Loading...
HomeMy WebLinkAboutOV120822GENERAL NOTES 1. THE GROSS AREA OF THIS DEVELOPMENT IS 1.43 ACRES NET BUILDING AREA = 0.24 ACRES MINIMUM AREA OF LANDSCAPE OPEN SPACE REQUIRED=20 % (0.28 ACRES), PROVIDED=0.29 ACRES. 2. EXISTING ZONING: "ROONEY RANCH PLANNED AREA DEVELOPMENT B" 3. BUILDING SQUARE FOOTAGE= 10,599 SF 4. AMOUNT OF PARKING SPACES REQUIRED AND ANALYSIS AS FOLLOWS: REQUIRED = 46-SPACES PROVIDED = 39 SPACES HANDICAP = 2 SPACE•3 BICYCLE = 2 SPACE 5. BASIS OF BEARINGS: THE NORTH -SOUTH MID SECTION LINE OF SECTION 7, TOWNSHIP 12 SOUTH, RANGE 14 EAST, G.S.R.M., PIMA COUNTY, ARIZONA. SAID BEARING BEING S 000 20' 38" E. 6. BASIS OF ELEVATION: ADOT DATUM BENCH MARK: 3"ALUMINUM CAP IN CONCRETE AT STATION 577+37.95, US HIGHWAY 89, STAMPED 2541.38, (ADOT HIGHWAY DIV.1979). BENCHMARK ELEVATION: 2541.38 7. DEVELOPER WILL COVENANT TO HOLD TOWN OF ORO VALLEY, ITS SUCCESSORS AND ASSIGNS, HARMLESS IN THE EVENT OF FLOODING. 8. DRAINAGE WILL NOT BE ALTERED, DISTURBED OR OBSTRUCTED WITHOUT THE APPROVAL OF THE ORO VALLEY TOWN COUNCIL. 9. DRAINAGEWAYS AND/OR DRAINAGE SYSTEMS TO BE CONSTRUCTED ACCORDING TO APPROVED PLANS PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS FROM THE TOWN OF ORO VALLEY AND/OR BUILDING OFFICIAL. 10. A PROPERTY OWNERS ASSOCIATION WILL BE FORMED TO ACCEPT RESPONSIBILITY FOR MAINTENANCE, CONTROL, SAFETY AND LIABILITY OF PRIVATE DRAINAGEWAYS, DRAINAGE EASEMENTS AND COMMON AREAS. 11. ACCESS ACROSS FLOOD PRONE AREAS TO BUILDING SITES WILL BE APPROVED BY THE TOWN ENGINEER AND SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 12. DEVELOPMENT PLANS WILL BE SUBMITTED FOR COMMERCIAL LOTS OR PADS PRIOR TO THE ISSUANCE OF ANY PERMITS BY THE TOWN ENGINEER AND/OR BUILDING OFFICIALS. 13. THE FOLLOWING UTILITIES WILL PROVIDE SERVICE TO THIS DEVELOPMENT: (A) ELECTRIC - TUCSON ELECTRIC POWER COMPANY (B) GAS -SOUTHWEST GAS CORPORATION (C) WATER - ORO VALLEY WATER UTILITY (D) SEWER - PIMA COUNTY WASTEWATER MANAGEMENT (E) TELEPHONE - QWEST COMMUNICATIONS (F) FIRE PROTECTION - RURALIMETRO FIRE DEPARTMENT (G) CABLE TELEVISION - COMCAST 14. THIS PROJECT WILL BE SERVED BY THE ORO VALLEY WATER UTILITY WHICH HAS BEEN DESIGNATED AS HAVING AN ASSURED 100 YEAR WATER SUPPLY BY THE DIRECTOR OF WATER RESOURCES. ��• •. r. • • .rvv v. .vrv. 15. REQUIRED FIRE FLOW FOR THIS DEVELOPMENT IS 1,500 G.P.M. 16. ON -SITE SANITARY SEWERS WILL BE PRIVATE AND WILL BE CONSTRUCTED, OPERATED AND MAINTAINED ON A PRIVATE BASIS. THE LOCATION AND METHOD OF CONNECTION TO AN EXISTING PUBLIC SANITARY SEWER IS SUBJECT TO REVIEW AND APPROVAL BY THE PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT AT THE TIME OF SUBMITTAL OF PLUMBING OR BUILDING PLANS. 17. ALL SEWERS WILL BE DESIGNED TO PROVIDE GRAVITY FLOW. 18. ANY WASTEWATER DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEMS SHALL MEET THE REQUIREMENTS OF INDUSTRIAL WASTE ORDINANCE (PIMA COUNTY ORDINANCE NO. 1994-140 AS AMENDED). 19. ON -SITE TRAVEL LANES DESIGNED FOR SU-30 VEHICLE, DESIGN SPEED EQUALS 15 MPH. ORACLE ROAD DESIGN SPEED EQUALS 45 MPH. 20. APPROVED IMPROVEMENT PLANS AND APPROVED ASSURANCES WILL BE REQUIRED PRIOR TO ISSUANCE OF GRADING PERMITS. 21. ANY RELOCATION, MODIFICATION, ETC. OF EXISTING UTILITIES AND/OR PUBLIC IMPROVEMENTS NECESSITATED BY THE PROPOSED DEVELOPMENTS WILL BE AT NO EXPENSE TO THE PUBLIC. 22. A PROJECT CONSTRUCTION PERMIT SHALL BE SECURED FROM PIMA COUNTY WASTEWATER MANAGEMENT DEPARTMENT WHEN CONNECTION IS MADE TO A NEW OR EXISTING PUBLIC MANHOLE BEFORE BEGINNING ANY WORK ON THIS PROJECT. 23. THE PROPERTY OWNERS, THEIR SUCCESSORS AND ASSIGNS AGREE TO: 1.) KEEP ALL REQUIRED LANDSCAPED AREAS MAINTAINED IN A WEED FREE, TRASH FREE CONDITION. 2.) REPLACE ANY DEAD PLANT MATERIALS WITHIN 90 DAYS, AND, 3.) MAINTAIN THE IRRIGATION SYSTEM IN PROPER WORKING ORDER. 24. A SOILS REPORT WILL BE SUBMITTED UNDER A SEPARATE COVER AND IS TO BEA PART OF THIS DEVELOPMENT. 25. MAXIMUM BUILDING HEIGHT-- 25 FEET. . .�..� . . . . . . . .� .. .. . .�.► .w w�. ........ .......■ ....-. w.- 0 I ..r%/%/1 A r\r- rf1 If-I-r-r% AA I r8 §r /%A w /%# r- Zj. I r1t: VKL)VL:K I Y VW/V=M0, I l7CIM JVIiI.,C00L)MJ AlVLJ MOOIVIVJ fiVMCC I V. 1.) KEEP ALL REQUIRED LANDSCAPED AREAS MAINTAINED IN A WEED FREE, TRASH FREE CONDITION. 2.) REPLACE ANY DEAD PLANT MATERIALS WITHIN 90 DAYS, AND, 3.) MAINTAIN THE IRRIGATION SYSTEM IN PROPER WORKING ORDER. 24. A SOILS REPORT WILL BE SUBMITTED UNDER A SEPARATE COVER AND IS TO BE A PART OF THIS DEVELOPMENT. 25. MAXIMUM BUILDING HEIGHT= 25 FEET. 26. ADDITIONAL LANDSCAPING REQUIREMENTS: 25 FEET LANDSCAPE BUFFER IN THE ORACLE ROAD RIGHT-OF-WAY. (CONDITION OF APPROVAL FOR ORIGINAL PAD ORDINANCE 89-16 EXHIBIT "C" ITEM 7B). 27. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF THE SIDEWALK ON ORACLE ROAD. 28. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF THE TRAILHEAD AREA, AND OFF -SITE CONNECTIONS TO ORACLE ROAD MULTI -USE PATH, IN ACCORDANCE WITH AASHTO STANDARDS. 29. THE SOILS ENGINEER OF RECORD OR OTHER REGISTERED PROFESSIONAL CIVIL ENGINEER WITH EXPERTISE IN THE AREA OF SOILS ENGINEERING SHALL CERTIFY, IN WRITING, THAT ALL SOILS OPERATIONS FOR THIS DEVELOPMENT WERE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS AS SET FORTH IN THE GEOTECHNICAL INVESTIGATION BY FOREE & VANN, INC. JOB NO. 13009, DATED NOV. 27, 2002, AND ANYACCEPTED ADDENDA/AMENDMENTS MADE THERETO. SAID ENGINEER WILL FURTHER CERTIFY, IN WRITING, THAT ALL MATERIALS UTILIZED IN THIS DEVELOPMENT ARE IN CONFORMANCE WITH THE TOWN ENGINEER OF THE TOWN OF ORO VALLEY PRIOR TO THE REQUEST FOR ANY BUILDING PERMITS AND/OR FINAL INSPECTION AND RELEASE OF ASSURANCES. 30. IN PLACE DENSITIES SHALL BE DETERMINED IN ACCORDANCE WITH U.B.C. STANDARD NO. 70-2. IN PLACE DENSITIES SHALL NOT BE DETERMINED BY OTHER U.B.C. STANDARDS UNLESS SPECIFIC WRITTEN APPROVAL IS OBTAINED FROM BUILDING OFFICIAL AND TOWN ENGINEER OF THE TOWN OF ORO VALLEY. 31. THE PROFESSIONAL ENGINEER OF RECORD SHALL CERTIFY, IN WRITING, THAT ALL IMPROVEMENTS, WHETHER PRIVATE OR PUBLIC, HAVE BEEN CONSTRUCTED, PLACED, INSTALLED, ETC. IN SUBSTANTIAL CONFORMANCE WITH THE ACCEPTED PLANS FOR THIS DEVELOPMENTT, CERTIFICATION, IN WRITING, IS TO BE RECEIVED BY THE TOWN ENGINEER OF THE TOWN OF ORO VALLEY PRIOR TO THE REQUEST FOR FINAL INSPECTION AND THE RELEASE OF ASSURANCES. 32. ACCEPTANCE OF THIS PLAN SET DOES NOT CONSTITUTE OR IMPLYACCEPTANCE OF ANY OF THE FOLLOWING: (A) WALLS, RETAINING OR OTHER TYPES, (B) ANY REINFORCED CONCRETE STRUCTURES, (C) ANY EMBANKMENT WHOSE PRIMARY PURPOSE IS TO FUNCTION AS A RETENTION/ DETENTION STRUCTURE. SEPARATE PLAN CHECKS AND PERMITS ARE REQUIRED, ALL IN ACCORDANCE WITH THE APPLICABLE CODES OF THE TOWN OF ORO VALLEY. 33. A DRAINAGE REPORT HAS BEEN PREPARED AND SUBMITTED TO THE TOWN OF ORO VALLEY UNDER SEPARATE COVER. 34. A CONCEPT LANDSCAPE PLAN HAS BEEN PREPARED AND SUBMITTED TO THE TOWN OF ORO VALLEY UNDER SEPARATE COVER. 35. ALL WEATHER ACCESS WILL BE PROVIDED TO ALL STRUCTURES WITHIN THE DEVELOPMENT. 36. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE RETENTION BASIN AND ALL ON -SITE DRAINAGE STRUCTURES. 37. PROPOSED NUMBER OF WASTEWATER FIXTURE UNITS IS 56. 38. TIRES NEED TO BE DISPOSED OF PRIOR TO TIRES CRESTING THE 12 FEET WALL. THEYARE NOT rr*. nr- .ilntnr rr P'rf/1AN e%^I RIM I n^rlAtn-rMAr-Y-S^ ^M AA 0Anr11/'T'Ar3^r%M]7lCt% DETENTION STRUCTURE. SEPARATE PLAN CHECKS AND PERMITS ARE REQUIRED, ALL IN ACCORDANCE WITH THE APPLICABLE CODES OF THE TOWN OF ORO VALLEY. 