Loading...
HomeMy WebLinkAboutIP191501r OJEY AR�O OQ'rR �f 7 DED 19 Development and Infrastructure Services February 20, 2015 Corey Thompson, P.E. The WLB Group 4444 E. Broadway Blvd. Tucson, AZ 85711 RE: IP1915-01, Public Sewer Plans for Naranja Drive; 2nd Submittal Dear Corey, We have completed the second review of the Public Sewer Plans for Naranja Drive. The plan has been accepted and the Town Engineer has signed the Mylar cover sheet. In accordance with the ORO VALLEY ZONING CODE (OVZC): SEC. 26.3, the technical accuracy and conformance to the current minimum design standards and requirements of the TOWN OF ORO VALLEY, and other applicable standards are the responsibility of the design engineer. Please provide Oro Valley with two (2) complete bond sets of the plans after approval is obtained from Pima County Department of Environmental Quality. Any proposed revision or modification to this accepted plan shall be submitted to the Town for review and approval prior to such revision/modification being made in the field. If you have any questions, please call me at (520) 229-4824. Sincerely, Josh Potter, P.E. Senior Civil Engineer Attachment: Signed Mylar Coversheet CC: File eng-g-02-20140703 OQO�p,LIEY ggjO29 Development and Infrastructure Services February 17, 2015 Corey Thompson, P.E. The WLB Group 4444 East Broadway Blvd Tucson, AZ 85711 RE: IP1915-01, Public Sewer Improvement Plan for Naranja Drive, 2nd Submittal Dear Corey, We have completed the second review of Public Sewer Improvement Plan for Naranja Drive. The plans are acceptable. Please provide the following information with the next submittal: ❑ Narrative detailing changes per PCRWRD review, if applicable ❑ Two bond copies of the revised plans ❑ Mylar coversheet Review of these construction documents is in accordance with the 2012 International Building Code (IBC), Section 106. The following comments are to verify conformance with all applicable requirements of the IBC, Town of Oro Valley, Pima County, State of Arizona, and Federal codes, regulations, ordinances, and/or laws: You may contact me at (520) 229-4824 if you have any questions. Sincerely, Josh Potter, P.E. Senior Civil Engineer Attachment: CC: File eng•swr imp•02-20150217-20140408 Development and Infrastructure Services January 28, 2015 Corey Thompson, P.E. The WLB Group 4444 East Broadway Blvd Tucson, AZ 85711 RE: IP1915-01, Public Sewer Improvement Plan for Naranja Drive Dear Corey, We have completed the first review of Public Sewer Improvement Plan for Naranja Drive. Please provide the following information with the next submittal: o A copy of this TOV comment letter ❑ A comment response letter ❑ Two bond copies of the revised plans ❑ Original redlines ❑ Review Fees: [$500 + ($200.00/sheet)(4 Sheets) = $1,300.00] Review of these construction documents is in accordance with the 2012 International Building Code (IBC), Section 106. The following comments are to verify conformance with all applicable requirements of the IBC, Town of Oro Valley, Pima County, State of Arizona, and Federal codes, regulations, ordinances, and/or laws: General Comments 1. Address all redlined comments within the attached Civil Improvement Plan (G) plan set sheets. Provide a comment response letter and return all redlined originals to the Town of Oro Valley. [Oro Valley Zoning Code, Sec 22.9.F.6.a.ii] 2. Please note that a separate submittal is required for Pima County Regional Wastewater Reclamation Department approval. It is the applicant's responsibility to coordinate this required submittal in order to secure approvals directly from PCRWRD. [Town Zoning Code 22.9.E.2] 3. A Right -of -Way Use Permit will be required for any Civil Improvements within the Town's Naranja Drive right-of-way. [Town Zoning Code 22.9.E.2] 4. Add a note for all call -outs that reference pavement to be demolished by others to indicate that the pavement/trench must be repaired per TOV standards if the work is completed prior to demolition of the existing pavement. [Town Zoning Code 22.9.E.2] eng-swr_imp-0I-20150127-20140408 Sheet 1 of 4 5. Add a note the indicates that a Right -of -Way Use Permit will be required for any Civil Improvements within the Town's Naranja Drive right-of-way. [Town Zoning Code 22.9.E.21 6. Add the OV Case number to the title block at the top of the sheet. [IPRC] 7. Verify the existing sewer plan number on the project overview map. See redlines for additional information. [IPRC] Sheet 2 of 4 8. Add the typical Town of Oro Valley Paving and Grading Notes per the TOV Subdivision Street Standards. [Town Zoning Code 22.9.E.2] Sheet 3 of 4 9. Provide wedge curb and vertical to wedge curb transitions for the sewer easements on the north side of Naranja Drive if this is acceptable to wastewater. If an apron must be used, the path will need to meander away from the back of curb to the back of the apron to keep the transitions out of the path. [Town Zoning Code 22.9.E.2] 10. Show/identify the limits of the Naranja Drive paving and subdivision paving improvements. [IPRC] 11. There are several inconsistencies between the plan and profile (rim elevations, stations, street names, etc.). Revise as necessary. See redlines for additional information. [IPRC] Sheet 4 of 4 12. There are several inconsistencies between the plan and profile (rim elevations, stations, street names, etc.). Revise as necessary. See redlines for additional information. [IPRC] You may contact me at (520) 229-4824 if you have any questions. Sincerely, Josh Potter, P.E. Senior Civil Engineer Attachment: Redlined Improvement Plans CC: File eng-g-blk2-01-20140408