HomeMy WebLinkAboutMinutes - Environmentally Sensitive Lands Task Force - 4/8/2010 4)0'01';
Agenda
Environmentally Sensitive Lands (ESL)
Public Advisory Committee (PAC)
Thursday, April 8, 2010
4 p.m.
Hopi Conference Room
Development Services Building
11000 N. La Canada Dr.
1. Call to Order 4pm
2. Approval of PAC Meeting Summaries
3. Schedule
4. Continued review of the following Section D, Design Requirements:
• Trample Zones (Recycled Issue from Previous Meetings)
• ESOS on Individual Lots (Recycled Issue from Previous Meetings)
• Wildlife Friendly Crossings
5. Discussion of Section G. Hillside Regulations to commence at 5:00pm
• Existing Oro Valley Zoning Code
• Proposed Section G. Hillside Regulations
6. Adjourn
Posted: 04/06/10
4:30 p.m.
kec
The Town of Oro Valley complies with Americans with Disabilities Act (ADA). If
any person with a disability needs any type of accommodation, please notify the
Clerk's office at 229-4700.
"Notice of Possible Quorum of the Oro Valley Town Council: In accordance
with Arizona Open Meeting Law A.R.S. §38-431 et seq, a majority of the Town
Council may attend the above referenced meeting as a member of the audience
only."
S' • t
eoees»eeroeeeee
Ari DRAFT MEETING SUMMARY
4,,z4„04,7�
Y t
Town of Oro Valley
ENVIRONMENTALLY SENSITIVE LANDS (ESL)
PUBLIC ADVISORY COMMITTEE MEETING # 22 �+
April 8 2010 r..
4-6p
HOPI CONFERENCE ROOM
11000 N. LA CANADA DR.
PAC Members Present:
Bill Adler
Doug McKee
Steve Solomon
Don Chatfield
Steve Ta i l l i e
PAC Members Absent:
Philip Kline
Susan Simms
Oro Valley ESL Team Members Present:
David Williams
Bayer Vella
Joe Andrews
Paul Keesler
Arinda Asper
1. Call to Order - Meeting called to order at 4:12 p.m.
2. Approval of PAC Meeting Summaries — no summaries to review
3. Schedule
Bayer Vella distributed schedules for PAC & TAC Review and HPC Cultural
Review. The ESL work, which is based on the Town budget, is being completed
in August so that staff can take to Town Council. The PAC needs to work
together to make these dates work. The plan is to spend no more than two to
three meetings on each section. After going through those chapters, staff will
take the entire document for legal review and clean-up, and then bring the PAC
back together to review the full document. SAHBA, MPA & landowners will also
review the document. PAC members have the option of attending the SAHBA,
MPA & landowner meetings. Publication of first draft will be close to July 1.
Doug asked for a publish date for comment.
The group discussed two methods of working through the sections. One option
is go to through a section together, line by line if necessary, make comments,
and then move on to the next section. A second option is to ask PAC to provide
F:\SR OFFICE SPEC\Projects for COMMUNICATIONS\ESL\ESL PAC\ESL PAC 04-08- 1
10 meeting summary.doc
•
written comments after review of each section. The third option is to stick with
what we're doing but follow the schedule.
Bill Adler suggested that while going through the remaining sections some items
could be put in the "parking lot" so that the PAC stays on schedule. Unresolved
issues would go to staff for review and decision. Don Chatfield liked Bill's idea
and is also comfortable with submitting written comments (Option 2). Steve
Solomon said that those issues that everyone acknowledges can go through, and
the problematic issues can go to staff for resolution. Bayer's preference is a mix
of what Don and Bill said. Bayer cautioned that he didn't want a parking lot with
40 items. The new process will be as follows:
1. Staff will provide a written draft of a section.
2. PAC will spend time discussing key elements.
3. Staff will redraft the section based on PAC direction.
4. PAC will be afforded an opportunity to provide written comments on
the redraft.
5. Major unresolved issues that are raised by PAC as part of Step 2 or
Step 4 will be held in a "parking lot."
6. Parking lot issues will be discussed once all ESL sections have been
drafted.
PAC members asked for clarification on whether there would be funding for
David's work to allow him to make presentations at council meetings. Bayer
Vella said that consultant support is essential for council meetings, and that there
would be funding for that purpose beyond August 1.
The PAC discussed the use of the vote to make decisions and the use of the
"parking lot." A significant issue like maintenance is definitely something that
goes in the parking lot. Many parking lot issues could be clarified by staff with
the individual bringing up the issue, as it might be simply a matter of confusion.
Don Chatfield suggested a ground rule to have a member raise an issue and a
possible solution, rather than open up to a 20-minute discussion. Everyone
agreed that would be a good approach.
VOTE: Agreement was reached by the majority (Don Chatfield, Bill Adler,
Steve Solomon, Doug McKee) to go with Option 2 (PAC to provide written
comments after review of each section).
Bayer Vella reported that staff had the final meeting with TAC, so there is now a
map to review. Some changes need to be made to the map based on today's
meeting, and it will return to PAC with those changes. The PAC will also receive
a white paper describing the map component.
There is HPC Committee meeting tomorrow and staff intends to bring the draft
Cultural Resource Section to PAC in the next few weeks.
F:\SR OFFICE SPEC\Projects for COMMUNICATIONS\ESL\ESL PAC\ESL PAC 04-08- 2
10 meeting summary.doc
Continued Review and Discussion of Section D, Design Requirements
David Williams led the discussion, beginning with the issue of whether ESOS
would be located on individual lots. Currently, ESOS cannot be on an individual
lot, but if some flexibility is introduced, Town Council could permit this.
On existing parcels, a tool is needed to protect features, using hillside
conservation, since ESOS is not on lots but hillside might be. Steve Solomon
would like to see the flexibility applied to individual lots. Bayer Vella said ESOS
on individual lots depends on how confident we are on protection mechanisms
(by either HOA or the Town).
Joe Andrews questioned why the group was discussing allowing ESOS on lots if
we are thinking of going to smaller size lots. Steve Solomon said he wasn't
aware that it wasn't going to be allowed. Don Chatfield said the ordinance
should stay as written because ESOS is being determined as a basis of science
and also because, regardless of the maintenance mechanism, the likelihood of
lasting disturbance increases when there is lot ownership of ESOS.
Bill Alder asked for clarification on whether hillside is considered to be -
environmentally sensitive land. Bayer responded that it is considered ESL— but
we may wish to deal with hillside areas differently. Doug McKee said he was not
clear whether doing this causes a parcel to be undevelopable at all. He gave an
example of a parcel where 90% is ES, and the remaining 10% is not big enough
for development. Bayer explained that was why we suggested building in a
relief mechanism. Paul Keesler added that we need to plan the lots outside of
the ESOS, so this is part of development planning, David sees that negotiations
regarding a tract might occur, but negotiations would not occur by lot. Doug said
that the wording of the code would be that the Town Council could approve relief,
so it's not a complete prohibition.
VOTE: Don Chatfield, Steve Solomon, Bill Adler and Steve Taillie all voted
yes to keep ESOS outside of individual lots. Doug McKee voted yes, with
the caveat that he wants to give this change special scrutiny when it comes
back for review.
David Williams lead the discussion on trample zones. To facilitate construction,
any time a structure is proposed, a trample zone is required to be established,
outside of the ESOS area. The need for a trample zone designation outside of
the ESOS was questioned. Paul Keesler said that often a trample zone is set,
but later disregarded by the construction crew. Bayer Vella said that a 15-foot
trample zone is currently required next to riparian areas and is needed to
preserve ESOS areas. Current building practice entails absolute destruction of
the trample area. A buffer is needed. Steve Solomon said that trample zone
compliance can be done correctly. He asked why not set the line (with a
temporary wrought iron fence, for example) and if a developer crosses it, there is
F:\SR OFFICE SPEC\Projects for COMMUNICATIONS\ESL\ESL PAC\ESL PAC 04-08- 3
10 meeting summary.doc
••4 1 •
a penalty. At minimum, the trample zone should be renamed a setback. Paul
said that the trample zone is really a setback for construction. Doug McKee
asked why it wasn't simply called a setback for construction.
