HomeMy WebLinkAboutOV1701072Prepared for: Prepared BV:
Shannon 77 LLC
700 E Broadway Boulevard Suite 200
Tucson, AZ 85711
APPROVED E 1'. DhS/BL A
D E
PZ PROJECT N,.ANAGcR
The WLB Group, Inc.
4444 East Broadway Blvd.
Tucson, Arizona 85711
Contact: Paul Oland
520.881.7480
gpoland@wlbgroup.com
WLB No. 116028-A-001
r: '
TABLE OF CONTENTS
A. Project Summary............................................................................................................. 1
B. Property Data.................................................................................................................. 2
C. Your Voice, Our Future General Plan Amendment Criteria ............................................ 2
D. General Plan Policy Conformance.................................................................................... 6
Exhibits
• Location Map
• Existing General Plan Land Use Designations
• Proposed General Plan Land Use Designations
Shannon 80 — General Plan Amendment
WAMBWLB No. 116028-A-001
A. Project Summary
The Town of Oro Valley is growing, not only in size but also in desirability. Since the year 2000,
the population of Oro Valley has increased roughly 45%, to over 43,500 residents (Source: 2015
American Community Survey). In addition, demand for housing is growing in the area. According
to Multiple Listing Service of Southern Arizona Statistics 2016 Year End Review, Tucson
experienced a total unit sales of 16,842 which is more units than have been sold in the last ten
years. Average list and sold prices for 2016 increased over the year 2015 while days on the
market saw a significant decrease from 2015. Furthermore, the number of building permits
pulled in Oro Valley have been steadily rising over the past three years signifying an increased
demand for housing. There were 176 permits pulled in 2016 up 15 from 2015 and up 42 from
2014. The Town of Oro Valley's recent economic and physical growth, as well as its need for
more housing, make our request a necessary and reasonable amendment to the "Your Voice, Our
Future" Oro Valley General Plan.
The subject property is located on the east side of Shannon Road between Lambert Lane and
Naranja Drive. The request is to modify the General Plan Land Use Designation from Rural Low -
Density Residential (R-LDR) to Low Density Residential 1 (LDR1, 0.4-1.2 DU/AC), to allow for a
single-family residential cluster subdivision.
The proposed change in land use designation and density is highly supported by several factors,
including:
• The Town of Oro Valley General Plan "Your Voice, Your Future" ratified by voters in
November 2016, has expanded the Town's Planning Area westward from Shannon to
Thornydale Road, signaling that this property is no longer on the fringe of the Town.
• The Urban Services Boundary has expanded west to Thornydale Road, positioning the
site away from the urban edge.
• The subject property is within a 1.5 mile proximity to two Tier 2 growth areas, located
at the intersections of Tangerine Road and La Cholla Boulevard, and Lambert Lane and
La Canada Drive.
• Naranja Drive road improvements have been made between Shannon Road and La
Cholla Boulevard.
• The changing transportation conditions of La Cholla Boulevard to a major north -south
corridor will increase the viability and accessibility of the site, creating demand for
medium density residential development.
• The adjoining Capella property to the east, is undergoing a rezoning from R144 to
Planned Area Development. Capella includes a mixture of uses and residential
densities from low density residential to high density residential, commercial areas,
recreation areas, and open space.
The requested change in land use designation will allow a residential cluster subdivision, with
large amounts of open space, and the preservation of Critical Resource Areas and Core Resource
Areas onsite. A significant open space buffer will be provided along the entire southern and
western boundaries to help mitigate any impacts created by this development. Additionally, this
r�eeMMB Shannon 80—General Plan Amendment
group WLB No. 116028-A-001
Plan Amendment is fully compliant with Oro Valley's Environmentally Sensitive Lands Ordinance
(ESLO). Under this Amendment, development of this property will result in approximately 66% of
the property being left in its natural condition.
In order to make this project a reality, the appropriate land entitlements must be acquired for
the property. The property owner is focused on acquiring the necessary entitlement in the Town
of Oro Valley and the first step in achieving the necessary land entitlements involves a Type 2
amendment to the Oro Valley General Plan. As such, this application for a Type 2 amendment is
being submitted.
B. Property Data
Location: The property is located immediately east of Shannon Road, south of Ironwood Ridge
High School, and north of Owl Vista Place, approximately one half mile west of La Cholla
Boulevard. The property can be described as the south half of the northwest quarter of Section
9, Township 12 South, Range 13 East.
Area of Properties/General Plan Amendment:
Parcel 224-21-0020: 9.8± Ac.
