HomeMy WebLinkAboutOV110603TOWN OF ORO VALLEY
COMMUNITY DEVELOPMENT DEPARTMENT
Planning and Zoning • Building Safety
11000 N. La Canada Drive, Oro Valley, AZ 85737 - (520) 229-4800 - Fax (520) 742-1022
Oro Valley Public Library
1305 W. Naranja Drive, Oro Valley, AZ 85737 - (520) 229-5300 • Fax (520) 229-5319
June 21, 2007
Paul Oland
WLB Group
4444 W. Broadway Blvd.
Tucson, AZ 85711
881.748o
Fax: 881.7492
Richard Maes
Stone Canyon LLC
1121 W. Warner Road, Suite log
Tempe, AZ 85284
480.831.2000
Fax: 480.893.i6o4
RE: OVi1-o6-03, WLB Group, representing Vistoso Partners, requests
approval of a General Plan Amendment and Rancho Vistoso PAD amendment for
Rancho Vistoso Neighborhood 5, Parcels 5-I and 5-R (Parcels #219-20-052Q &
219-54-oo6A).
Dear Paul and Richard,
Thank you for submitting a General Plan Amendment for Rancho Vistoso
Neighborhood 5, Parcels 5-I and 5-R. Staff received the tentative acceptance
letter from the Amphi School district on March 30, 2007 (attached). As a result
of this letter, the core development issues identified require inclusion into this
General Plan amendment. These issues require changes to the provided exhibits
for the Planning and Zoning Commission. This information is discussed in
greater detail below.
Items required prior to Public Hearings at Planning and Zoning Commission:
1. The parcel indicated for the proposed school site has not been platted. It
is difficult to provide any accurate information for a parcel that does not
exist. Therefore, the site is required to be platted prior to proceeding in
order to permit proper analysis. This can be accomplished through a
minor land subdivision. Please submit this application (attached).
2. Two neighborhood meetings are required — one prior to the Planning and
Zoning Commission meeting and one prior to the Council hearing.
Therefore, it would be prudent to begin the neighborhood meeting
process. Please provide staff with the specifics of the first neighborhood
meeting. Notification procedure and distances are specified in the
attached handouts. Generally, the distance for notification is 1,000 feet.
www.townoforovalley.com
Please ensure that the notification procedures "jump across right-of-ways"
and does not divide subdivisions in any way.
3. Furthermore, two public hearing shall be held before the Planning and
Zoning Commission (in different locations). Therefore, it would be
prudent to begin looking for a location for the second public hearing
within the General Plan amendment area.
4. All General Plan amendments shall utilize the Town of Oro Valley's GIS
files. Using these files, revise the exhibits to show the future extension of
Arrowsmith Drive and re -alignments and re -configuration of Moore Road,
as well as the correct parcel information. The GIS files will also provide
the calculation for the open space trade (roughly 1.9 acres).
5. Revise the General Plan Amendment exhibit — proposed conditions to
reflect the realignment and reconfiguration of Moore Road per the
submittal narrative if Moore Road is not intended to connect across the
Big Wash and link the east and west portions of Rancho Vistoso
Boulevard. If this re -alignment is not done concurrently with this
application, a future General Plan amendment will be required. Staff
suggests combining these items.
6. Revise the General Plan Amendment exhibit to delineate the Town ROW
system as it is depicted within the current Town of Oro Valley General
Plan — Figure 4. In addition to the arterials shown in the exhibit, this
comment includes the delineation of the collector street system.
7. Provide additional analysis in the narrative specifically addressing General
Plan visions, goals, and policies, with specific emphasis on the following
issues: compatibility, traffic, and open space. Address the letter to the
Planning and Zoning Commissioners of Oro Valley and specifically focus
on the following policies:
• "The amendment will not adversely impact the community as a
whole, or a portion of the community without an acceptable
means of mitigating these impacts through the subsequent
zoning and development processes."
• "How the proposal will consider development impacts on
natural rolling terrain and emphasize low -density developments
in these areas. This will include evaluating areas with slopes of
fifteen percent (15%) and greater for development compatibility
and safety, with the possibility of preserving them as natural
open space".
• "How the proposal will have new development to locate uses
that depend on convenient transportation access (e.g., higher
density residential and commercial) near major arterial streets".
"The proposed change is sustainable by contributing to the
socio-economic betterment of the Community, while achieving
community and environmental compatibility".
8. Provide detailed calculations of the areas of the individual areas to be
modified and/or traded and label them on the maps in regards to the
proposed open space trade area for the new school site. Trades are
required to be at a 1:1 ratio and require approval from the Planning and
Zoning Commission and Town Council. Please review the attached
"Criteria for Development" information.
The following issues will be conditions of this General Plan amendment:
1. A meaningful open space trade of a 1:1 ratio shall be proposed for review
and approval to from the Planning and Zoning Commission and Town
Council.
2. East Arrowsmith Drive shall be extended north and connect to Moore
Road east of Rancho Vistoso Boulevard.
3. Public gravity sanitary sewer shall be extended from the existing Pima
County Wastewater Management connection point to service the identified
future Amphitheater School site.
4. Provide a floodplain analysis for Big/Honey Bee Washes adjacent to parcel
5-R which determines the location of the loo-year flood limits and
describe mitigating measures that will be needed to provide the acceptable
buildable land area required by Amphitheater School District.
Items required for Resubmittal:
o Minor lands subdivision application for staff review and approval.
Proposed school site is required to be platted prior .to proceeding to the
Planning and Zoning Commission.
o Ten copies of 24"x36" and 11"M7" color copies are required. For the
Planning and Zoning Commission hearing, twenty-eight (28) color copies
11"x17" sized are required. The required maps are as follows:
• Map showing existing General Plan Land Use Map categories;
• Map showing proposed General Plan Land Use Map categories;
• Map showing existing Rancho Vistoso PAD zoning categories;
• A side -by -side comparison of existing and proposed General
Plan Land Use Map categories/ Rancho Vistoso PAD zoning
(similar to map created for the Oro.Valley Marketplace).
All these maps will be created using the Town of Oro valley's GIS files — which
was provided for your use via email June 21, 2007.
o Submit all files digitally on CD using the Town's GIS files (both CAD files
and GIS shapefiles).
o Synopsis from neighborhood meeting, with sign -in sheet. Additional
items to be submitted include the address list of all notified person and a
copy of the letter sent with the notification of the neighborhood meeting.
Additionally, a Rancho Vistoso PAD amendment is required. A Site Analysis and
Tentative Development Plan are required to be submitted. The Tentative
Development Plan (TDP) checklist (Section 3-104) for PAD amendments has
been previously provided for your use. If you have any questions about this
process, we would be happy to schedule a meeting with you. As a reminder, in
addition to the General Plan amendment revised exhibits (ten copies), the
following item swill be required to process the PAD amendment. We understand
that this item will be processed separately from the General Plan amendment.
1. A narrative addressing the following:
a. How the proposal is in compliance with the Golf Course Overlay
District.
b. What the current conditions are — size of parcels (in acres and
square feet).
c. Proposed land use changes with the approximate area of each land
. use to be modified, and the new proposed use.
d. Proposed density of the "proposed" medium density residential site.
e. Site constraints, such as access, slopes and floodplains;
A meeting with the Amphitheater School representative to discuss the General
Plan Amendment proposal is schedule for June 28th, 2007 at 2 pm at our offices.
We look forward to your participation at this meeting.
We look forward to the successful completion of this project. If you have any
questions, please contact me.
Most Cordially,
Pamela J. Pelletier
Planner
520.229.4813
ppelletier(@orovalley.net
Attachments: Minor Land subdivision application; "Criteria for Development";
General Plan excerpts.
Policy Document
AdoptedJune 15, 2005
Yes
I Neighborhood Meeting I
P&Z Hearing
Submittal
Oro Valley General Plan
Application submitted during an
approved submittal window.
Major? No
Public
Notification
Neighborhood Meeting
Provides a recommendation
to TC
P&Z Hearing
Town Council Hearing
Minor Amendment Procedure. To coordinate the review of amendments to the General Plan, minor
amendments may only be submitted during two, two -month periods of the year. They must include
at least one neighborhood meeting early in the process for all changes to the Land Use Map.
Major Amendment Procedure. Major Amendments:
■ May only be submitted at one time during the year;
■ Must go to two public hearings by the Planning and Zoning Commission (in different
locations);
■ Shall include two neighborhood meetings, one prior to the Planning Commission and one
prior to the Town Council;
■ Must be presented to the Council at a single public hearing during the calendar year that the
proposal is made; and
■ Must be adopted by a two-thirds vote of the Town Council.
Text amendments may not require neighborhood meetings.
