Loading...
HomeMy WebLinkAboutOV1701979O�OJP4IEV ARzO29 TOWN OF ORO VALLEY DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARTMENT 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 www.orovalleyaz.gov/dis °°Noeo Agl A 1.2 GENERAL APPLICATION FORM Application Type ❑ Major General Plan Amendment ❑ Rezoning/PAD Amendment ❑ Planned Area Development W Conditional Use Permit ❑ Zoning Code Amendment ❑ Conceptual Site Plan ❑ Conceptual Public Art ❑ Conceptual Architecture ❑ Final Site Plan ❑ Conceptual Landscape Plan OV Case #: DN4 ❑ Final Plat 7 (N T -IT w ❑ Pre -Application,;; AUG 14 2011 ❑ Zoning Verification is ❑ Sign Criteria ❑ Sign - PAD Exemption' ""' ❑ Master Sign Program ❑ Communication Facility — Tier 1 and 2 Minor ❑ Communication Facility — Major ❑ Revised Development Plan ❑ Other Subject Property Information: Address: 333 w cool Drive, ono Valley Az 85704 Parcel/Tax Code: 225-14-170C Subdivision / Commercial Center Name: Book / Page or Sequence Number: Lot Number(s) Legal Description: MAGEE PLAZA W93' OF LOT 1 EXC S147.55' Section/Township/Range: 25/12.0/13.OE Area of Property: 2,520 sq ft Existing Land Use: Veterinarian Clinic/Hospital Proposed Land Use: Unmanned Wireless Facility Applicant Information: Applicant *: Name: Michelle Lamoureux Address: 1426 N Marvin St, Suite 101 Telephone: 480-907-4265 Firm: Pinnacle Consulting, Inc Fax: 480-664-9850 Property Owner(s) if different from Applicant *: Name: CARLTON ANDREW J & CATHLEEN A JT/RS Firm: Address: 8771 N PASEO NORTENO Telephone: Consultant: Name: Address: Telephone Fax: (Discipline) Fax: * If more than one, attach list _ City: Gilbert State: Az Zip: 85233 Email: michelle.lamoureux@pinnacleco.net City: TUCSON Email: Firm: 1 City: — Email: State: AZ Zip: 85704 State: Zip: IL Project Description/Narrative: Proposition for new concealed wireless communications facility, replacing a nearby non -concealed facility which will soon be decommissioned. Please see the attached narrative for further details. I hereby certify that I have, read and examined this application and know the same to be true and correct. I am the owner of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The approval of this application does not presume to give authority to violate or cancel the provisions of any other federal, state or local law for which this project may be subject to. Notice: It is the applicantlowner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions & Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners Association or property management to determine applicable requirements. It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance. Failure to do so may delay issuance of permits. See attached list of agencies. b Michelle Lamoureux Applicant's Signature Print Name Date Important Note: All submittals received after 4:00 p.m. will be processed the next day Submittals will be rejected if: • Not folded using Pima County fold & collated; • There are missing items on the checklist unless otherwise approved by Planning Division Manager or Town Engineer. • Re -submittals cannot be accepted without a transmittal and a written narrative summary describing the purpose of submittal. 2 verizonN/ DEPART 128 W. GEMMB OR, TEMPE. AZ 65255 HEADINO NEST TOWARD S.MHAVE. TURNLEFTONTOS.ASHAVE.11IENCON71INUEFOR03 MILES UNTIL YOU REACH W. GUADALUPE RD. TURN RIGHT ONTO W. GUADALUPE RD, THEN CONTINUE FOR 01 MILES UNTIL YOU REACH S. KYRENE AD. TUPN LEFT ONTO E. KYRENE RD. THEN CONTINUE FOR 1.0 MILES UNRL YOU REACH W. ELUOT RD. TARN RIGHT ONTO W. ELLIOT RD. THEN CONTINUE FOP 1.2 MILES UNTIL YOU REACH THE FI O E.ON RAMP. TURN LEFTANO MERGE ONTO P10 E.ON RAMP TOWARD TUC30N. CONTNUE ON MO E. FOR 89 MILES UNTILYOU REACH EXIT 2MI COPTMO RD. TIIRTJ LEFTONTO CORTMO RD. THEN CONTINUE FOR 7.0 MILES UNTIL YOU REACH N. NORTHERN AVE. THE ROAD NAME CHANGES MOM CORTARO PD TO W. CORTARO FARMS RD TO W. MAOEE RD OVER THE 7.0 MILES. TURN LEFTONTO N. NORTHERN AVE AND CONTINUE FOR 01 MILES UNTILYOU PEACH W COOL DR. TURN RIGHT ONTO W. COOL DR, THEN CONTINUE FOR 02 MILES UNTIL YOU REACH TIE SITE ON RIGHT. VICINITY MAP a PROJECT ARFA­,�, Z W.MAGEE RD TUC PEPPERSAUCE APN: 225-14-170C 333 W. COOL DRIVE ORO VALLEY, AZ 85704 PIMA COUNTY INSTALL (3) NEW ANTENNA FRAMES WI (9) NEW PIPES ON EXISTING MONO-EM INSTALL (9) NEW PANEL ANTENNAS ON NEW ANTENNA FRAMES INSTALL (6) NEW RRH'S ON NEW ANTENNA FRAMES INSTALL (2) NEW OUTDOOR EQUIPMENT CABINETS ON EXISTING CONCRETE PAO INSTALL (2) NEW HYBRIFLEX A (6)'IeO COAX CABLES WITHIN EXISTING UNDERGROUND CONDUITS AND EXISTING MO —ELM INSTALL NEW UIIURY CABINETS ON EXISTING CMU WALL INSTALL (1) NEW OW ON NEW ANTENNA FRAME SHEET INDEX T-1 PROJECT INFORMATION GN-1 GENERALNOTES IS-1 TOPOGRMHICSURVEY 11 SITE PLAN I ENLARGED SITE PLAN AND ANTENNA PLAN A-3 ELEVATIONS — ELEVATIONS A5 DETAILS Ad DETAILS E-1 ELECTRICAL NOTE5 E4 ELECTRICAL DETAILS E-3 GROUNDING PLAN AND GROUNDING DETAILS CLIENT VERIZON WIFELESS 125 W. GEMINI DR. TEMPE.AZ85203 CONTACT: RICK MIRANDA PHONE: IBM] 39O88A4 PROPERTY OWNER CMLTON ANDREW J A CATHLFEN AJT)RS .11 N. PASEO NORTENO TUCSON. AZ 6ST00 CONTACT ANDREW CMLTON ONE (520) bat-36M TOWER OWNER SUN STATE TOWERS 1426 N. MMVIN STREET Y101 D LBERT. AZ W. CONTACT: CHAD WARD PHONE: (480) E645588 EXT. 214 SITE ID: AZUSOTO SITE NAME: SAGUARO SITE ACQUISITION PINNACLE CONSULTING, INC. 1426 N. MMAN STREET Y101 GILBERT, AZ .2 CONTACT:W HELLE LAMOUREUX PHONE: (46D)6 588-230 ZONING: C2 PARCEL*: 22514170C USE: UNMANNED COMMUNICATIONS NEW LEASE AREA: 1. SO, FT JURISDICTION: TOWN OF ORO VALLEY GOVERNING CODES: 20121BC, N121FC. 20121MC, 2011 NEC ALL BUILDING CODES LISTED MOVE SHALL -'No BY THE GC VE IN.. G. CTION 1. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEETTHE HEALTH AND SAFETYSTANDMDS FOP ELECTROMAGNETIC FEW EMISSIONS M ESTABLISHED BY THE FEDERAL COMMUNICATIONS COMMISSION OR ANYSUCCESSOR THEREOF, AND ANY OTHER FEDERAL OR STATE AGENCY. 2. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEET THE REGULATIONS OF THE FEDERAL COMMUNICATIONS COMMISSION REGARDING PHYSICAL AND ELECTROMAGNETIC INLENFERENCE. FR. NTF11K. ].��:3ulnl IiJ.T]ll ]Y•I]:IA��iiS•19fi31-Si 4. DEVELOPMENT AND CONSTRUCTION OF THIS PROJECT COMPLY W 111 ALL APPLICABLE CODES AND OFDINANCI 5. EXISTING PARKING IS NOT AFFECTED BY THIS PROJECT 0. THIS PROJECT DOES NOT INCLUDE WAMR OR SEWER. APPROVALS (RF): DATE: ASE FIRM NEW SITE LOCATION (CONST.): DATE: PIN NACUE CONSULTING' .INC. 1428 N.MMWIWNSTREETTPEET Yt01 LATITUDE 32.35305 3221'lO.fi64'NINADB31 (RE): DATE: GILBERT, AZ M03 LONGITUDE 110.97S88 110. 5Y32.A48• WINM891 CONTACT: KYLE FORTIN PHONE: (523) 2174235 2584.E MAVD88) LANDLORD: DATE: TUC PEPPERSAUCE RMACD [PROJECT INFORMATION T-1 FZ FR0j :CT W. v.;L; �i y GENERAL NOTES: 1, id dr[arorN.:rwH ,� CONCRETE AND REINFORCING STEEL NOTES: GROUNDING NOTES: ,, r rMA.,r.>t,Ear[cac alwn dxwN ,px coCE..xoeBIEA4` EorwWCEYmx,aCoau..ro,l. ELECTRICAL INSTALLATION NOTES: rta.N�..<x. aarrt rct.m,uca SOIL COMPACTION NOTES FOR SLAB ON GRADE: rtau.ED x=,wvaa.awaENo.ucEcws«EnerorErt • A�i ."°Ewa°"..°°x.'..a'"`'""arbE.c°"..a°"°"'°�"•TM A Emirtrt.[vsaaNN.sE usmw.N.•.w.o.n[«.cc,i>...nd...oc u �nE..�a.�eo`wNo�`rn[u�oal�""�"� :x�,�x.�� � o� . COMPACTION EQUIPMENT: ..x„p..,,�Es n..m�x nn,E co...�rdd `.,a..r,.,,Eax..x.rtro,xEwo.Eaw,xE,oxE.dwww '®N°'" rt�.E.xw m.o.roE.a...a.E,e.,rt.,. '"•P°"wm[�,,,..a,oam SYMBOLS axx.x[irta.mrdano�..N.�=...a1p„*.„o'.m'.,,,d,Eo'o." ®a•d'- sro sam GRouno eus eAR axxa.Eedom roirtdwwwn N.cwAD.NCEwmrrtrtc aa,vma .au,nnNn.ACEw.cn,E. us®.unva urrEwmE.=Ec.-. fi sm SIXID NEVIAAL RUSw 1r dmunvA,x•Ana cc.rEr, ran P.w.ax�wrftlq.®v ai—iFa,,�iwoA wxr�Exrma.,a»a ��SUPPLEMEN,AL GIIWND BAR ' rtrt u.nnwEndauu.o,vrt coroiar[u=n. r aERxoEEcnaau,dxuw aan,x�"m carEn Ec.wc, uraEna omwms sicca¢o. --THER—MA NETIC CIRCUrr BREUER = w,xox.¢rKurtc w,vweuuuicvancc�wuurtwm� SINGLE-0 LETHERMM.l GNEIIC n , Tcorawrw`a�`i..o ,anaa r.,Eodummsaa CBiCUR BREAI�R .r iarx [oo9 xairo oEaruNCEaait®.Ewan. r rr. EouroN wm. wFsaotrtwwEarEarm r e CHEMICAL GROUND ROD D em�da wry—iu.+�.�`ro-rca.Mna a,ruE A.iap rdarEi.nox Ar x.uss rwxn n.'[•A.Nu.A. ® GROUND RGD .crt.aEDNn. arEEi ro,. rEEi. MrwIN,Exoixa. ir<duro.DDa a=wirt r AccuwncEva,xx.w.wna.ca.no rtc. .d Rm,gc.t u.EN DISCONNECT SVrTTCH SITE WORK GENERAL NOTES: METER ,. ,�.u.edma,d.NNicarrtAcr D,unEa.,.o.aMcu.woa ror=eardre.eor.rw.cipN D.roq ■ CADKIIDTYPE CONNECTION 1 .ruEu=DsdF.Euc,Arx NarnEr.ur; nsa.dnm COMPRESSION TYPE CONNECTION __ _ __ rto,nN L� Iwra,vc.aa.u.Ew awaeE uam edcwcr�umaaod _ _ _ _ GROUNpNG VARE .b,EnCx.a[dsaEDaIKEq EIE[,woroaK�E,.R irtNc�.aaEasAvnwlxm .xaar<o.a®md.m.r....a,r[..,a,allomrt.rtx.EaxN..Ert.�E..xoa,.. ..E[,r,rand.d.r,Ea.x.�•�E.dwE..Rda,KE..rx,rErERd...E«, r ,E=ErNUC CwM.r Mia=wu.=wm,d ovr•Dd dEx[.amN.E,.an[m[a.wx=,E..nE.aa.rtAa..Er.[.E,n.Rw 'n""" [ar...I.n�,�mEa.E,oa�w,.E�.mn�rt... .»<rta.n.,rdaa[u.dNua,,..rtmm. .[[amn.[E..r,xxEW.wN..�ffa`.a�.d�nadN.[n.[a.aaE. ABBREVIATIONS =a a.a.E.«.oE •,a .uE,nN.[Exw.rmN I. N..,.�. Na.xa,ro.�A .nus, axdaw. an.ux=a=iewa.aNdd 1 .aAEaca.nV[.,Kal im.w anagMro.aWDM ufaw.luoEVwaRroN6xm 1 Ea;=.Nrd MNEW"...waLBEolVom MA-1Lo.E, uO1i.9uaDm PxEVFNreKeKw w.�xnon.aioEurea rd E>oznxAro am.fxrcaNrno.. c�ianay.z rtm,rEmrx MASONRYNOTES: I rt,roT Nooa.�a�wanld.E*,aR aarGad.. EcaW.uo w,mxea.,ld x[w, rt*,EN.'eDu,..drEwafApn aE,rEIOEloum. Ar. M,ED N.,pnrt„eT..,oa..dru,x.i rnor[crm A..daEirEN 0` "` .are.,xoAD....,sE wDr.D.E.,r. Ar.wu[oo.Aro.,AxD..m.ro ,n ,rnrx d�a Ed EaaaABlidDirortq m Easr3ridww0 ,.D .,, n,END.dwn rtaAwa venzonl PINNACLE LONSULMNCI INC. REV DATE DESCRFTR BV N�xrt M t TUC PEPPERSAUCE GENERAL NOTES GN-1 SURVEYOR NOTES SCHEGULEBEXGEPTIONS DAIS, FACE 11. SIT DE NG NY EN T TN UO 111 DYENAMS. DONDITIDxS OH RESiRICTroNs LIDIATF CI UEC ulDyCa 0 R....ED IN DOCxET nao, PAGE _ or OFNcwL RECDEDs. ON � RDEDINDO x ,..PADF s,DEDERDwLREDORDA x. LESSEE ACCESS=LITY EASEMENT LEGAL GESCRIPTON THATCE I. LESSEE LEASE AREA LEGAL DESCRIPTION 1 AS I" LEI REcaR05 DE VINA IN BODA tIo xPPS AND PV.TSni PADE S:NEEDE EF NP FA FEET ,n FEET. TXENCE IZ-1 as 1111 EAST. PEETTDTXE PwNTDP'eEDINNIA1 s.. LESSEE UTILITY EASEMENT LEGAL DESCRIPTION I THENCE I.— EAST AU.N. THE A..TH HE ClESAID D01THENCE SCUTH 111— MET, 1. 1 FEET, THENCE ACLTHI W1111 EAST, 07A. L7..11 FEET, THENCE m PROJECT META DATA I we (NAVDITESTASL SXED Flvau IND USER SENVIC' CPU515olPVrloN FEORDTNIS SFE' 19. REELDMAHwa, I=PRCI CTINAI 811CH A,E LESSOR'S LEGAL DESCRIPTION ALL H�T=AMREALPA—ITT FA,IN P4T ENTITLED ISTATE0E NFULANI „EREDx 9DEDREEa=s =NIII0-INDIRAIT-FED IAP11T WEST COOL DRIVE uLPouT�.1 PoCALL'snolDi� 0 Z 0 m r c-I w LEI avFRHAxD IEJ4sPw.ERP«E f '-CJaMT. 'VESMT. (EI ar PDwiR PDtF J —ALLEY WEST MAGEE ROAD T APN' 22514170E I ' ID APk'225141710 ' END z AIES AD ��-[ IN OR RA VMTN?Y NTS. Y4 'NA =Ry UNIT 1111RET SURFACE DO TAP Ix NAuoeroLE A p E ...R." fx FIRE IICRANT f EYENTEN . DE=TREE FLOOD ZONE DESIGNATION 10. 4P MAGNETIC NORTH DECLINATION GRAPHIC SCALE 20 ID z0 40 11 GI PEE! I Iocn = z0 n 1 LDS.. � ►� verizonv' 126 W. GEMINI DR. TEMPE, AZ 85283 (PINNACLE CerR.une n `roNS�•���tt IN� la cLLaERt1NA2 esx�aE ft, FIELD BY: DRANK BY: CAS CHECKED BY: RLI REVISIONS 4 DB25IIS REVISION 3 W17118 ADD BUIM140 HEIGHTS 2 05127117 FINAL D¢21I1T PRELIMINARY NO. DATE DESCRIPTION FRL-F-, CONSUL—TING PROJECT No. 10008394 SITE NAME: TUC PEPPERSAUCE SITE ADDRESS: 333 W COOL DR. ORO VALLEY, AZ 85704 SHEET TITLE: TOPOGRAPHIC SURVEY SHEET NO. REU15101,I: LS-1 PZ PfauJ C- EXISTING PROPERTY UNE_ _ EXISTING 12-P SUN - STATE ACCESS/ URU]Y EASEMENT I7 q�q K a F ZONING' CP EXISTING TREE (1YPJ EXISTING SUN STATE LEASE AREA EXISTING—TALL —� SUN STATE MONO ET.M I W. COOL DR EXISTING PROPERTY UNE _- ID r I I I I I I I I I EXISTING 12d SUN STATE PI RqN I ACCESS/UTgITY EASEMENT III T''/—�1—g IIXIR IN®I— EXISTIIG CONCRETE .. ... ... _ t � . WAU(WAY ............. F EX STWO BUIUXNG APN: 32}141]OC ZONIN((jjG C-Y 3 EXISTING PROPERTY UNE ____ APN: 2P3-141]DA ZONING' C-2 EXISTING PROPERTY UNE- - _ - _ _ _ _ _ - _ x APN'223t4,)aB I �I f i 20NING'C2 EXISTING GUNDERGROUND E EX.TING LOVEf1E0 PARKING 1 xl EXISnNG E AL EASEMENT — _EXISTING PROPERTY UNE ElOSTING PROPERTY UNE_ X EfOSTIxG PROPEf�jV UNE SITE PLAN - - — - - — SETBACK TABLE NORTH x1B9d SOUTH 2T9-, D' NEST x29d EAST 289d verizon)l PINNACLE CON STING. INC. ©� M o�mo om�m Y xr] waY.m TUC PEPPERSAUCE SITE PLAN A-1 NEW COAXIAL CABLE TABLE SECTdi AZIMUTH LENGTH OTY. SIZE TYPE ALPHA w 2]9d 2 %'O CORK CABLE BETA 17w x7— 2 %'O —CABLE OMIMA 280' z76-0' 2 %'O COAX CABLE S7— 2 1 114' HYBRID CABLE NOTE ALLAMMUTHS SHOWN ARE RELATIVE TO TRUE NORTH. UNLESS NOTED OTHERWISE -IT SHALL BE THE CONTRACTORS RESPONSIBILRYTO VERIFY AZIMUTHS DEPICTED HEREIN WITH RF DEPARTMENT PRIOR TO INSTALLING ANTENNAS. CABLING DETAIL •NOTE: ALL AMMLTI S SHOWN ARE RELATIVE TO TRUE NORTH. UNLESS NOTED OTHERWISE TTSHALL BE THE CONTRACTORS RESPONSIBRNYTO VERIFY AZIMUTHS DEPICTED HEREIN WITH RF DEPARTMENT PRIOR TO INSTALLING ANTENNAS NEW VERIZON REMOTE ] RADIO HEAD, (2) PER A-5 A5 SECTOR FOR (2) SECTORS yl, 'IdNU� E2STING W0 TALL SUN STATE MONO -ELM NEW VERIZON PANEL ANTENNAS (2) PER SECTOR FOR (2) SECTORS ANTENNA PLAN ea Bd ACCESS GATE 1 ACCESACCESS S OTHERS GATE r EXISTING OTHERS UNDERGROUNDUND COMMUNICATION LINE I NEW GENERATOR PLUG EXISTING SUN STATE METER- — DISCONNECT BANK MOUNTED TO EXISTING SUN STATE CMU WALL. VERIZONTODUL E%ISTNG SPARE METER SLOT EXISTING SUN STATE -I-� TELCO VAULT NEWVERIZON POWER -S CABINET MOUNTEDTO EOSTING CONCRETE PAD ]I NEW 1R011d-P I j VERIZON LEASE AREA EXISTING — TALL �- CMU WALL 1 WSTING OTHERS UNDERGROUND ELECTRIC EXISTING SUN STATE LEASE AREA 9 12-D' EXISTING SUN STATE G ACCESS/ UTILITY EASEMENT i Q G d Q II— I Q AS NEW VPJBZON OW MOUNTED ON ANTENNA MOUNT I T10-0' SIN STATE UTILITYI EASEMENT 2 4 NEW VERIZON SECTOR AS Aa FRAME W I (S) ANTENNA PIPE MOUNTS PER E) STING EDGE SECTOR OF ROAD Z 1�_ EXISTING OTHERS CHAIN-UNK FENCE 2 1 ENLARGED SITE PLAN `jI b p0 c V OCd o I I v I I I I 111 11 CONCRER VERZON LEASE EXISTING UNDERGROUND CONDUIT FOR NEW VERIZON HEK CABLES AND (e) ..0 CO COAX "D CABLES .� EXISTING 50-0' TALL SUN STATE MON0.ELN1 M." 2040 O C O° NOTE: xrsARen roa Q ANTENNAS AND ANTENNA MOUNTS NOT SHOWN FOR CWRTY NEW OORRA ED 20 verizon✓ OUTDOOR MTED CENTER EXISTING — x — x SUN STATEE CMU WALL zew a[wu Nt TeMY. KeNea - --- NEW VEIIIZONTELCO rxoxE Rem mwm DEMARCATION MOUNTED ON EXISTING SUN STATE CMU WALL oxsinrwc RaN 1 N EW VERIZON GPS ANTENNA AS 2 1 EW VERIZON RF CABINET @PINNAC LE A-B C:OASS'ULTdN a TNf.. OUNTET TO EXISTING ONCRETE 1/ \ 11 m FUTURE VERRON EQUIPMENT CABINETS (TYP. OF 2) (DG l/, ! h EXSTING IkID CONCRETE l PAD FE4STING EEV (fYP.) X— X— X z X x— X— X EXSTING SUN STATE CMU WALL g. 3 APP,9VV'- : G 6" Pz Pr.� -- _--- REV DATE DESCRIPTION BY n"r il� TUC PEPPERSAUCE mwc- --LITY ENLARGED SITE PLAN AND ANTENNA PLAN A-2 'MONOELM NOTE: ANTENNAS TO BE ENCLOSED IN SST SUPPLS:D RF FRIENDLY SOCK TO MATCH COLOR OF MONC.ELLI ALL BRANCHES TO BE INSTALLED BY SST PRIOR TO VEAIZON INSTALL EX TING—SUN STATE LIGHTNING ROD TOP OF EXISTING MONO -ELM BRANCHES ElEVA 55'V AGl NEW VERIZON REMOTE ! T ELEVATION 55'V AGL R11d0 MEAD, (2) PER A-5 S TOP OF EXSTING WHINING ROD A NATION 51'V AG.L SECTOR FOR (2) SECTORS ELEVATION 51'O G TO O NEW R 0 NN ELEVATION h TOP UN BTATE MONO -ELM LEVATION SZ-" A"'L NEW VERIZON OVP MOUNTED AS ON ANTENNA MOUNT P OF OUSUN STATE MONOFIM VATKIN — 50-0AGL ATION 50'O' A� NTERUNE OF NEW VERIZON 11NE82j,TIE Of MF-,W VEniiou e� 2 NEW VERIZON ANTENNAS ELEVATION Y AQ I Y ELEVATION N'-S-AGl 55) PER SECTOR FOR (5) 2 AS EC OM B MOF ANTENNAS h BOTTOMOFNEWVFRT20N ' 11-A.IZON NATION AY•ll-AG.L � ELEVATION N'•tl-AGl NEWVERIZONSECTOR 2 FRAME W/ (S) ANTENNA AS PIPE MOUNTS PER SECTOR IZORION Alt iILyZ ,� "Z_i[�;; � /'-�l�fj`,� "fir , t'iF+�"�►s i � .L ��' rLst r �$�,�e!'�,,\#B �, �� Ts <� 1'iT .� 4 { y� . • J 1. 'i,�-�i�'ci't�`> fR;R�'w�,tA..�,��� �iiil�.i`7 i�i.�►�'�1,) vTJ X. a f.I "Y S NEWVERIZON2.i OUMDOOR(I NEW WRIZON RF 0.5 A2 • B RAMMINTEGRATEDLOAD I CABINET MOUNTED `S� -r••'1 Z I I CENTERONEXSPNGSUN Co. PAD O e NEW VERIZON RF CABINET MOUNTED TO El051 5 AL , 4 I STATE CMU WALL S V.tt:t>W1� iRF NEW VERIZON TELCO NEW VERIZON TELCO — CONCRETE PAD 'DEMARCATION MOUNTED ON DEMARCATION MOUNTED ON IXISTING SUN STATE CMU WALL EXISTING SUN STATE CMU WA EXISTING S-0' TALL CMU WALL EXISTING SUN STATE METEA-DISCONNECT BANK MOUNTED TO IXISnNG CHAIN- EXISTING CHAIN - EXISTING SUN STATE UNK FENCE LINK FENCE UNISTRUT, VERIZON T9 OTLRE EMSnNG SPINE METER SLOT EASTMG VERIZON CONCRETE PAD EXISTING VERIZON CONCRETE PAD CONDUITS RYP1 CONDUITS (TYPJ NEW SOUTH ELEVATION T::a 1 1 1 NEW NORTH ELEVATION •LTONO£L M NOTE: rw. ANTENNAS TO BE ENCLOSED W SST SUPPLIED RF FAIENCLYSOCKTO MATCH COLOR OF MONO -ELM • ALL BRANCHES TO BE INSTALLED BY SST PRIOR TO VERIZON INSTALL verizon)l TING—SUN LI HT STATE LIGHTNING NING ROD 5 T NEW VERIZON REMOTE AS 5 RADIO HEAD. (A PER • SECTOR FOR(S)SECTOR! nv NEWVERIZONOVPMOUNTED y1NpF ON ANTENNA MOUNT NEW VERIZON ANTENNAS PER SECTOR FOR (S) PINNACLE SE SECTOR! Q NEW VERIZON SECTOR FRAME W/ (S) ANTENNA PIPE MOUNTS PER SECTOR a (2) NEW VERIZON HYBRID CABLE(S) AND (X) wo COAS CABLE(S) ROUTED ALONG INSIDE OF EXISTING MDNO-El EXISTING W0 TALL SUN STATE MONO— NEW VERDZON GPS ANTENNA NEW VERIZON POWER CABINET MOUNTED TO EXSTING CONCRETE PAD EXISTING SUN STATE METER DISCONNECT BANK MOUNTED TO IE STING SUN STATE UNISTRUT. VERIZON TO UTIUZE EXISTING SPARE METER SLOT EXISTING SUN STATE IDENTIFICATION E EXLSnNO!'V ACCESS GATE EXISTING ALL FBI cm�lmm=m om�m TUC PEPPERSAUCE Sol ELEVATIONS 1 MMn �. i- IL. i:+��_•. � . 1 m . ill. 41ta4. 91� re `r7�'4�L � �,� 1? r 5 •� ter•*' '11I yiC,J' lS' �Il=l-.• ©0 I ©� c1:�hr y`Sii +;� J Y'I 1! �Isfk'�!�11'�' J.Yif'" ®� 1 �� w'��:.I�'R,'rt,11,�Vr 11x1Z+F7 iry �L• l "'Ai, !1 s 5.r%-ar •']`■�srxr �.`�.� f�� a'`1�`t'.;r_ jw's�,y �.+�i 'a•� Z ti1`jrh-r/Y s„ q 1'1'Yj�u`'�� 4f'�. , • '! MW 1�� .1 t � " �. ��' . �i. p�•F�� { d ♦.ti.1�1. ��-� m1�i v+ 1 rt! ' .f'� "� �'I it �.��.• y j r1ci1., 0 r .i'Si � 7 r` M�NNNNNNNNa\A �I\ N\\ IE�NN� II�NNNNNN�NNp;�.l��"•w� = �NNr�� !7�I�r; wN�%I�i�NNNNNNNNNNI� \I�r- ��Nl.1ANNNNN�NNNN1 M�NNNNNNNNNMI�INN►u �I 1�1�!{�I� INI 1111u � �NNNNNNNNN �.-Ii�NN.MYNNNNNN��NNI nni II�NNNNNNNNN�h71ANNN mmNNNNNNNN� \� �INN� 7N111 Y��I�II rN� I I: t1N11�1� IIMImz■ �. lmmm �I�IIN�■ E.N!IMNNIoINNNNNNNNNN In II�NNNNNNNN�.�7.r NN �Nl:ll!I�L�11 IIMa/mum6 immmomm mmNNNNNNNI NNmN In n�NNN FI�NNNNmNNmmnnau NN mNIC16mmNI NMINNNr.IYNNNN NNNI nNNNNNNNNN�r �INN�!!♦� II�N�NN�NNNNfi�IT•7NN u��rf. 7�qi IIIN�NI n V mm1 �IIfmNNm;a=NNNNNNmmmm 'NON O�lII�N!•11w1�•NNNNNN�NmNI MMIII- MN7F�Ta_M!2 .=1 =—MMMMM vl/77117 ! 7/7 NEW EAST ELEVATIONELEVATIONS ELEVATION NEW GPS ANTENNA — ... MOUNTING PIPE SWPUED WNH GPS ANTENNA MOUNTING BRACKET .—ED WITH GPS ANTENNA SELF TAPPING SCREW. — ENSURE LOCATION WILL NOT DAMAGE MY EOUIPMENT INSIDE CABINET }B COM CABLE GPS ANTENNA DETAIL �1120'I p Li FRONT CABINETSTEEL BLDLT NEW ANTENNA SPECIFICATIONS ANTENNA DESCRIPTION HEIGHT NiDTII DFPTN ANTENNA ONLYYE HT WIMOUNTING BRP01 ff WEIGIR PANELANTENNA 95.1 U.- 1.1• ..1.T LBS. xW.0lB3. oVERIZON 2 U .L�EPPNoto � WRELESS NFPA 704 PLAQUE ONLY INFORMATION TNY w.YM�YA,.r. Ar..m.siM1 2 �� �� ,EM.No.o DANGER BATTERIES PLAQUE DETAIL I BOLT DOWN DETAIL 1 EQUIPMENT CABINET I? HILTIKBTZ SS WEDGE ANCHOR WTM A MINIMUM EMBEDMENT of r LOCK WASHER SQUARE WASHER CONCRETE PAD NANUFACTNRER SUPPLIED POLE MOUNTING BRACKET CAL MOUNTING PIPE ISEE NOTE) NOTES: 1. CO NTRACTORTOUILZEE nNOANTENNAWU"NGNMUNLEBSFIELO CONDITIONS WARRANT USE OF NEW VERTICAL MOUNTNG PIPE. RRH MOUNTING DETAIL NOT- RRN SHOWN IS GENERIC AND FORILLUSTRATION FRONTSOIM � PoRPoSES ONLY SHIELD WIDTH RAfI NEW REMOTE MOUNTING IBRACKETS RADIOHEAD IRRIQ FlRONTVIEW SIZE & WEIGHT TABLE RRH BAND W1DTH DEPTH HEl01R WEM.HTwo BRACKET 65915 RRH Ur 8.N• 110 T1 1B5 BRSBB RRH 1Sr 11.1• Is.0• TS IBS D ETAI L verizonN' PINNACLE `or suL7mgc INQ t �LT.tm ®I=wft=mmm ommm TUC PEPPERSAUCE 30-IrroM1 Vatle Cebinnt AbumnO FoagriM 26.1' 22.5' Y CONDUIT 000�0^ KNOCKOUTS (51 IT REM MOVNTIND b.. b HOLES (2) FROM A HOlEFS 2a b Fro. RF CABINET DETAIL csEbei Oinsnsbns end Door Clasrencns lSO°ana trod open) SI,S 50.0 22.T Top Yaw Top View 80e ttae b b Front $ FroM 1 1 \ _ NOTE: `�• `\ I1.P TO MAINTAIN ASEPARAATI�ON OF tY BETWEEN CA&NETS e' � zss• • a b L REM INTERNAL N MOUNTING HOLES FRONTINTERNM- MOUNTING HOLES TOPVIEW n b N O O, o 0 MOUNTING HOLE LOCATIONS \\ OG - op O0, —OPEN DOOR CLEMANCES POWER CABINET DETAIL NEW REMOTE RADIO HEAD. SEE SHEET VX5 FOR MOUNTING DETAILS ANTE— L � / I� TALL MON6EUA ANTENNA 3-d STMDOFF NEW T-MM MOUNT (BYTE PRO t YRMVt2S9e 0, OF 2) OR "PROVED EOUIVA T) TO BE PROVIDED BV VERIZON GC NEW 2.05T0 PIPE SUP LENGTHI SUPPLIED T (TO PROVIDEDVIDED By VERIZIZON GC) ANTENNA MOUNTING DETAIL THIS MOUNT WILL NEED TO BE MODIFIED ON SITE. CUT HORIZONTAL FACE PIPE PER 2/A-2 ISOMETRIC NEW ANTENNA MOUNT DETAIL PLAN NEW APPRVUFD Y: T '!P verizonJ i aupu oN� se e PINNACLE ELECTRICAL SPECIFICATIONS 1. SUBMITTAL OF BID INDICATES CONTRACTOR IS COGNIZANT OF ALL JOB SITE CONDITIONS AND WORK TO BE PERFORMED UNDER THIS CONTRACT. 2 CONTRACTOR SHALL PERFORM ALL VERIFICATION OBSEWATKN TESTS. AND EXAMINATIONWONKP IM TO THE ORDERING OFTHE ELECTRIC& EQUIPMENT AND THE ACTUAL CONSTRUCTON. CONT ACTOR SHALL ISSUE A WRITTEN NOTICE OF ALLFINDINGS TO THE ARCHITECT &STING ALL MALFUNCTIONS, FAULTY EQUIPMENT AND DISCREPANCIES. 1 HEIGHTS SHALL BE WRIFED WITH OYMER PRIOR M INSTALLATION. A. THESE PLANS ARE DAGRAMMATIC ONLY. FOLLOW AS CLOSELY AS POSSIBLE. S. EACH CONDUCTOROFEVERYSYSTEMSHALLBE MRMANENTLYTAGGEDNEACHPMELBOMD.PLI )I .FRO%. SWITCH BOX. ETC.. IN COMPUMCE WTH OCCUPATIONAL SAFETY AND HEALTH ACT (O.S.HAJ 6. CONTRACTOR SHALL PROVIDE ALLIABOR. MATERIALS, INSURANCE. EQUIPMENT, INSTALLATION, CONSTRUCTION TOOLS, TRANSPORTATION, ETC., FOR ACOMPLETE AND PROPERLY OMRATNE SYSTEM ENERGDED THROUGHOUT AND AS INDICATED W DRAWINGS, AS SPECIFIED HEREIN AND/DR AS OTHERWISE REQUIRED. T. ALLMATEERL9ANDEQUIPWENTSHALLSENEWMDN PERFECT CONDITION WAKEN INSTALLED AND SHALL R OF THE BEST GRADE PROOF THE SAME GROUP EOU"ETHROUGHOUT FOR EACH CLASS E GROUP OF EOURPMED, UNDERWRITERS A LASTED AND APPROVED BY UNDERWRITERS LABORATORY AND SHALL SEAR THEINSPECTIONLABEL. WERESUBJEC TTO SUCH APPROVAL. S ERF APPROVALOFTHEDSDNOIND TRLSAFETY AND ALL GINGBODIES HAWNG JSDICN. MATERIALS SHALE SE MANUFACTURED IN ACCORDANCE WITH APPLICABLE STANDARDS ESTABLISHED BY ANSI, NEMABNBFU R. CONTRACTOR SHALL CARRY OUT HIS WORK IN ACCORDANCE WTH ALLGOVERNWG STATE. COUNTY MDLOCALCODESANDOSNA 9. CONTRACTOR SHALL SECURE ALL NECESSARY BUILDING PERMITS 10. coMPIETE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE IT YEAR AFTER THE DATE OF JOB ACCEPTANCE BY OWNER. ANY WORK MATERIAL OR EQUIPMENTFOUND TO BE FAULTY DURING THAT PERIOD SHALLBE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION. AT THE EXPENSE ON THE WNTRACT011. II. ALL CONDUIT ONLY(C.OJ SHALL HAVE A FULL WIRE OR ROPE 12. PROVIDE PROJECT MANAGER WITH ONE SET OF COMPLETE ELECTRICAL 'AS INSTALLED' DRAWINGS AT THE COMPLETIONOF THE JOB. SHOWING ACTUAL DMENSIONS, ROUTINGS, AND CIRCUITS. 13. ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BEWRNED OVER TO OWNER AT JOB COMPLETION. 14. USE T-TM CONNECTIONS ON AU. MULTI{IRCURS WITH COMMON NEUTRAL CONWCTOR FOR UGHTING FDNRE. 15. ALL CONWCTORS SHALL BE COPPER. 1A. ALL CIRCUIT BREAKERS. FUSES MD ELECTRICAL EQUIPMENT SHALL HAVE AN INTERRUPTING RATING NOT LESS THE MAXIMUM SHOD CIRCUIT CURRED TO WABCH THEYMAY BE SUBJECTED, AND A MNNUM CF 10,1- AI.C. 17. THEE UTIREELECTRICALWSTALLATONSHALLBE GROUNDEDAS REOUREDBYALLAPPLICBIE CODES MDORAWiNGS. 16. PATCH. REPAIR AND PAIDANYMEATHATHAS BEEN DAMAGED IN THE COURSE OF THE ELECTRICAL WORK 19. IN DRW NG HOLES INTO CONCRETE WHETHER FOR ELECTRICAL SPECIFICATIO FASTENING OR ANCHORING PURPOSES, OR PENETRATIONS THROUGH THE FLOOR FOR CONDUIT RUNS. PIPE RUNS. ETC.. IT MUST BE CLEARLY UNDERSTOOD THAT TENDONS AND/OR REINFORCNQ STEEL WILL NOT BE STILLED ALTO, Clff OR DAMAGED UNDER ANYpRCUMSTANCES. 20. LOCATION OF TENDONS MOMR RMNFORCNG STEEL ME NOT DEFINITELY MOM AND THEREFORE MUST BE SEARCHED FOR BY APPROPRIATE METHODS AND ECKWMENT VN X-RAY OR OTHER DEVICES THAT CM ACCURATELY LOCATE THE REINFORCING AND/OR STEEL TENDONS. 21. PENETNAl10NS N FARE RATED WALLS SHALL RE FIRE STOPPED N ACCORDANCE WITH NC SECTION 714. 2L RECEPTACLES SHALL BE 20 MMPERE, 125 VOLT A.C. WHITE AS REWIRED BY THE ARCHITECT OR APPROVED EQUAL 20. WAU.SWTCHESSHN.LBESINGLE-POLE. HUBBELL91201 OR EQUIVALENT. WIBTE AS REQUIRED BY THE ARCHITECT. 24. PLASTIC PLATES FOR ALL SWITCHES. RECEPTACLES, TELEPHONE AND BLANKED OUTETS, SHALL HAVE ENGRAVEDLETTERING WHERE INDICATED ON THE DRAWANGS. WFATHEPPROOF RECEPTACLES SHALL HAVE RACE #M.1/T RAISED WORK COVERS. 25. WIRE MD CABLE CONDUCTORS SHALL BE COPPER I12 AM MINIMUM. NO BX OR ROMEX CABLE IS PERMITTED UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS. 26. GROUNDING CONDUCTORS SHALL BE SOLID TINNED COPPER MD ANNEALED 9L 27. ORWNORMS SHALL BE COPPER CLAD STEEL ST ROMD AND I O LONG COPPERWELD OR APPROVED EQUAL 25 METER SOLID=TRIM ES, WLTAGE, NUMBER OF PHASES SHALL BE AS NOTED ON THE DRAWINGS. MANUFACTURED BY SQUARE D COMPANY OR APPROVED EQUAL 29. ALL MATERALS SHALL BE Ul LISTED. >a. CONDUIT: A. RIGID CONDUIT SHALL BE Ul- LABEL GALVANIZED ZINC COATED V.TM DNC INTERIOR AND SHRILL BE USED WREN INSTALLED N ON UNDER CONCRETE ­.INC NThCTWITH THE FlRT1. UNDER PUBLIC ROADWAYS, IN MASONRY WALLS OR EXPOSED ON BUILDING EXTERIOR RIGID CONDUITIN CONTACT WTH EARTH SHALL BE 1/2 LAPPED WRAPPED WITH HUNTS WRAP PROCESS NO.3. b. ELECTRICAL METAUUC TUBING SHALL HAVE Ul. LABEL FITTINGS SHALL BE GLAND PING -US" EMT SHALL BE USED ONLY FOR INTERIOR RUNS. 9. FLEXIBLE METALLIC CONDUIT SHALL HAVE U.L USTED LABEL AND MY BE USED WHERE PERMITTED BY COpE FITTINGSSHAU.M'�ORMQUEEZE'TYPE, SEAL TIGHT FLEXIBLE CONDUIT. ALL CONDUIT IN EXCESS OF SD FEET IN LENGTH SHALL HAVE FULL SIMGRWND WIRE d. ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE 0 (UNLESS NOTED OTHERWISE) AT A MINIMUM DEPTH OF 2P BELOW GRADE 31. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED VIM PEAM ED ENGRAVED PLASTIC LABELS. W. UPON COMPLETIONOFWORKCONDUCTCONTINUTTY, SHOD CIRCUIT. AND FALL POTENTIAL GROUNDING TESTS FOR APPROVAL SUBMIT TEST REPORTS TO PROJECT MANAGER. CLEAN PREMISES OF ALL DEBRIS RESULTING FROM WORK AND LEAVE WORK N A COMPLETE AND UNDAMAGED CONDMXI. M. CONTRACTOR TO COORDINATE WTH UTKM COMPANY FOR CONNECTION OF TEMPORARY AND PERMANENT POWER TO THE SITE. THE TEMPORARY POWER AND ALL GENERAL ELECTRICAL NOTES 1. THE ELECTRICAL INSTALLATION WORK SHAH COMPLY WITH All LOCH- STATE AND NATIONAL CODES. LAWS AND ORDINMCES APPLICABLE F TO ELECTRICAL WORK 2. ELECTRICMCONTRACTGR SHALLVSITMBSTTEMD VERIFYIE TINGCONOTT10NS BEFOREBIDDINGAND SHALL INCLUDE IN HIS BID THE NECESSARY COSTS TO CONSTRUCT THIS PROJECT IN ACCORDANCE WTH INTENT OF THE ELECTRICAL DRAWINGS. SPECIFICATIONS, AND ALLAPPLICABLE CODES. 1 ALL MATERIAL AND EQUIPMENT FURNISHED AND NSTMIED UNDER THIS CONTRACT SHALL BE NEW. FREE FROM DEFECTS AND SHALL RE GUARANTEED FOR A PERIOD CF ME YEAR FROM DATE OF FINAL ACCEPTANCE BY OYMER OR HIS REMESEDATWE. SHOULD MY TROUBLE DEVELOP DUPING THIS PERIOD DAETO FAULTYWORKMANSNIP, MATERIALOR EQUIPMENT. THE CON RNCTdI SHALL FURMSH ALL NECESSARY MATERIAL AND LABOR TO CORRECT THE TROUBLE WITHOUT COST TO THE OWER. M. ALL WORK TO BE EXECUTED N WOR-ANUKE WINNER ANO SWILL MESENTA NEAT MECHANICAL APPEMMCE WHEN COMPLETED. 5. ALL ELECTRICAL IMTEAIALSANDEWIPMENTSHALLBE LISTED BY UNDERWRITERS LABORATORIES. 6. ELECTRKALCONTMCTOR SHALLSERESPONSIBLEFOR WORK UNLESS AND PATCHING RELATEDTO COORDINATED LARK UNLESS NOTED OTHERWISE AND COOIIDIRATED WITH THE GENERAL CONTRACTOR T. ELECTRICALCONTRACTORSHALLCOO MATEALL WORK WTN CAUL AND ARCHITECTURAL PLANS. THE REQUIREMENTS OF ALL EQUIPMENT ACTUALLY BEING INSTALLED SHALL BE VERIFIED PRIOR TO INSTALLING THE ELECTRICAL WORK S. ALL BRMCH CIRCUIT CONDUCTORS SHALL BE COPPER TYPE IM M N12, & 910 SOLID, lS AND LARGER STRANDED. 9. ON COMPLETION OF THE WORK, THE INSTALLATION SHALL BE FREE PROM GROUNDS AND SHORT CIRCUITS. 10. ELECTRICAL CONTRADTORSHNLFURNISHAS-BUILT DRAWINGS TO THE MCHTIECT AND CUSTOMER UPON COMPLETION OF THE JOB. 11. ELECTRDALWORK SHALL INCLUDE ALL LABOR, MATERIALS AND EOUIPMENT REWIRED. NCLUNNG BUT NOT UMTI'ED, TO COMPLETE ELECTRICAL SYSTEMS POWEN AND IKNTING. TELEPHONE CONDUCT SYSTEM, SIGNALSYSTEMS, PANETBOMO.SI. COTC.. AVMNG, GRWNDINO, CONDUITCALYSYSTEMS, ETC.. A9 INDICATED ON AL DRAWINGS AND/Oq GGVERIO RESULTED BY GOVERNING CODES. 1L RACEWAYSSHALLBE RGIDSTEELCONDUIT: HOT -IOW GALVANIZED HEAW WALLAS MANUFACTURED BY REPUBLIC. TRIANGLE Oft EQUAL. RMID POLYWNYL CHLORIDE CONDUIT OW: HEAVY WALLS SCHEDULE AO AS MANUFACTURED BY CPALON ELECTRICAL. VSOEEN OR EQUAL ELECTRICAL MUMLC TUBING (EMTI: ZINC -COATED THIN WALL M MANUFACTURED BY TROWGIE. REPUBLIC ON EQUAL I& FUSE TYPE SWILL BE BUSSAVWN OR EQUAL FUSE 14. PROVIDE ENGRAVED PLASTIC LABELS TO DENTIFYALL PMEL BOARDS. XFMRS., DSTNBUTION PANELS, DIS CONNECT SWITCHES. MD TRANSFER SWITCHES. LAPELS SHALL READ IN THIS FASHION'K 206Y/12W3- 4W, 22W CAT. BRR OR FUSES TYPE AND SUES. I& E.C. SHALL VERIFY AND TEST GROUND TO SOURCE TO MAXIMUM OF 50HMS. IF THE GRINND TEST DOES NOT ACHIEVE THE 5011 OA LESS. EC. SHALL BE RESPONSIBLE FOR PROVIDING THE NECESSARY CONDUCTORS AND GROUND RODS TO ACHIEVE 5OHM5 MAXIMUM. IB. BEFORE SUBMITTING BID, VERIFY E)STNG SITE CONDITIONS. ELECTRICAL SERVICE REQUIREMENTS AND THE EXACT SERVING U19JTY POINTS OF CONNECTION. 17. THE ELECTRICAL CONTRACTOR(E.CJ SHAH FURNISH AND PAY FOR ALL PERMITS AND RELATED FEES. 16. UNLESS SPECFICALLY NOTEDOTHERWSE ALL ELECTRICAL MATERIALS. E WIPMED AND WORK SHOWN ON THESE PLANS ME TO BE RIOWDEG ANO INSTALLED BYTHE ELECTRICAL CON 011. 19. E.C.SHALLFURNISHMOINSTALLALLSW CHES. CONDUTS, WIRES. BOXES, UGHT FIXTURES ONCLUDING LAMPS). SERVICE DEVICES. RECEPTACLES. SW= BOARDS AND PANEL SOMM, ETC. REQUIRED FOR ACOMPIETE AND OPERATING ELECTRICAL SYSTEM. 20. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONALALOCATION INFORMATION RELATING TO THE ELECTRICAL DRAWNGS. 21. ELECTRICAL WNIRICTOR SHALL WR9'YVOLTAGES AND HORSEPOWERRATNGS OFAU.MECHAIFCAL EOUIPMENT. M PRDRTONSTAUINGANYELECTRICMVARKTHE ELECTRICAL CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND REQUIREMENTS ON THE JOB AND BY REFERENCE TO MCHITECTURE, MECHANICAL AND EOUIPMENT SUPPUERS DRAVANGS. SHOULD THERE BE MY QUESTION OR PROBLEM CONCERNING THE NECESSARY PROVISIONS TO BE MADE. PROPER DIRECTIONS SHALL BE OBTAINED BEFORE MCCUMG WTN ANYWONK 23. OUTLET AND.ANCTION BOXES SHALL BE SITED PER CO DE FOR THE QUANTITY OF VARES THEY CONTAIN. SEE ARTICLE 370 OF N.E.C. PROVIDE ADDTIORAL BOXES AND EXTENSION RINGS AS REWIRED. 24. ELECTRICALCONRACTORSHALLWEpLYW1THCMLE BENDING RADIUS REQUIREMENTS PER CABLE MANUFACTIURERS'S SPECIFICATION. 2S CONDIITTLAYOUTSSHOWNONTHEPAMARE DIAGRAMMATIC, NOT INDICATING THE ROUTING REWIRED. THE CONTRACTOR SHALL ROUTE CONDUITS M REQUIRED BYTHE CONDITIONS OF NSTALLATIOK M ALLEWIPMENTMOWDEDBYTHEELECLRICAL CONTRACTOR SHALL BE USTEDMD LABELED BY A NATDNAI&YAECWNIMI) TESTING AGENCY, ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. FOR THE CONDITIONS OF THE INSTALLATION. V. PLANS MAY INDICATE THE NUMBER OF PHASE NEUTRAL AND GROUND CONDUCTORS WHERE MORE THAN THREE CW VICTORS ME TO BE INSTALLED ED N A CONDUIT REE OR LESS CONDUCTORS ME NOT SHOWMI. ADDIIIONALCONDUCTOAS REQUIREDFOR CONTROL SHALL BE INCLUDED EVEN IF NOT EXPLICITLY SHOWN. M MERE SITE S NOT SHOWN ON THE DRAWINGS, CRCUM SHALL CONSIST OF I12 PHASE AND GROUNDED NEUTRAL CONDUCTORS) AND A 912 CU GROUND N A-CONWIT. 29. UNLESS SPECIFICALLY NOTED OTHERWISE THE ELECTRICAL CONTTRACTOR S WILLMAKE FINAL CONNECTIONS TO ALLUTILIZATION EQUIPMENTSHOWN COTHEDRAWINGS.VERIFYTHETYPE FINAL CONNECTION MO PROVIDE PPPROPRMIKTE N1PoNO METHOD. >0. PRIORTOTRENCNINGINMYMEATHECONTRACTOR SHALL CONTACT ELECTRICAL. COMMUNICATIONS/DATA CABLE T.V.. GAS, AND WATER UTILITY PROVIDERS (BLUE STAKE AND HAVE ALL UTILITIES IN THE AREA IDENTIFIED. IN ADDITION. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A SUBCONTRACTOR SPECIALIZING N THE LOCATIONOF UNDERGROUND STRUCTURES TO IDENTIFY AND OBSTACLES N THE PATH OF TRENCHING (PRIOR TO COMMENCING WORIG. DAMAGE TO MY UNDERGROUND STRUCTURES SHALL W REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE PROJECT. 