33. A DRAINAGE REPORT HAS BEEN PREPARED AND SUBMITTED TO THE TOWN OF ORO VALLEY UNDER SEPARATE COVER. 34. A CONCEPT LANDSCAPE PLAN HAS BEEN PREPARED AND SUBMITTED TO THE TOWN OF ORO VALLEY UNDER SEPARATE COVER. 35. ALL WEATHER ACCESS WILL BE PROVIDED TO ALL STRUCTURES WITHIN THE DEVELOPMENT. 36. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE RETENTION BASIN AND ALL ON -SITE DRAINAGE STRUCTURES. 37. PROPOSED NUMBER OF WASTEWATER FIXTURE UNITS IS 56. 38. TIRES NEED TO BE DISPOSED OF PRIOR TO TIRES CRESTING THE 12 FEET WALL. THEYARE NOT TO BE VISIBLE FROM SOUTH BOUND TRAFFIC OR ADJACENT PROPERTIES. 39. THE LANDSCAPE BUFFER YARD ALONG THE NORTHERN LIMITS REQUIRED BY OVZCR SEC 14-207 A HAS BEEN REDUCED FROM 15 FEET TO 5 FEET BY THE DEVELOPMENT REVIEW BOARD. 40. THE NUMBER OF PARKING SPACES REQUIRED BY OVZCR SECTION 27.6D.3 HAS BEEN REDUCED FROM 46 TO 39 BY THE DEVELOPMENT REVIEW BOARD. 41. THE ALTERNATIVE PARKING COMPLIANCE ANALYSIS HAS BEEN EVALUATED FOR RETAIL USE. ANY USES OF HIGHER INTENSITY, SUCH AS RESTAURANT, SHALL REQUIRE A'SHARED PARKING AGREEMENT WITH HOME DEPOT. IF 17' BECOMES EVIDENT THAT EMPLOYEES AND/OR PATRONS OF THE RETAIL USES ARE PARKING IN HOME DEPOT'S PARKING AREA, THE PROPERTY OWNER MUST PROVIDE A SHARED PARKING AGREEMENT TO THE PLANNING AND ZONING ADMINISTRAPOR WITHIN 60 DAYS. 42. THE LOCATION OF THE LOADING AREA REQUIRED IN OVZCR 27.7.C.1 HAS BEEN EXTENDED FROM 100 FEET TO 120 FEET BY THE DEVELOPMENT REVIEW BOARD. 43. THE PROPERTY OWNER SHALL CONTRIBUTE 1 % OF THE BUILDING CONSTRUCTION COST TOWARDS THE PUBLIC ARTS PROJECTS. 44. THE PUBLIC RECREATIONAL TRAIL HEAD SHALL BE FIELD VERIFIED AND DEDICATED TO THE TOWN OF ORO VALLEY PRIOR TO GRANTING A BUILDING PERMIT. OR 45. THE DEVELOPER HAS AGREED TO CONTRIBUTE AN IN LIEU FEE TO IMPROVE A MULTI- PURPOSE TRAIL ON THE PIMA COUNTY PROPERTY LOCATED IMMEDIATELY NORTH OF THE SUBJECT PROPERTY. A BOND TO INSURE IMPROVEMENTS TO THE PORTION OF THE TRAIL THAT RUNS FROM THE EASTERN LIMITS TO THE WESTERN LIMITS OF THE SUBJECT PROPERTY IS REQUIRED PRIOR TO THE ISSUANCE OF GRADING PERMIT. THE IMPROVEMENTS SHALL CONSIST OF, AT A MINIMUM, A 12 FOOT WIDE INTEGRAL COLOR CONCRETE ASPHALT PATH FLANKED ON BOTH SIDES BY 2-3 FEET OF STABILIZED DECOMPOSED GRANITE. THE BOND WILL EXPIRE IN 10 YEARS. 46. A LIGHTING PLAN MUST BE SUBMITTED IN ACCORDANCE TO OVZCR SECTION 17-301 BEFORE A BUILDING PERMIT IS ISSUED. 47. CROSSWALKS WILL BE CLEARLY DELINEATED BY USE OF A DIFFERENT TEXTURE IN ACCORDANCE TO OVZCR SECTION 27.6G.2.D. 48. THE TIRE STORAGE AREA SHALL BE ENTIRELY ENCLOSED ON ALL FIVE SIDES. 49. IN THE EVENT THAT A SHARED PARKING AGREEMENT IS REQUIRED BETWEEN THIS PROPERTY AND THE HOME DEPOT SITE, A SAFE PEDESTRIAN CROSSING, SUBJECT TO PLANNING AND ZONING ADMINISTRATOR APPROVAL, SHALL BE PROVIDED. 50. AT A MINIMUM, THE FIRST FLUSH IN THE DETENTION BASIN SHALL BE INSPECTED ONCE A YEAR AND AFTER EVERY MAJOR STORM EVENT. THE INSPECTOR SHALL DOCUMENT ANY EROSION, PhoE CLOGGING, OR OTHER DAMAGE TO THE BASIN CAUSED BY STORM WATER RUNOFF. DOCUMENTATION SHALL INCLUDE THE DATE, LOCATION AND ANY DAMAGE, AND THE RECOMMENDED ACTION TO BE TAKEN TO CORRECT THE PROBLEM. THIS INFORMATION SHALL BE KEPT BY THE PROPERTY OWNER OR H►S AGENT AND AVAILABLE FOR REVIEW AT ANY TIME BY T LIE APPROPRIATE REGULATORYAGENCIES. 51. ANY RELOCATION, MODIFICATION, ETC., OF THE EXISTING UTILITIES AND/OR PUBLIC IMPROVEMENTS REQUIRED BY THIS DEVELOPMENT WILL BE AT NO EXPENSE TO THE PUBLIC. 0 6� CA. O MON m OC� / Wee B Group r. D LECE--r x, TAWn caf Ord Valley March 28, 2003 WLB No. 102069-B-001-0500 W:ILEGALS11810571B IG-O-TIREIEAST-BIG-O-TIRE.DOC LEGAL DESCRIPTION BIG-O-TIRE (EAST PARCEL) That portion of Section 7, Township 12 South, Range 14 East, Gila and Salt River Base and Meridian, Pima County, Arizona, described as follows: COMMENCING at the North quarter comer of said Section 7; THENCE S 00020'38" E, along the North South mid section line of the said Section 7, a distance of 2,074.46 feet, on the arc of a non tangent curve concave to the South, a radial line of said curve through said point having a bearing of N 10"42'23" E, said point being on the Southerly right of way line of Foothills Channel recorded in Docket 7102 at Page 887, Pima County Recorder's Office, Pima County, Arizona; THENCE Easterly along said right -of --way fine, along the arc of said curve to the right, having a radius of 1,352.39 feet and a central angle of 01050'08" for an arc distance of 43.33 feet to a point on said curve being the POINT OF BEGINNING; THENCE continue Easterly along said right-of-way line, along the arc of said curve to the right, having a radius of 1,352.39 feet and a central angle of 06036'37" for an arc distance of 156.03 feet to a point of tangency; THENCE S 70050'51" E, along the said right-of-way fine, a distance of 107.76 feet to a point on the arc of anon tangent curve concave to the Southeast, a radial line of said curve through said point having a bearing of N 41023'21" W, said point being on the Northwesterly right of way line of Oracle Highway (US Highway 89); THENCE Southwesterly along the said right-of-way line, along the arc of said curve to the left, having a radius of 16,470.22 feet and a central angle of 00046'20" for an arc distance of 221.96 feet to a point on the arc of a non tangent curve concave to the South, a radial line of said curve through said point having a bearing of N 35008'48" E; THENCE Westerly along the arc of said curve, to the left, having a radius of 200.00 feet and a central angle of 34140'09" for an arc distance of 121.02 feet; THENCE N 001100'00" E. 60.39 feet to a point on the arc of a tangent curve concave to the West; THENCE Northerly along the arc of said curve to the left, having a radius of 50.00 feet and a central angle of 12040'05" for an arc distance of 11.06 feet a point on the arc of tangent reverse curve concave to the East; Page 1 of 2 March 28, 2003 WLB No. 102069-B-001-0500 W:ILEGALS11810571BIG-0-TIREIEAST-8 IG-O-TIRE. DOC Tf1eg Group,. THENCE Northerly along the arc of said curve to the right, having a radius of 50.00 feet and a central angle of 29012'15" for an arc distance of 25.49 feet to a point of tangency; THENCE N 16113210" E, 96.80 feet to POINT OF BEGINNING. Prepared by: THE WLB GROUP, INC. Jack A. Buchanan, RLS Page 2of2 WeB Group. March 28, 2003 WLB No. 102069-B-001-0500 W:ILEGALS11810571BIG-0-TIREIWEST-BIG-0-TIRE. DOC LEGAL DESCRIPTION BIG-O-TIRE (WEST PARCEL) That portion of Section 7, Township 12 South, Range 14 East, Gila and Salt River Base and Meridian, Pima County, Arizona, described as follows: COMMENCING at the North quarter comer of said Section 7; THENCE S 001120'38" E, along the North South mid section line of the said Section 7, a distance of 2,074.46 feet to the POINT OF BEGINNING on the arc of a non tangent curve concave to the South, a radial line of said curve through said point having a bearing of N 10042'23" E, said point being on the Southerly right of way line of Foothills Channel recorded in Docket 7102 at Page 887, Pima County Recorder's Office, Pima County, Arizona; THENCE Easterly along said right-of-way line, along the arc of said curve to the right, having a radius of 1,352.39 feet and a central angle of 01050'08" for an arc distance of 43.33 feet to a