Parcel 224-21-0030: 9.8± Ac.
Parcel 224-21-0040: 18.3± Ac.
Parcel 224-21-0050: 38.5± Ac.
Total = 76.4± Ac.
Existing Land Uses: The site is currently vacant.
Existing Zoning: The property is currently zoned Single Family Residential District, R1-144.
Existing Oro Valley General Plan Designations: The property is designated as Rural Low Density
Residential (R-LDR).
Requested Oro Valley General Plan Designations: Low Density Residential 1 (LDR1, 0.4-1.2
DU/AC).
C. Your Voice, Our Future General Plan Amendment Criteria
In accordance with OVZCR Section 22.2.D.4 the General Plan amendment proposed shall, on
balance, be consistent with the vision, guiding principles, goals, and policies of the General Plan
as demonstrated by the following criteria. The request shall not:
1.a. Significantly alter existing development character and land use patterns without
adequate and appropriate buffers and graduated transitions in density and land use.
Shannon 80—General Plan Amendment
M6 WLB No.116028-A-001
• The development will include landscaping, architectural themes, and open space
treatments that comply with Oro Valley Code and Design Guidelines. This
development will contain landscape buffers around the entire perimeter of the
project and will provide a generous natural open space buffer for the lower density
neighborhood to the south and west. The project will also include significant
preservation of the onsite Critical Resource and Core Resource Areas. At minimum
95% of the Critical Resource Areas and 80% of the Core Resource areas will be
preserved in their natural condition on site. These areas along the southern and
western boundaries of the site will be permanently protected within a conservation
easement to be granted to the Town of Oro Valley. The proposed density is
approximately 1.0 homes per acre. In addition, the building height will be limited to
single -story for the entire development with a maximum of twenty-three (23') feet
height for gable roofed residences only to lessen the impact on views from the
surrounding neighborhood. This density is sensitive to the surrounding
developments, and will create a density transition between the lower density
developments to the south and west, and the higher intensity developments that are
being planned to the east. In addition, clustering development closer to the high
school is appropriate from a land use planning perspective.
1.b. Impact existing uses with increased infrastructure without appropriate improvements
to accommodate planned growth.
• With this development being on Shannon Road, an arterial roadway, much of the
utility infrastructure is already in place to accommodate this project. Sewer capacity
is available to serve this property. Sewer and any other necessary utility extensions
will be installed. Presently, water infrastructure is not in place to serve this parcel;
however, offsite infrastructure extensions of the Oro Valley Water system will be
made to serve this development. This development will have a net positive long-term
fiscal impact to the Town and its taxpayers. Given the recent extension of the urban
service boundary, the property lies well within the service limits of the Town and is in
a position to accommodate planned growth.
1.c. Impact other public services including police, fire, parks, water and drainage unless
careful analysis and explanation of anticipated impacts is provided to the Town.
• Being essentially infill, the location of this development and the proposed home sites
will not negatively impact public services such as police, fire and parks.
• Drainage will be carefully analyzed according to Town drainage design requirements.
Once developed, the site will have detention basins that will retain storm water runoff
and meter it out at less than pre -developed conditions. Additional onsite drainage
attenuation through larger basins will be completed to reduce the flow of existing run-
off. The following off -site drainage improvements will be implemented as agreed
upon with neighbors:
Shannon 80 — General Plan Amendment
WLB No. 116028-A-001
o Improvements along Owl Vista Place, which include larger culverts, armoring
the road, and raising the road in necessary areas.
o Working with Pima County to identify possible drainage improvements along
Saguaro Divide.
o Working with Amphitheater School District to identify possible drainage
improvements to Ironwood Ridge High School Property.
Capacity is available to serve the project site with water and sewer utilities. Additional
information on the type and amount of infrastructure extensions will be provided
during the platting process. According to the Traffic Impact Analysis findings, all
intersections adjacent to the subject property currently operate, and with the
addition of the project, are predicted to continue to experience an adequate level of
service for all movements on weekday and weekend peak hours. By clustering the
homes of this development in less environmentally significant areas, it will allow for
significant open space and buffering. There will be connectivity to the arterial road
network for emergency services and convenient access to nearby goods and services.
The subject property will have one access point that will connect this neighborhood
directly to Shannon Road, aligning with Sahuaro Divide. Both northbound and
southbound left -turn lanes at the project entrance (intersection of Shannon Road and
Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon
Road and Owl Vista Place will be installed to reflect the traffic analysis and agreement
with neighbors. A Traffic Impact Analysis (TIA) has been provided as part of the
Rezoning Application.
