Loading...
HomeMy WebLinkAboutIP191502� : A Eagles Rest Offsite Improvement Plans for Moore Road I P 1915-02 Review of plans dated 5-15-15 The Town of Oro Valley, Engineering Division has finished reviewing the Eagles Rest Offsite Improvement Plans for Moore Road and provides the following comments: (1) Sheet 2, Note 29: Add "and in compliance with the MUTCD, latest edition." (2) Sheet 3, Plan View Note at Sta. 18+82: Revise the match point to extend to approximately 15+60 to tie into the existing curb and provide the proper lane widths. Modify the existing catch basin top and provide a curb inlet along the new curb that ties into the existing catch basin structure. (3) Sheet 3, Plan View Note at Sta. 22+60: All pavement match points shall be sawcut and tied in at a 45 degree angle to traffic flow. (4) Sheet 4, Profile View Note at EX MH 4712-16: Add RWRD SD 211. (5) Sheet 5, Profile View Note at EX MH 4712-40: Add RWRD SD 211. (6) Sheet 6, Detail D — Riprap Slope Detail: Permanent slope improvements are shown in the ROW and will require a license agreement with the Town. The grouted riprap on the 1:1 slope shall have a toedown at the top and bottom of the slope (as well as those shown on the side transition slopes). The dumped rip rap on the west side 2:1 slope shall be surrounded by a concrete header. (7) Sheet 6, Detail E — Storm Drain Profile: The new MH at Sta. 34+22.08, 6.92'Rt shall be relocated to provide a minimum 0.50% slope on new 24" RCP. (8) Sheet 7, Striping Note 6, Striping Note 7 and Pavement Markings Quantities Table: Replace "Reflective Paint" with "water base traffic paint and reflective beads 15 mil thick" (9) Sheet 7, Signing Note 1: Add "All regulatory signs shall be HIP sheeting." (10) Sheet 7, Signing Note 6: Revise as follows — "All warning and regulatory signs shall be HIP sheeting", "advance street name signs (D3-2)", remove "No parking ... All school... diamond grade sheeting." (11) Sheet 7, Signing Quantities Table: Add a quantity for HIP sheeting. (12) Sheet 7, Signing Quantities Table Note 3: Add "Reuse of post shall be approved by the Town Engineer or Designee." (13) Sheet 8, Remove Gore Area YS12 striping and revise associated YDS4 to YS4. Revise tie in Sta. from 16+01.53 to approximately 15+60, to coordinate with comment to revise curb tie in point. (14) Sheet 8, At all intersections, add WG6(2x6) striping per PC/COT Pavement Marking Standards Sheet 3-8. (15) Sheet 8, Near Sta. 28+75: Install new advance street name sign in median for Morgan Ranch Rd. v - ► A Development and Infrastructure Services April 8, 2015 Nicole Cantalicio Lennar Arizona, Inc. 3275 W. Ina Road, Suite 275 Tucson, Arizona 85741 Via email: nicole.cantalicioe-lennar.com Re: 15t Review, Eagles Rest Off -site Paving Plan, IP1915-02 Dear Nicole, Thank you for submitting the abovementioned plans. Based on your recent submittal, staff offers the following comments. Planning does not have any comments on the abovementioned plan. The Planning review has been deemed complete. We look forward to assisting you with your project. Should you have any questions, please contact me at (520) 229-4812. Sincerely, Michael Spaeth, AICP Senior Planner Town of Oro Valley 520.229.4812 mspaeth(@-orovalleyaz.gov cc: Ben Becker (ben.beckerO-cbre.com) Regina Beem (rbeeme-psomas.com) Tim Johnson File Planning Permitting Inspection & Compliance Engineering Operations Transit (520) 229-4821 (520) 229-481 5 (520) 229-4815 (520) 229-4894 (520) 229-5070 (520) 229-4990 Caring for our heritage, our community, our future. 11000 N. La CaPiada Drive - Oro Valley, Arizona 85737 . Fax (520) 742-1022 •.Www.orovalleyDlS.com - Laws, David From: Regina Beem < Sent: Tuesday, June 23, 2015 2:02 PM To: Laws, David Cc: Nicole Cantalicio Subject: FW: Eagles Rest Moore Road Design Attachments: Moore Road - Proposed Cross Sections.pdf David, One more clarification item ... Nicole also mentioned this morning that Paul may want additional information on the offsite paving, i.e. the striping connection from existing Moore Road to the proposed improvements. Below is our email summary to Lennar that described the two options we discussed with you and Jose and the outcome of the meeting. Please let me know what additional information we can provide on the plans to help clarify the design intent. Thanks, Regina Beem, PE, ENV SP, LEED AP P S O M A S I Balancing the Natural and Built Environment 520.292.2300 www.Psomas.com From: Regina Beem Sent: Friday, February 13, 2015 9:13 