point, THENCE S 16"32'10" W, 96.80 feet to a point of a tangent curve concave to the East; THENCE Southerly along the arc of said curve to the left, having a radius of 50.00 feet and a central angle of 29012'15" for an arc distance of 25.49 feet to a point on the arc of a tangent reverse curve concave to the West; THENCE Southerly along the arc of said curve to the right, having a radius of 50.00 feet and a central angle of 12040'05" for an arc distance of 11.06 feet to a point of tangency, THENCE S 00000'00" W, 60.39 feet to a point on the arc of a non tangent curve concave to the South, a radial line of said curve through said point having a bearing of N 00°28'39" E; THENCE Westerly along the arc of said curve, to the left, having a radius of 200.00 feet and a central angle of 00049'17" for an arc distance of 2.87 feet to a point of tangency; THENCE S 89039'22" W, 11.20 feet to the North -South mid section line of the said Section 7; THENCE S 891139'22" W, 100.00 feet to a line 100.00 feet West of and parallel with the said mid section line; Page 1 of 2 March 28, 2003 WLB No. 102069-13-001-0500 W:ILEGALS1181057\BIG-0-TIREIWEST-BIG-0-TIRE.DOC TM Group THENCE N 00020'38" W along the said parallel line, a distance of 212.70 feet to a point on the arc of a non tangent curve concave to the South, a radial line of said curve through said point having a bearing of N 05037'17" E; THENCE Easterly along the arc of said curve, to the right, having a radius of 1,251.68 feet and a central angle of 04037'37" for an arc distance of 101.08 feet to POINT OF BEGINNING. Prepared by: THE WLB GROUP, INC. Jack A. Buchanan, RLS 12214 JACK A. B.UCHANAK Page 2 of 2 ORO VALLEY PLANNING AND ZONING DEPARTMENT MEMORANDUM TO: David Andrews, Town Manager; Jerene Watson, Assistant Town Manager; Oro Valley Police Department; Golder Ranch Fire District; Tucson Electric Power; Parks & Recreation Staff; Oro Valley Water Staff; Economic Development Staff, Building Safety Staff; Transit Services Administrator; Planning Staff, Legal Department; Public Works Staff; Pima County Assessors; and Pima County Wastewater. FROM: David Ronquillo, OV Senior Planner DATE: December 8, 2008 RE: Development Review Committee Agenda for Thursday, December 11, 2008 LOCATION: Kachina Conference Room — Administration Building 9:00 a.m. Pre -Application Conference: OV12-08-22, The WLB Group, Inc. on behalf of Big O Tire, requests preliminary review of a Minor Land Division to split one lot into two to create a new lot for the existing BedMart building. The parcel number is 220-08-001 J. If you have any questions about this matter, please contact Karen Berchtold, Senior Planner, at (520) 229-4814 or kberchtoldgorovalleyaz.gov. 9:15 a.m. Project Representative: WLB Group 9:50 a.m. Adjourn ORO VALLEY PLANNING & ZONING DEPARTMENT DEVELOPMENT REVIEW BOARD REPORT MEETING DATE: February 11, 2003 TO: DEVELOPMENT REVIEW BOARD FROM: Thomas Keiran, Planner I and Bayer Vella, AICP, Senior Planner SUBJECT: OV12-02-19; COMMERCIAL DEVELOPMENT PROPERTIES, INC. REPRESENTING THE TOSCO CORPORATION, REQUESTS APPROVAL OF A DEVELOPMENT PLAN FOR A COMMERCIAL DEVELOPMENT TO BE LOCATED IN THE ROONEY RANCH PLANNED AREA DEVELOPMENT AREA B, NORTHEAST OF THE HOME DEPOT, PARCEL 22008001J. BACKGROUND:. The subject property is located on the northeast corner of La Reserve Drive and North Oracle Road within the Rooney Ranch Planned Area Development (PAD) Development Area `B". This particular parcel has been earmarked for commercial development for the past 13 years ever since the Rooney Ranch PAD was adopted in February of 1990. The PAD was created with eight specific land use designations, Areas "A" through "I", and each area has detailed permitted uses and development standards. Additionally, this property was originally designated as Sub Area 6 of Area `B." As with the larger areas, the sub areas had defined development criteria. Ordinance (0) 97-17 deleted the sub areas and set new development standards for Area `B." The ordinance also specified that permitted uses of Area `B" are extended "in the area formerly known as Sub Area 6" to allow one Retail / Convenience Use Gasoline Sales. The Planning and Zoning Administrator has determined that the proposed non -convenience use Retail / Auto service is less intense than a gas station and, as such, is a permitted use. SUMMARY: General Commercial Development Properties, Inc. has proposed to develop the subject property for a "Big-0 Tire" service/tire center and retail shop. The property consists of 1.43 acres with a proposed net building area of .24 acres. The development plan includes a 5,154 square feet structure for the tire store and another 5,448 square feet structure for a variety of retail uses. The later structure will most likely have three or four tenants. Surrounding Land Uses Direction Description Zoning North — 160 feet wide Pima County R1-144 Drainage Easement then proposed Steam Pump Ranch commercial R1-144 site (currently under review for rezoning from R1-144 to C-2 [OV9-02-12]) South East Rooney Ranch Parcel B (Home Depot) parking area Oracle Road then vacant Rooney Ranch PAD Area "B" La Reserve PAD Area D (OVZCR equivalent = C2) West Rooney Ranch Parcel B (Home Rooney Ranch PAD Area `B" Depot) PAD AND OVZCR COMPLIANCE Development Standards As mentioned above, the development standards for the Rooney Ranch PAD Area `B" apply to this property and when an item is not addressed the standards of the Town's C-2 zoning district apply. The property must also comply with select standards of the Oracle Road Scenic Corridor Overlay District (ORSCOD). Item Required Proposed Maximum Building Height 25 feet 25 feet North Setback (C-2 use adjacent to Residential district) South Setback East Setback (Oracle Road) PAD Development Criteria B 50 feet OVZCR Sec. 8-304 G.2.a 0 feet PAD silent; C-2 adjacent to C-2 requires no setback 60 feet PAD Development Criteria A 0 feet West Setback PAD silent; C-2 adjacent to C-2 requires no setback 52 feet 45 feet from property line 10 feet from access easement 60 feet 10 feet The proposed development plan complies with the development standards derived from the PAD and OVZCR except for the Northern landscape buffer, the parking space counts and the location of the loading zone. The applicant seeks adjustments by the DRB and the OVZCR provides a degree of DRB zoning discretion on these three items. Each issue is discussed in the OVZCR Compliance section of this report. PAD AREA "B" The proposal complies with the Rooney Ranch PAD Area `B" development criteria except item F, which stipulates that auto service bays shall not face Oracle Road. Staff finds that the applicant has successfully placed the building so that the service bays are angled away from Oracle Road. While they do not directly face Oracle Road, they will be visible. The applicant has included combined a 5 feet high screening wall and 3 tiered landscaping screening to effectively screen the service bays. Also, the landscape screening buffer yard is between 5 to 10 feet more than required by the Landscape Code. OVZCR ARTICLE 8-3. C-2 COMMERCIAL DISTRICT The proposal complies with the standards and regulations of the C-2 Commercial District. ORSCOD The proposal complies with the standards and regulations of the ORSCOD except where exempted by OVZCR Section 10-401 A.2. A Viewshed Analysis was submitted in accordance to the ORSCOD requirements and the property was determined to not be located in a significant view corridor. LANDSCAPING The buffer yard requirements are also derived from the documents mentioned above and are as follows: Direction Required Proposed North 15 feet 5 feet C-2 adjacent to a residential district (OVZCR Sec 14-207 A) South 0 feet 10 feet C-2 adjacent to C-2 East West 30 feet 30 feet (OVZCR Sec 10-407 C.5.a.) 0 feet C-2 adjacent to C-2 10 feet The Northern buffer yard does not comply with the zoning code requirement as provided for in OVZCR Sec 14-207 A, TABLE 1:REOUIRED BUFFER YARDS. The DRB may modify buffer yard requirements where conflicts with standards and code requirements occur per OVZCR Sec 14-207 A.51 The applicant requests, and the staff supports, the Northern buffer yard requirement be reduced to 5 feet for the following reasons: Conflicts with OVZCR 1. 