Loading...
HomeMy WebLinkAboutOV110603TOWN OF ORO VALLEY COMMUNITY DEVELOPMENT DEPARTMENT Planning and Zoning • Building Safety 11000 N. La Canada Drive, Oro Valley, AZ 85737 - (520) 229-4800 - Fax (520) 742-1022 Oro Valley Public Library 1305 W. Naranja Drive, Oro Valley, AZ 85737 - (520) 229-5300 • Fax (520) 229-5319 June 21, 2007 Paul Oland WLB Group 4444 W. Broadway Blvd. Tucson, AZ 85711 881.748o Fax: 881.7492 Richard Maes Stone Canyon LLC 1121 W. Warner Road, Suite log Tempe, AZ 85284 480.831.2000 Fax: 480.893.i6o4 RE: OVi1-o6-03, WLB Group, representing Vistoso Partners, requests approval of a General Plan Amendment and Rancho Vistoso PAD amendment for Rancho Vistoso Neighborhood 5, Parcels 5-I and 5-R (Parcels #219-20-052Q & 219-54-oo6A). Dear Paul and Richard, Thank you for submitting a General Plan Amendment for Rancho Vistoso Neighborhood 5, Parcels 5-I and 5-R. Staff received the tentative acceptance letter from the Amphi School district on March 30, 2007 (attached). As a result of this letter, the core development issues identified require inclusion into this General Plan amendment. These issues require changes to the provided exhibits for the Planning and Zoning Commission. This information is discussed in greater detail below. Items required prior to Public Hearings at Planning and Zoning Commission: 1. The parcel indicated for the proposed school site has not been platted. It is difficult to provide any accurate information for a parcel that does not exist. Therefore, the site is required to be platted prior to proceeding in order to permit proper analysis. This can be accomplished through a minor land subdivision. Please submit this application (attached). 2. Two neighborhood meetings are required — one prior to the Planning and Zoning Commission meeting and one prior to the Council hearing. Therefore, it would be prudent to begin the neighborhood meeting process. Please provide staff with the specifics of the first neighborhood meeting. Notification procedure and distances are specified in the attached handouts. Generally, the distance for notification is 1,000 feet. www.townoforovalley.com Please ensure that the notification procedures "jump across right-of-ways" and does not divide subdivisions in any way. 3. Furthermore, two public hearing shall be held before the Planning and Zoning Commission (in different locations). Therefore, it would be prudent to begin looking for a location for the second public hearing within the General Plan amendment area. 4. All General Plan amendments shall utilize the Town of Oro Valley's GIS files. Using these files, revise the exhibits to show the future extension of Arrowsmith Drive and re -alignments and re -configuration of Moore Road, as well as the correct parcel information. The GIS files will also provide the calculation for the open space trade (roughly 1.9 acres). 5. Revise the General Plan Amendment exhibit — proposed conditions to reflect the realignment and reconfiguration of Moore Road per the submittal narrative if Moore Road is not intended to connect across the Big Wash and link the east and west portions of Rancho Vistoso Boulevard. If this re -alignment is not done concurrently with this application, a future General Plan amendment will be required. Staff suggests combining these items. 6. Revise the General Plan Amendment exhibit to delineate the Town ROW system as it is depicted within the current Town of Oro Valley General Plan — Figure 4. In addition to the arterials shown in the exhibit, this comment includes the delineation of the collector street system. 7. Provide additional analysis in the narrative specifically addressing General Plan visions, goals, and policies, with specific emphasis on the following issues: compatibility, traffic, and open space. Address the letter to the Planning and Zoning Commissioners of Oro Valley and specifically focus on the following policies: • "The amendment will not adversely impact the community as a whole, or a portion of the community without an acceptable means of mitigating these impacts through the subsequent zoning and development processes." • "How the proposal will consider development impacts on natural rolling terrain and emphasize low -density developments in these areas. This will include evaluating areas with slopes of fifteen percent (15%) and greater for development compatibility and safety, with the possibility of preserving them as natural open space". • "How the proposal will have new development to locate uses that depend on convenient transportation access (e.g., higher density residential and commercial) near major arterial streets". "The proposed change is sustainable by contributing to the socio-economic betterment of the Community, while achieving community and environmental compatibility". 8. Provide detailed calculations of the areas of the individual areas to be modified and/or traded and label them on the maps in regards to the proposed open space trade area for the new school site. Trades are required to be at a 1:1 ratio and require approval from the Planning and Zoning Commission and Town Council. Please review the attached "Criteria for Development" information. The following issues will be conditions of this General Plan amendment: 1. A meaningful open space trade of a 1:1 ratio shall be proposed for review and approval to from the Planning and Zoning Commission and Town Council. 2. East Arrowsmith Drive shall be extended north and connect to Moore Road east of Rancho Vistoso Boulevard. 3. Public gravity sanitary sewer shall be extended from the existing Pima County Wastewater Management connection point to service the identified future Amphitheater School site. 4. Provide a floodplain analysis for Big/Honey Bee Washes adjacent to parcel 5-R which determines the location of the loo-year flood limits and describe mitigating measures that will be needed to provide the acceptable buildable land area required by Amphitheater School District. Items required for Resubmittal: o Minor lands subdivision application for staff review and approval. Proposed school site is required to be platted prior .to proceeding to the Planning and Zoning Commission. o Ten copies of 24"x36" and 11"M7" color copies are required. For the Planning and Zoning Commission hearing, twenty-eight (28) color copies 11"x17" sized are required. The required maps are as follows: • Map showing existing General Plan Land Use Map categories; • Map showing proposed General Plan Land Use Map categories; • Map showing existing Rancho Vistoso PAD zoning categories; • A side -by -side comparison of existing and proposed General Plan Land Use Map categories/ Rancho Vistoso PAD zoning (similar to map created for the Oro.Valley Marketplace). All these maps will be created using the Town of Oro valley's GIS files — which was provided for your use via email June 21, 2007. o Submit all files digitally on CD using the Town's GIS files (both CAD files and GIS shapefiles). o Synopsis from neighborhood meeting, with sign -in sheet. Additional items to be submitted include the address list of all notified person and a copy of the letter sent with the notification of the neighborhood meeting. Additionally, a Rancho Vistoso PAD amendment is required. A Site Analysis and Tentative Development Plan are required to be submitted. The Tentative Development Plan (TDP) checklist (Section 3-104) for PAD amendments has been previously provided for your use. If you have any questions about this process, we would be happy to schedule a meeting with you. As a reminder, in addition to the General Plan amendment revised exhibits (ten copies), the following item swill be required to process the PAD amendment. We understand that this item will be processed separately from the General Plan amendment. 