Public Notification. Major amendments will include a public involvement program consistent with
state statutes. In addition, public notification for all General Plan amendments will be as follows:
■ Notice of the proposed amendment will be advertised a minimum of two times in two widely
distributed newspapers.
■ All property owners within 1,000 feet of the subject property and all adjoining properties will
be directly notified of the amendment.
■ All Homeowners Associations (as listed in the Town HOA database) will be notified of the
amendment.
■ Signs noticing the proposed amendment will be posted on the property on a sign or signs
3'x4' in size, with white background and 5-inch letters.
Introduction 12
Oro Valley General Plan Policy Document
Adopted June 15, 2005
Adoption of Amendment. The disposition of the General Plan amendment proposed shall be based
on consistency with the vision, goals, and policies of the General Plan, with special emphasis on:
1. The proposed change is sustainable by contributing to the socio-economic betterment of the
Community, while achieving community and environmental compatibility; and,
2. The proposed change reflects market demand which leads to viability and general
community acceptance; and,
3. The amendment will not adversely impact the community as a whole, or a portion of the
community without an acceptable means of mitigating these impacts through the subsequent
zoning and development processes..
The applicant for the amendment shall have the burden of presenting facts and other materials to
support these conclusions.
PROJECT CONFORMANCE WITH PLAN
Arizona State Law requires that zoning be in conformance with the General Plan. ARS Section §9-
462.01 F defines conformance as follows: "a rezoning ordinance conforms with the land use element
of the general plan if it proposes land uses, densities or intensities within the range of identified uses,
densities and intensities of the land use element of the general plan." All rezoning proposals and
development projects shall be evaluated for conformance with the Plan.
Rezoning Conformance
Per the Town's zoning code, "[a]ny new proposal for development, which does not comply [with the
General Plan], will be subject to denial by the Town Council." Thus, new development proposals
must match the land use map in accordance with the Town's zoning code and the requirements of
the State statute referenced above.
Further, the Growing Smarter Acts, as noted by the Arizona Department of Commerce Community
Planning Program, require that "all rezoning ordinances and regulations adopted shall not only be
consistent with, but must conform to the adopted General Plan. The rezoning ordinance shall further
the implementation of, and not be contrary to, the goals, policies, and applicable elements of the
Plan. A rezoning ordinance conforms to the Land Use Element if it proposes land uses, densities or
intensities within the range for the subject property as stated in the General Plan." To this end,
proposals for zoning change should be evaluated in relation to all of the policies in the General Plan
(not just the map and those in the Land Use Element). When a proposed zoning change is not in
compliance, the applicant will be required to amend the General Plan, or the proposal, prior to
initiating a rezoning.
Development Review
General Plan conformance shall also be used as a criterion in the approval or denial of other types of
development proposals, such as development plans, plats, and architecture. When considering a
development proposal, Town staff, the Planning and Zoning Commission, the Development Review
Board, and the Town Council will evaluate the proposal as to how it relates to the key concepts in
the General Plan. It is the burden of the applicant to provide clear and convincing proof, through an
analysis of each applicable policy, that the proposal is in conformance with the General Plan.
13 Introduction
Oro Valley General Plan
Policy Document
AdoptedJune 15, 2005
Table 1: General Plan Amendment Matrix
Pro osed Desi nation (Change To)
Existing Designation''
PSP&
(Change From)
R-LDR
LDR1
LDR2
MDR
HDR
MPC
RGC
NCO
CRC
COP
SCH
PARK
OS
R-LDR
ry a
�.
.,._
x
a« .
!s a..�.,_
LDR2:,
MDR
r� r,^
X
HDR
� "�
a
� ■ k-.
MPCZ
See footnote #2 below
RGC
■,.•�;
�
���
��
��;�
�'��,
u�,�� .�
�"*,�'
;�
,���
NCO
�ttr
�,� �,�*,•
�.�
�,,a '
%t ■ '=
a �'
E
�,�.��,?
��� ..
,�s)�xy°
CRC
f�
,.>
r>.
COP
PSP and SCH'
■
PARK
r ■,
}p¢.�
,an x
`}
w�� ,.■3
■ro.
n
Jos
Notes:
Major Amendment
Minor Amendment
No Amendment
For a complete definition of the land use designations, please refer to page 23.
Amendments to areas designated as MPC will be treated, per the General Plan Amendment Matrix Table, based
on the land use and density of the MPC designation. If no specific land uses and densities are called out for the
MPC (see Special Area Policies starting on page 26), it will be treated, for the purpose of an amendment only, as
MDR and NCO (no more than 10%).
Excluding Public Schools. Public schools are not subject to the amendment process.
See Special Area Policies starting on page 26.
Procedures forAmending the Plan
Amendments to the Oro Valley General Plan may be initiated by the Town or by a landowner. Such
amendments must be in accordance with the procedures set forth in the Arizona Revised Statutes
and the Town of Oro Valley Zoning Code. Arizona State Law requires that all municipalities provide
public review of General Plan amendments. All General Plan amendments will follow the additional
public notification requirements listed below. All minor and major amendments to the General Plan
shall follow the procedures outlined in the following flow diagram:
11 Introduction
A 2.0 Ae.
A
1 2, 0
4 S A At.
4 9-2 Ar �
P
19
F mmw
{� a c
—_ 4
AMENDMENT
AREAS
y ,
N
w L 4u
lEtEm
CHOO
b 0 etc d
7HIr�� ✓� � ip� � `* � w
- p
"dr8 t
It
7
`` r
c
#. p w
N
0//''y+. 0318,3
..
x
Ag
2.0�
4.5
e} j1
Al
J.1 A c .
i .qt �
►� A
1.0
1r
14.8)d
i. 2 2 ? A r .
8.0
;,.
um
-14
'
:. "f
Aj
bom
g
/a- AMENDMENT i1
AREAS '
HOSPITAL
w:rt
20.0 A . a
d, S TA'L
42.8Ac
m
M
TANGERINE ROAD W
Q
RANCHO VISTOSO
NEIGHBORHOOD 5
PROPOSED GENERAL PLAN AMENDMENT
EXISTING RANCHO VISTOSO P.A.D. LAND USE PLAN
The 20061113 0' 400' 800' 1200'
Gro p rm
K �VU V 2006
_A185050Weigh5f2006 General Plan Amendment Weigh5 GP Amend X-RVPAD Exhibit.dwg Plotted: Nov. 13, 2006
RANCHO VISTOSO
NEIGHBORHOOD 5
PROPOSED GENERAL PLAN AMENDMENT
AMENDMENT AREAS ON RECENT AERIAL PHOTO
20061113
The
WLB
Groupurim
® 0' 400' 800' 1200'
L:\1850501Neigh512006 General Plan Amendment 1Neigh5 GP Amend Aenal Exhibil.dwg Plotted: Nov. 13, 2006
IV
RD
Legend
Oro Way Lhnb
_Resort l GPd G.-.
G—th A,..
Neigtft,- d Commercial; 00ka
Lkb- Services Baundery
Nbir.; Sa WubliC
Ruml Low Densly Resldenliel {O- 0.3 OU/AC) - Canmamy, l Regional Oommercal
L— Oonsity Residential(0.4.1"2 MAC)
Cmrmmca i OIFce P.r
Low Density Residenial (1.3 - 2-0 DIRAC)
- Sdmo1
Medium Dansily Residential (2 1 • 5 OIAAC)
Open Sprce
" Higa Dene4y Residerdiel (5e DUTAC)
' PARK
Master Planned Canmunity
Bigmtkanl Res -Maas
EnBinope PiannlnB Surveying
E",,In g
T
The
turn D9a gn
In Tlla9an, Phaanlx
Offl I Wd In In
to
��
and Las Vagaa
Group
4aaa Eaat 0roatlway
dO
�
T�®ar,,A.rizoaa c32D,BB,_,4BD
1-7
f
RID ;
600 wA
lw PROPOSED
I
1
LAND USE
EXISTING
PROPOSED
NET CHANGE
MDR
20.0 AC.
36.3 AC.
+16.3 AC.
SCHOOL
36.3 AC.
36.3 AC.
O AC.
RESORT / GOLF
16.3 AC.
O AC.
—16.3 AC.
TOTALS: 72.6 AC. 72.6 AC.
RANCHO VISTOSO PARCELS '5-I' & '5-R'
PROPOSED 2006 ORO VALLEY GENERAL PLAN AMENDMENT
®6%.PEEI ]
0' 800' 1600' 2400'
SEP 2
The
Group
Inc.