1.d. Impact the natural beauty and environmental resources without suitable mitigation.
• Prior to development, this site will be inventoried for all significant vegetation. Town
of Oro Valley Native Plant Preservation ordinance requirements will be followed.
Flexible Design Options are being requested as part of the rezoning. A Native Plant
Preservation Waiver has been submitted but per the Zoning Code, the waiver does
not apply to significant ironwood trees or saguaro cacti within the developable area.
Plants that are suitable for transplanting will be transplanted on -site and be included
within the buffer yards and other open spaces of the site. The Critical Resource Areas
that run through the site will be preserved in their natural condition, except for
necessary roadway crossings. Both the Critical Resource Areas and the Core Resource
Areas will be preserved per ESOS Conservation Guidelines. The proposed residential
development will preserve surrounding views in the neighborhood through the use of
a natural bufferyard along the perimeter of the property and the preservation of
significant open space on the western portion of the site and the Core Resources Area
to the south.
2. Implement effective public outreach efforts to help identify neighborhood concerns and
respond by incorporating measure to avoid or minimize development impacts, and mitigate
unavoidable adverse impacts.
Shannon 80—General Plan Amendment
WLB No. 116028-A-001
• A Public Outreach Plan was developed and followed in accordance with Town
requirement. The first formal neighborhood meeting was held on April 25t" 2017, at
Casas Church. This meeting was held to increase public awareness of the proposal
and identify any initial concerns that surrounding neighborhoods may have with the
development of this property. The meeting was very productive and allowed
surrounding neighbors a chance to voice comments and suggestions, and any
questions answered.
• Some concerns raised during the neighborhood meeting were regarding:
o The density of the proposed development and the proposed number of lots
and the small lot size.
o The perceived loss of rural character within the neighborhood.
o The anticipated increase in traffic.
• In response to the above comments the following responses have been offered:
o A reduced density and reduced number of lots is being proposed. Lot size has
also increased in size from the previous proposal.
o The site will maintain a large amount of open space on the west and south of
the development in effort to preserve the views and rural character of the
area. We will work with neighbors to identify conservation methods.
o According to the Traffic Impact Analysis, all intersections adjacent to the
subject property currently operate and are predicted to continue to
experience an adequate level of service for all movements on weekday and
weekend peak hours. Both northbound and southbound left -turn lanes at the
project entrance (intersection of Shannon Road and Sahuaro Divide) as well as
a southbound left -turn lane at the intersection of Shannon Road and Owl Vista
Place will be installed to reflect the traffic analysis and agreement with
neighbors.
• A second formal neighborhood meeting was held on July 18th 2017, at Casas Church.
• An informal on -site tour was held on August 9, 2017 to better understand the layout
of the proposal. Survey poles with flags were set up to simulate the proposed building
heights and showed the proposed building envelope of the property. Residents
attended a guided tour to discuss the proposed development. At each checkpoint
discussions took place which addressed building heights, setbacks and drainage along
edges of the property. Residents who attended expressed their concerns related to:
o Drainage and ongoing damage to Owl Vista Place.
o Planning for on -site detention.
o Vehicular access and safety.
o Design of the homes.
o Location and design of the entry gate and sign.
o Preservation natural character of the project area.
As a result of the meetings held on July 18th 2017 and August 9, 2017 the following
agreements were made with neighbors:
o To mitigate for existing flooding issues an easement will be provided for
maintenance improvements to Owl Vista Place. Improvements along Owl
Shannon 80—General Plan Amendment
ftMMBWLB No.116028-A-001
Vista Place will include larger culverts, armoring the road, and raising the road
in flood prone areas.
o This development will attenuate pre-existing storm water flow rates by 15%-
25% by constructing larger than code -required onsite basins which are to be
landscaped within open space areas of the site.
o Both northbound and southbound left -turn lanes at the project entrance
(intersection of Shannon Road and Sahuaro Divide) as well as a southbound
left -turn lane at the intersection of Shannon Road and Owl Vista Place will be
installed to reflect the traffic analysis and agreement with neighbors.
o The design of homes will be compatible to the surrounding areas using natural
colors that blend with the desert landscape.
o The location and design of the entry gate will be compatible to the rural, desert
atmosphere of the area with a rustic western design and located a safe
distance from the Shannon Road right-of-way in order to prevent the back up
of traffic onto Shannon.
o Conservation of 96% of Critical Resource Areas, 97% of Core Resource Areas,
and 45% in the remaining Resource Management Area Tier 1. Preservation of
ESOS areas along the southern (300'-600') and western (300'-400') edges
which will be protected within an open space easement to be granted to the
Town.
