Loading...
HomeMy WebLinkAboutOV1800362TOWN OF ORO VALLEY COMMUNITY DEVELOPMENT & PUBLIC WORKS DEPARTMENT 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.orovalleyaz.gov 1.2 GENERAL APPLICATION FORM Apnliication ❑ TVp Major General Plan Amendment ❑ Final Plat Q ❑ Rezoning/PAD Amendment ❑ Pre -Application ❑ Planned Area Development ❑ Zoning Verification FEB O; 2Q18 ® Conditional Use Permit ❑ Sign Criteria ❑ Zoning Code Amendment ❑ Sign - PAD Exemption ❑ Conceptual Site Plan ❑. Master Sign Program """""••• ❑ Conceptual Public Art ❑ Communication Facility -Tier 1 and 2 Minor ❑ Conceptual Architecture ❑ Communication Facility — Major ❑ Final Site Plan ❑ Revised Development Plan ❑ Conceptual Landscape Plan ❑ Other Subject Property Information: Address: Tangerine Rd. (Shannon Road — Cooper Mt. Drivel Parcel/rax Code: N/A Subdivision / Commercial Center Name: N/A Book / Page or Sequence Number: N/A Lot Number(s) N/A Legal Description: S25' of N75' Sec 1 - 4 T12S R13E Section/Township/Range: Sec 1-4, T12S. R13E - Area of Property: 25' feet X 3.5 miles Existing Land Use: overhead utility Proposed Land Use: _overhead utility Applicant Information: * If more than one, attach list Applicant *: Name: Tucson Electric Power Co. Firm: Address: _Land Resources — RC131. 3950 E. Irvington Road City: Tucson State: AZ Zip: 85714-211'4 Telephone: 520-300-0586-46— Fax: 520-770-6780 Email: isaline(a)-tep.com Property Owner(s) if different from Applicant *: Name: _Town of Oro Valley Right -of -Way Firm: Address: Telephone: Fax: Consultant: (Discipline) City: _ Email: State: Zip: _ Name: Firm: Address: City: State: Zip: Telephone: Fax: Email: 1 Project Descriation/Narrative: see attachment hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The approval of this application does not presume to give authority to violate or cancel the provisions of any other federal, state or local law for which this project may be subject to. Notice: It is the applicant/owner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions & Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners Association or property management to determine applicable requirements. It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance. Failure to do so may delay issuance of permits. See attached list of agencies. NCSO1'1 Sc��� n� a plicant's Signature Print Name Date Important Note: All submittals received after 4:00 p.m. will be processed the next day Submittals will be rejected • Not folded using Pima County fold & collated; • There are missing items on the checklist unless otherwise approved by Planning and Zoning Administrator or Town Engineer. • Re -submittals cannot be accepted without a transmittal and a written response to staff comments. 2 TEP Tucson Electric Power Land Resources — RC131 3950 E. Irvington Road Tucson, Arizona 85714-2114 138 Kilovolt Tangerine Road Transmission Line Upgrade Tucson Electric Power (TEP) is planning to make necessary upgrades to a segment of an existing 138 kilovolt (kV) transmission line that connects TEP's North Loop Substation, located near West Tangerine Road and Interstate 10, to the Rancho Vistoso Substation, located near East Tangerine Road and North Copper Mountain Drive. TEP must complete these improvements to continue providing safe, reliable service to customers in the area. A portion of this work (The Project) will occur in Oro Valley within a 3.5-mile stretch of TEP's easement along the southern edge of Tangerine Road between North Shannon Road and Copper Mountain Drive. As part of the Conditional Use Permit application process, the following criteria has been provided by Tucson Electric Power (TEP) to clarify any potential concerns for public health, safety, or welfare as a result of approval for the proposed transmission line upgrade project. Conditional Use Permit Criteria 1. Granting of such conditional use permit will not be materially detrimental to public health, safety, or welfare. Factors which shall be considered have been addressed as follows: a. Damage or nuisance arising from noise, smoke, odor, dust, vibration or illumination; The Project will not result in an increase in noise, smoke, odor and illumination. The Project may generate temporary dust emissions as a result of construction. Dust emissions will be mitigated using water spray as necessary. Upon completion, the Project will not generate dust as a result of the intended use. Hazard to persons and property from possible explosion, contamination, fire or flood; There are no health hazards identified to persons as a result of the Project. The Project will not create any hazards associated with explosion, contamination, fire or flood. As a result of the neighborhood meeting held on Wednesday January 24`h, TEP has provided information regarding electric and magnetic field (EMF) levels associated with overhead 138 kilovolt transmission lines. See attached. c. Unusual volume or character of traffic, During construction, the Project may temporarily impact the flow of traffic within the area. Traffic impacts will be mitigated to the extent possible with an approved traffic control plan. Upon completion, the Project will not impact daily traffic patterns. 