Don Chatfield asked if a mass-graded construction area is considered a structure
for purposes of this discussion; David Williams said that it was not. Paul
explained that setbacks usually refer to building structures (walls, buildings).
VOTE: Don Chatfield called the question, to change the term from trample
zone to some type of setback and that the trample setback be 15 feet and
applied whenever there is a structure or earthen fill. Don supports ESOS
setback provided it only applies when there is a structure or when mass
graded. Bill Adler, Steve Solomon, Don Chatfield and Steve Taillie all
voted yes. Doug McKee voted no and said the definition of structure needs
to exclude the wrought iron fence.
Bill Adler agreed to put the issue of transitional density in the parking lot.
4. Discussion of Section G, Hillside Regulations, to commence at 5:00 p.m.
Bayer Vella referred to the previously distributed copy of hillside regulations and
proposed ESL, and explained that the current code is very complex and hard for
planners to utilize. He also referred to a map and to photographs of the hillside
outside the Development Services building, taken during a previous PAC
meeting and observation.
David Williams gave an overview of the concept and objectives of the Hillside
Development Zone (HDZ). He explained the Average Cross Slope (ACS)
formula and how it determines what portion of the parcel can be graded.
Existing code relies on ACS formula which is based on topographic contour. The
formula is prone to some error and involves the whole site. An example is a site
that has both flat and sloped land (75% of site is less than 15% slope; 25% of lot
is more than 15% slope). Current code allows for averaging out the slope
formula and allows any slope to be destroyed, so code needs to be improved.
Code also allows development of the sloped area so that that portion is not
involved in the calculation. In Oro Valley, this loophole hasn't been an issue
because most all developments have been under PADs.
Bayer explained that we are proposing not using the cross-slope formula
because the formula hasn't done anything to preserve slopes and hillsides.
Paul Keesler presented an example of a development he designed as a private
consultant in the City of Tucson in 2001, an apartment complex at Greasewood
and Anklam. The ASC calculation was higher than 15%. Even though subject to
ASC calculation, only a small portion of the hillside was preserved; the rest was
obliterated because it was allowed. Most important thing was that the developer
F:\SR OFFICE SPEC\Projects for COMMUNICATIONS\ESL\ESL PAC\ESL PAC 04-08- 4
10 meeting summary.doc
was able to obliterate almost the entire thing. The Oro Valley code was
patterned after the City of Tucson code, so this could also happen here. We
want to back away from the ACS formula by identifying the major feature(s) and
then writing the code accordingly.
Bayer said we want to use current topography rather than using slope maps that
may become outdated in the future. This has been an issue with PADs that
include slope maps.
Bill Adler questioned how the proposed slope preservation conflicts with the
General Plan. David said the proposed language is consistent with the General
Plan. .
Bill said he believes we are not "evaluating" 15% slopes as directed in the
General Plan; we are designating for destruction by providing the guidelines
presented. David asked how the group felt about "evaluating" which 15% is
preserved, which would mean adding an evaluation component to our objectives.
Paul said he believes an evaluation is being done, but the code is too loose and
we need to tighten that up. Bayer cautioned that we need to be very careful
when developing any type of criteria.
Referring to the latest Hillside Area Category (dated 3/12/10), David explained
that on a development, we want to identify and map slopes, with the intent of
designing around them and meeting minimum thresholds. We also want to
regulate lot size based on the slopes, and make this application without rezoning.
Table 24-1, on page 3, shows lot sizes, amounts of grading. We are also
changing a definition of what a slope is. If the entire parcel was sloped, it would
drive the lot size requirements.
Bayer asked if folks were prepared to give comments and start going through the
pages. It was agreed that for the next meeting, PAC members were to read the
document and start the page-by-page review. If there are any issues that need
clarification, PAC members are to call Bayer. Bayer will bring in maps next
time. Bayer clarified that the intent is to have this revision replace the entire
Hillside Code and, depending on the legal opinion, this might just need to apply
to rezonings.
5. Adjournment - Meeting adjourned at 5:50 p.m.
Prepared by:
Arinda Asper
Senior Office Specialist
F:\SR OFFICE SPEC\Projects for COMMUNICATIONS\ESL\ESL PAC\ESL PAC 04-08- 5
10 meeting summary.doc
PAC and TAC Review
�-..� ,� 5✓,Y✓ d t@�'s �^�.+N�,F jrr �"w e c l F s vxh.a+�,prra r w f x h -r r� h+c/fGjS 4.
»r a r1r r y 1 n
>-4 �a��,�4 _ ,e aya�,.��,m'tw �.P.�..k✓�✓.„,_.,. .,.,nii i¢°aii.. �$��,�av.4w„�„"�'";, ..w ,�,a. ,e a ;"° ��a�tiui>"�&r.�
Design 4-8 and 4-15
Hillside 4-8, 4-15, and
4-22
Cultural 4-22 and 4-29
Viewshed and 5-6 and 5-13
View Maps
ESL Maps 5-20 and 5-27 3-8
Maintenance 6-3
Enforcement 6-10
Final Staff TAC Code
Review of All Review:
Sections Written
Comments
SAHBA, MPA, July 1-22
and Landowner
Input
Final PAC 7-22 and 7-23
Review
HPC Cultural Review
1 2-22 -- -
2 3-11
4 4-9
5 4-12 to 4-22 &
4-29 4-29
6 Early June
May
PZ Commission and Town Council Review
• August and September
1 "
DRAFT 3/12/10
Section D Table of Contents
1. Use Restrictions
2. Design Incentives
3. Design Standards
D. Use and Development Standards
1. ESOS Use Restrictions
A. Applicability
Areas reserved as ESOS upon completion of a rezoning are subject to
use restrictions and standards. Each must be recorded when land is
reserved by ESOS zoning, easement, and/or deed restriction.
B. Permitted Uses
1 Natural Open Space,
2 Trails,
3 Identification, use restriction, and/or interpretive signage,
4 Wildlife friendly protective fencing or walls subject to Planning and
Zoning Administrator review and approval,
5 Cultural Resource Exhibition,
6 Essential services as provided for in Section 3.D.1.d,Open Space
Requirements,
7 Within the Multiple Use Management Category,the following uses
are sermitted sub'ect to the criteria listed below and Town Deleted:Golf Courses within the
Multiple Use Management Category I
Council approval:
meeting the criteria listed below and .
i. Golf Courses when: subject to
I. Natural drainage patterns are maintained, and r Formatted
2. Golf course best environmental management ......................................................................................................................�
Formatted
practices for irrigation,fertilizer use and pest ......................................................................................................................�
control are required.
ii. Passive and active recreation facilities that are
}
compatible with Formatted:Font:(Default)Arial,11
the conservation ur oses of ESOS �
and do not include impermeable surfaces. Allowable pt
facilities include but are not limited to: r Formatted:Font:(Default)Arial,11
' 1.p.t, J
. Soccer or ball field, ................�.............
2. Volleyball court,
I Formatted:Font:(Default)Arial 11
pt
3. Horseshoe pit. ...................................................................................................................
4. Par course, I Formatted:Font:(Default)Arial,11 j
5 pt
e r
• Turf area .. ......
6. Benches, F..,o...'rmattec.Font.(D...efault)
Arial,
i 11
pt
#74
Draft 3.12.10 1 fkit�E3iC3i�EAS4WFRE?.Y
7. Picnic tables, Formatted:Font:(Default)Arial,11
8. Shade structures. _....................._..........._............................................
9. Barbecues,rills and Formatted:Font:(Default)Anal,11
10.Pathways.. Pt
} Formatted:Font:(Default)Arial,11
C. Prohibited Uses pt
Formatted:Font:(Default)Arial,11
1. Structures Lpt
2. Waste Disposal
3. Motorized vehicle accessexce t for maintenance. =-(Deleted:, 1
4. Recreational activities not contained within the confines of a
designated trail.
5. Off leash domestic animals
6. Establishment of non-native species
7. Removal of native vegetation unless approved for flood control
purposes by the Planning and Zoning Administrator.
D. Use Standards
1. Trails
Trails and associated amenities such as benches must conform to
standards established by the Oro Valley Parks and Recreation
Department.
2. Signs
a. Permanent signs shall be posted in ESOS areas indicating
the use restrictions contained in this Section.
b. Signs must conform to standards established by the Oro
Valley Parks and Recreation Department.
