HomeMy WebLinkAboutOV120623Ba
O J p-LEY A,%
SOUNDED 1g�A
2 0 2009 i!� i
Planning and Zoning Division
" 11000 N. La Canada Drive, Oro Valley AZ 85737
Phone: (520) 229-4800 Fax: (520) 742-1022
M Web Site Address: www.orovallevaz.2ov
REQUEST FOR PREAPPLICATION CONFERENCE
PROJECT DESCRIPTION:
le
rl
LOCATION:
ZONING: A-'-
TYPE OF REQUEST:
APPLICANT NAME/FIRM:
ADDRESS:
TELEPHONE NO.:
PROPERTY OWNER:
SIGNATURE:
0
• ,// r+ /e— n
r.
l
��� % / �: v
❑ SUBMITTALS MUST BE RECEIVED BY THE PLANNING DEPARTMENT AT LEAST TEN (10)
WORKING DAYS IN ADVANCE OF THE DESIRED PREAPPLICATION CONFERENCE DATE.
❑ SUBMITTAL REQUIREMENTS "ALL PLANS MUST BE FOLDED PER PIMA COUNTY FOLD."
❑ FIFTEEN (15) COPIES (24X36) OF THE PROJECT CONCEPT PLAN, WITH LOCATION MAP.
Revised 11-20-08
I
CTR SEC 13 PER BK. 15. PG 84
FD: 4R TAGGED 'RLS 24405'
NOTES
1. THE BASIS OF BEARINGS FOR THIS PROJECT IS N DOW 53' V4 THE WEST LIKE OF HORIZON HEIGHTS AS
RECORDED IN BOOK 15. PG. 84 OF MAPS AND PLATS. BEING ALSO THE CENTER QUARTER LIKE OF SECTION 13.
TOWNSHIP 12 SOUTH, RANGE 13 EAST. GILA & SALT RIVER MERIDIAN. PIMA COUNTY. ARIZONA.
2. THE BENCHMARK FOR THIS PROJECT IS PIMA COUNTY SM NN 127, A 9/16' STEEL ROD AT THE NORTHEAST
CORNER OF ORACLE ROAD AND LINDA VISTA BLVD. NAVD ELEVATION: 2848.88
3. ALL DOCUMENTS REFERENCED BY THIS SURVEY ARE RECORDED IN THE OFFICE OF THE PIMA COUNTY RECORDER,
PIMA COUNTY, ARIZONA. UNLESS OTHERWISE NOTED.
4. SURVEY DATA SHOWN ON THIS RECORD OF SURVEY WAS COLLECTED WITH A TRIMBLE 5700 GLOBAL POS1110NING
SYSTEM AND IOPCON 303 TOTAL STATION BY MMLA, INC. SURVEY CREWS IN JANUARY-FEBRUARY, 2004 AND
SCALE 1' 40'
OCTOBER 2005.
5. ALL BEARINGS/OISTANCES ARE DERIVED FROM FIELD MEASUREMENTS UNLESS OTHERWISE NOTED.
6. NO BLUE STAKE WAS PERFORMED FOR THIS SURVEY. MMLA,INC. MAKES NO GUARANTEE THAT UTWTIES SHOWN
a ^
COMPRISE ALL UTILITIES IN THE AREA, ETHER IN SERVICE OR ABANDONED. EASEMENT INFORMATION WAS DERIVED
Tv
FROM TITLE REPORT.
7. THIS SURVEY IS BASED ON 717LE REPORT NO. 00022011-MAT, PROVIDED BY LONG TITLE AGENCY, LLC, DATED
^
JUNE 23, 2005. MMLA. INC. ASSUMES NO LIABILITY FOR INCOMPLETE AND/OR ERRONEOUS INFORMATION CONTAINED
IN SAID REPORT OR FOR INFORMATION THAT MAY BE REVEALED BY A MORE CURRENT REPORT.
8. THE DEDICATION TO THE TOWN OF ORO VALLEY RECORDED IN DKT. 5712 AT PG. 541 TERMINATES THE
EASEMENT RECORDED IN OKI. 52A m 894.
FO. ACP NO.
'
S/S RLS 7599
HORIZON HEIGHTS CONDOMINIUMS
BOOK 38, PACE 79
MAPS & PLATS 73 y3 W
E
�
4
7.533
F0. 1 1/2' AG FD. BENT 4R TAGGED
1A�#D AC ON SRC
LEGEND
'S/5 RLS 7529. is 40353 4 E
•
1 1/2'
P�08 PAR( 2
G Y BRASS DISC IN CONCRETE MARKED AS NOTED
• 1/2' IRON PIN TAOGED 'MMIA RLS ILW7' TO BE SET
FD. AC N g789
NO PUNCH, MID. bje*37'
S/S RLS 7599' .01'
O L a6•
AT COMPLETION OF GRADING I PROVDIENIS -
. SET 5/6' REBAR TAGGED WA RLS 165S7'
A-1
N 89 S8'51' W -43. 55 00�
UNLESS OTHERWISE NOTED.
R�Oa
79.48 -500L 00
O FOUND MONUMENT. AS NOIED
O CALCULATED POSITION
- - SECTION LINE
4R -. 1/2' REM .
OOTV�UH45 HTS
�r
TANG WEN LI
DKT, 6368, PG.
ACP 1 � ALUMINUM CAP ON 1/Y REBAR
B sun DISC IN DGONG
�✓ 9NT727 f4.IS.00
K. BOOK BOOK 29. PAGE 26
��� s� r. ZmIj�ILS . N
FD FOUND
11 �i� '.00��� ✓✓� ~ �.