AM To: Nicole Cantalicio;'Kevin Tarbox' Cc: Tom Lodge Subject: Eagles Rest Moore Road Design Nicole and Kevin, We met with David Laws and Jose Rodriguez at Oro Valley last week and presented two options for the Moore Road widening. The reason for the two options is that Moore Road to the east is a standard 32' of pavement on each side of a 20' median, while the existing section to the west has 36' of pavement with curb and gutter for eastbound traffic (to accommodate the existing two-way traffic in front of our project) and 32' of pavement for westbound traffic. This creates a 6' disparity (4' extra pavement + 2' gutter) when connecting the sections. The attached cross sections show the concept of the two options. Option A — matches the existing cross section to the east and holds a consistent section of 32' of pavement on both sides of a 20' median. The median will have vertical curb on both sides and the edge of the road will use curb and gutter. They will allow a reduced striped gore at the west end of the project so that the existing curb and catch basin in that area can remain intact. This option removes approximately 500' of curb and gutter that may have been salvageable in Option B. Option B — holds the existing 36' of pavement and curb and gutter for the eastbound travel lanes and ties in to the existing eastern section with a fairly short transition. This option would preserve approximately 500' of curb and gutter, however there would be multiple transitions along the median from vertical curb to curb and gutter. The extra 6' of driving surface (includes gutter area) would have to be added to one or both of the eastbound travel lanes. After discussion on both options, Oro Valley decided they would like us to proceed with Option A. They did not want the extra 6' of driving surface in one or both of the eastbound travel lanes since this could cause confusion to drivers. They agreed to use a reduced gore area at our connection point to the west so we can preserve the existing curb and catch basin in that area. We have full size print outs of each of these options that we can go over with you if you need more information. Please let me know if you have any questions. Thanks, Regina Beem, PE, ENV SP, LEED AP P S O M A S I Balancing the Natural and Built Environment Project Manager Planning I Civil Engineering I Consulting 333 E. Wetmore Road, Suite 450 Tucson, AZ 85705 1520.292.2300 www.Psomas.com t c' 1 � BUILDING SAFETY DIVISION PROJECT ROUTING 4 Date: March 17, 2015 Building Permit Application Approval PROJECT Name: Address: 610 W MOORE RD OV - Plan Review/Permit #: G1500005 Contact #: 747-0997 A Building Permit Application has been submitted to the Town Building Safety Division for the aforementioned project. If you have concerns, comments, requirements, or suggestions that would affect the issuance of:a building permit, please notify the Building Safety Division. as soon as possible. Please return this packet to the Building Safety Division as soon as you have completed your review or if you have access to the Permits Plus system, place your approval and comments in the appropriate location within the system. Separate comment sheets may be used, if necessary. Thank you. Planning and Zoning Review: Approved: Denied: Initial/Date: G ding/Engineering Re iew: Approved: Denied: Initial/Dater ) Water Utility: Improvement Plans Approved: Denied: i Fire Flow Available?: Initial/Date: , ONE SET PLANS Fire Marshal: Approved: Denied: Initial/Date: Police: ONE SET FOR FILE Economic Development: ONE SET FOR FILE TOWN OF ORO VALLEY DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARMENT 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.orovallevaz.gov/dis 1.2 GENERAL APPLICATION FORM Application Type ❑ Major General Plan Amendment ❑ Rezoning/PAD Amendment ❑ Planned Area Development ❑ Conditional Use Permit ��'ot J El Code Amendment P1,❑ Conceptual Site Plan MAR 16 ?p � g ❑ Conceptual Public Art ❑ Conceptual Architecture BY. ................. ❑ Final Site Plan ❑ Conceptual Landscape Plan ❑ Final Plat ❑ Pre -Application ❑ Zoning Verification ❑ Sign Criteria ❑ Sign - PAD Exemption ❑ Master Sign Program ❑ Communication Facility —Tier 1 and 2 Minor ❑ Communication Facility —Major ❑ Revised Development Plan ® Other Grading, Paving & Sewer, Offsite Paving Subject Property Information: Address: 610 W. Moore Road Parcelrrax Code: 219-22-0040 Subdivision / Commercial Center Name: Eagles Rest Book / Page or Sequence Number:. Lot Number(s) Lots 1-75 Legal Description: SE 1/4 of the SE 1/4 of Section 26 8ection/Township/Range: Section 26, T11S, R13E, G&SRB&M Area of Property. 