2. That the characteristics of the proposed use are reasonably compatible with the types of use permitted in the surrounding area and sufficient mitigation measures are employed to minimize impact on adjoining properties. a. The Project design and use aligns with the current type of use as permitted within the project area. b. TEP will cooperate with Oro Valley to minimize impacts to adjoining - properties -and apply appropriate mitigation measures as necessary. i'4 ' FEB 0�,201� TJY........................ 3. That the proposed use is consistent with the goals and policies of the general plan. a. TEP will coordinate with Oro Valley to ensure the Project is consistent with the goals and policies of the general plan. 4. That the hours of operation of the proposed use will not adversely impact neighboring properties. a. The hours of operation for the proposed use will not adversely impact neighboring properties. New Utility Pole Criteria 1. A Conditional Use Permit for the erection of new utility poles and wires will be granted in accordance with Section 22.5. The primary considerations shall be aesthetics with the following factors also considered. a. The location and height of such poles and wires and the relation to the present or potential roads; i. The Project design complies with national standards for transmission of electricity. In addition, TEP will coordinate with Oro Valley Engineering Division to ensure location and height of newly installed transmission poles will not adversely impact present or future planned roadway improvements. b. The crossing of such lines overmuch traveled highways and streets; i. The need to crossover highways and streets during construction will be coordinated with an approved traffic control plan as necessary. c. Proximity of such lines to schools, religious institutions and other places where people may congregate; I. The project is adjacent to the St. Mark Catholic at 2727 W Tangerine Road. TEP will cooperate with Oro Valley to avoid adverse impacts for events and flow of traffic during normal operating hours of the church. d. Fire or other accidental hazards from the presence of such poles and wires and the effect, if any, of the some upon the effectiveness of fire fighting equipment; , i. TEP will replace all wooden poles with steel monopoles therefore reducing potential fire hazards associated with wooden poles. e. The availability of a suitable right-of-way for the installation; i. New utility pole locations will be placed within approximately 10-20 feet in line of the existing utility poles and will not require additional road right of way. f. Future conditions which may be reasonably anticipated in the area in view of a normal course of development i. Future development and conditions which may be reasonably anticipated in the area including roadway improvements have been coordinated with the Oro Valley Engineering Division. g. The type of terrain i. Terrain and vegetation impacts for the Project will be considered during construction and mitigated to the extent possible. h. The practicality and feasibility of underground installation of such poles and wires with due regard for the comparative costs between underground and above ground installations (provided, however, that a mere showing that an underground installation shall cost more than an above ground installation shall not, in itself, necessarily require issuance of a permit). i. The option to underground transmission lines of 138 kilovolt capacity has significant additional cost compared to overhead installations, approximately 3:1. In addition, the heat that can be generated by 138 kilovolt transmission lines does not easily dissipate if installed underground and can shorten the life span of crucial equipment required to transmit safe and reliable electric service. L in the event such poles and wires are for the sole purpose of carrying electricity or power or for transmitting of telephone, telegraph, or television communication through or beyond the Town's boundaries or from one (1) major facility to another, the practicality of feasibility of alternative or other routes shall also be considered. i. The option to reroute the existing transmission line would require a major undertaking to include: new land right acquisition, new engineering design and construction, and compliance with applicable zoning codes and ordinances. The additional cost associated with re-routing the line would greatly exceed the cost for the proposed