Loading...
HomeMy WebLinkAboutOV120615Community Center and Skate Park OV08-06-04 Engineering Conditional Use Permit Conditions Paul Keesler, P.E. October 11, 2006 Public Works Condition to attach to the Use permit: 1. This development will be required to financially participate in its fair share for the future Glover Road improvements as well as a new traffic signal being planned at the intersection of Glover Road/La Cholla Boulevard. Contributing traffic volume to Glover Road shall be utilized as the basis for establishment of financial contribution share. PW conditions of Use Permit 101106 r o- TOWN OF ORO VALLEY, PLANNING AND ZONING 11000 N. lA CANADA DRIVE, ORO VALLEY AZ 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 AUG www.townoforovalley.com APPLICATION FORM OV Case # (Office Use only): � Application Type: Cc n d I t v rL a.,s'' l/t e- Qom' YYt 1 A, Project ManagerlDeveloper Name: Firm: Address: City: State• Zip: -- Telephone: Fax.: Email.• L B. Property Owner (s), If m6r than one owner, attach list C. L13 E rlrm: -rea rL w o� v r Address: - Citys TP -nhnn - C'Z v — state: i �- �-97- 9z � Subject Property ParceUTax Code: 2 2 1 O 2- O Legal Description/Property Address: 6 ` OF 16 D i1/ 6 J0 Ye-9 d O 2 Area of property: UstingZoning: Proposed Zoning: Is Proposed Zoning in conformance with General Plal designation?, General Plan Designation: �-O ink S I re.f / i Existing Land Use:/ i' slWo&&Lproposed Previous Applicatfons Relating To This Property ova- OVs• oV11- OV12- 0 io — l S Reason For Reauest i I • . This application is true and correct to the best of my knowledge. I been authorized by the owner to make this application. 1-iArA / ZOO,(. Land (47L-A SJ7 c F 1 anal u 1 (]Yes []No OV10- OV13- described property or have araLc • F.-Adndn KIFORMSIShanon Project SubdAlon Developmaol lion dcu Upplication GooerAdoo AUG-01-06 ' 16:28 FROM - Hug 61 06 04nz2p T-504 P.001/001 F-026 p.I AuVs[ 1, 2006 I authorize The Foursquare Church jo apply for a "Condiuonaa Use" permit fimn the Town of Oro VgIcy, for the propeM loemd ac 2440 W. Glover Rd., Oro Valley, Az• 85742. $- / - o 6 Lot Information Window Page 1 of 1 Lot Information Request Results Parcel Number:224110320 For more detailed information regarding this parcel please click here Street Address: 2440 W GLOVER RD OV Current Mailing Address: ALBEE MARALYN 1017 N ALAMO AVE TUCSON AZ 857110000 Legal Information: OV S264' OF SW4 SW4 NE4 4.00 AC SEC 4-12-13 (FORMERLY 203-15-003E) Subdivlon Plat Book and Page:: 00000 View Subdivion Plat from Pima County Flood Plain Information: Lot Not in Flood Plain Disclaimer: This information should be verified by the Oro Valley Zoning Department. The Town of Oro Valley expressivly disclaims responsiblity for damages or liability that may arise from the use of this map. Oro Valley Zoning Code:R1-144 Zoning Code Explanation: Single Family Residential .3 RAC Conditions: No Conditions found on this Lot General Plan Designation: Descrptions for General Plan Designations are currently unavailable. Please refer to the General plan web site. This location is located in the Amphitheater Public School District. For more information on which schools are available in the area, please visit the Amphitheatre School District Website. o�0y��YOti9 The map/data on the Oro Valley Mapping site is not meant to be used as an official or legal interpretation of Oro Valley features and w: no expressed or implied warranty is made regarding their accuracy. While every effort has been made to ensure the accuracy, :A correctness and timeliness of these materials, Oro Valley assumes no responsibility for errors or omissions. For more information regading the information displayed on your screen, please contact the Planning & Zoning Department at (520) 229-4800 or visit us at 11000 N La Canada Drive, Oro Valley Arizona 85737. http://gis/aspsites/planner/psearch2.asp?PARCEL=224110320&ADDR=&B1=Submit 08/18/2006 Written Narrative Explaining the Nature of the Use Permit Pathway of Hope Church is applying for a conditional use permit for property located at 2440 W. Glover Rd, Oro Valley, AZ 85742. We currently have an offer on this property that is contingent upon us obtaining the conditional use permit. Our plan is to build a Community Center and Skatepark. Pathway of Hope Church is a Christian church that seeks to be a blessing to our community. We desire