'While the property to the north is technically zoned R1-144 it is, in actuality, a drainage area that feeds into the Canyon Del Oro Wash. The property, commonly called La Reserve Foothill Wash, is owned by Pima County and is a Public Drainageway dedicated by BK 37, M&P PG 8. Staff is confident that the property will never be built on. As stated in OVZCR Sec 14-207 A, the purpose of buffer yards is to physically separate and visually screen adjacent land uses. The drainage area is approximately 160 feet wide north of the subject property and effectively separates this project from the adjacent use and the wall effectively screens the use. Staff finds that the intent of the code is being met. NEtigating Factors 1. The property north of the drainage area is the 15 acre Steam Pump Ranch site that is currently in review to be rezoned from R1-144 to C-2 (OV9-02-12). Buffer yards are not required between two C-2 uses. 2. The proposal includes a 5 feet high screening wall to the north. 3. The Town has been granted by the County a stretch of land 15 feet wide that runs the entire length of the Public Drainageway immediately north of the subject property for use as a public trail. The applicant has agreed to create a Trail Head area, approximately 100 SF, at the extreme northeast corner of the subject parcel, which will be dedicated to the Town. The applicant has also agreed to pay an in lieu fee to create a paved multi purpose trail for the Town. 4. The width of the Public Drainageway is approximately 160 feet, effectively separating the two uses. In sum, the County property to the north is not, nor will ever be, developed as a residential use and does not need to be buffered as such. The applicant has met the intent of the code by including a five feet high screening wall that both separates and screens the use. It is worth noting that the landscaping plan is an integral part of this review and is discussed throughout this report because it is used to mitigate non complying items. The Landscaping Plan complies with the OVZCR except for minor items that will be addressed during its review. PARKING The proposal includes 39 parking spaces. Staff has calculated the number of required parking spaces to be 46 based on the ratios provided in OVZCR Section 27.6 D.3. Use Required Parking/SF Proposed SF Required Parking General Retail 4/1,000 7,599 31 Auto Service 5/1,000 3,000 15 Total 46 OVZCR Section 27.6. C.2 allows the DRB to approve an alternative parking ratio. The purpose of the alternative compliance analysis is to explain how "the plan will be equal to or better accomplish the purpose of this Section". This section also contains very specific criteria for DRB to consider when considering the proposal. The applicant has submitted an Alternative Compliance analysis for consideration, attached herewith as Exhibit "B". Staff offers the following comments on the analysis (numbered according to the submittal): 1✓ 2. Nearbv Parking: The applicant discusses the availability of nearby parking at the Home Depot site. A shared parking agreement has not been provided by the applicant. 3. Availability of shared parkin : The applicant states tha t the two uses on this site will have shared parking rights. This is a common contractual agreement for commercial development with more than one �` stru ture. However, DRB should not confuse the private shared parking rights agreement stated by the applicant with the criteria for defining shared parking in OVZCR Section 27.6.D. +. This section states: When a mix of non-residential uses creates staggered peak periods of parking demand, shared parking calculations shall be made to reduce the total amount of required parking for retail, office, institutional and entertainment uses. The applicant states that the hours of operation of the two retail structures will be similar. He also states that the second (non Big-O Tire) structure will have a variety of retail uses and has discussed having either 3 or 4 tenants. While the Parking Section of the OVZCR bases required spaces on the total square feet of a retail use, the DRB may wish to consider the different parking demands of the retail structure having multiple tenants. Staff has evaluated this report based on the understanding that the retail structure will not have a restaurant or similar use that generates high traffic. 4. Factors that are unique to this development: The applicant mentions a hardship created when the entire shared ingress/egress easement (DKT 8894 Page 943) dedicated on the Rooney Ranch Area B (Home Depot) development plan was placed on the subject parcel. However, it is not known if the property owner received compensation for placing the easement thusly. The applicant explains the nature of the express retail tire business will not require many customers to occupy parking spaces. Staff agrees with this assertion. One of the purposes of the new parking code is to reduce excessive off-street parking. The applicant could fit in the required parking spaces, much to the detriment of the overall design. The following design features would be eliminated if 46 spaces are provided: I. The number of landscape islands along the northern limits would be reduced. The applicant could omit a landscape island along the northern limits by moving the dumpster/tire storage unit approximately 30 feet to the west. However, changing the location would have the undesirable effect of making the dumpsters become the most prominent feature as one enters the property. Staff would rather see it remain where it is. 2. The landscaped area screening the service bays would be reduced. The applicant could move the screening wall forward, reduce the width of the landscaped area and still comply with OVZCR requirements. Two or three parking spaces reserved for staff could fit into this area. The applicant does not wish to squeeze in parking spaces only to fulfill a code requirement and staff concurs. 