31. UTIWYCOORDINATION A THE CONTRACT OR SHALL SUBMIT A COMPLETE SET OF DRAWINGS TO ELECTOCALAND TEI.CO UTILITIES WITHIN ONE WEEK OF NOTICE TO PROCEED. b. THE CONTRACTOR SHALL NOT TRENCH OR INSTALL CONDUITS ION THE UTILITY OR LOAD SIDE) TO THE S.ES. THE UTSITYTRANSFORMER (PNMMY-OR SECONDARY). OR TO THE UTILITY CONNECTION POINT BEFORE RECEMNG A FINAL DESKN FROM THE U1WTY. c. THE CONTRACTOR SHALL NOT INSTALL EOUIPMENT PADS FOR THE $0 OR MY UTILITY EQUIPMENT (TRANSFORMERS. SWITCHING CABINETS. ETCJ PRIOR TO RECEIPT OF FINAL PLANS FROM THE LIMY. d. THE CONTRACTOR SHALL NOT BE COMPENSATED FOR ADDITIONALWORK REWIREDTO MEET THE REQUIREMENTS OF THE UTILITY WHICH IS THE RESULT OF PROCEEDING PRIOR TO RECEIPT OF A FINAL UTILITY DESIGN. M SERIES RATING NOTES:TO ENSURE THAT EACH PROTECTIVE DEVICE WMICN IS DEPENDENT ON SHORT CI DEVICE THEILL LOCATION WHERE E IT IS IE SHORT CIRCUIT AT THE LOCATION WHERE R S INSTALLED, R MUST MEET THE FOLLOWING REQUIREMENTS: A. SWITCHBOMDCOMMNENTSANCLUDINGOV WRRENTPROTECTIVE DEVCES. SHALL BE FULLY RATED FOR THE AVAILABLE FAULT CUMENT SHOWN. b. PROMM IDENTIFlGTION ATTHE ENCLOSURE OF PANEL BOARDS MERE BREAKERS ME APPLIED IN SERIES COMBINATION, STATING:'CAUTION- SERIES RATED SYSTEM. AMPERES. R EDIREPLACEMENT COMPONENTS EQUIREDRED-• CONTRACTOR RREN TO SHOWN N NONKHE SINGLE E FAULT CURRENT AS SIgYM ON THE SN(NLEINE DMGRMI. e. PER NEC ARTICLE 116n CAWS). PROVIDE IDENTIFICATION AT EACH DISCONNECTING MEANS FEEDING DOWNSTREAM DEVICES APPLIED IN SERIES COMBINATION. STATING: 'CAUTION - SERIES COMBINATION SYSTEM RATED AMPERES. IDENTIFIED REPLACEMENT COMPONENT REQUIRED.' CONTRACTOR TO FILL IN SLAW K WITH AVAILABLE FAULT CURRENT AS SHOWN ON THE SNGLEINE DIAGRAM. d. AIC RATING SHOWN AT PANEL BOARDS S MINIMUM RATING FOR CVERCURRENT PROTECTIVE DEVICES. EACH DEDUCE SHALL BE FULLYAATED SERIES RATEDWITHUES EDIDEVICE ATAFCM N SHOWN ON THE SGIE{NE DIAGRAM. A. NO DESIGN CHANGES MAY BE MADE TO THE SYSTEM WITHOUT THE PRIOR APPROVAL OF THE DESIGN ELECTRICAL ENGINEER AND THE ELECTRICALINSPECTOR. & THETOTALMOTORLOADCONNECTEDBETWEEN SERIES RATED DEDUCES DOES NOT EXCEED 1%OF THE INTERRUPTING RAT WG ON THE DOWNSTREAM DEVICE verizon-I PINNACLE CONSULTING. INC REV DATE DESCRpfpN BY TUC PEPPERSAUCE C00.0R1f ggvAUEv.AsnAN ELECTRICAL NOTES E-1 ASSUMED MAXIMUM AVAILABLE FAULT CURRENT 22.000A SYMMETTIICPL VERIFY YJITH THE SERVING UTIUTY PRIOR TOORDERING DISTRIBUTION EQUIPMENT. ALL DISTRIBUTION EQUIPMENT SHALL BE USMD FOR USE AT 22KMC MINIMUM. THE AUTOMATIC TRANSFER SWITCH SHALL BE A GENERAC ILC SERIES UNIT WITH DUAL TVSS. NEMA 3R, 2NVI DN SERIES RATED. —A. 12012. V- 10. aPOLEAUTOMATIC TRANSFERSWRCH WITH INTEGRATED LOAD CENTER. PANEL'A' ONE LINE DIAGRAM FROM UTILITY O NEW20DARATEDMET) pNSTau>=o BY UTILITY) =A 20DA UP.) (3)k9/O %HHW-2 CU., 2'CONDUR NEW GENERATOR PLUG (3)IMO %HHW-2 CU.. (1)"CU. E.G.C.. 2' CONDUIT TO EQUIPMENT CABINET WIRE & CONDUIT CONDUIT CONCEALED IN WALLS OR ABOVE CEILING W/2I12. 112 GND. S/I' C., UNLESS NOTED OTHERWISE. CONDUIT ROUTED UNDER FLOOR OR BELOW GRADE ----- WI2 M12, ♦12 GRD, e/A• C., UNLESS NOTED OTHERWISE. CONWRNRMNG UP �- CONWRTURNING DOVM NDICATES A PHASE CONDUCTOR NDICATES A GROUNDED (NEUTRAL) CONDUCTOR NDICATES AN EQUIPMENT GROUNDING CONDUCTOR INDICATES AN LSOLAMD GROUND CONDUCTOR (SAME SIZE AS EQUIPMENTGROUNDING CONDUCTOR) ■ GROUND LEAD COILED ABOVESLAB ELECTRICAL SYMBOLS ELECTRICAL SYMBOLS ® TEST WEWGROUND ROD ® GROUND ROD- S/B' X 10 COPPER CUD ■ CAD%VED CONNECTION 0 MECHANICALCONNECTON GROUNDING WIRE o GROUND BAR SURGESUPPRESSORGROUNDBM a FUSEDDLSCONNECTSWITCH ® METER AND MAIN BREAKER ® MANUALXFRSWTTCHANDOEN.RECPT. ANTENNA TELCO BOARD ------- ELECTRICAL POWER T-1 LINE — SURPACE MOUNTED PANEL BOMD 1-LINE DIAGRAM CIRCUIT BREAKER, FI11031 MOUNTED. r1. CIRCUIT BREAKER. DRAWOUT MOUNTING. �/- FUSIBLE SWITCH. SIZE AS INDICATED ON DRAWINGS. DISTRIBUTION TRANSFORMER CURRENTTPANSFORMER O• METERING DEVICE PANELBOMD. MAIN LUG ONLY nPMELBOMD. MAIN CIRCUITBREMER •� TRANSFER SWITCH- MANUAL OR AUTOMATIC PANEL SCHEDULES (3) NEW Ke/0 AWG AND (1) # AWG FOR GROUND IN EXISTING 2' CONDUR FROM NEW VERIZON 200A IfC. TO THE NEW WERIZON EOUIPMENTCABINET (1) EXISTING T CONDUIT FROM — THE EXISTING FIBER VAULT TO THE NEW TELCO DEMARCATION (NEMA A) CABINET, PROMDED BY LANDLORD NEW MON20OAMPMETER/- DISCONNECT MOUNTED TO EXLS nNG SUN STATE CMU WAIL (INSTALLED BY UIIUTY) LANDLORD SHALL PROVIDE AND - INSTALL A Y UNDERGROUND CON LIT FROM THE NEW INTEGRATED LOAD CENTER TO THE NEW EQUIPMENT CABINET. COORDINATE STUBi P LOCATION EXISTING TELCO VAULT NEW VERIZON POWER CABINET MOUNTED ON UISTING WRIZON CONCRETE NEW WRIZON RF CABINET j I MOUNTED ON FJOSTING Y/JI VERIZON CONCRETE PAD C Anlaet Arizona 011 at leant IVO IU11 Working days Detore You Deg1R a%DavatiDn Call 871 or click Arizonael l.com 9 SITE UTILITY PLAN verizon%/ IINIU— @PINNACLE NSIMTINC;� INC -6- (0) NEW "'ID AWG AND (11 k2 AWG FORGROUND EXISTING 2' CONDUIT FROM NEW 20oA � iELECTRICAL METER TO NEW YERI2ON 2AOA I.LC. EXISTING 2- ELECTRICAL CONDUIT FROM THE NEW 2OOA SERVICE RATED DISCONNECT TO THE INTEGRATED LOAD CENTER, PROVIDED BY LANDLORD NEW GENERATOR PL NEW VERIZON TELCO T GEMARCAl1ON (NEMA B \ MOUNTED TO EXISTING SUN STATE CMU WALL NEW YERIZON 20DAAUTOMATIC TRANSFER SWITCH Wl INTEGRATED LOAD CENTER MOUNTED TO EXISTING SUN STATE CMU WALL (1) EXISTING 2- CONDUIT FROM I I I I THE NEW TELCO DEMARCATION 1 1 I I (NEMA A) CABINET TO TI1E NEW 1 I 1 I EQUIPMENT CABINET, 1 1 I 1 PROVIDED BY LANDLORD 111 1� 00000 00 0 00 NOTES: ONLY UT UTY NOTES SHOWN FOR CLARITY. SEE SHEET h2FOR ALL SITE n SPECIFIC CALL OUTS Z /^�� r�l� • ALL ELECTRICAL BTELCO CONOURS INSTALLED BY IN11, VERIZON TO UTILIZE EXISTING CONDUITS FOR NEWELECTRICALBTELCOUNE INSTALLATION II:�III��II�. 111111111111111111-IIIII, IIIII,IIIIIIIII♦-_IIIII, 1 urLiKr TUC PEPPERSAUCE OO OPNE PA VNIEY. AZeelw O %1M 000NTY ELECTRICAL DETAILS E-2 0 A. C.O. . CONDUIT ONLY PVC. MXC. METAU-C TUBING THIN WALLA . SCHEDULE w PLASTIC CONDUIT GRC. . GALVANIZED RIGID CONDUIT FWT. -FV=RE MOUNTED WA - WEATHERPROOF VON. . UNLESS OTHERWISE NOTED G OR GRD. -GROUND N.OR NEUT.- NEUTRAL A OR AMP.. MHPERE KW. -KILOWATTS W. . WATTS LV. —VOLTAGE - PHASE DEF -DUALELEMEM FUSES DNA - ETEii HP.OR HOR MP . HORSEPOWER %TAR CA -TRANSFORMER -CRCUTTBREWER CKT. - CIRCUR SW. . SWITCH NITS - MANUALTRANSFORMERSWTTCH FA RECPT. .FIRE ALARM . RECEPTACLE ABBREVIATIONS 'NOTE GROUND RINGS ARE E]OSTNG. CONTRACTOR RESPONSIBLE FOR GRW NDNG VERIZON VMELESS EQUIPMENT ONLY. LANDLORD TO LEAVE EXCESS GRW ND LEADS ABOVE GRADE FOR USE BY WRIZON CONTRACTOR SEE V ES FOR GENERAL GROUNDING NOTES r2SCUDTINNEDBARECOPPER COME FROM EOUIPMEHT GROUND RING TO CABINETS. TYPICAL OF 2 PLACES EA Ism `NOTE ABOVE) REFER TO DUAL M E41 rt SOUDTINNEDBARECCIIW WARE FROM EOUIPMENT GROUND RING TO CABINETS. TYPICAL OF 2 PLACES EA. SEE 'NOTE ABOVE] REFER TO DETAIL 4/ EJ ANTENNA GROUND BAR REFER TO DETAIL L E41 A DETAIL 4' E 1 GRY4t ARI•IIA p11 M Awl twa NR w•IYtq Ypp bM. TPF MpY MewtlM pil B11 Nw ellot hlL•pasil.opm GROUNDING PLAN 1. ALL GROUNDING LEADS INSTALLED TO ENSURE A SMOOTH PATH TO COUNTERPOISE WITHOUT KINKS E.C. O.C. - ELECTRIC CONTRACTOR -GENERAL CONTRACTOII OR SHARP BENDS OR RETURN UPWARDS. I P, 2P, AV SINGLE PO LE, TWo,ATHREE POLE 2. CONTRACTOR WILL UTIUZE THE 'FALL OF POTENTIAL MEASUREMENT METHOD' PER NETA EGB . EQUIPMENT GROUND Bus STANDARDS, UTILIZING THE AEMC•4500 MEASURING DEVICE OR APPROVED VERIZON EQUAL ALL MGB - MAN GROUND BUS GROUND TESTING TO BE PERFORMED BEFORE CONNECTING TO POWER UTILITY GROUND AND PRIOR AFC CURRENT .CURREAVAILABLE UNITING TO ANY BACKFILL OF GROUNDING TRENCHES. ELECTRICAL CONTRACTOR WILL PROVIDE A MINIMUM AM . AMENGN VMEN�GE OF ONE (1) INSPECTION PORT FOR TESTING GROUNDING RESISTANCE. CONTRACTOR WILL INSTALL BCW WE COPPER WIRE THE MINIMUM OF ONE (1) INSPECTION PORT FOR TESTING GROUNDING RESISTANCE CONTRACTOR GPS - GLOBAL POSTCHNG SYSTEM WILL INSTALL THE MINIMUM NUMBER OF GROUND RODS INDICATED, SEE GROUNDING PLAN FOR PCS -PERSQNALCOMMUNICATIONSERVICE APPROX LOCATIONS. CONTRACTOR WILL INSTALL ADDITIONAL GROUNDING AS REQUIRED TO PPC - POWER PROTECTION CABINET ACHIEVE 5 OHMS OR LESS TO GROUND. A" -RACEWAY ^P RGS EMT - T"AL . RIGID GALVANIZED STEEL - ECTRICALNETALUCTU EBNG 3.1T IS THE INTENT THAT AT NO TIME ARE THE GROUND LEADS TO BE INSTALLED BELOW THE SURFACE OF THOSE APES DESIGNATED FOR FUTURE DISASSOCIATED PADS OR SHELTERS, DWG .DRAWINGIGR - ANTENNA WOUND RING AAA) 4. THE CONTRACTOR WILL DOCUMENT MEGGER TEST RESULTS, REDUNE THE DRAWINGS FOR THE CC - ANTENHACABLECOSYSMEMBLv LOCATION OF ALL UNDERGROUND GROUNDING COMPONENTS AND PHOTOGRAPH WITH A DIGITAL BTS -GE ERATORMISSNN SYSTEM CAMERA THE ENTIRE NEWLY INSTALLED GROUNDING SYSTEM PRIOR TO BACKFILL OF ANY OPEN GE GE -GENERATOR TRENCHES. OR BScw . BAH TBE RANGED COPPER WARE 5. ANY E(CEPTIONS TO THIS BASIC GROUNDING DESIGN GUIDELINE. ROUTING DESIGN, OR ISCW . INSULATED STRANDED COPPER WIRE MODIFICATIONS, WILL BE DOCUMENTED AND DIMENSIONED BY THE WAY OF RED LINE DRAWINGS. IT THE RESPONSIBIUTY OF THE SELECTED CONTRACTOR TO ENSURE THE NEWLY INSTALLED GROUNDING SYSTEM MEETS THE VERIZON WIRELESS STANDARDS OF 5 OHMS OR LESS. ROUNDING NOTES SYMBOLS LEGEND ® GROUACCESND RODS VLTH OROUND WIRE ® GROUND ROD • EXOTIH . CONNECTION GRWNDBM MECHANICAL CONNECTION TP RADIUS BEND(MINJ CARNET r2AWGSOUo CU. BARETINNE� , - - � ® T BUPoED GRQUND PoNG - r2SOUDTINNEDBARECOPPEA j WIRE FROM EQUIPMENT GROUND RING TO GANNETS. 1_1 _ •� TNOTE NOF 2 LE PLACES EA. (SEE GROUND W NDR _ DETAILVEJ GROUND GPSMOUNT CABINET GROUND DETAIL �--- rT--'---- _ 11 (1 TASTING GROUND RIND PRONGED BY LANDLORD o cpo �G •� o NOTES: 1) COPPER GROUND BAR CR APPRCVED EQUAL. 1/W xO X 12'. NGLE CENTERS TO MATCH NELM DOUBLE LUG CONF GURATON. 21:PACERS AS REOUIREO 6T LOCKWASMERS I! 4) WALL MOUNTING BRACKET 515T-I t x 1' HH.CS. BOLTS b GROUND BM TO BE PURCHASED FROM ROHN. 5 GROUND BAR DETAIL NOTES: I. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS Nlrt DIRECT GROUND WIRE DOWN TO ANTENNA GROUND BAR. 2. WEATHER PROOFING SHALL BE ANDREWS.[TPE 4 PART NUMBER AS SUPPLIED OR RECOMMENDED BY CABLE verizonl MANUFACTURER.) TO ANTENNAS I JUMPER PEWIRED WEATHERPROOFING W ONLYFOR 1 5/S'O WAX CM4 OR FOR urNo rw EASE OF CONNECTION STANDARD GRWND of TYPJ (TYPJ (SEE NOTE) CONNECTOR ANTENNA CABLE WFATHERPRCOFNG KR TO SHELTER (TYPJ � j��� (rmJ SEE NOTE 2 AN SIMILAR TO Kl-57. NI, ` I PIN ACLE MOUNT GROUND NBARO C014SULI'ING. INC. r2 AWG STPMIDED, NEM TOP OF MONOPOLE,.,.wnm rlew+u..w••+sw w+wo.-+ INSULATED BONDED TO TOWER OR WAVEGUIDE TOWER STEEL OR LADDER. MONOPOLE lua aurm. u.�smA l ANT. GROUND BAR DETAIL - 3 ! ANTENNA S ECTOR REV DATE DESCRIPTION BY �GRrEeETHWjr-mi ULA TYP M. SECTOR AGB r2 AM SOLID WCW g HYBRIFLEY A COAX GROUND KR rp THWN GREEN INSULATED CGB AT TOP OF TOWER,POLE I2AWGSOUDBTCW HYBPoFLEX N COAX GROUND KR rp THWH GREEN INSULATE GROUND BAR AT BASE OF TOM" I2AWGSOUDBTCW T R GROUND RING HYBRIFIN 4COAX GgWND IGf r6 THAN GREEN INS__ BAGB) AT EQUIPMENT g PAD r2 AW/G SOUD BTCW EQUIPMENT COMPOUND GROUND GROUND RING RING GROUNDING SCHEMATIC TUC PEPPERSAUCE capL grNE GROUNDING PLAN AND GROUNDING DETAILS E-3 DEPART I N. MARWN ST. WIBERT. AZ &MSS HEADING SOUTH ON N. MARVIN STTOWARD W. ME R LL AVE NRN LEFT OMO W. MEARILL AVE M1DCO NUEFOP0.3MILES1 LVOUREACHN.COOPERRO. TURN LEFT ONTO N. COOPER RD AND CONTINUE FOR 0.9 MILES UNTIL YOU REACH USED W.ON RALAP. TURN UEFTAND MERGE ONTO UISW W. TOWARD PHOENIX. CONNNUE ON USd W. FOR EAMILES IAJRL YOU REACH THE NO EANTERCHANGE MERGE — I-10 E. TOWARD TUCSON,THENCONTINUEFOR AMILESUN7ILYOUREA0HEXIT24el DO TARO RD. TURN LEFT ONTO CORTARO RD, THEN CO NUE FOR 7A MILES U"L YOU REACH N. NORTHERN AVE. THE ROAD NAME CHANGES FROM CORTARO RD TO W. CORTARO FARMS RD TO W. MAGEE RD OVER THE 7.0 MILES. TURN LEFT ONTO N. NORTHERN AVE AND COMINUE FOR 0.1 MILES UNTIL YOU REACH W. COOL DR. TURN RKSHTONTOW.000L R.THEN C NUE FOR 0.2 MILES UNRLYOU REACH THE SNE ON RIGHT. VICINITY MAP p o PROJECTAREA� _ W. MAGEE RD S U lei STATE T 0 W E R S AZ02-070 SAGUARO APN: 225-14-170C 333 W. COOL DRIVE ORO VALLEY, AZ 85704 PIMA COUNTY SCOPE OF WORN • INSTALL NEWSRO SUN STATE MONO -ELM • INSTALL NEW 28fi-12D-0- CMU WALL • INSTALL NEW P-OYtb-0' CONCRETE PAD • INSTALL (2) NEW FIBER VAULTS • INSTAL NEW ELECTRICALSERVICE • INSTALL NEW TELCO SERVICE • INSTALL NEW UNDERGROUND CONDUITS SHEET INDEX T. PROJECTINFORMATION GN-1 GENERAL NOTES is-1 TOPOGRAPHK:SURVEY A-1 SITE PLAN A.1.1 DEMO PLAN A-2 ENLARGED SITE PLAN A-S ELEVATIONS Ai ELEVATIONS AS DETMLS A e DETMLS E-1 ELECTRICAL NOTES E-2 ELECTRICAL DFTARS ES ON EUNEANDFAULTCALCS EJ GROUNDING PLAN AND GROUNDING NOTES CLIENT SUN STATE TOWERS 142E N. MARWN STREET ♦101 GILBERT.-&MSS CONTACT: CHAD WARD PHONE: IMIM 9514 PROPERTY OWNER CARLTON ANDREW J & CATHLEEN A JTIRS 8771 N. PASEO NORTENO TUCSON. AZ W70i TOWER OWNER SUN STATE TOWERS 162E N. MARV1N STREET E101 GILBERT, AZ E5233 CONTACr: CHAD WARD PHONE: (E02)eE0951A SITE ACQUISITION PINNACLE CONSULTING, INC. 102E N. MARMN STREET Y101 GILBERT, AZ &M. CONTACT: MICHELLE IAMOUREUX PHONE: (IEO) E81-85Ee ext 2. A&E FIRM APPROVALS (RF): DATE: PINNACLE CONSULTING. INC. (CONST.): DATE: 142E N. MARVIN STREET K101 NEW SITE LOCATION GILBERT. AZ E5233 CONTACT: KYLE FORTIN LATITUDE 32.353046° 3Y 21. 10.95X' N INADMI (RE): DATE: PHONE'. (EYJ)217-4235 LONGITUDE 110.975 M 110`5832A WINADWI GROUND ELEVATION 25 6INAVOBEI I LANDLORD: DATE:_ S SUN STATE TOW E R S tare N3TREEr not PINNACLE CCNSUI:1'INC., INC. m�1�m AZ02-070 SAGUARO PROJECT INFORMATION T-1 AZ02-070 SAGUARO PROJECT INFORMATION T-1 GENERAL NOTES: roA— CONCRETE AND REINFORCING STEEL NOTES: GENERAL NOTES GROUNDING NOTES: s°ys,,non,rn er riEusn: mSsrscaaclw Ln.MnWN 2 FieP sPn P r¢ECOMsaM ED wDp. ELECTRICAL INSTALLATION NOTES: N>E rN ePAxo, +rs e<x rusrK Ea!w.viw`eLe`se co�noi,cron�Yc1Daanc�s`swu �o cwo�`w�m,,,i� e�.°wmn on 'e , m Iws°°Nl wcsµowlncu[xxrss w1�s[ BArm con ossasiwx Arxo IFss rww asc ryYe IsevMANFt. wcnswtsomwertsrro,a stir, eASVssnn lFNerH OFnecnouno Woos axN2es t Kconoexcevmnxuiwsy SITE WORK GENERAL NOTES: nav R+ce"A.wcN,I�mawluN.roxrxe rw�.esrNunDx wxe�wssl5le swlLBEvsEo faxowrs�'� SR[cmwx�xaxarruUc rlsxcl�Pc.�°N5D Rq,Ecnox e�cexst®r s�G9et[crwr�t�°iv�ol m�ex. �leEYOEcsvntlanm eEtlM®ioN% t iourl°n¢.ms[wDE res,ErwCcwourt Asst svwu e[Useo wxan000n v uLurtwwucswue[wslwcArm ax rxsoMwxes♦xo mvsersssune"rope:. Mr M1E,PX.0 we seNEoua woAwcs we se�nus eq sxsli 51iENO DLSK6E5 DFLE4NlY. Wmwxa. wl6,ENBMrox CccV onrlE""smwrr6,EID®. BE�uEo rC°ORS M'o expl°A�snvsn. 0.°5es° °A orxsxmss NccwnMis° Pi e S.sclRun«lo5":,fr515�°w55DxxA�kDONwE�r�Enlmxw,�2�aa �°�o.x�e�„xxr*.'"�'µauls�`��,eDDx�Sa�DFw,5,5c.wcwDaSx x.�eSwwD�rDuu=esuA�N:ew„,sAroFL°w.wP.FPCN,xEx,S�xl�Sxr,xDr° wa,�a..aaxN.eE�D�z°.rEDVDnNN��wccwE.�x55eDoen.D�DxEDro Anfwa. sloncwW:Naxsisnxsiaa, I°n e:e5RN2xe.eeR..ceDwNnPI.DneNeNeDnrx.. DgN�DDxD.�Dgx.wrERNs.anowDn �*tswaD�:° �°::,�xlD�xsGsw°�n555�,5. ' SM�.ce.oA,�xS,.•PK,m"'DexD�,Dxrr5.5,.,55,„U�.Dln.cx,D�.RDxr°Ra�S ,�.a.,Dxx�„Ew.,` �:.�15��+5mDx�DD�Dx®�.,wDM,FS ' ca.AVAerw Dartw...axN.eeD..,DeD ro>°NwxNa�D�NoarAauaS TD . oK,.exa ms,Ne a rDx �a.Dx N,555�A � r e` oe w:.M"°wnx R �„DDDI.S. ' °°"` w w"— N TM� � - a`:�,5w MASONRY NOTES:o"xSAn�°"Ec°""°""Dw°"`°"'�""�"N,°Ia,aIR„ID"`"xGs. SOIL COMPACTION NOTES FOR SLAB ON GRADE: " DDelae"I E a. kip °MNu.wR S=cw..N:rm eaXraoN,°vEiomrx�WE—DcD SYMBOLS rS—IGJ SOLID GROUND BUS BAR S/N SOLID NEUTRAL BUS BAR H H SUPPLEMENTAL GROUND BAR 2fOLE THEIIMAL.MAGNETIC CIRCUIT BREM11A ^ Y o SINGIE-0OLEr MAL-MAGNENC CIRCUIT BREA 4=R e CHEMICAL GROUND ROD ® GROUNDROD DISCONNECTEWITCH 0 METER ■ CADWELD TYPE CONNECNON COMPRESSION TYPE CONNECRON — — — GROUNDING WIRE ABBREVIATIONS � Exisrvuc ENEn E. (S SUN STATE T O W E R S ,PINNACLE INC— ,ex NMMNNsmR:T •,u tlIHEAI. AZesZu REV DATE DESCRIPDON BY mm/le NTHe AZ02-070 SAGUARO aaa A.LLo°LLE-E GENERALNOTES GN-1 SURVEYOR NOTES TIE 11— � SO�HE011LE B�gEXECFEPTONS LINES ps sET FOriTX I]oF WMNIAL ON1AIN m- TIIE E_T SO „xnR'sv. —ITS. coNomONs oR RE—I..S NOTEE 42 use Mwlc} 0 �cavT lx ET-' esw.PAC A—%TFFCMLREcoxos. ON. OIINDED IN wcRET+0000. PACE—oft—RE-1 TIEREI" LESSEE ACCESENTIL1,W EASEMENT LEGAL DESCRIPTION STNIV THE INEIIE IEFINTNNG s xORTI LINE —I arWm' EAST ss N FEET, THENCE LESSEE LEA PTION RE 2". a IE. coutin nAR¢ -ST.cl Reo ASFmLows. EOF ENc ND AT TIE NORTxwEsr cON.RNEsnio wD LILIT ITT T THENCE NORTI I III El TIE— PO FEET. THEICE NiR FBEDINN Nc IT TNENIE I_TN1456 FEET TO TIE SET LESSEE UIIUTY EASfo'EMENT LEGAL DESCRIPTION FRC. NONTIUNEsanl.—EASt ii 6s2a oRm aTHME, =RR2FEErTOHEPaNTOFEEAFT, INE cTPIULEAEEREri REcORPEDIN'SeIF TIE PROJECT META DATA uePxnvoaeGEETIIE`L"' - INo USER cEnvK FIMUs'_LPurwx Faaliws srEcir�c LESSOR'S LEGAL DESCRIPTION IH I ITT" IS 20 seconds wFST sovo FEEr7o A POINT IN saD w�"Esr uNE oFEulI OT 1. IH NC IIITIEILY IETRDEP SAI-TILINE NORTI11.111EFDONOSNIT W M'U ss- Eff i COOL DRIVE W. APN'22514170C I I Iw i \€ IEISIOEwaX w O 3 J m I I r vL I f IE)-LTINc Q IIVM1 �ssEE ��. E1 LTv ['1FIENT cE. °.I.IE^° °IF'ATE: IE14R Pa ER FILE�p IE14S ALLEY /All/ IFI OVFPHANO /-p- 1 Fsn1T ' ESMr. N4 WEST MAGEE ROAD APN: 22514170A El wm"YRD s� d gvRoac+4RFA LEGEND 1p EN uPINNANPM,LE ® E aNER FSE —ANT LATER s D ousTREE x5° ELEVATION D IIN Nc PARCEL LINE CENTEILME FLOOD ZONE ENE OE3IGNATON ERCEIxv weNncENENI ACENcv MRNENAP nD.Sosc155 DATED eN b+T� r APN.22514170E IQ K V O r�filc!1725141710 �'f ' 1G" 41. MAGNETIC NORTH DECLINATION GRAPHIC SCALE 20 l0 20 40 SO Bi FBEf ) 1 e>ce - 2A Fc PZ/D R B/B OA verizon,/ 126 W. GEMINI DR. TEMPE, AZ 85283 PINNACLE caMe.kla"��NSiJL1"MNG.e SNC^ FIELD BY: ORA" BY: I cas CHECKED BY: RLF REVISIONS 4 08P25t18 REVISION 3 W17118 ADDBUILGNIGHEIGHTS 2 OS27117 FINAL 1 W21/17 PREGMINARV DESCRIPTION ND. WTE R L_ F-- CONSULTING E.FRa R,,,I,2 PROJECT NR. 10008394 SITE NAME: TUC PEPPERSAUCE SITE ADDRESS: 333 W COOL DR. ORO VALLEY, AZ 85704 SHEET TITLE: TOPOGRAPHIC SURVEY SHEET NO, REVISION: LS-1 EXISTING PROPERTY LINE APN: 226.143850 ZONING: C-2 EXISTING PROPERTY UNE SITE PLAN W. COOL DR III I I I lu I I IISTIN LL PA RKIN II �( I I 1 NO EASEMENTTILITY12- SUN STATE I j-f- WR • •. I= I� I� Q F IF I� EXISTING TREE (IYP) NEW SUN STATE 31'aY2o•L' LEASE AREA NEW SCa' TALL SUN STATE MONO -ELM EXISTINGPROPERTYUNE (S — NEW SUN STATE FIBER VAULT SUN STATE AT PROPERTY LINE INSIDE TOWERS SUN STATE EASEMENT , a STATE �vsunxO Flora _ EASEMENT k`PINNACLE — (2) NEW 4' UNDERGROUND.gNpa.y`p,�� TELCO CONDUIT PEP UTILITY COMPANY SPECS —EXISTING CONCRETE APN. 225-14t]OA r' m WALKWAY ZONING: C-2 EXISTING pF W 6 BUILDING 2 APN: 2ES141]OG EXISTING PROPERTY UNE_ z3B'Q SETBACK T �Y I APN: 22v-141]OB ZONING: C-2 EXISTING UNDERGROUND m ELECTRICAL LINE fW EXISTING COVERED PAR.NG NEW to'�o' SUN- UTILITY EASEMENT I EXISTING 1V0' EXISTING SOKVA TRANSFORMER TO BE I _ _ _ UTIUZED FOR POWER. _I SEE E-2 FOR DETAILS 9J ELECTRICAL EASEMENT _ _ _ x_I PROPERTY LINE _ _ SEBACKTABLE NORTN 31B9-B' _ _ _ SOUTN i]9- X _EXISTING EXISTG�PROPEI�7Y UN2 oE WEST EAST ±.S1 tAB-0' 1 o�mo sm�m i wP Forv// 00STING 8W TAIL CHAIW UNK FENCE TO BE REMOVED 20d C"N LINK T4' CHNNAINK FENCE TO BE REMOVED FENCE TO REMAIN X — —X —X —X —_ —x —x x —X X X SUN STATE T O W E R S I — — — — — — — — FwsnNG OULLDINo Ib PEAWN I I N �8 MSTATELFASEMEA 4yl EXSnNG TREETO '.:w im u mo w I I I REMAN {PINNACLE EASTANG UNDERGROUND ARN:Eu,F,TGc 1 J/ CONSULTING, INC. c.I I EIECTR,C METO REMAN I la rv. waHN srar� m r,IlBe+r, nzssxas c um n. TACIWN EXISTINGLL- I UNK FENCECE TO BE PEM j TINI DIRT RTME AREA Ii I I REV DATE MSCRI"- BY �m N o i aIA. I EISTING FENCE SECTION 1b BE REMOVED ATY TFOF EASTINO WATER / CANE TO BE CUT.ANO CAPPED OFF I I EICONCRETE SC.AB AN AB AND eNED In BE I REMOVED I To WATER LINE TO yEp w W �W�Z—w /\\ ' I EXISTING WATER SPIGOT y/ TO BE REMOVED y / co. hoar I I I ESKPUBIS)TO j BE ERM REMOVED 1 I I EXISTING CMU WALL ANDFOUNDATION TO BE REMOVED , AZ02-070 SAGUARO i — .,S G FENCE SECTION / TO BE REMOVED —D— _ RrvEt,*mE DEMO PLAN FENCE.EMSnN TO RE UNK FENCE. TO REMAIN � /� _ � • J H I DEMO PLAN � 1 APPRVVED BY: TC P�/DRB/BOA PZ WIECT NIA(',rR I I I NEW 1T-0-WIDE SUN STATE 1 ACCESS/ UTIUTY EASEMENT NEW SUN STATE 5'4' 4 I ACCESS GATE A-5 I X -I EXISTING OTHERS (- UNDERG ITHE COMMUNICATION UNE I (PROTECT IN PIACE) I EXISTING OTHERS I I ACCESS GATE NEW —A I M/ 2-10 SUN STATE I METER/OISCONNECT BANK W/(2) EMPTY —A METER SLOTS FOR FUTURE SPRINT AND VERRONUSE NEW 10'-0' SUN STATE UTILITY EASEMENT I 1 1 NEW .I'A' SUN STATEELEA.ESE MEA NEW 2 ' SUN STATE I FlBER VAULT NEW SUN STATE 50'-0' TALL MONO -ELM 1 1 1 R � 1 1 I J NEW SUN STATE TALL CMU WALL x I 1 I I NEW BUN STATCGRAVEL S I I DOMPoUND AS 1 FASTING PROPERTY LINE 1y II �- FASTING OTHERS UNDERGROUND ELECTRIC CONTRACTOR TO INSTALL STRETCHER POST AND BRACE FOR FREEEND OF 1 FASTING CHAIN LINK PENCE AS REOURED 1 L SUN STATE I 1 UTILITY EASEMENT' EXISTING EDGE OF ROAD I I 1 ENLARGED SITE PLAN I I 12'-0' SUN STATE Orin® wR SS/UTIUTYEASEMENT I E00STING E%ISTING 1 O d Sa EWW-K BUILDING 1 1- 11 I I 11 I FUTURE VERRON LEASE AREA F— — — — — 00000 Op O 00 d SUN STATE TOW ERS t ax uORM NUMN STnBT At of �EWO4'O UNDERGROUNDUITS `y + T+�„'ACU I ��) ,m.swm heMn Mn•.o�.n.Ls0.pm+M1 S NEW/VVE-/RIIIZON P-0•Y1B-0` CONCRETE PAX, tags NGVARNNKSTPECI m N3FAT, EAIPEDO TE XU EA TO' T CAPPEDOFAPPDX TEASTOF �(Yh, NEW CMU WALL n \' 7or W — W EXISTING TREE(TYP.I j / — DASHED LINE DENOTES FUTURESPRINTLE/SEAREA / EXISTING UNDERGROUND # ELECTRIC � / EXISTING CHAIN-UNK PENCE(TYP.) 2— X— _— X- 4 1 REV DATE DESCRIPTION BY M III AZ02.070 SAGUARO �W. cOCtOn �RMA rA ENLARGED SITE PLAN A-2 h EGEWELINE VUBE 5RRW-ANLNNA5_ EVA NEW SO'-0' TALL St STATE MONO-EUM NEW SUN STATE SW A-5 TALL CMU WALL NEW WA 1201200V IO SUN STATE METER/ DISCONNECT BANK W/ (2) EMPTY 200A METER SLOTS FOR FUTURE SPRINT AND VERIZON USE NEW VERIMN —V CONCRETE PAD A6 NEW PO UNDER( CONDUITS (TVP.) NEW SOUTH ELEVATION LIGHTNING ROD LOCATION j}EXISTING TREE ELEVATION a A.G.L Y UNK PENCE 1 NEW NORTH ELEVATION V NEW —SUN STATE SUN STATE LIGHTNING ROD T O W E R S 1.ze xoKIH MVMxs w FUTUREVEAIZON oxcunw Rau ANTENNALOCATK)N PINNACLE FUTURE SPRINT ANTENNA LOCATION REV I DATE DESCRIPTION BY NEW 50' TALL SUN STATE MONOOBJI NEW SUN STATE Sb• ACCESS GATE NEW SUN STATE IDENTIFICATION PLAGUE NEW SUN STATE S'O` TALLCMU WALL NEW OM 120/ 200V 10 SUN STATE METH DISCONNECT BANK WI (2) EMPTY 200A METER SLOTS FOR FUTURE SPRINT MD RIZON USE NEWVERIMN1k10' CONCRETE PAD AZ02.070 SAGUARO ,NEW 40 UNDERGROUND Comm (TYP.) s�TnnE ELEVATIONS A-3 2 APPROVED BY TC/P�RB/BOA C. P ROMECTr,t, 'A �,R r 1r •?.7�.Al MTENN ON i 17ti _ I VAR AlffiT^`M r Mg -lot .0 , STATE MONO�EIA -TAM MONO�E� lalm ft ram^ `t iF • • DISCONNECT nwwwwwwwwwi\��Iwwww SLOn FOR FUTURE METER SLOTS FOR I�UTURE Ml�YwwYwwi�wwwwwwwwwl IN�wwwwwwlww\�,lwwww!__^�wwl Mwwwwwwwwww\Il�Iwwww��l�E�wl� IDlww wwwwwww� ll�wwww� mwwMETER l�l� IwwIIl�=wwwlwlwwwwwwww� nwlwm■w�wll�wwwww—==—I Iww\�wlw!lwwwwwwwwww� wl wf �YWwl nwwwwwwwww!\��Iwwww\Jllsnw Il�wwwwwwwww��lwwww� nwwwwwwwww�I���Iwwww��l�Iwwl� l� Ml,.11wMn © © nwl Y�■wwwwl�wYwwwwwYYl Il�w\mow Ywww YYYYwwwwww� nwlw�\wwYwl�wwwwYwwYwl IDERGROUND NEW-IUNDERI CONDUITS(TW.) 1 NEW EAST ELEVATION 1 1 NEW WEST ELEVATION V NEW W-SUN STATE SUN STATE LIGHTNING ROD T O W E R S -RE VERIZON ANTENNA LOCATIDN w PINNACLE L"NvsUL•fiNG. IN RUTURESPRINT ANTENNALOCATIDN " REV DATE DESCRIPTION BY NEW SUN STATE B'D' TALL CMU WALL AZ02-070 SAGUARO ELEVATIONS 2 A-4 V SUN STATE TOW E R S COMPOUND ENCLOSURE SEE DETAIL I ON THIS SHEET PINNACLE CONSUMING, INC. cw MIRAR SWx STABILIZATION LJ F FABRIC (0R APPROVED EWAL) ON buN COMPACTED SUBGRADE taz¢NualRxstatti-r of NOTE: THE SUB.ECTSTIE IS LEVEL AND NO SUB3TANTVE GRAOWO D NECESSARY REV DATE DESCRIPTION BY uTA41s NOT USED n 1 NOT USED 1--1 21 GRAVEL DETAIL 3 ogxyle GROUT CAP MS CONTINUOUS IN YXY%1/I'"SSPERPLAN Y%Y XlWHSSIVBE GROUTED BOND BEAM TUBE POST POST 18GA STEEL'B' DECKING. e' BLOCK WALL TACK WELDED AT JOINTS NEW BROWN COLORED C S1UTFACECMUWALL GROUT FE NFORCING CELLS Sou GROUTING ACCEPTABLE G. STEEL GATE WI-W DECKING INFILL IRNISH PER ARCH) 05 VERT. AT 3Y D.C. L1-1/2'%1.1/2-X1/V FULLYGROUTEDCEUI L MATCH DOWELS VERT INNER FRAME. WELDED BARS AT CENTER WALL 2-X Y X 1/P HSS TUBE = aWe GATE., AFTER DREW Sge. DURAWALL AT 16 D.C. FRAME ROCK INSTALLATION b _ E%TRAHEAWDUTY HINGES. •1"WEL5 INTO FOOTING WELDED ATeYO.C.BENDACROSS [TYP. OF 3 MR POST] WEEP HOLES p3Y FOR DRAINAGE I. FULL WIDTH OF FOOTING 3' %P %SSA• TI. STEEL PLATE RECUR IRED] SCUDGROUTREOD VIELDEDTOJAOLTS EMBEDOED FINISH GRADE BELOW GRADE INTO SOLID GROUTED BLOCK. GROUT TO W FILLED AFTER JBOLT E'5CONTIN000SIN PLACEMENTOW.OF3j EVENLY DOOR STOP ITYP. OF 21 GROUTED BOTTOM BEAM SPACED b g AZ02-070 SAGUARO ] 483S JbOLT EMBEDDED INTO TRANSVERSE F.G . BETWEEN VERi. DOWELS BLOCK PRIOR TO GROUT FlLL ITW OF 3 PLACESj EARTH �I� I I31/55 CONT, 1/2'1IA MINIMUM �gVlw Y B-B — IN FTG. s�sT mtt — I ♦SREBAR b SECl10N B� NOTE: I NOTES: sECT1oxFC DETAILS DETAIL IS DIAGRAMMAnc ONLY- R 1. REFER TO GEOTECHNICAL REPORT FOR SITE PREPARATION. VERIFY WITH SITE PLAN FOR 2. TYPE V CEMENT, 4' SLUMP X°«�R EXACT CONFIGURATION OF GATE 3. SOLD GROUTING REQUIRED BELOW GRADE. LOCATION. b.2 4. CONTROL JOINTS REQUIRED. SPACE AT NO GREATER THEN 2S ON CENTER. YA' H 11 -5 COMPOUND ENCLOSURE DETAIL 4 APPrR- OV 3Y: C eZ/DR3/B0A iE Z PPO,. 51 MANAGER TRENCH FINISHEDGRADE, AC OR CONIC PAVING MATCH SLOPE AND THICKNESS - EXISTING b� (TYP.) 2- (MIN.1 (HORR. A %FAT.) CABLE COAX CONDUIT DETAIL NOTE: TRENCH BACKFlU.SHALL BE COMPACTED TO PRIOR TO DRESS ROCK INSTALLATION MATCH TO EXISTING OR FINISH TO NEWGRADES (SEE PLANI COAXIAL CABLE SDE A MINIMUM BEND PAWUS IN Y CONDUIT CABLE SIZE MINIMUM BEND RADIUS I" T/C Y 1/T 22 Ii"' 2Y NOTE: PRO NDE PROPER BENDING RADIUS FOfl CONDUITS AS REQUIRED BY THE COAXIAL CABLE MFR. RESTORE SURFACE UNDISTURBED COMPACTED SAC Fla PER THE DESIGN AND CONSTRUCTION SPECIFICATIONS FOR EARTHWORK OR IEAN CONCRETE LEAN CONC DUCT BANK (2)1N1 PVC CONDUITS (4) WO PVC CONDUITS PVC CONDUITS SCHEDULE 40. PER PLAN (RIGID STEEL CONDUIT PLUG FOR sPARE RIGID ScoNGUIT)TEEL CONDUIT COUPLING CONCRETE PAO RESTORE b SURFACE AGE PVC SCHEDULE 40 SIZEAS SHOWN ON LAYOUTS NOTE: RIGID STEEL CONDUIT MAY NOT BE USED WITH COAT —ANTENNA CABLE. USE PVC SCHEDULE 40 PIPE. SITE SPEGRC D--NL- SEE PLANS TO DETERMINE IF STUS UP IS REQUIRED UNDERGROUND CONDUIT STUB -UP TELCO TRENCH DETAIL COMPACTED BACKFlLL PER EARTHWORK SPECIFICATION UTILLTY WARNING TAPE UNDISTURBED EARTH TELCO RACEWAY BACKFlLL (SAND) PE B EARTHWORK SPECIFICATION COMPACTEDBACKFlLL PER EARTHWORK SPECIFICATION UT M WARMING TAPE UNDISTURBED EARTH ELECTRICAL FEEDER BACKFlLL(SANO) ELECTRICAL TRENCH DETAIL TRENCH DETAILS 1Y.D. (15) M4 EQ. SPACED Y CLR U y IBC 2012. ACH31B SOILS: ISC TABLE 1 WB3- MATERIAL CLASS 5 ALLOWABLE BEARING PRESSURE. Qa=1500PSF OLIMAS R CONCRETE Pc = 2500PSI TYPE V CEMENT. W/C —5 REINFORCING MIS GR W. PY = 50KM V CHAMFER (15) M4 TOP AND BOTTOM W m (TYP.) n V (31 k4 TOP AND BOTTOM (V Y) NS AS REQUIRED TO SUPPORT TAB MATS FG H..9 \ \ VERIZON EQUIPMENT PAD DETAIL EQUIPMENT PLATFORM DETAILS SITE NAME: sAmm (S SITE NUMBER: Ammo SUN STATE 7 FCC TOWER ID: FocTowERD 333 W. COOL DRNE ORO VALLEY, AZ 85704 Owned By: SUN STATE TOWERS LLC. Telephone: 866-426-9204 WWW.SUNSTATETOWER.COM NO TRESPASSING 1 X DIGITAL PRINT APPLIED TO .080 ALUMINUM SIGN DETAIL (S SUN STATE TOW E R S QPINNACLE �11�PR"r. KL IMf ql AZ02-070 SAGUARO OOL OPNE DETAILS A-6 ELECTRICAL SPECIFICATIONS 1. SUBMITTAL OF SID INDICATES CONTRACTOR IS COGNIZANT OF AILJOB SITE CONDITIONS AND WORKTO BE PERFORMED UNDER THIS CONTRACT. 2. CONTRACTOR SHALL PERFORM ALL VERIFICATION OBSERVATION TESTS, MO EXAMINATION WORK PRIOR TO THE ORDERING OF THE ELECTRICAL EQUIPMENTAND THE AC TUALCONSTRUCTION. CONTRACTORSHALL ISSUE A WRITTEN NOTICE OF ALL FINDINGS TO THE ARCHITECT LISTING ALL MALFUNCTIONS. FAULTY EQUIPMENT AND DISCREPANCIES. 3. HEIGHTS SHALL BE VERIFIED WITH OWNER PRIOR TO INSTALLATION. 4. THESE PLANS ME DIAGRAMMATIC ONLY. FOLLOW AS CLOSELY AS POSSIBLE. E. EACH CONDUCTOR OF EVERY SYSTEM SHALL BE PERMANENTLY TAGGED IN EACH PANELBOARD. PULLBOX, J-BOX. SWITCH BOX. ETC.. IN COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEATH ACT IO.S.HAI 3. CONTRACTOR SHALL PROVIDE ALL LABOR.MATERIALS, INSURANCE, EQUIPMENT. INSTAUATON, CONSTRUCTION TOOLS. TRANSPORTATION, ETC., FORA COMPLETE MD PROPERLY OPERATIVE SYSTEM ENERGIZED THROUGHOUT AND AS INDICATED ON DRAWINGS, AS SPECIFIED HEREIN AND/OR AS OTHERWISE REQUIRED. ]. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND IN PERFECT CONDITION WHEN INSTATED AND SHALL BE OF THE BEST GRADE AND OF THE SAME MANUFACTURER THROUGHOUT FOR EACH CLASS OR GROUP OF EQUIPMENT. MATERIALS SHAL BE LISTED AND APPROVED BY UNDERWRITERS LABORATORY AND SHALL BEM THE INSPECTION LABEL'.l' WHERE SUBJECT TO SUCH APPROVAL. MATERIALS SHALL MEET WITH APPROVA.OFTHE DIVISION OF INDUSTRIAL SAFETY AND ALL GOVERNING BODIES HAVING JURISDICTION. MATERIALS SHALL SE MANUFACTURED IN ACCORDANCE WATH APPLICABLE STANDARDS ESTABLISHED BY ANSI. NEMA M NBFU S. CONTRACTORS-L CARRYOUTHISWORKIN ACCORDANCE WITH ALL GOVERNING STATE, COUNTY AND LOCAL CODES AND OSHA e. CONTRACTORSHALLSECUREALLNECESSMYBUILOING PERMITS 10. COMPLETE JOB SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER THE DATE OF JOB ACCEPTANCE BY OWNER. ANY WORK. MATERIAL OR EQUIPMENT FOUND TO BE FAULTY DURING THAT PERIOD SHALL BE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION. AT THE EXPENSE OF THE CONTRACTOR. 11. All CONDUIT ONLY(C.O.) SHALL HAVE A PULL WIRE OR ROPE. 12. PROWDEPROJECTMANAGERWITHONESETOF COMP IFIE ELECTRICAL'AS INSTALLED' DRAWINGS AT THE COMPLETION OF THE JOB, SHOVING ACTUAL DIMENSIONS, ROUTINGS. AND CIRCUITS. 13. ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS. ETC. SHALL BE TURNED OVER TO OVMER AT JOB COMPLETION. 14. USET-TARCONNECTMSONALLMULTI-CIRCUITSWTTH COMMON NEUTRAL CONDUCTOR FOR UQHTINQ FIXTURE. 15. ALL CONDUCTORS SHALL BE COPPER. 16. ALL CIRCUIT BREAKERS, FUSES AND ELECTRICAL EQUIPMENT SHALL HAVE AN INTERRUPTING RATING NOT LESS THE MAXIMUM SHORT CIRCUIT CURRENTTO WHICH THEY MAYBE SUBJECTED, AND A MINIMUM OF 10,000 A.I.C. 17. THE ENTIRE ELECTRICAL INSTALLATION SHALL BE GROUNDED AS REQUIRED BY ALL MPUCMLE CODES AND DRAWINGS. 1S. PATCH, REPAIR AND PAINTMY AREATHAT HAS BEEN DAMAGED IN THE COURSE OF THE ELECTRICAL WORK. 19. IN DRILLNG HOLES INTO CONCRETE WHETHER FOR FASTENING OR ANCHORING PURPOSES OR PENETRATIONS THROUGH THE FLOOR FOR CONDUIT RUNS, PIPE RUNS. ETC., R MUST BE CLEARLY UNDERSTOOD TIIATTENDONS AND/OR REINFORCING STEEL WALL NOT BE DRILLED INTO. CUT OR DAMAGED UNDER MY CIRCUMSTANCES. 20. LOCATIONOFTENDONSAND/ORREINFORCING STEEL ME NOT DEFINITELY KNOWN AND THEREFORE MUST BE SEARCHED FOR BY APPROMIATE METHODS AND EQUIPMENT WA X-RAY OR OTHER DEVICES THAT CM ACCURATELY LOCATE THE REINFORCING MD/OR STEEL TENDONS, 21. PENETRATIONS IN FIRE RATED WALLS SHALL BE FIRE STOPPED IN ACCORDANCE WITH IBC SECTION 714. 22. RECEPTACLES SHALL BE 20 AMPERE, 125 VOLT AC., WHITEASREQUIRED BY THE ARCHITECT OR APPROVED EQUAL M. WALL SVITCHESSH BESINGLE-POLE.HUBBELLI1201 OR EQUIVALENT. WHITE AS REQUIRED BY THE ARCHITECT. 24. PLASTC PLATES FOR ALL SWITCHES.RECEPTACLES. TELEPHONE AND BLANKED OUTLETS. SHALL HAVE ENGRAVED LETTERING MERE INDICATED ON THE DRAWINGS. WEATHERPROOFRECEPTACLESSHALL HAVE RACO4'800, 1/T RAISED WORKCOVERS. 25, VAREANOCABLECONDUCTORSS-1-SECOPPERMI2 AWG MINIMUM. NO BX OR ROMEX CABLE IS PERMITTED UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS. 26. GROUNDING CONDUCTORS SHALL BE SOUD TINNED COPPER AND ANNEALED MI2. 27. GROUND RODS SHALL BE COPPER CLAD STEEL.31V ROUND AND 3' LONG, COPPERW/EM OR APPROVED EQUAL 28. METER SOCKET MIPERES, VOLTAGE. NUMBER OF PHASES SHALL BE AS NOTED ON THE DRAWINGS. MANUFACTURED BY SQUARED COMPANY OR APPROVED EOUAL. 29. ALL MATERIALS SHALL BE U.L LISTED. 90. CONDUIT: s. RIGID CONDUIT SHALL BE U.L LABEL GALVANIZED ZINC COATED WITH ZINC INTERIOR AND SHALL BE USED WHEN INSTALLED IN OR UNDER CONCRETE SLABS, IN CONTACT WITH THE EARTH, UNDER PUBLIC ROADWAYS, IN MASONRY WALLS OR EXPOSED ON BUILDING EXTERIOR RIGID CONDUIT IN CONTACT WITH EARTH SHALL BE 1/2 LAPPED WRAPPED WITH HUNTS MAP PROCESS NO.3. b. ELECTRICAL METALLIC TUBING SHALL HAVE U.L. LABEL FITTINGS SHALL SE GLAND RING COMPRESSION TYPE. EMT SHALL BE USED ONLY FOR INTERIOR RUNS. c. FLEXIBLE METAWC CONDUIT SHALL HAVE U.L. LISTED LABEL AND MAYBE USED WHERE PERMITIEO BY CODE. FITTINGS SHALL BE -JAPE' OR 'SQUEEZE' TYPE, SEAL TIGHT FLEXIBLE CONDUIT. ALL CONDUIT IN EXCESS OF SIX FEET IN LENGTH SHALL HAVE FULL SIZE GROUND WIRE. B. ALL UNDERGROUND CONDUIT SHALL BE WC SCHEDULE 40 (UNLESS NOTED OTHERWISE) AT A MINIMUM DEPTH OF 24' BELOW GRADE. 31. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED WITH PERMANENT ENGRAVED PLASTIC LABELS. W. UPON COMPLETION OFW/ORK, CONDUCT CONTINUITY, SHORT CIRCUIT, AND FALL POTENTIAL GROUNDING TESTS FOR APPROVAL SUBMIT TEST REPORTS TO PROJECT MANAGER. CLEAN PREMISES OF ALL DEBRIS RESULTING FROM WORKAND LEAVE WKORK IN A COMPLETE AND UNDAMAGED CONDITION. 93. CONTRACTOR TO COORDINATE WITH UTILITY COMPANY FOR CONNECTION OF TEMPORARY AND PERMANENT POWER TO THE SITE. THE TEMPORARY POWER AND ALL ELECTRICAL SPECIFICATIONS GENERAL ELECTRICAL NOTES 1. THE ELECTRICAL INSTALLATION WORK SHALL COMPLY WITH ALL LOCAL, STATE AND NATIONAL CODES, LAWS AND ORDINANCES APPUCABLE TO ELECTRICAL WORK. 2. ELECTRICAL CONTRACTOR SHALL VISIT JOB SITE AND VERIFY EXISTING CONDITIONS BEFORE BIDDING AND SHALL INCLUDE IN HIS BID THE NECESSARY COSTS TO CONSTRUCT THIS PROJECT IN ACCORDANCE WITH INTENT OF THE ELECTRICAL DRAWINGS, SPECIFICATIONS, AND ALL APPLICABLE CODES. 3. ALL MATERAL AND EQUIPMENT FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BE NEW, FREE FROM DEFECTS AND SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY OWNER OR HIS REPRESENTATIVE. SHOULD MY TROUBLE DEVELOP DURING THIS PERIOD DUETO FAULTYWORKMANSHIP. MATERIALOR EQUIPMENT. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL AND LABOR TO CORRECT THE TROUBLE WITHOUT COST TO THE OWNER. 4. ALL WORKTOBEEXECUTEDINWORKMMUKEMMNER AND SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN COMPLETED. 