September 29, 2006
Ms. Sarah More, FAICP
Planning & Zoning Administrator
Town of Oro Valley
11000 North La Canada Drive
Oro Valley, Arizona 85737
Engineering • planning
Surveying • Urban Design
Landscape Architecture
SUBJECT: General Plan Amendment in Rancho Vistoso — Neighborhood Five
Oro Valley, Arizona
WLB No. 185050-A-005
Dear Ms. More:
This letter is intended to accompany an application to amend the Oro Valley General Plan within
Rancho Vistoso Neighborhood Five. This proposed amendment is not broad in scope, but rather
focuses on the location of the designated school site within Neighborhood Five. This proposed
amendment would not adversely affect the public. In fact, as explained below, this amendment
would reduce commute time to and from school, thus slightly reducing traffic volumes on nearby
streets and lessening the need for Moore Road to eventually cross Honey Bee Wash and connect to
the current school site location.
Parcel 5-1 is currently designated in the General Plan as "School" and in the Rancho Vistoso PAD
(RVPAD) as a "Junior— Senior High School". Amphitheater School District has determined that their
long-term needs would be served more efficiently and effectively by relocating the designated school
site onto Parcel 5-R, which is near Rancho Vistoso Boulevard and Arrowsmith Road, approximately
one mile southwest of the current school site location. The most apparent reason for this
determination is that the bulk of the student population that is anticipated to eventually attend the
school will live to the west of Rancho Vistoso Boulevard, especially in Neighborhood Ten, and
beyond. Thus, relocating the school site from Parcel 5-1 to Parcel 5-R brings the school in closer
relation to its anticipated service area. Parcel 5-R is currently designated in the General Plan as
"Medium Density Residential" and in the RVPAD as "Medium -High Density Residential". We have
met with the District on several occasions and have agreed to provide an equivalently sized school
site on Parcel 5-R and surrounding area currently designated in the General Plan as "Resort / Golf
Course" and in the RVPAD as "Recreation Area / Golf Course". Conceptually, the future school
buildings would be constructed within the existing buildable limits of Parcel 5-R, while portions of the
future sports fields would extend into the current golf course area to the east. The proposed
amendment would essentially reverse the Parcel 5-1 / Parcel 5-R land use designations in both the
General Plan and the RVPAD so that 5-R becomes the designated school site and 5-1 becomes
medium -high density residential. The entitled portion of Parcel 5-1 is approximately 16 acres larger
than the entitled portion of Parcel 5-R. However, the entitled portion of Parcel 5-1 is unconstrained
by excessive slopes orflood plains. In addition, the Rancho Vistoso PAD allows up to 3555 dwelling
Engineering • Planning • Surveying • Urban Design • Landscape Architecture
Offices located in Tucson, Phoenix, Las Vegas • E-mail: tucson@wlbgroup.com
4444 East Broadway • Tucson, Arizona 85711 • (520) 881-7480 • FAX (520) 881-7492
Mr. Sarah More, FAICP
September 29, 2006
Page 2
units within Neighborhood Five, of which only 650 have been developed, and less than 170 entitled
acres remain. As such, the entire entitled portion of Parcel 5-1 has been designated as Medium
Density Residential in this General Plan amendment. This proposed amendment is needed in order
to secure the school site desired by the School District.
If you would like to discuss this issue or if you have any questions, please contact me. I look
forward to continuing this process with you.
Sincerely,
THE WLB GROUP, INC.
stav Paul Oland
Project Manager
Land Planning Department
Cc: Dick Maes, Vistoso Partners
Todd Jaeger, Amphi School District
Ken Scoville, Amphi School District
L:\185050\Neigh5\2006 General Plan Amendment\20060929 N5 Gen Plan Amend Cover Ltr.doc
o�O�PLLEY Ay/
'0
r
2006
"OUNDED A'1" TOWN OF ORO VALLEY, PLANNING AND ZONING
11000 N. LA CANADA DRIVE, ORO VALLEY AZ 85737
PHONE: (520) 229-4800 FAX: (520) 742-1022
www.townotorovalley.com
APPLICATION FORM
OV Case # (Office Use Only): C `�
Application Type: General Plan Amendment
A. Project Manager/Developer
Name: Gustav Paul Oland
Firm: The WLB Group, Inc.
Address: 4444 E. Broadway Blvd.
City: Tucson State: AZ Zip: 85711
Telephone: 520.881.7480 Fax: 520.318.6170 Email: gpoland@wlbqroup.com
B. Property Owner (s), if more than one owner, attach list
Name: Please see attached list.
Firm:
Address:
City: State: Zip:
Telephone: Fax: Email:
C. Subject Property
Parcel/Tax Code: Portions of 219-54-006A & 219-20-052Q.
Legal Description/Property Address: Rancho Vistoso Neighborhood Five, Parcels 5-1 and 5-R.
Area of property: +/- 56 Acres.
Existing Zoning: PAD Proposed Zoning: PAD
Is Proposed Zoning in conformance with General Plan designation? [ X ] N/A [ ] Yes [ ] No
General Plan Designation: School (Parcel 5-1) and MDR (Parcel 5-R).
Existing Land Use: Vacant. Proposed Land Use: MDR (Parcel 5-1) and School (Parcel 5-R).
D. Previous Applications Relating To This Property
OV8- (- Ord. No.157 OV10-
OV11- OV12- OV13-
E. Reason For Request
Amphitheater School District has requested that their designated school site be relocated from Parcel 5-1 to
Parcel 5-R. This request essentially switches the land use designations on the two parcels in order to accommodate
the school district's desires.
This application is true and correct to the best of my knowledge. I am the owner of the above described property or have
been authorized by the owner to make this application.
Date
Signature
2007 Pima County Assessor Property Inquiry
Search Paree12006 Paree12005 History ax Summary 0enealop�, PRC
Parcel • '��0 4 0
Book -Map -Parcel: 219-54-006A
Taxpayer Information
VISTOSO PARTNERS LLC
1121 W WARNER RD STE 109
TEMPE AZ
85284 0000
1)2scripgiou
PTN E2 NE4 & NE PTN SE4 44.34 AC SEC 36-11-13
Secondary Valuation Data Legislative Class
Land VACANT/AG (4 0)
Improvements VACANT/AG (0 0)
2006 Personal Property
Gross Value Totals
2006 LNITD/SCND Exemptions
Net Value Totals
PriorLimitedValue: $500
TaxArea:1012 TaxYear:2007
Recording Information
Docket 9737 Page 1102 Date Feb-25-1994
mlscerhalleous
Section 36 Twn 11.0 S Rng 13.0 E
LandMeasure 44.34 A
MarketArea: (423)
Tract Block Lot GroupCode 000
CensusTract 4611 UseCode 4710 File -Id 1
Date of Last Change Jul-12-2005
Full Cash Percentage Assessed
$500 16.0 $80
$0 0.0 $0
S500 $80
$500 $80
CurrentLimitedValue: $500
Map Selection(s) S36.dwg 1113E36.TIF
ParcelNote: RESIDUE 2003-RESIDUE OF 219540060 AFTER 10285/323,NO NOE
gwong Feb-20-2003
2007 Pima County Assessor Property Inquiry
Parce12006 History lax Summary C000100y PRC
Parcel
M 4►
Book -Map -Parcel: 219-20-052Q
TaxPayer Information
VISTOSO PARTNERS LLC
1121 W WARNER RD STE 109
TEMPE AZ
85284 2819
Description
IRR PTN SEC 19 29 30 31 731.25 AC T 1 1 S R 14E
Secondary Valuation Data Legislative Class
Land VACANT/AG (4 0)
Improvements VACANT/AG (0 0)
2006 Personal Property
Gross Value Totals
2006 LMTD/SCND Exemptions
Net Value Totals
PriorLimitedValue: $7,313
TaxArea:I012. TaxYear:2007
Recording Information
Docket 9737 Page 1102 Date Feb-25-1994
Miscellaneous
Section 19 * Twn 11.0 S Rug 14.0 E
LandMeasure 731.25 A
MarketArea: (423)
Tract Block Lot GroupCode 000
CensusTract 4611 UseCode 4710 File -Id 1
Date of Last Change Jan-20-2006
RANCH PROPERTY'
Full Cash Percentage
Assessed
$7,313 16.0
S 1,170
SO 0.0
SO
$7,313
S 1,170
S7,313 S 1,170
CurrentLimitedValue: $6,845
Limited Value Rule-N: 200,7.Audit2006.Audii
Recordings 9240^ 322 0 7871^ 1022 0 7850^ 1290 O
Map Selection(s) S19.dwg 1114EI9.TIF
NOTICE
In addition to the Town of Oro Valley (the "Town"), there may be other jurisdictions affecting
development of this property. If a property developer waits until late in the development process to contact
other pertinent governmental agencies or bodies, additional expense and time in coordination, redesign and
development may be a result. Examples of other governmental agencies and/or bodies that may have
overlapping jurisdiction over this property include but are not limited to the following:
Federal:
State:
County:
The United States Department of the Interior, Fish and Wildlife Service is responsible for
Endangered Species Act compliance, etc. Please note, habitat has been designated with the Town.