• A third formal neighborhood meeting was held on August 28th 2017.
o The meeting provided a good opportunity to review the latest site plan which
reflected revisions as agreed upon during previous meetings.
D. General Plan Policy Conformance
The proposed General Plan Amendment is in conformance with the following Town
policies in the Community chapter of the General Plan:
• CC.2. Provide appropriate park facilities and services for residents of all ages in the
community.
In addition to natural undeveloped open space, a neighborhood park will be built
onsite to serve the neighborhood. The exact type of amenities will be determined
during the development process.
• CC.3. Link existing and planned neighborhoods with parks and open spaces by
incorporating path and trail facilities.
Developer will provide an in -lieu fee to the Town for constructing a future multi -use
path along Shannon Road.
• CC.4. Provide public open space and park space where there is an existing park
shortage or a need to preserve open space, natural areas or scenic views.
mum��%� Shannon 80 —General Plan Amendment
WLB No. 116028-A-001
The project will have a neighborhood park and ESLO open space will be preserved per
Town requirements.
• CC.8. Foster development of complete neighborhoods with easy access to
transportation and employment options, and commercial areas that offer amenities
and services for residents' daily needs.
In addition to its ideal location south of Ironwood Ridge High School and along an
arterial roadway, the project will be within close proximity of the Capella Master
Planned Community (currently in the rezoning process) which will provide commercial
areas, additional amenities and services. The project is also within a 1.5 mile proximity
to two growth areas identified as Tier 2 Growth Areas located at the intersections of
Tangerine Road and La Cholla Boulevard and Lambert Lane and La Canada Drive.
• CC.9. Promote community interaction by planning for public land uses, such as parks,
schools and other civic uses to act as the focus of neighborhoods.
Community interaction will be supported based on the project's location adjacent to
Ironwood Ridge High School, and through the use of a neighborhood park.
The proposed General Plan Amendment is in conformance with the following Town
policies in the Environment chapter of the General Plan:
• SD.1. Identify, preserve and manage an integrated and connected open space system
that protects Oro Valley's natural resources and provides enjoyment for residents and
visitors while recognizing our place in the larger ecosystem.
The development of this property will preserve the three Critical Resource Areas to the
greatest extent possible as required by the ESLO, and will minimize topographic
changes. The project will also be in conformance with the native plant preservation
requirements to minimize the disturbance of significant vegetation (including
ironwood tree stands and significant saguaros) and mitigate for any disturbances.
• SD.2. Protect and provide connections between contiguous, environmentally
sensitive lands within the Town, including key habitat areas and significant natural
resource areas.
The Critical Resource Areas and the Core Resource Areas on the property will be
preserved, except for necessary roadway crossings and required infrastructure,
including areas of significant vegetation (containing significant saguaros and
ironwood tree stands). The preservation of these key habitat areas will provide
contiguous connections between offsite habitat areas and allow for wildlife movement
throughout the site.
Shannon 80 — General Plan Amendment
ftUMBWLB No.116028-A-001
• SD.4. Protect and conserve healthy native vegetation during the development
process.
The development of this property will be in conformance with the native plant
preservation requirements to minimize the disturbance of significant vegetation and
mitigate for any disturbances. A Native Plant Preservation Waiver has been
submitted, but per the Zoning Code the waiver does not apply to significant Ironwood
Trees or Saguaro Cacti within the developable area. Denser areas of Ironwood Trees
exist along the southern half of the property, which will be preserved in its natural
state within a conservation easement.
• SD.6. Protect scenic corridors, public park and trail view sheds, and the distinctive
visual character and visual appeal of Oro Valley.
The proposed residential development will preserve surrounding views in the
neighborhood through the use of a natural bufferyard along the perimeter of the
property which will soften any visual impacts to the surrounding landowners. The
project site is located outside of scenic corridors.
• SD.7. Enhance, protect, create and restore native biological habitats, especially along
washes, groundwater basins, recharge areas and wildlife corridors, in order to benefit
native plant and wildlife habitats and species movement, minimize the negative
impacts of invasive species and provide protection from flood risk.
The vast majority of Critical Resource Areas and the Core Resource Areas on the
property will be preserved in their natural condition, which will help reduce impacts to
onsite floodplains. The preservation of these key habitat areas will provide contiguous
connections between offsite habitat areas and allow for wildlife movement
throughout the site.