to discover needs and fulfill them. One of the greatest needs in Oro Valley is a gathering place for our town's youth. Our church seeks to fulfill this need by building a community center which includes a cluster of four buildings: office (approximately 800 sq ft), conference room/multi-purpose room (approximately 1600 sq ft), a classroom (approximately 1200 sq feet), and a general purpose auditorium (approximately 6,000 sq ft). The skatepark will be a professional concrete skatepark and will be free and open to the public. The site plan shows we are preserving the privacy of the existing neighbors. The entrance to the community center and skatepark is at the beginning of the shared road easement which is currently a dirt road. In addition, the usage of the community center and skatepark is of the same nature (schools, parks, and public facilities) as Wilson K-8 School, which is directly adjacent to the said property. The use of the community center will include the following: 1. A place for senior citizen socials, such as monthly potlucks and other social gatherings (we want the community center to be a benefit to the entire Oro Valley community) 2. A place for community groups/clubs to meet, such as Mothers of Preschoolers and other Moms groups 3. A place to hold monthly "Battle of the Bands" for local teenage bands 4. A place to start youth and adult sports leagues, including indoor volleyball and indoor soccer, etc. 5. A place for after school tutoring for youth (we will seek grants to financially support qualified tutors and learning assistants) The use of the skatepark will include the following: 1. Free skateboarding 7 days a week 2. Local skateboarding competitions and tournaments 3. Free clinics to help children and youth with their skateboarding skills Skateboarding is the fastest growing sport for youth. It is today's pick-up sport: more kids age 6 to 17 skateboard than play baseball, according to Kaboom, a non-profit organization that builds playgrounds and skateboard parks. Youth today have mastered mollies" and "half -pipe tail stalls," and now their hardest skateboarding trick is ... finding a place to skate. We want to create a place where kids can stay off of public streets and pedestrian ways to pursue their passion for skateboarding. Sincerely, jo� than A. Jo h son, D.Min 'V A V Vl--t VJ C-)\, JUN ? A P k- ( i-,j 6,, 't The Gathering Place OV Community Centelt ana Skatepark Pathway of Hope Foursquare Church is a Christian church that was started September 11, 2005. Our vision is to be a church that is a blessing to our community. We desire to discover needs and fulfill them. One of the greatest needs in Oro Valley is a gathering place for our youth. Our church seeks to fulfill this need by building a community center and Skatepark. At Pathway of Hope, we value the Next Generation. It is our passion to champion emerging generations by giving them the best of our time and resources to ensure their success in the world. The Use of the Community Room/Gym/Multipurpose room will include: 1. A place for senior citizen socials, such as monthly potlucks and other social gatherings (while we value the next generation, we also respect all generations and seek to bridge generational gaps at the community center) 2. A place for community groups/clubs to meet, such as Mothers of Preschoolers and other Moms groups 3. A place to hold monthly "Battle of the Bands" for local teenage bands 4. A place to start youth and adult sports leagues, including basketball, volleyball, indoor soccer, etc. 5. A place for after school tutoring for youth (we will seek grants to financially support qualified tutors and learning assistants) The community center will also include a Skatepark, which will feature: 1. Free skateboarding 7 days a week 2. Local skateboarding competitions and tournaments 3. Clinics to help children and youth with their skateboarding skills Skateboarding is the fastest growing sport for youth. It is today's pick-up sport: more kids age 6 to 17 skateboard than play baseball, according to Kaboom, a non-profit organization that builds playgrounds and skateboard parks. Youth today have mastered "ollies" and "half -pipe tail stalls," and now their hardest skateboarding trick is ... finding a place to skate. We want to create a place where kids can stay off of public streets and pedestrian ways to pursue