U.S Fish and Wildlife Field Division
2321 W. Royal Palm Rd., Suite 103
Phoenix, AZ 85021-4951
Phone (602) 640-2720 Fax (602) 620-2730
The United States Corps of Engineers: This agency is responsible for management of
jurisdictional waters, etc. Section 404 consultations may be required on properties that contain
washes.
U.S. Army Corps of Engineers
5205 E. Comanche
Davis Monthan AFB
Tucson, AZ 85707
Phone (520) 584-4486 Fax (520) 584-4497
Arizona Department of Environmental Quality: This agency has multiple responsibilities. Please
contact directly for further information.
ADEQ
1110 W. Washington Street
Phoenix, AZ 85007
(602) 771-2300
Pima County Department of Environmental Quality: This agency has multiple responsibilities.
Please contact directly for further information.
PDEQ
201 N. Stone Avenue, 2"d Floor
Tucson, AZ 85701
(520) 740-6520
Please be advised, issuance of a permit DOES NOT, nor should it be construed, to imply compliance with
Federal, State or County regulations. If you have any questions concerning your responsibilities under
federal law, please contact the applicable agency.
APPLICANT NAME: %Ne 1✓L(S
CONTACT PHONE AND ADDRESS:
SITE LOCATION: P.o- itia,., 1/is,
Case/File Number
- 8S7/ i
��P`LEY
-P7
4
All
A9 "
TOWN OF ORO VALLEY
GENERAL PLAN AMENDMENT SUBMITTAL
REQUIREMENTS
Application form
Written Narrative (Sec. 22.1)
28 Copies of Proposed Revision to the General Plan Ma
P P P
28 Copies Site Location Map (11" X 17")
7. Request for General Plan Amendment signed by the owners of the subject
property or by his/her designated agent.
Names and addresses of person, firm or corporation having interest in the
subject property. (Sec. 22.2E)
If Application includes properties other than that owned by the applicant,
the applicant shall file a petition in favor of the proposed land use plan
amendment by the property owners or their agents or attorneys representing
at least 75 % of the land area not owned by the applicant that is to be
included in the General Plan Amendment request.
✓: Signed Notification of Potential State and Federal Issues (Attached in Packet
Pocket)
V/ Fees 71---) 13C P,4-ram �T)f Vt c ya so
Clear Day
Page 1 of 1
Gay, Shirley
From: Pelletier, Pamela
Sent: Thursday, March 06, 2008 4:37 PM
To: Gay, Shirley
Subject: RE: ov11-06-03 RV NB5 Parcels L & R
Coming in this month...
Pamela J. Pelletier
Planner
elletier@orovalleyaz.gov
(520) 229.4813
From: Gay, Shirley
Sent: Thursday, March 06, 2008 4:37 PM
To: Pelletier, Pamela
Subject: ov11-06-03 RV NB5 Parcels L & R
No action on this for a while can I close it?
Shirley Gay
Development Coordinator
520-229-4849
sQay(o)orovalleyaz.gov
Please note new email address
03/07/2008
r
VUNDED �9%
TOWN OF ORO VALLEY
COMMUNITY DEVELOPMENT DEPARTMENT
Planning and Zoning • Building Safety
11000 N. La Canada Drive, Oro Valley, AZ 85737 - (520) 229-4800 - Fax (520) 742-1022
Oro Valley Public Library
1305 W. Naranja Drive, Oro Valley, AZ 85737 - (520) 229-5300 - Fax (520) 229-5319
Parks and Recreation
680 W. Calle Concordia, Oro Valley, AZ 85737 - (520) 229-5050 - Fax (520) 797-2202
October 20th, 2006 4-- 4-Ovk I U /a L11b (Q
Paul Oland
Richard Maes
WLB Group
Stone Canyon LLC
4444 W. Broadway Blvd.
1121 W. Warner Road, Suite 109
Tucson, AZ 85711
Tempe, AZ 85284
881.7480
480.831.2000
Fax: 881.7492
Fax: 480.893.1604
RE: OV11-06-03, WLB Group, representing Vistoso Partners, requests approval of a
General Plan Amendment and Rancho Vistoso PAD amendment for Rancho Vistoso
Neighborhood 5, Parcels 5-I and 5-R (Parcels #219-20-052Q & 219-54-006A).
Dear Paul and Richard,
Thank you for submitting a General Plan Amendment for Rancho Vistoso Neighborhood 5,
Parcels 5-I and 5-R. At this time, staff requires the following items to be submitted RELor
to scheduling this project for the Planning and Zoning Commission initiation. Additional
items may be required by the Planning and Zoning Commission following the initiation.
Initiation:
1. First, please note that the parcel numbers provided do not correspond to the parcel
locations proposed to be amended (review attached General Plan map and Rancho
Vistoso PAD map - the two parcels to be modified are indicated by the blue lines).
Provide the correct parcel data on Cl) (CAD files and GIS shapefiles) for staff
review.
2. A condition of initiation will be that a letter from the Amphitheater School is
provided which states that they approve of the new school site. Please note, if they
do not approve of the proposed school site, this initiation cannot move forward.
3. A narrative addressing how conditions have changed since the last adoption
(November 2005) of the General Plan.
Items required prior to Public Hearinas at Planning and Zonina Commission:
1. A CAD file and GIS shapefile of the future extension of Moore Road shall be
submitted.
2. More analysis on the current narrative specifically addressing General Plan visions,
goals, and policies, with specific emphasis on the following issues: compatibility,
traffic, and open space. Specifically, please focus on the following policies:
..F:\OV\OV11\2006\OV11-06-03 1
www.townoforovalley.com
• "The amendment will not adversely impact the community as a whole, or a
portion of the community without an acceptable means of mitigating
these impacts through the subsequent zoning and development
processes."
• "How the proposal will consider development impacts on natural rolling
terrain and emphasize low -density developments in these areas. This will
include evaluating areas with slopes of fifteen percent (15%) and greater
for development compatibility and safety, with the possibility of
preserving them as natural open space".
• "How the proposal will have new development to locate uses that depend
on convenient transportation access (e.g., higher density residential and
commercial) near major arterial streets".
• "The proposed change is sustainable by contributing to the socio-
economic betterment of the Community, while achieving community and
environmental compatibility"; and,
3. Staff requires ten copies of appropriately -scaled 24"x36" and 11"47" color copies.
For the Planning and Zoning Commission hearing, twenty-eight color copies of 11"47"
are required. The required maps are as follows:
• Map showing existing General Plan Land Use Map categories;
• Map showing proposed General Plan Land Use Map categories;
• Map showing existing Rancho Vistoso PAD zoning categories;
• Map showing proposed Rancho Vistoso PAD zoning categories; and
• A side -by -side comparison of existing and proposed General Plan Land
Use Map categories/ Rancho Vistoso PAD zoning (similar to map created
for the Oro Valley Marketplace).
4. Submit all files digitally on CD (CAD files and GIS shapefiles).
5. Provide more detailed calculations of the areas of the individual areas to be
modified and/or traded and label them on the maps.
4. ENGINEERING:
a. Revise the General Plan Amendment exhibit - proposed conditions to reflect
the realignment of Moore Road per the submittal narrative.
b. Revise the General Plan Amendment exhibit to delineate the Town ROW
system as it is depicted within the current Town of Oro Valley General Plan -
Figure 4.
In order to meet the deadline for the December 5th, 2006 Planning and Zoning Commission
initiation, these materials should be submitted no later than noon on October 31st, 2006.
If the materials are not received by this deadline, then the Planning and Zoning Commission
hearing will be delayed.
Additionally, a Rancho Vistoso PAD amendment is required. A Site Analysis and Tentative
Development Plan are required to be submitted. The Tentative Development Plan (TDP)
checklist (Section 3-104) for PAD amendments is also provided as an attachment, The
following items are additional items which also need to be submitted for review:
1. First, please note that the parcel numbers provided do not correspond to the
parcel locations proposed to be amended (review attached General Plan map and
F:\OV\OV11\2006\OV11-06-03 2
Rancho Vistoso PAD map - the two parcels to be modified are indicated by the blue
lines). Provide the correct parcel data on CD (CAD files and GIS shapefiles) for
staff review.
2. Furthermore, a CAD file and GIS shapefile of the future extension of Moore Road
shall be submitted.