3. The loading zone would become more prominent. The loading zone is located behind the retail structure, effectively screened from adjacent uses and most on -site uses. The applicant could move the loading area forward and place a parallel parking space abutting the landscape area north of the retail structure. Again, this would be a detriment to the overall design. In sum, the OVZCR Parking Code states that it wishes to reduce the number of required parking spaces by allowing an Alternative Compliance analysis. While the applicant's analysis requires some revision, it serves to provide a realistic view of their actual parking needs. Staff recommends DRB approval of the alternative compliance analysis to reduce the number of required spaces from 46 to 39. Other Parking Issues Location of Loading Space The loading space is located 120 feet from the Big-O Tire store, which is further than the 100 feet distance allowed in the Parking Code_ OVZCR Section 27.7.13.6. allows the DRB to reduce the location of required loading spaces where they determine that an unusual situation exists. Staff suggests that since new tires are stored inside and that most likely a truck will pull up to a service bay during off -hours, the loading zone requirements provided in the OVZCR do not meet the needs of this use. Staff finds that the loading area is located in the most appropriate location, tucked behind the second retail use and thoroughly screened from the adjacent property, and recommend the DRB approve the location of the loamag area as proposed in the development plan. Pedestrian Access In compliance with the Town Bike and Pedestrian Plan, the development plan incorporates pedestrian circulation to the adjacent properties. Specifically, there are pedestrian sidewalks on the east side of the property (Oracle Road) that will link the existing sidewalk to a future trail. In addition well placed pedestrian access between the two structures on site. Location of Bicycle Parking A sufficient number of bike lockers and bike racks have been provided, appropriately located between the perimeter screening and the main entry of the "Big-O Tire" store. Si za e The applicant has had preliminary discussions with Town staff about submitting a comprehensive sign package. They are aware that signage must comply with OVZCR Chapter 12. Lim A condition has been added to include a General Note that states: "A Lighting Plan must be submitted in accordance to OVZCR Section 17-301 before a building permit is issued." Gradin A Type 2 Grading Permit will be required to construct the building pads, drainage structures, utilities, parking lot, and any walls necessary for grading on the development site. Drainage The existing drainage patterns from the northeast to the southwest will be altered to accommodate water harvesting and first flush requirements for this site. The developed drainage will be directed south and east to a depressed landscaped area just north of the existing north entrance drive into the Rooney Ranch PAD area B. Drainage will then sheet flow across the existing drive and parking lot into an existing storm drain inlet. DESIGN GUIDELINES The development plan complies with the design guidelines of the PAD, OVZCR, and the ORSCOD. One item worth noting is the ORSCOD consideration to provide pathway links to planned recreation trails (OVZCR Section 10408 D.5.c.) The proposal includes a sidewalk that links to the existing one in front of Home Depot and has provided an area approximately 100 SF that will be dedicated to the Town as a public recreational Trail Head. Furthermore, the applicant has agreed to provide an in lieu fee to create a paved multi purpose trail for the Town. A condition has been added to include a General Note that states: "The developer has agreed to contribute an in lieu fee to improve a multi -purpose trail on the Pima County property located immediately north of the subject property. A bond to insure improvements to the portion of the trail that runs from the eastern limits to the western linuts of the subject property is required prior to the issuance of a grading permit. The improvements shall consist of, at a minimum, a 12 foot wide Integral Color Concrete Asphalt path flanked on both sides by 2-3 feet of stabilized decomposed granite. The bond will expire in 10 years" Additionally, the proposal adheres to the design guidelines in regards to screening from Oracle Road and adjacent uses. A screening wall and three tiered landscaping plan provides a satisfactory screen of the use from Oracle Road while preserving the significant vegetation. The screening wall along the northern property limits is also successful in separating and screening the property from adjacent uses. GENERAL PLAN COMPLIANCE: The Development Plan complies with the General Plan as proposed. The following items are noteworthy: • Policy 3. IM, "specialty commercial developments is encouraged in appropriate locations" This particular type of development, which provides a variety of retail shops, is encouraged as part of the General Plan. • Policy 9.11), "all development proposals should attempt to arrange building, massing of buildings, and/or arrangements of lots to preserve views from adjacent properties and streets while providing privacy for residents ". Policy 9. IH, `Landscape improvements are to: - preserve, restore, and enhance the ecological and scenic qualities of the natural landscape; - mitigate negative visual impacts of buildings and parking lots; - add aesthetic chcnm, interest and character; and - improve the functional use of a site " PRESENTATION REQUIREMENTS: As established in Resolution No. (R) 98-31, "all presentations before Boards, Commissions, and Council" must be formatted to be shown on the Town's projection system or overhead system. A presentation must be designed to insure that the audience staff and the voting; body can view the �rauhics. Examples of acceptable computer formats are PowerPoint, ArcView, videotape of presentation boards, and/or overhead transparences. The applicant is responsible for the development, presentation, and coordination of all presentation materials. If an applicant does not conform to the aforementioned resolution, the item may be continued due to non- compliance. RECOMMENDATION: Staff finds that the proposed Development Plan for the `Bib O Tire" store and retail shops is good layout — particularly in context of the Home Depot site. The DRB is being asked, and has the authority, to modify the following items: 1. Reduced landscape buffer to the North 2. Reduced parking space requirements 3. Permission to locate the loading zone further than 100 feet from the front building. Staff has addressed each of these items in detail above and finds that they are appropriate requests. Staff recommends approval with the conditions in Exhibit A SUGGESTED MOTIONS: I move to approve OV12-02-19, Development Plan for the "Big-O Tire" store and additional retail use, Parcel 22008001 J, with the conditions listed in Exhibit A, attached herewith. OR I move to approve OV12-02-19, Development Plan for the "Big-O Tire" store and additional retail use, Parcel 22008001J, with the conditions listed in Exhibit A, attached herewith, and the following added conditions: OR I move to deny OV12-02-19, Development Plan for the "Big-0 Tire" store and additional retail use, Parcel 22008001 J, finding that: Attachments: 1. Exhibit A 2. Exhibit B — Alternative Parking Analysis 3. Exhibit C- Ordinance (0) 97-17 — The revised development standards for Area `B." 4. Site plan PIWAS& zoning —Administrator EXHIBIT A CONDITIONS OF APPROVAL DEVELOPMENT PLAN BIGO TIRE AND RETAIL SHOPS OV12-02-19 1. Add a General Note that states: "The landscape buffer yard along the Northern limits required by OVZCR Sec 14-207 A has been reduced from 15 feet to 5 feet by the Development Review Board". 