1. A narrative addressing the following: a. How the proposal is in compliance with the Golf Course Overlay District. b. What the current conditions are — size of parcels (in acres and square feet). c. Proposed land use changes with the approximate area of each land . use to be modified, and the new proposed use. d. Proposed density of the "proposed" medium density residential site. e. Site constraints, such as access, slopes and floodplains; A meeting with the Amphitheater School representative to discuss the General Plan Amendment proposal is schedule for June 28th, 2007 at 2 pm at our offices. We look forward to your participation at this meeting. We look forward to the successful completion of this project. If you have any questions, please contact me. Most Cordially, Pamela J. Pelletier Planner 520.229.4813 ppelletier(@orovalley.net Attachments: Minor Land subdivision application; "Criteria for Development"; General Plan excerpts. Policy Document AdoptedJune 15, 2005 Yes I Neighborhood Meeting I P&Z Hearing Submittal Oro Valley General Plan Application submitted during an approved submittal window. Major? No Public Notification Neighborhood Meeting Provides a recommendation to TC P&Z Hearing Town Council Hearing Minor Amendment Procedure. To coordinate the review of amendments to the General Plan, minor amendments may only be submitted during two, two -month periods of the year. They must include at least one neighborhood meeting early in the process for all changes to the Land Use Map. Major Amendment Procedure. Major Amendments: ■ May only be submitted at one time during the year; ■ Must go to two public hearings by the Planning and Zoning Commission (in different locations); ■ Shall include two neighborhood meetings, one prior to the Planning Commission and one prior to the Town Council; ■ Must be presented to the Council at a single public hearing during the calendar year that the proposal is made; and ■ Must be adopted by a two-thirds vote of the Town Council. Text amendments may not require neighborhood meetings. Public Notification. Major amendments will include a public involvement program consistent with state statutes. In addition, public notification for all General Plan amendments will be as follows: ■ Notice of the proposed amendment will be advertised a minimum of two times in two widely distributed newspapers. ■ All property owners within 1,000 feet of the subject property and all adjoining properties will be directly notified of the amendment. ■ All Homeowners Associations (as listed in the Town HOA database) will be notified of the amendment. ■ Signs noticing the proposed amendment will be posted on the property on a sign or signs 3'x4' in size, with white background and 5-inch letters. Introduction 12 Oro Valley General Plan Policy Document Adopted June 15, 2005 Adoption of Amendment. The disposition of the General Plan amendment proposed shall be based on consistency with the vision, goals, and policies of the General Plan, with special emphasis on: 1. The proposed change is sustainable by contributing to the socio-economic betterment of the Community, while achieving community and environmental compatibility; and, 2. The proposed change reflects market demand which leads to viability and general community acceptance; and, 3. The amendment will not adversely impact the community as a whole, or a portion of the community without an acceptable means of mitigating these impacts through the subsequent zoning and development processes.. The applicant for the amendment shall have the burden of presenting facts and other materials to support these conclusions. PROJECT CONFORMANCE WITH PLAN Arizona State Law requires that zoning be in conformance with the General Plan. ARS Section §9- 462.01 F defines conformance as follows: "a rezoning ordinance conforms with the land use element of the general plan if it proposes land uses, densities or intensities within the range of identified uses, densities and intensities of the land use element of the general plan." All rezoning proposals and development projects shall be evaluated for conformance with the Plan. Rezoning Conformance Per the Town's zoning code, "[a]ny new proposal for development, which does not comply [with the General Plan], will be subject to denial by the Town Council." Thus, new development proposals must match the land use map in accordance with the Town's zoning code and the requirements of the State statute referenced above. Further, the Growing Smarter Acts, as noted by the Arizona Department of Commerce Community Planning Program, require that "all rezoning ordinances and regulations adopted shall not only be consistent with, but must conform to the adopted General Plan. The rezoning ordinance shall further the implementation of, and not be contrary to, the goals, policies, and applicable elements of the Plan. A rezoning ordinance conforms to the Land Use Element if it proposes land uses, densities or intensities within the range for the subject property as stated in the General Plan." To this end, proposals for zoning change should be evaluated in relation to all of the policies in the General Plan (not just the map and those in the Land Use Element). When a proposed zoning change is not in compliance, the applicant will be required to amend the General Plan, or the proposal, prior to initiating a rezoning. Development Review General Plan conformance shall also be used as a criterion in the approval or denial of other types of development proposals, such as development plans, plats, and architecture. When considering a development proposal, Town staff, the Planning and Zoning Commission, the Development Review Board, and the Town Council will evaluate the proposal as to how it relates to the key concepts in the General Plan. It is the burden of the applicant to provide clear and convincing proof, through an analysis of each applicable policy, that the proposal is in conformance with the General Plan. 13 Introduction Oro Valley General Plan Policy Document AdoptedJune 15, 2005 Table 1: General Plan Amendment Matrix Pro osed Desi nation (Change To) Existing Designation'' PSP& (Change From) R-LDR LDR1 LDR2 MDR HDR MPC RGC NCO CRC COP SCH PARK OS R-LDR ry a �. .,._ x a« . !s a..�.,_ LDR2:, MDR r� r,^ X HDR � "� a � ■ k-. MPCZ See footnote #2 below RGC ■,.•�; � ��� �� ��;� �'��, u�,�� .� �"*,�' ;� ,��� NCO �ttr �,� �,�*,• �.� �,,a ' %t ■ '= a �' E �,�.��,? ��� .. ,�s)�xy° CRC f� ,.> r>. COP PSP and SCH' ■ PARK r ■, }p¢.� ,an x `} w�� ,.■3 ■ro. n Jos Notes: Major Amendment Minor Amendment No Amendment For a complete definition of the land use designations, please refer to page 23. Amendments to areas designated as MPC will be treated, per the General Plan Amendment Matrix Table, based on the land use and density of the MPC designation. If no specific land uses and densities are called out for the MPC (see Special Area Policies starting on page 26), it will be treated, for the purpose of an amendment only, as MDR and NCO (no more than 10%). Excluding Public Schools. Public schools are not subject to the amendment process. See Special Area Policies starting on page 26. Procedures forAmending the Plan Amendments to the Oro Valley General Plan may be initiated by the Town or by a landowner. Such amendments must be in accordance with the procedures set forth in the Arizona Revised Statutes and the Town of Oro Valley Zoning Code. Arizona State Law requires that all municipalities provide public review of General Plan amendments. All General Plan amendments will follow the additional public notification requirements listed below. All minor and major amendments to the General Plan shall follow the procedures outlined in the following flow diagram: 11 Introduction A 2.0 Ae. A 1 2, 0 4 S A At. 4 9-2 Ar � P 19 F mmw {� a c —_ 4 AMENDMENT AREAS y , N w L 4u lEtEm CHOO b 0 etc d 7HIr�� ✓� � ip� � `* � w - p "dr8 t It 7 `` r c #. p w N 0//''y+. 