• SD.8. Encourage development project designs that connect wildlife habitat areas,
avoid disturbing significant wildlife habitats and minimize the overall impacts on
wildlife habitat areas.
By clustering the home sites along the northern property boundary, the impact to the
Critical Resource and Core Resource Areas will be minimized allowing for greater
wildlife habitats and habitat connectivity. In addition, the property was designed to
minimize the impact of road crossings to the Critical Resource and Core Resource
Areas.
• SD.10. Strive to protect the public and environment from the threats and risks of
stormwater surges and potential negative impacts of contaminants from runoff.
In accordance with Town policy, post -developed 100-year stormwater discharges
Shannon 80—General Plan Amendment
mum WLB No. 116028-A-001 U
exiting the site will be maintained in their current condition and reduced as required
by the Town Engineer.
The following "neighbor agreements" relative to off -site drainage improvements, are
to be completed to further reduce stormwater run-off:
o Improvements along Owl Vista Place, which include larger culverts, armoring
the road, and raising the road in necessary areas.
o Working with Pima County to identify possible improvements along Saguaro
Divide.
o Working with Amphitheater School District to identify possible improvements
to Ironwood Ridge High School Property.
• CR.1. Identify, preserve and interpret significant cultural resources within Oro Valley
and the larger planning area.
As part of the rezoning process a records check has been solicited from the Arizona
State Museum. The museum's findings indicate that no sites are located within the
project area. Local and State regulations will be followed if any cultural resources are
identified onsite.
The proposed General Plan Amendment is in conformance with the Town's policies in
the Development chapter of the General Plan:
• LU.1. Promote land use development practices and programs that conserve and
minimize impacts to natural and cultural resources.
Development of the property will be done with a focus on preserving its
environmentally sensitive areas, and will conserve the percentages of land required by
the Town's ESLO guidelines. To do this, the development will protect the property's
three washes, as well as clustering development in the less environmentally sensitive
areas of the site and avoiding a majority of the Core Resource Area.
• LU.4. Promote outdoor lighting that enhances safety and circulation, beautifies
landscapes, minimizes impacts to adjacent properties and does not reduce public
enjoyment of the night sky.
The proposed development will comply with Oro Valley Town Code and utilize dark sky
compliant lighting.
• LU.S. Provide diverse land uses that meet the Town's overall needs and effectively
transition in scale and density adjacent to neighborhoods.
This plan focuses on minimizing the impact of development on the neighbors by
providing large areas of open space in the southern and western portions of the
nUMB Shannon 80—General Plan Amendment
WLB No. 116028-A-001
property. This will serve as a buffer between this development and the existing
residences to the south and west. By increasing the density on this property to LDR1,
it will act as an appropriate and effective transition from the higher density
developments to the north and east and the lower density developments to the west
and south.
• LU.6. Maintain the small-town, neighborly character and improve the design and
safety of the built environment.
By clustering the homes of this development in less environmentally significant areas,
it will allow for significant open space and buffering. There will be connectivity to the
arterial road network for emergency services and convenient access to nearby goods
and services. The subject property will have one access point that will connect this
neighborhood directly to Shannon Road, aligning with Sahuaro Divide. The Traffic
ImpactAnalysis recommended a southbound left-hand turn lane into the project. Both
northbound and southbound left -turn lanes at the project entrance (intersection of
Shannon Road and Sahuaro Divide) as well as a southbound left -turn lane at the
intersection of Shannon Road and Owl Vista Place will be installed to reflect the traffic
analysis and agreement with neighbors.
• LU.8. Encourage the development of master planned communities which include
suitable residential and commercial uses.
The proposed LDR1 development will be planned so that it will fit within the larger
context of the area, providing an appropriate transition between the higher densities
to the east and north and the lower densities to the west and south. The areas of the
property near existing low density residential neighborhoods will be preserved as open
space while development will be clustered in areas of the property closer to the public
school and nearby lands planned for higher density development. This will allow the
development to better integrate with the existing neighborhoods and activity centers.
• DG.1. Require new development to pay its share toward the cost of additional public
facility and service needs generated by new development, while balancing public and
private interests in cost allocation.
As part of the rezoning of the property, a Traffic Impact Analysis has been completed.