5. ALLELECTRICAL MATERIALS AND EQUIPMENT SHALL BE LISTED BY UNDERWRITERS LABORATORIES. 3. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING RELATED TO ELECTRICAL WORK. UNLESS NOTED OTHERWISE AND COORDINATED WITH THE GENERA CONTRACTOR. ]. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH CIVIL AND ARCHITECTURAL PLANS. THE REQUIREMENTS OF ALL EQWPMENTACTUALLY BEING INSTALLED SHALL BE VERIFIED PRIOR TO INSTALLING THE ELECTRICAL WORK 8. ALL BRANCH CIRCUIT CONDUCTORS SHALL BE COPPER TYPE •TIIWN' I12. S M10 SOLD, I9 AND LARGER STRANDED. 9. ON COMPLETION OF THE WORK. THE INSTALLATION SHALL BE MEE FROM GROUNDS AND SHORT CIRCUITS. 10. ELECTRICAL CONTRACTOR SHALL FURNISH AB -BUILT DRAWINGS TO THE ARCHITECT AND CUSTOMER UPON COMPLETION OF THE JOB. 11. ELECTRICALWORKSHALLINCLUDE ALLLABOR. MATERIALS AND EQUIPMENT REQUIRED. INCLUDING BUT NOT UMITED. TO COMPLETE ELECTRICALSYSTEMS POWER AND LIGHTING, TELEPHONE CONDU TSYSTEM, SIGNAL SYSTEMS, PANELSOARD(S), CONTROL WIRING, GROUNDING, CONDUIT ONLY SYSTEMS. ETC., AS INDICATED ON ELECTRICAL DRAWINGS AND/OR REQUIRED BY GOVERNING CODES. 12. RACEWAYS SHALL BE'. RIGID STEEL CONDUIT: HOT - DIP GALVANIZED HEAVY WALL AS MANUFACTURED BY REFUBUC, TRIANGLE OR EQUAL. RIGID POLYVINYL CHLORIDE CONDUIT (PVC): HEAVY WALLS SCHEDULE 40 /S MANUFACTURED BYCARLON ELECTRICAL, ISOEEN OR EQUAL, ELECTRICAL METALLIC TUBING (EMT): ZINC -COATED THIN WALL AS MANUFACTURED BY TRIANGLE, REPUBLIC OR EQUAL 13. FUSE TYPE SHALL BE BUSSIAMN OR EQUAL FUSE. 14. PROVIDE ENGRAVED PLASTIC LABELS TO IDENTIFY ALL PANEL BOARDS, XFMRS.. DISTRIBUTION PANELS, DISCONNECTS CHU, AND TRANSFER SWITCHES. LABELS SHALL READ IN THIS FASHION 'I 20BYMOV 3-, 4W. 22SA, CKT. BKR OR FUSES TYPE AND SIZES. 15. E.C. SHALL VERIFY AND TEST GROUND TO SOURCE TO MAXIMUM OF S OHMS. IF THE GROUND TEST DOES NOT ACHIEVE THE 5 OHMS OR LESS, E.C. SHAD. BE RESPONSIBLE FOR PROVIDING THE NECESSARY CONDUCTORS AND GROUND RODS TO ACHIEVE 5 OHMS MAXIMUM. 10. BEFORE SUBMITTING BID, VERIFY EXISTING SITE CONDITIONS. ELECTRICAL SERVICE REQUIREMENTS AND THE EXACT SERVING UTILITY POINTS OF CONNECTION. 17THE ELECTRICAL (E CAL CONTRACTOR .0 SHALL FURNISH AND PAY FOR All PERMITS AND RELATED FEES. 13. UNLESS SPECIFICALLY NOTED OTHERWISE.ALL ELECTRICAL MATERIALS. EQUIPMENT AND WORK SHOWN ON THESE PLANS ME TO BE PROVIDED AND INSTALLED BY THEELECTRICALCONTRACTOR. 19. E.C. SHALL FURNISH AND INSTALL ALL SWITCHES, CONDUITS, VRES. BOXES, UGHT FIXTURES ONCLUDING LAMPS). SERVICE DEVICES. RECEPTACLES. SWITCHBOARDS AND PANEL BOARDS, ETC. REQUIRED FOR A COMPLETE AND OPERATING ELECTRICAL SYSTEM. 20. SEE ARCHITECTURAL DRAVANGS FOR DIMENSI-1-11-OCATION INFORMATION RELATING TO THE ELECTRICAL DRAWINGS. 21. ELECTRICAL CONTRACTOR SHALL VERIFY VOLTAGES AND HORSEPOWER RATINGS OF ALL MECHANICAL EQUIPMENT. 22. PRIOR TO INSTALLING MY ELECTRICAL WORK, THE ELECTRICAL CONTRACTOR SHALLVERIFYEXACT LOCATIONS AND REQUIREMENTS ON THE JOB AND BY REFERENCE TO ARCHITECTURE. MECHANICAL AND EQUIPMENT SUPPLIERS DRAWINGS. SHOULD THERE BE MV OUESTION OR PROBLEM CONCERNING THE NECESSARY PROVISIONS TO BE MADE. PROPER DIRECTIONS SHALL BE OBTAINED BEFORE PROCEEDING WITH MY WORK 23. OUTLET AND JUNCTION BOXES SHALL BE SIZED PER CODE FOR THE QUANTITY OF WARES THEY CONTAIN. SEE ARTICLE 9]0 OF N.E.C. PROVIDE ADDITIONAL BOXES AND EXTENSION RINGS AS REQUIRED. 24. ELECTRICAL CONTRACTOR SHALL COMPLY WITH CABLE BENDING RADIUS REQUIREMENTS PER CABLE MANUFACTURERS' S SPECIFICATION. 25. CONDUIT LAYOUTS SHOWN ON THE PLANS ME DIAGRAMMATIC, NOT INDICATING THE ROUTING REQUIRED. THE CONTRACTOR SHALL ROUTE CONDUITS AS REQUIRED BY THE CONDITIONS OF INSTALLATION. 26. ALL EQUIPMENT PROVIDED BY THE ELECTRICAL CONTRACTOR SHALL BE LISTED AND LABELED BY NATIONALLY-RECOGNIM TESTING AGENCY, ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. FOR THE CONDITIONS OF THE INSTALLATION. 27. PLANS MAY INDICATE THE NUMBER OF PHASE NEUTRAL, AND GROUND CONDUCTORS WHERE MORE THAN THREE CONDUCTORS ME TO BE INSTALLED IN A CONOUIT(THREE OR LESS CONDUCTORS ME NOT SHOWN). ADDITIONAL CONDUCTORS REQUIRED FOR CONTROL SHALL BE INCLUDED EVEN IF NOT EXPUCITLY SHOWN, 29. WHERE SIZE IS NOT SHOWN ON THE DRAWINGS. CIRCUITS SHALL CONSIST OF WI PHASE AND GROUNDED (NEUTRAL CONDUCTORS) AND A #12 CU GROUND IN ACONDUIT. 29. UNLESS SPECIFICALLY NOTED OTHERWISE, THE ELECTRICAL CONTRACTOR SHALL MAKE FINAL CONNECTIONS TO ALL UTILIZATION EQUIPMENT SHOWN ON THE DRAWINGS. VERIFY THE TYPE OF FINAL CONNECTION AND PROVIDEAPPROPRIATE HARING METHOD. 30. PRIORTOTRENCHING IN ANYAREATHE CONTRACTOR SHALL CONTACT ELECTRICAL COMMUNICATIONSMATA, CABLE T.V., GAS. MD WATER UTILITY PROVIDERS (BLUE STAKE) AND HAVE ALL UTILITIES IN THE AREA IDENTIFIED. IN ADDITION, THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A SUBCONTRACTOR SPECIALIZING IN THE LOCATION OF UNDERGROUND STRUCTURES TO IDENTIFY AND OBSTACLES IN THE PATH OF TRENCHING (PRIOR TO COMMENCING WORK). DAMAGE TO MY UNDERGROUND STRUCTURES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE PROJECT, 31. UTILIYCOORDINATION s. THE CONTRACTOR SHALL SUBMIT A COMPLETE SET OF DRAWINGS TO ELECTRICAL AND TELCO UTILITIES WTHIN ONE WEEK OF NOTICE TO A PROCEED. b. THE CONTRACTOR SHALL NOT TRENCH OR INSTALL CONDUITS (ON THE UTILITY OR LOAD SIDE TO THE S.E.S. THE UTILITY TRANSFORMER (PRIMARY OR SECONDARY). OR TO THE UTILITY CONNECTION POINT BEFORE RECEIVING A FINAL DESIGN FROM THE URUTY. c. THE CONTRACTOR SHALL NOT INSTALL EQUIPMENT PADS FOR THE SES OR MY UTILITY EQUIPMENT (TRANSFORMERS. SWITCHING CABINETS, ETC.) PRIOR TO RECEIPT OF FINAL PLANS FROM THE UTIUTY. 0. THE CONTRACTOR SHALL NOT BE COMPENSATED FOR ADDITIONAL WORK REQUIRED TO MEET THE REQUIREMENTS OF THE UTILITY WHICH IS THE RESULT OF PROCEEDING PRIOR TO RECEIPT OF A FINAL UTILITY DESIGN. 32. SERIES RATING NOTES:TO ENSURETHATEACH PROTECTIVE DEVICE WHICH IS DEPENDENT ON MOTHER DEVICE WILL INTERRUPT THE AVAILABLE SHORT CIRCUIT AT THE LOCATION WHERE IT IS INSTALLED. IT MUST MEET THE FOLLOWING REQUIREMENTS: e. SWITCHBOARD COMPONENTS. INCLUDING OVER CURRENT PROTECTIVE DEVICES, SHALL BE FULLY RATED FOR THE AVAILABLE FAULT CURRENT SHOWN. b. PROVIDE IDENTIFICATION AT THE ENCLOSURE OF PMEL BOARDS WHERE BREAKERS ARE APPMEDIN SERIES COMBINATION. STATING: •CAUTION - SERIESRATEDSYSTEM. AMPERES. IDENTIFIED REPIACEMENTCOMPONENTS REQUIRED.CONTRACTOR TO FILL IN BLANK WITH AVAILABLE FAULT CURRENT AS SHOWN ON THE SINGLE -LINE DIAGRAM. c. PER NEC ARTICLE I IM2(2005), PROVIDE IDENTIFICATION AT EACH DISCONNECTING MEANS FEEDING DOWNSTREAM DEVICES APPLIED IN SERIES COMBINATION. STATING: 'CAUTION - SERIES COMBINATION SYSTEM RATED AMPERES. IDENTIFIED REPLACEMENT COMPONENT REQUIRED: CONTRACTOR TO FILL IN BLANK WITH AVAILABLE FAULT CURRENT AS SHOWN ON THE SINGLE4INE DIAGRAM. d. AC RATING SHOWN AT PANEL BOARDS IS MINIMUM RATING FOR OVERCURRENT PROTECTIVE DEVICES. EACH DEVICE SHALL BE FULLY -RATED OR SERIES RATED WITH UPSTIVEAM DEVICE AT AC AS SHOWN ON THE SINGLE-UNE DIAGRAM. e. NODESIGNCHANGESMAYBEMADETOTHE SYSTEM WITHOUT THE PRIOR APPROVAL OF THE DESIGN ELECTRICAL ENGINEER AND THE ELECTRICALINSPECTOR. I. THE TOTAL MOTOR LOAD CONNECTED BETWEEN SERIES RATED DEVICES DOES NOT EXCEED - OF THE INTERRUPTING RATING OF THE DOWNSTREAM DEVICE. APPROVE'DBY- S IN AT F PRO.�EC i Af!!AGER V SUN STATE T O W E R S PnoN:: oaeasaaWee.!- PINNACLE CONSCTLT CG INC. l4 I-NS of AR1Wa/e AZ02-070 SAGUARO oR HMACOIIIY ELECTRICAL NOTES E-1 C.O. =CONDUIT ONLY D.C. =GENERAL CONTRACTOR NEW 36] 411 Ew. = ELEC, METALLIC TUBING (1NIN IF, 2P. & 3P— SINGLE POLE, 2. A S POLE r^a[own HANDHOLE WALL) B = EQUIPMENT GROUND 8U5 PVC. SCHEDULE 40 PLASTIC CONDUIT MOB =MAIN GROUND BUS GRC. =GALVANIZED RIGID CON WIT AFC =AVAILABLE FAULT CURRENT FIXT.=FD(TURE CLF = CURRENT LIMITING FUSE OPENS MIO. =MOUNTED AM = AMERICAN WIRE GAUGE BOTTOM \ WA =UN ESS OTH BCW=BARE COPPER WIRE (s) \\\\1 U.O.N.=UNLEBB OTHERWISE NOTED GPSGLOBAL POSITIONING BYSTEM H G.ORORD.NEUTROUND KS SERNCE PERSONALCOMMUNICATION SUN STATE A OR AMP. =AMPERE PK=POWERPNOTECTIONCABINET T O W E R S b KW. =KILOWATTS RWY =RACEWAY ,a ioi —r W. =WATTS TYR. =TYPICAL LV.=LOWVOLTAGE RGS =RIGID GALVANIZED STEEL =PHASE EMT -ELECTRICAL METAUUCTUBING DEF = DUAL ELEMENT FUSES DWG = DRAWING DIA=DIAMETER IGR = INTERIOR GROUND RING (HALO) H.P. OR HP =HORSEPOWER CCA = ANTENNA CABLECOVER KFMR =TRANSFORMER ASSEMBLY R BTSBAS UNDISTURBED EARTH CA = CIRCUIT BREAI(E=ETRANSMISSIONSYSTEM NOTE: CKT. =CIRCUIT GEN =GENERATOR S COMPACTGRAVEL B/SE VAULT 6 LID TO BE TRAFFlCRATED SW, SWITCH OR =GROWTH ��T7Nj7Aj /�('T MTS=MANUALTRANSFORMERSWITCH BSCW = BARE STRANDED COPPER L��j�AC DUCTTERMINATE0IY LE FA=FlREALARM WIRE c0Ns jf-'�'uw__' INC- ABOVEGRINATEDI RECPT. =RECEPTACLE ISCW = INSULATED STRANDED COPPER EC. = ELECTRIC CONTRACTOR WIRE TELCO VAULT DETAIL 1�Jlj NOT USED 2 ABBREVIATIONS 13 NEW1 SUNSTATE— 121 NEW 4'UNDERORWND TELCO NEW A•UNOERGROUNDTELCO CONDUIT 12-0'SUN STATE NEW tYPSUN STATE ACCESSI ' 01 gCCESS/fury CONDUIT PER UTILITY COMPANYSPECS PER UTILITY COMPANY SPECS (BEE - EASEMENT 7 (SEE SHEET AI FOR ENTIRE RUN) SHEET -FOR ENTIRE RUN) ACCESS/ UTILITY EASEMENT UTILITY EASEMENT 1Y-0'ACCESSI - I vRal[c*rp uv.om j �ES__, NEW— UNDERGROUND - ELECTRICALPOWERCONDUR 5F INSTALLED BV SUNSTATEbD_ .. I (1) NEWY CONDUIT FROM 1 FUTUREINTEGRATED LOAD CENTER TO THE FIRUgE EQUIPMENT CABINET. COORDINATESNB-UP All l{r LOCATION PRIOR TO INSTALLATION I — — D "CATION UNTE ...YYY i DEN STATE ON MOUNTED ON NEW 1 ELCO -- I / .� SUN STATE CMII WALL (SHOYM NEW TELCO VAULT NEW 9tl60.12D12CBV, 10.3W. N3R SUN STATE METER/ DISCONNECT - I FOR REFERENCE) BANK W/ 12) EMFTY 266E METER NEW SUN STATE I / FUTUREVERIZONINTEGRATED r ' SUOOIT2SOFNORF TIIgESPRINTAND I - - LOAD CENTER MOUNTED ON NEW LEASE AREA SUN STATE CMU WALLISHOWM FOR REFERENCE) NEW 2' UNDERGROUND TELCO CONOUR INSTALLED -- om�� I BY SUN STATE I U (i)NEW 2.5 RED WAVE RIB DUCT UNDERGROUND r ... _. / NEW TELCO VAVLTj 1 CONDUIT PER T.E.P. SPECS I I - j (3) NEW A'CONDUITS FOR / I FUTURE CARRIER COAX 151 I / FUTURE VEPoZON EQUIPMENT 10-P SUN STATE I —1 ETMOUNTEDTONEW URLLTY EASEMENT I VERIZON CONCRETE PAD 1 - IS— FOR REFERENCE) I NEW 19 SUN STATES I � / - NEW SUN STATE LEASE AREA UTILITY EASEMENT E.LT I PROPFAtt NNE EYISRNG OTHERS I UNDERGROUNDME I el CONCONTRIC TRACTOR TO USE I EKT :REME CAUTION VMEN . t 'WORNING AROUND / E)OSRNG UNDERGROUND j Gll tll xcllck AH2wet11.cam -Una CONTRACTOR TO 1 DIG 31a• BELLHOIE itlV SUNSTATE • OXN NO T50 OE / 1.'._ lRRffY EASEMENT / 120/ ,/ 240V TOPPNSFORMER FSR1T (MAYBE 111 NEW2SRE0 WAVE UPDATEDTOTBkVA © ✓—RIB DUCT CONDUIT PER T.E.P. SPECS BVT1=P.1 d� e SITE UTILITY PLAN "" 4 ENLARGED SITE TILITY PLAN "" 5 27— AR;e2/u AZ02-070 SAGUARO oqo vul£Y A2�£ sic �ry ELECTRICAL DETAILS E-2 Ama ONE -LINE DIAGRAM FAULT CALCS (s) SUN STATE TOWER S PINNACLE eeruvw�: AZ02-070 SAGUARO ONE -LINE DIAGRAM / FAULT CALCS 11 E-3 GENERAL GROUNDING NOTES 1. ALL GROUNDING LEADS INSTALLED TO ENSURE A SMOOTH PATH TO COUNTERPOISE WITHOUT KINKS OR SHARP BENDS OR RETURN UPWARDS. 2. CONTRACTOR WALL UTILIZE THE'FALL OF POTENTIAL MEASUREMENT METHOD' PER NETA STANDARDS, UTILIZING THE AEMC-4500 MEASURING DEVICE OR APPROVED EQUAL ALL GROUND TESTING TO BE PERFORMED BEFORE CONNECTING TO POWER UTILITY GROUND AND PRIOR TO ANY BACKFILL OF GROUNDING TRENCHES ELECTRICAL COMPACTOR WILL PROVIDE A MINIMUM OF ONE (1) INSPECTION PORT FOR TESTING GROUNDING RESISTANCE CONTRACTOR WILL INSTALL THE MINIMUM OF ONE (1) INSPECTION PORT FOR TESTING GROUNDING RESISTANCE CONTRACTOR WILL INSTALL THE MINIMUM NUMBER OF GROUND RODS INDICATED, SEE GROUNDING PLAN FOR APPROX LOCATIONS. CONTRACTOR WILL INSTALL ADDITIONAL GROUNDING AS REQUIRED TO ACHIEVE 5 OHMS OR LESS TO GROUND. & IT IS THE INTENT THAT AT NO TIME ARE THE GROUND LEADS TO BE INSTALLED BELOW THE SURFACE OF THOSE APES DESIGNATED FOR FUTURE DISASSOCIATED PADS OR SHELTERS. 4. THE CONTRACTOR WILL DOCUMENT MEGGER TEST RESULTS. REDONE THE DRAWINGS FOR THE LOCATION OF ALL UNDERGROUND GROUNDING COMPONENTS AND PHOTOGRAPH WITH A DIGITAL CAMERA THE ENTIRE NEWLY INSTALLED GROUNDING SYSTEM PRIOR TO BACMLL OF ANY OPEN TRENCHES. 5. ANY EXCEPTIONS TO THIS BASIC GROUNDING DESIGN GUIDELINE, ROUTING DESIGN, OR MODIFICATIONS, WILL BE DOCUMENTED AND DIMENSIONED BY THE WAY OF RED UNE DRAWINGS. IT THE RESPONSIBILITY OF THE SELECTED CONTRACTOR TO ENSURE THE NEWLY INSTALLED GROUNDING SYSTEM MEETS THE INDUSTRY STANDARDS OF 5OHMS OR LESS. GROUNDING NOTES 1 GATE GROUND DETAIL f=} .—NDTEST W . Ed MECHANICAL CONNECTION ETECTRIC SENWCE T ENTRANCE EJ GROUNDING.PER ONEIINE DIAGRAM. I2 SOLID TINNED BALE — COPPER WIRE LEAD WITH EXCESS ABOVE GRADE FOR LESSEE TO UTILIZE (TYPE TOWER GROUND RING. 2 •2 SOUD TINNED BARE J COPPER 1MRE. BURIED f2 SCUD TINNED WE — COPPER WIRE LEAD WITH EXCESS ABOVE GRADE FOR LESSEE TO UTILIZE (fYPJ f2 SOUD TINNED BALE — COPPER WIRE FROM TOWER GROUND RING TO MONOELM, TYPICAL OF 4 PLACES •NOTE: LANDLORD TOLFAVEEXCESS GROUND lEAD4 ABOVE GRADE FOR USE BY LESSEE CONTRACTOR. SEE 1/ E4 FOR SYMBOLS LEGEND ® GROUND ROD VATH ACCESS GROUND WIRE ® GROUND flOD EXOTHERMIC CONNECTON e GROUND BAR MECHANICAL CONNECTION .......... *):-, 7V 7/ IXOTHERMC CONNECTION 2 EOU ENTGROUND RING. P250UDTINNED BARE COPPER WIRE ,p f}AGROUND BURIED ROD 1.) WAGE I2 BOUD TINNED CU EXTERNAL BUILDING BURED GROUND RING T II — -- IXOIHERMCALLY V WElD TO GROUND ROD .. __ (TVRCAD GROUND ROD (TYPICAL) L MAX. TO TOP OF TEST LEAD EXOTHERMIC WELD — (THEAMOWELDOR EOUTVAJENTI DIRECTLY TO TOP OF GROUND ROD P2 AYW2 TNND SOLD BORE COPPER CONDUCTOR. CADV E TO EXTERIOR HALO GROUND BY G.C. It ABOVE FlNALGRADE 4 s — CONCRETE ACCESS BOX SUBGRADE — S.4T DIA PVC PIPE I2 SOLW, BARE TINNED COPPER GROUND RING L_i2 SOLID. WE. TINNED COPPER GROUND RING SIP. L COPPER CUD STEEL GROUND ROD DETAIL STEEL'B' DECKING HSS TUBE FRMIE CADWELD DATE JUMPER TO TUBE FRAME EX RAHEAW DUTYHINGE R2 AM FLEXIBLE DATE JUMPER (HARGER NGJX28 �9.WROVED EQUAL) BLOCK WALL AT GRADE STEEL PUTE EMBEDDED WTO SOLID GROUTED BLOCK WIRE & CONDUIT CONDUD CONCEALED IN WALLS OR ABOVE GEEING — W/2I12. I12 GND.W C.. UNLESS NOTED OTHERWISE CONDIIR ROUTED UNDER FLOOR OR BELOW GRADE W/2#12, Y12 GRD. S/P C.. UNLESS NOTED OTHERWISE — ~ CONDUTTURNINGUP callour TURNINo oovm INDICATES A GR MIPCOD (NCTOR INDICATESAGROUNDEDTGROUALI NGCON C OR INDICATES AN ENT OMD LING L-OR (S INDICATES AN BOLATED GROUND CONDUCTOR (SAME ISOLAT SIZE AS EOUIPMENT GROUNONG CONOUCTOR) O GROUND IFAD CORED ABOVE SUB ELECTRICAL SYMBOLS ® TEST VVEU/GROUND ROD ® GROUNDROD• R CADWELD CONNECTION O MECHANK:AL CONNECTION WOUNDING VARE c GROUND BAR SURGE SUPPRESSOR GROUND BAR ty FUSEDDISCONNECTSWDCH ® METER AND MAIN WEAKER 0 MNJUAL XFR SVATCH AND GEN. RECPT. GPS ANTENNA iV TELDO BOARD ELEC"CAL POWER T" ONE !� SURFACE MOUNTED PANEL BOARD SYM GRADE 2L MIN. aR s eELow CADWELD FROSTLINE — EXTERIOR GROVNORING M2 AM. BCW I7 II —STEEL COPPER CUD II`TII.� STEEL GROUND R00 DETAIL (8) SUN STATE T O W E R S @PINNACLE COAS[1LTINCi, IIdG REV DATE DESCRIPTION BY AZ02-070 SAGUARO COOLMIE GROUNDING PLAN AND GROUNDING NOTES E-4 PROJECT: NEIGHBORHOOD EXPANSION SITE NAME: PH90XC839 SITE NUMBER: PH90XC839 SST SITE #: AZ02-070 SITE ADDRESS: 333 W. COOL DR. • o ORO VALLEY, AZ 85704 Spri nt COUNTY: PIMA COUNTY SITE TYPE: EXISTING 50'-0" MONO -ELM MARKET: ARIZONA LATITUDE: 32.353046" LONGITUDE:-110.9756790 SHEET INDEX T-1 PROJECT INFORMATION AND DATE SP-1 SPRINTSPECIFICAliONS SP-2 SPRINT SPECIFICATIONS SN-1 SIGNAGE LS1 TOPOGRAPHIC SURVEY A-1 OVERALL SITE PLAN 12 EXISTINGENIAHGED SITEPLAN A3 NEW ENLARGED SITE PLAN A 0 ELEVATIONS A<.1 ELEVATIONS Ad NEW ANTENNA A RRU PLAN A4l EQI/IPMENTDETAL$ A-T EQUIPMENT DETAILS AS ED IPMENTDETALS FB EQUIPMENT DETAILS E-1 ELECTRICAL NOTES, ABBREVIATION A SYMBOLS E4 POWER PLAN Ea ELECTRICILDETAILS E< GROUNDING PLAN A OETAUS ES GROUNDING DETAILS Ee GROUNDING DETAILS iPE OF WORK: INTPROPOSES TO MODIFYAN EXISTING UNMANNED _COMMUNICATIONS FACILITY: INSTALL (6) NEW ANTENNAS ON NEW ANTENNA MOUNTS INSTALL (S) NEW RADIOS ON NEW ANTENNA MOUNTS INSTALL N) NEW EQUIPMENT CABINET ON NEW CONCRETE PAP INSTALL It) NEW BATTERY CABINET ON NEW CONCRETE PAD INSTALL (3) NEW HYBRID CABLES AND (1) NEW FIBER CABLE L INSTANEW GPS ANTENNA INSTALL NEW CIENNA INSTALL NEW SITE LIGHT INSTALL NEW ekg-Y CONCRETE PAD IN$TALL NEW ICE BRIDGE INSTALL NEW ELECTRICAL SERVICE INSTALL NEW FIBER SERVICE :L •: 22s141TaC UNMANNED COMMUNICATIONS ACTION: TOWN OF ORO VALLEY INING CODES: 20121BC. 20121FC. 20121MC. 2011 NEC ALL BUILDING CODES LISTED ABOVE SHALL INCLUDE AMENDMENTS BY THE GOVERNING JURISDICTION CLIENT AREA SPRINT 11011 NORTH TATUM BLVD, SURE P155 PHOENIX, ARIZONA M028 CONTACT: BARSARA BROWN PHONE: (62S) 4 3434 SITE LOCATION TOWER OWNER SUN STATE TOWERS 1426 N. MARVIN STREET M101 0 _ GIWERT, AZ 85233 CONTACT: CHAD WARD PHONE:(4B0)664 8O4 214 STEIMAZ02-OTa VICINITY MAP SITE NAME: AZ02-Dl0 CONSTRUCTION MANAGER SPRINT CONSTRUCTION MANAGER CONTACT:JAY TANK - PHONE'. (310) 61s40i1 SITE ACQUISITION - �( PINNACLE CONSULTING, INC. 1426 N. MARVIN STREET Y101 GILBERT, AZ B,5233 SITE LOCATION— 0 CONTACT: ERIC HURLEY PHONE: (4501660.SSB0 — 2. A&E CONSULTANT SITE DIRECTIONS PIN NACLECONSULTING.INC. FROM THE SPRINT OFFICE IN PHOENIX, AZ: I— N. MARVIN STREET Y101 GILBERT, AZ 65233 CONTACT: KYLE FORTIN DEPART 11811 NORTH TATUM BLVD. SUITE PIM ONTO N TATUM BLVD. TURN LEFT ONTO N TATUM BLVD. TURN RIGHT ONTO E SHFA PHONE: (M)2124235 BLVD. TAKERAMPFORAZ-51S.TAKERAMPRIGHTFORFIOE.AT EXIT240. TAKE RAMP RIGHT FOR N CASAGRANDE HWY I N I-10 ENGINEER FRONTAGE RD TOWARD INA RD. BEAR LEFT ONTO W INA RD, TURN LEFT ONTO N LA CHOLLA BLVD. BEAR RIGHT ONTO W MAGEE RD. ISE INCORPORATED TURN LEFT ONTO N NORTHERN AVE. TURN RIGHTONTO W COOL DR. P.O. BOX 5003R ARRIVE AT 333 W COOL DR. PHOENIX, AZ 8"" CONTACT: GLEN L HUNT III PHONE: 1002) 403A614 1. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEETTHE HEALTH AND SAFETY STANDARDS FOR ELECTROMAGNETIC FIELD EMISSIONS AS ESTABLISHED BY THE FEDERAL COMMUNICATIONS COMMISSION OR ANY SUCCESSOR THEREOF. AND ANY OTHER FEDERAL ORSTATEAGENCY. 2 THIS WIRELESS TELECOMMUNICATIONS FACILf1Y WILL MEETTHE REGULATIONS OF THE FEDERAL COMMUNICATIONS COMMISSION REGARDING PHYSICAL AND ELECTROMAGNETIC INTERFERENCE. 3. NGHFNG OR SIGNS WILL BE PROVIDED ONLY AS REOUIRED BY FEDERAL OR STATE AGENCIES. 4. DEVELOPMENT AND CONSTRUCTION OF THIS PROJECT `ALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. S. EXISTING PARKING IS NOT AFFECTED BY THIS PROJECT 0. THIS PROJECT DOES NOT INCLUDE WATER OR SEWER, SIGNATURE BLOCK APPROVAL SIGNATURE DATE SITEACO. MGR, CONSTRUCTION MGR. A&E MGR, PLANNING CONS. RF MGR. RF ENGINEE8 PROPERTY OWNER Sprint PINNACLE 14:eNMAm1Ns � ISE lino-nXtfid SWCHurd Ergimers o�mmm�m _ �r1CI( •. PH90XC839 O�RMA COUNiv w PROJECT INFORMATION AND DATE T-1 _ �r1CI( •. PH90XC839 O�RMA COUNiv w PROJECT INFORMATION AND DATE T-1 THESE OUTLINES SPECS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE PERFORMED BYTHE CONTRACTOR. SECTION 01 100- SCOPE OF WORK 2. SWEEP AND FIBER TESTS BETWEEN THE RRUS AND ANTENNAS OR TOMB TOP AMPLIFIERS SHALL CONSIST OF 1121NCH FOAM DIELECTRIC, UTDOOR RATED COA% CABLE. DO NOT USE SUPERFLEX OUTDOORS. JUMPERS SHALL THE WORK: 3. SCALABLEBMCODEPHOTOGRAPHSOFTOWERMPMDINACCESSIBLESERWIZEDEOUIPMENT BE FACTORYFABRICATED INAPPROPRIATE LENGTHS ITTH AMAXIMUM OF 4FEET EXCESS PER JUMPER SKALLCOMPLYWATIAPPUCML MTIONALCOMSMDSTMDMDS,LATESTEOMM,MDPORTIONS 4. ALL AVAILABLE JURISOICTIONALPERMITANDOCCUPANCYI"FORMATION AND HAVE CONNECTORS AT EACH END, MANUFACTURED BY SUPPLIER. IF JUMPERS ME FIELD THEREOF. FABRICATED, FOLLOW MANUFACTURERS REQUIREMENTS FOR INSTALLATION OF CONNECTORS. PRECEDENCE: B. POFSCANOF REDLINES PROOUCEDIN FIELD REMOTE ELECTRICAL TILT ORE) CABLES SHOULDCONFLICTS OCCUR BETWEEN THESTMDMDCONSTRUCTION SPECIFICATIONS FOR WIRELESS S. A POP SCAN OF REDUNE MARK-UPS SUITABLE FOR USE IN ELECTRONIC AS -BUILT DRAWING SITES INCLUDING THE STANDMO CONSTRUCTION DETAILS FOR WIRELESS SITES AND THE PRODUCTION CONSTRUCTION DRAIWNGS, INFORMATION ON THE CONSTRUCTION DRAVANGS SHALL TAKE T. LIEN WAIVERS PRECEDENCE. 8, FINAL PAYMENT APPLICATION SITEFMILWIITV: 9. REQUIRED FINAL CONSTRUCTION PHOTOS LL PO CONTRACTOR SHABE RESPONSIBLE FOR FAMIUMIZING HIMSELF WITH ALL CONTRACT DOCUMENTS, FIELD CW DRIONS MD DIMENSIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. 10. CONSTRUCTION MD COMMISSIONING CHECKLIST COMPLETE WITH NO MEFI ITEMS ONSITE SUPERVISION: 11.APPUCABLE POST NTP TASKS INCLUDING DOCUMENT UPLOADS COMPLETED IN SRERRA (SPRINTS THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE RESPONSIBLE FOR DOCUMENTREPOSITORY OF RECORD). CONSTRUCTION MEANS, METHODS, TECHNIQUES,SEQUENCES, AND PROCEDURES IN ACCORDANCE 12. CLOSEOUTPHOTOGRAPHS: PROIDEPHOTOGRAPHSOFFINALPROJECTPERTHEFOLLOWING LIST. WITH THE CONTRACT DOCUMENTS. NOTE - ADDITIONAL PHOTOGRAPHS MAY BE REQUIRED TO SUPPORT ACCEPTANCE PROCESSES. DRAWINGS, SPECIFICATIONS AND DETAILS REOUIRED AT MBSITE: CAMERAS USED TO TAKE PHOTOGRAPHS SHALL BE GPS ENABLED SUCH THAT THE GPS THE CONSTRUCTION CONTRACTOR SHALL MAINTAIN A FULL SET OF THE CONSTRUCTION DRAWINGS AT COORDINATES ME INCLUDED IN THE PHOTO MEDWRLE INFORMATION. THE JOBSITE FROM MOBIUZ ANON THROUGH CONSTRUCTION COMPLETION. 121 MAIN HYBRID CABLE ROUTE (MINIMUM TWO PHOTOS) A DETAILS ME INTENDED TO SHOW DESIGN INTENT. PROVIDE ALL MATERIALS AND LABOR AS 122. PHOTOS OF EACH ANTENNA AND RRU REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM, MODIFICATIONS MAY BE REQUIRED 12.5, MANUFACTURERM NAME TAG FOR ALL SERIALIZED EQUIPMENT TOSUTT JOB DIMENSIONS OR CONDITIONS. AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART 12.4, PULL AND DISTRIBUTION BOXES INTERMEDIATE BETWEEN RRUS AND MMBS (DOOR OPEN) OF THE WORKS. MMBS CABINET WITH DOOR OPEN SHOWING MODIFICATIONS B. CONTRACTOR SHALL NOTIFY SPRINT CONSTRUCTION MANAGER OF MY VARIATIONS PRIOR TO 12.6. POWER CABINET, DOORS OPEN, BATTERIES INSTALLED PROCEEDING WTIH THE WORKDIMENSION$ SHOWN ME TO FINISH SURFACES UNLESS NOTED 12.]. BREAKOUTCYIJNDERS OTHERWISE, MODIFICATIONS MAY BE REQUIRED TO SUM JOB DIMENSIONS DR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK 12.e. ASR MGNAGE FOR SPRINT OWNED TOWERS C. MINK THE FIELD SET OF DRAWINGS IN RED, DOCUMENTING MY CHANGES FROM THE 122. RADIATION EXPOSURE WARNING SIGNS 12.10. PNOTGGRAFH FROM EACH SECTOR FROM MPROMMATELY RAD CENTER OF MY NEW CONSTRUCTION DOCUMENTS. ANTENNA AT HORIZON METHODS OF PROCEDURE BMOPS) FOR CONSTRUCTION: 1T.11. LABEL PHOTOS WITH SITE CASCADE AND VIEW BEING DEPICTED TRACTOR SHALL CONPERFORM WORK AS DESCRIBED IN COMMISSIONING: A COAX COLOR CODING SWEEPS AND FIBERTESTINGTS-II—AND EL-0388 PERFORM ALL COMMISSIONING M REQUIRED BY APPLCABLE MOPS. B. CABLE LABELING EN-20" INTEGRATION: C. APPLCABLE INSTALLATION MOPS IDENTIFIED ELSEWHERE IN THECONTHACT DOCUMENTS PERFORM ALL INTEGRATION ACTIVITIES AS RECLINED BY APPLICABLE MOPS. COMPANY FURNISHED MATERIAL AND EQUIPMENT IS IDENTIFIED ON THE RF DATA SHEET IN THE CONSTRUCTION DRAWINGS. CDNTRACTOR IS RESPONSIBLE FOR SPRINT PROVIDED MATERIAL AND EQUIPMENT TO ENSURE IT IS PROTECTED AND HANDLED PROPERLY THROUGHOUT THE CONSTRUCTION DURATION. CONTRACTOR RESPONSIBLE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL SITE OR CONTRACTORS LOCATION. CONTRACTOR TO COMPLETE SHIPPING AND RECEIPT DOCUMENTATION IN ACCORDANCE WITH COMPANY PRACTICE. NOTICE TO PROCEED: NO WORK SHALL COMMENCE PRIOR TO COMPANYS WRITEN NOTICE TO PROCEED AND THE ISSUANCE OF WORK ORDER. SITECLEANUNESS: CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL. DEBRIS, AND TRASH. AT THE COMPLETION OF THE WORK CONTRACTOR SHALL REMOVE FROM THE SITE ALL REMAINING RUBBISH. IMPLEMENTS. TEMPORARY FACILITIES. AND SURPLUS MATEHIMB. SECTION 01 400 - SUBMITTALS & TESTS ALTERNATES: AT THE COMPMYS REQUEST, MY ALTERNATIVES M THE MATERIALS OR METHODS SPECIFIED SHALL BE SUBMITTED TO SPRINTS CONSTRUCTION MANAGER FOR APPROVAL. SPRINT WILL REVIEW AND APPROVE ONLYTHOM REQUESTS MADE IN WRITING. NO VERBALAPPROVALS WU M CONSIDERED, TESTS AND INSPECTIONS: 0. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION TESTS. INSPECTIONS AND PROJECT DOCUMENTATION. B. CONTRACTOR SHALLACCOMPLISH TESTING INCLUDING BUT NOTUMITEDTO THE FOLLOWING: 1. COAX SWEEPS AND FIBER TESTS PER TB— REV 4 ANTENNA LINE ACCEPTANCE STANDARDS. 2. AGL, AZIMUTH AND DOWMILT PROVIDE AN AUTOMATED REPORT UPLOADED TO SITERRA USING A COMMERCIAL MADE -FOR THE PURPOSE ELECTRONIC ANTENNA ALIGNMENT TOOL (AAT). INSTALLED ALMUT-I. CENTEAUNE AND DOWNTILT MUST CONFORM WITH RF CONFIGURATION GATA 3, CONTRACTOR SHALL BE RESPONSIBLE FOR MY AND ALL CORRECTIONS TO ANY WORK IDENTIFIED AS UNACCEPTABLE IN SITE INSPECTION ACTIVITIES AND/OR AS A RESULT OF TESTING. 4. ALL TESTING REQUIRED BY APPLICABLE INSTALLATION MOPS. C, REQUIRED CLOSEOUT DOCUMENTATION INCLUDES. BUT IS NOT LIMITED TO THE FOLLOWING: 1. AZIMURL DOMMT, AGL FROM SUNSIGHT INSTRUMENTS- ANTENNA ALIGNMENT TOOL(AAT) SPRINT SPECIFICATIONS SUMMARY: THIS SECTION SPECIFIES CUTTING AND PATCHING EXISTING HOOFING SYSTEMS "MERE CONDUIT OR CABLES EXIT THE BUILDING ON THE ROOF OR BUILDING -MOUNTED ANTENNAS, AND AB REWIRED FOR WATERTIGHT PERFORMANCE. ROOFTOP ENTRY OPENINGS IN MEMBRANE ROOFTOPS SHALL M CONSTRUCTED TO COMPLY WITH LANDLORD, MY EXISTING WARRANTY. AND LOCAL JURISDICTIONAL STANDARDS. SUBMITTALS: 1, PRE -CONSTRUCTION ROOF PHOTOS: COMPLETE A ROOF INSPECTKNI PRIOR TO THE IMTALAT OF SPRINT EQUIPMENT ON MY ROOFTOP BUILD. AT A MINIMUM INSPECT AND PHOTOGRAPH (MINIMUM 3 EA) ALLMEAB IMPACTED BYTHE ADDITION OF THE SPRINT EQUIPMENT. 2. PROVIDE SIMILAR PHOTOGRAPHS SHOWING ROOF CONDITIONS AFTER CONSTRUCTION (MINIMUM 3 EA). S. ROOF INSPECTION PHOTOGRAPHS SHOULD BE UPLOADED VAIN CLOSEOUT PHOTOGRAPHS. SUMMARY: THIS SECTION SPECIFIES INSTALLATION OF ANTENNAS, RRUS, AND CABLE EQUIPMENT. INSTALLATION. AND TESTING OF COAXIAL FIBER CABLE. ANTENNAS AND RR — THE NUMBER AND TYPE OF ANTENNAS AND RRUS TO BE INSTALLED IS DETAILED ON THE CONSTRUCTION DRAWINGS. HYBRID CABLE: HYBRID CABLE TILL RE DC/FIRM AND FURNISHED FOR INSTALLATION AT EACH SM. CABLE SHALL BE INSTALLED PER THE CONSTRUCTION DRAWINGS AND THE APPLICABLE MANUFACTURERS REQUIREMENTS. .NMPERS AND CONNECTORS: FURNISH AND INSTALL 1Q' COAX JUMPER CARIES BETWEEN THE RRUS AND ANTENNAS. JUMPERS SHALL BE TYPE WF 4, PLC 12-50, CR B40, OR M W. SUPER -FLEX CABLES ME NOT ACCEPTABLE. JUMPERS MISCELLANEOUS: INSTALL SPLTITERS. COMBINERS. FILTERS PER RF DATA SHEET, FURNISHED BYSPRINT. ANTENNA INSTALLATION: THE CONTflACTOR SHALL ASSEMBLE ALL MTENNA ONSNE IN ACCORDANCE WITH THE INSTRUCTIONS SUPPUW BY THE MANUFACTURER. MTENNA HEIGHT. AZMUTH, AND FEED ORIENTATION INFORMATION SHALL BE ADESIGNATED ON THE CONSTRUCTION DRAWINGS. C. THE CONTRACTOR SHALL POSMM THE MTENNA ON TOWER PIPE MMM SO THAT THE BOTTOM STRUT IS LEVEL THE PIPE MOUNTS SHALL BE PLUMB TO WITHIN 1 DEGREE. D. MTENNA MOUNTING REQUIREMENTS: PROVIDE ANTENNA MOUNTING HARDWARE AS INDICATED ON THE DRAVANGS. HYBRID CABLE INSTALLATION: A THE CONTRACTOR SHALL ROUTE, TEST. AND INSTALL ALL CABLES AS INDICATED ON THE CONSTRUCTION DRAWINGS MD IN ACCORDANCE AITH THE MANUFACTURERS RECOMMENDATIONS. B. THE INSTALLED RADIUS OF THE CABLES SHALL NOT BE LESS THAN THE MANUFACTURERS SPECIFICATIONS FOR BENDING RADII. C. EXTREME CAE SHALL M TAKEN TO AVOID DAMAGE TO THE CABLES DURING HMDUNG AND INSTALLATION, 1. FASTENING MAIN HYBRID CABLES: ALL CABLES SHALL BE INSTALLED INSIDE MONOPOLE WITH CABLE SUPPORT GRIPS M REQUIRED BY THE MANUFACTURER, 2. FASTENING INDIVIDUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE (MEDUSA). WTIHIN THE MMBS CABINET AND MY INTERMEDIATE DISTRIBUTION BOXES: e. FIBER: SUPPORT FIBER BUNDLES USING W VELCRO STRAPS OF THE REQUIRED LENGTH Q APS 18- OC. STRSHALL BE UV. OIL AND WATER RESISTANT AND SUITABLE FOR INDUSTRIAL INSTAUATIONS AS MANUFACTUflED BVTEMW OR APPROVED EQUAL. b. DC: SUPPORT DC BUNDLES VAIN 21P TIES OF THE ADEQUATE LENGTH. ZIP TIES TO SE UV STABLI ED. BUCK NYLON, WITH TENSILE STRENGTH AT U.— PSI M MANUFACTURED BY NELCO PRODUCTS OR EQUAL- 3. FASTENING JUMPERS: SECURE JUMPERS TO THE SIDE ARMS OR HEAD FRAMES USING STAINLESS STEEL TIE WRAPS OR STAINLESS STEEL BUTTERFLY CLIPS. 4. CABLEINSTAILATION: e. INSPECT CABLE PRIM TO USE FOR SHIPPING DAMAGE, NOTIFY THE CONSTRUCTION MANAGER. b, CABLE ROUTING: CABLE INSTALLATION SHALL BE PLANNED TO ENSURE THAT THE ONES VALL BE PROPERLY ROUTED IN THE CABLE ENVELOP AS INDICATED ON THE DRAWINGS. AVOID TWISTING AND CROSSOVERS. c. HOIST CABLE USING PROPER HOISTING GRIPS. DO NOT EXCEED MANUFACTURES RECOMMENDEDMAIIIMUM BEND RADNS. S. GROUNDING OF TRANSMISSION LINES. ALL TRANSMISSION LINES SHALL BE GROUNDED AS INDICATEG ON DRAWINGS. 8. HYBRID CABLE COLOR CODING: ALL COLOR CODING SHALL BE AB REQUIRED IN TS 0200 REV 4. T. HYBRID CABLE IASEUNG: INDIVIDUAL HYBRID AND DC BUNDLES SHALL BE LMEI-ED ALPHA -NUMERICALLY ACCORDING TO SPRINT CELL SITE ENGINEERING NOTICE - EN WIM01, REV 1 A AU -FIBER A COAX CONNECTORS AND GROUND KDS SHALL BE WEATHERPROOFED. B. WEATHERPROOFED USING ONE OF THE FOULDWNG METHODS. ALL INSTALLATIONS MUST BE DONE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND INDUSTRY BEST PRACTICES. 1. COLD SHRINK: ENCOMPASS CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE WRAP OF 2- ELECTRICAL TAPE EXTENDING 2' BEYOND TUBING. PROVIDE SM COLD SHRINK CXS SERIES OR EQUAL. 2. SELF -AMALGAMATING TAPE: CLEAN SURFACES. APPLY A DOUBLE WRAP OF SELF -AMALGAMATING TAPE 2- BEYOND CONNECTOR. APPLY A SECOND DUMP OF SELF -AMALGAMATING TAPE IN OPPOSITE DIRECTION. APPLY DOUBLE WRAP OF 2' WIDE ELECTRICAL TAPE EXTENDING 2' BEYOND THESE - AM)MING TAPE. S. W SUM LOCK CLOSURE 716: SUBSTITUTIONS WILL NOT BE ALLOWED. 4. OPEN FLAME ON JOB SITE IS NOT ACCEPTABLE 0. THIS SECTIONSPECIFII MMWCMINETS,POWERCMINETS,MOINTERNALEQUIPMENTINCLUDING BY NOT LIMITED TO RECTIFIERS. POWER DISTRIBUTION UNITS, BASE BAND UNITS. SURGE ARRESTORS, BATTERIES. AND SIMILAR EQUIPMENT FURNISHED BY THE COMPANY FOR INSTALLATION BYTHE CONTRACTOR (OFCI). B. CONTRACTOR SHALL PROVIDE AND INSTALL ALL MISCELLANEOUS MATERIALS AND PROVIDE ALL LABOR REWIRED FOR INSTALLATION EQUIPMENT IN EXISTING CABNET OR NEW CABNET M SHOWM ON DRAWINGS AND AS REQUIRE BY THE APPUCABLE INSTALLATION MOPS. C. COMPLY WITH MANUFACT.I REPS INSTALLATION AND STMT-UP REQUIREMENTS Sprint Ue w.sU0E P1s e carauLTNO RrM aaREAtaJKm«+ PINNACLE LSE IRCDrporated SbucNtl ErpiTNeTz REV DATE DESCRIPTION BY NRT�e PH90XC839 are W. VbCL 00. AUPY.MasTM SPRINT SPECIFICATIONS S'p-1 SECTION OB SOD -PAINTING MALMASSURMCE: 1. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTVRERS WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCES INSTALLERS. DERIVER. HANDLE AND STORE MATERIALS IN ACCMDMCE WITH MANUFACTURER' INSTRUCTIONS. 2. COMPLY WITH ALL ENVIRONMENTAL REGULATIONS FOR VOLATILE ORGANIC COMPOUNDS, MATERIALS: 1. MANUFACTURERS: BENJAMIN MOORE, ICI DEVOE COATINGS, PPG, SHERWIN W ILUAMS OR APPROVED EQUAL PROVIDE PREMIUM GRADE. PROFESSIONAL-M ITY PRODUCTS FOR MATING SYSTEMS. "SCHEDULE: 1. BOMRIORANTENNAEANDANTENNA MOUNTING HARDWARE: ONE COATOFPRIMERANDTWO A MHCOATS. PNNTMRANTENNAESHALLBENON-METALUCBASEDAND CONTAINNO METALLIC PARTICLES. PROVIDE COLORS AND PATTERNS AS REQUIRED TO MASK APPEARANCE OF ANTENNAE ON ADJACENT BUILDING SURFACES AND AS ACCEPTABLE M THE OWNER. REFER TOAUWUFACNTRSTION'TUCH WHENEVERPOSSIBLE. 2. ROOF TOP STAN CONSTRUCTION' TOUCH UPNTS OF WNRFACEBTCH ERSTINGC. FOLLOW INDUSTRY STANDMOS AND REQUIREMENTS OF OWNER TO MATCH EXISTING COATING AND FINISH. PAINTING APPLICATION: 1. INSPECT SURFACES, REPORT UNSATISFACTORY CONDITIONS IN WRITING: BEGINNING WORK MEANS ACCEPTANCE OF SUBSTRATE. 2. COMPLY WITH MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS FOR PREPARATION, PRIMING AND COATING WORK. COORDINATE WITH WORK OF OTHER SECTIONS. 3. MATCH APPROVED MOCK-UPS FOR COLOR. TEXTURE, AND PATTERN. RE -COAT OR REMOVE AND REPLACE WORK WHICH DOES NOT MATCH OR SHOWS LOSS OF ADHESION. X. CLEAN UP, TOUCH UP AND PROTECT WORK. TOUCHUP PAINTING: 1. GALVANILNGDMUGEMDALLBOLTSMDNUTSSHALLBETWCHMUPAFTERTOWER ERECTION WITH -GALVANOX'.'DRY -. ON'ZINC4r. 2. FIELD TOUCHUP PAW SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS. 3. ALLMUT COMPONENTSSHALLBEHMDLEDWITHCMETOMEVENTDAMAGETOTHE COMPONENTS. THEIR PRESERVATNENEATMEW.OR THEIR MOMCTIVE COATINGS. SECTION 28IM-BASIC ELECTRICALREOMREMENTB SUMMARY: THIS SECTION SPECIFIES BASIC ELECTRICAL REQUIREMENTS FOR SYSTEMS AND COMPONENTS. QUAITYASSURANCE: A NL EQUIPMENT FURNISHED UNDER DIVISION 26 SHALL CARRY UL LABELS AND WINDS WHERE SUCH LABELS AND LISTINGS ME AVAILABLE IN THE INDUSTRY. B. MANUFACTURERS OF EQUIPMENT SHALL HAVE A MINIMUM OF THREE YEARS EXPERIENCE WITH THEIR EQUIPMENTINSTALLED AND OPERATING IN THE FIELD IN A USE SIMILARTO THE PROPOSED USE FOR THIS PROJECT. C. MATERWS AND EMIPMEW: ALL MATERMLS AND EOUIPMEW SPECIFIED IN DMSION 280E THE SAE TYPE SHALL BE OF THE SATE MMUFACNRER MD SHALL BE NEW. OF THE SESTOUALITY AND DESIGN. AND FREE FROM DEFECTS SUPPORTING DEVICES: A ALL EQUIPMEWFURNISHED UNDER DIVISION 285HALLCMRYUL LABELS AND LISTINGS MERE SUCH LABELS AND MTNM ME AVAILABLE IN THE INDUSTRY. B. MANUFACTURERS QU EQUIPMENT SHALL HAVE A MINIMUM OF THREE YEARS EXPERIENCE WITH HEIR EQUIPMENT INSTALLED AND OPERATING IN THE FIELD IN A USE SIMILAR TO THE PROPOSED USE FOR THG PROJECT. C. MATERIALS AND EQUIPMENT: ALL MATERIALS AND EQUIPMENT SPECIFIED IN DIVISION 28 OF THE SAE TYPE SHALL BE OF THE SAE MANUFACTURER AND SHALL BE NEW, OF THE BEST QUMTY AND DESIGN, AND FREE FROM DEFECTS SUPPORTING DEVICES: A MANUFACTUREDSTRUCTORALSUMORTMATERMLS:SUBJECTTOCOMPLIANCEWITH REQUIREMENTS, PROVIDE PRODUCTS BYTHE FOLLOWING: 1. ALUEDTUBEANDCONDUR 2. BRINE SYSTEM S. MIS'PUT NVERSIFlEO PRODUCT' I. THOMAS&BETTS B. FASTENERS: TYPES. MATERIALS, AND CONSTRUCTION FEATURES AS FOLLOWS: 1. EXPMSION MCHORS: CMBON STEEL WEDGE ON SLEEVE TYPE 2. POWER-0RIVEN THREADED STUDS: HEAT -TREATED STEEL. DESIGNED SPECIMIO YFOR THE INTENDEOSERVICE. 