0318,3 .. x Ag 2.0� 4.5 e} j1 Al J.1 A c . i .qt � ►� A 1.0 1r 14.8)d i. 2 2 ? A r . 8.0 ;,. um -14 ' :. "f Aj bom g /a- AMENDMENT i1 AREAS ' HOSPITAL w:rt 20.0 A . a d, S TA'L 42.8Ac m M TANGERINE ROAD W Q RANCHO VISTOSO NEIGHBORHOOD 5 PROPOSED GENERAL PLAN AMENDMENT EXISTING RANCHO VISTOSO P.A.D. LAND USE PLAN The 20061113 0' 400' 800' 1200' Gro p rm K �VU V 2006 _A185050Weigh5f2006 General Plan Amendment Weigh5 GP Amend X-RVPAD Exhibit.dwg Plotted: Nov. 13, 2006 RANCHO VISTOSO NEIGHBORHOOD 5 PROPOSED GENERAL PLAN AMENDMENT AMENDMENT AREAS ON RECENT AERIAL PHOTO 20061113 The WLB Groupurim ® 0' 400' 800' 1200' L:\1850501Neigh512006 General Plan Amendment 1Neigh5 GP Amend Aenal Exhibil.dwg Plotted: Nov. 13, 2006 IV RD Legend Oro Way Lhnb _Resort l GPd G.-. G—th A,.. Neigtft,- d Commercial; 00ka Lkb- Services Baundery Nbir.; Sa WubliC Ruml Low Densly Resldenliel {O- 0.3 OU/AC) - Canmamy, l Regional Oommercal L— Oonsity Residential(0.4.1"2 MAC) Cmrmmca i OIFce P.r Low Density Residenial (1.3 - 2-0 DIRAC) - Sdmo1 Medium Dansily Residential (2 1 • 5 OIAAC) Open Sprce " Higa Dene4y Residerdiel (5e DUTAC) ' PARK Master Planned Canmunity Bigmtkanl Res -Maas EnBinope PiannlnB Surveying E",,In g T The turn D9a gn In Tlla9an, Phaanlx Offl I Wd In In to �� and Las Vagaa Group 4aaa Eaat 0roatlway dO � T�®ar,,A.rizoaa c32D,BB,_,4BD 1-7 f RID ; 600 wA lw PROPOSED I 1 LAND USE EXISTING PROPOSED NET CHANGE MDR 20.0 AC. 36.3 AC. +16.3 AC. SCHOOL 36.3 AC. 36.3 AC. O AC. RESORT / GOLF 16.3 AC. O AC. —16.3 AC. TOTALS: 72.6 AC. 72.6 AC. RANCHO VISTOSO PARCELS '5-I' & '5-R' PROPOSED 2006 ORO VALLEY GENERAL PLAN AMENDMENT ®6%.PEEI ] 0' 800' 1600' 2400' SEP 2 The Group Inc. September 29, 2006 Ms. Sarah More, FAICP Planning & Zoning Administrator Town of Oro Valley 11000 North La Canada Drive Oro Valley, Arizona 85737 Engineering • planning Surveying • Urban Design Landscape Architecture SUBJECT: General Plan Amendment in Rancho Vistoso — Neighborhood Five Oro Valley, Arizona WLB No. 185050-A-005 Dear Ms. More: This letter is intended to accompany an application to amend the Oro Valley General Plan within Rancho Vistoso Neighborhood Five. This proposed amendment is not broad in scope, but rather focuses on the location of the designated school site within Neighborhood Five. This proposed amendment would not adversely affect the public. In fact, as explained below, this amendment would reduce commute time to and from school, thus slightly reducing traffic volumes on nearby streets and lessening the need for Moore Road to eventually cross Honey Bee Wash and connect to the current school site location. Parcel 5-1 is currently designated in the General Plan as "School" and in the Rancho Vistoso PAD (RVPAD) as a "Junior— Senior High School". Amphitheater School District has determined that their long-term needs would be served more efficiently and effectively by relocating the designated school site onto Parcel 5-R, which is near Rancho Vistoso Boulevard and Arrowsmith Road, approximately one mile southwest of the current school site location. The most apparent reason for this determination is that the bulk of the student population that is anticipated to eventually attend the school will live to the west of Rancho Vistoso Boulevard, especially in Neighborhood Ten, and beyond. Thus, relocating the school site from Parcel 5-1 to Parcel 5-R brings the school in closer relation to its anticipated service area. Parcel 5-R is currently designated in the General Plan as "Medium Density Residential" and in the RVPAD as "Medium -High Density Residential". We have met with the District on several occasions and have agreed to provide an equivalently sized school site on Parcel 5-R and surrounding area currently designated in the General Plan as "Resort / Golf Course" and in the RVPAD as "Recreation Area / Golf Course". Conceptually, the future school buildings would be constructed within the existing buildable limits of Parcel 5-R, while portions of the future sports fields would extend into the current golf course area to the east. The proposed amendment would essentially reverse the Parcel 5-1 / Parcel 5-R land use designations in both the General Plan and the RVPAD so that 5-R becomes the designated school site and 5-1 becomes medium -high density residential. The entitled portion of Parcel 5-1 is approximately 16 acres larger than the entitled portion of Parcel 5-R. However, the entitled portion of Parcel 5-1 is unconstrained by excessive slopes orflood plains. In addition, the Rancho Vistoso PAD allows up to 3555 dwelling Engineering • Planning • Surveying • Urban Design • Landscape Architecture Offices located in Tucson, Phoenix, Las Vegas • E-mail: tucson@wlbgroup.com 4444 East Broadway • Tucson, Arizona 85711 • (520) 881-7480 • FAX (520) 881-7492 Mr. Sarah More, FAICP September 29, 2006 Page 2 units within Neighborhood Five, of which only 650 have been developed, and less than 170 entitled acres remain. As such, the entire entitled portion of Parcel 5-1 has been designated as Medium Density Residential in this General Plan amendment. This proposed amendment is needed in order to secure the school site desired by the School District. If you would like to discuss this issue or if you have any questions, please contact me. I look forward to continuing this process with you. Sincerely, THE WLB GROUP, INC. stav Paul Oland Project Manager Land Planning Department Cc: Dick Maes, Vistoso Partners Todd Jaeger, Amphi School District Ken Scoville, Amphi School District L:\185050\Neigh5\2006 General Plan Amendment\20060929 N5 Gen Plan Amend Cover Ltr.doc o�O�PLLEY Ay/ '0 r 2006 "OUNDED A'1" TOWN OF ORO VALLEY, PLANNING AND ZONING 11000 N. LA CANADA DRIVE, ORO VALLEY AZ 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.townotorovalley.com APPLICATION FORM OV Case # (Office Use Only): C `� Application Type: General Plan Amendment A. Project Manager/Developer Name: Gustav Paul Oland Firm: The WLB Group, Inc. Address: 4444 E. Broadway Blvd. City: Tucson State: AZ Zip: 85711 Telephone: 520.881.7480 Fax: 520.318.6170 Email: gpoland@wlbqroup.com B. Property Owner (s), if more than one owner, attach list Name: Please see attached list. Firm: Address: City: State: Zip: Telephone: Fax: Email: C. Subject Property Parcel/Tax Code: Portions of 219-54-006A & 219-20-052Q. Legal Description/Property Address: Rancho Vistoso Neighborhood Five, Parcels 5-1 and 5-R. Area of property: +/- 56 Acres. Existing Zoning: PAD Proposed Zoning: PAD Is Proposed Zoning in conformance with General Plan designation? [ X ] N/A [ ] Yes [ ] No General Plan Designation: School (Parcel 5-1) and MDR (Parcel 5-R). Existing Land Use: Vacant. Proposed Land Use: MDR (Parcel 5-1) and School (Parcel 5-R). D. Previous Applications Relating To This Property OV8- (- Ord. No.157 OV10- OV11- OV12- OV13- E. Reason For Request Amphitheater School District has requested that their designated school site be relocated from Parcel 5-1 to Parcel 5-R. This request essentially switches the land use designations on the two parcels in order to accommodate the school district's desires. This application is