2. Development Balance and Incentives
A. Purpose
Achieving or exceeding base zoning densities and implementation of
conservation objectives are both supported.This section includes more
flexibility for site planning, lot sizes and dwelling types than permitted
under conventional, base zoning districts. Limited density increases may
be approved, Deleted:
if additional open space is
provided beyond required minimums.
B. Applicability
The following design options may be applied to property or portions of
property reserved as ESL.
1. When ESOS is applied to 25%or more of a project site,the
remaining areas are eligible to utilize the design options included
in this Section.
Draft 3.12.10 2 tfdtlE3iU1V3etERiER.3.Y
2. When ESOS,is applied to 66%or more of a project site, broader • Deleted: open space
flexibility is provided throu h,additional lot size reductions as _ ...Deleted.the...........................theremaining areas are............
......................... ...........
...........
:
provided in Section D 2.D,3,d. eligible to utilize the design options
included in this Section,and
♦.......................... .........................................._......................_................J
C. Flexible Development Standards
1. Process. Development standards may be modified to allow
flexibility by Town Council as a part of the rezoning process.
2. Review Criteria. The determination to permit a modification is
subject to the following findings:
a. Open space conservation is assured and there is a
measurable reduction in development area as a direct
result of the modification.
b. Enables development to the base zoning density,at a
minimum,for the entire site.
c. Compatibility with adjacent land uses is achieved through
architectural design,transition of density, buffers,and
placement of structures and improvements to reduce view
impacts.
d. Statutes,development agreements,appeal processes,or
other provisions of this code are not violated.
3. Standards Subject to Modification
The following standards may be modified as they relate to the
nosed construction of sin•le famil attached and detached
residences,multi-family residences,commercial,employment and
mixed use projects, Formatted:.Font:NotBold ..
a. Building Setback and Landscape Bufferyard. Minimum
required distances may be reduced up to 20 percent
subject to the following limitations:
i. Side yards shall not be less than five feet, unless
a zero lot line design is utilized,
ii. Setback reductions shall not result in on-lot
driveway lengths that are less than 20 feet.
b. Minimum Lot Size. Minimum lot sizes in all R1, R-4, R-S
and SDH-6 districts may be modified subject to Cluster
Design requirements in Section D.
c. Off-Street Parking. Modifications resulting in reduced
amounts of parking and circulation area are supported.
Off-street parking requirements may be reduced in
accordance with Section 27.7.C.
Draft 3.12.10 3 £dJE3iC31VA8fRdFRE.3.Y
d. Building Height. Building heights for single family
attached and multi-family dwelling types may be increased
by no more than 1 feet and one additional story., = Deletes:2
•
t Formatted:Font:Bold
e. Open Space. Open space requirements may be reduced I Formatted:List Paragraph, No
in accordance with Section III.C.3, Open Space 1 bullets or numbering
Requirements, — .
_ f Formatted:Font:Bold
•
Mixed Use. Residential that functional! I Formatted:List Paragraph, No
f• uses are
bullets or numbering
integrated, including access, non-vehicular circulation, and
amenities,with commercial or employment uses may be
approved within commercial zoning districts.
Editor's note. � .. --{Formatted
. . .•A mixed-use zoning distnct must be •Indent:Left: 2 5"
developed, fi;;;;;tted–TF-
ont:Not Bold,Italic 1
{ •
Formatted:Font:Italic
g. Modified Review Process. Development plans and
•relimina •lats submitted in conformance with theFormatted:List Paragraph, No
• bullets or numbering
approved Tentative Development Plan, as determined by L........................................................................................................................:
the Planning and Zoning Administrator, may be
administrati ,
raved., ...................................'................'...........................................................
Formatted:Font:Bold
• I Formatted:List Paragraph, No i
h. Recreation Area Credit. Permissible •assive and/or Lbullets or numberingi
active recreational amenities located within Multiple Use
Mana•ement ESOS areas ma be credited toward
residential recreation area re•uirements as a••roved b
the Plannin and Zonin Administrator.
.- - Formatted:Font:Bold •
• I Formatted:List Paragraph, No
.................
i. Native Vegetation Preservation. When 66%or more of a t bullets or numbering
site is •reserved as Multi•le Use Mana•ement ESOS
re•uirements for native •lant Salva•e •reservation and
restoration ma be waived. This modification shall not
apply to areas of distinct vegetation which are designated
as a Core Resource by the ESL.
D. Cluster Design
1. Purpose
Cluster design concentrates residential development on a portion
of the available land in order to maximize protected open space,
improve the efficiency of infrastructure systems and offset the
reduction in development yield. Cluster options include potential
increases to development density.
2. General Requirements
a. Development shall be arranged in a manner to preserve
identified resources.
(Insert graphic)
Draft 3.12.10 4 aw�EcarEssvER..v
55P:':IYtvE:ANf;I
b. The area to be developed must be consolidated to a
greater extent than permitted in Section 23.4 and provide a
concomitant increase in ESOS.
Insert Graphic:Traditional layout vs Cluster
c. The length of residential streets,driveways and utility lines
shall be reduced in comparison to a design that complies
with zoning standards identified in Section 23.4. The
length of collector streets shall not be considered in
assessing overall roadway reductions. (add graphic).
(Insert graphic)
d. Compatibility with adjacent land uses through architectural
design,transition of density, buffers, and placement of
structures and improvements must be achieved as follows:
i. Architectural Design. Structures shall include
architectural design features and a color palette
that is compatible with an adjacent subdivision(s).
Design compatibility is subject to Development
Review Board review and approval.
ii. Transition of Density. In perimeter areas
adjacent to residential development, a density
transition shall be provided utilizing base zoning
lot sizes. Reduced lot sizes shall not be placed
within 150 feet of adjacent residential uses or
ESOS areas.
(Insert graphic)
iii. Placement of Structures—cluster development
lots immediately abutting a residential subdivision
zoned R1-144, R1-43,or R1-36 shall meet base
zoning minimum lot size requirements.
(Insert graphic)
e. Cluster designs may employ any dwelling unit type
permitted by OVZCR, except site-delivered housing as
defined in Chapter 31. The following requirements apply. __, _ - [Formatted:Font:Bold
`- - - Formatted:Indent:Left: 2.5" j
Draft 3.12.10 5 fydt{£34:3iV3s4Q8iER£.3.Y
i. Building heights must comply with base zoning, or -- Formatted:Numbered+Level:1+
building heights modified by an ESL rezoning Numbering Style:i,ii,iii,...+Start
approval. at:1+Alignment:Right+Aligned
at: 2.75"+Tab after: 3"+Indent
at: 3"
ii. Alternative dwelling unit types shall employ the
i Formatted:Indent:Left: 2.5" s.)
OVZCR development standards associated with
an alternative dwelling type. Formatted:Numbered+Level:1+
y Numbering Style:i,ii,iii,...+Start
1, at:1+Alignment:Right+Aligned
a) Townhouse dwellings are subject to R-4 •. at: 2.75"+Tab after: 3"+Indent
zoning standards in Section 23.7.k
at: 3"
t Formatted:Indent:Left: 2.5" J
b) Multi-family dwellings are subject to R-6 ♦,, Formatted:Numbered+Level:2+
zoning standards in Section 23.7.D. ` Numbering Style:a,b,c,...+Start
`, at:1+Alignment:Left+Aligned at:
3.25"+Tab after: 3.5"+Indent at:
f. The sum total of square feet by which the area of each lot 3.5"
in the subdivision is reduced shall not exceed the total Formatted:Indent:Left: 2.5"
square footage of the preserved area. „. 2 -------- ��
' Formatted:Numbered+Level:2+
Numbering Style:a,b,c,...+Start
(Insert graphic) at:1+Alignment:Left+Aligned at:
3.25”+Tab after: 3.5"+Indent at:
g. Any proposed increase in cluster density must be specified ,3.5"
on the tentative development plan required for rezoning.
3. Compact Development
a. Compact development without an increase in density may
occur by reducing minimum lot sizes while retaining the
overall base zoning density as defined in Chapter 31.