3. FASTEN BY MEANS OF WOOD SCREWS ON WCOD. N. TOG'XNLEBOLTSONHOLLOWMMWRYUNITS. SPRINT SPECIFICATIONS 5. CONCRETE INSERTS OR EXPANSION BOLTS ON CONCRETE OR SOLID MASONRY. S. MACHINE SCREWS, WELDED THREADED STUDS, OR SPRING -TENSION CLAMPS ON STEEL. T. EXPLOSIVE DEVICES FOR ATTACHING HANGERS TO STRUCTURE SHALL NOT BE PERMITIED. S. DO NOT YIELD CONDUIT, PIPE STRAPS, OR ITEMS OTHER THAN THREADED STUDS TO STEEL STRUCTURES. e. IN PARTITIONS OF W HT STEEL CONSTRUCTION. USE SHEET MU&SCREWS. SUM TINGDEVICES: A INSTALLSUPPO GDWMSTOFASTENETECTM&MUMNE SEWRELYMD PERMANENTLY IN ACCORDANCE WITH NEC. B. COORDINATE WITH THE BUILDING STRUCTURAL SYSTEM AND WITH OTHER TRADES. C. UNLESSOTIERWISEINUI MDONTHEDMVNGS,FMMNELECMCALITENSMDMBR SUPPORTINGHMDWMESECURELYTOTHESTRUCTUREINACCO MCEWITHTHEF OWING: D. ENSURE THATTHELOAD APPLIED BYANYRMTENER DOES NOTEXCEED 25 PERCENT OFTHE PROOF TEST LOAD. E. USE VIBRATION AND SHOCK-NESISTANT FASTENERS FOR ATTACHMENTS M CONCRETE SLABS. ELECTRICALIDENTIFICATION A. UPDATE AND PROVIDE TYPED CIRCUIT BREAKER SCHEDULES IN THE MOUNTING BRACKET, INSIDE DOORS OF AC PMLL WMM WITH MY CHANGES MADE TO THE AC SYSTEM. B. BRMCHCIRCUTTSFEEDINGAVIATIONOBSTRUCTIONUGHTINGEGUIPMENTSHALLBECEMLY IDENTIFIED AS SUCH AT THE BRANCH CIRCUIT PMELBOARD. CONDUIT: A RIGID GALVANIZED STEEL (RCS) CONCUR SHALL BE USED FOR EXTERIOR LOCATIONS ABOVE GROUND MD IN UNFINISHED INTERNOR LOCATIONS AND FOR ENCASED RUNS IN CONCRETE. RIGID CONDUITAND RINGS SHALL RE STEEL. COATED WITH ZINC EXTERIOR AND INTERIOR BYTHE HOT MP GALVANIZING PROCESS. CONDUIT SHALL BE PRODUCED TO ANSI SPECIFICATIONS C30.1. FEDERAL SPECIFICATION W WC-5S1 AND SHALL BE LISTED WITH THE UNDERWRITERS' LABORATORIES. FRTINOS SHALL BE THREADED - SET SCREW OR COMPRESSION FNTINGS MILL NOT BE ACCEPTMLE. RGS CONDUITS SHALL BE MANUFACTURED BY AWED, REPUBLIC OR WHEATLAND. B. UNDERGRWNDMNDU INCOWRETESHALLBEPOLWINYLCHLORIDE(PVC)SUITMLEMRDIRECT SURIAL M APPMMLE. JOIWS SHALL BE BELLED. MD FISH SOLVENT WELDED IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. CONDUIT SHALL BE CARLON ELECTRICAL PRODUCTS OR APPROVED EQUAL_ C. TRANSITIONS BETWEEN PVC AND RIGID (RGS) SHALL BE MADE WITH PVC COATED METALLIC LONG SWEEP RADIUS ELBOWS. D. EW OR RIGID GALVANIZED STEEL CONDUIT MAY BE USED IN FINISHED SPACES CONCEALED IN WALLS MD CEILINGS. EMT SHALL BE MILD STEEL, ELECTRICALLY WELDED, ELECTRO-0 VMM OR HOT -DIPPED GALVANIZED AND PRODUCED TO ANSI SPECIFICATION CM3. FEDERAL SPECIRCATONWAVC.MDSHALLMULLISTED.BATSHALLMMANUFACTUREDBYNLED. REPUBLIC OR WHEATLAND, OR APPROVED EWN_ FITTINGS SHALL BE METALLIC COMPRESSION. SET SCREW CONNECTIONS SHALL NOT BE ACCEPTABLE. E. UQUID TIGHT FLEXIBLE METAWC CONDUIT SHALL BE USED FOR FINAL CONNECTION TO EQUIPMENT. FITTINGS SHALL BE METNIIC GI -AND TYPE COMPRESSION FITTINGS. MAINTAINING THE INTEGRITY OF CONDUITS TEM. SET SCREW CONNECTIONS SHALL NOT BE ACCEPTABLE. MAXIMUM LENGTH OF FLEXIBLE CONDUIT SHALL NOT EXCEED &FEET. LFMC SNAl BE PROTECTED AND SUPPORTED AS REWIRE BY NEC. MANUFACTURERS OF FLEXIBLE CONDUITS SHALL BE CAROL. ANACONDA METAL HOSE OR UNIVERSAL METAL HOSE, OR APPROVED EQUAL F. MINIMUM SIZE CONDUIT SHALL BE 3/I INCH (2IMM). HUBS AND BOXES: A AT ENTRANCES M CABINETS OR OTHER EQUIPMENT NOT HAVING INTEGRAL THREADED HUBS PROVIDE METALLIC THREADED HUBS OF THE SIZE AND CONFIGURATION REQUIRED. HUB SHALL INCLUDE LOCKNW AND NEOPRENE O-RING SEAL PROVIDE IMPACT RESISTANT LIB DEGREE C PLASTIC BUSHINGS M PROTECT CABLE INSULATION. B. CABLE TERMINATION FITTINGS FOR CONDOR 1. CABLETERMINATORS FOR RO' CONDUITS SHALL BE TYPE CRC BY O-ZAGEDNEY OR EQUAL BY ROX TEC. 2. CMIE TERMINATORS FOR LFMC SHALLBE ETCO. CL2075: OR MADE FOR THE PURPOSE PRODUCTS BY ROXTEC. C. EXTERIOR PULLBOXES MO PULL BOXER IN NTENOR IN WSTRIAL AREAS SHALL BE PLATED CAST ALOY, HEAVY DUTY. WEATHERPRODF. MST PROOF, WITH GASKET. PLATED IRON ALLOY COVER AND STAINLESS STEELCOWR SCREWS. GROUSE -HINDS WM SERIES M EQUAL. D. CO NDUROUTLETBOMOSHALLBEPLATEDCMTALWYWITHSIMIURGASKETEDCOWRS.OUTLET BODIES SHALL BE OF THE CONFIGURATION MD SIZE SUITABLE FOR THE APPLICATION. PROVIDE CROUSE-HINDS FORM B OR EQUAL. E. MANUFACTURER FOR BOXES MID COVERS SHALL BE HOFFMM. SOUARE'D', CROUSE-HINDS. COOPER,ADAL APPLETW, 0.ZGEDNEY, RACO.ORAPPROVED EQUAL SUPPLEMENTAL GROUNDING SYSTEM A FURNISH AND INSTALL A SUPPLEMENTAL GROUNDING SYSTEM TO THE EXTENT INDICATED ON THE DRAWINGS. SUPPORT SYSTEM WIM NON-MAGNETIC STAINLESS STEEL CUPS WITH RUBBER GROMMM. GROUNDING CONNECTORS SHALL BE TINNED COPPER WIRE, SIZES AS INDICATED ON THE DRAWINGS. PROVIDE STRANDED OR SOUD BARE OR INSULATED CONDUCTORS EXCEPTED AS OTHERWISE NOTED. B. SUPPLEMEWALWMNDING'V'TEM:ALLCONNECTIONSTOSEMADEWITHCADWELDS.EXCEPT ATE lPMEWUSE LUGS OR OTHER AVNIABLE GROUNDING MEANS M REQUIRED BY MANUFACTURER: AT GROUND BARS USE TWO HOLE SPADES WITH NO OX C. STOLEN GROUND-BMS: IN THE EVENT OF STOLEN GROUND BARS. CONTACT SPRINT CM FOR REPLACEMENT INSTRUCTION USING THREADED ROD KITS. EXISTING STRUCTURE: A EMSTING MX EOWIMNGMDALLEKPOSEDOUTLEIS,RECEKT US,SWTTCHES.DEVICM. BOXES. AND OTHER EQUIPMEW THAT ME NOTTO BE UTILIZED IN THE COMPLETED PROJECT SHALL BE REMOVED OR DE -ENERGIZED AND CAPPED IN THE WALL, CEILING, OR FLOOR SO THAT THEY ME CONCEALED MO SAFE. WALL, CMUNG. OR FLOOR SHALL SE PATCHED TO MATCH THE ADMCENT CONSTRUCTION. CONDUIT AND CONDUCTOR INSTAL ATION: A CWDURSSHNLBEFf TENEOSEWRELYINPLACEVATHMPROVEDNONPERFOMA STRAPS AND HANGERS. EXPLOSIVE DEVICES FOR ATTACHING HANGERS TO STRUCTURE MALL NOT BE PERMITTED. CLOSELY FOLLOW THE LINES OF THE STRUCTURE, MAINTAIN CLOSE PROXIMITY THE STRUCTURE AND KEEP CONDUITS IN TIGHT ENVELOPES. CHANGES IN DIRECTION TO ROUTE MOUND OBSTACLES SHALL BE MADE WITH CONDUIT OURET BODIES. CONDUIT SHALL BE INSTALLED IN A NEAT AND WORKMMUKE MANNER. PARALLELAND PERPENDICULARTO STRUCTURE WALL AND CEILING UNES. ALL CONDUIT SHALL BE FISHED TO CLEAR OBSTRUCTIONS. ENDS OF CONDUITS SHALL BE TEMPORMILY CAPPED TO PREVENT CONCRETE. PLASTER OR DIRT FROM ENTERING. CONDUITS SHALL BE RIGIDLY CIAMPEO TO BOXES SY GAVMiMD MALLEABLE IRON BUSHING ON INSIDE AND GALVANIZED MALLEABLE IRON LOCKNUTON OUTSIDE AND INSIDE. B. CONDUCTORS SHALLSE PULLED IN ACCORDANCE WITH ACCEPTED GOOD PMCTXC . ENGINEERS NOTES 1. IF A DISCTiEPANCY ARISES BETWEEN THE DRAWINGS MD FIELD CONDITIONS. OR WHERE A DETNL S DOUBTFUL OF INTERPRETATION. OR M UNMTICIPAWD FIELD CONDITIONS ENCOUNTERED. THE ENGINEERSHALLBE CALLEDIWM TELYFORMOCEWRETOBEFOLLOWED.SUCHINSTRUCTIONS SHALL BE CONFIRMED IN WIRING MD DISTTBBUTED TO ALL APFECTED PNITIES. 2. THE ENGINEER WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS. METHODS, TECHNIQUES. SEQUENCES, PROCEDURES, SAFETY PRECAUTIONS. OR PROGRAMS UTIUMD IN CONNECTION WITH THE WILL AND VfiNOT BE RESPONSIBLE FOR THE CONTRACTORS FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONSTRUCTION DRAWING MD/OR DOCUMENTS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER LAYOUT OF IMPROVEMENTS BASED UPON SETBACKS/ PROPERTY LINE LOCATION. DIMENSIONAL RELATIONSHIPS TO EQUIPMENT ME APPROXIMATE AND ME FOR ILLUSTRATIVE PURPOSES ONLY. I. CONTRACTOR TO MAINTAIN ALL DRAINAGE PATHS FREE MOM ANY OBSTRUCTIONS (I.E. DEBRIS AND SIT)- S. CONTRACTOR TO PROVIDE POSITIVE DRANAGE AWAY FROM EQUIPMENT. & IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THESE DRAWINGS, THE SUBCONTRACTORSHALLPROPOSEMALTERNATIVEINSTN TONFORMMOVALBYTNE CONTRACTOR AND ENGINEER OF RECORD. T. SUBCOWRACNR SHALL DETERMINE ACTUAL ROUTING OF CONDUI. POWER MD TI CABLES, GROUNDING CMLES M SHOWN ONTHE POWER, GROUNDING AND TELCO PUN DRAWING. SUBCONTRACTOR SHALL UTIUM EXISTING TMYS MD/OR SHALL NOD NEW TRAYS M NECESSARY. SUBCONTRACTOR SHALL CONFIRM THE ACTUAL ROUTING WITH THE CONTRACTOR. ROUTING OF TRENCHING SHALL BE APPROVED BY CONTRACMR UTILITY NOTES 1. R SHALL BE THE CONTRACTORS RESPONSI&UTY TO CONTACT SLUESTAKE AT LEAST TWO FULL WORKING DAYS HA HOURS) PRIOR TO BEGINNING OF MY EXCAVATING. 2. IT SHALL BE THE CONTRACTORS RESPONSIBUTY TO LOCATE NL STRUCTURES, UNDERGROUND PIPEUNES. ELECTRIC MD TELEPHONE CONDUITS. EITHER SHOWN OR NOT SHOWN ON THE PLANS MM TO MY CONSTRUCTION, AND TO OBSERVE ALL POSSIBLE PRECAUTIONS TO AVOID MY DAMAGE TO THESE FACILITIES. THE ENGINEERING AND/OR DEVELOPER WILL NOT GUARANTEE MY ELEVATIONS OR LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THESE PLANS. 3. CONTRACTOR TO VERIFY LOCATION AND ELEVATION OF ALL UTIIRY CONNECTIONS Sprint 11B PHODM A2 eso2a P155 �PINN.CLE � NMMMNs1AEEf not (>n. A2 M2u LSE Incorporatetl S-N! Engineers APPROVED Y- T '!P- / DAB; 3OJI , D, PZ P-0-1ECT Vl . IACER DL A PH90XC839 WA�c u� DROI�cDUNTV SPRINT SPECIFICATIONS SP-2 BATTERY INFORMATION AND NOTES: BATTERY INFORMATION: MANUFACTURER POWER — MODEL SM 190E ELECTROLYTE CONTENT PER BATTERY 2%I GALLONS ELECTROLYTE HA DCLASSIFICATION PER 2007 C.F.C. (a.T%SULFURIC ACID) CORROSIVE NUMBER OF BATTERIES TO BE INSTALLED 4 MAx. TOTAL ELECTROLYTE CONTAINED ON STTE (44.34 = 9.36) 5,3B GPLLONS MA%. BATTERY NOTEB: A, QUANTITIES OF too GAL OR LESS ARE EXEMPT PER TABLE 3-E OF THE 1897 U.B.C. B. SINGLE VESSEL CAPACITIES OF 20 GAL OR LESS. AND AGGREGATE QUAMITIES NOT IN EXCESS OF 100 GAL ME EXEMPT PER ARTICLE 64 OF THE 2007 C.F.C. C. QUMTTRES LESS THM 5D GAL. ME EXEMPT FROM G.F.C. ARTICLE 00, AND SHALL NOT REQUIRE PERMIT 0. MYCHMG- OR MDRIONS TO BACWUP BATTERIES MUST COMPLY WITH -1 C.F.C. ARTICLE IN, AND SHALL NOT CONTAIN ELECTROLYTE OUMTITIES IN EXCESS OF 50 REQUIRED NFPA SIGNAGE nSprint SITE ID #: PH90XC839 FCC ASR #: N/A Emergency: (866) 400-6040 For Leasing Information: www.sprintsitesusa.com SITE SIGNAGE WARNING THIS FACILITY CONTAINS CORROSIVE LIQUID TOXIC LIQUID iS 1 WATER REACTIVE LIQUI[ 1 HAZARDOUS MATERIALS STORAGE zi AREA I HAZARDOUS MATERIALS SIGNAGE I' 131 ACAUTION • 0,P) Beyond this paint: Radio Ir quancy flelda beyond Radio "..noy field. at this this point may exceed the FCC site may exceed FCC rules for general public exposure IimiL human ums exposure. FAry9ouar salary, ahoy ell lwatad sigm entl tuba o*^anaatlggr—d sAa q.,d0nea 'shoes lerwaMmy In redo rmnlvO egwncy ,r.qw ygrvimnmma. m.roa RF SIGNAGE AWARNING t Beyond this point: Radio frequency Odds at Bhia site exceed the FCC odes for human expos Fsge`tn —Y alw el�a saes emronmanN mWd i9isua In vawuselnji Sprint PINNACLE <",Ur75U2:1'INCu, IN<t � haNMNSTaEET e,4� LSE Incorporated Shuclurd Engineers ears REV DATE DESCRIPTION BY Ianw+a PH90XC839 �Y4ue�.4zu R1M [DUNIY SIGNAGE S'N-1 E6cw I N Ac ION su 11.11HRIEFTECTI—Emaenin. "ADETxv, aRceR wspwvu EO1.6usnEO TI aRDOR'�]^, RE1141—INIONA BEmc NORD TODUARLr THEEM, s DErERNw— DEFECTINTRLE EAROH DF PUBLID RECDRDSTO srE .. NEER EER—E-I-LND so I— FOR THIS B-1- FOLLONs - - gANTaaecrAaA THE mT� yRED..... G"r�resrv0rcN�HEox�rtRrES.[nPTHE POn. —. RATION.D.I—ForLINE OF .T EREOx ll­ DOES NOT 11—TM"LIBIBEI TRELvTPaECTwsgF x viT.eL4�MqD DF THE LW E aHEtuOcAuxE BEING PAuLE=1 FEET RE.ovnL I.L 1px ut aR nErugcFR.wtxrrs eR voxs6lury of Sao LOT t. ranPaxT ON nLwE eEwc PuwtEL wrx suDxartH uxE Vmx.rs. SCHEDULE BEXCEPTONS x$TH s.A)FETNEINO ET TO THE TRUE Pair OF BECIxxlrvc. HBO Braa $ECOxos EAsi �/ srr.q"cR UNEsps sEr FogTH tr OF orwn PREFEgEr�iCEUUNN�T�wrDimoR�oR firRkT¢E�EAb-EEE i us xDr.. wExANrs.-NOTI I-RE11 S CLDR—NITED WEST COOL DRIVE coaTEo� OAµPwnEr c ouEo HQE.a.Ni.DinEATIMI � IUNFI nExLIx, _ +—is —ss _u — —is ss—a---ex—ss—-a--r-:� — mO—" J\>• ON O vwxEierulrres nnaoEnL or Enxeom u o<.H rnmox, T 0 I=T NDaNDT=-.PADIIIO RE D6 1 _wor I—S. RESTRICT INS OR OTHER FIC111-1. INS SUR sNOTcANNOr cURAxTEETHAT xoxLOTTIILE ENPRNEGDO ER_'_TNrAFFECTTHEU.,ECTLEED s c I ._1ION I IPyunL Tr FAs LESSEE ACCESSATIIUTY EASEMENT LEGAL DESCRIPTION I 1 A6CE6 EMENi Eo llp `eoox"iTOFN vS ABD I ++i� LEGEND ON EACH mEOFTHEFOuaMNG DEscgIeEDCENTERLwE nxO6B6 FEET I : 22514170C UNIT oRDI OF HN , coUNTv w, 1 L APN I APN: 22514170A III 1=E.UNIIC. �0 NHL MToH D. ¢EALLINEof$aaFOTEON SED NN NO _. Ia • ovH eU FEET THEN -SOUTH ao-iz Lr se FEETTOAs cnvNluuoxaLE rHEPO NTOFTERx Nvs,^. A NAILS 6 'ET LESSEE LEASE AREA LEGAL DESCRIPTION EIS DEwnLE M E��l'MN$FORNEH cANT R—RD$ IF RNA COUNTY. Al —NA. —DIED AS FOLLOWS REOF z I: .ENTER HExDE� aNDTHE NDRTNLN DEPARTxD$aDNaRrHLINE� TH H 6oINT.I.—NIN..EET _ qRIII ELEl' IxE PO NroF BEC NN NO N C I EL UNE THENCExoxTH eS•snsEAsr lsss m I b riw FFEiriw NcE NORRTH snc EART ics FEErro.HE POINT OFBEGINNINO. 1� I °, a TH EAST. LESSEE UTILITY EASEMENT LEGAL DESCRIPTION — LINE W I / IEI suILDIxG + ss—sa—az— $ANRAgr$E BLDIE PIOB oN EA PAIOFTHEFEOF.RE MDSOFFllll EDCFNT1R 11DNA LTIiNIEWFEET I v LI IEEIIIIIPI LE—F I L Ipq�ssEE I. II— THENDE SO 41.OVM ea snfi WE TO THE Pair OF BEO Nx ET.THENDE B IAIfl CATS FLOOD ZONE DESIGNATION xu $ED cwER I e.o ■ ERDENDYAR I. BE ENExr ADFLOO 21 86:6"WEST ii+ D—NNBNPAGE—oP OFHCIU REcOrsOnuso o[wcn cnrDro nT or � EKI EBB cnq�x RRN NAP xo.owtscf6eoL DAr[o aulalr FL—1 reLNixus I gNIxED TO BE artSIDETHE Ix AxD osA ANNUAL cwsxOE Y I —PUNK. LINE TABLEREARDI. Lz .a sm Bn 6B� IeiovERNAxe APN: 225141708 s/ I Q e � 10° 4 LI _1' y4 MAGNETIC IF+s PaNER ROLE�F ESMT. Esrni. O NORTH DECLINATION cEl.s POnER POLE AL LEY ti qPN:22 -5141710 ., GRAPHIC SCALE xD p to xo Ao 1. FND BCHH I R Fee ) L usch - 20 sL WEST MAGEE ROAD 5 verizon-1 126 W. GEMINI DR. TEMPE, AZ 85283 PINNACLE CO. ISOLTiNG,2NC_ FIELD BY: DRANMBY: s LkECMED BY: REVISIONS 4 0&25�18 REVISION 9 DGt]l1R ADD BUILDING HEIGHTS 2 �O5l2]11] FINAL-- 1 OG2111] PRELIMINARY 11 ,..tAEB..PTI.. RI_F-- CONSULTING aPsas an/sI/sI Y. PROJECT No. 10008394 SITE NAME: NC PEPPERSAUCE SITE ADDRESS: 333 W COOL DR. ORO VALLEY, AZ 85704 [SHEETTIME: TOPOGRAPHIC SURVEY SHEETNO. RENGION: LS-1 W. COOL DR EXISTING PROPERTY LINE EXISTING PROPERTY UNE EXISTING PROPERTY LINE EXISTING 2CI TRAFFIC flATEp TF1CVAULT I EXIST NG—d'WIDESUNSTATE ® I®I I BE MUMDSYSPRINT ENT TO 1 T I BE UESS/UTUWEA E ' I EXISTING Pi RKIN SUN STATE I I ACC66/UTUTY EASEMENT —J J I T - I � 1 PAIR INO I EXISTING CONCflETE APN: 225141]OA I WAU(WAV ZONING: C2 I I I= I I I II " to F F I a APN: 225-19a560 '.,0 I I i ;t ZONING C-2 - F EXISTING EXISTING TREE (T]P.) BUILDING I F APN: 225-141]OC ' EXISTING PROPERTY LINE _— I EXISTING SUN STATE 25'-Sx2tl5' LEASE AREA EXISTING SV-0-TALL SUN STATE MONO -ELM I inn I M NEW SPRINT I EQUIPMENT AREA I y - pPN: 22519-1]OS 10'-P SUN STATE EXISTING UNDERGROUND ELECTRICAL UNE EXISTING COVERED EXISTING IV P NOE SUN I PARKING P STATE UMUTY EASEMENT K EXISTING 1G-0' fX ELECTRICAL EASEMENT I _EXISTING PROPERTY LINE _ — _ _ _ _ _ IXISTI GPpOPE UNE EXISTING PROPERTY UNE x `-- x — z — � — z BALL SITE PLAN i'p-rint� PINNACLE ,17 ISE Incorporated Shucturd Eneimars GATE I DESCRIPTION I BY W�122�® o�ms�® o�Mmmmo ��Kmmm;m® PH90XC839 4 OVERALL SITE PLAN A-1 1 I EXISTING tZa'VADESUN STATE ACCESS/UTILITY EASEMENT ACCESS/ EASEMENT WSTgIO pd -5— p NrvnNEo wr+ Sprint' IXGTSiG T WKIE ACCESS GATE I I Q d p I I d d a TING OTHERS ACCESS GATE .�. T — —T p \ \ r T IT —r 1T —T —r —T —T 1 �t iss AeEwN5u1INGFIPM65liEAcaASIaaN r- ---1---- PINNACLE IXISTING AQUA SUN STATE WSrING OTHER CARRIFA EOWPMENT EXISTNO IXISTING UATIONS UNE BUILDING COMMUNICATIONS LINE , xGNHA ED ON DISCONNECT BANK MOUNTED ON I EXISTING CMU WALL O �jp e EXISTING TH EE S IOCarjJ SwcMd EMI—.I—.insen IXISG-------------- I UNDERGROUNDELECTRICAL UN E I (fYP.) yI 3 O�OO DO I IXISTING ¢AkaS TRAFFIC Ia RATED TELCO VAULT -rNu I REV DATE DESCRIPTION BY I,. IXISTING to-PVADE I SUN STATE UTILITY EASEMENT I IXISTING OTHER CARRIER EQUIPMENT PAD CIO OO 00 00 walte m�xwle to+q+e I OO O \ , 1 I ro 4 00 IWSTING EXISTING ' TALL W CMU WALL I Sa'A'TALLMONO-EIA/ j I � r IXISTING GRAVEL AREA I I UTILITY EASEMENT � I PH90XC839 po .� / I IXISTING COVERED / IXSTNG CHAIN slfsr nnrM LINK FENCE�ITW.) PARKING zYa-p I " EXISTINGENLARGED SITE PLAN I EGEING CUIB I EDGE. A-2 EXISTING ENLARGED SITE PLAN 1 RFPrOff / J/DRB/B0A ACCESS GATE EXISTING OTHERS ACCESS GATE r I EXISTING UNDERGROUND ELECTRICAL LINE NEWSPRINT RI DISCONNECT N CT METER/ DISCONNECT TO BE INSTALLED $T 11 EXISTING MU BUN STATE BUNK (BY BANK (BY UTILITY) I EXISTING 24'xNB' —t'- TRAFFIC RATED T, VAULT EXISTING I" MADE SUN STATE UTILITY EASEMENT I I I EXISTING GRAVEL AREA—.� I I I EXISTING S-N' - TALL CMU WALL 1— _ IXIBTING tY P WIDE BUN STATE ACCESBYUIRTTYEASEMENT ACCESS/IJRLiT'/EASEMENT I Q IXIBTING BUIUNNG d DUSTING J d O d a I i �soEWAuc d 0 t I T T T -T T —T� —TEXISTING -T CHAIUNK VC=11- FENCE ISTING UNDERGROUND COMMUNICATIONS LINE Op000 O� O 00 UISTING OTHER CARRIER EOUIPMENTPAD EXISTING SP-a TALL MONO ELM NEW SPRINT UPS ANTENNA R (N) NEW NYBRIFLEX CABLES - AND (1) NEW FIBER CABLE, ROUTED ALONG NEW ICE BRIDGE AND INSIDE EXISTING MONO ELM NEW SPRINT ICE BRIDGE NEW —INT SCAB ABSEMBLYON NEW A-� CONCRETE PAD HEW SPRINTS-P % Y-Y' CONCRETE PAD I NEW SPRINT—PPC 1- ,91I ANDTELCOCASINET X` NOUN DON II EXISTNG CMU W LL NEW SPRINT � CIENNA INSIDE �I NEW TELCO I I CABINET 1-7 NI I EXISTING CURB I EXISTING C..ED� EDGE. RYP.) I PARKING I N I NEW ENLARGED SITE PLAN O f♦ R. L MaIsTwa E %---N X E%IBTING C WUN LINK FENCE -------------- 1 I I •� I ' T 1 CABINET LAYOUT 11 SNOT USED Sprint x.E � Nlnem FF,-TT.LNTrE AAco��N+�TTwNE t ISE Irl W WEN ted ShucNEnNineMlo REV DATE DESCRIPTION BY 04` le oe^atlle ev wle B PH90XC839 NEW ENLARGED SITE PLAN A-3 h TOPOFFXISTINGGHTNING ROQ V ELEVATION 54'-0' A.G.L h TOP OF EXISTING MO NO -ELM ELEVATION Stl-0' 0.O.L CENTER NL EX.LS NG OTHERCARRIER ANTENNAS Y EIEVATbN 48'V A.G.L EXISTING 5tl-P TALL MONO -ELM EXISTING BUILDING — EXISTING OTHER CARRIER EOUIPMENT EXISTING 4GGA SUN STATE METERI DISCONNECT BANK MOUNTED ON EXISTING CMU WALL EXISTING V. — TALL CMU WALL ISTING SOUTH ELEVATION EXISTING 4'-0' LIGHTNING ROD ELEVATION 55-0• AG.L h TOP OF EXISTING LIGHTNING ROD 4 ELEVATION 54'-O'0.GL EXISTING OTHER h TOp OF EXISTING MONO -ELM CARRIER ANTENNA ELEVATION fitl-0' AG.L ARRAY CENTERLINE OF E%J_STEN CMRIER ANTENNAS ELEVATION 48'-0• AGL (3)NEWeGOI1SOOMHAANTENNA 3 4 MOUNTED TO NEW PIPE MOUNT A.6 Ad (D) NEW 2.5 GHA MIMO ANTENNA g 5 MOUNTED TO NEW PIPE MOUNT CENTER NLJ EOF NEW SPRINTANTENN0.5 _ ELEVATION GV-02VA'IIG.L �✓ EXISTING TREE 3 2 (3)NEWSPRINTISGGMH%RRH MAST A-5 AB MOUNTED TO NEW PIPE MOUNT Of 1 (6)NEWSPRINTSOOMH%RRH G 1 MOUNTED TO NEW PIPE MOUNT AS A6 ON NEW ANTENNA MOUNT ' (G) NEW HYBRIFLIX CABLES AND (1) NEW CABLE, - NEW ROUTED ALONGG NEW ICE BRIDGE AND INSIDE EXISTING -.. MONO -ELM EXISTING5tl-PTALLMONG-ELM— ^'H� EXISTING BUILDING —� NEW SPRINTSNE r Ae I LIGHT MOUNTED TO EXISTING CMU WALL NEW SPRINT GPS ANTENNA NEWSPRINTICE BRIDGES EXISTING OTHER (. CARRIER EQUIPMENT _ _ - EXISTING B-v TALL CMU WALL EXISTINO —A SUN STATE METERI -- DISCONNECT BANK MOUNTED ON EXISTING CMU WALL NEW SPRINT NOA PPG AND TELCO CABINET MOUNTED ON EXISTING CMU WALL j//� j/� j EXBTI G �\ LINK FENCE NEW SPRINT CIENNA INSIDE NEW TELCO CABINET \ NEW SPRINT BCAB ASSEMBLY EXISTING OTHER CARRIER EQUIPMENT ON NEW CONCRETE PAD A-6 NEW SPRINT ECAB AT�� ON NEW CONCRETENEWSPRINTTE SPRINT6E PAEW AD 1 NEW SOUTH ELEVATION NOTE: STRUCTURAL ANALYSIS IS BEING PERFORMED BY AEa>nEO BOA OTHERS. INSTALLATION SHALL NOT START UNTIL THE CONTRACTOR HAS DTHOROD/OR D THE STRUCTURAL ANALYSIS AND/OR STRUCTURAL AN Sprint® STRUCTURAL EVALUATION OR ASSESSMENTS PERTAINING STRUCTURAL TOALL UPGRADES DNDATIO AND REPORINTHESE SHALL FOLLOW ALL REPORT RECOMMENDATIONS. ire i%BLS 155 w, PbE cousuLmcHeN ssire Acausma+ �—EXISTING LIGHTNING ROD PINNACLE l GQNb'LlUl1 ,?Nl— �a+w..nais�rw^w.rwW..+ YY��yy 1sY1 EXISTING OTHER I NAIINNST I CARRIER GI ANTENNA ARRAY O g ISE Incorporated NEWSPRINT VFA­D 6tructwd Erpireers AA MAST ANTENNA NTENN • EXISTING � THEE m�mamsmm UNKFENCE EXISTING OTHER CARRIER EQUIPMENT 12 1 AFD?HUOVE Y: TCMe R3/BOA GOIr PH90XC839 GOL GR ORO RNA — ELEVATIONS A-4.e0 UNKFENCE EXISTING OTHER CARRIER EQUIPMENT 12 1 AFD?HUOVE Y: TCMe R3/BOA GOIr PH90XC839 GOL GR ORO RNA — ELEVATIONS A-4.e0 ELEVATION 55'-0• A.G.L ELEVATON 54'-0' A.G L ELEVATON SD-0' A.G.L iN. cENT€RTON UN.E .EF)(I$T Tf_1EgCARRIEB-ANTENIM— Y ELEVA �� �"� F f `{ c7q ♦ e'er' 'Sa •� zy4 N Ya �' EXISTING a'-0' — TALL CMU WALL EXISTING EAST ELEVATION EXISTING ELEVATION 55'-0' AG,L UGHTNING RODME OF E=ING ELEVATIO1454'-O-A.01 EXISTING OTHER ELEVgPON SG-O'AG.L CARRIER 1LELEVATICENV RU IXIS NT ERCARM0AANIENNAS ANTENNA YY ON SB'o'A.G.L ARRAY (a) NEW 2A GHz MIMO ANTENNA A-5 A9 MOUNTED TO NEW PIPE MOUNT Ne00It MHz ANTENNA MOEW NE IPE MOUNT UNTEO TO NEW P �NTERLI IL 1 NEW S�JtjLANTENNAS _ Y ELEVAT ON 3B'-W A.G.L EX$I TING 59-W TALL (3)NEWSPRINT-161Ha RRHN MONO -ELM MOUNTED TO NEW PIPE MOUNT (B) HEW SPRINT 800 MHz RRH — MOUNTED TO NEW PIPE MOUNT ON NEW ANTENNA MOUNT EXISTING TREE (a) NEW HYBRIFLEX CABLES — ANO (I) NEW FIBERCABLE, ROUTED ALONG NEW ICE BRIDGE AND INSIDE EXISTING MONO ELM EXISTING NEWSPRINTGPS T BUILDING ANTENNA NEW SPRINT ICE BRIDGE f—h NEW SPRINT ECAS ASSEMBLY E ON NEW CONCRETE PAD NEW SPRINT BCAB ASSEMBLY E ON NEW CONCRETE PAI�D\\— EXISTING OTHER NEW SPRINT SITE CAARRIRRIER \% LIGHT MOUNTED TO \% EQUIPMENT EXISTING CMU WALL NEW SPRINTCIENNA INSIDE NEW TELCO EXISTING 400A SUN CABINET STATE NEW SPRINT —A PPC AND--4 METER/ TELCO CABINET MOUNTED ON DISCONNECT EXISTING CMU WALL BANK EXISTING a -- MOUNTED TALL CMU WALL ON � IXIBTING CMU WALL NEWSPRINTB'0'X t—F� S-Y CONCRETE PAO Q� 11 ANEW EAST ELEV. NOTE: STRUCTURAL ANALYSIS IS BEING PERFORMED BY OTHERS. INSTALLATIONSHALLNOT STARTUNTILTHE CONTRACTOR HAS ACQUIRED AND THOROUGHLY i�rint)5 REVIEWED THE ANALYSIS AND/OR ALAMON O U EVALUATION OR PERTAINING S P THESE DRAWINGS ALL UPGRADES SHOWN IN THESE DRAWINGS AND TO ALL FOLLOW SMALL FOLLOW ALL REPORTRECOMMENOAliONS. zE CONsuLnra FlrozARTEBwuamOx EXISTING 4 GHTNING ROD 'pjjL. T A /�Ti T ru�i��'j�/L% t'.ATSdSUi'i'TNia tNT' EXISTING OTHER CARRIER ANTENNA xGnSix ARRAY ME Incorporated NEW --W EO i—. SPRINT S ANTENNA MAST EXISTING O' TALL MONO -ELM EXISTING TREE Ii`�'— !NYYIIpiAiilrlJs ��� �'- P i Ili �Ilii �'['�illll iY� rim IIRIY V �1� IiIB MtI�:'r'=i�a�®Y ii�il�ilW�II �11 �wwa�iii�nYi i��eirBE,Bmn1�u m own mm�i�Ml�iYiil�i �IHJi�II ��M� iiNliiiY�G■P�IMIIB���1� Iir■ii'i\miiYYIYiil iY�nsaiYriwnmir—u 19 PH90XC839 NOTES: 1. STRUCTURAL ANALYSIS IS BEING PERFORMED BY OTHERS. INSTALLATION SMALL NOT START UNTIL THE CONTRACTOR HAS ACQUIRED AND THOROUGHLY REWEWED THE STRUCTURAL ANALYSIS AND/OR STRUCTURAL EVALUATION OR ASSESSMENTS PERTAINING TO ALL UPGRADES SHOWN IN THESE DRAWINGS AND SHALL FOLLOW ALL REPORT RECOMMENDATIONS. 2 A MUTHS SHOWN ARE FOR REFERENCE ONLY. REFER TO THE MOST CURRENT RFDS FOR ANTENNA A ALMUTH SPECIFICATIONS (3) NEW SPRINT MIMO ANTENNA TO NEW PIPE M( (6) NEW SPRINT RRH MOUNTED PIPE MOUNT ON ANTENNA MOUN A2lo Pa16 MUTH 26S° (3) NEWSPRINT RRH MAST MOUI NEW PIPE NOUN NEW ANTENNA & RRU PLAN NEW SPRINTYPAt 9..SD ANTENNAMAST OS.4 fU�ri� p) NEW SPRINT 696/19A9 MHs ANTENNA MOUNTED TO NEW PIPE MOUNT NEW PIPE MOUNT — TOD, SLONG NEW COMMSCOPE — MC.RM16 3(QTY.2) EXISTING MONO ELI NOTE: NARING A HYBRID TNLS NOT SHOWN FOR CLARIRItt. (2) Y.-O -LT (TYR PER CONNECTION) NEW RRU ON PIPE MOUNT flE1—.... (tYP.I OR PER PLAN Sprint! NEWS LONG MOUNT PIPE tte PNOQdNBu t55 ANTENNAIWHEN 6co9stArxa 2WV asrt6 rcwsmory APPLICABLE-SEESITEPLAMI MNACLE C.:IINSUl.71N1.:, ii+iG. NEW SPRINT I t T RRH MAST MOUNTED TO NEWPIPE MOUNT21 ... OD • P LONG w/(2) U�BOLTS(TYP. OF 2) ME I�corporetetl Sbu dErgitwers NEW SPRINT VFA—D ANTENNA MAST I TYPICAL SECTOR DETAIL I �-- 12 1 NEW MAST MOUNT RRH — BRACNET (INCLUDED WITH RRH) NEW M MHz RRH (TYP.OF2) DETAIL SHOWN FOR ILLUSTRATNE PURPOSES ONLY. SEE PLAN FOR ANTENNA AND RRH MODEL NUMBERS NEW ANTENNAPER PLAN MOUNTED TO NEW PIPE MOUNT2e O0x BLONG (TYP.) NEWANTENNA MOUNTING BRACIO_T SUPPUEDW/ANTENNA (TYP.) NEW SPRINT 1990 MH2 RRH MAST MOUNTED TO NEW PIPE MOUNT 2: 00 x f LONG W1(2) a U-BOLTS (TYP. OF 2) NEW VFAIOSD ANTENNAMAST 4 6�V NEWANTENNAL00.A MOUNTING �J LI PIPE YP.) S E PLAN FOR (rm.l SEE PLAN FOP Ott. RRH MOUNTED BEHIND ANTENNA HRH MOUNTED TO ANTENNA MAST a 1 ANTENNA AND RRH MOUNTING DETAILS T r III®®® Iirx PH90XC839 c ar 0— w NEW ANTENNA & RRU PLAN A-5 NEWHYBRIDCABIE BR OUTUNN NOTE: SEE 2-NS FOR Ec.aEoroA 00 (ATTACH TO NEW ANTENNA MAST) EOUIPMEM DETAINS TOP NEW FRONT VIEW BIDE NEW e49 Sprint° NEW HYBRID CABLE D 12.Y PER SECTOR) I-yl IHTOPN�EW yI IH— —yI �� pie w.sunE viss 1 xc ax Tll�l l\L1CLTN.CC. ■ ■ � N.NNrvm3TR66Tnm to x cIt9DR, AZ MOUNTING DETAIL ISOMETRIC VIEW 0 NOTCH rvciHEEs FlLTER NMPER M MH3 RRH ISE Incorporate Sbuclurd En9ineArA FRONT VIEW SIDE NEW e EXTERNAL PnoD4X. /�� NOTCH FILTER 'ALCATEL-LUCENT —MHz 2X30W RRH 'ACATELLUCENT RRH -15I— NEW rWTENNA CABLE gRH WEIGHT: 5S LBS. w/FlLTER 84 U3S RRH WEIGHT: x5B.5 LBS. ,NMPERS RRH DIMENSIONS: IV H x 13- W x 0 6 D WMl-TER 1P H x iS W X 12.2' D RRH DIMENSIONS: 25-11.1Y10.69• FREQUENCY RANGE: S62 MHz - 869 MHz FPEWENCY RANGE:1930 MHz-1995 MHz EXISTING MONOPOLE REV PATE DESCRIPTION BY 800 MHz RRH DETAILS 1 1900 MHz RRH DETAILS M:� 2 ANTENNA CABLING DETAIL 3 � 19619.]Y NEW GPS ANTENNA eyMte MODEL GPS-0BW261,11114 A x3.YD) NEWP.i64• IPE2 CABLE N' m CE TO PIPE O.DLONG CONNECTOR RNDY TAM PE b GAR NEW PIPE MOUNT NEW BNEPROI UNIVERSAL TOP NEW TOP NEW NEW HUBBELL ( OUNT (PARTM B1BN) f-IW 112OV) aL.wS .f °5 EQUIVALENT 1LENT OR NEWBITEPROI a ]2' EOVWNENi UNIVERSAL MOUNT (PITYT# GPSP) 2 HUM1N A'Af NEW UGHT SWITCH S 1 �"O PIPE r.r.e.xa �'O CONDUR MOUNTING POST ai 1.000AXIALCABLE (UP TO 4]'D) PIPE CLAMP MOUNTED TO PIPE MOUIITED TO ICE BRIDGE p OR HFRMIE POST NOTES 1 THE GPS ANTENNA MOUNT IS DESIGNED TO FASTEN TO A STANDARD IPH9OXC839 D"ETER, SCHEDULE 49, GALVANIZED STEEL PIPE. THE PIPE MUST NOT BE THREADEDATTHEANTENNAMOUNTEND. THEMPESHALLBECUTTOTHE FRONT VIEW SIDEWEW EXISTINGCMUWALL REQUIRED IENGTH(MINIMUM OF 18 INCHES. 1— WMOUNTEDTOPROPOSED MMSS-88111 USING AHAND OR ROTARY PIPE CUTTER TO ASSURE A SMOOTH FRONT NEW SIDE NEW ANDPERPENDICULARCUT.AHACRSAWSHNINOTBEUSFD_ THECUTRPE END SHALL BE DEBURRL-D. NOgA'2.6G AAA-AAHC(64TBMi) 2. IT IS CRITICAL THAT THE GPS ANTENNA IS MOUNTED SUCH THAT IT IS WITHIN snu RFBAPXVBBLL15X 45C-120 ANTENNAWEIGHT:!—B L85. ROUTED PER ELECTRICAL DESIQN 2DEGREESOFVERRCALANDTHEBASEOFTHEANTENNAISWITHIN2 EQUIPMENT DETAILS ANTENNA WEIGHT: 75 LISS ANTENNA DIMENSIONS: 26.63Y19.]YX9.3• DEGREES OF LEVEL. BRACIETWEIGHT:].5 LB5 FREQUENCYRANGE:2496MHz-2699MHx 3. SWEEP TEST PER TS-0290. FREQUENCY RANGE: 16952— MHZ (NOTE: RRH 6 INClU51VE WITH THIS ANTENNA) 4. ATTACH GPB MOUNTING PIPE TO H-FRAME PIPE OR ICE BRIDGE STRUCTURE USING (4) &nmxi5mm SS BOLTS AND (4) 1' PIPE STRAPS. GPS TO BE MOUNTED A MINIMUM OF 2'-P ABOVE STRUCTURE. 5. MUST BE INSTN I PD WITH A NN.OF 1D SEPARATION FROM AN EXISTING GPS n —� ANTENNA 1900 MHz/Alm TENNA _ 4 2.5 MIMO ANT. 5 SITE LIGHTING DETAIL 6 GPS ANTENNA 7 NEW ANTENNA SCHEDULE SECTOR POSITION ANTENNA MANUFACNPEP ANTENNA MODEL ANTENNA SIZE ANTENNA F � �NCY ANTENNA Wµ�, ALMUTH PAD CENTER ELECTgICAL OOKTITLT RANGE 500 eAHD 1800 BANG 2500 eaND SECTOPI 1 R. APXVBBLLIS%g34:420 8aTx1B.8'x3.S BDD/1800 1 Y(Y 9B-0' S° 2" N/A SECTORI 1 NOgA MAA-PANG (86TBW) 25.b9'v18.]2Y9,6' 23U0 1 2D' NA NA i' SECTOR2 1 RFS APXVBBLLIS%0.4C42D ee.Tx1B.B'xS.S 800/IBDO 1 110• 9Bd 5° Y WA SECTOR2 I NONIA MAA-MHC (54TBNi) 25.83'x1 B.]Yxe.S' 2500 1 11P 99'-O NA NA i° SECTOR] 1 PFS APXVBBLLi6%49C420 eb.7'x1B.e'>m.5' 800/1800 1 286" b" 2° N/A SECTORS 9 NOgA MAAAAMC (B4TBW1 25.bTx18.7'L10.6' Y600 1 285° ffi'-0' NA NA 1° NEW RRH SCHEDULE RPH RwH RNI SECTOR POSRION RRH SIZE PRH WEIGHT ILBSI FREO.RANO Sprint (®PINNACLE ISE Incorporated SWcWrd Ergimers REV DATE DESCRIPRON BY 4AAe ANTENNA AND RRH SCHEDULES I NOT USED 2 GREEN MAq R ❑ m m m ❑ m GREEN &UkR FR BLUE MM1a=R �1 CII BLUE MMKFA ❑ CI ne um em RED MARKER GREEN MARKER El m BLUEMANKER YELLOW MP11KEfl REO MARKER FRRH/JUMPER ORANGE MARKEA YELLOW MMKER ❑ m Cil PURPLE MMNEP ORANGE MARI�R PURPLE MARKER m1BA0(1.2S METERS) PH90XC839 S) 98.0012.44 METERS)IP-LC CONN. ADAPTER 98.0012.94 M) MIN. (4)POWER PNPSATED caDLDR �a�DCUSTOMER ORDER SIDE WEATHERPROOF ORDERLENGTH REF.BREAKOUT BOOT LENGTH REF. 'U BULK HVBRIFLE%CABLE /��• EQUIPMENT DETAILS BULKHYBRIFLEx CABLE BOTTOM BBU SIDE PRODUCT LABEL PRODUCT LABEL A-7 HYBRIFLEX DETAILS 3 RAH PM CASINETOIMENSIONS MANUFACTURER PURCELL ELTEK HEIGHT mx Seo VMDTH 2A, 240 DEPTH 12.2• 1D0 WEIGHT (EMPTY) ]S bs N lb. WEIGHT(LOADED) N/A I N/A TELCO CABINET DIMENSIONS MANUFACTURER PURCELL ELTEK HEIGHT WIDTH 24.1• 29.0 DEPTH 22.Y V.Q WEIGHT (EMPTY) 58 ba SO bs WEIGHT (WADED) DEPENDENTON INSTALLED EQUIPMENT DEPENDENTON INSTALLED EQUIPMENT PPC & TELCO DETAIL SEE PLAN •I . a4 AJ @ 12 E-H WAY 'vr CRUSHED TO /yam/�/��/��/��/��/� CRUSHED STONE \\j�\%\\%�\%\\%\\j OR GRAVEL CONCRETE PAD DETAILS PLAN NEW BATTERYCABINET (BCAB) ON MOUNT] TUBES RAN/EQUIPMENT 4 �FIBERMPARTMENT CABINET(ECASI ON A -A (ATTACHES TO MOUNTING TUBES ADJACENT CABINETS - FRONTAEW UNSUPPORTED UNDERNEATH)(GMK) M 1 EQUIPMENT CABINET DETAILS O O O O II II II 0 0 BOTTOM VIEW (ANCHOR PLACEMENT) (ATTACHES TO ADJACENTCABINETS- .EFRMEW UNSUPPORTED UNDERNEATH)(GMIO „ Wt•u�n not MOUNTINGTUSESFOR EQUIPMENTCASINET IZ HILTIIOITZSS NOTE: 1. USE GALVANIZED HILTI WEDGE EXPMLAION ANCHORS OR ANCHOR WITH A APPROVED EQUAL. FOR EOUIPMENTANCHORAGE. MINIMUM EMBEDMENT OF /• LOCK WASHER 2. FOR SIZE AND WCATKTN OF ANCHORS AND OTHER REQUIREMENTS, SEE so WASHER EOUIPMENT VENDOR DRAWINGS. CONCRETE PAD 3. POSTINSTAUL ANCHORS • •A n ARENON-S UCTUHAI.FOR F AING ONLY. NO SPECIAL INSPECTION REQUIRED. u n d • P � 0 T-DOWN DETAILS ECAS CABINET OIMEHSIGNS (NOTE: PURCELL EQUIPMENT 6HOWM MANUFACTURER I PURCELL HEIGHT 72.P WIDTH 9R.Y DEPTH 0.1 WEIGHFFXMPTY) —be WEIGHT(FUI- 1B28 bs LOADED) BCAB CABINET DIMENSIONS (NOTE: PURCELL EQUIPMENT SNOWM MANUFACTURER PURCELL HEIGHT 720 WIDTH 14.T• DEPTH 2S.Y WEIGHT(EMFTY) —1. WEIGRTFULLY t256 bs WADED) GMK CABINET DIMEN6IONS (NOTE: PURCELL EQUIPMENT SHOWN) MANUFACTURER PURCELL HEIGHT 7— MOTH 1D.0 DEPTH 2S.Y WEIGHT(EMPTY) loft WEI('HT(FULLY N/A LOADED) RAN/EOUIPMENT CABINET (ECAS) ON MOUNTINGTUBES (4) NEW 2-)I OD.6-O LONG PIPE MOUNTS (TYP. PER SECTOR FRPME) ISOMETRIC VIEW PLAN VIEW SHE PRO t VFAIOSO ANTENNA MAST DETAILS Sprint tle TUN)&w, in [ cacuL� �I s slreAcaanwx QINNACLE LSE In ad 6hucMW ENI ErQinaem M J ®IIII��II� om�® PH90XC839 A7ITLE • BETTAR NOTE TO FIE mcr.�co.on 1. ALL CONDWINCLUDING FLEXIBLE METKlICUMIDnGHTMUST BE Sprint SUPPORTED PER NEC. 2. MAXIMUM LENGTH FOR FLEXIBLE METALLIC LIQUID TIGKVIV. INSTALLANDREWj INSTALL 9. FOR NEW STUBS, ROUTE RGS THROUGH SLAB PER SPECIFICATIONS. (O SIM PR 4SU,BOL� (OR 6nE PRO 4Ba � 4. ATPLATFORMSCONDURS MAVENTERTHEBOTTOM OFCABINETS WHEN APPROPRIATE ENCLOSE CONDUIT 6 SUPPORTED PER NEC. INSTALL L4' x 4' x Ew'sutipw��Tww���asrt♦♦♦E �caumory IV-0' 1Vd' INSTALL t x S-0' PINNACLE am I" THREADED ROD ��m.i�fNuCil:l'1N(:, 1hdG INSTALL F A P WSOLTS S�'O.D. a j' O.D. GALV. PIPE 1tes N.w�RR�AN4TRE 1 n GALV. PIPE a A R ISElncorporotod FINISH SLOPE Struclurd Enpimera TO DRAIN INSTALL L4' X4'X}' INSTALLED WAWOL40E RID (O GRATED PR WAVEGNDE BRIDGE PLAN WFIV (OR SIIC PRO 48246214) � b DRILLED PIER FOUNDATION WITH (4) #5 BARS a xS TIES Q 12' SIDE NEW ICE BRIDGE DETAIL 1 NOT USED 2 PH90XC839 Ao vaaEv. Az EQUIPMENT DETAILS -9 T USED A NO3 FZ FRO •.;E GT fvlFal `AuFfi om�® om�© om�m ELECTRICAL NOTES: 1. ALL ELECTRICAL WpRK SHALL BE DONE IN ACCORDANCE WITH CURRENT NATIONAL ELECTRICAL CODES AND ALL LOCAL AND STATE CODE, LAWS. AND ORDINANCES. PROVIDE ALL COMPONENTS AND HARING SIZES AS REQUIRED TO MEET NEC STANDARDS. 2. CONTRACTOR SHALL COORDINATE VITH LOCAL POWER COMPANY FOR REQUIREMENTS OF POWER SERVICE LINE TO THE METER BASE POWER SERVICE REQUIREMENTS M COMMERCNL AC NOMINAL 12W2W VOLT OR 12W240 VOLT. SINGLE PHASE WITH 2W AMP RATING. S. CONTRACTOR SHALL COORDINATE WITH LOCAL TELEPHONE COMPANY FOR SERVICE LINE REQUIREMENTS TO TERMINATE AT THE PPC CABINET. 4. CONTRACTOR SHALL FURNISH AND INSTALL ELECTRIC METER BASE AR0200A DISCONNECT SWTGH PER SITE PLAN AND DETAIL DRAWINGS. THE METER BASE SHOULD BE LOCATED IN A MANNER WHERE ACCESSIBLE BY THE LOCAL POWER COMPANY. 5. LOCALPOYERCOMPANY SHALL PROVIDE 200 AMP ELECTRIC METER. CONTRACTOR SHALL COORDINATE INSTALLATION OF METER WITH LOCAL POWER COMPANY. S. UNDERGROUND POWER AND TELCO SERVICE LINES SHALL BE ROUTED INA COMMON TRENCH. ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE 40 AND CONDUIT EXPOSED ABOVE GROUND SHALL BE GALVANIZED RIGID STEEL TUBING UNLESS OTHERWISE INDICATED. T. ALL TELCO CONDUIT LINES SHALL BE4' SCH. 40 PVC CONDUIT UNLESS OTHERWSE INDICATED. THE TELCO CONDUIT FROM THE PPC SHALL BE NOUTEDAND TERMINATED AT DESIGNATED TELCO DEMARCATION OR 2-FEET OUTSIDE FENCED AREA, NEAR UTILITY POLE (IN FENCED AREA). OR END CAP OFF AND PROVIDE MARKER STAKE PAINTED BRIGHT ORANGE WITH DESIGNATION FOR TELCO SERVICE. 