true and correct to the best of my knowledge. I am the owner of the above described property or have been authorized by the owner to make this application. Date Signature 2007 Pima County Assessor Property Inquiry Search Paree12006 Paree12005 History ax Summary 0enealop�, PRC Parcel • '��0 4 0 Book -Map -Parcel: 219-54-006A Taxpayer Information VISTOSO PARTNERS LLC 1121 W WARNER RD STE 109 TEMPE AZ 85284 0000 1)2scripgiou PTN E2 NE4 & NE PTN SE4 44.34 AC SEC 36-11-13 Secondary Valuation Data Legislative Class Land VACANT/AG (4 0) Improvements VACANT/AG (0 0) 2006 Personal Property Gross Value Totals 2006 LNITD/SCND Exemptions Net Value Totals PriorLimitedValue: $500 TaxArea:1012 TaxYear:2007 Recording Information Docket 9737 Page 1102 Date Feb-25-1994 mlscerhalleous Section 36 Twn 11.0 S Rng 13.0 E LandMeasure 44.34 A MarketArea: (423) Tract Block Lot GroupCode 000 CensusTract 4611 UseCode 4710 File -Id 1 Date of Last Change Jul-12-2005 Full Cash Percentage Assessed $500 16.0 $80 $0 0.0 $0 S500 $80 $500 $80 CurrentLimitedValue: $500 Map Selection(s) S36.dwg 1113E36.TIF ParcelNote: RESIDUE 2003-RESIDUE OF 219540060 AFTER 10285/323,NO NOE gwong Feb-20-2003 2007 Pima County Assessor Property Inquiry Parce12006 History lax Summary C000100y PRC Parcel M 4► Book -Map -Parcel: 219-20-052Q TaxPayer Information VISTOSO PARTNERS LLC 1121 W WARNER RD STE 109 TEMPE AZ 85284 2819 Description IRR PTN SEC 19 29 30 31 731.25 AC T 1 1 S R 14E Secondary Valuation Data Legislative Class Land VACANT/AG (4 0) Improvements VACANT/AG (0 0) 2006 Personal Property Gross Value Totals 2006 LMTD/SCND Exemptions Net Value Totals PriorLimitedValue: $7,313 TaxArea:I012. TaxYear:2007 Recording Information Docket 9737 Page 1102 Date Feb-25-1994 Miscellaneous Section 19 * Twn 11.0 S Rug 14.0 E LandMeasure 731.25 A MarketArea: (423) Tract Block Lot GroupCode 000 CensusTract 4611 UseCode 4710 File -Id 1 Date of Last Change Jan-20-2006 RANCH PROPERTY' Full Cash Percentage Assessed $7,313 16.0 S 1,170 SO 0.0 SO $7,313 S 1,170 S7,313 S 1,170 CurrentLimitedValue: $6,845 Limited Value Rule-N: 200,7.Audit2006.Audii Recordings 9240^ 322 0 7871^ 1022 0 7850^ 1290 O Map Selection(s) S19.dwg 1114EI9.TIF NOTICE In addition to the Town of Oro Valley (the "Town"), there may be other jurisdictions affecting development of this property. If a property developer waits until late in the development process to contact other pertinent governmental agencies or bodies, additional expense and time in coordination, redesign and development may be a result. Examples of other governmental agencies and/or bodies that may have overlapping jurisdiction over this property include but are not limited to the following: Federal: State: County: The United States Department of the Interior, Fish and Wildlife Service is responsible for Endangered Species Act compliance, etc. Please note, habitat has been designated with the Town. U.S Fish and Wildlife Field Division 2321 W. Royal Palm Rd., Suite 103 Phoenix, AZ 85021-4951 Phone (602) 640-2720 Fax (602) 620-2730 The United States Corps of Engineers: This agency is responsible for management of jurisdictional waters, etc. Section 404 consultations may be required on properties that contain washes. U.S. Army Corps of Engineers 5205 E. Comanche Davis Monthan AFB Tucson, AZ 85707 Phone (520) 584-4486 Fax (520) 584-4497 Arizona Department of Environmental Quality: This agency has multiple responsibilities. Please contact directly for further information. ADEQ 1110 W. Washington Street Phoenix, AZ 85007 (602) 771-2300 Pima County Department of Environmental Quality: This agency has multiple responsibilities. Please contact directly for further information. PDEQ 201 N. Stone Avenue, 2"d Floor Tucson, AZ 85701 (520) 740-6520 Please be advised, issuance of a permit DOES NOT, nor should it be construed, to imply compliance with Federal, State or County regulations. If you have any questions concerning your responsibilities under federal law, please contact the applicable agency. APPLICANT NAME: %Ne 1✓L(S CONTACT PHONE AND ADDRESS: SITE LOCATION: P.o- itia,., 1/is, Case/File Number - 8S7/ i ��P`LEY -P7 4 All A9 " TOWN OF ORO VALLEY GENERAL PLAN AMENDMENT SUBMITTAL REQUIREMENTS Application form Written Narrative (Sec. 22.1) 28 Copies of Proposed Revision to the General Plan Ma P P P 28 Copies Site Location Map (11" X 17") 7. Request for General Plan Amendment signed by the owners of the subject property or by his/her designated agent. Names and addresses of person, firm or corporation having interest in the subject property. (Sec. 22.2E) If Application includes properties other than that owned by the applicant, the applicant shall file a petition in favor of the proposed land use plan amendment by the property owners or their agents or attorneys representing at least 75 % of the land area not owned by the applicant that is to be included in the General Plan Amendment request. ✓: Signed Notification of Potential State and Federal Issues (Attached in Packet Pocket) V/ Fees 71---) 13C P,4-ram �T)f Vt c ya so Clear Day Page 1 of 1 Gay, Shirley From: Pelletier, Pamela Sent: Thursday, March 06, 2008 4:37 PM To: Gay, Shirley Subject: RE: ov11-06-03 RV NB5 Parcels L & R Coming in this month... Pamela J. Pelletier Planner elletier@orovalleyaz.gov (520) 229.4813 From: Gay, Shirley Sent: Thursday, March 06, 2008 4:37 PM To: Pelletier, Pamela Subject: ov11-06-03 RV NB5 Parcels L & R No action on this for a while can I close it? Shirley Gay Development Coordinator 520-229-4849 sQay(o)orovalleyaz.gov Please note new email address 03/07/2008 r VUNDED �9% TOWN OF ORO VALLEY COMMUNITY DEVELOPMENT DEPARTMENT Planning and Zoning • Building Safety 11000 N. La Canada Drive, Oro Valley, AZ 85737 - (520) 229-4800 - Fax (520) 742-1022 Oro Valley Public Library 1305 W. Naranja Drive, Oro Valley, AZ 85737 - (520) 229-5300 - Fax (520) 229-5319 Parks and Recreation 680 W. Calle Concordia, Oro Valley, AZ 85737 - (520) 229-5050 - Fax (520) 797-2202 October 20th, 2006 4-- 4-Ovk I U /a L11b (Q Paul Oland Richard Maes WLB Group Stone Canyon LLC 4444 W. Broadway Blvd. 1121 W. Warner Road, Suite 109 Tucson, AZ 85711 Tempe, AZ 85284 881.7480 480.831.2000 Fax: 881.7492 Fax: 480.893.1604 RE: OV11-06-03, WLB Group, representing Vistoso Partners, requests approval of a General Plan Amendment and Rancho Vistoso PAD amendment for Rancho Vistoso Neighborhood 5, Parcels 5-I and 5-R (Parcels #219-20-052Q & 219-54-006A). Dear Paul and Richard, Thank you for submitting a General Plan Amendment for Rancho Vistoso Neighborhood 5, Parcels 5-I and 5-R. At this time, staff requires the following items to be submitted RELor to scheduling this project for the Planning and Zoning Commission initiation. Additional items may be required by the Planning and Zoning Commission following the initiation. Initiation: 1. First, please note that the parcel numbers provided do not correspond to the parcel locations proposed to be amended (review attached General Plan map and Rancho Vistoso PAD map - the two parcels to be modified are indicated by the blue lines). Provide the correct parcel data on Cl) (CAD files and GIS shapefiles) for staff review. 2. A condition of initiation will be that a letter from the Amphitheater School is provided which states that they approve of the new school site. Please note, if they do not approve of the proposed school site, this initiation cannot move forward. 3. A narrative addressing how conditions have changed since the last adoption (November 2005) of the General Plan. Items required prior to Public Hearinas at Planning and Zonina Commission: 1. A CAD file and GIS shapefile of the future extension of Moore Road shall be submitted. 