Definition: Base Zoning Density: An expression of
residential land use density calculated by dividing the area
of the site or parcel, before any required dedications for
right-of-way or drainage, or designations for open space or
other OVZCR requirements, by the base zoning minimum
lot size. (See formula below)
(Note:As described above, base zoning density is
calculated using the'raw' or`gross' acreage of the site,
•rior to an area deductions for infrastructure or other
uses. All density calculations are intended to be
completed in this manner.)
b. Residential lots may be reduced in size by 40 percent, but
shall not be smaller than the minimum lot areas set forth In
Table 111-4.
c. When ESOS is applied to 66 percent or more of a project
site, residential lot size may be reduced by up to 80
percent, but in no case be less than 5,500 square feet.
t%d;CE Dt:3tE eSE Aa'FRE.3.Y
Draft 3.12.10 6
Table III-4
Allowable Lot Size Reductions
District Minimum Base Zoning Lot Area Minimum Cluster Lot Size
R1-144 144,000 86,400
R1-43 43,000 24,000
R1-36 36,000 21,600
R1-20 20,000 12,000
R1-10 10,000 6,000
R1-7 7,000 5,500
SDH-6 6,000 5,500
4. Compact Development With Density Increase
a. When compact development designs are utilized and
minimum open space requirements of the ESLS are met, a
density increase of 10 percent above the base zoning
densityis ermitted. The additional densit cannot result
in any reduction in required ESOS. -t Formatted:Font:Bold
Formatted:Indent:Left: 2.5", No
b. A density incentive up to 20 percent of the base zoning L bullets or numbering
density is permitted if ESOS requirements are exceeded
by 10 percent or more.
c. This density bonus provision may be applied when utilizing
the flexibility and modifications permitted in Section D.2.D,
Cluster Design.
d. The increase in density is calculated by multiplying the
area of additional ESOS times the density of the base
zoning district. Maximum density increases for
development are listed in Table III-5.
Draft 3.12.10 7 t'dliC3iFfkfER7FR'..I.Y
Formula to Calculate Density Bonus
Step One:
Base Zoning Density(expressed as dwellings per acre)=
Site Area_Minimum Lot Area of Base Zone Formatted Font
_ ,-..............................................._...._�............_............_.................................1
•Bold
Additional Dwellings Permitted=
Additional ESOS Area X Base Zoning Density
Formatted:Font:Bold
Step Two:
Allowable Density with Bonus= Formatted:Left
additional Dwain s+Base Zoning Dwellings�.Protect Acres •
Formatted:Underline �t
�iii■iii�ni iii w..w — — w _ _
Deleted:+Project
De Allowable:=Allowa a De ity
_. _ _. .. _. .. .. ns
Bonus •
Deleted:
e. The additional ESOS must meet the following criteria:
i. Meet the standards in Section III.C.3, Open
Space Requirements.
ii. Be natural, undisturbed desert area and cannot
include revegetated areas.
iii. The additional ESOS shall be provided in
common area or separate tracts and cannot be
located on an individual single-family lot.
Draft 3.12.10 8 fAotlE33;3W3►f4l1ERE.3.Y
Table III-5
Maximum Density Bonus
Zoning Minimum Area Base Density Maximum
District per Dwelling (D.U.'s/acre Density with
Bonus
:•¢�,;?if,,;••if?;:a }t. .�x�:C 3c.•..;;.4'...}y,Y;{.a•:: "2::;:".•.'•:::t%%2?�tff•.•:;:;>:if?;:{:•'`��C+`+��'��h>i"tY '?. t:y'i;"` .;ir.':;}:jti:,4'aY�t�:
�;+k .•<;+..k4,f}.,r?},y `+'�YY�,; •v;a`�• ) a '.k+?,::.�j`:�yx;�.; ,�`��\4 etc..7c� .3:•.;j.,.;�.� t.: +�';:.?;?:p�.;��}
}: +a_•r •fn �r• �j :N3�ryY�+�++� ...vt,�,�C ?. Cv'4 4`• h ••}•• �4�'v"'t:+`�:::
v a+ .,, ?..••.4 4 v.:.{. R�,+{{Y ..��:a.a +•+'iC:.if. :+ryj +,,.';'�'.?{l"}..� �}:'}' :t''�.L�.?
.•�y: i^s�:,+..,:, .'Yh.} 3t�.;.; ,,.•:. :.?{+:, J :•Y'.�,:..,•M}�+r'•°?F. ,�a...5�' :{?:.+..}�+,,.t.a n•...f%7x.�°�:'...•.
:Y' :•;.4\:•gq4vr;� •3�,., R•'�. ..2•?';}• � ..'���4���?.\. ,${;'•,`i`,�44, W K•.+ W,.;\ a{a, is
'�:��� ''iv} ?Yar•.f...{:}:�; .:s14.a. .\ ..v�...{{{., .:�.r1... S}'�v.'.:Y. \•:F i })'' .r:i';}.'.',.:: �,:n.Y:•.}.v..
.i;",;.'•{,�...�':,.:�:� .+•�..{:C:G•. :.!t.. ?�` '?:it: ..b:•.�`a.C+t;:f},:v:. :�t�t:}::., -,a�'c •..Y.?}<.�
:� .`4...�., .'}5;:. �.. ]• 3..:'fi`a'•.?n?J+ :'6... ..4`#....}... ...?",..a$r:'3M: :ttA .�..:.}.}•�'•��+'�'•;}�+,':`�i RC2 }Lka:)'`:�':`f` :•a.: �`l�.•..'•.:
i?:'i:::a:....Yn:.:.........:.�........;�.Ea.B.k,•.,.�•:::<,•:::.::...��.�.::.::.....a.......���..i'.'c�.�'r35..�:.}�',.........}Lr.:...,.,.'a..,.....}•.....Y�.{..... •:..?..a.:..�....a..:..,,..,.s�..,�4..3'::;:A.,t',.........n*.2G.::....:}:J:�a'b.r:..
R1-300 300,000 0.15 .17
R1-144 144.000 0.3 .36
R1-72 72,000 0.6 .72
R1-43 43,000 1.0 1.2
R1-36 36,000 1.2 1.44
R1-20 20,000 2.2 2.64
R1-10 10,000 4.4 5.28
R1-7 7,000 6.2 7.44
SDH-6 6,000 7.3 8.76
R-4 5,450 8.0 9.6
R-4R 4,250/rental 10.2 12.24
15,000/dwelling 2.9 3.48
R-S 5,450 8.0 9.6
R-6 3,500 12.4 14.88
n\J•:�. v.,4 a v,4+a.0 a v,}v n.k;... .c?y?,::}�`:}•':•iY4:':�:•;,;•:t??•i.:...... ..} .y}�v}.v.;,}..
WINgairaliPPIPENalitaNaralliplenfillOP11100
::{.}}::n}.....,{.'{•.n::.:T+"+ ..,A'i•^: .7......:.h+?�... vv...:v..'?n}.'4:G}} >.?? '+...'?:hJ:i.'{\"<'{4?:}4.vv: .v{ .n i:... ,.Y...f.
}{.},•;.:{{.,..,,�,.+};:. ...k\e• ..tY,}}tt f..ni.t4.,�,. ..k} •$�.+\f'..:`'••?4: ��ll...�•• .�}•}?�.•):K. �•>:>{'v?Ya•r"....;?Y;::i:'ti}%tn'.•.fi , .f��F:,iP;+'3}:3?M1?y.`•:•'•��::�.��'3:./aa.,'••}}+•
.a::}Y,�.};,�{;.?,:.:�;;f:.,:•{;'�°^•..:::R�4•..«•.VV �.;::,+••.' ..{:a.,. %`:g;... ?.. ~. t,; ,'a.. �'' ...�:{.•a�'t•x 't?`:
•nv ,., , :•: vx�...,\•�',Cii:. \..•� .,;�: .ti +?+• J:,,... .}:O�C'Y.?:'•k4:;:}vi.
w:+.,�{+ha.},�'.. ••w��+:`•:•a.�.•�. .4�r}Y?a•: ::}:•:}r:fir•, •�`ia.. )�;Sf�s�: 3;>;�:'i,;,,:;3. ::;':.f. :\r,?bx::' "?;f,f•>.5.,3..rk:$ar:..
?^c,•4..c???}at:•:..f,y .c4:,.. r,;:,..«,:.,•t•;�t;. �:,{a:•::•: a�. :::•k Y:}+.,}::.:wc::}.?:s?Y�c:.a.'•{••X^''.