6. CONDUITS INSTALLED AT POS EQUIPMENT ENDS PRIOR TO THE EQUIPMENT INSTALLATION SHALL BE STUBBED AND CAPPED AT 6' ABOVE GRADE OR PLATFORM. IF SERVICE LINES CAN'T BE INSTALLED IN ITIALLY, PROVIDE NYLON PULL CORD IN CONDUITS. 9. THE SPRINT CABINET, INCLUDING 200 Al P LOAD PANEL AND TELCO PANEL. SHALL BE PROVIDED BY OWNER AND INSTALLED BY THE CONTRACTOR. CONTRACTOR IS TO INSTALL SNEAKER(S) NOT PROVIDED SY MANUFACTURER. SEE PANEL SCHEDULE ON THIS SHEET FOR BREAKER REQUIREMENTS. 10. LOCATION OF ELECTRIC METER AND DISCONNECT SWITCH TO BE PROVIDED BY GENERAL CONTRACTOR. 11. t2 WARE TO BE UTILIZED IN ELECTRIC SERVICE RUNS EXCEEDING IW. 12. CONTRACTOR SHALL INSPECT THE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. ANY QUESTIONS ARISING DURING THE BID PERIOD IN REGARDS TO THE CONTRACTORS FUNCTIONS. THE SCOPE OR WORK OR ANY OTHER ISSUE RELATED TO THIS PROJECT SHALL BE BROUGHT UP DURING THE BID PERIOD WTH THE PROJECT MANAGER FOR CLARIFICATION, NOT AFTER THE CONTRACT HAS BEEN AWARDED. 13. LOCATION OF EQUIPMENT, CONDUIT AND DEVICESSHOWM ON THE DRAWNGS ARE APPROXIMATE AND SHALL BE COORDINATED WTH FIELD CONDITIONS PRIOR TO ROGH-IN. 14. THE CONDUIT RUNS AS SHOWN ON THE PLANS ARE APPROXIMATE. EXACT LOCATION AND ROUTING SHALL BE PER EXISTING FIELD CONDITIONS. 15. PROVIDE PULL BOXES AND JUNCTION BOXES WHERE SHOWN OR REQUIRED BY NEC. 16. ALL CONDUITS SHALL BE MET WTH BENDS IN ACCORDANCE WTH NEC TABLE 046.1 D. NO RIGHT ANGLE DEVICE OTHER THAN STANDARD CONDUIT ELBOWS WTH 12 MINIMUM INSIDE SWEEPS FOR ALL CONDUITS 2' OR LARGER. 17. ALL CONDUIT TERMINATIONS SHALL BE PROVIDED WTH PLASTIC THROAT INSULATING GROUNDING BUSHINGS. IS. ALL WRE SHALL BE 'TYPE THWN-SOLID. ANNEALED COPPER UP TOSIZEVIO AM (15 AND URGER SHALL BE CONCENTRIC STRANDED) 75 DEGREE C. (167 DEGREES F), BB' CONDUCTIVITY, MINIMUM 512. 19 . LLWRESSHALLBE TAGGEDATALLPULLBOXES.J-BOXES,EQUIPMENT BOXES AND CABINETS WTH APPROVED PLASTIC TAGS, ACTION CRAFT. BRADY OR APPROVED EQUAL 20, ALLNEWMATERIA SHALLHAVEAU.LLABEL 21. CONDUIT ROUGH4H SHALL COORDINATED WTH THE MECHANICAL EQUIPMENT TO AVOID LOCATION TO CONFLICTS. VERIFY WTH MECHANICAL CONTRACTOR AND COMPLY AS REQUIRED. 22. ALL PANEL DIRECTORIES SHALL BE TYPE WRITTEN NOT HAND WRITTEN. 2O. INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS PER THE SPECIFICATIONS AND NEC. THE EQUIPMENT GROUNDING CONDUCTORS SHALL BE BONDED AT ALL JUNCTION BOXES, PULL BOXES AND ALL DISCONNECT SWATCHES. STARTERS AND EQUIPMENT CABINETS. 24. THE CONTRACTOR SHALL PREPAREAS-SUILTORAWNGS. DOCUMENTANY AND ALL WRING AND EQUIPMENT CONDITIONS AND CHANGES WALE COMPLETING THIS CONTRACT. SUBMITAT SUBSTANTIAL COMPLETION. 2S. ALLDISCONNECT SWTCHES AND OTHER CONTROLLING DEVICES SHALL BE PROVIDED WTH ENGRAVED PHENOLIC NAME PLATES INDICATING EQUIPMENT CONTROLLED, BRANCH CIRCUITS INSTALLED ON AND PANEL FIELD LOCATIONS FED FROM (NO EXCEPTIONS). PROVIDE SAMPLE FOR CONSTRUCTION MANAGER'S APPROVAL 26. ALL ELECTRICAL DEVICES AND INSTALLATION OF THE DEVICES SHALL COMPLY WITH (ADA) AMERICANS WTH DISABILITIES ACT AS ADOPTED BY THE APPLICABLE STATE. 27. ELECTRICALCHARACTERISTICSOFALLEQUIPMENT(NEWARDEXISTINGI SHALL BE FIELD VERIFIED WTH THE OWNERS REPRESENTATIVE AND EQUIPMENT SUPPLIER PRIOR TO ROGH4N OF CONDUIT AND WRE. ALL EQUIPMENT SHALL BE PROPERLY CONNECTED ACCORDING TO THE NAME PLATE DATE FURNISHED ON THE EQUIPMENT (THE DESIGN OF THESE PLANS ARE 00.4E UPON BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN AND SOME EQUIPMENT CHARACTERISTICS MAY VARY FROM DESIGN AS SHOWN ON THESE DRAWINGS_ 26. LOCATION OF ALL OUTLET, BOXES. ETC. AND THE TYPE OF CONNECTION (PLUG OR DIRECT) SHALL BE CONFIRMED WTH THE OWMEWS REPRESENTATIVE PRIOR TO ROUGH -IN. ELECTRICAL NOTES 1 ABREVIATIONS AND LABELS AFF ABOVE FINISHED FLOOR AM ABOVE FINISHED GRADE ADS ARTENNAGROUNDBAR ATS AUTOMATIC TRANSFER SNATCH AM AIERICAN WE GAUGE SCAB BATTERYCABINET BCW BARE COPPER WIRE BSCW BTCW BARE STRANDED COPPER WIRE BARE TINNED COPPER WARE C CONDUIT CB CIRCUIT BREAKER DISC DISCONNECT ECAB POWIOA CABINET EAR ELECTRICAL METAWC TUBING GND GROUND GPS GLOSALPOSITIONINGSYSTEM ORS DALVANOED RIGID STEEL LTFC UQUIOTIGHTFLEXIBIECONDUIT MC METALCLADCABLE ARCS MANCIRCUITBREAKER MOP MN DISTRIBUTION PANEL MGS MASTER GROUND BAR SGB SECTOR GROUNOBAR MILD MAIN LUGS ONLY N NEUTRAL OM OVERHEAD NEC NATIONAL ELECTRIC CODE PNL PANEL PP POWER PANEL PPC POWER PROTECTION CAB PVC POLYANYLCHLORIDE RA RIGID ALUMINUM RGS RIGID GALVANZIED STEEL RRH REMOTE RADIO HEAD RRU REMOTE RADIO UNIT TYP TYPICAL UIG UNDERGROUND WP WEATHERPROOF XFMR TRANSFORMEiI EVIATIONS & LABELS SYMBOLS IDENTIFIER DESCRIPTION d SAFEfYSWTTCH PANEL BOARD ® ELECTRIC METER ELECTRICAL WIRING (TURNING UP) ELECTRICAL WRING (TURNING DOM) ® COMMUNICATIONS CABINET -- — BACKBOARD - RECEPTACLE / NEW UTILITYPOLE Q EXISTING UTSITY POLE MASTER GROUND BAR o INSULATED GROUND BAR m UNINSULATED GROUND BAR SECTOR GROUND BAR SYMBOLS & LEGEND 13 1NOT USED Sprint tie NTATUM Xw.sMtE PIe6 RIDENRK PINNACLE c,XWN,SL3:1'2N('.2, INC � to cl FAT. AI� t LSE 111WEr ,ete wMd Ergid Stwen REV I DATE I DESCRIPTION I BY M�S ® H®sz�® PH90XC839 o VNLFY. 42 es a ELECTRICAL NOTES, ABBREVIATION $ SYMBOLS E-1 NEW SPRINT 200A METER/ DISCONNECT TO BE INSTALLED fl IN EXISTING A00AMULTI-METER BaxK (Bv unLIT1T (�E EXISTING 1r IDE SUN STATEACCESS/UTILTIY EASEMENTEXISTING TELCO VAULT (1) NEW rCI I MT FROM THE IDS NO RBERVAULTTO I NEW CIENNA UMT. I n (1)NEW I O• TRIC;5L ELECTRICAL CONOUITFROM I EASING METER BANK TO NEW NEW SPRINTTELCO CABINETMOUNTED EXISnNG LMU WALL NEW SPRINT ClINSIDE NEW TELLO CABINET 1 E E VTILRY EASEMENT 11..�� I—EASnNG1—WIDESUN STATE UIILM EASEMENT ENLARGED POWER PLAN I � I I I I 1 NEW 21be' TELCO VAULTBY T I 2AYO IN ROW NEW SPRINT 2~ J:? TELCO VAULTIN I I EXISTING EASEMENT I I NEW 6'B CONDUIT I I I i rat% y I f` ..uaPG II I FIBER DESIGN UTIILTYP SOURCE (1) NEW 11/# CONDUIT FROM CIENNA TO NEW FIBER MANAGEMENTTRAY. COORDINATE STUB-l1P LOCATION PRIOR TO INSTALLATION (1) NEW 1-1/4'CONDUIT FROM THE NEW PFL TO NEW TELCO CABINET. COORDINATE STUB -UP LOCATION PRIOR TO INSTALUITION (1) NEW r CONDUIT FROM THE NEW PPC TO NEW ECAS. COORDINATE STuSAIP LOCATION PRIOR TO INSTALLATION (1) NEW 1-1/4' CONDUIT FROM THE NEW PPC TO NEW B-CAB. COORDINATE STUB -UP LOCATION FRIOR TO INSTALLATION NEW SPRINT 200A PPC MOUNTED ON EXISTING CMU WALL .(I) NEW 1. 1V CONDUIT FROM THE NEW PPC TO NEW SITE LIGHT " 'COORDINATE STUB -UP LOCATON PRIOR TO INSTALLATION DLSCONNECTSWITCH NEW#2 CU SERVICE GROUND (2) ay htl GROUND RODS SPACED MINBC' APART NEW 20OA SPRINT PPC CABINET W/ NEW 100A Su—EDCIRCUITTO CABINET GENERATOR PLUG RECEPTACLE CIRCUIT SCHEDULE NO. FROM TO CONFIGURATION 1Q lTTIl7TY SOURCE METER/DISCONNECT BY UTILITY TRANSFER A LOAD P) #y0 CU N (1) #2 CU (GND), O2 METEWDISCONNECT CENTER 2.5'O CONDUIT(- RATED) O TRANSFER A LOAD GENERATOR (3) #*0 CU A (1) #2 CU (ONG), CENTER RECEPTACLE 2S 9 CONDUIT (SO°RATED) © TRANSFER S LOAD CENTER NEW ECAB 13)#1CUA(1)#BCU INM CONDUIT TRANSFER A LOAD 13) #12 CU A 111 N12 CU )ONO), 1 Q CENTER NEW BLAB 1W O CONDUIT- RATED) TRANSFER A LOAD LIGHT1M' C. (3) #12 CU A (1) #1,2 CU IGND), 1 CENTER O T 190' RATED) 1 ONE -LINE DIAGRAM j A/C PANEL SCHEDULE USAGE SERYIC LOAD BREAKER BREAKER BREAKER SEUSAGE �FMAIE�-E BAEANEp BREAKER CI<T - CESCPIPnON AMPS POLES STATUS LOADD(VA fVgl FACTOR AVA B VA FACTO E LOAD R LVAI STgtUS POLES 1 ECABINET j 100 ON I - 1 25 1 - I 0 I 0 1 ON 1 2 rN tl CONDUIT i) EIANK i0 B:.WK 21 BLANK NEW SPRIW SPIT UNIT INSIDE NEWSPRINT 23. BLANK TELCO CABINET - 3 i PANEL SCHEDULE NEWECAB NEW SCAB Sprint> PINNACLE � o C:f3NSUi.'iT1YG, :SIG WE In Em, t , StrucArtW Elgireers IIII'�Illm�© om�m L- DESCRIPTION BLANK ,i BLANK 1I PH90XC839 BUWK 13 BLANK 20 ALLEv. Ai OTa BLANK BLANK 1F POWER PLAN E-2 4 RESTORE EWTING SURFACE tr COMPACTED BACIffILL PER EARTHWORK SPECIFlCATION Sprint' UI1LtTY WMNING TAPE UNMS RMDEMTH ne w.surEnss tt mnev.A2 eeonr F coxs�xTNc FRN esrrt waasmwv N ELECTRICAL RACEWAY - BACMFl ISMDI PF EMTHWORK GPECIPCATION P UCME @ MIN. �+.+.wrMwaoma.su ELECTRICAL TRENCH DETAIL t seNMNMN9TREET I�ot RESTORE E%ISTIND SURFACE Tr ISE Incorporate d COMPACTED BACKFlLL PER EMTHWORK SPECIRWION Siruclurd Engineers N UTILDV WMNING TAPE UNDISTURBED EMTH MLCOFEEDER BACKFILL ISMDI REV DATE DESCRIPRON By agrzq�e @ MIN. TELCO TRENCH DETAIL UTILITY TRENCH DETAIL M 1 NOT USED 2 �Y�AS PH90XC839 HIACO— ELECTRICAL DETAILS E-3 NOT USED _ 3 GROUNDING PLAN - ANTENNA LEVEL NEW GPS GROUND MOUNT 1 I •-~ -+ •� •• 1 NEW EQUIPMENT W NEW &CAB #2 SOLID TNNED BARE COPPER WIREFROMEOUIPMENTGROUNO TO MASTER GROUND NEW ECAS r.-:,. GROUNDNEWBATTERY r_____ •:•. _..-.. STRINGSTONEW CABINET I GNOINID BAN pYP.) ___ _ I NEWBATIERY STTIINGS IN L J.. NEW BLAB I - GROUND NEW ECUIPMENT TO NEW CABINET GROUND BAR (TYP.) NEW GROUND RING, A SOLID TNNED •� - BARE COPPER WIRE, BURIED 1 GROUNDING PLAN AT EQUIPMENT NOTE: ALL GROUND NS ARE TO :HANICAL UNLESS OTHERWISE. STANDARD GROUND KIT (TYP.) •8 AWG (PROVIDED \ W/GROUND KIT RYP.) ANTENNA GROUND BAR CIGBE(W(O INSULATORS) TOP OF TOWER D GROUNDING TO ANTENNA MAST (TYP.) HYBRID OR COA%TO EQUIPMENT - WG SOLID INSULATED GROUND OR R GROUND TO ANTENNA MAST AND GROUND BAR (TYP.) SECTOR GROUND BAN MP.) WG STRANDED INSULATED GROUND TO RRU (TYP.) HANICAL GROUND CONNECTION TO NEWINTERNAL ECAB GROUND BAR NEW MASTER GROUND BAR NEW INTERNAL BLAB Y2 SOLID TINNED BARE COPPER WIRE FROM EQUIPMENT GROUND RING TO EQUIPMENT, TYP. NEW GROUND ROD (TYP.) SYMBOLS LEGEND ® GROUNDROD WNH ACCESS GROUNDWIRE ® GROUNDROD C-.=ERMIC CONNECTION GROUNDBAR A MECHANICAL CONNECTION 2 HOLE, LONG BARREL AN SOLID COPPER LUG (TYP.) INSULATED BOTTOM — TOWER GROUND BAR i2 AWG BARE SOLID — TINNED COPPER (BSTCWI BOND TO _ TOWER GROUND RING 4 #2AWGBARE O— TINNEDPER TINNED O GROUND T BURIED GROUND RING IN FLEXIBLE NONMETALLIC ® OR PVG CONDUIT CABLE GROUND DETAIL NOTETONE FOR COO CABLES AND HYBRID CABLE WITH OUTER CORRUGATED COPPER SHEATH SUITABLE FOR STANDARD GROUND KITS — BOND GROUND BAR T( GROUNDING TAB WITN EXOTHERMIC WELD — #6 AWG STRANDED COPPER GROUND WIRE(GROUNDED TO GROUND BAR) (SEE NOTES t A 2) — V MIN. BEND RADIUS TO GROUND BAR TO PRIMARY CABINET HYBRIFLEX GROUNDING DETAIL 1-nU'y�if bY:-El;/rZ/DRi3/BOA DATE PZ PROJECT MANAGER Sprint TA.. NI2w iM ASAMNACLE 1 N. MANNNs t BEPi.M LSEITK ET ieTeG SWciwd Engineers MDDRxsows ®IIII��III� 1 RUMrA PH90XCO39 GROUNDINGEPLAN & DETAILS E-4 1 RUMrA PH90XCO39 GROUNDINGEPLAN & DETAILS E-4 NO "off 1. AALLL NAPOWARE 18d ES STNNLS STEEL DI INCWNG SPLR WASHERS. Sprint) •PROVIDE NOOX GREASE AT COMACTSURFACE BETWEEN LUG AND GROUND BAR 2. COAT WARE ENO WITH ANTIOXIDATION COMPOUND PRIOR TO INSERTION INTO LUG BARREL AND CRIMPING. •GC WILL VERIFY BUSS BM °ROUNDING TO THE TOOR RING. 3. APPLYANTIOM ATION COMPOUND BETWEEN ALLLUGS AND 8— PRIOR TO MATIN. AND EIOLTING. TATUM A tte NLW. Im RfOEWX. AZeS.Tm P RRUfl GROUNDS TINNED GROUND E casuTw R-salre Acaamw STR FR iRU STRANDED . WIRE MOUNTING NTTH GREEN.600V. MOUNTING PIPE THHN/rHWN INSUTATON.512E AS SPECIFIED NOTE:MINIMUMM 3 SIB Nam ) THREADS TO BE MSIBIE jiYP.l � ^ IV• 2HOLE, LONG BARREL S—WASHER ') a.<ONSX.'C..1'XN(±,INS'.. GROUND BAR ON HYBPoDCABLE TINNED SOLID COPPER ANTENNA TOWER GROUND LEAD WG (TYP.) SIB FIAT WASHER (TVP.) O 0000 OOOO 00 O nGNE°' O O O O O O O O O O O O NEWGROUNDBAR SISFIATWASHER(IYPJ O O ISE Incorpotetetl 0 0 0 0 0 0 0 0 0 s/s eoLr (IYP.1 swcn.d Eyi�mers TYA1HOLE LUG, BOLTED TO NEW I'xT2}i• THIL, TINNED GROUNDBARUSINO3le'-18x1 GROUND BARB 1/4-STAINLESS STEEL HEX HEAD CONNECTIONS TYP. SECTOR GROUND BAR CONNECTIONS M" 1 GROUND LUG DETAIL "' 2 NOT USED Rom' 3 REV DATE DESCRIPTION BY I�ABY 92 SOLID TINNED OelB�e COPPER CONDUCTOR BOND TO TOWER NOTES: •PROVIDE NCOX GREASE AT CONTACT SURFACE BETWEEN LUG AND GROUND BAR TIN COATED - SOUD •GC WALLVERIFY BUSS BAR GROUNDING TO THETOWER OR RING. COPPER GROUND •GROUND BAPS AT BOTTOM OFTOWERS OR MONOPOLES SHALL BAR USEEXOTHERMIC CONNECTION. STRANDED CJIN'U"TIONO 2 HOLE, LONG BARREL TINNED WITH GREE SOLID COPPER LUO (TYP.) THHN/rHWN SIS BOLT (iYP.) 512E AS SPE GROUND B GROUND LEADS TO EACH WASHER (TYP.) MINIMUM OF THREE THREADB IFLATWALL, FLOO SECTOR GROUNDBAA TO BE VISIBLE (IYP.)=I'D ANTENNAT C°ROU1r NUT(TYPJ0 0 0 0 0 0 0 0 0 0 0 0 0 0 O SIS SPOT0 0 0 0 0 0 00000 0wnsHER pm� (rrP.) 0 0 0 0 0 0 0 0 0 0 0 0 SIS FLAT WASHER CLAMP TD 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 RvPJ COMFORT .Y2 AWG BARE SOLID BURIED GROUND RING NOTES PH90XC839 1. ALLHARDWARE1 8 STAINLESS STEEL INCLUDING SPLfT WASHERS u �, Ta 2. COAT WIRE END Yv1rH ANTI -OXIDATION COMPOUND PRIOR TO sH TWO -HOLE LUG, BOLTED TO GROUND BAR USING 3/8--19 z 1 INSERTION INTO LUG BARREL AND CRIMPING. 1//STAINLESS STEEL HEX HEAD BOLTS AND HARDWARE. 3. APPLY ANITO%IDATIONCOMPOUNDBETWEENALLLUGSANO BUSS BARS PRIOR TO MATING AND BOLTING. DO Nor COAT GROUNDING DETAILS EXOTHERMIC WELD WTTH 92 AWG SOLID TINNED BARE CU WIRE OR STRANDED CU ENTIRE BAR. WIRE WITH GREEN. 9VV. THHN/THWN INSUTATON TO GROUND RING E-5 MASTER GROUND BAR CONNECTIONS -= 4 NON -INSULATED GROUND BAR 5 NOT USED M= 6 lY—.TOTOP CONCRETE ACCESSB- OFTIETSTLEAD _ �� _ SUBGRADE 3D'MIN. I �`� 9'x12 DIAPVCPIPE B11RE. TINNED COPPER GROUND RING #2 SOLID, BARE. TINNED GROUND RING EXOT�ECOPPER jQEAMOWELDOR (THERNAMICDOR TOUIVAL O TO TOP OfF G GROUUND ND %V.x COPPERCLAD STEEL GROUND ROD POD NOT USED 1mJl GROUND TEST WELL DETAIL R 2 1 NOT USED 3 TYPICAL PER SECTOR --� -.7 ---� SYMBOLS LEGEND ANTENNA MOUnN PIPEN(TYPGj� �j E E](OTHEBMIC A MECHANICAL CONNECTION CONNECTION 2.5 MIMO ANTENNA (TW.I g I PERSECTOR 1 FINISHED GRADE —ET(31g1�Tl�lg�— —#2 AWG BARE SOLID TINNED COPPER BURIED GROUND RING T CADWELD COPPER CLADD STEEL GROUND ROD �0x1 a4'LONG (TYPICAL] GROUND ROD DETAIL NOTE: GC WILL VERIFY BUSS BAR GROUNDING TIED TO (E) TOWEfl OR GROUND RING. NEW #2 AWG GREEN NEWMEWSA BREAROUTCYUNDER INSULATEDSOUD (TYP.) PER SECTOR GROUNDCONDUCTOR FROM CABINET BULKHEAD TO ... ASTER GROUND BM NEW BCAB #2 AWGMOM ERGROUOUND�� NEW RAYCAR TO MASTER GROUND BAR IPMENT GROUNDING SCHEMATIC 4 SOLIDCOPPERTINNED GROUND WIRE TO NEW #2 AM TINNED TOE ANTENNAMAST #SAWGSTRANDED� TO RRU SECTOR GROUND BARS (TYP.) SEE NOTE UPPER GROUND BAR Spri nt P. b QMNACr E tOe NrMANNSiREET#ta ISE Incorporated Sbuctvd Ergiroen PHOENIX.A�e REV DATE DESCRIPDON BY a4p,s ae/q,e oew/ e PH90XC839 Rw�.cOUNiY GROUNDING DETAILS E-6 HPPPO� �Y: TF f Z/D� -,.WB0A Pr Z PR'J:1-_ I Date v � 2te / I y TOWN OF ORO VALLEY NEIGHBORHOOD MEETING SIGN -IN SHEET "Please print legibly" Project Name VW1,0VA on U0, Drive— Name Street Address Zip Code verfZOnwireless Public Outreach Plan Project: AZ02-070 Saguaro / TUC Peppersauce 333 W. Cool Drive, Oro Valley, AZ 85704 APN:22514170C Applicant: Michelle Lamoureux Pinnacle Consulting, Inc. 1426 N. Marvin St., Gilbert (480) 664-9588 x 230 Michelle. Lamoureux@Pinnacleco. net Clients: Verizon Wireless 126 W Gemini Dr., Tempe AZ, 85283 Sun State Towers, LLC 1426 N. Marvin St., #101, Gilbert AZ, 85233 V� SUN STATE T O W E R S Sun State Towers Site Name: AZ02-070 Saguaro Verizon Wireless Site Name: TUC Peppersauce 4-0 PINNACLE CONSULTING, INC DV IDItTlel Table of Contents Section1.0 Project Description........................................................................................................................1 Section 2.0 Identification of Interested Stakeholders..................................................................................1 Section 3.0 Proposed Neighborhood Meetings.............................................................................................2 Attachments: Photo Simulations Zoning Drawings Notification Area Map A 1.0 Project Description Verizon Wireless and Sun State Towers are proposing a new wireless communication facility at 333 W. Cool Drive, Oro Valley. The proposed facility will be a 50' tall monopole facility disguised as an elm tree (mono -elm). The facility will be constructed and owned by Sun State Towers, Verizon Wireless will be the first tenant on the facility. This facility is designed to be co -locatable, meaning that is will be able to hold multiple carriers, mitigating the need for new facilities in the future. This facility is being proposed due to the planned decommissioning of a nearby tower owned by Crown Castle, Inc. When this tower is decommissioned, Verizon Wireless will no longer be able to continue to provide service in this area. This new facility is being proposed as a replacement site to the existing Verizon Wireless facility on the Crown Castle, Inc. tower. 2.0 Identification of Interested Stakeholders Pinnacle Consulting, Inc. has identified the primary stakeholders for this proposed development to be the adjacent land owners in the area, which is primarily composed of commercially zoned lots and Right - of -Way. Per Town of Oro Valley code section 22.15.F.4.a.i, all landowners within 600' of the proposed development will be notified of the neighborhood meeting. i 3.0 Proposed Neighborhood Meetings Pinnacle Consulting, Inc. will be working with the Town of Oro Valley to hold a neighborhood meeting regarding this proposed facility on 6/26/2018 in the Town of Oro Valley Council Chambers from 6-730 pm. This meeting will be held for the purpose of informing, as well as answering questions and addressing concerns that attendees may have. a NARRATIVE REPORT PROJECT NAME: AZ02-070 Saguaro - TUC Peppersauce APPLICANT: Sun State Towers on behalf of Verizon Wireless REQUEST: TIER II MINOR FACILITY APPROVAL FOR NEW WIRELESS COMMUNICATIONS FACILITY p ��r,7V� .Blip 19 `�Ql� Sun State Towers for Verizon Wireless Michelle Lamoureux 1 480-907-4265 August 14, 2017 ,. Petitioner SunState Towers is a real estate development firm specializing in wireless communication infrastructure. We develop multi -tenant facilities to support the ever-increasing needs of our wireless clientele. Verizon has engaged Sun State's services in the development of a facility to address wireless network deficiencies in the Oro Valley area. Verizon Wireless is one of the largest wireless communication providers in the United States with over 100 million subscribers. Purpose of the Request This application for a Tier II Minor Facility is requested to allow the development of wireless communications infrastructure to initially support Verizon's network. As the anchor tenant of the facility, the site will improve wireless voice and data services for Verizon Wireless customers. This site is designed to satisfy the demand for Verizon Wireless service in this area as required by their Federal Communications Commission License. Sun State Towers is proposing to develop a 50' monoelm communications facility within the 0.56 +/- acre parcel of Saguaro Vista Veterinary Clinic generally located southwest of the intersection of W. Cool Dr. and N. Oracle Rd. in Oro Valley, Arizona (APN 225-14-170C). Verizon is requesting the Tier II Minor Facility approval to run concurrently with the lease terms between Sun State Towers and the property owners, Andrew J. Carlton and Cathleen A. Carlton. The proposed antenna configuration necessitates a 12' array diameter, with 3' separations between antennas to optimally propagate Verizon's LTE frequency, without signal redundancy. Justification of the Request and Need for the Facility The wireless communications industry has seen tremendous growth over the past two decades. This growth has come in the form of larger subscriber base, an increase in the number of devices per subscriber, and a tremendous uptick in demand for bandwidth per subscriber. There are two ways wireless carriers can address this capacity pressure: 1.) Acquire more spectrum, or frequency, with which to operate the network or, 2.) Build more sites (network densification). In the case of the former, Verizon Wireless, like most wireless carries, is an active participant in FCC spectrum auctions, when they are conducted. Spectrum acquisition alone is not enough to meet current bandwidth demand. In addition, Verizon is currently utilizing a non -concealment tower in the area to meet coverage needs, however this tower is set to be decommissioned and therefore will result in a fairly large gap in service. With the new tower being of a concealed nature, this will improve the esthetics of the area. Existing Towers in the Area Other structures were identified as part of the due diligence efforts; however, they were all either outside the required search ring provided by RF engineers in order to close the gaps in coverage for voice and data demands, one mile away, or they were in the process of being decommissioned. Alternate Candidate Locations In the best interest of servicing our customer, their customers, and proceeding with the best of intensions regarding the City of Oro Valley, other candidate locations were identified and evaluated with the proposed location deemed as the best for all parties' interest. Proposed Modifications Sun State Towers is proposing a new 50' high monoelm to be located at 333 W. Cool Dr., Oro Valley. Additional screening is provided by densified branch counts and RF-friendly socks covering antennas. The communications facility, measuring 20' X 30', is an unmanned facility to be improved with a 50' monopole structure, perimeter chain linked fence as well as power and fiber utilities. Inside the compound a 8'X12' concrete pad will house one (1) Verizon power cabinet, (1) Verizon RF cabinet, and one (1) future Verizon equipment cabinet. After the initial 60-day construction period, the site will have a technician visit the site once a month for routine maintenance and monitoring. Setback Table (From center of proposed monoelm to nearest property line) Direction Distance North 184'-6" South 78'-10" East 70'-5" West 22'-7" Relationship to Surrounding Properties The subject property and all adjacent property are currently zoned either commercial or residential. There is a dirt lot and alleyway to the south and both commercial buildings to the east and west back up to the proposed tower. There is an apartment building to the north which is buffered by W. Cool Dr. and in addition the proposed tower location is approximately 185' into the parcel. Circulation System The proposed site will be accessed from the veterinarian parking lot through the northern entrance off W. Cool Drive and technicians will utilize one of the parking lots spaces for their vehicle while conducting monthly routine service visits. All necessary utility, fiber, access, and other easements will be outlined within the lease terms between Sun State Towers and the property owners, Andrew J. Carlton and Cathleen A. Carlton. Development Schedule The project development schedule will take approximately 60 days following the issuance of all necessary permits for the project. Co^rrrmunity Facilities and Services The proposed development is located in a commercial use area surrounded by other commercially zoned parcels to the east, west, and south. Dense residential apartments are located to the north. It is worth noting the tremendous benefit of enhanced wireless services in this high network demand portion of the city, especially for use by Public Safety agencies. Allowing Verizon to proceed with their proposal will not only strengthen their service in the area for residents and those that travel through the area, but it will also provide competition and allow wireless users options to choose from. Public Utilities and Services The proposed project will require electrical and telephone service. The project is an unmanned facility so it will not require sewer or water services. Assessor's Map Parcels __:141%OC ""N COOL DR W Cool Dr CARLTON ANDREW.1 & CATHLEEN A 1 R_. More Information Oblique Aerial Photos \ r AS I* :9 _ _� ry - 1 e f Ra f ♦ • t .. s s§ t. i ea �� t .. � f e v.. 'w..., f` M r• • <; -• a v / - RSearch result In X ,Add Y ♦ 4 ` 333 W Coal Dr, Tucson, Arizona, 85704 h ` •mob„� i t . D I a' .� band . Map ke _ f °. Y F , a •ryI ' t '-' s fj.#--,s a /I + r ,.f '4 3J ,w .. • a v_ 1 n .Y .. Pw .f �.... Y f ...� s :,Y ar.,, "" -.mod 'a ♦# .� o� ":. ♦ ff `�♦-°+*�. r,w�,F� ` ♦s .�* ,� - per' .G' y, � 4 1 a 4rr♦ ai ' h 4 4r s = { a � f � �� / ."�..""'M � � R ♦ tea# 1.M. -.MYS �.�I P C1• i Ns1f s, R *F .Y'•w,� � // �� � �w ~+w t ♦ .. •.7�-: M;� „' � ,,. ► ' , ' A? ✓ r ter, t r•t�' w�ynr`, � .�� �� y a. �: � rq. �Y�' �,p .. �♦s v 'r f r+, � ' ? 6 f 1 ., 11- t •i �. 7 � ' y ' •.. 1.0 r►i �. " ' ` � = f/'+ " .> ' . ti-r. ~ ' � 4 v Y _ w %I , SUN STATE T O W E R S DEPART 1426 N. MARVIN ST, GILBERT, AZ 85233: HEADING SOUTH TOWARD W. MERILL AVE. TURN LEFT ONTO W. MERILL AVE, THEN CONTINUE FOR 0.2 MILES UNTIL YOU REACH N. COOPER RD. TURN LEFT ONTO N. COOPER RD AND CONTINUE FOR 1.2 MILES UNTIL YOU REACH US-60 W. TURN LEFT AND MERGE ONTO US-60 W. TOWARD PHOENIX, THEN CONTINUE FOR 8.6 MILES UNTIL YOU REACH 1-10 E. TOWARD TUCSON. TAKE EXIT RAMP FOR 1-10 E. TOWARD TUCSON, THEN MERGE ONTO I-10 E. CONTINUE ON 1-10 E. FOR 92.0 MILES UNTIL YOU REACH EXIT 246/ CORTARO RD. TURN LEFT ONTO CORTARO RD, THEN CONTINUE FOR 7.0 MILES UNTIL YOU REACH N. NORTHERN AVE. THE ROAD NAME CHANGES FROM CORTARO RD TO W. CORTARO FARMS RD TO W. MAGEE RD OVER THE 7.0 MILES. TURN LEFT ONTO N. NORTHERN AVE AND CONTINUE FOR 0.1 MILES UNTIL YOU REACH W. COOL DR. TURN RIGHT ONTO W. COOL DR, THEN CONTINUE FOR 0.2 MILES UNTIL YOU REACH THE SITE ON RIGHT. VICINITY MAP O Q' u" Qe 0 PROJECT AREA 2 W. MAGEE RD SUN STATE SCOPE OF WORK INSTALL PROPOSED 50'-0" SUN STATE MONO -ELM INSTALL PROPOSED 29-6'k20'-0" SUN STATE CMU WALL INSTALL PROPOSED ELECTRICAL SERVICE INSTALL PROPOSED TELCO SERVICE DEMOLITION OF EXISTING STRUCTURES WITHIN LEASE AREA INSTALL PROPOSED SITE IDENTIFICATION PLAQUE VERIZON SCOPE OF WORK • INSTALL PROPOSED VERIZON EQUIPMENT CABINET • INSTALL (9) PROPOSED VERIZON ANTENNAS • INSTALL (9) PROPOSED VERIZON REMOTE RADIO HEADS • INSTALL (2) PROPOSED VERIZON OVP'S • INSTALL (2) PROPOSED VERIZON HYBRID CABLES • INSTALL (6) PROPOSED VERIZON COAX CABLES • INSTALL (1) PROPOSED 4'X70' VERIZON CONCRETE PAD SPRINT SCOPE OF WORK INSTALL PROPOSED SPRINT EQUIPMENT CABINET INSTALL (6) PROPOSED SPRINT ANTENNAS INSTALL (9) PROPOSED SPRINT REMOTE RADIO HEADS INSTALL (3) PROPOSED SPRINT HYBRID CABLES INSTALL (1) PROPOSED SPRINT FIBER CABLE INSTALL (1) PROPOSED 4'XB' SPRINT CONCRETE PAD INSTALL (1) SPRINT NEW ICE -BRIDGE INSTALL (1) SPRINT H-FRAME SHEET INDEX T-1 PROJECT INFORMATION LS-1 TOPOGRAPHIC SURVEY Z-1 SITE PLAN Z-2 DEMO PLAN Z-3 VERIZON ENLARGED SITE PLAN Z-4 SPRINT ENLARGED SITE PLAN Z-5 ELEVATIONS Z-6 ELEVATIONS Z-7 DETAILS SUN STATE: AZ02-070 SAGUARO VERIZON: TUC PEPPERSAUCE SPRINT: PH90XC839 CLIENT SUN STATE TOWERS 1426 N. MARVIN STREET #101 CONTACT: CHAD WARD GILBERT, AZ 85233 PHONE: (480) 664-9588 EXT. 214 PROPERTY OWNER CARLTON ANDREW J & CATHLEEN A JT/RS 8771 N, PASEO NORTENO TUCSON, AZ 85704 TOWER OWNER SUN STATE TOWERS 1426 N. MARVIN STREET #101 CONTACT: CHAD WARD GILBERT, AZ 85233 PHONE: (480) 664-9588 EXT. 214 SITE ID: AZ02-070 SITE NAME: SAGUARO SITE ACQUISITION PINNACLE CONSULTING, INC. 1426 N. MARVIN STREET #101 GILBERT, AZ 85233 CONTACT: MICHELLE LAMOUREUX PHONE: (480) 664-9588 ext. 230 AP N : 225-14-170C 333 W. COOL DRIVE ORO VALLEY AZ 85704 i PIMA COUNTY PROJECT DATA ZONING: C-2 PARCEL #: 225-14-170C USE: UNMANNED COMMUNICATIONS NEW LEASE AREA: 570 SQ. FT JURISDICTION: TOWN OF ORO VALLEY GOVERNING CODES: 20121BC, 20121FC, 20121MC, 2011 NEC ALL BUILDING CODES LISTED ABOVE SHALL INCLUDE AMENDMENTS BY THE GOVERNING JURISDICTION A&E FIRM NEW SITE LOCATION PINNACLE CONSULTING, INC. 1426 N. MARVIN STREET #101 LATITUDE 32.353046 32° 21' 10.964" N (NAD83) GILBERT, AZ 85233 LONGITUDE 110.975679" 110 58' 32.446" W (NAD83) CONTACT: KYLE FORTIN PHONE: (623) 217-4235 GROUND ELEVATION 2584.6' (NAVD88) 1. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEET THE HEALTH AND SAFETY STANDARDS FOR ELECTROMAGNETIC FIELD EMISSIONS AS ESTABLISHED BY THE FEDERAL COMMUNICATIONS COMMISSION OR ANY SUCCESSOR THEREOF, AND ANY OTHER FEDERAL OR STATE AGENCY. 2. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEET THE REGULATIONS OF THE FEDERAL COMMUNICATIONS COMMISSION REGARDING PHYSICAL AND ELECTROMAGNETIC INTERFERENCE. 3. LIGHTING OR SIGNS WILL BE PROVIDED ONLY AS REQUIRED BY FEDERAL OR STATE AGENCIES. 4. DEVELOPMENT AND CONSTRUCTION OF THIS PROJECT WILL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. 5. EXISTING PARKING IS NOT AFFECTED BY THIS PROJECT. 6. THIS PROJECT DOES NOT INCLUDE WATER OR SEWER. (RF): DATE: (CONST.): DATE: (RE): DATE: LANDLORD: DATE. PREPARED FOR'. (5 SUN STATE T O W E R S 1426 NORTH MARVIN STREET # 101 GILBERT, AZ 85233 PHONE: 480-664-9588- FAX 480-664-9850 CONSULTING FIRM PINNACLE C(JNSUL'TING, 77c. Canstructon Project Maregement SM1e Develocment 1426 N. MARVIN STREET # 101 GILBERT AZ 85233 PROJECT NO AZS2-070 DRAWN BY: CDA CHECKED BY'. KF REV DATE DESCRIPTION BY I A 6-13-18 90%ZONING I CDA PRELIM FOR ZONING ONLY JUN 19 v SURVEYOR NOTES 1. ALLTITLE INFORMATION IS BASEDUPONA COMMITMENTFOR TITLE INSURANCE PREPARED BY GREATAMERICAN TITLE AGENCY, ORDER NO. 21700835 EFFECTIVE DATE. 032W017. 2. SURVEYOR HAS NOT PERFORMEDASEARCH OF PUBLIC RECORDSTO DETERMINE ANY DEFECT IN TITLE. 3. THE BOUNDARY SHOWN HEREON IS PLOTTED FROM RECORD INFORMATION AND DOES NOT CONSTITUTE A BOUNDARY SURVEY OF THE PROPERTY 4. SURVEYOR DOES NOT GUARANTEE THATALL UTILITIES ARE SHOWN OR THEIR LOCATIONS IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND DEVELOPER TO CONTACT BLUE STAKE AND ANY OTHER INVOLVED AGENCIES TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. REMOVAL, RELOCATION AND/ OR REPLACEMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. SCHEDULE B EXCEPTIONS OEASEMENTS. RESTRICTIONS, RESERVATIONS, CONDITIONS AND SET -BACK LINES AS SET FORTH ON THE PLAT RECORDED IN BOOK 17 OF MAPS, PAGE60, BUT DELETINGANY COVENANT, CONDITION OR RESTRICTION INDICATINGA PREFERENCE, LIMITATION OR DISCRIMINATION BASED ON RACE, COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS OR NATIONAL ORIGIN TO THE EXTENT SUCH COVENANTS, CONDITIONS OR RESTRICTIONS VIOLATE 42 USC 3604(C). OAN EASEMENT FOR ELECTRIC COMMUNICATIONS FACILITIES AND APPU RTENANCES AND ALL OTHER MATTERS AS SET FORTH THEREIN, RECORDED IN DOCKET 8599, PAGE 603 OF OFFICIAL RECORDS. OAN EASEMENT FOR ELECTRIC AND COMMUNICATION FACILITIES AND APPURTENANCES AND ALL OTHER MATTERS AS SET FORTH THEREIN, RECORDED IN DOCKET 10000. PAGE 589 OF OFFICIAL RECORDS. ITEMS 1 THRU 2.4 THRU 5, AND 8 THRU 10 OF THE CLIENT PROVIDED. TITLE REPORT DO NOT CONTAIN GRAPHICALLY PLOTTABLE EASEMENTS, SETBACKS, RESTRICTIONS OR OTHER ENCUMBRANCES. THE SURVEYOR CANNOT GUARANTEE THAT NON-PLOTTABLE ENCUMBRANCES DO NOT EXIST THAT MAY AFFECT THE SUBJECT LEASED PREMISES. LESSEE ACCESS/UTILITY EASEMENT LEGAL DESCRIPTION A 12,00 FOOT WIDE STRIP OF LAND BEING A PORTION OF OF LOT 1 AS SHOWN ON THAT CERTAIN PLAT ENTITLED MAGEE PLAZA, RECORDED IN BOOK 17 OF MAPS AND PLATS AT PAGE 60 THEREOF, RECORDS OF PIMA COUNTY, ARIZONA. LYING 6.00 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE COMMENCING AT THE NORTHWEST CORNER OF SAID LOT 1; THENCE NORTH 89°2940" EASTALCNG THE NORTH LINE OFSAID LOT 1, 70.69 FEET TO THE POINT OF BEGINNING. THENCE DEPARTING SAID NORTH LINE SOUTH 00'00'00" EAST, 66.03 FEET; THENCE NORTH 90'00100" WEST, 51.78 FEET; THENCE SOUTH 00°OZ34" EAST, 114.56 FEET TO THE POINT OF TERMINUS. LESSEE LEASE AREA LEGAL DESCRIPTION A PORTION OF OF LOT 1 AS SHOWN ON THAT CERTAIN PLAT ENTITLED MAGEE PLAZA, RECORDED IN BOOK 17 OF MAPS AND PLATS AT PAGE 60 THEREOF, RECORDS OF PIMA COUNTY, ARIZONA DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID LOT 1; THENCE NORTH 89°29'40" EAST ALONG THE NORTH LINE OF SAID LOT 1, 70.69 FEET; THENCE DEPARTING SAID NORTH LINE SOUTH OVOOOU' EAST, 55.03 FEET; THENCE NORTH 90'00'00' WEST, 51.78 FEET; THENCE SOUTH OD°0234' EAST, 114.56 FEET TO THE POINT OF BEGINNING, THENCE NORTH 89"57'35" EAST, 15.33 FEET; THENCE SOUTH 00°00101' EAST, 30.01 FEET; THENCE NORTH 90"00'0P WEST, 20.00 FEET; THENCE NORTH 00°0933" EAST, 29.99 FEET; THENCE NORTH W5726' EAST, 4.66 FEET TO THE POINT OF BEGINNING. LINE TABLE LINE LENGTH BEARING Lt 70.69 NEW 29' 40'E L2 5&03 SD° 00' 00"E L3 5178 N9(r W OOW L4 114.56 SO' 07 34"E L5 15,33 NEW 57 35'E L6 30.01 SO" 00' 01"E L7 2000. NEW 00 DO N LB 29. 99 I NO' 00' 33'E L9 4.66 1 NEW 5T 26"E FLOOD ZONE DESIGNATION THE PROPOSED LEASE PREMISES SHOWN HEREON APPEAR TO BE WITHIN FLOOD ZONE "X" AS DELINEATED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY FIRM MAP NO 04019C16801 DATED 06/16/11. FLOOD ZONE "X" IS DEFINED AS. AREAS DETERMINED TO BE OUTSIDE 500.YEAR FLOOOPLAIN; DETERMINED TO BE OUTSIDE THE 1%AND 0. 2%ANNUAL CHANCE FLOODPLAINS. PROJECT META DATA 1, ELEVATIONS SHOWN HEREON ARE REPRESENTED IN NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) ESTABLISHED FROM GPS DERIVED ELLIPSOID HEIGHTS, APPLYING GEOID 09 SEPARATIONS CONSTRAINING TO NGS CORS STATIONS PROVIDED IN THE "ONLINE POSITIONING USER SERVICE" (OPUS) SOLUTION FOR THIS SPECIFIC SITE. 2. BEARINGS SHOWED HEREON ARE BASED UPON U.S. STATE PLANE NA083 COORDINATE SYSTEM ARIZONA STATEPLANE COORDINATE ZONE CENTRAL, DETERMINED BY GPS OBSERVATIONS. 