their passion for skateboarding. June 23, 2006 Johnny Johnson 13055 N. Desert Olive Dr. Oro Valley, AZ 85755 Re: OV12-06-15, Community Center and Skate Park Town of Oro Valley Department of Public Works staff offers the comments listed below. Note: these comments are preliminary in nature and subject to change upon receipt of more detailed information. These comments are for guidance and are not a substitute for all applicable Town of Oro Valley, Pima County, State of Arizona and Federal codes, regulations, ordinances and/or laws. DRAINAGE A professional civil engineer registered in the state of Arizona will be required to prepare a hydraulic and hydrologic drainage report that conforms to the Town's Drainage Criteria Manual. First flush measures and detention storage shall be required for this project. A scoping meeting can be arranged with The Town of Oro Valley prior to preparing the drainage report if the engineer desires. 2. SOILS A geotechnical soils report shall be prepared containing all geotechnical engineering information and recommendations applicable to this project. The minimum geotechnical information to be included in the report is as follows: • Soil stability of all proposed cut and fill slopes • Angle of shear and maximum recommended slope ratio of all proposed cuts or fill • Erosion vulnerability of all graded areas and created slopes • Stormwater siltation potential of soils for all graded areas and created slopes • Description of soil constraints on the structural design of all foundations footings and walls • Recommended compaction treatment of all fills areas • Identification of any potentially hazardous geotechnical areas where construction is Proposed • Recommended treatment for stability, erosion and siltation control of all newly graded areas and created slopes • Determination of a pavement design section for roadways • Foundation design recommendations 3. TRAFFIC A traffic impact analysis (TIA). 4. LANDSCAPING Please ensure that sight visibility triangles appear on landscape plans. Section 4.8 of the Town of Oro Valley Subdivision Street Standards explains limitations to improvements within the triangles. Ensure that there is coordination between the landscape architect and the engineer preparing the drainage and grading plans. 5. GRADING Grading shall be in conformance with the Town of Oro Valley Grading Ordinance, Oro Valley Zoning Comprehensive Code Amendments (OVZCCA) Section 27.9 and stipulation from the Development Plan and Master Site Grading Plan. A Type H grading permit is required for this lot. 6. TITLE REPORT Provide full schedule B dockets for all easements identified within the Title Report Summary. These dockets shall include all information necessary to corroborate all easements shown on the Preliminary Plat. 7. GENERAL INFORMATION Restoration Assurances approved by the Planning and Zoning Department will be required prior to the issuance of a grading permit, see Chapter 26.6 of the OVZCCA. The Development Plan for this lot shall be prepared per Chapter 22.9 of the OVZCCA. The Development Plan shall be completed to delineate the amount of information that is typical on industry accepted Design Development, level of completion. This should represent approximately a 50% Construction Level Document. General Comments: • Provide typical details for proposed lot grading • Provide cross sections for proposed PAALS. • Provide proposed infrastructure layout with connections (water, sewer and electrical). • Provide First Flush measures • Provide required amount of parking per this Development Plan. • Provide required areas for loading and trash requirements. If you have any questions, please call Fritz Laos at 229-4818. Sincerely, Paul Keesler, P.E. Development Review Division Manager Cc: Shirley Gay David Ronquillo N Shannon Rd iN Shado",,,ista PI N Vista del Sol IfE L 0 cn a N La Cholla BI � m e h '" Ca ysa12a rJa\f)e� CD oZ o d� Rosy pna sae Ply /'/// o"',oj� Boa No �'�o ° N�� °' N/ronwood a�Q m t4r co 0)(0 coo � o Canyon PI 'M sov\ —� 2Da m6 -�� NMon . >C ueC NSaC N N Caet -o= o Leig�w o ePe a = < uS Rose Dr o� Y<p N Tapestry Dr W pia M. ZW N Via de N Vista del Sol o a Z W C� v$ fl- CL Nd 'ra� n °� x Verbinita a = m n inta Or o n°�>ada .. cn Ridge Dr n n - d � w � N h'ancho Naranjo 3'< N la Tanya �n 4— o`er N Pia Alameda a�n0� ° '�°`zi N Cam del Fierro E N Cam del Plata N Como Dr r 3� cm �o c. X..rL fjjj Y f J _. i 441.1 140 oZ _-DX� PYIi�9YfNipPBiai1� — - nrsniYr�rY ; � f j"= UP p �►1 � t" i f y i Pv Oq7 i �,�.