2. More analysis on the current narrative specifically addressing General Plan visions, goals, and policies, with specific emphasis on the following issues: compatibility, traffic, and open space. Specifically, please focus on the following policies: ..F:\OV\OV11\2006\OV11-06-03 1 www.townoforovalley.com • "The amendment will not adversely impact the community as a whole, or a portion of the community without an acceptable means of mitigating these impacts through the subsequent zoning and development processes." • "How the proposal will consider development impacts on natural rolling terrain and emphasize low -density developments in these areas. This will include evaluating areas with slopes of fifteen percent (15%) and greater for development compatibility and safety, with the possibility of preserving them as natural open space". • "How the proposal will have new development to locate uses that depend on convenient transportation access (e.g., higher density residential and commercial) near major arterial streets". • "The proposed change is sustainable by contributing to the socio- economic betterment of the Community, while achieving community and environmental compatibility"; and, 3. Staff requires ten copies of appropriately -scaled 24"x36" and 11"47" color copies. For the Planning and Zoning Commission hearing, twenty-eight color copies of 11"47" are required. The required maps are as follows: • Map showing existing General Plan Land Use Map categories; • Map showing proposed General Plan Land Use Map categories; • Map showing existing Rancho Vistoso PAD zoning categories; • Map showing proposed Rancho Vistoso PAD zoning categories; and • A side -by -side comparison of existing and proposed General Plan Land Use Map categories/ Rancho Vistoso PAD zoning (similar to map created for the Oro Valley Marketplace). 4. Submit all files digitally on CD (CAD files and GIS shapefiles). 5. Provide more detailed calculations of the areas of the individual areas to be modified and/or traded and label them on the maps. 4. ENGINEERING: a. Revise the General Plan Amendment exhibit - proposed conditions to reflect the realignment of Moore Road per the submittal narrative. b. Revise the General Plan Amendment exhibit to delineate the Town ROW system as it is depicted within the current Town of Oro Valley General Plan - Figure 4. In order to meet the deadline for the December 5th, 2006 Planning and Zoning Commission initiation, these materials should be submitted no later than noon on October 31st, 2006. If the materials are not received by this deadline, then the Planning and Zoning Commission hearing will be delayed. Additionally, a Rancho Vistoso PAD amendment is required. A Site Analysis and Tentative Development Plan are required to be submitted. The Tentative Development Plan (TDP) checklist (Section 3-104) for PAD amendments is also provided as an attachment, The following items are additional items which also need to be submitted for review: 1. First, please note that the parcel numbers provided do not correspond to the parcel locations proposed to be amended (review attached General Plan map and F:\OV\OV11\2006\OV11-06-03 2 Rancho Vistoso PAD map - the two parcels to be modified are indicated by the blue lines). Provide the correct parcel data on CD (CAD files and GIS shapefiles) for staff review. 2. Furthermore, a CAD file and GIS shapefile of the future extension of Moore Road shall be submitted. 3. A narrative addressing the following: a. How the proposal is in compliance with the Golf Course Overlay District. b. What the current conditions are - size of parcels (in acres and square feet). c. Proposed land use changes with the approximate area of each land use to be modified, and the new proposed use. d. Proposed density of the "proposed" medium density residential site. e. Site constraints, such as access, slopes and floodplains; 4. Staff requires ten copies of appropriately -scaled 24"x36" and 11"x17" color copies. For the Planning and Zoning Commission hearing, twenty-eight color copies of 11"x17" are required. The required maps are as follows: • Map showing existing Rancho Vistoso PAD zoning categories; • Map showing proposed Rancho Vistoso PAD zoning categories; and • A side -by -side comparison of existing and proposed Rancho Vistoso PAD zoning. 5. Submit all files digitally on CD (CAD files and GIS shapefiles). 6. ENGINEERING: a. Revise the General Plan Amendment exhibit - proposed conditions to reflect the realignment of Moore Road per the submittal narrative. b. Revise the General Plan Amendment exhibit to delineate the Town ROW system as it is depicted within the current Town of Oro Valley General Plan - Figure 4. The next deadline for a PAD amendment is no later than noon on November 2"d, 2006. The above listed items should be submitted with the attached application form. Staff will require a meeting with you to discuss the aforementioned requirements for both the General Plan Amendment and the Rancho Vistoso PAD Amendment. Furthermore, a meeting with the Amphitheater School representative to discuss this proposal shall occur RLor to an initiation of this project at the Planning and Zoning Commission. If you have any questions, please contact me. Most Cordially, Pamela J. Pelletier Planner 520.229.4813 ppelletier@orovallev.net Attachments: General Plan map; Rancho Vistoso PAD map; Tentative Development Plan (TDP) checklist (Section 3-104); Oro Valley Water comments; General Plan Amendment packet; 4 PAD Amendment packet. F:\OV\OVII\2006\OV11-06-03 e'i "" � fi � . 'k ✓ rxY. w .yY r ;,°Y a+.ai+i � �r +.•. *"'� 'k,:. *+. .. ti l a fi arc ti }Z. d+ ;Fr c r 7#9 ra/y{� y�' ,s'Y ✓9y"v1,'Y`.Fae st k a M► -Zv+Y�t ��i '.i � � � } r k• � ��Iy� y �� �•a �R t y.* r•7 ¢ : z aY i`S' +"' ft �' fi �NO, Qkv �k`'�-'4',".'�'' ,+ `prc Mt, 1, �is�aY'".�!f ya•.� �'„'�^,[ o- d;y SY r�'sr"rt�r •v,��:,,+ J a. � ir�''S,�L°r�' !',�' +,� a �r[,rz >r Y�" ",' ; �"l�ti� s �a�'m r� .. t, a 4 .1A�i.iy'n t4it.+'kc 3�fi !� s4 <i3 Tia Z}: R�ifaT. '�.� %/R A+•'i 4` f �� i,A Y �."a S�N \`�u p 2 4•4"-t �•� L 4 :,� .h'd'.. +arit�;'rA,. .1„�5,7 '1. 1.'r E. d ?yet''"" + j( Ip�Y.+�`+: \��f v�4 `` �f �`y 3•.6 '�..k..G 'r {+a r��Fi '§,'u�.r�`+M' . Ce� '[ s Y � s ,. • ✓, � 4 +�` � ��' of ° Srs'",re �'a$i..i'e�st?-•k .a s + t t E� R �, ,.M' ,� ::4 x�r +w:Ft d tr F ,��+Wy. `'. yy� Tyryr r- n Y., t S S r M A ri # h 4�* yyR ftA r�+ `�,.Y r�y:r ?4'! t Fit lr'•,2Aii y� ' an �c ' •. \+R� r! r ,�'+'.i F,.,+,Y1 yt"•F ;31�bvzZ�°\ �T�•`,3 t ����' Ste` �`y � f:S.r'� ''"�i � � i. n � � !r y{.�� ���� '"1 ir.. •+2' t�s 7'.r` z x �' > - r Y 'F+J7�'17r1�i ���p7 A• +J';F%rg T F . F� 6 r`.,_" �°t'^ 7 c 'i '3 a ° Y" y ..,* '..e ' �ry✓Ay7�}'xi'r•�r,e }y., � �Frj '��e.n'�.+,,r.iL SC aY-�' `k4 a7J �+ �syY $�Ti1� e �;y t�•�S t �h.Q� i vJ r%T-,r:f1* A c k r�cA3;+/FJ�> ,�.rAMEN \�f+. ,75 ���'s �xn`* v•s rj.� {, *•m ^�ht7��fr �'�;��>,':i'k✓�f if+ ,�„,, by�,{/f� 4, gtr/ JY 4'f a...•3s. ti d2 r �'.�. �} t,,' / d?� l�-ctw.. Sr r: 4� /�mLb z� s. e.�„, .,:✓f✓z✓ .(�tl4rj y„r'1 t, R. 'n� sy�'` Yt{P �� �•B J ', i'C 4�� �"{i"cY.: A+.t o �Y� 'T 1 "kW}1Y' Wiit•d� �wxi � �)i'Y A5 '.�` � 'S j` ��^� CYwy _,r �`+'•'Y�sna.,, a Fw ""a'r-%t YRr=� t9'gf A; §E Ai,�'�v' Y ^Ki t, \4t'\"�!'S i re t p''si sr. y�/�..§t,, yt ,ie".` ;S° w •�C tyytie@ t ?f/y is YoK �'rAyr q�,. r487� +ai 9'a$�f•V .k,,..w 1Rsa WON il�w Y+i� Irv- '-V�Y p�P ��.{t�.�,"+^�n "�" ,1' '�'r'�,;- �' :?� u )'S.`'lt �,+ � $'�S's«\�a„Nb �'§G'rO`�'• ^. ,yt.�,rrr`J1fc7�Wd';�a't t;,�r;�,"�g��t'n'�,f"`� ro+t' tg j t wti +•w ANYXPxx✓rc�3diia t at jet 6 >`Ss,fS `4 SdtM• pen Spat,M= x a t d ��r !