The Traffic Impact Analysis recommended a southbound left-hand turn lane into the
project be considered. Both northbound and southbound left -turn lanes at the project
entrance (intersection of Shannon Road and Sahuaro Divide) as well as a southbound
left -turn lane at the intersection of Shannon Road/ Owl Vista Place will be installed to
reflect the traffic analysis and agreement with neighbors. The developer will pay its
share toward the cost of additional public infrastructure needs generated by new
development.
�
Shannon80—GeneralPlan Amendment
O1p � �%� RX WLB No. 116028-A-001
• 1.1. Accommodate community services and utilities that meet the larger community
needs and goals.
Developer will provide an in -lieu fee to the Town for constructing a future multi -use
path along Shannon Road.
• 1.2. Consider aesthetics and visual impacts of utilities and infrastructure during the
planning, design or upgrade process, to the extent reasonably possible.
The development of the property will provide the appropriate buffers for the washes
as well as for the surrounding neighborhoods and school. All utilities will be installed
underground.
• 1.6. Provide for safety, efficiency and environmentally -sensitive design in stormwater
systems.
Stormwater systems will meet Town code requirements. Drainage will be carefully
analyzed according to Town drainage design requirements. Once developed, the site
will have detention basins that will retain storm water runoff and meter it out at less
than pre -developed conditions.
Shannon 80 — General Plan Amendment
MUMWLB No.116028-A-001
MOM
M1 ink
IIIIII Ironwood'••.
High School
I• .�Iz
/IIIII��- 111►� �■
I■� ■■■■ • ,1111 1111.E ; i
..■ � � � 11111►� � i
ect
Property XIF
Casas
—
11
I■■■ ■■■ �IIIIIIIIIIr � �uo��
Churchloin
II■■ � r.111.�i.,���
ME � ��� i' MEMO
III I� JIM � MEN�
■
NON mom
■ MONO
Wpm
■11� +����'�i
��■■■ IIIIII■ _� ��i=/,�i
Location Map ® 0' 1/4 mile
The IM Shannon 80 - General Plan Amendment
WLB
G .P- WLB No. 116028-A-001
Existing General Plan Land Use Designations �'I'7 I soo
The Shannon 80 - General Plan Amendment
GLB
rog WLB No.116028-A-001
_��
Rural Low
, I
Density
_I___d
Low Density Residential
Residential
(0-0.3 DU/AC)
(0.4-1.2DU/AC)
NARANJA DR
School
_.. _..._.
Rural Low Density
Residential
(0-0.3 DU/AC)
SUBJECT
z
PROPERTY
z
a
Low Density Residential
(0.4-1.2DU/AC)
a
m
U)
U_
z
0
o
y
W
a
p
K
O
O
H
O
a.
z
3
Rural Low Density
z
z
Residential (0-0.3 DU/AC)
Public/Semi Public
Master Plan
Community
® o soo
Proposed General Plan Land Use Designations
The
Shannon 80 - General Plan Amendment
G LB WLB No.116028-A-001
JPytEY AA/2
OQ0 10
11100NDE0 191a
Community Development and Public Works
March 5, 2018
Paul Oland
The WLB Group, Inc.
4444 E. Broadway Blvd
Tucson, AZ 85711
gpolandR-wlbgroup.com
Re: Shannon Road Type 2 General Plan Amendment and Rezoning
East side of Shannon Road, south of Ironwood Ridge High School
Letter, OV1701072 and OV1701617
Dear Mr. Oland,
Thank you for submitting a final site analysis and narrative for the Shannon Type 2 General Plan
Amendment and accompanying rezoning. The next step in the approval process is to proceed to final
design review.
If submitted after five (5) years from the approval date, December 6, 2017, conceptual design review will be
required.
If you should have any questions about the process, please do not hesitate to contact me at 520-229-7836
or msimms@orovalleyaz.gov.
Best regards,
Milini Simms
Planner
msimms a(jorovalleyaz.gov
520-229-4836
cc: File
Oro Valley, it's in our nature.
11000 N. La Canada Drive, Oro Valley, Arizona 85737
www.orovalleyaz.gov I phone: (520) 229-4800 1 fax: (520) 742-1022
TLB
(jroupv"
Engineering • Landscape Architecture
Planning - Surveying • Urban Design
PREPARED FOR:
Shannon 77 LLC
700 E. Broadway Blvd. STE 200
Tucson, Arizona 85719
PREPARED BY:
The WLB Group, Inc.