3. A narrative addressing the following:
a. How the proposal is in compliance with the Golf Course Overlay District.
b. What the current conditions are - size of parcels (in acres and square feet).
c. Proposed land use changes with the approximate area of each land use to be
modified, and the new proposed use.
d. Proposed density of the "proposed" medium density residential site.
e. Site constraints, such as access, slopes and floodplains;
4. Staff requires ten copies of appropriately -scaled 24"x36" and 11"x17" color copies.
For the Planning and Zoning Commission hearing, twenty-eight color copies of
11"x17" are required. The required maps are as follows:
• Map showing existing Rancho Vistoso PAD zoning categories;
• Map showing proposed Rancho Vistoso PAD zoning categories; and
• A side -by -side comparison of existing and proposed Rancho Vistoso PAD
zoning.
5. Submit all files digitally on CD (CAD files and GIS shapefiles).
6. ENGINEERING:
a. Revise the General Plan Amendment exhibit - proposed conditions to reflect
the realignment of Moore Road per the submittal narrative.
b. Revise the General Plan Amendment exhibit to delineate the Town ROW
system as it is depicted within the current Town of Oro Valley General Plan -
Figure 4.
The next deadline for a PAD amendment is no later than noon on November 2"d, 2006. The
above listed items should be submitted with the attached application form. Staff will
require a meeting with you to discuss the aforementioned requirements for both the
General Plan Amendment and the Rancho Vistoso PAD Amendment. Furthermore, a meeting
with the Amphitheater School representative to discuss this proposal shall occur RLor to an
initiation of this project at the Planning and Zoning Commission. If you have any questions,
please contact me.
Most Cordially,
Pamela J. Pelletier
Planner
520.229.4813
ppelletier@orovallev.net
Attachments: General Plan map; Rancho Vistoso PAD map; Tentative Development Plan (TDP)
checklist (Section 3-104); Oro Valley Water comments; General Plan Amendment packet; 4
PAD Amendment packet.
F:\OV\OVII\2006\OV11-06-03
e'i "" � fi � . 'k ✓ rxY. w .yY r ;,°Y a+.ai+i � �r +.•. *"'� 'k,:. *+. ..
ti l a fi arc ti }Z. d+ ;Fr c r 7#9 ra/y{�
y�' ,s'Y ✓9y"v1,'Y`.Fae st k a M►
-Zv+Y�t ��i '.i � � � } r k• � ��Iy� y �� �•a
�R t y.* r•7 ¢ : z aY i`S' +"' ft �' fi �NO,
Qkv
�k`'�-'4',".'�'' ,+ `prc Mt, 1, �is�aY'".�!f ya•.�
�'„'�^,[ o- d;y SY r�'sr"rt�r •v,��:,,+ J a. � ir�''S,�L°r�' !',�' +,� a �r[,rz >r Y�" ",' ; �"l�ti� s �a�'m r� .. t, a
4 .1A�i.iy'n t4it.+'kc 3�fi !� s4 <i3 Tia Z}: R�ifaT. '�.� %/R A+•'i 4` f �� i,A Y �."a S�N \`�u p 2 4•4"-t �•� L 4 :,� .h'd'..
+arit�;'rA,. .1„�5,7 '1. 1.'r E. d ?yet''"" + j( Ip�Y.+�`+: \��f v�4 `` �f �`y 3•.6 '�..k..G 'r {+a r��Fi '§,'u�.r�`+M' . Ce�
'[ s Y � s ,. • ✓, � 4 +�` � ��' of ° Srs'",re
�'a$i..i'e�st?-•k .a s + t t E� R �, ,.M' ,� ::4 x�r +w:Ft d tr F ,��+Wy. `'.
yy�
Tyryr r- n Y., t S S r M A ri #
h 4�* yyR ftA r�+ `�,.Y r�y:r ?4'! t Fit lr'•,2Aii y� ' an �c ' •. \+R� r! r ,�'+'.i F,.,+,Y1 yt"•F ;31�bvzZ�°\ �T�•`,3
t ����' Ste` �`y � f:S.r'� ''"�i � � i. n � � !r y{.�� ���� '"1 ir.. •+2' t�s 7'.r` z x �' > - r Y 'F+J7�'17r1�i ���p7 A• +J';F%rg T F . F� 6 r`.,_"
�°t'^ 7 c 'i '3 a ° Y" y ..,* '..e ' �ry✓Ay7�}'xi'r•�r,e }y., � �Frj '��e.n'�.+,,r.iL SC
aY-�' `k4 a7J �+ �syY $�Ti1� e �;y t�•�S t �h.Q� i vJ r%T-,r:f1* A c k r�cA3;+/FJ�>
,�.rAMEN
\�f+. ,75 ���'s �xn`* v•s rj.� {, *•m ^�ht7��fr �'�;��>,':i'k✓�f if+ ,�„,, by�,{/f� 4,
gtr/ JY 4'f
a...•3s. ti d2 r �'.�. �} t,,' / d?� l�-ctw.. Sr r: 4� /�mLb z� s. e.�„, .,:✓f✓z✓ .(�tl4rj y„r'1 t, R. 'n� sy�'`
Yt{P �� �•B J ', i'C 4�� �"{i"cY.: A+.t o �Y� 'T 1 "kW}1Y' Wiit•d� �wxi � �)i'Y A5 '.�`
� 'S j`
��^� CYwy _,r �`+'•'Y�sna.,, a Fw ""a'r-%t YRr=� t9'gf A; §E Ai,�'�v' Y
^Ki t, \4t'\"�!'S i re t p''si sr. y�/�..§t,, yt ,ie".` ;S° w •�C
tyytie@ t ?f/y is YoK �'rAyr q�,. r487�
+ai 9'a$�f•V .k,,..w 1Rsa WON
il�w Y+i� Irv- '-V�Y p�P
��.{t�.�,"+^�n
"�" ,1' '�'r'�,;- �' :?� u )'S.`'lt �,+ � $'�S's«\�a„Nb �'§G'rO`�'• ^. ,yt.�,rrr`J1fc7�Wd';�a't t;,�r;�,"�g��t'n'�,f"`�
ro+t' tg j t wti +•w ANYXPxx✓rc�3diia t at jet
6 >`Ss,fS `4 SdtM•
pen Spat,M= x a t d ��r
!$ > F T'� y .,• t y2! JCS r+" 4 f ( u -c a C Yr. 3'',
•�s, r. tyA�' r �t qr`� ! • r•aa`' 0'" � r.
Ai"$1"� p •F ,,�, ✓+`6^'�
516
^any xE5'". a'.J,r})#X a� a 4 r
'Cr wA •g, ! a dt r\ SM s yY tl.+° r7'/ 7t;11 L +4 tYN r'' ;v 47 tN4
�.x'C yj t4r
4 Yvr„'a �„?•Yx. 3'b J#�+a 'r � t 'y`Jrr i
!' 2at3a�g eb Gilt" S"i r r; �YJY
A ^'kC "r' >< 4a� 11 + �A o 7"§'','W'}.E,<d�.i S`si j{t 4 IR, w �r �k:d. +'1.4 }" ,?i3•
Ope� ��AA��'4`� Y �?��� dW< y r `� 4 Y y r E a a r"ry��+t
4
t
Vol
�� \,'�'d� f F a •'v r t.