► 000 - t w�, 7) PROJECT STATUS Date Received:, Project Type: Project # 0 G�/ - Q� �S Parcel #:_ I J, q - !/ _ /,?q n Contact Person "77,� Tom, ti S n r, PH: 2 9 f7 - W Fax: � 9 % - E-mail:pa�r rmk n �j yn hon,Gn Planner.�Q Date To Principal Planner -O (o Pre-App Mtg (n —� 3 —d 6 Comment Letter Mailed Formal Submittal Date: Date To Principal Planner Transmittal Due Date: (4 week review time) Certification Date: Letter Mailed: Resubmittal Date: Date To Project Planner Transmittal Due Date: (4 week review time) Comment Letter Mailed Scheduled for Meeting (DRB,P&Z, TC, PARC, BOA) Notice Due:. Received Notice Date: Sent to Paper. Labels Prepared: Area Map Printed showing the area noticed: Notice mailed out: Property Posted: Cancellation Notice Notice Due: Received Notice Date: Sent to Paper. Labels Prepared: ' Area Map Printed showing the area noticed: Notice mailed out: I Property Posted: Action from meeting? Approved Denied Action letter mailed to applicant: Resubmittal Date: Date To Project Planner Transmittal Due Date: (4 week review time) Comment Letter Mailed Scheduled for Meeting (DRB,P&Z, TC, PARC, BOA) Executive Summary sent to Clerks Office: Notice Due: Received Notice Date: Sent to Paper. Labels Prepared: Area Map Printed showing the area noticed: Notice mailed out: Property Posted: Action from meeting? Approved Denied Action letter mailed to applicant: Final Submittal Date: Sent to Project Manager._ PP Signed: FP Signed: LP Signed: DP Signed: Received Trust Agreement Received CC&R's Received Bond Estimates: Sent estimates to Senior Zoning Inspector Approved / Denied Date: Sent Bond estimates to Public Works Approved / Denied Date: If approved send copy of approved estimates to developer and to Linda in Public Works: Date sent: ' Received Bonds Date: Type & Amount of bonds: RECORDING PROCESS Assurance: CC&R's: Date Recorded: Call repro for copies (2 black lines I photo copy mylar for addressing): Sent to Pima County Addressing: Place Mylar in hanging file: Enter BK & Page into Permits Plus;__ PREPARIlVG Fa,E FOR FILE ROOM TC Staff Reports DRB P8Z P&Z TC Minutes DRB public records: Pick up Mylar from Pima County p Put Mylar in Hanging File Disk to Pima County GIS Dept. Add Project # to Card Catalog in the (F — drive) BK and PG in Permits Plus, Update Status in Permit Plus Complete — Put in file room Approved Corrections Comments Reviewing Agency Required PC Addressin PC Wastewater PC Assessors PC Transportation PC Dev. Services PC Admin Office TEP SWG Qwest Tucson Water Golder Ranch ADOT Az State Museum SHPO AZ Fish & Wildlife Am hi Public School US Postal Svc. OV Buildin Safety OV Water — Mark Moore OV Water — Kevin McCaleb OV Zonin -Planner OV Zonin - Sarah OV Plannin OV Transit OV Communi Development OVPD OV Parks & Rec. OVED OV Public Works PAG — K. Zimmerman File NOTES .I JP�LEY qR� Q0 1 A NOUN D ED July 100', 2006 Johnny Johnson 13055 N. Desert Olive Dr. Oro Valley, AZ 85755 TOWN OF ORO VALLEY 11000 N. LA CANADA DRIVE ORO VALLEY, ARIZONA 85737 Administrative Offices (520) 297-2591 Fax (520) 297-0428 www.ci.oro-valley.az.us RE: OV12-06-15 Pre -Application Review for Pathway of Hope Foursquare Church, located on the south 264' of the SW% SWY4 NE% of Section 4, T12S, R13E, located on the north side of Glover Road approximately three -eighths ells) of a mile west of La Cholla Drive, Parcel #224-11-0320 Dear Mr. Johnson: Thank you for your submittal of the pre -application conference request for a proposed community center, gym, multi -purpose room, and an outdoor skate park on the above - captioned property. The following comments are based on a preliminary review and are intended to assist you in preparing a formal submittal: Development Process The project will require approval of the following: • Conditional Use Permit (CUP) — subject to Planning and Zoning Commission (P&ZC) and Town Council (TC) approval. • Development Plan — subject to Development Review Board (DRB) and TC approval. • Landscape Plan — subject to DRB approval. • Architectural Elevations - subject to DRB approval. • Significant Resources Inventory (SRI) and Native Plant Protection Plan (NPPP) — subject to administrative approval. Oro Valley Zoning Code Revised (OVZCR) The following sections of