Attn: Paul Oland
4444 East Broadway
Tucson, Arizona 85711
WLB No. 116028-A-001
February 14, 2018
The
WLB
GroupVVLE
QA116028 Shannon 80\A-001\01 Planning\04 Rezone or GPA\Site Analysis\Shannon 80 Rezoning Site Analysis.docx
Ai-`�,hOVE BY: T /PL/Dhb/bUA
E y-y3�
PZ PROJECT MANAGER
CONTENTS
Introduction....................................................................................................................................1
PartI — Inventory & Analysis............................................................................................................3
1.
Existing Land Uses........................................................................................................................................
5
A. Regional Context..................................................................................................................................................5
B. Onsite Uses..........................................................................................................................................................5
C. Project Vicinity.....................................................................................................................................................
5
2.
Environmentally Sensitive Lands..................................................................................................................
6
A. ESL Categories Onsite..........................................................................................................................................
6
B. Additional ESL Characteristics..............................................................................................................................
7
C. Total acreage present on -site for each Conservation Category ...........................................................................7
3.
Topography..................................................................................................................................................7
A. Topographic Character & Features......................................................................................................................
7
4.
Cultural /Archaeological / Historic Resources..............................................................................................
8
A. Archaeological Survey Status / Results................................................................................................................8
5.
Hydrology..................................................................................................................................................10
A. Offsite Watersheds............................................................................................................................................10
B. Balanced / Critical Basins...................................................................................................................................10
C. Offsite Features Affecting or Affected by the Property.....................................................................................10
D. Area of Upstream Watersheds Greater than 100 CFS.......................................................................................10
E. Location / Ownership of Well Sites within 100' of Site......................................................................................10
F. Onsite Hydrology Characteristics.......................................................................................................................10
G. Existing Drainage Conditions along the Downstream Property Boundary .........................................................11
6.
Wildlife......................................................................................................................................................
12
A. Arizona Game & Fish Dept. Letter.....................................................................................................................12
7.
Viewsheds..................................................................................................................................................23
8.
Traffic.........................................................................................................................................................24
A. Connection to Arterial Roadway Network.........................................................................................................24
B. Arterial Roadways within One Mile of the Property..........................................................................................24
9.
Recreation / Trails......................................................................................................................................
26
A. Trails, Parks and Recreation Areas within One Mile of the Property.................................................................
26
10.
Schools.......................................................................................................................................................
27
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
A. Schools within One Mile of the Property........................................................................................................... 27
B. Schools Expected to Serve the Project............................................................................................................... 27
11. Water......................................................................................................................................................... 28
A. Water Service Provider...................................................................................................................................... 28
12. Wastewater............................................................................................................................................... 29
A. Sewer Service Connection................................................................................................................................. 29
13. Exhibits...................................................................................................................................................... 30
Exhibit 1-1-A: Site Location Map................................................................................................................... 31
Exhibit1-1-8: Aerial Photograph.................................................................................................................. 32
Exhibit 1-1-C. Existing General Plan Future Land Use Designations.............................................................. 33
Exhibit1-1-D: Existing Zoning....................................................................................................................... 34
Exhibit 1-1-E: Existing Land Uses.................................................................................................................. 35
Exhibit 1-2-A: Environmentally Sensitive Lands............................................................................................ 36
Exhibit1-3-A: Topography............................................................................................................................ 37
Exhibit1-5-A: Offsite Watersheds................................................................................................................. 38
Exhibit 1-5-8: Onsite Hydrology Characteristics............................................................................................ 39
Exhibit 1-8-A: Transportation....................................................................................................................... 40
Exhibit 1-9-A: Trails, Parks & Recreation...................................................................................................... 41
Exhibit 1-10-A: Existing & Proposed Schools................................................................................................. 42
Exhibit1-12-A: Sewer Service....................................................................................................................... 43
Exhibit 1-13-A: McHarg Composite Map...................................................................................................... 44
PartII — Land Use Plan...................................................................................................................45
1. Land Uses................................................................................................................................................... 47
A. Project Description............................................................................................................................................47
B. General Plan Conformance................................................................................................................................47
C. Flexible Design Options / Conservation Subdivision Design...............................................................................47
D. Effect on Existing Land Uses..............................................................................................................................48
2. Environmentally Sensitive Lands................................................................................................................ 49