3, FIELD WORK FOR THIS PROJECT WAS PERFORMED ON 04/13/17. LESSOR'S LEGAL DESCRIPTION ALL THAT CERTAIN REAL PROPERTY, SITUATE IN THE COUNTY OF PIMA, STATE OF ARIZONA, BEING A PART OF LOT 1 AS SHOWN ON THAT CERTAIN PLAT ENTITLED MAGEE PLAZA, RECORDED IN BOOK 17 OF MAPS AND PLATS AT PAGE 60 THEREOF, RECORDS of PIMA COUNTY, ARIZONA BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS. BEGINNING AT THE NORTHWEST CORNER OF SAID LOT 1 THENCE FROM SAID POINT OF BEGINNING, EASTERLY ALONG THE NORTH LINE OF SAID LOT 1, 89 DEGREES 59 MINUTES 20 SECONDS EAST 93.00 FEET TO A POINT THEREON; THENCE LEAVING SAID NORTH LINE SOUTHERLY ALONG LINE BEING PARALLEL WITH THE WEST LINE OF SAID LOT 1, SOUTH 00 DEGREES 07 MINUTES W SECONDS WEST 263. 47 FEETTO A POINT ON ALINE BEING PARALLEL WITH SAID NORTH LINE OF SAID LOT 1 THENCE WESTERLY ALONG SAID PARALLEL LINE. SOUTH 89 DEGREES 59 MINUTES 20 SECONDS WEST 93.00 FEET TO A POINT ON SAID WEST LINE OF SAID LOT 1. THENCE NORTHERLY ALONG SAIO WEST LINE, NORTH 00 07 00 SECONDS EAST 263.47 FEET TO THE TRUE POINT OF BEGINNING. o W HARDY RD p V Q U 00 2 g PROJECT AREA W COOL DR W MAGEE RD z 77 N W INA RD VICINITY .MAP N.T.S- verizon✓ 126 W. GEM INI DR. TEMPE, AZ 85283 (OPINNACLE CONSULTING, INC. Construction - Prgect Management - Site Development CALCULATED WEST COOL DRIVE CALCULATED POSITION N89° E, -POSITION 1426 N. MARVIN STREET 9101 4�GILBERT. AZ 85233 1275. 17''� O0 zees zNG FIELD BY: JTS NEW 29' 40E 93.0)' 1- - - 3580.9 NG � DRAWN BY: CAB zsea sNG CHECKEDBY: RILE N89° 29' 40"E _ 1156,68' WEST MAGEE ROAD P.O.B. (P) LESSEE 12' ACCESS/UTIUTY EASEMENT APN: 22514170A APN: 22514170B APN: 225141710 FND BCHH Z Ip Q LU U LEGEND BLDG BUILDING CMU CONCRETE MASONRY UNIT CLF CHAIN LINK FENCE CS CONCRETE SURFACE EP ELECTRICPPNEL NG NATURAL GRADE OVH OVERHANG TOP M BRASS CAP IN HANDHOLE ® NAIL e ELECTRIC METER © ELECTRICAL TRANSFORMER V FIRE HYDRANT Q WATER METER ® BACKFLOW PREVENTER * PALM TREE a DECIDUOUS TREE BOLLARD/POST BREAKLINE X szeo as NG SPOT ELEVATION ADJOINING PARCEL LINE CENTERLINE CHAIN LINK FENCE -GE-GE U/G ELECTRIC UNE -W-W-W- WATER UNE -SS-SS-SS- SANITARY SEWER LINE 1OR 41' MAGNETIC NORTH DECLINATION GRAPHIC SCALE 20 0 10 20 40 EL ( IN FEET) L inch = 20 ft. REVISIONS 2 05/27/17 FINAL 1 04/21/17 PRELIMINARY Ii,.NO.j DATE I DESCRIPTION RI-F-- CONSULTING Leh � � -__.� _• ... _.-_ �_�a�aal HfID SL "U p i RYAN L FIpLER M1� sP- EXPIRES 03/31/18 REUSE OF DOCUMENT THE IDEAS& DESIGN INCORPORATED HEREON, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF RLF CONSULWING, L-C & IS NOT TO BE USED FOR ANY OTHER PROJECT WITHOUT WRITTEN AUTHORIZATION OF RLF CONSULTING, LLC. . PROJECT No. 1 10008394 TUC PEPPERSAUCE SITE ADDRESS: 333 W COOL DR. ORO VALLEY, AZ 85704 SH EET TI TLE: TOPOGRAPHIC SURVEY . SHEET NO. REVISION: LS-1 EXISTING PROPERTY LINE — — I I PROPOSED 12'-0" WIDE SUN STATE ACCESS/ UTILITY EASEMENT APN: 225-14-3650 ZONING: C-2 EXISTING TREE (TYP.) I PROPOSED SUN STATE - 28'-6"x20'-0" LEASE AREA PROPOSED 50'-0" TALL — SUN STATE MONO -ELM I I EXISTING UNDERGROUND ELECTRICAL LINE EXISTING PROPERTY LINE SITE PLAN W. COOL DR EXISTING PROPERTY LINE I � I ® I 12'-0" SUN STATE _ ( ®I ® I I ACCESS/ UTILITY EASEMENT _ EXISTING , PAA KING I I I $ I EXISTING PARKING o EXISTING CONCRETE l I WALKWAY IZ I Y I J r Q IIr I m m Ir +I N la I I Io z x IW z I EXISTING PROPERTY LINE APN: 2-14170A ZONIN25G: C-2 Icc I w o ¢ cr -BUILDING fEXISTING _/ Iw 9l I III' w l APN: 225-14-170C ixw ZONING: C-2 _ - _EXISTING PROPERTY LINE I I I - I I i WE JG PROPERTV LINE APN: 225-14-170B ZONING: C-2 —EXISTING COVERED I PARKING I EXISTING 10'-0" ELECTRICAL EASEMENT — _ — — — — EXISTING PROPERTY LINE PREPARED FOR: 6 SUN STATE T O W E R S 1426 NORTH MAR" N STREET #101 GILBERT AZ 85233 PHONE: 480-664-9588. FAX 480,654-9850 CONSULTING FIRM PINNACLE CONSULTING, INC. CO.rrsltUctgn Pro,-t Marki,B 1 S,le C?v21I 1426 N. MARVIN STREET # 101 GILBERT. AZ 85233 PRQIECT NO AZ02-0 DRAWN BV. CDA CHECKED BY: KF IIIII,IIIIIIIIIIII,—� PRELIM FOR ZONING ONLY AZ02-070 SAGUARO 333 W. COOL DRIVE I ORO VALLEY, AZ 85704 / PIMA COUNTY ISHEET TITLE SITE PLAN SHEET NUMB-=.R Z-1 24'WO'SCALE: 115' 11'V7"SCALE: 1" 30' 15' SETBACKTABLE NORTH ±183'-7' SOUTH ±79-10' WEST #23'-3" EAST �69'-9" I T I I 1 I I 1 I I I I I I I I I I I I I I I I I I I DEMO PLAN a EXISTING 6'-0" TALL CHAIN- Q d Q 4 4'-0°CHAIN-LINK LINK FENCE TO BE REMOVED \ 20'-0" CHAIN-LIN� \\ FENCE TO BE REMOVED Q FENCE TO REMAIN 4 - X X X - X X X X - X - X X X X T T - i T - T T T i - T T T T - T T T EXISTING BUILDING X TO REMAIN I DASHED LINE DENOTES SUN STATE LEASE AREA EXISTING TREE TO I REMAIN APN: 225-14-170C X ZONING: C-2 1 X c EXISTING 6'-0" TALL CHAIN- x EXISTING LINK FENCE TO BE REMOVED DIRT AREA I X IZ W X Y O J w � Z = m X U O c� o w m U Z EXISTING FENCE SECTION LL PREPARED FOR: (5 SUN STATE T O W E R S 1426 NORTH MARM N STREET #101 GILBERT, AZ 85233 PHONE: 480-664-9588- FAX 4B0-664.9850 CONSULTING FIRM PINNACLE )NSULTING, INC. Can t—lon Pmtect Management Sne Development 1426 N. MARVIN STREET # 101 GILBERT, AZ 85233 PROJECT NO: AZ02-070 DRAWN BY: CDA CHECKED BY: KF TO BE REMOVED �� � V/ / /J EXISTING CONCRETE SLAB AND SHED TO BE REMOVED o� EXISTING WATER LINE / TO BE REMOVED 7 (G// y w 1 �w —w —w EXISTING WATER SPIGOT TO BE REMOVED EXISTING SHRUB TO BE REMOVED j EXISTING CMU WALL TO BE REMOVED / AZ02-070 SAGUARO EXISTING FENCE SECTION TO BE REMOVED 333 w COOL DRIVE ORO VALLEY, AZ 85704 J PIMA COUNTY X X X X X X X X X x x x x SHEET rrtLE J DEMO PLAN v" FBHEETNUMBER Z-2 24'k36" SCALE: 1" = 2' i 11NIT SCALE: 1 - 4' 2' V 0" e NEW CABLE TABLE SECTOR AZIMUTH LENGTH OTY COAX COAX SIZE HYBRID QTY. HYBRID SIZE TYPE ALPHA 50' ±75' 2 7/8"0 2 1 1/4" HYBRIFLEX CABLE BETA 170" ±75' 2 7/8"0 GAMMA 290` ±75' 2 7/8"0 NOTE: ALL AZIMUTHS SHOWN ARE RELATIVE TO TRUE NORTH, UNLESS NOTED OTHERWISE *IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AZIMUTHS DEPICTED HEREIN WITH RF DEPARTMENT PRIOR TO INSTALLING ANTENNAS. VERIZON CABLING DETAIL *NOTE: ALL AZIMUTHS SHOWN ARE RELATIVE TO TRUE NORTH, UNLESS NOTED OTHERWISE IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY AZIMUTHS DEPICTED HEREIN WITH RF DEPARTMENT PRIOR TO INSTALUNG ANTENNAS PROPOSED VERIZON — SECTOR FRAME W/ (3) ANTENNA PIPE MOUNTS �q'NM a21M�rH2�" �O Typ U►r PROPOSED SO'-0" TALLI�jj� SUN STATE MONO -ELM Aj PROPOSED VERIZON REMOTE --- RADIO HEAD, (3) PER SECTOR FOR (3) SECTORS PROPOSED VERIZON PANEL ANTENNAS (3) PER SECTOR FOR (3) SECTORS VERIZON ANTENNA PLAN 1 PROPOSED VERIZON OVP MOUNTED ON ANTENNA MOUNT PROPOSED 12'-0" WIDE SUN STATE ACCESS/ UTILITY EASEMENT EXISTING OTHERS UNDERGROUND COMMUNICATION LINE PROPOSED 6'-0" ACCESS GATE T __._ i Y I EXISTING OTHERS ACCESS GATE PROPOSED 10'-0"x15'-O" VERIZON LEASE AREA PROPOSED 24" x 36" SUN STATE FIBER VAULT PROPOSED VERIZON —w EQUIPMENT CABINET 3' MOUNTED TO PROPOSED I CONCRETE PAD PROPOSED 50'-0" TALL — SUN STATE MONO -ELM I ¢d W L J m rn � z 0 cn O 0 O EXISTING OTHERS a UNDERGROUND ELECTRIC PROPOSED 28'-6"X20'-0" SUN STATE LEASE AREA I PROPOSED 8'-0"TALL SUN STATE CMU WALL 12-W SUN STATE I 4 ACCESS/ UTIUTY EASEMENT 6'4)" 12'40" ACCESS GATE 4 ---- TI T a I // LU m o O o ¢ I D- ui p 4 w Ul I a cc ]{7J a0 0 a -67 CONCRETE PAD i � w PROPOSED VERIZON LEASE AREA ;`x;7SCALE;;< ' 2 ENLARGED VERIZON SITE PLAN C 4 PROPOSED SUN STATE 400A METER/ DISCONNECT BANK MOUNTED TO PROPOSED SUN STATE UNI-STRUT, VERIZON TO UTILIZE PROPOSED 200A SPARE METER SLOT / PROPOSED VERIZON OUTDOOR RATEDATEDINTEGRATED T LOAD CENTER MOUNTED ON -- -PROPOSED SUN STATE CMU WALL PROPOSED VERIZON TELCO DEMARCATION MOUNTED ON PROPOSED SUN STATE CMU WALL PROPOSED VERIZON GPS ANTENNA PROPOSED VERIZON REMOTE —OVP MOUNTED ON PROPOSED /\ SUN STATE CMU WALL FUTU RE VERI20N EQUIPMENT CABINET (TYP. OF 2) v / l_, 1 / _�fl 2'-0" PROPOSED VERIZON r ,VxlO'CONCRETE PAD PROPOSED 4" UNDERGROUND CONDUITS FOR NEW VERIZON HYBRIFLEX & COAX CABLES (±75') EXISTING TREE (TYP.) J NOTE: ANTENNAS AND ANTENNA PREPARED FOR(S SUN STATE T O W E R S 1426 NORTH MARMNSTREET#101 GILBERT, AZ 85233 PHONE: 48U664-9588- FAX 480.664-9850 CONSULTING FIRM 4 0PINNACLE Constructun Pralect Menagement She Development 1426 N. MARM N STREET # 101 GILBERT, AZ 55233 PROJECT NO: AZ024070 DRAWN BY: GOA CHECKED BY: KF REV DATE DESCRIPTION BY A 6-13-18 80%7ONING CDA PRELIM FOR ZONING ONLY MOUNTS NOT SHOWN FOR CLARITY. REFER TO 2/ Z-3 FOR DETAIL. AZ02-070 SAGUARO / 333 W, COOL DRIVE ORO VALLEY, AZ 85704 EXISTING OTHERS PIMA COUNTY 20'-0" UNDERGROUND ELECTRIC 1 SHEET TITLE PROPOSED SUN STATE LEASE AREAx X x x X — X — X /1'x VERIZON ENLARGED SITE PLAN sHR-Tr YPER JU Z-3 24'k36'SCALE- t 2' , .. 3 11 Y17"SCALE .. V1 NOT USED *NOTE: • ALL AZIMUTHS SHOWN ARE RELATIVE TO TRUE NORTH, UNLESS NOTED OTHERWISE • AZIMUTHS SHOWN ARE FOR REFERENCE ONLY. REFER TO THE MOST CURRENT RFDS FOR ANTENNA. & AZIMUTH SPECIFICATIONS PROPOSED SPRINT ANTENNAS (2) PER FOR (3) SECTORS PROPOSED 50'-0" TA SUN STATE MONO-E 111A AZIMUTH 265 PROPOSED SPRINT SECTOR FRAME W/ I ANTENNA PIPE MOU PROPOSED SPRINT RADIO HEAD, (3) PER SECTOR FOR (3) SECTORS SPRINT ANTENNA PLAN PROPOSED I2'-0'WIDE I SUN STATE ACCESS/ UTILITY EASEMENT PROPOSED 6'-0" ACCESS GATE I 2'1" EXISTING OTHERS ACCESS GATE PROPOSED 8'-0" TALL SUN STATE CMU WALL PROPOSED SUN STATE 24" x 36" FIBER VAULT PROPOSED 28'-6'k20'-0" SUN STATE LEASE ARE, PROPOSED 50'-0" TALL SUN STATE MONO -ELM 1 W W F W U) m uJ N Z 7 rn O EXISTING OTHERS y UNDERGND O4L� ROU ELECTRIC O PROPOSED SPRINT ICE -BRIDGE , 12'-0* SUN STATE ACCESS/ UTILITY EASEMENT I a <4 as g'-0" 12'-0" ACCESS GATE C I V v V Nam �Zl� ¢ O I 4 ? N � 2 N I w a I a O NOTE: a ANTENNAS AND ANTENNA MOUNTS NOT SHOWN FOR CLARITY. REFER TO 2/ Z-4 FOR DETAIL. 4 v 24k56'SCALE '11 I 1 k 17" SCALE 3/16" = t'-fl" :3/16 2 ENLARGED SPRINT SITE PLAN O" D • B�n • * PROPOSED SPRINT LEASE 4'-0" CONCRETE PAD 2U-0" SUN STATE LEASE AREAx x -� PROPOSED SUN STATE 400A METER/ DISCONNECT BANK MOUNTED TO PROPOSED SUN STATE UNI-STRUT, SPRINT TO UTILIZE PROPOSED 200A SPARE METER SLOT 3EA- PROPOSED SPRINT GPS (ANTENNA MOUNTED ON PROPOSED SPRINT ICE -BRIDGE PROPOSED SPRINT EOUIPM ENT CABINETS MOUNTED ON PROPOSED SPRINT CONCRETE PAD PROPOSED 12'-0"x9'•4" SPRINT L\ AREA PROPOSED SPRINT CIENNA CABINET MOUNTED ON PROPOSED 1 SUN STATE CMU WALL Ii EXISTING TREE (TYP.) PROPOSED SPRINT POWER & TELCO CABINET MOUNTED ON PREPARED FOR(S SUN STATE T O W ER S 1426 NORTH MARMN STREET #101 GILBERT. AZ 85233 PHONE: 48&6649588- FAX 480-664-9850 PINNACLE _�nsiruct P .-,g meni 4SM1e DevbloP,nenl 1426 N. MARMN STREET # 101 GILBERT, AZ 05233 PROJECT NO AZ02 070 DRAWN BY COA CHECKEDBY. KF PROPOSED SPRINT H-FRAME 4'-0" PROPOSED SPRINT FLOODLIGHT AZ02-070 SAGUARO MOUNTED ON PROPOSED SUN STATE CMU WALL 333 W. COOL DRIVE ORO VALLEY, AZ 85704 EXISTING OTHERS PIMA COUNTY UNDERGROUND J `S` ELECTRIC SHEET TITLE X X —_ X — X — X — X — SPRINT ENLARGED SITE PLAN SHEET NUMBER Z-4 24'k SCALE: 112" 77 f•3 11'k17"SCALE 1/4" = 1' 0" � PROPOSED VERIZON OVP MOUNTED ON PROPOSED SECTOR FRAME PROPOSED VERIZON REMOTE RADIO HEAD (3) PER SECTOR FOR (3) SECTORS l' PROPOSED VERIZON SECTOR �- FRAME W/ (3) PIPE MOUNTS PER SECTOR Ij I i TOP OF PROPOSED MONO -ELM BRANCHES ELEVATION 55-0" A.G.L. TOP OF PROPOSED SUN STATE LIGHTNING ROD ELEVATION 54'-0" A.G.L. TOP OF PROPOSED VERIZON ANTENNAS a.._ I! � ELEVATION 52'-1" A.G.L. 4�1 ' �! TOP OF PROPOSED SUN STATE MONO -ELM PROPOSED VERIZON ELEVATION 50'-0" A.G.L. (3) PER SECTOR FOR (3) CENTERLINE OF PROPOSED VERIZON ANTENNAS SECTORS III Q I a ' ! I; ELEVATION 48'-0_A.G.L_ IV (3) PROPOSED SPRINT ANTENNA MASTS I ;1-'--- 1 prw !v__. er- ! BOTTOM OF PROPOSED VERIZON ANTENNAS (6) PROPOSED SPRINT 800 MHz I ELEVATION 43'-11" A.G.L. RRH MOUNTED TO PROPOSED PIPE MOUNT ON PROPOSED 11 _ i TOP OF PROPOSED SPRINT ANTENNAS ELEVATION 41'-9" A.G.L. ANTENNA MOUNT _ It'rT: �4;, ':'id" - .I I .. �}CSI' l�.-1 I I �_'�I._-�+.'� ►;._I 'Fl�y,r—n� (3)PROPOSED 800/1900 MHz III I�M1'I I•" ) I i MOUNTED TO 1 I{yl I CENTERLINE OF PROPOSED SPRINT ANTENNAS _ _ANTENNA ELEVATION 39'-0" A.G.L PROPOSED PIPE MOUNT J (3) PROPOSED 2.5 GHz MIMO {�-:j �i'r-`FAY I BOTTOM OF PROPOSED SPRINT ANTENNAS ANTENNA MOUNTED TO I ! ELEVATION 36'-3" A.G.L. PROPOSED PIPE MOUNT (3) PROPOSED SPRINT 1900 MHz RRH MAST MOUNTED I I o Q .atS 9 pP �'�•a ; TO PROPOSED PIPE MOUNT I I .'L:..CiaeRaLTt y - {,JJ yr lg' ` (2) NE <N N 413010 CABLE(S) & ' +� - � tl(6) COAX CABLE (S) ROUTED ALONG ° rp' 0-INSIDE OF PROPOSED MONO -ELM PROPOSED 50'-0" TALL SUN STATE MONO -ELM I °- �a () I e.Ro s^,4� 3 PROPOSED SPRINT HYBRIFLEX �'' g17de CABLES AND (1) NEW SPRINT FIBER I z° y o SSA G UILD�ING % CABLE, ROUTED ALONG NEWSPRINT I ,s. b.y'; p°'�9�'�a°dal 0 �MgB ICE BRIDGE AND INSIDE PROPOSED o}ac a MONO -ELM RO� E E ON EQUfPM�NT L PROPOSED SPRINT ICE -BRIDGE ^CggINET MOUNTED TO 1 PROPOSED SPRINT ECAB ON Z.3 I I za S , Iy a b° ^ PROPOSED CONCRETE PAD . PROPOSED CONCRETE PAD °9 POS D E RIZON INTEGRATED �T ,PRO`POSED VERIZON OAD CENTER MOUNTED TO (BEYOND)' �R**OPOSED CMU WALL (BEYOND) 1�ROPOSTb ViAl ON wLCO PROPOSED CONCRETE PADD PROPOSED SPRINT BLAB DEMARCATION MOUNTED ON (BEYOND) ROPOSED CMU WALL . '40POSED VERIZON OVP MOUNTED PROPOSED SPRINT 200A PPC, fTO PROPOSED CMU WALL (BEYOND) TELCO CABINET MOUNTED ON PROPOSED SPRINT H-FRAME PROPOSED SUN STATE 8'-0" TALL CMU WALL PROPOSED SPRINT 8'-0"x4'-0" EXISTING OTHERS CHAIN -LINK FENCE CONCRETE PAD EXISTING GRADE II \\/\\ D /\ PROPOSEDN 4'0 � \\ UNDERGROUNDUND C CONDUITS \ PROPOSED SOUTH ELEVATION PROPOSED VERIZON OVP MOUNTED ON PROPOSED SECTOR FRAME PROPOSED VERIZON REMOTE RADIO HEAD (3) PER SECTOR FOR (3) SECTORS PROPOSED VERIZON SECTOR FRAME W/ (3) PIPE MOUNTS PER SECTOR PROPOSED VERIZON ANTENNA (3) PER SECTOR FOR (3) SECTORS (3) PROPOSED SPRINT ANTENNA MASTS (6) PROPOSED SPRINT 800 MHz RRH MOUNTED TO PROPOSED PIPE MOUNT ON PROPOSED ANTENNA MOUNT (3) PROPOSED 800/1900 MHz — ANTENNA MOUNTED TO PROPOSED PIPE MOUNT (3) PROPOSED 2.5 GHz MIMO ANTENNA MOUNTED TO PROPOSED PIPE MOUNT (, (3) PRO S�filA 1900 - MHz RRH MAST MOUNTED f TO PROPOSED PIPE MOUNT, (2) fiEW'VIfR1L04I`IftkIDWBLt((S) &' ` "Z (6) COAX CABLE(S) ROUTED ALONG INSIDE OF PROPOSED MONO -ELM P- o 6� EXI'§TING BOIL ING ,,eXQUIPMENT CABINET MOUNTEDS --"PTO PROPOSED CONCRETE PAD PROPOSED SPRINT ICE -BRIDGE r PROPOSED VERIZON INTEGRATE ° '- LOAD CENTER MOUNTED TO PROPOSED CMU WALL z' PROPOSED VERIZON TELCO DEMARCATION MOUNTED ON PROPOSED CMU WALL PROPOSED VERIZON OVP MOUNTED TO PROPOSED CMU WALL . PROPOSED SUN STATE 8'-0" TALL CMU WALL PROPOSED VERIZON 4'x10' CONCRETE PAD EXISTING OTHERS CHAIN- UNKFENCE TOP OF PROPOSED MONO -ELM BRANCHES ELEVATION 55'-0" A.G.L. TOP OF PROPOSED SUN STATE LIGHTNING ROD ELEVATION 54'-0" A.G.L. _ TOP OF PROPOSED VERIZON ANTENNAS ELEVATION 52'-1" A.G.L. TOP OF PROPOSED SUN STATE MONO -ELM A ELEVATION 50'-0" A.G.L. Y CENTERLINE OF PROPOSED VERIZON ANTENNAS ELEVATION 48'-0" A.G.L. BOTTOM OF PROPOSED VERIZON ANTENNAS ELEVATION 43'-11" A.G.L. TOP OF PROPOSED SPRINT ANTENNAS ELEVATION 41'-9" A.G.L. PREPARED FOR: (5 SUN STATE T O W ER S 1426 NORM MARVIN STREET #101 GILBERT, AZ 85233 PHONE'. 480-%4-9588 - FAX 480-664-9850 CONSULTING FIRM PINNACLE NG, IN, nstruclon Pm)-Manvgement Sne DevebPment 1426 N. MARVIN STREET # 101 } GILBERT. AZ 85233 CENTERLINE OF PROPOSED SPRINT ANTENNAS IL ELEVATION 39'-D" A.G.L. PROJECTNO. AZO 07O BOTTOM OF PROPOSED SPRINT ANTENNAS DRAWN BY. CDA ELEVATION 36'-3" A.G.L. CHECKEDBY. KF PROPOSED 50'-0" TALL SUN STATE MONO -ELM (3) PROPOSED SPRINT HYBRIFLEX CABLES AND (1) NEW SPRINT FIBER I ! I CABLE, ROUTED ALONG NEWSPRINT . ICE BRIDGE AND INSIDE PROPOSED MONO -ELM i PROPOSED SPRINT ECAB ON ` PROPOSED CONCRETE PAD PROPOSED SPRINT BCAB ON PROPOSED CONCRETE PAD I j II PROPOSED & WIDE ACCESS GATE PROPOSED SUN STATE IDENTIFICATION PLAQUE � I PROPOSED SPRINT200A PPC, TELCO CABINET MOUNTED ON PROPOSED SPRINT H-FRAME (BEYOND) a PROPOSED SUN STATE 400A METER/ DISCONNECT BANK MOUNTED TO PROPOSED SUN STATE � 5m. EXISTING GRADE CONCRETE PAD \/\\//V//\1/ "0/���//\\/\\\/\\\/\\\/\\\/\\\\\/PROPOSED VERIZON 4 UNDERGROUND CONDUITS 11 PROPOSED NORTH ELEVATION 2 a'xae SCALEALE'/'� L REV DATE DESCRIPTION BY A 6 13 18 90 : ZONING COA FOR ZONING ONLY AZ02-070 SAGUARO 333 W. COOL DRIVE ORO VALLEY, AZ 85704 PIMA COUNTY SHEET TITLE ELEVATIONS SHEET NUMBER Z-5 PROPOSED VERIZON OVP MOUNTED ON PROPOSED SECTOR FRAME PROPOSED VERIZON REMOTE RADIO HEAD (3) PER SECTOR FOR (3) SECTORS - - i j it PROPOSED VERIZON SECTOR FRAME W/ (3) PIPE MOUNTS PER SECTOR PROPOSED VERIZON ANTENNA I (3) PER SECTOR FOR (3) SECTORS II ir.1 IFe ,j •-( I (3) PROPOSED SPRINT ANTENNA MASTS < (6) PROPOSED SPRINT 800 MHz RRH MOUNTED TO PROPOSED D PIPE MOUNT ON PROPOSED' ^� ANTENNA MOUNT (3) PROPOSED 800/1900 MHzI ANTENNA MOUNTED TO _� -. PROPOSED PIPE MOUNT (3) PROPOSED 2.5 GHz MIM0 ANTENNA MOUNTED TO PROPOSED PIPE MOUNT --' (3) PROPOSED SPRINT 1900 - MHz RRH MAST MOUNTED TO PROPOSED PIPE MOUNT (2) NEW VERIZON HYBRID — CABLE(S) & (6) COAX CABLE(S) ROUTED ALONG INSIDE OF PROPOSED MONO -ELM EXISTING BUILDING i 1 I PROPOSED VERIZON EQUIPMENT CABINET MOUNTED TO PROPOSED CONCRETE PAD ! ! PROPOSED VERIZON OVP MOUNTED TO PROPOSED CMU WALL PROPOSED VERIZON INTEGRATED LOAD CENTER MOUNTED TO PROPOSED CMU WALL PROPOSED VERIZON TELCO DEMARCATION MOUNTED ON PROPOSED CMU WALL PROPOSED SUN STATE 400A METER/ DISCONNECT BANK MOUNTED TO PROPOSED SUN STATE a as _ PROPOSED VERIZON SECTOR - PROPOSED VERIZON SECTOR - FRAME W,I (3) PIPE MOUNTS PER SECTOR TOP OF PROPOSED MONO -ELM BRANCHES PROPOSED VERIZON REMOTE RADIO HEAD (3) PER SECTOR ELEVATION 55'-O" A.G.L. FOR (3) SECTORS TOP OF PROPOSED SUN STATE LIGHTNING ROD PROPOSED VERIZON OVP — ELEVATION 54'-0" A.G.L. TOP OF PROPOSED VERIZON ANTENNAS MOUNTED ON PROPOSED SECTOR FRAME (i ELEVATION 52'-1" A.G.L. TOP OF PROPOSED SUN STATE MONO -ELM PROPOSED VERIZON ANTENNA (3) PER SECTOR FOR (3) + ELEVATION 50'-0" A.G.L. 1� __ CENTERLINE OF PROPOSED VERIZON ANTENNAS II : ELEVATION 48'0" -G.L. SECTORS \ \� PROPOSED VERIZON CONCRETE PAD 4'X10' \/ � / / \ �PROPOSED VERIZON 4"0 UNDERGROUND CONDUITS N /� / PROPOSED WEST ELEVATION (6) PROPOSED SPRINT 800 MHz RRH MOUNTED TO PROPOSED BOTTOM OF PROPOSED VERIZON ANTENNAS PIPE MOUNT ON PROPOSEDANTENNA MOUNT ELEVATION 43'-11" A.G.L. TOP OF PROPOSED SPRINT ANTENNAS (3) PROPOSED SPRINT ANTENNA MASTS ELEVATION 41'-9" A.G.L. (3) PROPOSED 800/1900 MHz - CENTERLINE OF PROPOSED SPRINT_ ANTENNAS _ ANTENNA MOUNTED TO ELEVATION 39'-0" A.G.L. PROPOSED PIPE MOUNT BOTTOM OF PROPOSED SPRINTANTENNAS (3) PROPOSED 2.5 GHz MIMO - ANTENNA MOUNTED TO ELEVATION 36'-3" A.G.L. PROPOSED PIPE MOUNT PROPOSED 50'-0" TALL SUN STATE MONO -ELM (3) PROPOSED SPRINT HYBRIFLEX CABLES AND (1) NEW SPRINT FIBER CABLE, ROUTED ALONG NEW SPRINT ICE BRIDGE AND INSIDE PROPOSED MONO -ELM PROPOSED SPRINT ICE -BRIDGE PROPOSED SPRINT ECAB ON PROPOSED CONCRETE PAD PROPOSED SPRINT BCAB ON PROPOSED CONCRETE PAD PROPOSED SPRINT CIENNA CABINET MOUNTED ON PROPOSED CMU WALL (BEYOND) PROPOSED SPRINT SITE LIGHT MOUNTED TO PROPOSED CMU WALL PROPOSED SUN STATE 8'-0" TALL CMU WALL PROPOSED SPRINT 200A PPC, TELCO CABINET MOUNTED ON PROPOSED SPRINT H-FRAME PROPOSED SPRINT B'•0"x4'-0" CONCRETE PAD EXISTING GRADE (3) PROPOSED SPRINT 1900 MHz RRH MAST MOUNTED TO PROPOSED PIPE MOUNT TOP OF PROPOSED MONO -ELM BRANCHES ELEVATION 55'-0" A.G.L. TOP OF PROPOSED SUN STATE LIGHTNING ROD ELEVATION 54'-0" A.G.L. : TOP OF PROPOSED VERIZON ANTENNAS ELEVATION 52'-1" A.G.L. !'1 TOP OF PROPOSED SUN STATE MONO -ELM •: __ ,�; ) _ - ELEVATION 50'-0" A.G.L. ,I I .iil I j I ,i _CE_NTERLINE OF PROP_OSED_VERIZ_ON ANTENNAS 6 I ! I ) II I ELEVATION 48'-0" A.G.L. I BOTTOM OF PROPOSED VERIZON ANTENNAS � ELEVATION 43'-11" A.G.L. ! ' TOP OF PROPOSED SPRINT ANTENNAS ELEVATION 41'-9" A.G.L. PREPARED FOR'. (5 SUN STATE T O W E R S 1426 NORTH MARVIN STREET #101 GILBERT, AZ 85233 PHONE. 480-664-9588 - FAX 480 664-9850 CONSULTING FIRM PINNACLE 1. LTlNC Corslluc F.'­ V.-g— She I- - -" 1426 N. MARVIN STREET # 101 GILBERT. AZ 85233 CENTERLINE OF PROE SEQ_! PRINT ANTENNAS ELEVATION 39'-0" A.G.L. PRO•IECTNO. AZ°2 070 BOTTOM OF PROPOSED SPRINT ANTENNAS DRAWN Br CDA ELEVATION 36'-3" A.G.L. CHECKED BY KF PROPOSED 50'-0" TALL SUN - STATE MONO -ELM - -. (3) PROPOSED SPRINT HYBRIFLEX CABLES AND (1) NEW SPRINT FIBER (2) NEW VERIZON HYBRID - CABLE, ROUTED ALONG NEW CABLE(S) $ (6) COAX CABLE(S) i SPRINT ICE BRIDGE AND INSIDE ROUTED ALONG INSIDE OF - I I 1 PROPOSED MONO -ELM PROPOSED MONO -ELM - .- EXISTING BUILDING PROPOSED SPRINT ICE-BRIDGE-- i PROPOSED SPRINT ECAB ON - - PROPOSED CONCRETE PAD PROPOSED SPRINT BCAB ON - PROPOSEDCONCRETEPAD - 1 ' - PROPOSED VERIZON - PROPOSED SUN STATE ! EQUIPMENT CABINET MOUNTED 8'-0"TALL CMU WALL z TO PROPOSED CONCRETE PAD PROPOSED SPRINT SITE I I PROPOSED VERIZON OVP MOUNTED LIGHT MOUNTED TO PROPOSED CMU WALL PROPOSED SPRINT 200A PPC, TELCO CABINET MOUNTED ON PROPOSED SPRINT H-FRAME PROPOSED SPRINT CIENNA - CABINET MOUNTED ON PROPOSED CMU WALL PROPOSED SPRINT 8'-0"x4'-0" - CONCRETE PAD EXISTING GRADE X/ www��ww/� �� / /// / / � / /\//�`. /, ij� /� 24ta6' SCALE_17 SCALE,:4=,-° I 1 1 PROPOSED EAST ELEVATION TO PROPOSED CMU WALL ,{— PROPOSED VERIZON INTEGRATED LOAD CENTER MOUNTED TO PROPOSED CMU WALL PROPOSED VERIZON TELCO DEMARCATION MOUNTED ON PROPOSED CMU WALL � PROPOSED SUN STATE 400A III�IIIIII��II� III♦ --III■ -IIIIIIIII♦—III■ IIIII,IIIIIIIIIII,—IIIIII' III■IIIIIIIII■—IIII♦ PRELIM FOR ZONING ONLY METER/ DISCONNECT BANK MOUNTED TO PROPOSED SUN STATE AZ02-070 SAGUARO � /v A x PROPOSED VERIZON j \/ 4'x10' CONNCRETTE PAD 333 W COOL DRIVE ORO VALLEY, Az e57on PIMA COUNTY PROPOSED VERIZON 4"O \ sHEEr TITLE UNDERGROUND CONDUITS /\ , �'x/�� ELEVATIONS SHEET NUMBER 2c A36SCALE 1'4" = 1 0' f'� x 7 SCALE 1:6 = , �0 L Z-6 NEW ANTENNA SCHEDULE ELECTRICAL ANTENNA RAD DOWNTILT RANGE SECTOR ANTENNA ANTENNA ANTENNA FREQUENCY ANTENNA AZIMUTH CENTER MANUFACTURER MODEL SIZE (MHz) QUANTITY (A.G.L) 800 1900 2500 BAND BAND BAND SECTOR 1 NOMA MAA-AAHC (64T64R) 25.63"Al 9.72'S(9.6" 2500 1 20` 39--0" N/A N/A 1` SECTOR 1 RFS APXVBBLL15X_43-C-120 66.7"X19.6"x8.5" 800/1900 1 20` 39'1" 21 2° N/A SECTOR2 N019A MAA-AAHC(64T64R) 25.63"xl9.72"x9.6" 2500 1 110, 39'1" N/A N/A 1` SECTOR2 RFS APXVBBLL15X_43-C-120 66.7"09.6"x8.5" 800/1900 1 110, 39'-O" 2° 2° N/A SECTOR3 NOMA MAA-AAHC(64T64R) 25.6n19.72"x9.6" 2500 1 265° 39'-0" N/A N/A 1` SECTORS RFS APXVBBLL15X_43-C-120 66.7"x19.6"x8.5" 800/1900 1 265' 391-O" 2' N/A NEW RRH SCHEDULE SECTOR RRH RRH RRH SIZE RRH WEIGHT (LBS) RRH FRE .RA) GE RRH MANUFACTURER MODEL (MHzSECTOR QUANTITY 19'H x 13"W x 8.6" D 53 1 ALCATEL-LUCENT 2x50 w/FILTER 19"H x 13"W x 6.6" D w/FILTER 64 862 -869 2 SECTOR 1 ALCATEL-LUCENT 4x45 25.1 "H x 11.1 "W x 10.69"O 59.5 1930 - 1995 1 SECTOR2 ALCATEL-LUCENT 2x50 19'H x 13"W x 8.6" D 53 862 - 869 2 w/FILTER 19"H x 13"W x 8.6' D w/FILTER 64 SECTOR 2 ALCATEL-LUCENT 4x45 25.1 "H x 1 1.1"W x 10.69"D 59.5 1930 - 1995 1 SECTOR 3 ALCATEL-LUCENT 2x50 19'H x 1 & W x 8.6" D 53 862 - 869 2 w/FILTER 19"H x 13'wx 8.6' D WFILTER 64 SECTOR 3 ALCATEL-LUCENT 4x45 25.1"H x 11.1"W x 10.69"D 59.5 1930 - 1995 1 NEW PIPE MOUi 4"OD xS'LONG NEW COMMSCC MC-RM1500-3 (C EXISTING 50'-C" MONO -ELM NOTE: WIRING & HYBRID DETAILS NOT SHOWN FOR CLARITY. NEW 800 MHz RRH MOUNTED TO NEW PIPE MOUNT 2 J'OD x 6'LONG (TYP. OF 2) NEW ANTENNAS MOUNTED TO NEW PIPE MOUNT 2 J"OD x&LONG (TYP.) NEWSPRINT 1900 MHz RRH MAST MOUNTED TO NEW PIPE MOUNT 2 a' OD x 4' LONG w/(2) a' U-BOLTS (TYP. OF 2) NEW SPRINT VFA10-SD ANTENNA MAST SPRINT ANTENNA & RRH MOUNTING DETAIL I F I 1 1 SPRINT ANTENNA & RRH MOUNTING DETAIL 1 Nc E 1 2 1 PIPE MOUNT (2)rl SECTOR, (6) TOT STANDOFFARM SITE PRO #MMO: (2) PER SECTOR, (6) TOTAL UNIVERSAL RING SITE PRO #LWRD APPROVED EQW UNIVERSAL RING SITE PRO #LWRM (x2) OR APPROVED EQUAL ISOMETRIC VIEW VERIZON ANTENNA MOUNT DETAIL PLAN VIEW NEW PANEL ANTENNA NEW 2.0, 8'-0' PIPE. (3) PET FOR (3) SECTORS 013 SITE NAME: SAGUARO SITE NUMBER: A ZO SUN STATE T O w E R 5 FCC TOWER ID: TBD HIGH MONO -ELM N PREPARED FOR: (5 SUN STATE T O W E R S 1426 NORTH MARM N STREET # 101 GILBERT, AZ 85233 PHONE: 480-6649588 - FAX 480-654-9850 1 ' PINNACLE onso-u<�on P'jmt Mnrn9em 1 see De 1'Pt.ni 1426 N MARMN STREET # 101 GILBERT, AZ 85233 PROJECT NO: AZ02-070 DRAWN BY: CDA CHECKED BY: KF -IIIIIIIIIII,-IIIII, -IIIIIIIIIII,-IIIII, ;J:]=1gIdi FOR ZONING L AZ02-070 333 W. COOL DRIVE ORO VALLEY, AZ 85704 PIMA COUNTY SH EEf TITLE DETAILS 1 X DIGITAL PRINT APPLIED TO .080 ALUMINUM SHEEPNUMB7ER Z/ ;rs`E 3 ISITE IDENTIFICATION PLAQUEJ NS"E 4 333 W. COOL DR ORO VALLEY, AZ 85704 Owned By: SUN STATE TOWERS LLC. Telephone: 866-426-9204 WWW.SU NSTATETOWER.COM NO TRESPASSING Verizon Wireless & Sun State Towers New Wireless Communications Facility — TUC Peppersauce / AZ02-070 Saguaro Fact Sheet Address 333 W. Cool Dr. Parcel Size 0.5648 Acres Zoning C-2 Use Unmanned Communications Facility Design 50' stealth faux elm tree EXISTING PARKING LOT EXISTING TREE (PIP.) . PROPOSED 12'4Y' WIDE SUN STATE ACCESS; UTILITY EASEMENT EXISTING UNDERGROUND TELEPHONE LINE PROPOSED SUN STATE 2D . 31Y LEASE AREA PROPOSED 50-0' TALL SUN STATE MONOELM WEST COOL DRIVE ANEW 24'.30" FIBER PULL VAULT I APN_ 22514, 7CIC I I ', ZONING: G2 — I I DUSTING UNDERGROUND SAMTARY SEWER LINE a d �U r cA13 .... ................ APN: 22514170A DaSTINGCONCRETE 4 WALKWAY EXISTING UNDERGROUND WATER LINE a W 1 a� 11 � I "' --PEW 22514170B I _ I I EXISTING UNDERGROUND ELECTRICAL LINE jTYP.; ;,.al.J:,E ME � Michelle Lamoureux, Pinnacle Consulting, Inc. (480) 664-9588 Michelle. Lamoureux@Pinnacleco. net Biwabkos Consultants LLC RF Safety and NIER Analysis Report � O August 22, 2018 �Q1Q Site: AZ02-070 Saguaro - TUC I eppersauce �o Oro Valley, AZ Prepared for: 40 PINNACLE on behalf of Verizon Wireless 16N Table of Contents 1 Certification.................................................................................................................3 2 Executive Summary ..........................................................:..........................................4 2.1 Conclusion and Recommendations: ...................................................................... 4 3 Introduction..................................................................................................................5 3.1 Site Description: ................................................................................................5 3.2 Site Configuration Being Modeled: ...................................................................... 5 3.3 Assumptions: ......................................................................................................... 5 4 Predictive Analysis Details: ......................................................................................... 6 4.1 Analysis Locations: ............................................................................................... 6 4.2 Antenna Inventory: ............................................................................................... 6 4.3 RF Emissions Diagram(s)- All Transmitters: ....................................................... 7 4.4 RF Emissions Diagram(s)- Pinnacle Consulting/ Verizon Transmitters Only: .... 9 5 Signage/ Mitigation: .................................................................................................. 11 5.1 Signage/ Barrier Detail........................................................................................11 5.2 Signage/ Barrier Diagram...................................................................................11 6 Conclusions and Recommendations:.........................................................................12 7 Appendix A: FCC Compliance and RF Safety Policies............................................13 8 Appendix B: Overview of RoofView® Functions and Assumptions .......................15 9 References..................................................................................................................16 10 Limited Warranty.......................................................................................................17 Page 2 of 17 1 Certification This report, prepared by Biwabkos Consultants LLC for Pinnacle Consulting (on behalf of Verizon Wireless), is intended to document compliance and evaluate power density levels as outlined in the report. The computations, analysis, and resulting report and conclusions were based on applicable FCC guidelines and regulations for maximum permissible exposure to humans consistent with FCC OET Bulletin 65, Edition 97-01. Additionally, Biwabkos Consultants LLC certifies that the assumptions are valid and that the data used within Biwabkos Consultants' control are accurate, including information collected as part of Biwabkos Consultants' field surveys (if applicable). Biwabkos Consultants LLC does not however certify the accuracy or correctness of any data provided to Biwabkos Consultants LLC for this analysis and report by Pinnacle Consulting or other third parties working on behalf of Pinnacle Consulting. I certify that the attached RF exposure analysis and report is correct to the best of my knowledge, and all calculations, assumptions and conclusions are based on generally acceptable engineering practices: e &"�" Report Pr aced By Melissa A Summers, Principal Engineer August 22, 2018 Report Reviewed By Steven Kennedy, Engineering Manager August 22, 2018 Page 3 of 17 2 Executive Summary This report provides the results of an RF power density analysis performed for Pinnacle Consulting on behalf of Verizon Wireless at site TUC Peppersauce in accordance with the Federal Communications Commission (FCC) rules and regulations for RF emissions described in OET Bulletin 65, Edition 97-01. This report addresses RF safety for two classified groups defined by OET Bulletin 65: Occupational/ Controlled and General Population/ Uncontrolled. Based on the analysis, this site will be Compliant with FCC rules and regulations and Verizon Wireless' Signage and Barrier Policy since the mitigation details provided in Table I are implemented. Minimum Required For Compliance 16tigation Infornwtiun li 0,P) A ® - Caution NN arning Guidelines Site Info 7 I 5 ; �§�- Banier = %larker r=��7r- Notice Access Point Alpha Bcta Ganum Delta Omni Notes/ Additional Compliance Requirements(s): No Mitigation required Table 1: Mitigation Requirements for Compliance 2.1 Conclusion and Recommendations: • The results of the analysis indicate that the power density levels in the generally accessible areas on the Ground level will not exceed the FCC's MPE limit for both General Population and Occupational environment. • The results of the analysis indicate that the power density levels in the generally accessible areas on the Adjacent Buildings' Rooftops will not exceed the FCC's MPE limit for both General Population and Occupational environment. • The max theoretical % MPE (Occupational) is 7.4% at the Adjacent Building. • No mitigation is required. • This site will operate in general compliance with FCC OET Bulletin 65 and Verizon Wireless' Signage and Barrier policy. Page 4of17 3 Introduction The purpose of this analysis and report is to evaluate the cumulative power density levels of all non -excluded antennas located on the Monopole and identify any areas of concern that require mitigation. This report also assesses the Monopole's compliance with FCC OET Bulletin 65; "Guidelines for Human Exposure to Radio -frequency Electromagnetic Fields". The power density simulation performed for this site utilized RoofView® analysis software. All antennas were assigned an operating frequency and transmit power and were deemed to be operating at 100% of their rated output power. 3.1 Site Description: • Site Name: • Street Address: + Latitude: • Longitude: • Structure Type: • Structure Height: TUC Peppersauce 333 W. Cool Drive Oro Valley, AZ 85704 320 21' 11" N 1100 58' 32" W Monopole 50' AGL • BTS Equipment Location: On the west side of the courtyard. • Co -Locators/ Other Antennas: There are no other co -locators at this time • Access: Access is through a locked gate on the north side of the fenced compound • Other Notes: There are two adjacent buildings that may be accessible to the General Population. 3.2 Site Configuration Being Modeled. • This is a 3- sectored site with 3 transmitting antennas per sector (total of 9). There are 3 additional unused antennas reserved for future use. • Each sector supports LTE carriers at 700 MHz, 850 MHz, 1900 MHZ, and 2100 MHZ frequencies and CDMA carriers at 850 MHz. • All LTE supports MIMO. 3.3 Assumptions: • The fenced compound will remain locked and is not accessible to the General Population. • There are two adjacent building whose rooftops may be accessible to the General Population. Page 5of17 4 Predictive Analysis Details: For purposes of this analysis, RootViewe was configured to provide an output based on the appropriate MPE limit(s) published in the FCC's guidelines. The antenna information was loaded into RootViewg, an MPE predictive analysis tool by Richard Tell and Associates. Inc. 4.1 Analysis Locations: Number of Elevations Analyzed: 2 • The Ground level is accessible to the General Population outside the fenced compound and is accessible to the Occupational Population within the bricked walled compound. • The Adjacent Building rooftop level may be accessible to the General Population. 