the OVZCR are notable for this development: • Section 23.6, Standards for Single -Family Residential Districts. Please note that staff would require setback and bufferyard standards consistent with the Private Schools and Churches (PS&C) district (Section 23.8.D). • Sec 23.4, Table of Dimensional Requirements • Sec. 24.4, Tangerine Road Scenic Corridor Overlay District (TRCOD) • Sec. 26.1, Development Plan (temporarily refer to Section 4-504 of the previous code for specific general notes) F:\OV\OV12\2006\OV12-06-15\Pre-apphcation 7-7-06.doc • Sec. 27.6, Landscape & Irrigation Plan (temporarily refer to Section 14-205 of the previous code for specific general notes). • Sec. 27.7, Off -Street Parking • Sec. 27.8, Off -Street Loading • Addendum A, Design Guidelines (applies to site development, landscaping, signage, detention basins, and architecture) Major Issues • Road improvements to Glover Road • Infrastructure improvements (water, sewer, electric, telephone). • Bufferyards should be provided between the site and residentially -zoned property. • Building height is limited to 18 feet in the R1-144 single-family zoning district. The proposed gym may not conform to this height. limitation. General Comments • Staff recommends that you coordinate with Richard B. Wilson K-8 School regarding this project. • Staff recommends holding neighborhood meeting(s) to present the proposal to affected neighbors, identify any areas of concern, and resolve them prior to public hearing. 1. Access: a. Glover Road is currently a private easement. The Town of Oro Valley is currently working with surrounding property owners to acquire right of way for Glover Road. Participation in the improvements to Glover Road will likely be required. 2. Tangerine Road Corridor Overlay District (TRCOD): a. The project will need to be designed in accordance with the TRCOD design guidelines (Section 24.4, OVZCR). 3. Drainage: a. There is a small wash and riparian area on the western side of the property. Consideration will need to be given to mitigate impacts to this feature. 4. Mitigation of Impacts on Adlacent Properties: a. Increased setback and/or additional bufferyard from residential homes on the western and southern sides of property. b. Restrict lighting to limit impacts on adjoining neighbors on west and south (current and future). F:\OV\OV12\2006\OV12-06-15\Pre-application 7-7-06.doc c. Restrict nuisances associated with noise by placing skate park facility away from residential areas. d. Neighborhood meetings should be held to discuss mitigation tactics and the proposed project. Other Agency Comments Oro Valley Engineering Division Oro Valley Parks and Recreation Miscellaneous Staff would require an additional pre -application with more information and a more detailed site plan prior to formal submittal. We look forward to working with you on this project. Please feel free to contact me at 520.229.4822 or mmichelsaa orovalley.net at any time regarding this project. Respectfully, Matt Michels Senior Planner Encl: Oro Valley Engineering Division, memo Oro Valley Parks and Recreation, memo cc: Shirley Gay Paul Keesler F:\OV\OV12\2006\OV12-06-15\Pre-application 7-7-06.doc JUN-06-06 10:57 FROM- T-735 P-001/002 F-182 planning and Zoning Division I1000 N. La Canada Drivtt. Ora Valley AZ 85737 p11olles (520) 729-4800 Fnx: (529) 742-1022 Web Site Address; www.town0[0rovall9y-com REQUEST FOR PREAPPLICATION CONFERENCE PROJECT DESCRIPTION: LOCATION: 'l ` 1 ` () W � I C'2 I (2� Or UG �e PARCEL NUMBER, 2-0- TYPE OF REQUEST: — (C ',,)) t ur Sohn t APPLICANT NAME/FIRM: iC I' w ADDRESS:12 5 N �Se� UINE DL,_C)rC� �/<11�,�I lS`� TELEPHONE NO.;ALL' Z� -I Z FAX NO.: v 7 ��� �Z�� EMAIL: `P�i I'll io(Ir'a;y�IP_ PROPERTY OWNER: SIGNATURE: PREAPPLICAMN DATE: DATE REQUESTED: (Office use only) v SUBMITTALS MUST BE RECEIVED BY THE PLANNING DEPARTMENT AT LEAST TEN (10) WORKING DAYS IN ADVANCE OF THE DESIRED PREAPPLICATION CONFERENCE DATE. a SUBMITTAL REQUIREMENTS "ALL PLANS MUST BE FOLDED PER PIMA COUNTY FOLD." o TWENTY (20) COPIES (24X36) OF THE PROJECT CONCEPT PLAN, WITH LOCATION MAP. o--TWO-(2) COPIES-OPSITE RESOURCEJI AV 4RY. f ; I Project Number: Project Title: Transmittal Due: Date: TOWN OF ORO VALLEY BUILDING PERMIT Office of Community Development 11000 N. La Canada Dr. 520-2294800 Office 520-742-1022 Fax OV1206-15 COMMUNITY CENTER AND SKATEPARK June 23, 2006 