upgrade. Thank you for your consideration and do not hesitate to contact me with any questions or concerns. I can be reached at (520) 396-2767 or at isaline@tep.com Respectfully, Jason Saline, Environmental and Land Use Planner Tucson Electric Power TEP Tucson Electric Power Land Resources — RC131 3950 E. Irvington Road Tucson, Arizona 85714-2114 138 Kilovolt Tangerine Road Transmission Line Upgrade Project Description Tucson Electric Power (TEP) is planning to make necessary upgrades to a segment of an existing 138 kilovolt (kV) transmission line that connects TEP's North Loop Substation, located near West Tangerine Road and Interstate 10, to the Rancho Vistoso Substation, located near East Tangerine Road and North Copper Mountain Drive. TEP must complete these improvements to continue providing safe, reliable service to customers in the area. A portion of this work will occur in Oro Valley within a 3.5-mile stretch of TEP's easement along the southern edge of Tangerine Road between North Shannon Road and Copper Mountain Drive. The Rancho Vistoso Substation is the primary power distribution source in the in this fast-growing area. Recent projections indicate the transmission line is at risk of being overloaded in 2018 during times of peak energy demand, exceeding North American Electric Reliability Corporation standards and shortening the lifespan of crucial equipment. TEP must install higher -capacity conductor to increase the maximum operating temperature. The total number of conductors will remain the same. To accommodate the heavier, more resilient conductor, TEP will replace 32 wooden and steel poles with 32 self - weathering steel monopoles. The current poles have an above ground height ranging between 51-68 feet will be replaced by new poles with an above ground height range of 56-79 feet. The increased height is necessary to conform with National Electric Safety Code standards and to support the upgraded conductor and additional load capacity. TEP has applied for a Conditional Use Permit as required under the Town of Oro Valley zoning code; chapter 25 Use Regulations, B. Requirements for Specific Non -Residential Uses, Sec. 22 New Utility Poles and Wires and Sec. 22.5 Use Permits. Thank you for your consideration and do not hesitate to contact me with any questions or concerns. I can be reached at (520) 396-2767 or at isaline@tep.com Respectfully, Jason Saline, Environmental and Land Use Planner Tucson Electric Power Y........................ Tucson Electric Power 138 Kilovolt Tangerine Road Transmission Line Upgrade Fact Sheet Tucson Electric Power (TEP) is planning to upgrade a segment of an existing 138 kilovolt (kV) transmission line that connects TEP's North Loop Substation, located near West Tangerine Road and Interstate 10, to the Rancho Vistoso Substation, located near East Tangerine Road and North Copper Mountain Drive. TEP must complete these improvements to satisfy national safety code standards and to continue providing safe, reliable service to customers in the Oro Valley area. These improvements also will accommodate anticipated future growth in the area. A portion of this work will be performed in Oro Valley along the southern edge of Tangerine Road between North Shannon Road and Copper Mountain Drive. The Rancho Vistoso Substation is the primary power distribution source in the in this fast-growing area. Recent projections indicate the transmission line is at risk of being overloaded in 2018 during times of peak energy demand, exceeding national standards and shortening the lifespan of crucial equipment! This steel monopole is representative of the new equipment that TEP plans to install along Tangerine Road. TEP must install more resilient, higher -capacity wires and replace 32 wooden and steel poles. New steel poles with heights of 56-79 feet will replace existing structures with heights of 51-68 feet. For More Information: Jason Saline Environmental and Land Use Planner (520) 396-2767 or jsaline@tep.com West Boundary: Tangerine and Shannon Roads, located east East Boundary: Tangerine and Copper Mountain Roads, of North Thornydale Road. located west of North 111 Avenue. r i MOY m rEP Tucson Electric Power Electric and Magnetic Fields Electric and magnetic fields (EMFs) are part of our everyday environment. They are emitted by power lines and other electrically -powered systems that light, cool and heat our homes, provide our communications and entertainment and support other aspects of our modern lifestyle. EMFs also are produced naturally by the Earth. For more than 30 years, scientists and researchers from universities, national laboratories, health agencies, the World Health Organization and other groups have conducted research activities into possible health effects of EMFs. According to this large body of research, there are no confirmed health