2. Add a General Note that states: "The number of parking spaces required by OVZCR Section 27.6 D.3 has been reduced from 46 to 39 by the Development Review Board". 3. Add a General Note that states: "The Alternative Parking Compliance Analysis has been evaluated for Retail Use. Any uses of higher intensity, such as a restaurant, shall require a Shared Parking Agreement with Home Depot. If it becomes evident that employees and/or patrons of the retail uses are parking in Home Depot's parking area, the property owner must provide a Shared Parking Agreement to the Planning and Zoning Administrator within 60 days". 4. Add a General Note that states: "The location of the loading area required in OVZCR 27.7.C.I has been extended from 100 feet to 120 feet by the Development Review Board". 5. Add a General Note that states: "The property owner shall contribute 1% of the building construction cost towards public arts projects". 6. Add a General Note that states: "The public recreational Trail Head shall be field verified and dedicated to the Town of Oro Valley prior to granting a building permit". 7. Add a General Note that states: "The developer has agreed to contribute an in lieu fee to improve a multi -purpose trail on the Pima County property located immediately north of the subject property. A bond to insure improvements to the portion of the trail that runs from the eastern limits to the western limits of the subject property is required prior to the issuance of a grading permit. The improvements shall consist of, at a minimum, a 12 foot wide Integral Color Concrete Asphalt path flanked on both sides by 2-3 feet of stabilized decomposed granite. The bond will expire in 10 years" 8. Add a General Note that states: "A Lighting Plan must be submitted in accordance to OVZCR Section 17-301 before a building permit is issued". 9. Add a General Note that states: "Crosswalks will be clearly delineated by use of a different texture in accordance to OVZCR Section 27.6G.2.d". 10. Add a General Note that states: "The tire storage area shall be entirely enclosed on all five sides". 11. Change General Note 4 required parking spaces to 46. 12. Revise the Alternative Compliance Parking Analysis letter introduction to state the actual square feet of the buildings (10,599 SF) and required parking spaces (46). 13. Provide proof of a shared parking agreement from Home Depot or omit any reference to the availability of nearby parking in the Alternative Compliance Parking Analysis per OVZCR Section 27.6C.2.b.2. 14. Revise the Alternative Compliance Parking Analysis letter discussion of Shared Parking to comply with the standards of shared parking set forth in OVZCR Section 27.6.D.4. 15. Include Storage Area enclosure details on sheet 3. 16. Revise general note 19 to reflect change in design vehicle to SU-30. 17. Add delta data to curve data of the property boundaries per title report. 18. Revise curb opening note to reflect condition 1 a. 19. Clarify with elevations drainage west of Retail building. a. Revise finish elevations north of the workshop to meet 0.5% minimum slope requirement. Spot elevations depict less than 0.5% slope. b. Clarify with elevations detention basin drainage flow pattern. c. Provide easement documentation for sanitary sewer MHI to existing MR. d. Provide a schedule for the maintenance of the first flush/detention basin on the development plan. 20. Provide more detail between the basin and sidewalk to accurately depict grading. 21. Drainage Report Items. a. Remove curb depressions and replace with full sized curb at concentration point 4(CP4) to provide a broad crested weir that will accommodate first flush and code requirements, (page 11) per OVZCR Section 4-504-D-5. Revise appropriate notes on sheet 2 and details on sheet 3 to reflect change to design. b. Correct page 11 (2°d paragraph, 0 sentence) CP3 should read CP4. 22. All the aforementioned conditions must be addressed prior to Town Council review of the Development Plans. WAm ORO VALLEY PLANNING AND ZONING DEPARTMENT MEMORANDUM. a, TO: David Andrews, Town Manager; Jerene Watson, Assistant Town Manager; Oro Valley Police Department; Golder Ranch Fire District; Tucson Electric Power; Parks & Recreation Staff; Oro Valley Water Staff; Economic Development Staff; Building Safety Staff; Transit Services Administrator; Planning Staff; Legal Department; Public Works Staff; Pima County Assessors; and Pima County Wastewater. FROM: DATE: RE: David Ronquillo, OV Senior Planner December 8, 2008 Development Review Committee Agenda for Thursday, December 11, 2008 LOCATION: Kachina Conference Room — Administration Building 9:00 a.m. Pre -Application Conference: OV12-08-22, The WLB Group, Inc. on behalf of Big O Tire, requests preliminary review of a Minor Land Division to split one lot into two to create a new lot for the existing BedMart building. The parcel number is 220-08-001J. If you have any questions about this matter; please contact Karen Berchtold, Senior Planner, at (520) 229-4814 or kberchtoldaorovalleyaz.gov. 9:15 a.m. Project Representative: WLB Group 9:50 a.m. Adjourn E�, ill 1 UUt, c,1M To cLz4'1'-' 0 t� w Page 3 of 4 This also means I won't be around for the event and you'll need a new sign -in sheet volunteer. Sorry to miss this one. Kate Quoting Jason Meininger <JMeininaer@Sonoran.Ora>: Hello all, After reviewing the event checklist for next week there are only a few details that are in need of a volunteer on the day of the event. If someone (Laura maybe) could send me the criteria for the AICP CM write-up, I will take care of that this week and send to Karen. What I have listed for the day of the event are: * Order Food: Pamela * Pick-up Food: volunteer needed * Distribute Food: Laura * Beverages: Kelly * Sign -in Sheet: Kate * Cashier: Kate * Speaker Gift: Volunteer needed, doesn't Danny have the gifts rolling around in the back of his car, or stuffed in his closet? * Introduce Speaker: Pamela After event * Clean-up: everyone * Forward sign -in sheet to Karen: Kate * Thank you letter: Jason The only other consideration is that the computer at the conference room doesn't accept flash -drives. In the past, I have used my laptop and plugged it into the blue projector cord that is attached to the ParkWise computer. If someone has a laptop that they can bring, it will ensure the presentation is seamless. In the event there is no computer to be used, the staff at Pennington have the capability to burn the presentation to a CD and use that (it's a pain). Once the computer is plugged in, there is a remote control in the 2nd drawer from the left that turns on the projector. There is no remote control for the presentation, unless one of you bring one. I think that covers all the bases, or have I forgotten something? Jason Laura Huntoon, PhD AICP Associate Professor of Practice Director of Graduate Studies Degree Program in Planning Department of Geography & Regional Development University of Arizona PO Box 210076 Tucson AZ 85721-0076 06/27/2008 QUO JP�;Ec'Y AR/��w �CUNDED N91N Planning and Zoning Division 11000 N. La Canada Drive, Oro N alley AZ 85737 Phone: (520) 229-4800 Fax: (520) 742-1022 Web Site Address: www.townoforovalley.com REQUEST FOR PREAPPLICATION CONFERENCE PROJECT