:rS.?... ,:.:..,.. k,2v+.'r:" Y:iY`:'<'{y..?oMk ,•a„•:'+. a.:. •:{•.:. :,V..•... .;,.;,:.,tai} .£,.`alb,:?h:•:�. .}} .:.a:::. 4:a}..t...""��.. ...�Y.��yt:.:�4Y •�����.� v�',4 :a•}it}Y: .}:G•.vv ..}:}:l:•}Y•..%•.r. ::'{�:;• .3:.`.•4::0:ti?4•:::::.:,. ..�:: ••.......Y3'i�... ,aa.{•:2 Y.•:. •.W.•}N.':,•hw')Y•::.,•S.aY..�•:, ?.J.�.. ,•:�?•:+::•}R•: v.?�4tt•}�: :... \....... •. ?,,;:K:%. ..:t'''+�:t ...t .•w•.'++?•:... ..{':..nv}•. ,.+c..... fY.•,,..yt...:..;.�.,+'r:'.•:•.: :X }.+>::?•}.::` :+.{Y,'iL+.f?r'�.��,:,.: •.}:t+• +:� Y•f. .:},,,.a{,ova,..;,?.•{,�3:i :::}:�:4:v:'v .,,a. }+}N::.,•.4.,v,.v:?.Y.v :.� ..}..: +}v v�� `i::F'ri:•.....:....6.•:.k........n:•.{{.v,......... i?h`�i}:::':: ?...v}`.44.fk'�+ ?Ca'•n....Ka.�Y{..•�:J!:�'�.y�`.�.::...,n:::•}..'�.....K o,:.F'4....x..{..�•.....Yi•�^Rl`.n?�* f<:?':•3•.�...�`,•...:tz�4a}.{.:i:•�x ...5'�i. •.+{%�1....r......'$.......e....�.........v.........:.........t.}......�......R.........:.......................................7�}?"..lS..........x.......r....Y...........�.n..............u�....��+.....:.......r.}...............{...:::•.........v.v:::::}:::}::.�i...}....:....:�
Base (FAR) Maximum FAR
with Bonus
CN .20 .24
C-1 .30 .36
C-2 .40 .48
PS
T-P .50 .60
POS .15 .18
Draft 3.12.10 9
tiSR::;tYlkf.:.9,fiE;l
3. Design Standards
A. Development Envelope
1. Development envelopes are required when ESOS is proposed on
individual lots. All impervious surfaces and other improvements
requiring ground disturbance shall be contained within
development envelopes.
GRAPHIC: Development Envelope
2. No clearing, grading, grubbing, or disturbance may occur outside
of the approved development envelopes or within ESOS areas.
Exceptions for underground utility corridors, roads, or regional
drainage improvements may be authorized by the Planning and
Zoning Administrator subject to the following findings and
standards:
a. There is no alternative location outside of an ESOS that can
accommodate the improvement.
b. Improvements are required to insure public safety.
c. Disturbance for underground utility lines must be mitigated as
required in Section NPPSM
d. Additional ESOS areas shall be designated at a ratio of 1:1 to
offset disturbances for drainage or road improvements within
ESOS areas.
3. The specific location of a development envelope shall be shown
on the development plan, subdivision plat, improvement plan,and
Type 1 grading permit. The method of delineating the envelope
boundary must enable precise field verification.
4. A field survey to determine the location of development envelope
boundaries is required at the discretion of the Planning and
Zoning Administrator.
5. The boundary of ESOS or the development envelope shall be
delineated by a temporary, protective fence. Fencing must be:
a. Six foot high vertical posts that are spaced in a manner to
support and connect wire or a similar material as approved
by the Planning and Zoning Administrator.
b. Established prior to construction and remain in place until
construction is complete as determined by the Planning
and Zoning Administrator.
Draft 3.12.10 10 £ki'Jfii33E3e4FFjFRE.3.Y
B. Trample Zones
1. Trample zones are required as a horizontally measured area
adjacent to ESOS which permits access for the installation of
permanent walls or other improvements.
GRAPHIC: building setbacks,envelope, ESL feature with
trample zones
2. The following standards apply to trample zone width:
a. Decorative and perimeter walls: 15 feet
b. Retaining walls and Accessory structures: 20 feet
3. Upon completion of construction of the structure adjacent to the
trample zone,the area must be restored in compliance with
Sectiones (NPPSM).
C. Rock Outcrops and Boulders
1. The perimeter of a rock outcrop is defined in Section III.0 ,
Standards for Rock Outcrops and Boulders.
2. Rock outcrop and boulders that do not meet the criteria contained
in Section 4 below may be disturbed.
3. If a construction envelope includes a rock outcrop or boulder
feature,the following standards apply:
a. A trample zone shall be included in calculating the
permissible amount of encroachment.
b. A mitigation plan shall be submitted as prescribed by the
Planning and Zoning Administrator.
c. Encroachment shall be minimized and in no case exceed
20%of the areal extent of the feature.
d. The rock outcrop or boulder feature shall be mitigated
through the replacement of rock materials to the impacted
feature at a ratio of 1:1.
e. Replacement materials shall be native to the site or the
immediate environs as approved by the Planning and
Zoning Administrator.
Draft 3.12.10 11 £dLIEl4UFf3a4£BdFRf.i.Y
SSi:.tZts%£?.A.fdE:l
f. Cut or newly exposed rock surfaces shall be treated to
simulate pre-development conditions.
4. Rock outcrops and boulders shall not be encroached upon when
they contain the following characteristics:
a. The rock outcrop or boulder is 20 feet or greater height as
measured from the lowest adjacent natural grade.
(additional M. Goode input pending on ht. criteria).
b. The rock outcrop or boulder is an isolated feature, located
1,000 feet or more from other rock outcrop or boulder
features as defined in Section III.C.2, Rock Outcrops and
Boulders(additional M. Goode input pending on spacing
criteria).
D. Driveways and Access Roads
1. Driveways and access roads must be designed to minimize
grading and disturbance of environmentally sensitive areas.
Shortest distance, direct alignments must be used, unless
avoiding or minimizing impact to Critical or Core Resource
features.
2. No parking or additional circulation areas are permitted outside
the approved construction envelope.
3. Restoration of all disturbed areas is required in accordance with
the standards of Section NPPSM.
E. Structures
1. For structures on residential lots adjacent to ESOS,or non-
residential and multi-family structures within 200 feet of ESOS,
building materials must meet the following standards:
a. Glass surfaces shall not exceed a reflectivity of %.
b. Exterior finishes shall not exceed a reflectivity of 60%.
c. Materials used for exterior surfaces of all structures shall
match in color, hue, and tone with the surrounding natural
desert setting.
d. Surface materials of walls, retaining walls or fences shall
be similar to and compatible with those of the adjacent
main buildings.
2. All equipment appurtenant to underground facilities, such as
surface mounted utility transformers, pull boxes, pedestal
cabinets, service terminals or other similar on-the-ground facilities,
Draft 3.12.10 12 £dL't3i:3iEJ.S£PdFR4.3.Y
•
*
shall have an exterior treatment that has a reflectivity not to
exceed 60%.
F. Wash and Drainage Crossings
1. Roadway, pathway,fence and utility crossings of natural
watercourses shall be wildlife friendly.
a. (specifications pending)
2. Fences crossing natural watercourses shall be designed in
accordance with the standards and policies specified in the
Town's Drainage Design Criteria.
G. Permanent Walls and Fences
1. No walls,fences,or other barriers may be located so as to impede
wildlife movement through designated ESOS. Walls or fences
shall not enclose or disconnect contiguous ESOS.
2. Fences shall be wildlife friendly and designed in accordance with
Section 24.7.D (RHOD)
3. Walls are not permitted to cross washes of fifty(50)cfs greater
flow in a 100-year event.
4. Walls can be in the form of a view fence that combines solid wall
elements with wrought iron or other open material to permit
unobstructed views.