$ > F T'� y .,• t y2! JCS r+" 4 f ( u -c a C Yr. 3'', •�s, r. tyA�' r �t qr`� ! • r•aa`' 0'" � r. Ai"$1"� p •F ,,�, ✓+`6^'� 516 ^any xE5'". a'.J,r})#X a� a 4 r 'Cr wA •g, ! a dt r\ SM s yY tl.+° r7'/ 7t;11 L +4 tYN r'' ;v 47 tN4 �.x'C yj t4r 4 Yvr„'a �„?•Yx. 3'b J#�+a 'r � t 'y`Jrr i !' 2at3a�g eb Gilt" S"i r r; �YJY A ^'kC "r' >< 4a� 11 + �A o 7"§'','W'}.E,<d�.i S`si j{t 4 IR, w �r �k:d. +'1.4 }" ,?i3• Ope� ��AA��'4`� Y �?��� dW< y r `� 4 Y y r E a a r"ry��+t 4 t Vol �� \,'�'d� f F a •'v r t. p40 `+y ti v� � ,7F � '.: 4 T / + t ` �r . ;+ ",Y 1A✓�:.c i t1q �+.� '[ " 1 � tt t 4�r 1 �•i1+'"{+i �"C � r g*i... -o [ k, P� Y� r g,�f,�'j'{l`� h+� is 1F. y, ".f ,r ,•Y � a "Yr t �. l' '' �A�r ,�'U;Y� [ ..; Y r .a',":�� ♦ e A�r � Itr f`, n F n,c�t �F' � ar I pT ter:. Y "'�•$ '�„1�LY ��:x.,;ai, :. «. v„.Y «.c 'SS wFryi-u'+a�RF. �:Y ..d't'§ nr��'�'� .,���J... .. ri ' a r t,Yp t"tZ t ,/$v r x� k r .-t-'+ J ? [- 2�a\iA' tyrc r i•& Yt�T � r �� • �'r� r a � e $'T �1'>�i` e°'•,ng � xa.A�n iu''W r.� �'�.,,y� v 1 � 4. �i a y� a y`��+ /» f'�' ♦ , 4 � ,. /�f�1' � t. yP y a arA E r ' ; i kj d : PaA GP3 \a §r1�7^� p-`�Y-sd`�t�c'� r* r ��r s t 7gy,� �1 �� �} r. �. a sA .+�.. �4 •"^ i �.'. { .3t. ytx`' x, ,,x 4 a rt � �. -"++•a \lp 4°�'4 g u k SG- r = � ',�' a ,�� + *>� x' .*Ya t s id't ?` V.t .k{D�• � l�{��'�;,jrt b -� §.c /r s �•. �" '. . z.� It �`� 9 i4��� r+ t Fj t y r� i�� 5c` �y��'e r��� 8 is •,, tF,1r i `a br d F c ,ir, Y^5l' h�'�o,�P ' A+i-*n` y rY"'�i��'`• ,�=��'a�pQtoPr a c ;� x "R1 t�Q«��/° 1��rr r J kj� r, sr • t Ji� t a•r tr Yit ygr W i d•`a�ub '� ± f!! ya s my t pp°r A 21`, ita Il 4'r7 r �py 't apss r,x:p,z 44'1Y'� i .r ." k['xv, eyY +-` C '�" `a x i� Y► .Y � +°z'r� \di%� Y•r z r w �}a 'yd`� �. fYx, 1}i��'»�R + ' id A`. ite r.J��4F 5 r_; � F� z•t +.rare t �"i { n Y<1 r .✓54 3�'d".YrJc {+ pIVG{YS} * t �)ti*'� r ��`'n•� c•7 ,rf G`4 w y� r r � x !4((4Ak .� a Y. sf ° C +`" ., •xr. 1 � '�.` s rX r �'/ �i � � v'i�,C..qAa+Y ✓ t : a y�ti?M'1 "� xrr 4 5f.,. ry{.i ei(I } tx �. � ,i J.� � '# �f� w�r��i k+".�g;'�s'a��, 4 � x4 �+ ur a, W P r" G � �� v �'' ,C � a ?•+ ° °e v 'ir r'" �"�, ems; ':.� L:>c� ., s� Et �� �, r t •.r� 1 �� $s , t� �& s .ee t�a{Yj� + e 1 Gs .xa*`'r+,�'' � a+, la a .g .� P Y � � r 1 s �tl��. �t•"" drS cM ,�t, -t, e � t 4X i � t t s. _v4�t•�,i� Y f" •tx az s :J a, A- <++r:" s �< * F'wiq {''d i F j f t t C. ,� b 4 � ? 14 S [ y .. q �✓ 4• _. dy ^s .. � i'hjR N fr'.'f -f'S ki }�.,t }1, r'✓ l T �' �' `r L (��1 ? �r1:� w v��•`t"".a ,a? )aP^aaxd, + t ,r- ,� ,..• a Y a �, �° t t ' ,1 ,z�;�, '.��a t •, �'�, +r �} �� �'� M far i4��4 3{ c��-,}it4+ k c �'�y'�+` � ,�'nt,>ti.+i.' tv � } ° � ' € ,:� e�°;' a�,J§ C •, .�t .� a"k� 'ak ,FT tkd a ,r"t �Z R`je +k � id]r«.� ,� �..a.�4�v $,41"'r,µaJ•'p Er't" �y it M.ti rY. ''. vw '� w ar ap .. 4�`t `.+. 1•s,Yl1,E✓dj,; T�fry`"� a'.+dt�ssy'',+ �O';•fir rY {�_� ~ a a r ,✓, Yyr yK, � �y' °"'� T �� �'l6iv v+^""a.'"m p,• w✓r+'ae '�""`aw,� !( ,too.- * , .h k � :� 1 /f� x r � _r,+r 'tY9`' � a s«^•�'+ e T ,s f "" ki s � F 1 � R s • �% I � � ' f,„,J''�� , � �yr'� � dA � � P rc s .5� � { �,�`7�' rY � m. \'+ A eiw v� Y3 �•y�.?d ,,rk ' /� -..� ��s� ✓,r yi trx�A � sG !'�"#'S't��v i�. •. +4 :cr r`N "5�: V ., 1 ram• r �t15 • .y r s:1i'1�� ,, £ ..,.... _..,_ u... .•.. .c..s. w.4.aa`.4a.,ot.+�, v .a0s�•'`' 1 _ ., .A, s.ew.::x.".�.1:` "- Rancho Vistos0 PAD N Land Use Designations GOLDERRANCH FIRE DISTRICT Preventi Helping to i our community a better, safer place to livel International Fire Code 2003 Edition TO: Town of Oro Valley Planning and Zoning Division FROM: James Tucker, Fire Prevention Specialist II DATE: October 30, 2006 PROJECT: OV11-06-03 PLAN REVIEW: Fire Code Review of Preliminary Development Plan Documents Please read the following Fire Code review comments to the applicant for the above referenced project The Golder Ranch Fire District has no comments on this submittal at this time. Please email or call me with any questions regarding the understanding of any of the above Fire Code Review comments. James Tucker, Fire Prevention Specialist II Golder Ranch Fire District 520-818-1017 itucker(a7golderranchfire.org Golder Ranch Fire District - Prevention Division 3885 E. Golder Ranch Rd.; Tucson, Arizona 85739 520-818-1017 Fax 520-825-8043 www.olderranchfire.org prevention(h),golderranchfire.org Proudly Serving Our Community with Strong Hands & Caring Hearts Since 1977. Serving as the Fire Marshal for the Town of Oro Valley since 1999. NOTICE In addition to the Town of Oro Valley (the "Town'), there may be other jurisdictions affecting development of this property. If a property developer waits until late in the development process to contact other pertinent governmental agencies or bodies, additional expense and time in coordination, redesign and development may be a result. Examples of other governmental agencies and/or bodies that may have overlapping jurisdiction over this property include but are not limited to the following: Federal: State: County: The United States Department of the Interior, Fish and Wildlife Service is responsible for Endangered Species Act compliance, etc. Please note, habitat has been designated with the Town. U.S Fish and Wildlife Field Division 2321 W. Royal Palm Rd., Suite 103 Phoenix, AZ 85021-4951 Phone (602) 640-2720 Fax (602) 620-2730 The United States Corps of Engineers: This agency is responsible for management of jurisdictional waters, etc. Section 404 consultations may be required on properties that contain washes. U.S. Army Corps of Engineers 5205 E. Comanche Davis Monthan AFB Tucson, AZ 85707 Phone (520) 584-4486 Fax (520) 584-4497 Arizona Department of Environmental Quality: This agency has multiple responsibilities. Please contact directly for further information. ADEQ 1110 W. Washington Street Phoenix, AZ 85007 (602) 771-2300 Pima County Department of Environmental Quality: This agency has multiple responsibilities. Please contact directly for further information. PDEQ 201 N. Stone Avenue, 2"d Floor Tucson, AZ 85701 (520) 740-6520 Please be advised, issuance of a permit DOES NOT, nor should it be construed, to imply compliance with Federal, State or County regulations. If you have any questions concerning your responsibilities under federal law, please contact the applicable agency. APPLICANT NAME: 'T/& W" CONTACT PHONE AND ADDRESS: SITE LOCATION: I AC7 - 8S7/ / Case/File Number t�)ov Pik October 13, 2006 PIMA COUNTY DEVELOPMENT SERVICES DEPARTMENT Carmine DcBoni_, Jr. Cirect or Planning EW,:ior, Comprehensive Plan 'section De�elapment 5enK OK Shirley Gay 1 Project Coordinator "aw Planning and Zoning Division Town of Oro Valley 11000 N. La Canada Drive Oro Valley, Arizona 85737 RE: Pima County's Response to OV11-06-03, Rancho Vistoso Neighborhood 3, Town of Oro Valley Major Plan Amendment request Dear Ms. Gay: Thank you for the opportunity to comment on the above -referenced. Pima County offers the following comments on the major plan amendment request submitted to your office. Comments from the Planning Division, Pima County Development Services Department: There is concern over how this amendment request would impact the Resource Transition (RT)- designated area on the east side of Oracle Road at its intersection with Tangerine Road. The project site is contiguous to the RT area, separated by Oracle Road. Other comments related to environmental planning, flood control and transportation are appended herein. Environmental Planning This proposed amendment to the Oro Valley General Plan seeks to revise, re -configure, and re- designate various land uses as identified in the existing General Plan and PAD for Rancho Vistoso Neighborhood 3. We understand that the end results will: • re -designate approximately 37 acres in the Big Wash floodplain as Natural Open Space and transfer previously approved development to other areas within Neighborhood 3; • re -align the future bank protection extension such that it better aligns with the boundary of the Big Wash floodplain; • re -configure and expand the park site to incorporate a node trail system; and • consolidate commercial and office uses along Oracle Road thereby reducing fragmentation of open space. Comparing this proposal with what was approved in the existing PAD, there is no change in the total number of acres designated for parks and open space. Neither is there any change in the total number of acres proposed for development nor the types of planned land uses requested. 