DESCRIPTION: Split the Big O Tire Center parcel so Bed Mart and Big O Tires are individual lots Both lots are already fully constructed and currently occupied. Bed Mart wishes to purchase their lot from Big O Tires LOCATION: North half of Section 7 T12S R14 E (on Oracle Road N of La Reserve Dr PARCEL NUMBER' 220-08-001J TYPE OF REQUEST: Lot Split APPLICANT NAME/FIRM: The WLB Group Inc ADDRESS: 4444E Broadway Tucson AZ 85711 TELEPHONE NO.: 881-7480 FAX NO.: 881-7492 EMAIL: subdivisioncoordinator(a-)wlbgroup.com PROPERTY OWNER: Big O Center LP c/o Thomas Tucker, 13984 W. Bowles Ave #200 Littleton CO 80127 SIGNATURE: PREAPPLICATION CONFERENCE DATE REQUESTED: DATE: (Office use only) ❑ SUBMITTALS MUST BE RECEIVED BY THE PLANNING DEPARTMENT AT LEAST TEN (10) WORKING DAYS IN ADVANCE OF THE DESIRED PREAPPLICATION CONFERENCE DATE. ❑ SUBMITTAL REQUIREMENTS "ALL PLANS MUST BE FOLDED PER PIMA COUNTY FOLD." o TWENTY (20) COPIES (24X36) OF THE PROJECT CONCEPT PLAN, WITH LOCATION MAP. The LB Group Inc. CL„ -1 2O S T�uvr� �_ Ora Valley Shirley Gay Town of Oro Valley 11,000 N. La Canada Drive Oro Valley AZ 85737 Re: Big-0 Tires Pre -application Submittal WLB No. 102069-CO01-0000 Dear Shirley: J Engineering • Planning Surveying • Urban Design December 1, 2008 Landscape Architecture Attached for scheduling on the December 11, 2008 Pre-App. Agenda, please find: ■ One (1) complete Request for Preapplication Conference ■ Twenty (20) bluelines of the project concept plan ■ One (1) copy of the Legal Description If you have any questions, or require additional information, give me a call. Once the Agenda is available, please fax a copy to my attention at 881-7492. Sincerely, THE WLB GROUP, INC. David J. Whitney Subdivision Coordinator c: John Holley Engineering • Planning - Surveying • Urban Design • Landscape Architecture Offices located in Tucson, Phoenix, Flagstaff, Las Vegas • E-mail: tucson@wlbgroup.com 4444 East Broadway • Tucson, Arizona 85711 • (520) 881-7480 • FAX (520) 881-7492 GENERAL NOTES: a—IMM-1 7 .==2 —%—"" oz. — — (—.I P.C./C.O.T. SM. DETAILS: R00h P, I'IIU SCALE' � L 8TUI ,.'IJ 0 AMS-99 ,, "A�,/ 4-r-q— :11 TOWN OF ORO VALLEY PROJ#:OV12-98-17 ZONE:SEE NOTE #2 Adm. Address: 10801 N. ORACLE RE A DEVELOPMENT PLAN FOR: ROONEY RANCH PARCEL 8 HANDICAP PARKING DETAIL 7—\ DP BK 23 PG 73 SHT 1 OF 2 Page 1 of 1 http://www.pimaxpress.com/dsgis/images/Dev_plan/bk23/dp_bO23_p073_sOl .tif 11/19/2008 P. 1 N 114 C CR. FWD. STONE -47 a o N 1 /4 COR. 0 o SECTION 7 J N -P O -P W a7 co _ 0 11. 08 ` m 3,52,p83 3 _O �V co z 0) N O � o PEST PARCEL a (24,765 Sq Ft.) OD R=50,00, L=25,49' R=50,00' L=11.06' f 0 0 0 L=2.87' o'oo S89'39'22"W W 100.00' 11.20' S89'39'22"W Rol 6. 03, 4 352.3 �•36,37-1 9 EAST PARCEL (37,625 Sq Ft.) Z�Y'6a, 1, p2. 409 b EXHIBIT TO ACCOMPANY DESCRIPTION OF PARCELS W172W BIG O TIRE SECTION 7, T. 12 S., R. 14 E., G.S.R.M., PIMA COUNTY, ARIZONA WLB# project No. 102069—A001-1003X 4-01-03 N:\102--069\EXBT—PARCELS.DWG N?O. roe °,sr "w 16 The WLB Group �x o�0JP� BEY qR/�o29 "'OUNDED 191a John Holley, P.E. The WLB Group, Inc. Tucson, AZ 85711 TOWN OF ORO VALLEY Department of Public Works 11000 North La Canada Drive Oro Valley, Arizona 85737 (520) 229-4800 Fax: (520) 229-4899 December 16, 2008 Re: OV12-08-22, Big-O-Tire Lot Split Pre -Application Letter Dear John, Town of Oro Valley Department of Public Works staff offers the comments listed below. Note: these comments are preliminary in nature and subject to change upon receipt of more detailed information. These comments are for guidance and are not a substitute for all applicable Town of Oro Valley, Pima County, State of Arizona and Federal codes, regulations, ordinances and/or laws. General Comments: 1. Provide a record of survey document for the entire original parcel being affected. This exhibit should include at a minimum the following: a. Show all existing and proposed easements, with width and use shown and reference to docket and page where recorded. b. Provide surveyable metes & bounds for both parcels resulting from the split. c. Provide documented established or found survey monuments. All established monuments must be field set and data gathered prior to submittal of lot split document. d. Provide a Basis of Bearing. e. Provide the surveyor's Arizona RLS stamp, with signature and date on plan. f. Provide a surveyor's statement that the survey was performed either by the surveyor or under the surveyor's direct supervision. g. Provide a legend or table that identifies and explains all symbology and abbreviations to be used. h. Provide names, addresses, and telephone numbers of all parties of interest to the lot split. i. Provide a description of access to each of the parcels proposed to be divided and method by which such access is to be granted. j. Distance and bearings from at least one boundary corner must be shown to at least two of the following: a section corner, quarter section corner, or Town/County survey monument with description of said point. Note that at least one of the ties must be to a section or quarter section corner. The r original survey ties utilized for the original development would be adequate for this document as well. 2. Provide/prepare a means by which drainage flowing across the proposed lot divide can be accounted for. This can be in the form of a drainage easement or a Common Operation Reciprocal Easement Agreement (C.O.R.E.A.). 3. Provide/prepare utility easements to account for all utilities that will cross the proposed lot divide. This may also be achieved using the C.O.R.E.A. discussed in number 2 above. 4. Provide a copy of boundary closure calculations for both parcels. 5. Provide a current title report, including full schedule B dockets If you have any questions, please call Fritz Laos at 229-4818. Sincerely, . Paul Keesler, P.E. Development Review Division Manager Cc: Shirley Gay Karen Berchtold F:\OV\OV12\2008\12-08-22\correspondence\agency commcnts\PW_Lot Split_Pre_app12_16_08.doc 2 GOLDE9 GOLDERRANCH FIRE DISTRICT �- Communit Services Division E T S'A N CN International Fire Code 2006 Edition TO: Town of Oro Valley Planning and Zoning Division FROM: Chris Kiel, Plans Examiner DATE: December 11, 2008 PROJECT: OV1208-22 Big-O Tire lot split PLAN REVIEW: Fire Code Review of the Preliminary Development Plan Documents Please provide the following Fire Code review comments to the applicant for the above referenced project. The following items need to be addressed with the subsequent submittal: A) Please provide an access easement or cross -access agreement for the required fire apparatus access (see note #1 below for additional information). B) Add the following note to the Plan: An approved automatic sprinkler system shall be installed throughout each new building. The remaining items are provided as general information for the applicant. Fire Apparatus Access. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved all-weather fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. The fire apparatus access road shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Approved fire apparatus access roads shall be installed and in service prior to combustible material delivery to the site. Gates installed across fire apparatus access roads shall be installed in compliance with Fire Code Appendix D. All electrically operated gates shall include preemption operating equipment compatible with the fire department's system. The installation of new traffic control signaling devices on fire apparatus access roads shall include preemptive control equipment compatible with the fire department's existing system. An approved fire department key box shall be installed at an accessible approved location on the building. Door keys shall be provided and maintained in the key box as to provide access to all structures for fire- fighting and life-saving purposes. Automatic Sprinkler Systems Required. All new occupancies shall install an approved automatic sprinkler system throughout. Water supplies for automatic sprinkler systems shall comply with the International Fire Code. The potable water supply shall be protected against backflow in accordance with the requirements of the International Fire Code, the International Plumbing Code, and the Oro Valley Water Utility. Backflow prevention devices shall be listed for fire protection service. Backflow prevention devices may be installed remote from the building or as a portion of the sprinkler system riser inside the building. Backflow prevention device shutoff valves shall be locked in the open position. The backflow prevention valves shall be electrically supervised by a tamper switch installed in accordance with NFPA 72 and annunciated by the sprinkler system monitoring control panel. The main drain on automatic sprinkler systems shall be sized to allow for forward flow testing of the backflow prevention device. Golder Ranch Fire District - Commmunity Services Division 3885 E. Golder Ranch Dr.; Tucson, Arizona 85739 520-818-1017 Fax 520-825-8043 www.golderranchfire ors* ckiel(ii��"Olderranclifire ors* Proudly Serving Our Community with Strong Hands & Caring Hearts Since 1977. Serving as the Fire Marshal for the Town of Oro Valley since 1999. The building shall provide an exterior door leading directly into the room containing the fire sprinkler riser and shut off controls. New Fire Department Connections (FDC's) shall have approved locking caps installed. Automatic fire sprinkler systems and fire alarm systems shall be monitored by an approved central station, proprietary supervising station, or remote supervising station. Fire protection system monitoring shall be in service prior to acceptance testing/inspection of the system. Each building shall have a lockable As -Built Plans Box mounted at an approved location, usually adjacent to the automatic sprinkler system riser. Please feel free to contact me if you have any questions or concerns regarding any of the above Fire Code review comments. Chris Kiel, Plans Examiner Golder Ranch Fire District & Town of Oro Valley (520) 825-5968 ckiel@golderranchfire.org Golder Ranch Fire District - Community Services Division 3885 E. Golder Ranch Dr.; Tucson, Arizona 85739 520-818-1017 Fax 520-825-8043 ww-w.eolderranclifire.org ckiel@goldetranchfire.org Proudly Serving Our Community with Strong Hands & Caring Hearts Since 1977. Serving as the Fire Marshal for the Town of Oro Valley since 1999. oho Jp�IEY. gRiZp2v F lam: lv �(//ypED 1g'1 Town of Oro Valley Planning & Zoning December 31, 2008 John Holley The WLB Group, Inc. 4444 East Broadway Tucson, AZ 85 711 CON&WAW-5 RE: OV1208-22, The WLB Group, Inc. on behalf of Big O Tire, requests approval for a Minor Land Division to split one lot into two to create a new lot for the existing Bedmart building, parcel # 220-08-001J. Dear John: Thank you for attending the DRC on December 8, 2008 to discuss this project. Staff has determined that this request does not meet the requirements for a minor land division by researching the parcel genealogy through Pima County Assessors. It appears this parcel is derived from parcel 220-08-0010. That parcel has been split 3 times since October 1988, when the land was annexed. Under the Town's Zoning Code definitions, a subdivision: "Shall mean improved or unimproved land or lands divided for the purpose of financing sale or lease, whether immediate or future, into four (4) or more lots ..." Under a minor land division, a parcel may be split to create up to three lots, but four lots triggers the subdivision process. At the DRC meeting, staff discussed open space requirements. Staff confirmed that if the lots were split, they would not need to individually meet the 20% open space requirement. As noted, staff informed the Barclay Group they must file a subdivision plan for the entire Rooney Ranch Area B site. If you wish to subdivide the Big O Tire parcel, it may make sense to do so as part of the overall subdivision. Please do not hesitate to contact me if I can be of further assistance. Sincerely, Karen Berchtold, AICP Senior Planner Cc: File Engineering Enclosure: 1 Coordinators F:\OV\OV 12\2008!12-08-22\correspondence\December 22 comment letter.doc www.orovalleyaz.gov 11000 N. La Canada Drive • Oro Valley, Arizona 85737 phone: (520) 229-4800 • fax: (520) 742-1022 v i \Jwu A ACAIA) Folqw"Pta'a - P40 0"4" 004""p. qw 'k Am* woom. 4004 i Ali-. 01-46 c ke"i. + to y c -b m Plan for 11111 Iill:IiIlli�iii ill!Ildid. aWrlovcd by tho Oro N41&Y A49yor and _Lt-—day of CO"mil On the Dated t�.js. I -, F-1 1�w (Alf C' YTOwn Clerk A, PORT QF7,11 )IIIIM CrAh P%ol 4XISWIV.Sm"ll- k 44 W ­3 4 CATTM. U P G'_ E EXIST. OW,,,MU 5 WE ARIA W DWW7MQF Fl, OW,, F F WDRANT IFE 32.67 PUSHED RDOR SL Will VALVE& ME 310D F PAO&OV Wft LRTTMShEET NUMBER ,'y (WAll Q A /z WST PA-VOE I T I PROPOIS W—L rg, ft-Ws -,DUMp, AWW A04OMW S­lf/Wffl'VW'8'llPLffy­MNAf E R10FAMIRKYW SPA OW WA4T WW COW TR MDT Xn CIA TO a� lrr �l 1 � l� r �4� ---------- P. CdC 0". P 0877 , 8 A'AR R, A 1I 210yea W19 c"10 'to, z o" too, Q%4QW ROAD PAAL !, TZ COARAS W-,Va- PR Q'I Rl 3 E. FAJ, 8077351M coNn T" e"I L7 w1w, m j ,W = m Esr� CWWF.., (Mmm;;o W w w MM-lot- -mwww, SCALE tI**-2.(Y A �Fl & c WQNW777�1:1- i&l Ali P �Sr � , loop\ovez 731 2595 t ,;a ,I> 60 COAC W? am AW -R*ow sp,120 6A c, aw-w-r, w WINTRItIMIM WMWO RM V AKU. MET, i 4> 40 M,,",MK MWW FER, R4*W I M as Am Ras" Vil, aW AQ= AW PW, filpWl owww mow w az tz 1� J*aRg OPE mmw Amov mw IV BM14 SK J MOMW PARK AM AP MUt SHE: i 0 WE PEa ES ORMWA <ft> aMW PARK mmg Aw POST SCR 05 MR; $9, Z1106 -A E PIT pc/� 91 G SE OEM Am RN MW S DE 441 Oi 0 it n n ja­ W ALIFW-li w w &'IVIWR'M I -44 !)M�4 �bi It, I X�,* I VI, �I-w Wr N 0 T ML OR E 1. AU SIR 1, M"W, R He 2. ALL ro An ■ TK MAD nVAM ISO W, Al nFTAK- &L� 6uv L4 nul WAJIF nFTJ G EDGE r'll N kuh", Ull rf w P PA x W .............. nu WE TLA FFT-IA A' IV k 7W OR= Aff OW" TWaMI-Aj IS YARACRM PWTSV AMA r-, 4,X AMM Ad A Of tAl OPS, M SPAM RE W�,J "AQRM woo rld PIP 4wAk, Ake, a, hl 14 m A Intsw n. Vol Ook, 12 .................... Y !7 J Ul 40, 01) F,17 Aw 11"t, eo 10 Avl! ;lY tl* �v TRE 13 TYAr&7-. 4- XV 7!:44 Lo. T .......... ... 10*94W fjol %"Awn - O#M*Okl No. Ams Movom, Nv- 07 77J -7,,Sq /4 Tmn CIO&, of Or'O AZ, do ce, Pla"aflar aPPfolved by tfie as orlo d dWY co OR ci I on, t�h,,C, y of y -or an: a Dated day cat le r k IF voZO �RIWW ■ rdbl In $CALoe ll'WIY AL = 1 W te 2W 40" TU"aw. AVJW"o =t= 6#0W W amw A;O� w 2w N MR ARM TV, XTIA., 4'MIMK "%UW AW RCSM W RC*" / 401 <$> OW AOW S-9, 2a-7 al Az shw i i,l* am ammi ~51"CAP PARKI RIM W-1 BETL swiffull. i PAR OW 70 AUK- SK i IME PE RPOWE PA 5'QW SEEM PFR PC s PW MWW PU P"OT SO A06 =WR, QMW MR AW SMWW, AM *0 41' • leg, �Igiwwjpo ----------- - ---- ---