5. Walls shall satisfy the following criteria:
a. Walls shall not require the removal of protected native
plant specimens and rock outcrops;
b. Walls shall contain ground level openings of at least nine
(9)square feet in area with a dimension of three(3) by
three(3)feet, and be spaced no more than two hundred
(200)feet apart, including openings for drainage ways, in
order to allow wildlife movements and passage of localized
stormwater flows; and
c. Walls shall be built of materials that blend into the rough
textures and rustic character of the vegetation, rocks and
other features of the natural desert setting.
t-A
xdtlf3i:3EA4q;Fd'FRE.).Y
Draft 3.12.10 13 S5F<:,, f RNE:S
Section 24.2 Hillside Development Zone
A. Introduction
This ordinance seeks to implement the adopted planning goals of this community with regard to
public safety, conservation of resources, community design and open space and recreation.
Oro Valley is surrounded by mountains. These mountainous areas exhibit steep slopes which
may contain unstable rock and soils. Development on potentially unstable soils or rock can be
hazardous to life and property. Development in these areas should utilize construction methods
which ensure slope stabilization and minimize soil erosion.
Further, Oro Valley's rolling desert terrain, containing peaks, ridges and drainageways, is a
valuable scenic resource which should be preserved. Significant peaks and ridges should be
protected in order to preserve the Town's unique visual setting, promote its economic well-being,
and encourage tourism. Regulating the intensity of development according to the natural
characteristics of hillside terrain, such as steepness of slope, significant vegetation and
landforms and soil stability and existing drainage patterns, will allow for sensible development in
hillside areas while minimizing the physical and visual impact of such development.
B. Purpose
This zone provides for the reasonable use of hillside areas and related lands while protecting the
public health, safety, and general welfare by:
1. Determining whether certain types of soil conditions exist (such as loose or easily eroded soils,
or rocky soils), and utilizing appropriate engineering technology to result in stable slopes during
and subsequent to development.
2. Reduction of water runoff and changes in the natural drainage patterns, soil erosion, and rock
slides by minimizing grading and requiring revegetation.
3. Permitting intensity of development compatible with the natural characteristics of hillside terrain,
such as steepness of slope, significant landforms, soil suitability, and existing drainage patterns.
4. Preservation of the scenic quality of the desert and mountain environment through the retention
of significant peaks and ridges in their natural state.
5. Reduction of the physical impact of hillside development by encouraging innovative site and
architectural design, minimizing grading and requiring restoration of graded areas.
6. Provision of safe and convenient vehicular access by encouraging development in the less
steeply sloped terrain.
7. Promoting cost-efficient public services by encouraging development in the less steeply sloped
terrain, thereby minimizing service extensions and utility costs, and maximizing access for all
necessary life safety services.
C. Applicability
The provisions of the Hillside Development Zone (HDZ) apply to development in the areas listed
below:
1. Sloped Areas
a. Any parcel with an average cross slope of 15 percent or containing slopes of 25
percent or greater. Methods of analyzing slope are given in Section 24.2.K.
b. Any parcel containing sloped areas of 25 percent or greater where the sloped area is
greater than 50 feet in any horizontal direction or greater than seven and one-half(7
1/2)feet vertically.
2. Previously Approved Subdivisions
Any recorded subdivision plat approved in compliance with the Pima County Hillside
Development Zone regulations may be developed in compliance with the conditions and
stipulations as approved. If the plat is resubdivided after the effective date of this
ordinance, September 17, 1993, it must comply with all provisions of the Oro Valley HDZ
currently in effect.
3. Exceptions
a. The HDZ regulations shall apply to all property described in Section 24.2.0 except
where the development standards prevent the reasonable utilization of property as
determined by the Board of Adjustment through the approval of a variance. All HDZ
applicability appeals shall be heard by the Board of Adjustment in conformance with
the variance procedures established in Section 21.6.
b. The HDZ regulations do not apply to the paving of an existing driveway located on
property with HDZ applicability.
c. Lots within existing, approved subdivisions on the effective date of this ordinance,
and subdivision plats which have been submitted prior to the effective date of this
ordinance shall not be subject to the provisions of this ordinance.
D. Permitted Uses
Any use permitted by the underlying zone is allowed.
E. Review Required
All development will require subdivision plat or development plan approval, in accordance with
the Oro Valley Zoning Code Revised, prior to the granting of a permit for grubbing, grading,
excavation, or construction.
F. Development Criteria
The following development criteria apply to all parcels that are affected by this zone. Any parcel
created must meet slope/size requirements of Table 24-1. All development is subject to the Oro
Valley Grading Ordinance.
1. Single-Family Residential Development
a. This paragraph applies to an existing parcel where no land division has occurred, nor
is land division proposed, since the adoption of this ordinance. The average cross
slope (ACS) is calculated for the entire parcel. If the ACS is 15 percent or greater,
Columns A and D of Table 24-1 apply.
b. This paragraph applies to any parcel of property or lot where land division is
proposed or has occurred since the adoption of this ordinance. The average cross
slope is calculated for the parcel prior to land division. If the ACS is 15 percent or
greater, columns A and C of Table 24-1 apply. Natural open space may be
designated on the parcel in accordance with Section 24.2.G, to reduce the ACS
percentage. Such natural open space will be excluded from the ACS calculation, but
will be included in the land area for the parcel.
i. If a subdivision plat is required, all 25 percent or greater slopes (as defined in
24.2.C.1.b)within the proposed lots, except for those within natural open space
areas, are delineated. These sloped areas then determine the design of the
development according to the following criteria.
a) Where the areas of 25 percent or greater slope are located outside the
buildable area, the minimum lot size requirements of the underlying zone
apply.The buildable area may be redefined by the applicant to exclude
areas of steeper slope in order to comply with this requirement. Grading
may occur only within the buildable area and access to the buildable area.
Grading for roadway or driveway access shall not cross a 25 percent or
greater sloped area unless no alternative routes exist. Driveway clearing
and grading may be no wider than 30 feet.
b) Where the buildable area contains areas of 25 percent or greater slope,
the minimum size required for that proposed lot is 43,560 square feet
unless a greater size is required by the underlying zone. The amount of
grading permitted is the amount indicated in Column D of Table 24-1,
based on the area of the lot, Column B.
ii. If a subdivision plat is not required, the land area of each parcel created must
comply with Columns A, B and D of Table 24-1.
2. Multi-Family Residential Development
a. All grading is subject to the provisions of the Oro Valley Grading Ordinance.
b. The ACS is calculated for the entire parcel. If the ACS is 15 percent or greater,
columns A, B, C, and D of Table 24-1 apply.
c. Natural open space may be designated on the parcel, in accordance with Section
242.G to reduce the ACS percentage. Such natural open space will be excluded
from the ACS calculation, but will be included for density calculation. If the ACS of the
remaining portion of the parcel, after natural open space designation is:
i. Less than 15 percent and contains no areas of 25 percent or greater slope,
100 percent of that portion may be graded.
ii. Less than 15 percent, but contains areas of 25 percent or greater slopes, no
more than 80 percent of that remaining portion may be graded.
iii. Fifteen percent or greater, columns B, C, and D of Table 24-1 apply, based on
the entire area of the parcel.
3. Non-Residential Development
a. All grading is subject to the provisions of the Oro Valley Grading Ordinance.
a
b. The ACS is calculated for the entire parcel. If the ACS is 15 percent or greater,
columns A, B, and D of Table 24-1 apply.
c. Natural open space may be designated on the parcel, in accordance with Section
24.2.G, to reduce the ACS percentage. If the ACS of the remaining portion of the
parcel is:
i. Less than 15 percent and contains no areas of 25 percent or greater slope,
100 percent of that portion may be graded.
ii. Less than 15 percent, but contains areas of 25 percent or greater slope, no
more than 80 percent of that remaining portion may be graded.
iii. Fifteen percent or greater, Columns B and D of Table 24-1 apply, based on
the entire area of the parcel.
4. Mixed Development
When a mix of development is proposed, i.e., a combination of residential, commercial, office, or
industrial land uses, each use must meet all criteria for that development, as required by this Section.