p40 `+y
ti v� � ,7F � '.: 4 T / + t ` �r . ;+ ",Y 1A✓�:.c i t1q �+.� '[ " 1 � tt t
4�r 1 �•i1+'"{+i �"C � r g*i... -o [ k, P� Y� r g,�f,�'j'{l`� h+� is 1F. y, ".f ,r ,•Y � a
"Yr t �. l' '' �A�r ,�'U;Y� [ ..; Y r .a',":�� ♦ e A�r � Itr f`, n F n,c�t �F' � ar I pT ter:. Y "'�•$ '�„1�LY ��:x.,;ai, :. «. v„.Y «.c 'SS wFryi-u'+a�RF. �:Y ..d't'§ nr��'�'� .,���J... .. ri '
a r t,Yp t"tZ t ,/$v r x� k r .-t-'+ J ? [- 2�a\iA' tyrc r i•& Yt�T � r �� • �'r� r a � e
$'T �1'>�i` e°'•,ng � xa.A�n iu''W r.� �'�.,,y� v 1 � 4. �i a y� a y`��+ /» f'�' ♦ , 4 � ,. /�f�1' �
t. yP y a arA E r ' ; i kj d : PaA GP3 \a
§r1�7^� p-`�Y-sd`�t�c'� r* r ��r s t 7gy,� �1 �� �} r. �. a sA .+�.. �4 •"^ i �.'. {
.3t. ytx`' x, ,,x 4 a rt � �. -"++•a \lp 4°�'4 g u k SG- r = � ',�' a ,�� +
*>� x' .*Ya t s id't ?` V.t .k{D�• � l�{��'�;,jrt b -� §.c /r s �•. �" '. . z.� It �`� 9 i4���
r+ t Fj t y r� i�� 5c`
�y��'e r���
8 is •,, tF,1r i `a br d F c ,ir, Y^5l'
h�'�o,�P ' A+i-*n` y rY"'�i��'`•
,�=��'a�pQtoPr
a c ;� x "R1 t�Q«��/° 1��rr r J kj� r, sr • t
Ji� t a•r tr Yit ygr W i d•`a�ub '� ± f!! ya s my t pp°r A
21`, ita Il 4'r7 r �py 't apss r,x:p,z 44'1Y'� i .r ." k['xv, eyY +-` C '�" `a x i� Y► .Y
� +°z'r� \di%� Y•r z r w �}a 'yd`� �. fYx, 1}i��'»�R + ' id A`. ite r.J��4F 5 r_; � F� z•t +.rare t �"i { n
Y<1 r .✓54 3�'d".YrJc {+ pIVG{YS} * t �)ti*'� r ��`'n•� c•7 ,rf G`4
w y� r r � x !4((4Ak .� a Y. sf ° C +`" ., •xr. 1 � '�.` s rX r �'/ �i
� � v'i�,C..qAa+Y ✓ t : a y�ti?M'1 "� xrr 4 5f.,. ry{.i ei(I } tx �. � ,i J.� � '# �f� w�r��i
k+".�g;'�s'a��, 4 � x4 �+ ur a, W P r" G � �� v �'' ,C � a ?•+ ° °e v 'ir r'" �"�, ems; ':.�
L:>c� ., s� Et �� �, r t •.r� 1 �� $s , t� �& s .ee t�a{Yj� + e 1 Gs
.xa*`'r+,�'' � a+, la a .g .� P Y � � r 1 s �tl��. �t•"" drS cM
,�t, -t, e � t 4X i � t t s. _v4�t•�,i� Y f" •tx az s :J a, A- <++r:" s �< * F'wiq {''d i F j f t t C. ,� b 4 � ? 14 S [ y .. q �✓ 4• _. dy ^s
.. � i'hjR N fr'.'f -f'S ki }�.,t }1, r'✓ l T �' �' `r L
(��1
? �r1:� w v��•`t"".a ,a? )aP^aaxd, + t ,r- ,� ,..• a Y a �, �° t t ' ,1 ,z�;�, '.��a t
•, �'�, +r �} �� �'� M far i4��4 3{ c��-,}it4+ k c �'�y'�+` � ,�'nt,>ti.+i.' tv � } ° � ' € ,:� e�°;' a�,J§ C
•, .�t .� a"k� 'ak ,FT tkd a ,r"t �Z R`je +k � id]r«.�
,� �..a.�4�v $,41"'r,µaJ•'p Er't" �y it M.ti rY. ''. vw '� w ar
ap .. 4�`t `.+. 1•s,Yl1,E✓dj,; T�fry`"� a'.+dt�ssy'',+ �O';•fir rY {�_� ~ a a r ,✓,
Yyr yK, � �y' °"'� T �� �'l6iv v+^""a.'"m p,• w✓r+'ae '�""`aw,� !( ,too.-
* , .h
k � :� 1 /f� x r � _r,+r 'tY9`' � a s«^•�'+ e T ,s f "" ki s � F 1 � R s • �% I � � ' f,„,J''�� , � �yr'� � dA � � P rc s .5� � { �,�`7�' rY � m. \'+ A eiw v� Y3 �•y�.?d ,,rk
' /� -..� ��s� ✓,r yi trx�A � sG !'�"#'S't��v i�. •. +4 :cr r`N "5�:
V ., 1 ram• r �t15 • .y r s:1i'1�� ,, £
..,.... _..,_ u... .•.. .c..s. w.4.aa`.4a.,ot.+�, v .a0s�•'`' 1 _ ., .A, s.ew.::x.".�.1:` "-
Rancho Vistos0 PAD N
Land Use Designations
GOLDERRANCH FIRE DISTRICT
Preventi
Helping to i
our community a better, safer place to livel
International Fire Code 2003 Edition
TO: Town of Oro Valley Planning and Zoning Division
FROM: James Tucker, Fire Prevention Specialist II
DATE: October 30, 2006
PROJECT: OV11-06-03
PLAN REVIEW: Fire Code Review of Preliminary Development Plan Documents
Please read the following Fire Code review comments to the applicant for the above referenced project
The Golder Ranch Fire District has no comments on this submittal at this time.
Please email or call me with any questions regarding the understanding of any of the above Fire Code Review
comments.
James Tucker, Fire Prevention Specialist II
Golder Ranch Fire District
520-818-1017
itucker(a7golderranchfire.org
Golder Ranch Fire District - Prevention Division 3885 E. Golder Ranch Rd.; Tucson, Arizona 85739
520-818-1017 Fax 520-825-8043 www.olderranchfire.org prevention(h),golderranchfire.org
Proudly Serving Our Community with Strong Hands & Caring Hearts Since 1977.
Serving as the Fire Marshal for the Town of Oro Valley since 1999.
NOTICE
In addition to the Town of Oro Valley (the "Town'), there may be other jurisdictions affecting
development of this property. If a property developer waits until late in the development process to contact
other pertinent governmental agencies or bodies, additional expense and time in coordination, redesign and
development may be a result. Examples of other governmental agencies and/or bodies that may have
overlapping jurisdiction over this property include but are not limited to the following:
Federal:
State:
County:
The United States Department of the Interior, Fish and Wildlife Service is responsible for
Endangered Species Act compliance, etc. Please note, habitat has been designated with the Town.
U.S Fish and Wildlife Field Division
2321 W. Royal Palm Rd., Suite 103
Phoenix, AZ 85021-4951
Phone (602) 640-2720 Fax (602) 620-2730
The United States Corps of Engineers: This agency is responsible for management of
jurisdictional waters, etc. Section 404 consultations may be required on properties that contain
washes.
U.S. Army Corps of Engineers
5205 E. Comanche
Davis Monthan AFB
Tucson, AZ 85707
Phone (520) 584-4486 Fax (520) 584-4497
Arizona Department of Environmental Quality: This agency has multiple responsibilities. Please
contact directly for further information.
ADEQ
1110 W. Washington Street
Phoenix, AZ 85007
(602) 771-2300
Pima County Department of Environmental Quality: This agency has multiple responsibilities.
Please contact directly for further information.
PDEQ
201 N. Stone Avenue, 2"d Floor
Tucson, AZ 85701
(520) 740-6520
Please be advised, issuance of a permit DOES NOT, nor should it be construed, to imply compliance with
Federal, State or County regulations. If you have any questions concerning your responsibilities under
federal law, please contact the applicable agency.
APPLICANT NAME: 'T/& W"
CONTACT PHONE AND ADDRESS:
SITE LOCATION: I AC7
- 8S7/ /
Case/File Number
t�)ov Pik
October 13, 2006
PIMA COUNTY DEVELOPMENT SERVICES DEPARTMENT
Carmine DcBoni_, Jr.
Cirect or
Planning EW,:ior,
Comprehensive Plan 'section
De�elapment 5enK
OK
Shirley Gay 1
Project Coordinator "aw
Planning and Zoning Division
Town of Oro Valley
11000 N. La Canada Drive
Oro Valley, Arizona 85737
RE: Pima County's Response to OV11-06-03, Rancho Vistoso Neighborhood 3, Town of Oro Valley
Major Plan Amendment request
Dear Ms. Gay:
Thank you for the opportunity to comment on the above -referenced. Pima County offers the
following comments on the major plan amendment request submitted to your office.
Comments from the Planning Division, Pima County Development Services Department:
There is concern over how this amendment request would impact the Resource Transition (RT)-
designated area on the east side of Oracle Road at its intersection with Tangerine Road. The
project site is contiguous to the RT area, separated by Oracle Road.
Other comments related to environmental planning, flood control and transportation are appended
herein.
Environmental Planning
This proposed amendment to the Oro Valley General Plan seeks to revise, re -configure, and re-
designate various land uses as identified in the existing General Plan and PAD for Rancho Vistoso
Neighborhood 3. We understand that the end results will:
• re -designate approximately 37 acres in the Big Wash floodplain as Natural Open Space and
transfer previously approved development to other areas within Neighborhood 3;
• re -align the future bank protection extension such that it better aligns with the boundary of
the Big Wash floodplain;
• re -configure and expand the park site to incorporate a node trail system; and
• consolidate commercial and office uses along Oracle Road thereby reducing fragmentation
of open space.
Comparing this proposal with what was approved in the existing PAD, there is no change in the total
number of acres designated for parks and open space. Neither is there any change in the total
number of acres proposed for development nor the types of planned land uses requested.