June 28, 2006 There is not enough information submitted to be able to provide any comments. General comments are noted below. Check lists are available for your use in preparing construction documents for application for building permits on your projects at the customer service counter in the Town of Oro Valley Community Development Services building at 11000 N. La Canada, Oro Valley, Arizona or online at littp://www.ci.oro-valley.az.us/com.mdev/bldg_forms.11tin . The following comments are provided to further assist you in preparation submittal of documents: 1. The codes currently enforced by the Town of Oro Valley Building Safety Division are the 2003 editions of the International Building, Fire, Mechanical, Plumbing, Fuel Gas, Energy Conservation Codes, the Arizonan's With Disabilities Act and the 2002 National Electrical Code. It is anticipated that the Town of Oro Valley will be enforcing the 2006 editions of the above mentioned International Codes and the 2005 edition of the National Electrical Code beginning January 1, 2007. 2. Plans submitted for review of this project will be required to be designed to demonstrate compliance with the codes adopted and enforced by the Town of Oro Valley at the time of Building Permit application. 3. Minimum plumbing facilities as required by Section 403 and Table 403.1 of the International Plumbing Code are required. 4. Minimum outdoor air as required by Section 403 of the International Mechanical Code (occupancy and volume per Table 403.3). 5. Fire flow on site must be approved by the Town Fire Marshal. 6. Fire service water lines are required to have a backflow prevention device installed in compliance with the 2003 International Plumbing and Fire Codes. 7. Emergency vehicle access must approved by the Town Fire Marshal. 8. Fire hydrants supplied with the required fire flow per the Fire Code adopted by the Town of Oro Valley must be installed, tested, inspected, and approved by the Page 1 of 2 Town Fire Marshal prior issuance of building permits or placing any combustibles, including construction trailers, on site. 9. Per Section 1008.1.8.3 of the 2003 International Building Code, all egress doors (required and non -required) must have locking hardware that is readily operable from the egress side without the use of a key or special knowledge or effort and shall comply with the Arizonan's With Disabilities Act. 10. Please ensure that building areas comply with Chapter 5 of the 2003 IBC. 11. Please ensure that the exterior wall fire rating complies with Tables 601, 602, and Chapter 7 of the 2003 International Building Code. 12. Please ensure that the use separations comply with Section 302.3 of the 2003 International Building Code. 13. Construction of private sewers are required to have plumbing permits and inspections from the Town of Oro Valley & shall comply with the edition of the International Plumbing Code adopted by the Town of Oro Valley and in effect in the at the time of permit application.. 14. All blasting operations require a separate blasting permit. 224-11-0320 Pima County Assessor Online http://www.asr.co.pima.az.us/APIQ/APIQ.aspx 2007 Pima County Assessor Property Inquiry Search P2=120116 Parce12005 History Commercial Tax Semmary Genealogy M Parcel 24110320%W, "Go" Book -Map -Parcel: 224-11-0320 TaxPayer Information ALBEE MARALYN 1017 N ALAMO AVE TUCSON AZ 85711 0000 Legal Description S264' OF SW4 SW4 NE4 4.00 AC SEC 4-12-13 (FORMERLY 203-15-003E) (FORMERLY 203-15-0320) Property Address 2440 W GLOVER RD (OV) Secondary Valuation Data Legislative Class Land RES RENTAL (6 0) Improvements RES RENTAL (6 0) 2006 Personal Property Gross Value Totals 2006 LMTD/SCND Exemptions Net Value Totals PriorLimitedValue: $109,979 Map Selection(s) S4.d�g L_213_[ili... flf TaxArea:1039 TaxYear:2007 Recording Information Docket 9017 Page 835 Date Apr-15-1991 WARRANTY DEED Miscellaneous Section 4 Twn12.0 S Rng 13.0 E Map&Plat 0 / 0 LandMeasure 4.00 A MarketArea: (14) Tract Block Lot GroupCode CensusTract 4611 Use-Code0194 File -Id 1 Date of Last Change Jul-12-2005 MISCL RES IRIPROVENIENT RURAL NON SUBDIVIDED Full Cash Percentage Assessed $140,000 10.0 $14,000 $5,243 10.0 $524 $145,243 $14,524 $145,243 $14,524 CurrentLimitedValue: $120,977 4e�-,t(, 1 of 1 6/19/2006 1:20 PM Pima County Construction Cost Model Detailed Valuation Report http://www.asr.co.pima.az.us/APIQ/ccsdvr.aspx