TABLE 24-1: SLOPE DENSITY REQUIREMENTS
A B C D
Minimum Area* Density* Maximum Grading
Average Cross Slope (Acres/Dwelling or
Structure) (Dwellings/Acre) (Percentage)
Less Than 15 as Permitted by Underlying Zoning
15.0-15.9 1.00 1.00 40.0
16.0-16.9 1.00 1.00 40.0
17.0-17.9 1.25 .80 32.0
18.0-18.9 1.37 .73 29.2
19.0-19.9 1.50 .67 21.3
20.0-20.9 2.00 .50 20.0
21.0-21.9 2.25 .44 17.7
22.0-22.9 2.50 .40 16.0
23.0-23.9 3.50 .29 13.3
24.0-24.9 4.50 .22 11.9
25.0-25.9 6.00 .17 9.3
26.0-26.9 7.00 .14 9.3
27.0-27.9 8.60 .12 9.3
28.0-28.9 10.40 .09 9.3
29.0-29.9 12.80 .08 9.3
30.0-30.9 16.00 .06 8.8
31.0-31.9 23.50 .04 6.7
32.0-32.9 31.00 .03 6.7
33.0 and Greater 36.00 .027 4.0
*Or as permitted by underlying zoning,whichever density is less.
G. Natural Open Space
Natural open space (see Chapter 31 for definition) may be designated on any parcel, subject to
the following criteria:
1. Development other than hiking trails will not be permitted within the legally described boundaries
of natural open space in the Hillside Development Zone. Access roads, other than driveways, are
not permitted within natural open space.
2. Natural open space will be delineated in a surveyable manner on the preliminary and final plats
of a subdivision, or on the development plan, and shall be designated by legal description on a
document recorded with the Pima County Recorder.
3. Natural open space may be designated as a deed restricted portion of a privately owned lot, or
as a separate land parcel. This parcel may be under the ownership of a homeowner's
association, or deeded to any organization willing to accept responsibility for the perpetual
preservation of the natural open space, subject to approval and acceptance by the Town of Oro
Valley.
4. To protect natural open space, covenants which run with the land will be provided in favor of the
Town of Oro Valley and all owners with record interest in the natural area.
5. If natural open space is designated on parcels four (4) acres or more, at least one (1) such
natural open space area shall be a minimum of one-half(1/2)acres in size.
H. Hillside Site Improvement Standard
1. Building Height
a. As permitted by the underlying zone. If the building also falls within the boundaries of
other overlay zones, the more restrictive of the requirements applies. In order to
eliminate large amounts of cut and fill, segments of buildings may be designed at
varying elevations according to the slope of the land. For parcels with HDZ
applicability per Section 24.2, building height shall be measured, using a building
height contour line(as defined in Chapter 31, Building Height Contour Line).
b. A variance to maximum building height may be approved by the Board of Adjustment.
Additionally, the Development Review Board shall review any structure over 18 feet
in the HDZ and may approve said structure if such approval provides a better method
of building to the land and is no more detrimental to adjacent properties than strict
adherence to the development standards of the underlying district would allow. Such
variance, as granted by the Board of Adjustment, shall be in compliance with the
provisions of Section 21.6 of the Oro Valley Zoning Code Revised. Development
Review Board review and approval shall be required prior to the issuance of any
grading or building permits in accordance with Section 22.5.
2. Site Improvement Standard
All proposed site work (see Site definition in Chapter 31), including grading, shall comply
with the Development Standards contained in the Grading Ordinance.
3. Color
All exposed exterior walls and roofs of structures, retaining walls and accessory structures
shall utilize the predominant natural colors found on the parcel. Satellite dishes shall be
earth tone or black. White is not permitted. Color approval by the Planning and Zoning
Administrator shall be required for all HDZ development. Appeals of the Planning and
Zoning Administrator's decision may be filed by the applicant and will be heard by the
Development Review Board within 35 days from the date of appeal. The decision of the
Development Review Board shall be final.
I. Maintenance and Protection
The Planning and Zoning Administrator may, prior to recordation of a subdivision plat or issuance
of building permits, require measures, such as covenants, assurances, or homeowner's
associations, as are necessary to ensure the long term maintenance of slope control measures.
J. Enforcement
1. The developer and/or property owner shall be responsible for the following:
a. Submitting average natural cross slope and sloped area analyses, certified by a
qualified registrant, for review and verification by the Town Engineer or his/her
designee.
b. Surveying, staking, and inspection of the property by a qualified registrant to
determine compliance with the provisions of this Section.
c. On-site enforcement by certifying to the Town Engineer that the development
complies with Section 24.2 Hillside Development Zone during the period of
development.
2. If violation of any provision of the Hillside Development Zone occurs, the pro owner shall be
responsible for bringing the violation into compliance with the requirements of ttiis-.zone. This
may require restoration of the site as closely as possible to its original undisturbed condition,
topography, and vegetation, in order to remove the violation.
•
K. Slope Analysis Standard
1. Average Cross Slope Analysis
The Average Cross Slope (ACS) of a site shall be determined by a qualified registrant in
the following manner:
a. The site is depicted on a topographic map of the existing terrain, prior to any grading,
grubbing, clearing, excavation, or modification, utilizing a scale no smaller than one
(1) inch equals 100 feet, with the following contour intervals:
i. For sites less than five(5)acres, a contour interval of two(2)feet;
ii. For sites five (5) acres and greater, a contour interval of two (2)feet or five (5)
feet.
b. The length of each contour line contained within the site boundaries on the map is
measured by means of a mechanical device such as a map wheel or digitizer. This
actual length is converted to scale length in feet. For example, at a scale of one (1)
inch equals 40 feet(1" =40'), a contour line with an actual map length of six and one-
half(6 3/4) inches represents a line 260 feet long (6.5 x 40=260).
c. The sum of the lengths (L) of all contour lines is multiplied by the contour interval (I)
in feet.
d. The result is multiplied by the factor .0023, which converts the square footage of the
scale map to acres.
e. This result is then divided by the area (A)of the site in acres.
f. This process is mathematically represented by the formula
ACS= (I) (L) (.0023)
(A)
g. The answer is the percentage of the ACS for the site.
2. Sloped Area Analysis
In addition to ACS requirements, any parcel containing areas with a slope of 25 percent or
more shall have HDZ applicability as stated in Section 24.2.C. A sloped area analysis,
which must be prepared by a qualified registrant, shall identify individual slopes for design
and review purposes. A detailed methodology for performing sloped area analysis is
available from the Planning and Zoning Department.
t �
Draft 3.12.10
G. Hillside Area Category
1. Purpose
The Hillside Area category is intended to protect public safety,
conserve scenic sloped and mountainous areas and,when
developed,ensure compatibility with the distinct hillside
topography which is important to the visual and scenic character
of the Town.
2. Applicability
a. The Hillside Area requirements apply to any parcel
containing sloped areas of 15 percent or greater where the
sloped area is greater than 150 feet in length and no less
than 50 feet wide and greater than seven and one-half(7
1/2)feet vertically. (add graphic).
b. Areas of less than 15 percent slope are not restricted by
these Hillside Area requirements.
..................
c. Rock outcrops and boulders, as defined in Section
Conservation System,are excluded from this Section. See
Section KC and 111.D.3, Design Standards.
3. Sloped Area Analysis
a. When the minimum dimensions and percent of slope as
described above are present, a sloped area analysis shall
be prepared.
b. When land division, subdividing, development plan or other
development approval is requested, all areas of 15% slope
or greater shall be identified by the sloped area analysis.
c. The sloped area analysis,which must be prepared by a
State of Arizona, licensed and registered engineer, shall
identify and map all"Percent Slope"categories in Table III-
5.
d. Digital topographic information meeting a minimum
standard as defined by the Town Engineer, shall be used
to prepare the sloped area analysis. Alternative
information or methodologies may be approved by the
Town Engineer.
4. Conservation Standards
Hillside Areas shall be conserved in the following manner:
#.4
Draft 3.12.10 1 ?6iVtfEi(3kdAtefnf 3Y
1
c �
a. Sloped areas from fifteen(15)to less than twenty-five(25)
percent slope may be developed in a limited manner in
accordance with the standards of this Section, Section III.D
and the OVZCR.
b. In accordance with the Critical Resource designation,
ninety-five(95)percent of sloped areas of twenty-five(25)
percent and greater are to be conserved as ESOS.
Exceptions may be approved in accordance with Section
IIIC 3 , ESOS Flexibility.
5. General Requirements
a. A development envelope shall be delineated on the
subdivision plat,development and site plan when sloped
areas of 15 percent or greater are present on the plat,
development or site plan. The development envelope shall
be treated as specified in Section I I I D3A.