201 N. Stone Avenue, 2n" Floor, Tucson, Arizona, 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411 c�'C 2 Looking at this request as if it were under Pima County's jurisdiction, it would be subject to the Conservation Lands System (CLS) and its corresponding Conservation Guidelines for Important Riparian Areas and Multiple Use Management Areas. The application and determination of conservation objectives for the retention of undisturbed natural open space (NOS) are estimated in the following table. Table 1. Application of CLS Conservation Guidelines and estimates of undisturbed natural open space to be conserved. (Note: Estimates are based on a comparison of the proposed project with data available from Pima County's MapGuide System.) PAD Acres CLS Conservation CLS N.O.S. to be Objective Conserved' Important 157 95% 149 Riparian Areas Multiple Use 653 66 Z/% 435 Management Area TOTAL 810 --- 584 1 = Estimated acreage of natural open space (N.O.S.) The existing PAD and the current proposal provide approximately 383 acres of parks and open space; this is approximately 47% of the area within Neighborhood 3 (there is no further distinction between open space and natural open space). At face value, there appears to be a deficit between the amount of open space that is proposed (and previously approved) and what is expected in order to conform to CLS objectives. However, conservation objectives within the larger Rancho Vistoso Development area, of which Neighborhood 3 is part, are likely being fulfilled with execution of the Development Agreement between Pima County and Stone Canyon L.L.C. (3/12/2002). This Development Agreement creates and preserves the Honey Bee Canyon Biological Corridor by designating approximately 70% (247 acres) of Neighborhood 12 as natural open space and permanently protecting 988 acres of natural open space within the larger Rancho Vistoso Development area through conveyance or conservation easement to Pima County. These requirements plus the on -site provisions of Neighborhood 3 suggest that CLS conformance has been achieved. Although the specific elements of this proposed plan amendment, as referenced on the previous page, are environmentally -favorable revisions when compared to the existing PAD, there is additional opportunity to consolidate a broader natural open space corridor to enhance the protection of Big Wash's hydrologic function and natural resource values while keeping the same ratio of development to open space. Open space in the southeast quadrant — in the area of the Tangerine Road and Oracle Road intersection — could be transferred into the northwest portion of Neighborhood 3 that lies between Big Wash and the current alignment of N. Vistoso Village Drive that is currently designated for Commercial/Office Park. Otherwise, existing development (including bank protection) and grading in preparation for pending development have effectively precluded any further jostling and re -arrangement of land uses within the proposed amendment area to accommodate/consolidate a broader natural open space corridor for Big Wash. Comments from the Pima County Department of Transportation: The site of the proposed general plan amendment lies wholly within the Town of Oro Valley and has no direct access onto County maintained roadways. The parcel is situated west or Oracle Road between Tangerine Road and Rancho Vistoso Boulevard. 201 N. Stone Avenue, Tucson, Arizona 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411 Comments from the Pima County Regional Flood Control District: Big Wash runs along the eastern edge of the property. There is existing bank protection along the southern reaches of Big Wash adjacent to the development. The applicant proposes constructing additional bank protection north of the current improvements to minimize the flood hazards associated with Big Wash. There is a FEMA Letter of Map Revision (LOMR) that affects a portion of the property. The LOMR removed areas from special flood hazard designation due to the bank protection improvements. It should be noted that Pima County Regional Flood Control is embarking on a study to re-evaluate the hydrology along much of the Canada del Oro wash, including its tributary watercourses. The main objectives of the study will be to determine accurate discharge values for the watercourses, and then assess whether existing levees are adequate to deal with the expected discharge. It is recommended that the applicant meet and coordinate with Pima County Regional Flood Control District regarding the proposed bank protection and any hydrology studies related to the development. Several other minor washes traverse the property that should be considered in any drainage improvement for the parcel. Finally, there are also several areas of Important Riparian habitat on the parcel. These are mainly associated with several of the smaller washes on the property as well as within the channel of Big Wash. Avoidance and preservation of these areas to the maximum extent possible is recommended. Comments from the Pima County Department of Natural Resources, Parks and Recreation: Natural Resources, Parks and Recreation Department staff do not have any comments on this request. On October 11, 1 received another request from Oro Valley (OV11-06-03 Rancho Vistoso Neighborhood 5) to forward comments to the Development Coordinator by October 20. Please be informed that it would not be possible to obtain comments from the various Pima County departments to generate a report for this request in nine days. Moreover, I am not so sure that this request fulfils the 60-day review period required by the Growing SmarterAct. Unless, of course, "Rancho Vistoso Neighborhood 5" happens not to be an Oro Valley major plan amendment request. Please advise. Again, thank you for the opportunity to participate in the Town of Oro Valley's general plan amendment process for major plan amendments, and we look forward to continued participation in the future. If you have any questions, please call me at (520) 740-6800 cc: C. H. Huckelberry, County Administrator John M. Bernal, Deputy County Administrator for Public Works Carmine DeBonis, Jr., Director, Development Services Department Arlan M. Colton, Planning Official 201 N. Stone Avenue, Tucson, Arizona 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411 �istoso pannag September 4, 2007 Todd A. Jaeger Amphitheater School District 701 W. Wetmore Road Tucson, AZ 85705 SUBJECT: Neighborhood 5 School Site Dear Todd, SEP 0 5 2007 The Town of Oro Valley has requested a letter from Vistoso partners memorializing our agreement regarding dedication of a school site in Neighborhood 5 to Amphi School District. They have requested that the letter outline the agreements between both of us, and that both parties sign and notarize the letter so that the Town will feel comfortable that both parties have agreed. The following is an outline of our agreement as I know it from our last meeting regarding moving the school site shown in Neighborhood 5 PAD documents. 