Pima County Assessor Detailed Valuation Report Construction Cost Model Jun-19-2006 — Yareel: 4110320 Sec . t.' 001 Sect: 001 :� I'axYear: 50 7? , Get Data a Count: I..oeation: 2440 W GLOVER RD (PDS) Occupancy: 599 3 (MISCELLANEOUS) Deprc. CD: Model: C01 3 Class: D Construction Year: 1977 Common Arca: N PC1': 0.00 ShopCenter Eft Year: 0000 Percent Complete: 100 Cround Floor-- Perim: 1 Area: 1 I • Obsolescence: 0 Total Floor Area: 1 Modernization: 0 Nnmb,�r of Stories:1.0 Bldg Cinits: 00000 - Physical Cond: 1.0000 Avg Story Height: 1 Composite: 2.00 Code Rank Tv Misc Uuittl 1'/;11 "o NO(I Deceription Cost _ I i _j ADDS 2.00 35 0 UN 0.00000 ADD ITEM $10,304 ....... .......................... ........................................ ._.. n Base Replacement Cost $10,304 = o $412 - > $9,892 Location Adjustment 96 /o Depreciation = 46% $4,649 - > $5,243 Assessable Improvement Full Cash Value $5,243 1 of 1 6/19/2006 1:21 PM c. Restrict nuisances associated with noise by placing skate park facility away from residential areas. d. Neighborhood meetings should be held to discuss mitigation tactics and the proposed project. Other Agency Comments Oro Valley Engineering Division Oro Valley Parks and Recreation Miscellaneous Staff would require an additional pre -application with more information and a more detailed site plan prior to formal submittal. We look forward to working with you on this project. Please feel free to contact me at 520.229.4822 or mmichelsOorovalley.net at any time regarding this project. Respectfully, Matt Michels Senior Planner Encl: Oro Valley Engineering Division, memo Oro Valley Parks and Recreation, memo cc: Shirley Gay Paul Keesler F:\OV\OV12\2006\OV12-06-15\Pre-application 7-7-06.doc Message Page I of 1 Vella, Bayer From: Gay, Shirley Sent: Thursday, July 06, 2006 3:05 PM To: Vella, Bayer Subject: FW: SUNSET CANYON ESTATES OV1205-31 Shirley Gay Town of Oro Valley Development Coordinator 520-229-4849 -----Original Message ----- From: LCastillo@tep.com [mailto:LCastillo@tep.com] Sent: Thursday, July 06, 2006 2:23 PM To: Gay, Shirley Cc: rchinea@mmla-psomas.com Subject: SUNSET CANYON ESTATES OV1205-31 SUBJECT: SUNSET CANYON ESTATES Lots 1-21 OV 1205-31 Tucson Electric Power Company (TEP) has received the final plat submitted for review June 22, 2006. TEP is unable to approve the plat at this time. An electrical design to determine our easement requirements will be provided on the Approved Preliminary Plat within fifteen (15) working days upon receipt of the plat. Additional plans necessary for preparation of the design are: building plans including water, electrical, landscape, sidewalk and paving plans. Also, submit the AutoCAD version of the plat on a CD or email to Icastillofltep.com. Should you have any questions, please contact me at (520) 917-8745. Liza Castillo Right of Way Agent Land Management Tucson Electric Power Co. (520) 917-8745 Icastillo@tep.com This E-mail has been scanned by McAfee WebShield. Any infected attachments associated with this E-mail have either been deleted or cleaned. --Town of Oro Valley Information Technology Division 07/06/2006 JPLLEY q/�/ OHO '02� f� SOUNDED 191� Johnny Johnson 13055 N. Desert Olive Dr. Oro Valley, AZ 85755 TOWN OF ORO VALLEY Department of Public Works 11000 N. La Canada Drive Oro Valley, Arizona 85737 (520) 229-4880 Fax (520) 229-4899 www.townoforovalley.com Re: OV12-06-15, Community Center and Skate Park July 10, 2006 Town of Oro Valley Department of Public Works staff offers the comments listed below. Note: these comments are preliminary in nature and subject to change upon receipt of more detailed information. These comments are for guidance and are not a substitute for all applicable Town of Oro Valley, Pima County, State of Arizona and Federal codes, regulations, ordinances and/or laws. 1. DRAINAGE A professional civil engineer registered in the state of Arizona will be required to prepare a hydraulic and hydrologic drainage report that conforms to the Town's Drainage Criteria Manual. First flush measures and detention storage shall be required for this project. A scoping meeting can be arranged with The Town of Oro Valley prior to preparing the drainage report if the engineer desires. 