Formatted:Indent:Left: 0"
b. When lots or development plans include sloped areas over
15 percent,the areal extent of grading or other ground
disturbance of 15 percent but less than 25 percent, sloped
areas is limited in accordance with Table III-5.
• Formatted:List Paragraph, No
c. When proposed lots are comprised entirely of fifteen (15) L bullets or numbering
sercent slo•es or •reater the minimum lot size shall be in
accordance with Table 111-5. If proposed lots include
multiple slope categories:
I Formatted:List Paragraph, No
(1) Lot size is determined by the slope category 4 bullets or numberin
comprising the largest percent of the proposed lot, and .1 Formatted i
(2) Grading limits in Table 111-5 apply to each slope
category on the lot.
Gra•hic: Exam•le lot with va in sbo e [Formatted: "
• ��� Indent.Left. 3.5
#.4
Draft 3.12.10 2 3E KEY#E3Cs3EteS3ENi'ERE 3.Y
•
a �
TABLE III-5: SLOPE DENSITY AND GRADING LIMITS
Percent Slope Minimum Lot Size Maximum% Maximum
(acres) Graded Building Height(ft)
15<20 1.00 40.0 Per Base Zoning
20<25 2.00 20.0 18
25<33 8.00 5.0 18
33.0 and Greater 36.00 4.0 18
*Or as permitted by base zoning,whichever lot size is larger.
d. In determining the areas to be developed, maximum
disturbance limits and specific design criteria must be
considered. Table III-5 indicates the maximum amount of
disturbance to sloped areas. Prioritized criteria for site
planning and the delineation of hillside ESOS and/or
Hillside Conservation Areas are included below.
(1) Subdivision design shall meet the following:
i. Contiguous location of hillside open space to
established open space areas or other ESL
features,
ii. Minimize disturbance of ESL features as prioritized
in Section III.C ,
iii. Conservation of the largest sloped areas of 15
percent or greater on the site,
iv. Consolidation of hillside and other open space
areas, and
v. Minimize disruption to natural drainage patterns.
(2) Development envelope design on individual lots shall
meet the criteria as listed above, however, replacing
Criteria iii, above,with:
i. Exclude the areas of steepest slope from the
development envelope.
e. After delineation of permissible development areas, all
remaining areas of 25 percent and greater slope shall be
designated as ESOS in accordance with the provisions of
Section III C.3, Open Space Requirements. (note, meaning
it has to meet the minimum size and maintenance
requirements of that section)Areas of 25 percent slope
that do not meet the minimum requirements for ESOS shall
be designated as Hillside Conservation Area.
#14
Draft 3.12.10 3
a
f. Open space identified during individual residential lot
development or open space not meeting the minimum
requirements for ESOS must be designated as Hillside
Conservation Area.
Hillside Conservation Area: Shall mean land area set aside for
conservation of natural slopes greater than 15 percent.
g. If an existing (at the time of adoption of this Ordinance) lot
or parcel does not meet the minimum size requirements of
Table III-5, grading limitations based on percent of slope
from Table III-5 still apply.
h. For property composed entirely of 25 percent or greater
slopes, any proposed lot shall meet the minimum lot size
and maximum grading requirements of Table III-5.
i. Calculations shall be provided indicating the percent of
disturbance, if any,to each slope category described in
Table III-5.
6. Hillside Area Design Standards
a. Development must be in compliance with Section III.D.3,
Design Standards, Subsections A, B, D, E, F and G.
Flexible Development Standards or Cluster Design
standards may be applied in accordance with the
provisions and limitations in Section III.D.
b. Where sloped areas include ridge features, building
rooflines shall not protrude above the height of the ridge,
unless approved by the Town Council in accordance with
the criteria below.
(1) Structures are single story, and no more than 14 feet,
including parapets,above the pre-development grade
of the site,
(2) Roof design is limited to a slope of no greater than 1/2
inch rise per 12 inch horizontal run.
(3) Approved plant materials are installed along exterior
walls of 15 feet or more in length.
New Definition- Ridge: Shall mean a topographic feature
associated with the top of hillsides and mountains having a
continual elevation crest of 150 lineal feet or more and
height of at least 20 feet.
#4
Draft 3.12.10 4 ie1EY£EiC£D4A43Fwi'£A£.iY
Discussion Point::If stronger ridge line conservation is
desired:the following alternate language might be
considered. However there Is a concern with"pushing"
construction off the ridge and creating more significant
hillside impacts with cutting/fliin
"Conserve the ridge line silhouette of significant
topographic features by locating all improvements below
the ridge line and using a finished height that does not
protrude into the silhouette as viewed from nearby public
roads."
c. Cut and fill slopes shall be shielded by structures so as to
not be visible from adjacent properties or public roadways,
or shall be colored or otherwise treated in a manner to
blend with surrounding native soils and rocks.
d. All structures and appurtenances thereto such as a
satellite dishes, shall be earth tone and shall comply with
Section D.3.E, Structures. Colors and exterior finishes
exceeding a reflectivity value of 60%are not permitted.
e. Outdoor storage shall be located within an entirely opaque
barrier designed to match the materials,color, and finish of
the primary structure. Storage may not be visible from
private or public streets or adjacent residential areas.
f. Roof mounted equipment is prohibited unless fully
screened from all neighboring properties. Screening
devices may not exceed permitted building heights as
measured in hillside areas.
7. Building Height
a. As permitted by the underlying zone.
b. For buildings located within identified slope areas of 15
percent of greater, building height shall be measured in the
following manner:
(1) Where building pad elevation is the same or higher
than predevelopment grade due to engineered fill,the
building height contour line method shall be used(as
defined in Chapter 31). Small areas of rugged terrain
shall not increase or reduce building height. Small
areas are those features with a maximum width of
twenty-five(25)feet.
GRAPHIC_building height contour line
t:14
Draft 3.12.10 5
53:VC33'lYf t.Awt3t;
�. •
(2) Where building pad elevation is lower than
predevelopment grade due to cut conditions, building
height is measured from finished grade.
c. Additional building height of 12 feet may be approved in
accordance with Section III.D.2.C, Flexible Development
Standards, if the additional building height does not
protrude above adjacent ridge lines as viewed from public
streets and abutting residential property. Adjacent ridge
lines include ridge features on site or within 150 feet of the
proposed building.
t*
Draft 3.12.10 6
c3:dCli'I•if t.h:'Jf1S:
NOTICE OF PUBLIC TOUR
z
Environmentally Sensitive Lands (ESL)
N-4., 42;031:
A
4
Public Advisory Committee (PAC
�(,in;-: y e ltisok.v.
ENV ROtN� MENTATIVE S
,I,:,,;
Thursday, March 18, 2010
4 p.m.
Site Tour
Development Services Building
11000 N. La Canada Dr.
Notice is hereby given to the members of the Environmentally Sensitive Lands
Public Advisory Committee (ESL PAC), and to the general public, that the ESL
PAC will hold a tour open to the public on Thursday, March 18, 2010 at 4:00 p.m.
We will be meeting at the Development Services Building, Town Hall.
A quorum of the full ESL PAC may be present. This is a tour only and not a
meeting. There may be information provided and/or questions and answers
during the tour. Discussion and possible action will take place at a regularly
scheduled meeting.
This site tour replaces the previously posted ESL PAC meeting for this same
date and time.
Itinerary for the tour is as follows:
1. Convene at the Development Services Building, Town Hall
2. View the Pusch Ridge Vista I and II Subdivisions located on the
South side of Naranja Drive approximately 1/2 m west of N. 1st Avenue
3. Tour the Milagro Subdivision in the Ruthrauff and Silverbell area at 3015-
3057 N Gaia Place
4. Adjourn
For questions regarding the site tour, please contact Bayer Vella, Conservation
Sustainability Manager at 229-4810 or bvella@orovalleyaz.gov.
Posted: 3/17/10
10:30 a.m.
rg
The Town of Oro Valley complies with Americans with Disabilities Act (ADA). If
any person with a disability needs any type of accommodation, please notify the
Clerk's office at 229-4700.
"Notice of Possible Quorum of the Oro Valley Town Council: In accordance
with Arizona Open Meeting Law A.R.S. §38-431 et seq, a majority of the Town
Council may attend the above referenced meeting as a member of the audience
only."