201 N. Stone Avenue, 2n" Floor, Tucson, Arizona, 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411
c�'C
2
Looking at this request as if it were under Pima County's jurisdiction, it would be subject to the
Conservation Lands System (CLS) and its corresponding Conservation Guidelines for Important
Riparian Areas and Multiple Use Management Areas. The application and determination of
conservation objectives for the retention of undisturbed natural open space (NOS) are estimated in
the following table.
Table 1. Application of CLS Conservation Guidelines and estimates of undisturbed natural open
space to be conserved. (Note: Estimates are based on a comparison of the proposed project with
data available from Pima County's MapGuide System.)
PAD Acres
CLS Conservation
CLS N.O.S. to be
Objective
Conserved'
Important
157
95%
149
Riparian Areas
Multiple Use
653
66 Z/%
435
Management Area
TOTAL
810
---
584
1 = Estimated acreage of natural open space (N.O.S.)
The existing PAD and the current proposal provide approximately 383 acres of parks and open
space; this is approximately 47% of the area within Neighborhood 3 (there is no further distinction
between open space and natural open space). At face value, there appears to be a deficit between
the amount of open space that is proposed (and previously approved) and what is expected in order
to conform to CLS objectives.
However, conservation objectives within the larger Rancho Vistoso Development area, of which
Neighborhood 3 is part, are likely being fulfilled with execution of the Development Agreement
between Pima County and Stone Canyon L.L.C. (3/12/2002). This Development Agreement creates
and preserves the Honey Bee Canyon Biological Corridor by designating approximately 70% (247
acres) of Neighborhood 12 as natural open space and permanently protecting 988 acres of natural
open space within the larger Rancho Vistoso Development area through conveyance or
conservation easement to Pima County. These requirements plus the on -site provisions of
Neighborhood 3 suggest that CLS conformance has been achieved.
Although the specific elements of this proposed plan amendment, as referenced on the previous
page, are environmentally -favorable revisions when compared to the existing PAD, there is
additional opportunity to consolidate a broader natural open space corridor to enhance the
protection of Big Wash's hydrologic function and natural resource values while keeping the same
ratio of development to open space. Open space in the southeast quadrant — in the area of the
Tangerine Road and Oracle Road intersection — could be transferred into the northwest portion of
Neighborhood 3 that lies between Big Wash and the current alignment of N. Vistoso Village Drive
that is currently designated for Commercial/Office Park. Otherwise, existing development (including
bank protection) and grading in preparation for pending development have effectively precluded any
further jostling and re -arrangement of land uses within the proposed amendment area to
accommodate/consolidate a broader natural open space corridor for Big Wash.
Comments from the Pima County Department of Transportation:
The site of the proposed general plan amendment lies wholly within the Town of Oro Valley and has
no direct access onto County maintained roadways. The parcel is situated west or Oracle Road
between Tangerine Road and Rancho Vistoso Boulevard.
201 N. Stone Avenue, Tucson, Arizona 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411
Comments from the Pima County Regional Flood Control District:
Big Wash runs along the eastern edge of the property. There is existing bank protection along the
southern reaches of Big Wash adjacent to the development. The applicant proposes constructing
additional bank protection north of the current improvements to minimize the flood hazards
associated with Big Wash. There is a FEMA Letter of Map Revision (LOMR) that affects a portion of
the property. The LOMR removed areas from special flood hazard designation due to the bank
protection improvements.
It should be noted that Pima County Regional Flood Control is embarking on a study to re-evaluate
the hydrology along much of the Canada del Oro wash, including its tributary watercourses. The
main objectives of the study will be to determine accurate discharge values for the watercourses,
and then assess whether existing levees are adequate to deal with the expected discharge. It is
recommended that the applicant meet and coordinate with Pima County Regional Flood Control
District regarding the proposed bank protection and any hydrology studies related to the
development.
Several other minor washes traverse the property that should be considered in any drainage
improvement for the parcel. Finally, there are also several areas of Important Riparian habitat on the
parcel. These are mainly associated with several of the smaller washes on the property as well as
within the channel of Big Wash. Avoidance and preservation of these areas to the maximum extent
possible is recommended.
Comments from the Pima County Department of Natural Resources, Parks and Recreation:
Natural Resources, Parks and Recreation Department staff do not have any comments on this request.
On October 11, 1 received another request from Oro Valley (OV11-06-03 Rancho Vistoso Neighborhood
5) to forward comments to the Development Coordinator by October 20. Please be informed that it would
not be possible to obtain comments from the various Pima County departments to generate a report for
this request in nine days. Moreover, I am not so sure that this request fulfils the 60-day review period
required by the Growing SmarterAct. Unless, of course, "Rancho Vistoso Neighborhood 5" happens not
to be an Oro Valley major plan amendment request. Please advise.
Again, thank you for the opportunity to participate in the Town of Oro Valley's general plan amendment
process for major plan amendments, and we look forward to continued participation in the future.
If you have any questions, please call me at (520) 740-6800
cc: C. H. Huckelberry, County Administrator
John M. Bernal, Deputy County Administrator for Public Works
Carmine DeBonis, Jr., Director, Development Services Department
Arlan M. Colton, Planning Official
201 N. Stone Avenue, Tucson, Arizona 85701, Telephone: 520-740-6800, Facsimile: 520-623-5411
�istoso pannag
September 4, 2007
Todd A. Jaeger
Amphitheater School District
701 W. Wetmore Road
Tucson, AZ 85705
SUBJECT: Neighborhood 5 School Site
Dear Todd,
SEP 0 5 2007
The Town of Oro Valley has requested a letter from Vistoso partners memorializing our
agreement regarding dedication of a school site in Neighborhood 5 to Amphi School District.
They have requested that the letter outline the agreements between both of us, and that both
parties sign and notarize the letter so that the Town will feel comfortable that both parties have
agreed.
The following is an outline of our agreement as I know it from our last meeting regarding moving
the school site shown in Neighborhood 5 PAD documents.
1. Vistoso Partners will relocate the 35 acre school site shown on the PAD document
from its present location in Parcel I over to the Parcel R location on the PAD map.
This process is being done through a PAD and General Plan Amendment within the
Oro Valley zoning procedures. Please reference the attached map of Rancho Vistoso.
2. Vistoso Partners will agree to extend Arrowsmith Road from its present location north
to tie into the Moore Road alignment at Rancho Vistoso Boulevard. The roadway
design will incorporate design features (such as a multi -use walking path on one side)
appropriate for this type of roadway. Furthermore, Arrowsmith Road will be extended
in a manner to allow bi-directional access from the proposed school site (referred to as
the Loop Road).
3. Vistoso Partners will install a sewer line from the connection point on Tangerine Road
and Big Wash, up to the lift station at Sun City Vistoso, no sooner than five years
(unless able to do so earlier) or when Amphi School District applies for a C of O.
Location of the sewer line will Be along the bank protection. If there is a delay with
Pima County replacing the critical link of sewer line along Tangerine Road to the
identified point of connection, the condition will be revisited at such time.
4. Amphitheater School District agrees to handle all onsite drainage/flood control
measures to protect public improvements for their site. Both parties shall share and
1121 West Y04-met goad, S ti1te log
qe-mPe, 74tLzona 85284
480-831-2000 ® Fax 480-893-1604
coordinate the floodplain and drainage information to ensure suitable protection for
their respective land.
Please review this information and return a signed/notarized letter to me for my signature. We
are processing the property through the PAD and General Plan revisions at this time.
If there are any questions regarding this, please contact me at 602-723-1170.
Regards,
&,V4 14 .
Richard Maes
Project Manager
cc: David Andrews, Town Manager
ACCEPTED BY
AMPHITHEATER SCHOOL DISTRICT
0
State of Arizona }
County of Pima ] ss.
Date:
Signed before me this day of 2007.
ACCEPTED BY
VISTOSO PARTNERS, LLC
A
State of Arizona }
County of Maricopa ] ss.
Signed before me this day of
NOTARY
Date:
NOTARY
2007.
0
G
"lanclw ist
oso
A MASTER PLANNED COMMUNITY
ORO VALLEY, ARIZONA
(520) 797-3300
NATURAL a" :ACE -
11
5 2.