4.2 Antenna Inventory: The following table contains the technical data used to simulate the power density that may be encountered with all antennas simultaneously operating at full rated power with the exception of any excluded antennas cited in this document. The assumptions used are based on past experience with communications carriers. 71DFN,�� (MHz) ! re Trans Power Trans Count Other Loss C"C Power Mf Model Z (ft) Ground Z (ft} Rooftop T (ft) A r d8d 181111d1h Gain Pt Dir VZAIA C850 850 20 8 1.5 113.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;50 VZA2A L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;50 VZA2B L850 850 40 2 0.5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;50 VZA2C L1900 1960 30 4 0.5 107.0 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 14.75 63;50 VZA3A L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;50 VZA3B L850 850 40 2 0,5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;50 VZA3C L2100 2150 45 4 0.5 160.4 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 15.05 60;50 VZ81A C850 850 20 8 1.S 113.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;170 VZB2A L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;170 VZB2B L850 850 40 2 0.5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;170 VZB2C L1900 1960 30 4 0.5 107.0 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 14.75 63;170 VZ83A L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;170 VZ83B L850 850 40 2 0.5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;170 VZ03C L2100 2150 45 4 0.5 160.4 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 15.05 60;170 VZC1A C850 850 20 8 1.5 113.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;290 VZC2A L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;290 VZC2B L850 850 40 2 0.5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;290 VZC2C L1900 1960 30 4 0.5 107.0 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 14.75 63;290 VZOA L700 730 30 2 0.5 53.5 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 12.95 75;290 VZC3B L850 850 40 2 0.5 71.3 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 13.65 70;290 VZC3C L2100 2150 45 4 0.5 160.4 Amphenol HEX658CW0000 40.9 40.9 Hexport 8.2 15.05 60;290 Table 2- Antenna Inventory Page 6 of 17 4.3 RF Emissions Diagram(s)- All Transmitters: The following Diagram(s) represent the theoretical spatially averaged Maximum Permissible Exposure (MPE) percentages that are expected for each study's elevation from all Transmitters. 100 Dr ivcway VZW Gamma (2901) Vewon Equipment within Fenced C ornt)rund Adjacent Building VZW Alpha (SOo) V7W Bet (17 ) Arai rr-r nt f3t,i6cttirg I Statistical Summary s %MPE SO. FT %SO. FT. a 13006 100.00 Y. of total ROOF Aren 0 -20 1366E 100 00 Y. of Selected A,ea 21 -100 6 0-06 % of 8efected Area 101 -1000 rj 0 00 Y. of Selected Area > 1000 6 0 0d % of Selected Area Roof Area 13000 Sq- ft. Max %MPE 1 9 % Min %MPF 00 % Using Near/Far Spatial Avg Model With FCC 1997 Occu ational Standard <_ 20% Occupational Limit (s 100% General Population Limit) > 20% through 100% Occupational Limit (> 100% General Population Limit) > 100% through 1000% Occupational Limit `,.i > 1000% Occupational Limit Diagram I - MPE% for Ground Level Page 7 of 17 Oriveway 1w WW' Gamma (290101 Verizon Equipment 130 ; q� q�� s i Adjacent Building Ground VZW Alpha (500) within Fetyted (ompaunrl Vzw !'seta (1 mn) Statistical Summary r :MPG SO. F7 %SO. FT- 13000 10006 % of toted ROOF Area 0-20 13000 100,00 % otSeleaedAree 21 -100 0 0.06 % otSelectadAm* 101 -1000 6 0 06 % of SetectedA. 00t ct r tedea�n _l ._ -- t Root Area 13000 sq. N. Max %MPE 7 A % Min %MPE 00 % Using Naar/Far Spatial Avg Model Adjacent Auilding Courtyard 5 20% Occupational Limit (s 100% General Population Limit) i > 20% through 100% Occupational Limit (> 100% General Population Limit) > 100% through 1000% Occupational Limit Red > 1000% Occupational Limit Diagram 2- MPE% for Adjacent Building Roof Level Page 8 of 17 4.4 RF Emissions Diagram(s)- Pinnacle Consulting/ Verizon Transmitters Only: The following Diagram(s) represent the theoretical spatially averaged Maximum Permissible Exposure (MPE) percentages that are expected for each study's elevation. An additional 1 % Occupational MPE Limit (5% General Population MPE limit) is included to demonstrate where Verizon Wireless is a significant contributor to accessible areas where multiple carrier's transmitters are present. Tan <_ 1 % Occupational Limit (s 5% General Population Limit) > 1 % through 20% Occupational Limit (s 100% General Population Limit) > 20% through 100% Occupational Limit (> 100% General Population Limit) > 100% through 1000% Occupational Limit F , ,,i > 1000% Occupational Limit Diagram 3- MPE% for Ground Level Page 9 of 17 .. 4 k p.v Adjacent Building Way Ground �k Gamma (2901) a s VZW' A1t.ifa (5(PI) Verizon Equipment. within Fenced Compound �, .. i'tf,tttytrcl VIW Beta 11I( Statistical Summary -_- XMPE SO. FT %SO, FT. a 13006 100 00 % of total ROOF Area - 0 -20 1300;7 100 00 Y. of Selected Area 21 -100 ti 006 % of Selected Area 101 _ 1000 6 0 00 % of Seleced Area > 1000 0 06 % of SelenedArea Root Area 13000 sq. ft. Max %MPE 7A % Min %MPE 0.0 % Using Near/Far Spatial Avg Model With FGc-1997 Occupational Standard Tan s 1 % Occupational Limit (<_ 5% General Population Limit) it een > 1 % through 20% Occupational Limit (s 100% General Population Limit) Blue > 20% through 100% Occupational Limit (> 100% General Population Limit) > 100% through 1000% Occupational Limit Red > 1000% Occupational Limit Diagram 4- MPE% for Adjacent Building Roof Level Page 10 of 17 5 Signage/ Mitigation: 5.1 Signage/ Barrier Detail Minimum Required For Compliance Mitigation Information (I CA) A A 'i Notice Caution_ Wniving Guidelines Site Info Barrier Ntarker Access Point .'UP113 Beta Ganum Delta Omni Table 3-Mitigation Requirements for Compliance Notes/ Additional Mitigation Details from Audit: No Mitigation Required 5.2 Signage/ Barrier Diagram A N Adjacent Building Driveway Ground r. 100, VZW Gamma (2W) J� 'Potio VZWAJphalW) i At Cowya,d Vernon Equipment within Fenced Compound Adjacent Budding_ vzw Beta (I 7o*) Page 11 of 17 6 Conclusions and Recommendations: • The results of the analysis indicate that the power density levels in the generally accessible areas on the Ground level will not exceed the FCC's MPE limit for both General Population and Occupational environment. • The results of the analysis indicate that the power density levels in the generally accessible areas on the Adjacent Buildings level will not exceed the FCC's MPE limit for both General Population and Occupational environment. • The max theoretical % MPE (Occupational) is 7.4% at the Adjacent Building. • No mitigation is required. • This site will operate in general compliance with FCC OET Bulletin 65 and Verizon Wireless' Signage and Barrier policy. Note: Modifications to the site: and/or increases in channel counts or power levels exceeding those listed in this report will require additional evaluation to determine compliance Page 12 of 17 7 Appendix A: FCC Compliance and RF Safety Policies In August of 1997, the FCC published OET Bulletin 65 Edition 97-01 to regulate methods for evaluating compliance with FCC guidelines for human exposure to radiofrequency (RF) electromagnetic fields. The FCC guidelines for human exposure to RF electromagnetic fields incorporate two categories of limits; namely "Controlled" (a.k.a. Occupational) and "Uncontrolled" (a.k.a. General Public). The guidelines offer suggested methods for evaluating fixed RF transmitters to ensure that the controlled and uncontrolled limits deemed safe by the FC for human exposure are not exceeded. OET Bulletin 65 recommended guidelines are intended to allow an applicant to "make a reasonably quick determination as to whether a proposed facility is in compliance with the limits." In addition, the guidelines offer alternate supplementary considerations and procedures such as field measurements and more detailed analysis that should be used for multiple emitter situations. These guidelines define RF as emissions in the frequency range of 300 kHz to 100 GHz. The FCC define Maximum Permissible Exposure (MPE) limits within this frequency range based on limits recommended by the National Council on Radiation Protection and Measurement, the Institute of Electrical and Electronics Engineers (IEEE), and by the American National Standards Institute (ANSI). The specific MPE limits defined by the FCC are as follows: Frequency Range [MHz] 0.3 - 3.0 3.0 - 30 30-300 300 - 1,500 1.500-100,01 Range [MHz] 0.3 - 3.0 3.0 - 30 30-300 300 -1,500 1,500 -1000 Limits i Electric Field Strength (E) [Vim] 614 1842/f 61.4 Electric Field Strength (E) [Vim] 614 842/f 27.5 Magnetic Field Strength (H) [Alm] 1.63 4.89/f 0.163 Magnetic Field Strength (H) [Alm] 1.63 2.191f 0.073 Power Density (S) [mW/Cm"2] 100' 900/f"2• 1 V300 5 Power Density (S) [mW/Cm"2] 100' 1 SO&2` 0.2 f/1500 1 Averaging Time JEJ"2, JHJ"2 or S [minutes] 6 6 6 6 6 Averaging Time JEJ"2, JHJ"2 or S [minutes] 30 30 30 30 30 The FCC states that "Occupational/ Controlled limits apply in situations in which persons are exposed as a consequence of their employment provided those persons are fully aware of the potential for exposure and can exercise control over their exposure. Limits for Occupational/ Controlled exposure also apply in situations when an individual is transient through a location where Occupational/ Controlled limits apply provided he or she is made aware of the potential for exposure." Page 13 of 17 For General Population/ Uncontrolled limits, the FCC states that "General Population/ Uncontrolled exposures apply in situations in which the general public may be exposed, or in which persons that are exposed as a consequence of their employment may not fully be aware of the potential for exposure or cannot exercise control over their exposure." For purposes of this analysis, all limits are evaluated against the Power Density limits. Typical guidelines for determining whether Occupational/ Controlled limits can be applied include insuring the environment (such as a rooftop) as limited/controlled access via locked doors or physical barrier that are preferably controlled by a landlord that is aware of the situation and can inform anyone going through the locked door of the existence of the RF emissions. Such notification/awareness is typically accomplished by means of signage on the door, or other access to the area of concern, as well as signage on or near the antennas. Examples of such signs include the following: Radio frequency fields beyond this point may exceed the FCC general public exposure limit 0-, ae pes afgn> and a1. guldegnoc for worlung M tadro frequency env4onmeMs ,&CAUTION Beyond this point: Radio frequency fields at this site may exceed FCC rules for human exposure. For your salary obey ae posted slgm aM sfb ;.WNk— la —M l; M radio negwncy wtNrorxwd>. Beyond this point: Radio frequency fields at this site exceed the FCC tules for human exposure. Falk" to Obey all posted argon and W. pIrleenes 1. —Aing in radio trequerxy envitorteunts could re>uK In sMMU> Igtrey. Standards for when to use each of the above signs for Occupational situations are as follows: No sign required: <20% of Occupational MPE Blue Sign, Notice: 20% to <100% of MPE Yellow Sign, Caution: 100% to <1000% of MPE Red Sign, Warning: >1000% of MPE All MPE references are to the M_' Occupational limits. Page 14 of 17 8 Appendix B: Overview of RoofView® Functions and Assumptions RoofView® is a tool developed and supported by Richard Tell Associates, Inc. to be used for analysis of RF field levels at telecommunications sites produced by antennas of the type commonly used in cellular, paging, SMR, PCS and two-way radio communications services. Although its name suggests that the tool is only for use in evaluating emissions for roof top applications, it can also be used to evaluate ground level effects of tower facilities. RoofView® allows the user to apply near field, far field, or a combination of near and far field computational methods as desired by the user. For this analysis, near field computations are used for areas within the near field, and far field computations are used beyond the near field. Specific break points are dynamic based on the aperture of the antenna being analyzed. The near field methodology is based on a cylindrical model that assumes the power into an antenna is distributed as a cylinder around the aperture of the antenna. Research by Richard Tell Associates, Inc. found that using such a model, along with corrections for height and antenna pattern, is very accurate, if not slightly conservative in estimating RF exposure. FCC Bulletin 65 recognizes the use of the cylindrical model for near field calculations. The following picture and corresponding equation summarize the computations used by RoofView® on a bin -by -bin basis when the near field method is used: 11 h S _ 360 P 0 aW 2nRh 7 3 dB Beam (degrees) - 0BW Each bin's results are then also adjusted by spatially averaging the portion of a 6 foot tall human that intercepts the aperture over 6 feet. Once the antenna is completely above (or below) the height that corresponds io a 6 foot tall human, the cylindrical results are reduced Page 15 of 17 to 10% of their results and then dissipated inversely in proportion to the square of the distance. Once bins being analyzed fall outside of the near field (as determined by a method and variable that is user -selectable; see below for method and variable used in this analysis), a far -field spatial average is calculated. Spatially averaged power density in the far -field is calculated by reducing the spatially averaged power density inversely, by the square of the distance from the antenna(s). There are several input variables to RoofView® that can impact the results produced when evaluating specific cell sites. Those variables are summarized accordingly: Standard FCC 1997 Occupational (default) FCC 1997 General Population (as applicable) Model Near/Far Spatial Average Uptime 100% (vary as applicable) Near/Far Field Transition Method X ApHt Near/Far Field Transition At Ht Factor 1.5 9 References FCC (1997). "Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields"; Federal Communications Commission; Office of Engineering and Technology, OET Bulletin 65, Edition 97-01, August. Richard Tell Associates, Inc. (2003). RoofView® User Guide Version 4.15, Richard Tell Associates, Inc., February 10, 2003. Page 16 of 17 10 Limited Warranty Biwabkos Consultants LLC warrants that this analysis was performed in good faith using the methodologies and assumptions covered in this report and that data used for the analysis and report were obtained by Biwabkos Consultants LLC employees or representatives via site surveys or research of Verizon Wireless' available information. In the event that specific third party details were not available, best efforts were made to use assumptions that are based on industry experience of various carriers' standards without violating any confidential information obtained under non -disclosure terms. Biwabkos Consultants LLC also warrants that this analysis was performed in accordance with industry acceptable standards and methods. There are no other warranties, express or implied, including but not limited to, the implied warranties of merchantability and fitness for a particular purpose, relating to this agreement or to the services rendered by Biwabkos Consultants hereunder. In no event shall Biwabkos Consultants be held liable to Pinnacle Consulting, or to any third party, for any indirect, special, incidental, or consequential damages, including but not limited to loss of profits, loss of data, loss of good will, and increased expenses. In no event shall Biwabkos Consultants be liable to Pinnacle Consulting for damages, whether based in contract, tort, negligence, strict liability, or otherwise, exceeding the amount payable hereunder for the services giving rise to such liability. Page 17 of 17 Attachment 1 Proposed Cell Facility on Cool Drive Condition of Approval (OV1701979) 1. Approval of the fifty (50') foot cell tower is contingent upon the approval of the related code amendment to Section 25.1, revising the setback requirements for new cell facilities. 2. The proposed cell tower shall meet all the underlying zoning district's building setback requirements. 3. A revised photo simulation showing the mono -elm painted and shaped to match native plants common in the area and listed on the approved plant list (Addendum C of the Zoning Code) shall be provided for administrative approval, prior to issuing grading or building permits. DEPART I425 N. MARVIN ST. GEBERT. AZ 05233 HEADING SOUTH ON N. MARVIN STTOWARD W. MEOLL AVE. TURN LEFTONTO W. MERRILL AVE ANDOONT1 EFOR-MILESUNTILYOUREACHN.COOPEARD. TURN LEFT ONTO N. COOPER RD AND CONTNUE FOR 0.0 MILES URTL YOU REACH USED W. ON RAMP, TURN LEFT AND MERGE ONTO USW W TOWARDPHOENIX. CONTNUEONUS-00W POR-MILESUNTILYOU REACH THE F10 E INTERCHANGE MERGE ONTO I-10 E TOWARD TUCSON. THEN CONTINUE FOR 5 0 MILES UNTIL YOU REACH MT—/ CORTARORD. TURN LEFTONTOCORTARORD.THENCONTNUEPOR 7.0 MILES UNTIL YOU REACH N. NORTHERN AVE. THE ROAD NAME CHANGES FAOMCORTARO RD TO W CORTARO FARM RDTO W. MAGEE RD OVEN T1E— MISS. TURN LEFTONTO N NORTHERN AVE AND CO WE MR 0A MILES UNTIL YOU REACH W COOL DR TURN RIGHT ONTO W. COOL DR, THEN CONTINUE FOR 0.2 MILES UNTIL YOU REACH TEE SITE ON RIGHT, VICINITY MAP PROJECTAREA 0 W. MAOEE RO 4 v SUN STATE T O W E R S AZ02-070 SAGUARO APN: 225-14-170C 333 W. COOL DRIVE ORO VALLEY, AZ 85704 PIMA COUNTY INSTALL NEW 50'0' SUNS TEMONO-ELM • INSTALL NEW 20�0'X20'-0' CMU WALL • INSTALLNEW-0-CONCRETEPAD • INSTALL (2) NEW FIBER VAULTS • INSTALL NEW ELECTRICAL SERVICE • INSTALL NEWTELCOSERVICE INSTALL NEW UNDERGROUND CONDUITS SHEET INDEX T-1 PROJECT INFORMATION GN i GENERAL NOTES US 1 TOPOGRAPHIC SURVEY A SITE PLAN 11.1 DEMO PLAN A-2 ENLARGED SITE PLAN A-3 ELEVATIONS A ELEVATIONS A DETAILS A-0 DETAILS E-I ELECTRICAL NOTES E-2 ELECTRICAL DETAILS ### ######################## E4 GROUNDING PLAN AND GROUNDING NOTES CLIENT SUN STATE TOWERS 1420 N. MARV N STREET # 101 CONTACT: CHAD WARD GILBERT. AZ05233 PHONE: 1502) 4m M14 PROPERTY OWNER CARLTON ANDREW J A CATHLEEN A.RALS MI N. P/SEO NORTENO TUCSON. AZ W704 TOWER OWNER SUN STATE TOWERS 1420 N. MARVIN STREET #101 CONTACT: CHADWARD GILBERT. AZ052 PHONE =2) M SITE ACOUISI ION PINNACLE CONSULTING. INC. 28 N. MARVIN STREET #101 GILBERT. AZ 05233 CONTACT: MICHELLEIAMOUREUX PHONE: (A00) 004PSBBeM. 230 A&E FIRM ZONING: PARCEL#: c 225-111]OC USE: UNMANNED COMMUNICATIONS NEW LEASE AREA 570 SO. FT UTILITYCOMPANY TUCSON ELECTRIC POVIER(T.E.P) JURISDICTION: PIMACOUNTY GOVERNING CODES: 201R ISC, 20121M. W121MC. 2011 NEC ALL SUILDING CODES LISTED ABOVE SHALL INCLUDE AMENDMENTS BY THE GOVERNING JURISDICTION 1, THIS VARELESS TELECOMMUNICATIONS FACILJTY WILL MEET THE HEALTH AND SAFETY STANDARDS FOR ELECTROMAGNETIC FIELD EMISSIONS AS ESTABLISHED BYTHE FEDERALCOMMUNCATIONS COMMISSION OR ANYSUCCESSOR THEREOF. AND ANYOTHER FEDERALORSTATEAGENCY 2MMUNCATGNS FACILITY W LL MEET THE RUATIONS OF THE FEDERAL COMMUNICATONS COMMISSION REGARDING PHYSICAL AND ELECTROMAGNETIC INTERFERENCE. 3.!IGHTNG OR SIGNS ALL BE PROMDEDONLYAS REQUIRED BY FEDERAL OR STATE AGENCIES. 4. CEVELOPMENTANDCONSTRUCTONOF PROJECTWLL COMPLYAIH ALLARPUCABLE CO RdNANCES. 5. EXISTING PARIONG IS NOT PF ECT. O. THIS PROJECTDOES NO WATER (RF): DATE: PINNACLE CONSULTING. INC. (CONST.): - 25N.MARWNSTREET#101 NEW SITE LOCATION GILBERT, A205233 CONTACT:XYLEFORTIN LATITUDE 323530 3Z'21' 10.954' N INADBIII (RE): PHONE: (023)21]a235 LONG— E 11091599 11W"MW. INADB3I GROUNDELEVATION 25049 MAVDBBI LANDLORD', DVIlDI97 DATE: DATE: V SUN STATE T O W E R S @PINNNACLE G0SULTING. INC. FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO PROJECT INFORMATION T-1 GENERAL NOTES: aR - oR FON3mtgigN RaESS�5PP1M A WuwlwsPwNo®H#esFNOTro OE s'.u®Aw enE xIENJE0,O5HowauRNEONLv a wsaNTRtcTonsiau �ooasnuo�A�'NaroRo w�ma�mavwiPq�A.sowR'v amuam. ,s INiTm .,,: aRwORNa,aLLSEmNEINAccoPrva—HA—ANmrFRETE M CONCRETE AND REINFORCING STEEL NOTES: A. 1-111N TI Io,e'El� I.";ml �a_TT elsen "�.cLo�Nrva rr<m sEl: LEsa,HAN e"®aR"A�°gmNOP� ���w�a��wA�H� K�E°`A"RAOE stPNfO. GENERAL GROUNDING NOTES: I. ENIA�R�Ot�t-,NNDi- 0wRsTRCT S µa �OOPt®ev irE Aeaa. THE artEsrs�re ILa. iv L aR NVN TEff; QAxD INaTN�=�PPI,:NENakro�gG.q E<EDT�gD®Aa,F»ED TD AGR�EA T®T SN T oNNLmrRBEssq"NDBOL® IGWcoxGFTNEcaoR PAsrq suuOE,«D IF �IEG. 1D arLou m00 r�iEGaw m G�FrwoR�aHau �wroeo oA �mHEwo�r�A�iE® coNw.i, ,a NsIII ELECTRICAL INSTALLATION NOTES: A°E�Na�NME<n'"Ha� q wiignE. wrsISHALLauaEim wgxco�DRm ®TNs..LA.gN roNewNo.,n Ix:H Pasrq ELSTwrxTAPEwnxwrw,Ecrgx oR wNsr�opN%m�Mwumxwnuwnxr�rrcnoaniAro LLAL WreEm sEuS qN POWFROR,�NV TIeR WLT E,Nn�nc PHASEM ID.--ll ,PAx3mAw WDclicuT osl. BECLPAR Y NBBdE—WlaM AA.I WM'LIGo BPFN£,e FNs mN.MO 9sHLLL ' oxi�lLAwD�o®�w.mGv oLiwga srN'xirrr`:«oar`pw.x..a'cu�`�"®es�rsro'N�om iFuiPN NVD PAceNAr srereA�ir� "1uxe�ae°orH��i ear � "g`®iOR T� , �pAG®vcuoRi�AasOEqu�v'ol�Ra�AaMM'>�oA,�mN �1r�N�ireuumx ueEim mRT,Elnca,gN ANDwcEwAvs_EN m.u¢BsmHaM,snay IRED eESIwLEmw P wcmuo TviDmPPecwalE�ila�EstR moEmvsEsuslPt®. roriE 111 LNOBO Aro DmtcPEnATIHHNIRT ERJsa¢TBusreo WDu�®rw E I 0fl31oR ®u4. LU�a A W mgElAJf� xawLLw'ff MT®Em cPUUnCN Ar W tEOTIUNTuc �9/c IFnvnIUNG DR��mRE�rw�AL�E�N SITE WORK GENERAL NOTES: �_ �,rRtFB,AroRGe<ErgA �a� Iwlwamogw�owNAETAucwxc.rrol.e.glcioPw �sIB.ECi Pth9gPL 6WevE1 ,. r,E semxraecmgsHNLmM/crufNttLaGnH;s9,NC6sRmRro,HEarAgroPcorSrmCrgN gHyy gE�gEO WgE)Oo�DlNumqu'JCArgx3 1 w1ENry. EiaiRFAL roxAErAwcTLelw IENR. oq Rqq �c�Ar®rasd�r®Bvi�su�o�rrtvAn�aqu�tEnEEG pxs�igL�iD ���,a uxnnOxs �g1�lo We.sc�ouEnl sHNt eE u:EO WgmNCB,tID IPmoq �, bNm TR rrAOTn xaarPoruR`i s°eRnoi T wiuN.nG :mm,,L� Nlm oaPAU N. �`'A`,nroxsAsvECAmE TErAEiAu-NourlNglvw.ff—AourmaR ALLSDEwoT«swueEAS lNrwrEooN,HEDRANrrs,as AxoPwJSTSPECIrrurgNG. .oNn o.E. wcID PNgs,Eoue,oegRCloP,gscw<w.ee.law. mEao DvoaEo :n smABs.D®gs.s—NSsAlooTIER R:aNESHALL aE RR.gGEO Rox,HE p oR PucrsEOINgDNwa�mmNcgETEINAgcsDPNE.ww.Du_,NAEPn. �LLr TODITgLgDIDTOEg N� aE�®�NmD,aA�q �» NIFT E'1aq" TI A 11 DuNrMD�� aNTgNDm �a mNDP HEwDN a a s rD NE, �,LDP "D'"a mNN TDaDw�. DA mN aE� a ..,sox<R,oTDaaHALLN�NL�I:EDIs,�gEAgNGEN,�go,Tt�.�NZDNwI HAuaEDwn®TowusssufAcewAre,ro RPw Aw,rRPN TtE araswwExr exoro �. e IFNOwuo. RgIFTJNATERws.S—R sUR'ACE,PPUCAigN MPA— ANfBR— TO ASNOOTH LNW 1—S—TO RNOHEoINS T T,ealu�mPRti9vTEmsgN WgrNE o ATgN ®'N' � n I� gEwr m� au KmgDANDEwI,NG�N,.��..'%Nsul�A�rocr�"'"aamT-0«agTNCALtgEw .D—ANJIN]uDEANNGscC DENc Tl vgEEPRmuND. Aue R,TED r6Jn pR B—I Pxmom .. Pa BErtBN otrtoDOPs. iENwA�PR eErt6p�Nm aq TSAAas IOA SEnep otrtmoPa� b'NO PAT® RV NBM, ryR EDUPNEesogoSttwAv. sausE[s+D. ALIT. S.A.- J�}m[CmN9GULEUKSwRwsgNNloseYMglfcoMloL coMawAVCEvmgTTE �CUL aEnEH mph, ogwFM RbTEcr®(.wOPBErtEq o,rtr� o���N9A.N�t Nn BE�T,F�A'm�fs.aXOWb�M�HO K'T®lwP aBE®,T�A051. MASONRY NOTES: owNEaaEwREm xaFl woR,oNr�N:mwB,DInTRI�no PN,Ba. SOIL COMPACTION NOTES FOR SLAB ON GRADE: Gat WG EONOcr ANNW OBbRDOROLLTNEOLWNETODc. Dww,uBRLL Nome«< ®As � ®NnVE �N� rwa�A� a. osLa®sew ax.�LeEru,uv,�cws�ovnrH,w. COMPACTION EQUIPMENT: SYMBOLS S/G SOUDGROUNDBUSBAR S/N SOUD NEUTRAL BUS BAR H N SUPPUMEWALGROUND BAR e-POLETHER L AGNETIC CIRCUIT BPEARER SINGLE -POLE TMERMAL-MAGNIMC CIRCUIT BRISAI R e CHEMICAL GROUND ROD ® GROUNDROD OISCONNECTSWITCH METER ■ CAOWELDTV ECONNECTION COMPRESSION TWE CONNECTION — — — GROUNDING WIRE ABBREVIATIONS IN wsn MN NO, TO eRGB ClIR1i,WMo1gLNJ �Po e0 BA9 q� � gGORc�ocroPoNllHAun (S SUN STATE T O W E R S PINNACLE CONSULTING, INC. FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO GENERAL NOTES GN-1 SURVEYOR NOTES u— E .......... y F-I .............................. SCHEQUU B EXCEPTIONS (D .-Y' I.— F-E .1 .11. FF—. w. ITT I E. IE .F_ Ull 1..' .1111-1 I.E 11-1 —ED IFEI.— USSEE ACCESSNNUTY EASEMENT UEOAL DESCRIPTION AlOuo THE E" I L. ,. "*,L MOTI I—ELE IT _— THE KITOF 11 11 IE"'T"l 1^11 Ut,EFII— I ll,.1.11FEl.—Tll T. LESSEE LEAMAWA LEGAL DESCRI-ON " . .... EIIIE' coRos F—IFD 11 .1 — 1.. 11— .1 I—E I... C-1. I ... A, D—F-D FIll— I I 0_ I—IMI 10-11110-1-111' _T U ;El 2919 PFUJI—L NORTH 1157 I_ iAT6 1.FEET To T ETTTOTHE FOIFT IF S'EY 1-10 mmc2m mm� mm� =ME= mmemmmi FLOOD ZONE DESIGNATION I I I F.1 1. I.A. EZT"A I PROJECT -TA DATA ea F— F.....E.E—E—D I I-T. EOFRow M WI CIM ITIT... SITE irva VIER IEWIE' (­ $MIT.. F.R T.1 I—M DIM' LESSORS LEGAL DESCRIPTION � III CIIITY. 11— lElW WIE PAITIULAILl IT — —111T CI —0 lIT 1, L.T I '�E 0IT"PL.I.ET11 —1- 1. LIE, —F.LT IL.- I LIE El- PAIALLE1 ID.P. I^L,.LEL D. IF 1'1 7 F T IIr ,.F.F. WEST COO, DRIVE IDS L —nL-- _E---I=— WEST MAGEE ROAD APN: 22514170A IN: 2251417DB to IN:225141710 LEGEND op uF ILI 1= IT.0 .. D-IT E—TIC —ER 13 —1—L II F.-E. "I —Fl— PREIENTER :11T.ELIAT C- I. -CT— IINE L.E dY '.. 41' MAGNETIC NORTH DECLINATION GRAPHIC SCALE verizon,l 126W.GFMINIDR. TFMPE. AZ 85283 (OPINNACLE C�ONSUIA7NGa. IN Q FIELD BY: IT. DRAWN BY. CHECKED BY: REVISIONS 2 0-117 FINAL I 0Q1117 PREUMINARY ,NO DATE DESCRIPTION F-:? F-- =c3Ns;LJL— -rIrjr_— Tll — I R111 1 11 ZTRII'FIF _ FT.Y R, I I I NITTIIE UIll IT "7 MY1,T_R IRRIACT .1 10008394 SITENAME: TUC PEPPERSAUCE SITE ADDRESS: 333WCOOL DR. ORO VALLEY. AZ 85704 [SHEET TITLE: I TOPOGRAPHIC SURVEY SHEETNI LS-1 T7 W, COOL DR�—�—�— EXISTING PROPERTY LINE EXISTING PROPERTY LINE EXISTING PROPERTY LINE NEW SUN STATE FIBER VAULT ILL ATPROPERTYLINEINSIDE I SUN STATE EASEMENT I ISTINI e�'IIy,' I I 12'0'SUN STATE — PI RNIN i I I I ACCESS/ UTILITY EASEMENT I I I F I (2) NEW 4'UNDERGROUND I TELCOCONDUITPER UTILITYCOMPANY SPECS I1Jr I/ 1PARR I I I /J AEWESSa UTILITYYTATE NO 1— 1 EASEMENT Y// IONCR— AP'IC 20A ZONING 1 — WALKWAY IF APN'. 225 143850 IW ZONING: C w EXISTING TREE (TYP) [ UN NEW SSTATE NEW /EASE AR EA NEW 50-TALL SUN �T STATE MONO -ELM I I gI ELECTRICAL LINE I NEW 10'-o"SUN STATE----, TATE I « U ILITY EASEMENT 1 I E%[STING 50"A TRANSFORMER TO BE 1 UTILIZED FOR POWER - SEE E-2 FOR DETAILS EXISTING PROPERTY LINE SITE PLAN EXISTING BUILDING APN: 225-141]OC EXISTING PROPERTYLINE ZONING C-2 _ _ — _ _ _ _ _ _ _ - _ — _ _ _ _ _ - - APN: 225-141]OB ZONING: C-2 I�— EXISTING COVERED PARKING 1 EXISTING 10'U' ELECTRICAL EASEMENT SETBACK TABLE I NORTH xt R3'A- x E%/STING PROPERTY LINE SOUTH x7910' L �ROPEflTV LINE WEST EAST SUN STATE T O W E B S xc.Lnw RRM PINNACLE o��Ilf / I I I II / I I I I11111111111111, — FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO SITEPLAN A-1 EXISTING lb' TALL CHAIN — LINK FENCE TO BE REMOVED EXISTING UNDERGROUND - EIECTRIC LINE TO REMAIN EXISTING ab' TALL CHAIN LINK FENCE TO BE REMOV EXISTING FENCE SECTION TO BE REMOVED 0' 0' CHAINNNK ' CHAIN -LINK FENCE TO BE REMOVED FENCE TO REMAIN EXISTING BUILDING J TO REMAIN I I OASMED LINE DENOTES NEW SUN STATE LEASE AREA EXISTING TREE TO REMAIN APN: P2S1i1TOC NNING: C2 EXISTING DIRTAREA i I I EXISTING WATERLINE TO BE REMOVED E ISTING CONCRETE LABANDSHED�BE w i REMOVED B IEXISTING WATER SPIGOT TO BEREMOVED I I BERE EXISTING SHRUBIS)TO BE REMOVED 4 I I EXISTINGWALL T TO BEREMOVED ED I - EXISTINGFENCESECTION/ TO BE REMOVED I 3 I x DEMO PLAN V SUN STATE To !NE R 50 ni P MAC INC REV DATE DESCRIPTION BY mAllle FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO DEMO PLAN A-1.1 I NEW 12 SSi WIDE SUN STATE ESS( ACCUTILITY EASEMENT NEW SUN STATE s'a• V ACCESS GATE I % \ UNDERGROUND— I C LINE DOM MNNICATOS NE (PROTECT I (PROTECT IN PIACEI I EXISTING OTHERS ACCESS GALE I I NEW 24—SUN STATE FIBERVAULT I NEW 1D'-G• SUN STATE UTILITY EASEMENT I I I I I NEW 2n'-e'1¢0'-N SUN x STATE LEASE AREA I I I NEWS UNSTATE SowM I TALL ONO -ELM I I II " I i I � I NEWSUNSTATES'-W a I TALLCMU WALL .S I q I I I I „ I II NEW SUN STATE GRAV ELOMPOUND 6 C -1 EXITING PROPERTY LINE I r EXISTING OTHERS II UNDERGROUND \ryl1 I ELECTRIC I IQ'-G'SUN STATE I_I I UTILRYEASEMENT' I EXISTING EDGE OFROAD I I I D SITE PLAN 1—SUSTATE ACCESS/ UTILRY EASEMENT 2-a• s.m ACCESS GATE I i p EXSTING _O d SIDEWALK I � d pd 12'-G•- p 1 I 1 FUTURE VEflIZON /G .EA REA •__ z— x2GG X— M— X SUN STATE COMPOUND p / �EX STING u,En wR BUILDING � (S /^ d / SUN STATE NEW 900A /20/2AOV 109UN STATE T O W E B S • —METER/ DISCONNECT BANK W/(2) EMM20GA METERSLOTSFOR gyp 1.1 FUTURE SPRINT AND VERIZON USE D�T�T� T l� NEWSUNSTATEWO O11LIM CLE UN1D\"E/R/GgOUNO CONDUITS (TYP.) C. SULn N(i, IN(: ' 8 NEW VERIZAN a'-o'z1CA• � �,m oA� �m, az u.s�... CONCRETE PAO o� C� / 1 EXISTING TREE (TYP.) tw/ DASHED UNE DENOTES FUTURE SPRINT LEASE AREA EXISTING UNDERGROUND 4 ELECTRIC (Y „ M ESSTING CHPINUNK FENCE X(TYP.I II■II__� FOR REVIEW ONLY NOT FOR CONSTRUCTION AZA2-070 SAGUARO ENLARGED SITE PLAN A-2 1 NEWS -0- T— 61 STATE MONO -ELM NEW SUN STATE TALL CMU WALL NEW VERIZON A'z10' CONCRETE PAD NEW SUN STATE PO — UNDERGROUND CONDUITS (TTP.) NEW —SUN STATE NEW A' -a• SUN STATE UGNNNING ROD IES LIGHTNING ROD ELEVATION 66'-a• A.G.L ( ELEVATM)N sa'a• A.G.L f___—...__ _.______T 1 1 1 I I FUTURE VERIZON FUTURE VEAIZON - I ••L•I 1 NTENNA LOCATION A I _---.-._ �•rz _.. .. _ I ELEVATgN60'-0•A.G.L f r_-_-. - _ _ I ANTENNA LOCATION 1 1 �GENIE�LINEQF EU7URF vF nugf{gNNAi _ 1 I I 1 EIFVA ION 4B'0'AG.L - I I I I I I 1 r-------1"�-------• FUTURE SPRINT ANTENNA LOCATION I : I FUTURE SPRINT I jlI ANTENNA LOCATION I 1 I � rE?ER!N�OFfJlIUL 9E9PAINLANIENNAS—__ .. ' I �ELEVATIDN SOo'AG. ------i�------� EXISTING THEE EXISTING TREE------i ;+------� i t ! 'J"I •.I i.i'e e.f` ��. ' NEW • TALL SUN ATE M STATE MONO -ELM f :^ellz. ti I •F o�+..s' 'a:tiL:. ,�• •} i;!; l I I '•• EXISTING EXISTING I •YAuA�iT •,•S , • e SUILOING4 RUILDtNG • �' STATE (2) EMPTY—AE METER/DISCON BUN DISCONNECT STATE METERSLO I AND V ROR FU I tt A , �6.C. • I } ; SPRINT AND ERIZON USE I I I o�vA; • P .vd. '•D• y a���;CCC �••••�uuuw __- I I A NEW SU..T.-..-- _.I Y e"L • I - I 5 ACCESS GATE II �•4 Ij) I !I I ZO NEW SUN STATE a I IION P NEW S UN STIATE A'�C UE ANEW SOUTH ELEVATION EkSTNGCHAW E%-TINGCHAIN- -FENCE I:IfO(FENC£ 11 I NEW NORTH ELEVA NEW SUN STATE.-0 UNDERGROUND CONDUITS '(TVP) 2 V SUN STATE To W E B S ll—RT PINNACLE C;UNSI!1.TI N(� IN(; ME Ml FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO ELEVATIONS A-3 CHES LIGHTNING ROD ELEVATION 65'0" A.G.L I. T Y' ELEVATpN594uA G.L 1 I FUTUREVEAIZON ELEVATpN50'0' A.G.L T'L• I ANTENNA LOCATION J� rcuTpgIJNE O'A.GLHE LE91ZON91�EtlNAS__ Y ELEVATION 9B'-O'A.G.L I III' — 11 — FUTURE SPRINT I I 1 S ANTENNA LOCATION �GENTEBUNE OY.EUTLBE SPRINT ANgtltlBS_ _ _ 1 ELEVATION 59 6'AG.L I 1 I CHES ELEVATON 56'0' A.G.L h To V ELEVATON s9'aN4.G.L L h TOP OF NEW SUN STATE MONO.ELM �h ELEVATION 56'6'A.G.L Y�A I�ae4F �U�LBE YE91ZOli9N7ENNB9__ h EI-EVA gLIN39 W A GLEE SPBINL9NgtltlAS_ _ Y ELEVATION 39-0' A G.L �L)10 9 T ? % ✓� Ptis`' STATE MONO -ELM N STATE MONO N !L pr f y 7C ON r:• Ra TINQ BUILDING s r - Nuuuuu�uuua'�w IM�����������■'llrr� �Ir �luu�uuu�ul� �� MMAMMA l �l��������r umumuumml �1�����u�uu��■ 111uuu����uuu'�ruu�����wl nuuuuuuuuun 15nuuuuuuuuur �Enluuuuuuuul� �I.IM �Iuuu��u�uu �uuuuuuuu�rl 15nuuuuuuuuur �I�n��uuuuuui�El �lu������� NEW EAST ELEVATION NEWBUNBTATEA'0 NEW WIN STATE4'O— UNDENGROUNDCONDUr UNDERGROUND CONDUITS (TVP.) =,2� '41 1 1 NEW WEST ELEVATION NEW 9'-0' SUN STATE LIGHTNING ROD r_______________T I I 1 FUTURE VERIZQN ANTENNA LOCATION I I� r I 1 1 I FUTURE SPRINT j ______+.--.