O/.
LC LEAD CAP
LCP 1-1/2' LEAD CAP ON 5/6' REHAR
�✓ I �n
o ✓✓ �.�✓
(M) MEASURED SEARING/DISTANCE
✓
NA NOT ACCEPTED (FOR BOUNDARY MCNAAIENTA710 0
� .
DP OPEN PIPE
it 0' x 6' UTIUTY EASEMENT
PK PARKER KALE NAL
S. GO' OF N 454-V OF DKT 8984 PG 790
(RAO) RADIAL LINE
—
(R) RECORD BEARUNG/DISTANCE PER DKT. 12076. PG. 8889
TOWN ORO VALLEY S 6731'08' E S' \
FD. 1 1/2' AC, DKT =2 PG 541 n.57.
SEE NOTE 11 k �\
FD. 4R TAGGED
'RLS
NO PUNCH. BK fi
32. Pa. 91 `{f r''
13178'
SURVE`tSN 8755'03' E 454.3 ' Q4• ' 955'03' E
89'S5'03' E
296.54 TO ORO VALLEY PER DKT. 571Z .38•74'
, 119;02'
FD. BCSM MKD. 'RLS 18219' M 541RECORDED 2/101M (NO ROAD
N 8755'35' E 688.74'
0o s1'E S. ,s"E, DESERT SKY
ROAD
1 29.98' 84 MP
N 89'55'26' E 454.32'
FD. LC ON 1' OLP MID. i/18'
S O'04'30' W 1320.86' TOWN OF ORO VALLEY
FD. AC ON 5R
MID 'PE 2663'
.,i DKT 5712 PG 50
/4 2' BC Mm • 73
35980' (SEED APO,91 SURVEYS)
THIS SURVEY WAS PERFORMED
UNDER MY SUPERVISION.
V IAA
NOT FOR CONSTRUCTION
M M L A
PS O M AS
800 E 1Ych= Road, Su86 110, Tucson, AZ 85719
Tel (520) 292-2300 (800) 441-5875
PoI (520) 292-1290
®I=
FD..1 1%2' LC ON. 1" OP MKD.
RECORD OF' SURVEY
YANG WEN LIN PARCEL=`yam:
•'
A PORTION OF BLOCKS '
HORIZON HEIGHTS.
BOOK 15, PAGE. 84 MAPS AcW PLATS
SE 114. SEC. T3. T12S, RISE
+�
�
GiSRM. PIMA COUNTY. ARIZONA-
4 .,
DATE: NOV 2005 SCALE .1'-40' SHEET' OF-
Page 1 of 1
Gay, Shirley
From: Widero, Dee
Sent: Tuesday, August 25, 2009 12:24 PM
To: Michels, Matthew
Cc: Gay, Shirley
Subject: Comments - Ov12-06-23B lot split
Anything beyond the current three parcels is considered a subdivision.
328. Subdivision
Shall mean improved or unimproved land or lands divided for the purpose of financing sale or lease, whether immediate
or future, into four (4) or more lots, tracts or parcels of land or, if a new street is involved, any such property which is
divided into two (2) or more lots, tracts or parcels of land or any such property, the boundaries of which have been fixed
by recorded plat which is divided into more than two (2) parts. "Subdivision" shall also include any condominium,
cooperative, community apartment, townhouse or similar project containing four (4) or more parcels in which an
undivided interest in the land is coupled with the right of exclusive occupancy of any unit located thereon, but plats of
such projects need not show the buildings or the manner in which the buildings or air space above the property shown
on the plat are to be divided.
Dee Widero
Zoning Program Supervisor
Town of Oro Valley
520-229-4812
dwideroaorovalleyaz.gov
08/25/2009
ORO VALLEY WATER UTILITY
INTEROFFICE MEMORANDUM
TO: SHIRLEY GAY, DEVELOPMENT COORDINATOR
FROM: MARK MOORE, NEW DEVELOPMENT COORDINATOR
SUBJECT:ENCLAVE AT DESERT SKY OV-12-06-23B
DATE: 09/14/2009
CC: DAVID RUIZ, ENGINEERING DEPARTMENT ADMINISTRATOR
• The proposed development lies in the utility's D Zone.
• If an extension of existing infrastructure is required a water improvement plan will need
to be submitted to the Utility for review and approval.
• Before submitting a plan to the Utility, the engineer must receive from the Fire Marshall
specific fire flow requirements, i.e., capacity, number and location of fire hydrants. This
information must be submitted along with the plan to the Utility for review and
approval.
• A PCDEQ Certificate for the Approval to Construct or a Waiver will be required and
provided to the Utility before construction can begin.
• A Line Extension Agreement must be signed and returned to the Utility before
construction can begin.
• A PCDEQ Certificate for the Approval Of Construction will need to be issued and
provided to the Utility before water service can begin.
• Easements for the placement of public water facilities, i.e., water lines, fire hydrants, etc.,
on private property must be submitted to the Utility for review and approval. The
approved legal description and sketch will need to be recorded by the Engineer and a
copy provided to the Utility before construction is finaled.
• The contractor must arrange for a pre -construction meeting with the Utility before
construction of the water system can begin.
• These comments are in no way all inclusive as a hydraulic review of a submitted water
improvement plan must be completed.
• The submittal I have is a pre-app not a Final plat.