T12S, R13E, a Portion of Section 9, Pima County, Arizona 2012 Pictometry Orthophoto Legend Projection: UTM NAD83, Zone 12 Project Area 0 270 540 N E Isolated Occurrence Feet Westland Resources 0 125 25Meters Figure 5. Results of survey