39.02 ac Existing Land Use: R1-144 Proposed Land Use: Rancho Vistoso PAD, Neighborhood 10, MDR Applicant Information: Applicant *: * If more than one, attach list Name: Nicole Cantalicio Firm: Lennar Arizona, Inc. Address: 3275 W. Ina Road, Suite 275 City: Tucson State: AZ Zip: 85741 Telephone: (520) 747-0997 Fax: (520) 747-0989 Email: nicole.cantalicio@lennar.com Property Owner(s) if different from Applicant *: Name: Kenneth W. Olson Family Living Trust Firm: ATTN. Ben Becker with CBRE Address: 610 W. Moore Road City: Oro Valley State: AZ Zip: 85755 Telephone: (520) 323-5149 Fax: Email: ben.becker@cbre.com Consultant: Civil Engineer Name: Regina Beem, P.E. Address:333 E. Wetmore Rd., Suite 450 Telephone: (520) 292-2300 (Discipline) Firm: Psomas City: Tucson Fax: (520) 292-1290 Email: rbeem@psomas.com State: AZ Zip: 85705 Project Description/Narrative: Proposed 75 lot single-family detached residential subdivision encompassing 26.57 developed acres. The site is locatedon a no si e o oore oa a ween a ana a rive an anc o is oso v . I hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The approval of this application does not presume to give authority to violate or cancel the provisions of any other federal, state or local law for which this project may be subject to. Notice: It is the applicantlowner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions & Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners Association or property management to determine applicable requirements. It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance. Failure to do so may delay issuance of permits. See attached list of agencies. Applicants Signature Print Name Date Important Note: All submittals received after 4:00 p.m. will be processed the next day Submittals will be reiected if: • Not folded using Pima County fold & collated; • There are missing items on the checklist unless otherwise approved by Planning Division Manager or Town Engineer. • Re -submittals cannot be accepted without a transmittal and a written narrative summary describing the purpose of submittal. 2 G°LeA o GOLDER RANCH FIRE DISTRICT Fire and Life Safety Division r ! T gANCH International Fire Code (IFC) 2012 Edition Compliance Review TO: Town of Oro Valley Development Services Building Safety Division FROM: William Loesche, Fire Marshal DATE: 04/08/15 PROJECT: Eagle Rest Subdivision 610 W. Moore Rd., TOV TOV PERMIT #: G1500005 REVIEW: Fire Code Compliance Review of Building Permit Application Documents Review Type: First Review Received on: 03/18/15 Review Status: Approved Review Due Date: 04/10/15 Occ Type ''=Const.T e- I Area S.F Stories Height . Occ. Load ' S dnkler Fire Alarm Fire Flow Submittal Re resents= Gradin Plans Deferred Submittals.. - Water. Plan Status , Current Fire -Flow Status Current Fire`A aratus Access -Status IFC=Standard 901 Acknowledgment Does Fire Approve of, PermitIssuance? Approved The Building Permit Application of the above referenced project is in review for compliance with the Town of Oro Valley and Golder Ranch Fire District Fire Code and Standards. K 1.1 N/A Section 11— Building Permit Application Fire Code Review Comments: 2.1 No comments The documents submitted for permit review are in compliance with the fire code and are approved. Approval of plans and specifications shall not be construed to be a permit for, or approval of, any violation of any provisions of the Fire Code and shall not be deemed to nullify any provisions of local, state, or federal law, regulation, or code. Section III — IVR Inspections Oro Valley Building Safety Division, please add the following fire inspection codes to the IVR System. IVR Fire Code Inspections X 09026 C of O FIRE APPROVAL Call 825-5959 X 05290 FIRE CODE GENERAL CALL 825-5959 Please email or call me with any questions related to any of the above Fire Code comments. William Loesche Fire Marshal Golder Ranch Fire District & Town of Oro Valley (520) 818-1017 wloesche cc arfdaz.gov TOV: No sets of plans to be returned Golder Ranch Fire District, Fire and Life Safety Division, 3885 E. Golder Ranch Dr., Tucson, Arizona 85739 Office:520-818-1017 Fax:520-825-5987 www. rfg daz.gov wloescl1ena rfg daz ov Proudly Serving Our Community with Strong Hands & Caring Hearts Since 1977. Serving as the Fire Marshal for the Town of Oro Valley since 1999.