risks caused by exposure to low-level EMFs. What are EMFs? The term "EMF" describes two invisible forces that surround any electrical device. Both types of fields weaken significantly as they extend further away from the source. Electric fields are produced by voltage — the strength or 'pressure' with which an electric current flows. Electric fields can be weakened by solid objects such as vegetation, buildings or other structures. The strength of electric fields varies depending on the voltage of the power line. Magnetic fields are produced by current — the movement of electrons through a conductor. The EMFs associated with power lines and electrical devices are much weaker than those associated with other sources such as microwaves or radio waves; they are considered to be "extremely low frequency" fields at 60 Hertz (Hz). These EMFs, at the low end of the electromagnetic spectrum, are described as "non -ionizing" because they are not known to damage DNA or cells directly. Health Studies and Concerns Although researchers and scientists have heavily studied this issue since the 1970s, they have not confirmed that any adverse health effects have been caused by exposure to low-level EMFs. • After a recent review of scientific literature about the issue, the World Health Organization (WHO) called for continued research but concluded that, "... current evidence does not confirm the existence of any health consequences from exposure to low level electromagnetic fields." • In 1997, a National Research Council committee studying the issue concluded, "...the current body of evidence does not show that exposure to these fields presents a human -health hazard. Specifically, no conclusive and consistent evidence shows that exposures to residential electric and magnetic fields produce cancer, adverse neurobehavioral effects, or reproductive and developmental effects." • Similarly, in 1999, the National Institute of Environmental Health Sciences (NIEHS) reported to the U.S. Congress that, "No consistent pattern of biological effects from exposure to EMF had emerged from laboratory studies with animals or with cells." • According to the National Cancer Institute: "No consistent evidence for an association between any source of non -ionizing EMF and cancer has been found, despite numerous epidemiologic studies and comprehensive reviews of scientific literature." This research has been performed through epidemiological, animal, biological and clinical studies. -- .Y...,o.... ......... Magnetic Field Exposure Studies show that primary sources of EMF exposure can be found at home or at work. Median magnetic field strength, measured in milliGauss (mG), for common household items is shown in the first chart below. Exposure levels vary considerably based on the model of appliance, distance from it and its use. For example, a hair dryer's "high" setting produces a stronger magnetic field than its "low" setting. A dash means the measurement could not be distinguished from background measurements before the appliance was turned on. Dis ,nce rom source 6" 1' 2' 3' . 11 Digital Clock 1 —CMIM — — ® Electric Oven 9 4 — — aji� Hair dryer 300 1 - - !/// Microwave Oven 200 4 10 2 Refrigerator 2 2 1 — Video Display Terminal (PCs with color monitors) 14 5 2 — Washing Machine 20 7 1 — Source: National Institute of Environmental Health Sciences Magnetic fields surrounding everyday appliances can be stronger than fields near power lines, depending on distance from the source. This chart shows typical magnetic field strengths of overhead power lines. 0' 33' 66' 98' 131' 500kV 81 72 51 33 21 230kV 38 28 15 8 5 138kV 33 22 11 5 3 69 kV 18 6 3 1 0 25 kV 10 5 2 1 0 Source: BC Hydro TEP designs and builds its equipment to meet or exceed national building and safety standards. Learn More You can learn more about electric and magnetic fields by visiting these resources: • World Health Organization: • Environmental Protection Agency: www.who.int/peh-emf/en/ www3.epa.gov/radtown/electric-magnetic- • U.S. National Institutes of Health, National fields.html Institute of Environmental Health Sciences: www. • National Cancer Institute: niehs.nih.gov/health/topics/agents/emf/ https://www.cancer.gov/ riep Tucson Electric Power • American Cancer Society: www.Cancer.org/cancer/cancercauses/ rod iation-exposure/extremely-low-frequency- radiation.html For more information about our planned infrastructure improvements, visit tep.com/projects. Rev 1/18 North Loop -Rancho Vistoso Reconductor ® Existing J Existing/Replace Existing Transmission Line Jurisdictional Boundaries = MARANA ORO VALLEY Data Sources: TEP Pima County GIS Imagery: ESRI World Imagery a soo 00o e 'Feat II� EP Tucson Electric Power This map is for planning purposes only. TEP and UNS Energy make no warranty of its accuracy. r\MX Ds\0 ro_Valley_exh ibit_24x36. mxd