---_' ANTENNA LOCATION I I� I I � 1 ' I l Ii 1 .Aw.y.i y .5 V NEW - STATE -TALL CMU WALL V SUN STATE TOW E R S PINNACLE GONSULTING, INC. FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO ELEVATIONS A-4 V SUN STATE T O W E R S COMPOUND ENCLOSURE SEE DETAIL a mris�.lr,w Haw ON THIS SHEET PINNACLE 2Q MIRAFI—STABILIZATION s FABRIC(OR APPROVED EQUAL) ON COMPOCTED BUBGRADE �• o� NOTE: TIE SUB.IECT SITE IS LEVEL AND NO SUBSTANTIVE GRADING IS NECESSARY REV DATE DESCRIPTION BY o1PN�e NOT USED ` 1 NOT USED M= 2 i GRAVEL DETAIL z�t 3 YXYX1/4'HSS PER PLAN r X r X1/4'HSS TUBE TU IEPOST POST �II� C SlUTBFCECMUWA® ,SGA STEEL•B• DECKING, FOR REVIEW `. STEELGATE TACK WELDED PTJOINTS WI'T DECKING INFILL ONLY NOT FOR Ll FULLYGflOUTED CELLS CONSTRUCTION WEEP HONES®AS ®` 2X T XINNER t4'H.SS_H' FOR DRAINAGE LAB It Ll REQUIRED] TUBE FRAME FINISH GRADE �� HOEAVY� P ISTHINGES. P. F 3 AZ02-070 SAGUARO EARTH 4 X W X S/F' TH. STEEL PLATE g'B WELDED TO J-SOLTS EMBEDDED INTO SOLID GROUTED BLOCK. #5 REBAR GROUT TO BE FILLED AFTE—BOLT PLACEMENT RYP. OF a] EVENLY J-BOLT EMBEDDED INTO vl�rrnlE INDOCATION SPACED BLOCKPRIOR TOGMILO EL IS DIAGRAMMATIC ONLY- FILL PW OF S PLACESIEYWITH SITE PLAN FOp 1/2'DIA. MINIMUMDETAILS XTCONFIGURATIONOPGATESECTION B-B-TI1flU CMU WALL SECTION GC A-5 COMPOUND ENCLOSURE DETAIL M� 4 TRENCH FINISHEDGRADE, A DR CONCPAMNG MATCH SLOPE AND THICKNESS OF EXISTING Pj"7 2 IN. (HOAIL d VERT.) CABLE COAX CONDUIT DETAIL NOTE: TRENCH BACKFILLE COMPACTED TO O%PRIOR PPIOp TO DRESS ROCK INSTALLATION MATCHTO EXISTING OR FINISH TO NEWGRADES (SEE PLAN) COAXIAL CABLE SIZE & MINIMUM BEND RADIUS IN W CONDUIT CABLE SIZE MINIMUM BEND RADIUS n•100 Tm• e' 1-114" 22' 1 A.. NOTE: PROVIDE PROPER BENDING RADIUS FOR CONDUITS AS REQUIRED BY THE COAXIAL CABLE MFR. UNDISTURBED COMPACTED BACKFILL PER THE DESIGN AND CONSTRUCTION SPECIFICATIONS FOREARTHWORKORLEAN CONCRETE LEAN CONC DUCT BANK (2) 1'a PVCCCNDUITS (4) 4V PVC CCNOUITS PVC CONDUITS SCHEDULE 40. PER PLAN (RIGID STEEL CONDUIT PLUG FOR SPARECONQUIT) RIGID STEELCONDUIT COUPLING CONCRETE PAD f A E PVC SCHEDULE 40 SIZE AS SHOWNON LAYOUTS NOTE: RIGID STEEL CONDUIT MAY NOT BE USED WITH COAXIALANTENNA CABLE. USE PVC SCHEDULE 40 PIPE SITE SPECIFIC DETAIL - SEE PLANS TO pETERMINE IF STUB UP IS REQDIRED UNDERGROUND CONDUIT STUB -UP RESTORE SURFACE RESTORE SURFACE TELCO TRENCH DETAIL COMPACTED BACKFILL PER EARTHWGRK SPECIFICATION UTILITY WARNING TAPE UNDISTURBED EARTH TELCO NACEWAY BACKFILL (SAND) PER EARTHWORK SPECIFICATION COMPACTED BACKFILL PE fl EARTHWGRK SPECIFICATION UTRITY WARNING TAPE UNDISTURBED EARTH ELECTRICAL FEEDER BACKFILL (SAND) ELECTRICAL TRENCH DETAIL TRENCH DETAILS 10.0- 1151 #4 EQ. SPACED T CLR b IBC 2012, ACI-319 SOILS: IBCTABLE 1 BOB.2 MATERIALCLASSS ALLOWABLE BEARING PRESSURE. Q. = 1SWPSF DL=1B.na0# CONCRETE F. = 2—PS1 TYPE V CEMENT. WiC < O,S REINFORCING AB15 GR 00. FY = BOKSI 1- CHAMFER (1&I #4 TOP AND BOTTOM M B-) (TYP) Hu (e)#4 TOP AND BOTTOM IS C) ZL #3 AS REQUIRED TO SUPPORT T&B MATS FG VERIZON EQUIPMENT PAD DETAIL EQUIPMENT PLATFORM DETAILS SITE NAME: SAam SITE NUMBER: Am = SUN STATE T D W E A B FCC TOWER ID: FCcT imi) 333 W. COOL DRIVE ORO VALLEY, AZ 85704 Owned By: SUN STATE TOWERS LLC. Telephone: 86& 426-9204 WWW.SUNSTATE70WER.COM NO TRESPASSING 1 X DIGITAL PRINT APPLIED TO .080 ALUMINUM SIGN DETAIL SUN STATE —To W E R 50 4PMACLE m111=11111I=111m Q®l�lim _==i FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO DEAL LS A-6 ELECTRICAL SPECIFICATIONS I. SUBMITTALOF 8I0 INDICATES CONTRACTOR IS COGNIZANT OF ALLJOB SITE CONDITIONS AND WORK TO BE PERFORMED UNDER THIS CONTRACT. 2. CONTRACTOR SHALL PERFORM ALL VERIFICATION OBSERVATION TESTS. AND EXAMINATION WORK PRIOR TO THE ORDERING OF THE ELECTRICAL EQUIPMENT AND THE ACTUAL CONSTRUCTION. CONTRACTOR SHALL SUE A WRITTEN NOTICE OF ALL FINDINGS TO THE ARCHITECT USTING ALL MALFUNCTIONS, FAULTY EQUIPMENT AND DISCREPANCIES. S. HEIGHTSSRALLBEVERIFIEDWTTH OWNER PRORTO INSTALLATION. 6 THESE PLANS ARE DIAGRAMMATIC ONLY, FOLLOW AS CLOSELY AS POSSIBLE. 5, EACH CONDUCTOR OF EVERY SYSTEM SHALL BE PERMANENTLYTAGGED IN EACH PANELBOARD. PULLBOX, J-BOX. SWITCH BOX. ETC.. IN COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH ACT IO S.H.A) S CON TRACTORSHALLPROVIDEALLLABOR.MATERIALS. INSURANCE, EQUIPMENT. INSTALLATION. CONSTRUCTION TOOLS, TRANSPORTATION, ETC.. FOR A COMPLETE AND PROPERLY OPERATIVE SYSTEM ENERGIZED THROUGHOUT AND AS INDICATED ON DRAWINGS. AS SPECIFIED HEREIN AND/OR AS OTHENWASE REQUIRED, 7. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND IN PERFECT CONDITION WHEN INSTALLED AND SHALL BE OF THE BEST GRADE AND OF TIE SAME MINNUFACTURER THROUGHOUT FOR EACH CLASS OR GROUP OF EQUIPMENT. MATERIALS SHALL BE LISTED AND APPROVED BY UNDERWRITERS LABORATORY AND SHALL BEAR THE INSPECTION LABEL-J- WHERE SUBJECT TO SUCH APPROVAL MATERIALS SHALL MEET WITH APPROVALOF THE DMSION OF NDUSTRIAL SAFETY AND ALL GOVERNING BODES HAVING JURISDICTION. MATERIALS SHALL BE MANUFACTURED IN ACCORDANCE WITH APPLICABLE STANDARDS ESTABLISHED BY ANSI. NEMA b NBFU e. CONTRACTORSHALLCARRYOUT HIS WORK IN ACCORDANCE WITH ALL GOVERNING STATE, COUNTY AND LOCAL CODES AND OSHA. e. CO NTRACTORSHALLSECUREALLNECESSARYBUILDING PERMITS 10. COMPLETE JOB SHALL BEGUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER THE DATE OF JOB ACCEPTANCE BYO WREN. ANY VARK. MATERIAL OR EQUIPMENT FOUND TO BE FAULTY DURING THAT PERIOD SLMLL BE CORRECTED AT ONCE. UPON WRITTEN NOTIFICATION, AT THE EXPENSE OF THE CONTRACTOR. 11. ALL CONDUITONLY(C.O.)SHAM-PUUMMOR ROPE. 12. PRO VIDE PROJECT MANAGER WITH ONE SET OF COMPLETE ELECTRICAL 'AS INSTALLED DRAWINGS AT THE COMPLETION OF THE JOB, SHOWING ACTUAL DIMENSIONS, ROUTINGS. AND CIRCUITS. 15, ALL BROCHURE, OPERATING MANUAIB, CATALOGS. SHOP DRAWINGS. M. SHALL BE TURNED OVER TO OWNER AT JOB COMPLETION. 14. USE TTAP CONNECTORS ON ALL MULTI IRCUTIS WITH COMMON NEUTRAL CONDUCTOR FOR LIGHTING FIXTURE. 15. ALL CONDUCTORS SHALL BE COPPER. 16. AMCIIICUITBREAKERS. FUSES AND ELECTRICAL EQUIPMENTSHALL HAVE AN INTERRUPTING RATING NOT LESS THE MAXIMUM SHORT CIRCUIT CURRENT TO WHICH THEY MAY BE SUBJECTED, AND A MINIMUM OF 10.000 A.I.C. 17. THEENTIREELECTRFALINSTALLATIONSHAMBE OROUNDED AS REQUIRED BY ALLAPPLICABLE CODES AND DRAWINGS. 15. PATCH. REPAIR AND PAINT ANY AREA THAT HAS BEEN DAMAGED IN THE COURSE OF THE ELECTRICAL WORN. 10. IN DRILLING HOLES INTO CONCRETE WHETHER FOR FASTENING OR ANCHORING PURPOSES. OR PENETRATIONS THROUGH THE FLOOR FOR CONDUIT RUNS. PIPE RUNS. ETC.. IT MUST BE CLEARLY UNDERSTOOD THAT TENDONS AND/OR REINFORCING STEEL WILL NOT BE DRILLED INTO, CUT OR DAMAGED UNDER ANY CIRCUMSTANCES. 20. LOCATION OF TENDONS AND/OR REINFORCING STEEL ARE NOT DEFINITELY KNOWN AND THEREFORE MUST BE SEARCHED FOR BY APPROPRIATE METHODS AND EQUIPMENT VIA X-RAY OR OTHER DEVICES THATCAN ACCURATELY LOCATE THE REINFORCING AND/OR STEEL TENDONS. 21. PENETRATIONS IN FIRE RATED WALLS SHALL BE FIRE STOPPED IN ACCORDANCE WITH IBC SECTION 714, 22. RECEPTACLES SHALL BE 20 AMPERE. 125 VOLT AC.. WHITE AS REQUIRED BY THE ARCHITECT OR APPROVED EQUAL 0. WALL SNYCHESSHALLSESINGLE-POLE.HUBBEU.0-1 OR EQUIVALENT. WHITE AS REQUIRED BYTHE ARCHITECT, 24. PLASTIC PLATES FOR ALL SWITCHES, RECEPTACLES, TELEPHONE AND BLANKED OUTLETS, SHALL HAVE ENGRAVED LETTERING WHERE INDICATED ON THE DRAWINGS. WEATHERPROOFRECEPTACLESSHAMHAVE RACO #B00.1(2- RAISED WORK COVERS. 25, WIRE AND CABLE CONDUCTORS SHALL BE COPPER#12 ANG MINIMUM NO BX OR ROMEX CABLE IS PERMTTED UNLESS SPECIFICALLY NOTED OTHERWISE ON DRAWINGS, M, GROUNDING CONDUCTORS SHALL BE SOUD TINNED COPPER AND ANNEALED #2. 27. GROUNDROMSHALLBECOPPERCUDSTEELSM' ROUND AND 10' LONG. COPPERWELD OR APPROVED EOUAL 2n. METER SOCKET AMPERES. VOLTAGE. NUMBER OF PHASES SHALL BE AS NOTED ON THE DRAWINGS. MANUFACTURED BY SQUARE D COMPANY OR APPROVED EQUAL 20. ALL MATERIALS SHALL BE U.L LISTED. W. CONDUIT I,, RIGID CONDUIT SHALL BE U.L LABELGALVANIZED ZINC COATED WITH ZINC INTERIOR ANDSHAM BE USED MEN INSTALLED IN OR UNDER CONCRETE SLABS. IN CONTACT WITH THE EARTH. UNDER PUBLIC ROADWAYS. IN MASONRY WALLS OR EXPOSED ON BUILDING EXTERIOR RIGID CONDUIT IN CONTACT WITH EARTH SHALL BE IY2 LAPPED WRAPPED WITH HUNTS WRAP PROCESS W. S. b. ELECTRICAL METALLIC TUBING SHALL HAVE U.L. LABEL. FITTINGS SHALL BE GLAND RING COMPRESSIONTYPE. EMT SHALL BE USED ONLY FOR INTERIOR RUNS. c. FLEXIBLE METALLIC CONDUIT SHALL HAVE U.L LISTED LIBEL AND MAYBE USED WHERE PERMITTED BY CODE- FITTINGS SHALL BE-JAKPOR'SOUEEZE' TYPE. SEAL TIGHTFLEXIBLECONDUIT. ALLCONDUITIN EXCESS OFSIXFEETIN LENGYISHAMHAVEFULL SIZE GROUND WARE. d. ALLUNDERGROUNDCONDUUSHALLBEPVC SCHEDULE 40 (UNLESS NOTED OTHERWISE) AT A MINIMUM DEPTH OF 24- BELOW GRADE. 51. ALLELE CTRICALEOUIPMENTSHALLBEI-AMEDWITH PERMANENT ENGRAVED PLASTIC LABELS. s2. UPON COMPLETION OF WORK. CONDUCT CONTINUITY. SHORT CIRCUIT. AND FALL POTENTIAL GROUNDING MSTSFORAPPROVAL SUBMITTESTREPORTSTO PROJECT MANAGER. CLEAN PREMISES OF ALL DEBRIS RESULTING FROM WORK AND LEAVE WORK IN A COMPLETE AND UNDAMAGED CONDITION. W. CONTRACTORTOCOORDINATEWNHUTIUTVCOMPANY FOR CONNECTION OF TEMPORARY AND PERMANENT POWER TO THE SITE. THE TEMPORARY POWER AND ALL GENERAL ELECTRICAL NOTES 1. THE ELECTRICAL INSTALLATION WORK SHALL CO MPLY WITHALLLOCALSTATE ANDNATONA-CODES. WS AND ORDINANCES APPUCABLE TO ELECTRICAL WORK 2. ELECTRICAL CONTRACTOR SHALL VISIT JOB SITE AND VERIFYEXISTINGCONDITIONS BEFOREBIDDINGAND SHALL INCLUDE IN HIS BID THE NECFSSARYCOSTS TO CONSTRUCT THIS PROJECT IN ACCORDANCE WITH INTENTOF THE ELECTRICAL DRAWINGS. SPECIFICATIONS, AND ALL APPUCABLE CODES. S. ALL MATERIAL AND EQUIPMENT FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BE NEW, FREE FROM DEFECTS AND SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY OWNER OR HIS REPRESENTATIVE. SHOULD ANYTROUSLE DEVELOP DURING THIS PERIOD DUETO FAULTYWORKMANSHIP. MATERIALOR EQUIPMENT, THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL AND LABOR TO CORRECTTHE TROUBLE WITHOUT COST TO THE OWNER. 4. ALL WORK TO BE EXECUTED IN WORKMANUKE MANNER AND SHALL PRESENT A NEAT MECHANICAL APPEARANCE WHEN COMPLETED, B. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE USTED BY UNDERWRITERS LABORATORIES. M. ELECTRICAL CONTRACTOR SHALL BE RESPONSISLE FOR ALL CUTTING AND PATCHING RELATE TO ELECTRICAL WORK, UNLESS NOTED OTHERWISE AND COORDINATED WITH THE GENERAL CONTRACTOR, 7, ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH CIVIL AND ARCHITECTURAL PLANS. THE REQUIREMENTS OF ALL EQUIPMENT ACTUALLY BEING INSTALLED SHALL BE VERIFIED PRIOR M INSTALLING THE ELECTRICAL WORK. S. ALL BRANCH CIRCUITCONDUCTORS SHALL BE COPPER TYPE-THWN#12.A #10 SOUD, #S AND URGER STRANDED. A ONCOMPLETIONOFTHEWORK.THEINSTALLATION SHALL BE FREE FROM GROUNDS ANDSHOPTCIRCUITS. 10. ELECTRICAL CONTRACTORSHALL FURNISH AS BUILT DRAWINGS TO THE ARCHITECT AND CUSTOMER UPON COMPLETION OF THE JOB. 11. ELECTRICAL WORK SHALL INCLUDE ALL LABOR, MATMIALS AND EQUIPMENT REQUIRED. INCLUDING BUT NOT LIMITED. TO COMPLETE ELECTRICAL SYSTEMS POWER AND LIGHTING. TELEPHONE CONDUITSYSTEM. SIGNALSYSMMS, PANE MARDIS). CONTROL WIRING. GROUNDING. CONDUIT ONLYSYSTEMS, ETC.. AS INDICATED ON ELECTRICAL DRAWINGS ANDOR REQUIRED BY GOVERNING CODES. 12. RACEWAYSSHALLSE: RMIDSTEELCONOUN: NOT -DIP GALVANIZED HEAVY WALL AS MANUFACTURED BY REPUBLIC, TRIANGLE OR EQUAL RIGID POLYVINYL CHLORIDECONDUTI(PM): HEAVYWALLSSCHEDULE40 AS MANUFACTURED BY CARLON ELECTRICAL VISOEEN OR EQUAL ELECTRICAL METALLIC TUBING (EMT): ZINC COATED THIN WALL AS MANUFACTURED BY TRIANGLE, REPUBLIC OR EQUAL 15. FUSE TYPE SHALL BE BUSSMANN OR EQUAL FUSE. 14, PROVIDE END RAVED PLASTIC LIBELS TO IDENTIFY ALL PANEL BOARDS, XFMRS- DISTRIBUTION PANELS. DISCONNECT SWITCHES, AND TRANSFER SWITCHES, LABELS SHALL READ IN THIS FASHION'A' 20BY/12aV S 4W. MSA, CKT. BKR OR FUSES TYPE AND SIZES. 1S. E.C, SHALLVERIFYANDTESTGROUNDTOSOURCETOA MAXIMUM OF S OHMS. IF THE GROUND TEST DOES NOT ACHIEVE THE S OHMS OR LESS, E.C. SHALL BE RESPONSIBLE FOR PROVIDING THE NECESSARY CONDUCTORSANDGROUNDRODSTO ACHIEVE5OHMS MAXIMUM. 10 BEFORE SUBMITTING BID, VERIFY EXISTING SITE CONDITIONS, ELBQTRICAL SERVICE REQUIREMENTS AND THE EXACT SERVING UTILITY POINTS OF CONNECTION. 17. THE ELECTRICAL CONTRACTOR E.C. SHALL FURNISH AND PAY FOfl ALL PERMITS AND RELATED FEES. IRA. UNLESS SPECIFICALLY NOTED OTHERWISE,ALL ELECTRICAL MATERIALS. EQUIPMENT AND WORK, SHOWN ON THESE PUNS ARE TO BE PROVIDED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. 19. E.C. SHALL FURNISH AND INSTALL ALL SWITCHES. CONDUITS. WIRES, BOXES LIGHT FIXTURES (INCLUDING LAMPS). SERVICE DEVICES. RECEPTACLES. SWITCHBOARDS AND PALL BOARDS. ETC. REQUIRED FOR A COMPLETE AND OPERATING ELECTRICAL SYSTEM 20, SEE ARCHITECTURALDRAWINGS FOR DIMENSDNAULOCATION INFORMATION RELATING TO THE ELECTRICAL DRAWINGS. 21, EEECTRICALCONTRACTORSHALLVERIFYVOLTAGES AND HORSE'OWERRATINGS OFAMMECHANICAL EQUIPMENT. 22. PRIORTO INSTALLING ANY ELECTRICALWOW..THE ELECTRICAL CONTRACTOR SHALL VERIFY EXACT LOCATIONSAND REOUIREMENTSONTHEJOBAND BY REFERENCE TO ARCHITECTURE MECHANICALAND EDUIPMENTSUPPUERS DRAWINGS. SHOULD THERE BE ANY QUESTION OR PNOBEEM CONCERNING THE NECESSARY PROVISIONS TO BE MADE, PROPER DIRECTIONSSHALLBEOBTAINED BEFOREPROCEEDING WITH ANY WORK. 2J. OUTLET AND JUNCTION BOXES SHALL BE SIZED PER CODE FOR THE QUANTITY OF WARES THEY CONTAIN. SEE ARTICLE- OF N. EC, PROVIDE AMMO NAL BOXES AND EXTENSION RINGS AS REQUIRED, 24, ELECTRICAL CONTRACTOR SHALL COMPLY WITH CABLE SENDING RADIUS REOUIREMENTS PER CABLE MANUFACTURERS' S SPECIFICATION. 25. CONDUIT LAYOUTS SHOWN ON THE PLANS ARE DIAGRAMMATIC. NOT INDICATING THE ROUTING REQUIRED. THECONTRACTORSHALLROUTECONDUITS AS REQUIRED BYTHE CONDRIONS OF INSTALLATION. - ALL EQUIPMENT PROVIDED BYTHE ELECTRICAL CONTRACTOR SHALL BE UST® AND LIBELED BYA NATIONALLY -RECOGNIZED TESTING MENCY. ACCEPTABLE TO THE AUTIORRYHAVING JURISDICTION. FOR THE CONDITIONS OF THE INSTALLATION. 2T. PLANS MAY IN DICATE THE NUMB ER OF PHASE NEUTRAL AND GROUND CONDUCTORS WHERE MORE THAN TH REE CONDUCTORS ARE TO BE INSTALLED IN A CO NDUTIITHREE OR LESS CONDUCTORS ARE NOT SHOWN). ADDITIONALCONDUCTORB REQUIRED FOR CONTROL SHALL BE INCLUDED EVEN IF NOT EXPLICITLY SHOWN. 2n. WMERESI2EISNOTSHOWNONTHEDRANNGS. CIRCUITS SHALLCONSMT OF #12 PHASE AND GROUNDED (NEUTRAL CONDUCTORS) AND A #12 CU GROUND IN A 3/4' CONDUIT. 25. UNLESS SPECIFICALLY NOTED OTHERWISE. THE ELECTRICAL CONTRACTOR SHALL MAKE FINAL CO NNECTIONSTOALL UTIUZATIONEOUIPMENT SHOWN ON THE DRAWINGS. VERIFY THE TYPE OF FINAL CONNECT ON AND PROVIDEAPPROPRIATE WIRING METHOD. n0. PpIORTOTRENCHINGINANYAREATHECONTRACTOR SHALL CONTACT ELECTRICAL COMMUNICATIONSMATA. CABLE T.V.. GAS. AND WATER UTILITY PROVIDERS (BLUE STAKE) AND HAVE ALL UTILITIES IN THE ARFA IDENTFIEO. IN ADDITION, THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A SUBCONTRACTOR SPECIALIZING IN THE LOCATION OF UNDERGROUND STRUCTURES TO IDENTFYAND OBSTACLES IN THE PATH OF TRENCHING (PRIOR TO COMMENCING WORK). DAMAGE TO ANY UNDERGROUND STRUCTURES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDTONAL COST TO THE PROJECT, 01, UIa. LITYCOORDINATION I-MCONTRACTOR SHALLSUBMITACOMPLETE SETOF DRAWRNGS TO ELECTRCAL AND TELCO UTILITIES WITHIN ONE WEEK OF NOTICE TO PROCEED. b. THE CONTRACTOR SHALL NOT TR ENCH OR INSTALL CONDUITS ION THE UTILITY OR LOAD SIDE) TO THE S.E.S. THE UTILITY TRANSFORMER (PRIMARY OR SECONDARY)OR TO THE UTIUTY CONNECTION POINT BEFORE RECEIVING A FINAL DESIGN FROM THE UTILITY. c. THE CONTRACTOR SHALL NOT INSTALL ED UIPMENT PADS FOR THE SES OR ANY UTIUTY EG UIPMENT (TRANSFORMERS. SWITCHING CABINETS. ETC.) PRIOR TO RECEIPT OF FINAL PLANS FROM THE UTILITY. d. THE CONTRACTOR SHALL NOT BE COMPENSATED FOR ADDITIONAL WORK REQUIRED TO MEET THE REQUIREMENTS OF THE UTILITY WHICH M THE RESULT OF PROCEEDING PRIOR TO RECEIPT OF A FINAL UTILITY DESIGN. 02. SERIES RATING NOTES: TO ENSURE THAT EACH PROTECTIVE DEVICE WHICH IS DEPENDENT ON ANOTHER DEVICE W M INTERRUPT THE AVAILABLE SHORT CIRCUIT AT THE LOCATION WHERE IT IS INSTALLED. IT MUST MEET THE FOLLOWING REQUIREMENTS: a. SWITCHBOARDCOMPONENTSANCLUDINGOVER CURRENT PROTECTIVE DEVICES. SHALL BE FULLY RATED FOR THE AVAILABLE FAULT CURRENT SHOWN. b. PRO NDEIDENTIFICATIONATTHEENCLOSUREOF. PANEL BOARDS WHERE BREAKERS ARE APPUEDIN SERIES COMBINATION. STATING. 'CAUTION SERIES RATED SYSTEM AMPERES. IDENTIFIED REPLACEMENT COMPONENTS REQUIRED' CONTRACTOR TO FILL IN BLANK WITH AVAILABLE FAULT CURRENT AS SHOWN ON THE SINGLE LINE DIAGRAM. c. PER NEC ARTICLE 11-2(2005). PROVIDE IDENTIFICATION AT EACH DISCONNECTING MEANS FEEDING DOWNSTREAM DEVICES APPLIED IN SERIES COMBINATION. STATING: 'CAUTION SERIES COMBNATIONSYSTEM RATED AMPERES. IDENTFIED REPLACEMENT COMPONENT REQUIRED.' CONTRACTOR TO FILL IN BLANK WITH AVAILABLE FAULT CURRENT AS SHOWN ON THE SINGLE -LINE DIAGRAM. d. AIC RATING SHOWN AT PANEL WARM IS MINIMUM RATING FOR OVERCURRENT PROTMTIVE DEVICES. EACH DEVICE SHALL BE FULLY RATED OR SERIES RATED WITH UPSTREAM DEVICE AT AFC AS SHOWN ON THE SINGLE UNE DIAGRAM. e. NO OE SIGN CHANGES MAY BE MADE TO THE SYSTEM WITHOUT THE PRIOR APPROVAL OF THE DESIGN ELECTRICAL ENGINEER AND THE ELECTRICALNSPECTOR. I THE TOTAL MOTOR LOAD CON NECTED BETWEEN SERIES RATED DEVICES DOES NOT EXCEED 11 OF THE INTERRUPTING RATING OF THE DOWNSTREAM DEVICE. V SUN STATE T O W E B S (PINNACLE (:CONSULI'ING, IN(;. a�I�+v+N as wran�n ®IIII��III� FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO ELECTRICAL NOTES E-1 FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO ELECTRICAL NOTES E-1 C.O, =CONDUIT ONLY GC. = GENERAL CONTRACTOR aFsnaEo ma NEW­a'cf6� EMT. = ELEC. METALLIC TUBING (THIN 1P. 2P,&3P=SINGLEPOLE. 2.­POLE HANDHOLE WALL) EGB = EQUIPMENT GROUND BUS DBUS PVC =G LVANILE4a RIGID CRC = IZED RIGIDCONDOR AFC = CO CONDUIT MGB =AA ILASUE AULTC -I I F07 FIXTURE FD(i, =FIXTURE Cu = CURRENT UNITING FUSE CURRENT UMITLTC FUSE OPEN -I I =MOUNTED =AMERICAPER BOTTOM BAWGCW W.A. —WEATHERPROOF BCW BARE -GUOBA OPPERWIRE WA WIFE _ U.O.N. =UNLESS OTHERWISE NOTED GPS =GLOBAL POSITIONING SYSTEM G. OR ORD.=GROUND PCs = PERSONAL COMMUNICATION SUN STATE --- _ N. OR NEUT.= NEUTRAL SERVICE A.OR AMP. -AMPERE PI=POWERPROTECTIONCABINET T O W E R S -b- KW. =KILOWATTS RWY RAC WAY W. WATTS TYP. TYPICAL =LOW WLTAGE RGSEMT = RIGIOGALVANIZEDLIC EL TUBING = PHASE EMT = ELECTRICAL METALLIC TUBING DEF = DUAL ELEMENT FUSES DWG =DRAWING xvAnw VA I— DIA =DIAMETER IOR = INTERIOR GROUND RING (HAW) _ H.P. ORHP =HORSEPOWER CCA = ANTENNA CABLE COVER XFMR =TRANSFORMER ASSEMBLY UNDISTURBED EARTH NOTE: C.A. =CIRCUIT BREAKER CKT. =CIRCUIT BTS GEN = BASE TRANSMISSION SYSTEM —GENERATOR WCOMPACTGRAVEL BASE UD TO BETMFFIO MTED SW. =SWITCH MIS =MA NUALTRANSFORMERSWITCH OR BSCW =GROWTH = BARE STRANDED COPPER A �T ��7*T*Tf] L jjr jr F.A.=FIREALARM WIRE DU CT TERMINATED 12' RECPT- =RECEPTACLE ISCW = INSULATED STRANDED COPPER °°�°w ele°xs,y°rmr swc ABOVE GRAVEL BASE E.C. = ELECTRIC CONTRACTOR WIRE TELCO VAULT DETAIL M= 1 NOT USED �` 2 ABBREVIATIONS 3 NEW 12'D'SUN STATE (2)NEW a" UNDERGROUND TELCO " I NEW A'UNDERGROUND TELCO CONDUIT 12'-D•SUN STATE a d A aA / EW I NTILITY c'SEM STATE ACCESSI ,«, N MARNNaTREFT, I�r crulPRr. nz eszu ACCESS/ UTLffY I CONDUITPERUTILTTCDMPANYSPECS PER UTILITY COMPANY SPECS (SEE ACCESS/ UTILITY EASEMENT UTILITY EASEMENT EASEMENT EASEMENT I t2'-a ACC E55/ / (SEE SHEET A.t FOR ENTIRE RUN) 9MEET AI FOR ENTIRE RUN) - c IITILITVESMT // — i UNDERGROUND ELECT`ICALCONDUIT T I \ NEW 9MA 120/2COV 10 GUN SIT TIE METER/ DISCONNECT BANK WI(2) ffm... L _ / jyNEW2' INSTALLED BY SUN STATE �' EMPTY2 A,METER SLOTS FOR / / -`—// / / / / / / / / / / / / (T NEW 2' CONDUIT FROM THE — L� FUTURES PRINT ANO VERIZON USE - -- -- x I FUTURE INTEGRATED LOAD CENTER TO THE FUTURE EQUIPMENT T I CABINET. COORDINATESNBUP I FUTUREVERIZONTELCO (� <Y LOCATONPRIORTO;NSTALLATION LL DEMARCATIONM IVIIEDONNEW SUN STATE CMU WALL (SHOWN NEW TELCO VAULT 1 b' `' / H I NEW TELCO VAULT E 2 I Y m (�( Ii / / / FOR REFERENCE) NEWSUNSTATE I I l- I I ( q.l O� /l/ FUTUREVERIZON INTEGRATED LOAD CENT ER MOUNTED ON NEW LEASEAREA 1 I 0�00 % SUN STATE CMU WALL (SHO WN 3Y FOR REFERENCE) It NEW 2.K' RED WAVE RIB NEW.NOERGROU II DCTUNDERGROUN CU PER T.E.P. SPECS TBLCoCINSTALLEDONDUIT BI II BYUNSIT TATE I 4I (a) NEW WCONDUITS FOR I FUTURE CARRIER COAX(215) ao•SUN STATE m 3 h I FUTURE VERU:ONE ENT I CABINET MOUNTED To TO NEW I lffILITY EASEMENT / VERIZONCONCRETEPAD ' / / x I (SHOWN FOR REFERENCE) I NEW ta'SUNSTATE V I NEW SUN STATE LEIASE AREA I 'UTILITY EASEMENT / EXISTING I %II PROPERTY LINE I je ryOTES: m EXISTING OTHERS I I •ONLYUT LITY NOTES SHOWN FOR CLARITY. SEESHEETA2FOR fl UNOERGOUNO ELE TRIOI ALL S In SPECIFIC CALLOUTS. CONTRACTOR TO USE I ' ALL ELECTRICAL& TELCO CONDUITS INSTALLED BY LANDLORD. I EXTREME CAUTCUSE N I VERIZONTOUT LITZEE%ISTINGCONDUITSFORNEWELECTRICAL EMEMWORKING CAUTIONROUND A TELCO LINE INSTALIATON. E%ISTNG UNDERGROUND I UTLITYCOMPANY: TUCSON ELECTRIC POWER IT.E.P.) . I I 00 �O e.ln a eeel°, eo ee use to 'UTUTIES I 'UT LITYCONTACT: WIS DEL BASSO m ��O Op0 1 CONNiACTORTO 1 'UTILTTYPHONE. (0)520 9188258 (C)52D-a 5913 DIG a'Fa'BELLHOLE I - •SUN STATE J� to a e D.n eu m.L al:..Aen...m UTILITY EASEMENT ON NORTH SIDE OF 4 I m TRANSFORMER EXISTING 50 kVA, 12D/ - - - - - -� - - 3 AVE 20aV TRANSFORMER li; FSR1-tt (MAYBE 1 I I RtIBNDS UPDATED TO 75 MVA 'fL _ �J TCONDUIREDTPER BYTE P.1 ® M T.E.P. SPECS / SITE UTILITY PLANE,1,:'a 4 ENLARGED SITE UTILITY PLAN NOSE""° 5 ®II��IIIB�I�� II���II�i1M III■=-= FOR REVIEW ONLY NOT FOR CONSTRUCTION AZ02-070 SAGUARO ELECTRICAL DETAILS E-2 3 S310N ONIONnoup (INV NVId LJNIONnoHO odvnovs OLO-ZOZV NOIIondISN00 aO=l ION AINO M3IA3ld 803 AS NOLLdltl053a 31tl0 A3tl )Ni NI11i'I<; (O 3 er 3'I�KI�II�IId1@ -sa3Na, M01 SIVIS Nns S) -1I`dl30 C10H aNno0 m OOtl ONnOtlD 13315 OtlYJ H3ddOJ A l • O.y SNItl DNf10tlD t101tl31%3�II 3Nfll50tli Q13MaV0 MOl3B .etl0 NIW .OS OtltlOe l3NVd 031NNOW 30tlitln5 — 3NI11-1 - --- NWOdlVOMlOM3 ------- am.. .3131 VNN INV Sda ld33tl'N3DaWH0lMSHdXIVnNVW _ H3V3He NIVW aNV l n HO11MS103NNOOSI0a35ni ,O Htle ONnoms HOSS3NddnS 3Dtlns _ We aNnOtlO e 3UM SNIONnOHO NOUO NNODT/OINVH03W NOUO NNOO a13MOVD OOtl ONnOHO aoN aNnoHDm3Mis31 Sloam's Tdolalo313 5 SMOeVa311000V31ONnoue (moionaNOJ DNIONn OHO—ndIn03 5V -� 3WVS) uoionONOO ONn OHO a31V1051 Ntl S3IVOIONI $ HmMONOOONIONnous1N dIn03Ntl S3IVOIONI uoionONOO ntltlln3Nl a3aNnWHD V S31VoiaN1 umonONW 35VHd V SMI OIONI WOO DNINtln111nONOO in ONINHnl LnaNOO 35MH3H1O a3LON SS31Nn] Ale aHS Z L# 'ZL#ZIM ------- 3MNO M013e tl0 HOOIi tl30Nn a3NOtl 1mm- '3S1MU3H1003LON SunNn "a .v15'aND ZI# Z4#ZIM SNIICIO 3AOSV NO "VM NI OMV3ONOO nnaNOO llndNOO V 3HIM Noose mInWHD anos a1N1030a3eW331tl1d 13315 3aVHD 1V lTIM NOOIe ntln03 a3AOtld O ....D#tl3sN-).3d.m _ 31VD319IX31i OMV ZY'. 3DNIH Alna MV HVNIX3 3WVtld 3en1 Ol J H3dwr.—Ol3MaV 3WVtld 3enl SSH DNIN030.9.1331S -llVi3a aNnou!D 31 30VW.lVNlA 3nOBV O AB aNnoi. O1VH UOIH31X3 Ol al3MOVO 'HOlonONOD U3ddO3 — 3HV9 anOS ONNI 0— Zx Ntfld ONI4NnoHo ®I MON DNlaNnOtl91-30 tlOi P31L 335 "tlOO0 3 oalleeuozutl %a1la+o llB lley 335531 A03Sn35n HOd 5530 33Atl3101 OtlON. — 310N. 53oV d I iO IvoIdA1 Wl3 ONOW Ol MIN aNn OND tlWOI WOtld 3.M U3dd- /\ 3UV9a3NNllan OS Z# (1W 3— 0133SS31 \+ tlOi 30tltlD 3AOBtl SS3JX3 >3 H11MOH3dd00 3tltl8 G3NNu3NNLLWnOS zx -lIb'13a M -P31S31 aNnou!D T3M 1S310NnOdH C -/� a31Nne 34. N3dd00 e-3 D-3 3WVe 03WI Of105 Za ('I'D 0otl ONn OHD 'DNIN ON--tl3M01 - ('dAl) 3Znun 0133SS31 pOtl 03elne '3HM H3dd OO 3Htle - HOd 3a"D 3AO9V SS3oX HIM aV313tlM tl3dd00 ONnOtlD i0 d0101 aOtl ONnO.MX0.S 03NNLL aIIOS Z#'DNIH e3 3WV903NNIl On OSZ# Al1O3Hla UmmvA5103 OtllJ tl3ddNALzO•Y , � HOQI3MOWtl3Hl1 ONNOtlD1N3WdIn03 Z —etlAl -® 7 Ol3M WIWtl3H10X3 N01103NN00 + DNItl ONDOtlD U3dJO0 03NNLL 3tltle'Onos05 Z# OIWtl3H10%3 I ON DHD� D 8—ioo NOIla3NNOa IOJINVHJ3W �--� 03NNLL 3uvs an OS z# i 311d OAd'tll0.ze x.e +� Nly(,� II 1N13OONDOtlD 31VD 30tltl Den. o OV311531 i0 %Oe $S3JaV 313HWNOa d0101%Vw a ItlOINtlNNOO NOLLNVHN3" LfV80Nn0lID o 1 \✓/ NOLLVtlVd35 .OL@ SOON ONnWHDZ IM 031Una 3UMH3ddoo 3UVS b_ MNNI1 anoe Z#-SNIONnOHD L 3ONV1LLN33OWtl35 OIHlo3l3 N01103NNO0 OIWtl3H10%3 CON aNlIOtlD ® 3HM ONnOtlD SS3JOV HIM OON ONnOHD ® 0NA0319109WAS 3 ONIH aNnoH!D HOIH; 1 X3 L S310N ONI4Nf oup SS31 tlO SWHO 9 d0 SOWONVIS AHLSnON13H1 S133W W31SAS ONIONnOtlo a31lV1SNl A1M3N 31-l13dnSN3 01 dOi0Vtl1NO0 a31O313S 3H1 d0 ALIl191SNOdS3tl 3HL 11 'S'JNIMVHO 3Nll mtl d0 AVM 3H1 A9 03NOISNElma (INV a31N3Wn000 39 TeM'SNOIIVOHI00W HO 'NOIS3a ONLLnOH '3NI1301n0 N'JIS3O ONIONnOb'J 01SV O SIFLL Ol SNOLLd3OX3 AW '9 'S3HON3lii N3d0 ANV dO IIIdN0V9 Ol 8018d W31SAS'JNIONno8o mTV1SNIAlM3N 38L N3 3Hi Vtl3WVO 1tl1101❑ V H1IM HdV E)OIOHd (lINV S-LN3NOdMC) ONIONn013D ONnowouSONn nVJIdAU OOH ONnotlD TV d0 NOLLVOOI 3Hi tlOd S'JNLAAVtl0 3H13NI103H 'S11ns3tl 1S3L H3D03W 1N3Wn000 IIIM tl010VHLN00 3H1 'V nVOUAN 'SH31-13HS 80 SOVd C31Vl0OSSVSlG 38nin.A 80d 031VNRJIS30 CON ONnoHD 01 al3M S3W 3SOHI d0 3otldFlnS 3H1 MO139 0311VISNI 39 Ol SOV31 ONnOtlO 3H13HV 3WLL ON 1V 1VHL 1N31NI 3H1 SI II 'E ATVOIWtl3H10X3 1 'aNnotlO Ol SS0 80 SWHO 93&31HDVOI33S O3 LVDIGN GV sood ONnodo IVNOLLIOOV TIVISNI IIIM t101Otltl1NOO 'SNOI1VOOl XOtlddV tlod NMd ONIONnOtlO 33S'031V01ONI SOOtl ONnOtlO ONIH ONnous 031Hne DNlallns g JO tl39WnN WnWINIW 3H1 llV1SNI-nM 8Oi0Vtl1NO0'30N1V1SIS3tl ONIONnOII<J ONILS31 tlOd i8Od NOLL03dSNl I L) 9NO 1VNHMX3 n003NN11 anos z# i d0 WnWINIW 3H111V1SNl TIM HOiOVtl1NOO '30N ViSIS3tl ONIONnotlO 0NliS3L UOd AOd NO1103dSNl G) 3N10 d0 WnWINIW - V 301AOtld llM UOlotltl1N001V01HLo313 'S3HON3Hi eJNIONnotlO dO 111iNoV9 ANV Ol uoiud ONV aNnOtlo A1nLLn H3MOd T Ol ON1103NNO03tl033903WtlOjtl3d3801`JNI1S31ONnOtlOTM'1tln0303AOtlddVH030N30'JNItlnsv3W0asb-oW3tl 3a— 3HLON2nLLn'SOWONIVIS Vi3N tl3d.0OHJ.3VY1N3W3tlnstl3W IVLLN310d 30 -nVd.3H13Znlin IIIM uoiotltllNOo 'Z 'SOWMdn NHn13tl tl0 SON39 dWHS tl0 SNNDI inOH11M 3SIOdtl31Nn00 Oi Hltld H100WS V 3HnSN3 Ol O311V1SNI SOV3l ONIONnOtlO IT/ 'L S310N JNIONnoH9lVH3NAE) Site: AZ02-070 Saguaro/TUC Peppersauce Vei1Zo11'" Address: 333 W. Cool Drive — Oro Valley, AZ 85704 8/21/2018 These depictions are for demonstrative purposes only. They are to be used in addition to the engineering drawings for an accurate representation of the site Iii Verizon Wireless 126 W. Gemini Drive Tempe, AZ 85283 DV 170 t9-7� ;PINNACLE CONSULTING. INC 1426 North Marvin Street, Suite 101 Gilbert, AZ 85233 ry ra c� _ 'oo Site: AZO2-070 Saguaro/TUC Peppersauce verizen Address: 333 W. Cool Drive — Oro Valley, AZ 85704 8/21/2018 These depictions are for demonstrative purposes only, I hey are to be used in addition to the engineering drawings for an accurate representation of the site Applicant Verizon Wireless 126 W. Gemini Drive Tempe, AZ 85283 A-0 PINNACLE CONSULTING, INC 1426 North Marvin Street, Suite 101 Gilbert, AZ 85233 Site: AZ02-070 Saguaro/TUC Peppersauce verizonv Address: 333 W. Cool Drive — Oro Valley, AZ 85704 8/21/2018 These depictions are for demonstrative purposes only. They are to be used in addition to the engineering drawings for an accurate representation of the site 'dEU'T'=' Verizon Wireless 126 K Gemini Drive Tempe, AZ 85283 40PINNACLE CONSULTING. INC 1426 North Marvin Street, Suite 101 Gilbert, AZ 85233 Site: AZ02-070 Saguaro/TUC Peppersauce VEI'I7mf1' Address: 333 W. Cool Drive — Oro Valley, AZ 85704 8/21/2018 , These depictions are for demonstrative purposes only. They are to be used in addition to the engineering drawings for an accurate representation of the site Verizon Wireless 126 W. Gemini Drive Tempe, AZ 85283 -P PINNACLE CONSULTING. INC 1426 North Marvin Street, Suite 101 Gilbert, AZ 85233 NAME OF SITE LAT LONG ON AIR/FUTURE PLAN CIRCLE-K 32.352574 -110.993431 ON AIR CONCORDIA 32.375951 -110.970099 ON AIR PEPPERSAUCE 32.353044 -110.975679 FUTURE RAM 32.408568 -110.943656 FUTURE NIGHTHAWKS 32.409139 -111.023694 FUTURE b I D19- 9 NARRATIVE REPORT PROJECT NAME: AZ02-070 Saguaro - TUC Peppersauce APPLICANT: Sun State Towers on behalf of Verizon Wirele J* REQUEST: TIER II MINOR FACILITY APPROVAL R� FOR NEW WIRELESS COMMUNICATIONS FACILIT:,,� l�P Sun State Towers for Verizon Wireless Michelle Lamoureux 1 480-907-4265 August 14, 2017 Petitioner SunState Towers is a real estate development firm specializing in wireless communication infrastructure. We develop multi -tenant facilities to support the ever-increasing needs of our wireless clientele. Verizon has engaged Sun State's services in the development of a facility to address wireless network deficiencies in the Oro Valley area. Verizon Wireless is one of the largest wireless communication providers in the United States with over 100 million subscribers. Purpose of the Request This application for a Tier II Minor Facility is requested to allow the development of wireless communications infrastructure to initially support Verizon's network. As the anchor tenant of the facility, the site will improve wireless voice and data services for Verizon Wireless customers. This site is designed to satisfy the demand for Verizon Wireless service in this area as required by their Federal Communications Commission License. Sun State Towers is proposing to develop a 50' monoelm communications facility within the 0.56 +/- acre parcel of Saguaro Vista Veterinary Clinic generally located southwest of the intersection of W. Cool Dr. and N. Oracle Rd. in Oro Valley, Arizona (APN 225-14-170C). Verizon is requesting the Tier II Minor Facility approval to run concurrently with the lease terms between Sun State Towers and the property owners, Andrew J. Carlton and Cathleen A. Carlton. The proposed antenna configuration necessitates a 12' array diameter, with 3' separations between antennas to optimally propagate Verizon's LTE frequency, without signal redundancy. Justification of the Request and Need for the Facility The wireless communications industry has seen tremendous growth over the past two decades. This growth has come in the form of larger subscriber base, an increase in the number of devices per subscriber, and a tremendous uptick in demand for bandwidth per subscriber. There are two ways wireless carriers can address this capacity pressure: 1.) Acquire more spectrum, or frequency, with which to operate the network or, 2.) Build more sites (network densification). In the case of the former, Verizon Wireless, like most wireless carries, is an active participant in FCC spectrum auctions, when they are conducted. Spectrum acquisition alone is not enough to meet current bandwidth demand. In addition, Verizon is currently utilizing a non -concealment tower in the area to meet coverage needs, however this tower is set to be decommissioned and therefore will result in a fairly large gap in service. With the new tower being of a concealed nature, this will improve the esthetics of the area. W �q ""�r, Existing Towers in the Area Other structures were identified as part of the due diligence efforts; however, they were all either outside the required search ring provided by RF engineers in order to close the gaps in coverage for voice and data demands, one mile away, or they were in the process of being decommissioned. Alternate Candidate Locations In the best interest of servicing our customer, their customers, and proceeding with the best of intensions regarding the City of Oro Valley, other candidate locations were identified and evaluated with the proposed location deemed as the best for all parties' interest. Proposed Modifications Sun State Towers is proposing a new 50' high monoelm to be located at 333 W. Cool Dr., Oro Valley. Additional screening is provided by densified branch counts and RF-friendly socks covering antennas. The communications facility, measuring 20' X 30', is an unmanned facility to be improved with a 50' monopole structure, perimeter chain linked fence as well as power and fiber utilities. Inside the compound a 8'X12' concrete pad will house one (1) Verizon power cabinet, (1) Verizon RF cabinet, and one (1) future Verizon equipment cabinet. After the initial 60-day construction period, the site will have a technician visit the site once a month for routine maintenance and monitoring. Setback Table (From center of proposed monoelm to nearest property line) Direction Distance North 184'-6" South 78'-10" East 70'-501 West 22'-7" Relationship to Surrounding Properties The subject property and all adjacent property are currently zoned either commercial or residential. There is a dirt lot and alleyway to the south and both commercial buildings to the east and west back up to the proposed tower. There is an apartment building to the north which is buffered by W. Cool Dr. and in addition the proposed tower location is approximately 185' into the parcel. Circulation System The proposed site will be accessed from the veterinarian parking lot through the northern entrance off W. Cool Drive and technicians will utilize one of the parking lots spaces for their vehicle while conducting monthly routine service visits. All necessary utility, fiber, access, and other easements will be outlined within the lease terms between Sun State Towers and the property owners, Andrew J. Carlton and Cathleen A. Carlton. Development Schedule The project development schedule will take approximately 60 days following the issuance of all necessary permits for the project. Community Facilities and Services The proposed development is located in a commercial use area surrounded by other commercially zoned parcels to the east, west, and south. Dense residential apartments are located to the north. It is worth noting the tremendous benefit of enhanced wireless services in this high network demand portion of the city, especially for use by Public Safety agencies. Allowing Verizon to proceed with their proposal will not only strengthen their service in the area for residents and those that travel through the area, but it will also provide competition and allow wireless users options to choose from. Public Utilities and Services The proposed project will require electrical and telephone service. The project is an unmanned facility so it will not require sewer or water services. Assessor's Map i ' r a r t • ♦ .� A 1 a a 'e� ` i e » ♦ • ! t ♦h � rp6.. fi.°� htmuwi� a .._. w❑ •' w ,• a f y "' � N « 0. ���L4da lui ^S2S3fCh result 7: 4dd to Map Notes v Y 9 a K S���.�y,;yi ♦ as 1. - `ti '! ,� S Y ' m �` r.. µ, a ° � ' ♦ '� * i 'Sr x ♦ ," � p � 1 r 0 _ � + � � Tyr.. F ,. S ° "' ♦ �' + M n :d r r" ° y w" s I 'J,NV ."i� ' to 'TS } �'�'"1W r y~•y♦ ""_ ;...1 • 3 .r _~i".t ,.k a. F,;,. r 1 / ,'�l r a � w. ti.` - _ » .. +