OAm p
2&1 Am /�
"'\Tr \`�l1� \\ :`; \\ cv...l.� •��i �`�� °A� K /e.0Aa /J // 1, 5\
`) co!>• couRSE`j�\ .�t� �� , +e4.4 Ae. 4.5 / / c-t \ \4e.9 Am \ 1
±`r f �� ✓I 1 ')�\ \\ / �l/� I IV! 1 49A Am I I AL'S I �� .68 Ae.\ \ I
1136.t Aq (H 2.7e Ae�� 1 III
- - - - L `j 0 \, 1 `1 1, k5 I.F J�,q.o Ac� 11
p .rz:e°�j�.,/ p 11+4.3 r•/• 1ORT
c-t I j- j\ \ 9A �y�1
J.0 �J HOTEL 1I /,/ `. Y ` w,85 �9 A. IC-2\ \ �� RF ��\
2C8 1 j s2.e Ac. /Z 1 ---- 'V � .47 �yc` \ ; ' ° I i `: '� " '(
ems\ /" \4.5`.
�\ }� B v 1 c , it tt
51 c_p ` I_\ �S`t \\`
3i.1Am E `\ 65OAc 4s7�m 1 1o.7Aml II �\ \1e.01 2900 �\4.5\ I) !
\ + TO t\ L \ fi
J•(�ABf /% \\ + eBA` _ BB ' l `gA`�1 t'�'V // . I J 0 �1T14is A/ /
4.0 4e°Ac\\� 11j / ( 139.o A• 1 {�`�g�1 iA,, \ 1 ff�(6, 1 zes A I
•zae Am �� r` I)a ^i\\ ��� � : 20 1. h C l It / e 1 ^ v (,) / / ��I
•�' / /� /^ V t" AH °Qs v 2.0' �szs ) n 1 i \ (o
AG 10.0 �`/\ F �+' c. t" -t•-� / j / e%.8A5UI I I 1 \ hivX� /-'�
11 o AF \ 4.o/I m.e I AN \foAeJ�`\ /� \ �� // C / \\\ I O
- `-�
\`eAI t .o sa4 Am f E `� \ p - ;3ii°Am ❑�• 1 (VA
\✓�
= AA 1✓ aueH•••,.�?,� �s As\\ �� �� /�;, 1 C„ \ 1 1 V•�
J.2/ °RrwNa `�-..` 9 / , RECREATION I----- i W�27,111 Am ° �$
/ -! ' t0.0 AREA ❑ I / t t `•� \,e\ I - 1 \\ sae �m O N '
11( \\ 3.7 / AK� t 13 S Ac B 7 C� p o ( L.� , O
1\ze.e / y.2 .t� .0 1 ✓ 1 �4 po /f/ r \ 'c}� \ 00 2
�• ,..� /� y ate\ • 4z.o Am 1 Cl Am 1 I
• C ALTV 6.2 Il 1-------------�. `� - ❑--ir------} ,' l r e s 1 O \ _�
9 1 ui Am// I �� �� O // . 1 / ` 5�\/ r s A� O \ F 1\l C /�\ l \ Cpl�
le A- `.l; / jc� F � 1 t2o � /7 p `!J // �'L� I29.7�
44.2 �•./ 4.8 11 \ 30.4 0 // / A T \ ►+t- O ? J
Ac. /� 20.4 Am r ! C
• / fi:e /. �`\• H �II ''' 0L\ ls.a/� /I p \ x`.:. 1'I O\\ �cP
/)6o r N i ----1( f03I o �� F-'-----// oo� I
2is 8.0 j`\.J O `\ ram\
5
JJ cpl
J
�I r JE Am �� j V, a� /< \ iee �+ ao\ s � TOa1r `\ ,u I I 1 i1 y
s\� 3155 ;cr:.e Ac ) P 9 Am t: \\ `�� L te.z\ CREAn
o I! I z\�\�\\\„s�� c�3�a'4(ei� \\\\ S\\ sue„/ \ QQ a i AREA
,�2 1`I1�.oAm �, �, r 1i \`. / 1 \ ;..�.o ,�� c� /� I
SCHOOL REC. • 8.0 1 K b ° N C 24.7 Am C
1\ / X i 27.e1 Am' 10.0 O \
jl• 8.2 SITE AREA CP, CPI
• we• Ai� e.4 Ay/ /Am M / /�34.4 TOWN CENTER I� �b b4, O° 40+ tl('K i/ .1 ia7 Am =
� �.� L• br Q ` si6sAm // / C \� `;a Cf"' ` v U �i° \ ••�J ; Lpi B, A Z
1 , 5 . �ZZ �w
•T su ' e : ? R a.s 1 } / "tie.e \\. c 3555 ��/ // \ A�• o
Z1.2 I Ae. j � c. 110.0 Am tY
V II Ae. 1S5 3.9 Aa 4 1 1 \i. Am I )� / i , B Ci
4 1\ w CPI
4 3 41.5 Ae7 RF 1 . ��y 12.4 Ac.
1 zei Am 1J \ 4.s r 1 1 I O 3.� // �/ M �/j c-t .
• s.7 Ac i 1 7.1 // �/( CPI 1 i�. �� [ c_, I
Q3oRE"iz�Ao - 4.0 0 \ / /
..._ _ _..... .. o .._...
/n5
I4.1 Am 1 i I o 0 0 /14
! P 1 ioPie •1i ilAm a E
)OUNDARY �--. \r V/ hM7-_,�
I163 AeLe Af P Am t •t I cpt�1CPI
nA \ 7�Aal1&530UNDARY !' ` s. S F-p- 1 E J"O p 11 y I IRE =�J r } ��Am1. /1 +A? o
3 Am / 0.0 Am \ J / 6.5 1 ` CPI Ili \ I / \
• • 112.0 JS 20.4 ❑ 40.0 AmQ /MtEA •: Ce_Am
PACE I-+.J I•/% % / \.) A. t �s7 1 \\ o �� + �� ? �t (�I / 4
�\ ��• / 1' o J. c_t �J 1' ❑ t� ��R S \` i `G�1lf`�? o
••�\ I 3A Am/ • 1 / 1 Am • 1 Q •�, • • •T T • •iZ T,1• - ,0.3 I \�•
=NTIAL DENSITY 0-1 R.A.C. "`/ 1707 I1 //�•/%_ �( sue-s7A X " cPl CPI
1 �\
•�Ac. �• ❑O H2&C IAA I I t/� V �, 4.5 Am F J\
3IDENTIAL 1.1-3.0 R.A.C.:y 'L� /;CPI
A.C. I/ x' (.c' si:s �\ \ \ \\' Is.J
•�/••• r , / 1 REC. / \ss'•in ,A z W A_i j U \ 1/� P, [Am
TI AL DENSI TY 3.1-6.0 R.A.C. I AR 1 / i ❑ HOSPITAL �i .j( cPl I os Am
3.0
NSITY RESIDENTIAL 6.1-8.0 R.A.C. .r-� N % 80 �\ \/AI
� 1 + \ C-t
r 30.e Am ` • 79 7 Ac. \ T
:SIDENTIAL 8.1-21 R.A.C. ; !L r �•� \ - �1T --- �J`
r z9� Am ' �' �'❑ ❑ O[e:c M4Oo Aa�e.e( zs o :•. / 1
WELLING UNIT CAP /
n \\\_�_�,' - I
�(( c-2 1
'ER ACRE (RAC) o; /� \\ 529 Am 1
�EAGE o1 4 ��
IERCIAL
/ a E
RCI AL o c4. �\
DUSTRIAL
'I TU TI ON AL / °t
[TY SEcdE2 f. //✓E L.r /�h
\ / GOLF COURSE 1 i�
Conceptual Site Plan
85-63 Acres Located in the Vicinity of
Rancho Feliz Drive and La Canada Drive
Site Plan Information
Total Site Area
Total Number of Lots
Typical Lot Size
Gross Density
Interior Road Length
Legend
N
85.63 Acres
172
80'x 125' (10,000 s.f.)
2.0 Dwelling Units per Acre
f 9,,950 Linear Feet
Linear Path
Open Space (f 27 Acres, 31% of Site)
La Canada Linear Park -Access Node
CONTOUR INTERVAL= 1 FOOT
0 40' 80' 120'
Ll
I
— z n b 14, , � zoob
GENERAL PLAN AMENDMENT
Da
Y
f Ll9
&
0.
4-
QA
4
ae ' W4
AW IM
17�
CIA
1R
We
RANCHO FELIZ DRIVE & OVERTON RD
Vi-qto,00 ;Name7s
September 11, 2007
Ms. Sarah Moore
Town of Oro Valley
11000 N. La Canada Drive
Oro Valley, AZ 85737
RE: Neighborhood 5 - School Site
Dear Sarah,
SEP 1 3 2007
In follow-up to Pamela's request, I have sent a letter to Amphi School District outlining
what our agreement is. I have called Todd Yeager to explain why the letter agreement
requires a notarized signature block for both of us, but have not heard back from him.
Please keep this in your files as verification that I have requested the school district to
sign and notarize per the Town's request.
Sincerely,
Richard Maes
Project Manager