2. SOILS A geotechnical soils report shall be prepared containing all geotechnical engineering information and recommendations applicable to this project. The minimum geotechnical information to be included in the report is as follows: • Soil stability of all proposed cut and fill slopes • Angle of shear and maximum recommended slope ratio of all proposed cuts or fill • Erosion vulnerability of all graded areas and created slopes • Stormwater siltation potential of soils for all graded areas and created slopes • Description of soil constraints on the structural design of all foundations footings and walls • Recommended compaction treatment of all fills areas • Identification of any potentially hazardous geotechnical areas where construction is proposed • Recommended treatment for stability, erosion and siltation control of all newly graded areas and created slopes • Determination of a pavement design section for roadways • Foundation design recommendations 3. TRAFFIC This development may be subject to participation in the future Glover Road improvements as well as a new traffic signal being planned at the intersection of La Cholla Boulevard. The amount of participation shall be determined in the future. This project shall require a Traffic Impact Statement to assess the contributing traffic to Glover Road generated due to this development. 4. LANDSCAPING Please ensure that sight visibility triangles appear on landscape plans. Section 4.8 of the Town of Oro Valley Subdivision Street Standards explains limitations to improvements within the triangles. Ensure that there is coordination between the landscape architect and the engineer preparing the drainage and grading plans. Landscaping with a Detention Basin is acceptable; however, no landscaping will be permitted within a Drainage Channel. Landscape Plans must show and clearly delineate all underground utilities that are portrayed on the Development Plan/Preliminary Plat for determination of planting clearances and conflicts 5. GRADING Grading shall be in conformance with the Town of Oro Valley Grading Ordinance, Oro Valley Zoning Comprehensive Code Amendments (OVZCCA) Section 27.9 and any stipulations set forth on the Development Plan. A Type II grading permit is required for this lot. 6. TITLE REPORT Provide full schedule B dockets for all easements identified within the Title Report Summary. These dockets shall include all information necessary to corroborate all easements shown on the Preliminary Plat. 7. GENERAL INFORMATION Restoration Assurances approved by the Planning and Zoning Department will be required prior to the issuance of a grading permit, see Chapter 26.6 of the OVZCCA. The Development Plan for this lot shall be prepared per Chapter 22.9 of the OVZCCA. The Development Plan shall be completed to delineate the amount of information that is typical on industry accepted Design Developnimt, level of completion - This should represent approximately a 50% Construction Level Document. General Comments: • Provide typical details for proposed lot grading • Provide cross sections for proposed PAALS. • Provide proposed infrastructure layout with connections (water, sewer and electrical). • Provide First Flush measures • Provide required amount of parking per this Development Plan. • Provide required areas for loading and trash services. If you have any questions, please either call Fritz Laos at 229-4818 or me at 229-4811. sncerel� Paul Keesler, P.E. Development Review Division Manager Cc: Shirley Gay Matt Michels CHAPTER 23: ZONING DISTRICTS Section 23.3 Table of Permitted Uses TABLE 23-1: PERMITTED USES -Sin Ie-Fami ulti-Family Commercial Other USECATEGORY . .. �� SPECIFIC USE TYPE �'- :R7=:, R1 d, : R1=,` .-R1 , `:�:R1 .Ri R1-, -R7` S R-- R-� R- R- . C-�. :C-. C- 5 T P, �' AD . .. .r 300 ° 144 T2'. 43 ` 36 -fl �10 ` �: 7, D : °4 4R S 6 N < .1 2 8' P O :. REDS 6 PUBLIC INSTITUTIONAL AND CIVIC USES Public, Business schools or similar C P P Institutional!, Civic private schools Cemetery, including C C funeral chapel Church I f P P P P Community buildings and recreational facilities, private, not -for -profit, such C C C C C C C C C C C C C as athletic fields and boys clubs Community buildings other than hospitals, parks, and P P P playgrounds Flood control facilities and C water recharge areas Golf course (except I 1 1 24.6 miniature golf course or C C C C C C C C commercial drivingrange)25.1.J Golf driving range C Hospitals C Municipal Services P P P P Museum Zoning Code/Oro Valley AZ May 2005 85 O'l kv.