1. Vistoso Partners will relocate the 35 acre school site shown on the PAD document from its present location in Parcel I over to the Parcel R location on the PAD map. This process is being done through a PAD and General Plan Amendment within the Oro Valley zoning procedures. Please reference the attached map of Rancho Vistoso. 2. Vistoso Partners will agree to extend Arrowsmith Road from its present location north to tie into the Moore Road alignment at Rancho Vistoso Boulevard. The roadway design will incorporate design features (such as a multi -use walking path on one side) appropriate for this type of roadway. Furthermore, Arrowsmith Road will be extended in a manner to allow bi-directional access from the proposed school site (referred to as the Loop Road). 3. Vistoso Partners will install a sewer line from the connection point on Tangerine Road and Big Wash, up to the lift station at Sun City Vistoso, no sooner than five years (unless able to do so earlier) or when Amphi School District applies for a C of O. Location of the sewer line will Be along the bank protection. If there is a delay with Pima County replacing the critical link of sewer line along Tangerine Road to the identified point of connection, the condition will be revisited at such time. 4. Amphitheater School District agrees to handle all onsite drainage/flood control measures to protect public improvements for their site. Both parties shall share and 1121 West Y04-met goad, S ti1te log qe-mPe, 74tLzona 85284 480-831-2000 ® Fax 480-893-1604 coordinate the floodplain and drainage information to ensure suitable protection for their respective land. Please review this information and return a signed/notarized letter to me for my signature. We are processing the property through the PAD and General Plan revisions at this time. If there are any questions regarding this, please contact me at 602-723-1170. Regards, &,V4 14 . Richard Maes Project Manager cc: David Andrews, Town Manager ACCEPTED BY AMPHITHEATER SCHOOL DISTRICT 0 State of Arizona } County of Pima ] ss. Date: Signed before me this day of 2007. ACCEPTED BY VISTOSO PARTNERS, LLC A State of Arizona } County of Maricopa ] ss. Signed before me this day of NOTARY Date: NOTARY 2007. 0 G "lanclw ist oso A MASTER PLANNED COMMUNITY ORO VALLEY, ARIZONA (520) 797-3300 NATURAL a" :ACE - 11 5 2. OAm p 2&1 Am /� "'\Tr \`�l1� \\ :`; \\ cv...l.� •��i �`�� °A� K /e.0Aa /J // 1, 5\ `) co!>• couRSE`j�\ .�t� �� , +e4.4 Ae. 4.5 / / c-t \ \4e.9 Am \ 1 ±`r f �� ✓I 1 ')�\ \\ / �l/� I IV! 1 49A Am I I AL'S I �� .68 Ae.\ \ I 1136.t Aq (H 2.7e Ae�� 1 III - - - - L `j 0 \, 1 `1 1, k5 I.F J�,q.o Ac� 11 p .rz:e°�j�.,/ p 11+4.3 r•/• 1ORT c-t I j- j\ \ 9A �y�1 J.0 �J HOTEL 1I /,/ `. Y ` w,85 �9 A. IC-2\ \ �� RF ��\ 2C8 1 j s2.e Ac. /Z 1 ---- 'V � .47 �yc` \ ; ' ° I i `: '� " '( ems\ /" \4.5`. �\ }� B v 1 c , it tt 51 c_p ` I_\ �S`t \\` 3i.1Am E `\ 65OAc 4s7�m 1 1o.7Aml II �\ \1e.01 2900 �\4.5\ I) ! \ + TO t\ L \ fi J•(�ABf /% \\ + eBA` _ BB ' l `gA`�1 t'�'V // . I J 0 �1T14is A/ / 4.0 4e°Ac\\� 11j / ( 139.o A• 1 {�`�g�1 iA,, \ 1 ff�(6, 1 zes A I •zae Am �� r` I)a ^i\\ ��� � : 20 1. h C l It / e 1 ^ v (,) / / ��I •�' / /� /^ V t" AH °Qs v 2.0' �szs ) n 1 i \ (o AG 10.0 �`/\ F �+' c. t" -t•-� / j / e%.8A5UI I I 1 \ hivX� /-'� 11 o AF \ 4.o/I m.e I AN \foAeJ�`\ /� \ �� // C / \\\ I O - `-� \`eAI t .o sa4 Am f E `� \ p - ;3ii°Am ❑�• 1 (VA \✓� = AA 1✓ aueH•••,.�?,� �s As\\ �� �� /�;, 1 C„ \ 1 1 V•� J.2/ °RrwNa `�-..` 9 / , RECREATION I----- i W�27,111 Am ° �$ / -! ' t0.0 AREA ❑ I / t t `•� \,e\ I - 1 \\ sae �m O N ' 11( \\ 3.7 / AK� t 13 S Ac B 7 C� p o ( L.� , O 1\ze.e / y.2 .t� .0 1 ✓ 1 �4 po /f/ r \ 'c}� \ 00 2 �• ,..� /� y ate\ • 4z.o Am 1 Cl Am 1 I • C ALTV 6.2 Il 1-------------�. `� - ❑--ir------} ,' l r e s 1 O \ _� 9 1 ui Am// I �� �� O // . 1 / ` 5�\/ r s A� O \ F 1\l C /�\ l \ Cpl� le A- `.l; / jc� F � 1 t2o � /7 p `!J // �'L� I29.7� 44.2 �•./ 4.8 11 \ 30.4 0 // / A T \ ►+t- O ? J Ac. /� 20.4 Am r ! C • / fi:e /. �`\• H �II ''' 0L\ ls.a/� /I p \ x`.:. 1'I O\\ �cP /)6o r N i ----1( f03I o �� F-'-----// oo� I 2is 8.0 j`\.J O `\ ram\ 5 JJ cpl J �I r JE Am �� j V, a� /< \ iee �+ ao\ s � TOa1r `\ ,u I I 1 i1 y s\� 3155 ;cr:.e Ac ) P 9 Am t: \\ `�� L te.z\ CREAn o I! I z\�\�\\\„s�� c�3�a'4(ei� \\\\ S\\ sue„/ \ QQ a i AREA ,�2 1`I1�.oAm �, �, r 1i \`. / 1 \ ;..�.o ,�� c� /� I SCHOOL REC. • 8.0 1 K b ° N C 24.7 Am C 1\ / X i 27.e1 Am' 10.0 O \ jl• 8.2 SITE AREA CP, CPI • we• Ai� e.4 Ay/ /Am M / /�34.4 TOWN CENTER I� �b b4, O° 40+ tl('K i/ .1 ia7 Am = � �.� L• br Q ` si6sAm // / C \� `;a Cf"' ` v U �i° \ ••�J ; Lpi B, A Z 1 , 5 . �ZZ �w •T su ' e : ? R a.s 1 } / "tie.e \\. c 3555 ��/ // \ A�• o Z1.2 I Ae. j � c. 110.0 Am tY V II Ae. 1S5 3.9 Aa 4 1 1 \i. Am I )� / i , B Ci 4 1\ w CPI 4 3 41.5 Ae7 RF 1 . ��y 12.4 Ac. 1 zei Am 1J \ 4.s r 1 1 I O 3.� // �/ M �/j c-t . • s.7 Ac i 1 7.1 // �/( CPI 1 i�. �� [ c_, I Q3oRE"iz�Ao - 4.0 0 \ / / ..._ _ _..... .. o .._... /n5 I4.1 Am 1 i I o 0 0 /14 ! P 1 ioPie •1i ilAm a E )OUNDARY �--. \r V/ hM7-_,� I163 AeLe Af P Am t •t I cpt�1CPI nA \ 7�Aal1&530UNDARY !' ` s. S F-p- 1 E J"O p 11 y I IRE =�J r } ��Am1. /1 +A? o 3 Am / 0.0 Am \ J / 6.5 1 ` CPI Ili \ I / \ • • 112.0 JS 20.4 ❑ 40.0 AmQ /MtEA •: Ce_Am PACE I-+.J I•/% % / \.) A. t �s7 1 \\ o �� + �� ? �t (�I / 4 �\ ��• / 1' o J. c_t �J 1' ❑ t� ��R S \` i `G�1lf`�? o ••�\ I 3A Am/ • 1 / 1 Am • 1 Q •�, • • •T T • •iZ T,1• - ,0.3 I \�• =NTIAL DENSITY 0-1 R.A.C. "`/ 1707 I1 //�•/%_ �( sue-s7A X " cPl CPI 1 �\ •�Ac. �• ❑O H2&C IAA I I t/� V �, 4.5 Am F J\ 3IDENTIAL 1.1-3.0 R.A.C.:y 'L� /;CPI A.C. I/ x' (.c' si:s �\ \ \ \\' Is.J •�/••• r , / 1 REC. / \ss'•in ,A z W A_i j U \ 1/� P, [Am TI AL DENSI TY 3.1-6.0 R.A.C. I AR 1 / i ❑ HOSPITAL �i .j( cPl I os Am 3.0 NSITY RESIDENTIAL 6.1-8.0 R.A.C. .r-� N % 80 �\ \/AI � 1 + \ C-t r 30.e Am ` • 79 7 Ac. \ T :SIDENTIAL 8.1-21 R.A.C. ; !L r �•� \ - �1T --- �J` r z9� Am ' �' �'❑ ❑ O[e:c M4Oo Aa�e.e( zs o :•. / 1 WELLING UNIT CAP / n \\\_�_�,' - I �(( c-2 1 'ER ACRE (RAC) o; /� \\ 529 Am 1 �EAGE o1 4 �� IERCIAL / a E RCI AL o c4. �\ DUSTRIAL 'I TU TI ON AL / °t [TY SEcdE2 f. //✓E L.r /�h \ / GOLF COURSE 1 i� Conceptual Site Plan 85-63 Acres Located in the Vicinity of Rancho Feliz Drive and La Canada Drive Site Plan Information Total Site Area Total Number of Lots Typical Lot Size Gross Density Interior Road Length Legend N 85.63 Acres 172 80'x 125' (10,000 s.f.) 2.0 Dwelling Units per Acre f 9,,950 Linear Feet Linear Path Open Space (f 27 Acres, 31% of Site) La Canada Linear Park -Access Node CONTOUR INTERVAL= 1 FOOT 0 40' 80' 120' Ll I — z n b 14, , � zoob GENERAL PLAN AMENDMENT Da Y f Ll9 & 0. 4- QA 4 ae ' W4 AW IM 17� CIA 1R We RANCHO FELIZ DRIVE & OVERTON RD Vi-qto,00 ;Name7s September 11, 2007 Ms. Sarah Moore Town of Oro Valley 11000 N. La Canada Drive Oro Valley, AZ 85737 RE: Neighborhood 5 - School Site Dear Sarah, SEP 1 3 2007 In follow-up to Pamela's request, I have sent a letter to Amphi School District outlining what our agreement is. I have called Todd Yeager to explain why the letter agreement requires a notarized signature block for both of us, but have not heard back from him. Please keep this in your files as verification that I have requested the school district to sign and notarize per the Town's request. Sincerely, Richard Maes Project Manager Enc. ... State iog a ! t f s i 9 nL