A. ESOS Selection & Preservation Methods...........................................................................................................49
3. Topography................................................................................................................................................50
A. Design Response to Site Topography................................................................................................................. 50
B. Slope Encroachment..........................................................................................................................................50
C. Hillside Conservation Areas............................................................................................................................... 50
D. Quantified Site Disturbance...............................................................................................................................50
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
4. Cultural / Archaeological / Historic Resources............................................................................................ 51
A. Resource Protection.......................................................................................................................................... 51
B. Treatment Plan..................................................................................................................................................51
5. Hydrology.................................................................................................................................................. 52
A. Design Response to Site Hydrology.................................................................................................................... 52
B. Modifications of Drainage Patterns...................................................................................................................52
C. Mitigation..........................................................................................................................................................52
D. Town Policy Conformance................................................................................................................................. 52
6. Wildlife...................................................................................................................................................... 53
A. Mitigation..........................................................................................................................................................53
7. Viewsheds..................................................................................................................................................54
A. Design Response to Site Viewsheds................................................................................................................... 54
B. ORSCOD / TRCOD Conformance........................................................................................................................ 54
8. Traffic.........................................................................................................................................................55
A. Traffic Impact Analysis.......................................................................................................................................55
B. Proposed Rights-of-Way....................................................................................................................................56
C. Proposed Pedestrian / Bicycle Circulation.........................................................................................................56
9. Recreation / Trails...................................................................................................................................... 57
A. Offsite Trail Access............................................................................................................................................. 57
B. Open Space Ownership......................................................................................................................................57
10. Schools....................................................................................................................................................... 58
A. Student Generation........................................................................................................................................... 58
B. School Capacity..................................................................................................................................................58
11. Water......................................................................................................................................................... 61
A. Water Demand..................................................................................................................................................61
B. Water Service Provider & Capacity.................................................................................................................... 61
12. Wastewater............................................................................................................................................... 64
A. Sewer Service Method.......................................................................................................................................64
13. Bufferyards................................................................................................................................................ 66
A. Mitigation (if applicable)....................................................................................................................................66
14. Exhibits...................................................................................................................................................... 67
Exhibit 11-1-A: Tentative Development Plan................................................................................................. 68
Exhibit 11-2-A: Proposed ESOS Map.............................................................................................................. 69
Exhibit 11-3-A: Proposed Grading Limits....................................................................................................... 70
Shannon 80 - Rezoning Site Analysis
MIAMBWLB No.116028-A-001
Exhibit11-4-A: Proposed Zoning.................................................................................................................... 71
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Introduction
Introduction
This site analysis has been prepared in support of a proposed rezoning of Shannon 80. This project is a proposed 76.4± acre
residential subdivision located on the east side of Shannon Road between Lambert Lane and Naranja Drive. Currently the
subject property remains undeveloped. The proposed project will increase the density on the subject property but remain
substantially out of Critical Resource and Core Resource Areas identified through the Town's Environmentally Sensitive
Lands Ordinance (ESLO).
The proposed density increase is supported by several factors including its proximity to activity hubs such as Ironwood Ridge
High School, Wilson K-8 School, Casas Church, Casas Christian School and the Capella Master Planned Development. This
project will help act as a buffer between the lower density neighborhoods to the south and west, and the higher density
land uses to the east and north.
This request is to rezone the property from the current R1-144 to R1-36. The vision is to develop three clusters of homes,
separated by the Critical Resource Areas running through the site and surrounded by large swaths of open space along the
southern and western edges of the property.
In order to make this residential project a reality, the appropriate land entitlements must be acquired for the property. The
property owner is focused on acquiring the necessary entitlements in Oro Valley through a rezoning of the subject property.
(Please refer to ExhibitA: Location Map.)
Shannon 80 - Rezoning Site Analysis
WUMBWLB No. 116028-A-001
Introduction
(This pole intentionally blank)
t�vn�ee
Shannon 80 - Rezoning Site Analysis
RLMM WLB No. 116028-A-001
Part I — Inventory & Analysis
Part I — Inventory & Analysis
Shannon 80 - Rezoning Site Analysis
WUMBWLB No. 116028-A-001
Part I — Inventory & Analysis
(This page intentionally plonk)
M�7ry/� Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part I — Inventory & Analysis
1. Existing Land Uses
A. Regional Context
The property subject to this rezoning request consists of 76.4± acres located in the Town of Oro Valley in
Section 9, Township 11S, Range 13E, Pima County Arizona. The property is located immediately east of
Shannon Road, south of Ironwood Ridge High School, north of Owl Vista Place, and approximately a half
mile west of La Cholla Boulevard. The Pima County Tax Assessor designates the subject property as parcel
numbers 224-21-0020, 0030, 0040, and 0050.
Please refer to Exhibit 1-1-A: Site Location Map and Exhibit 1-1-B: Aerial Photograph.
B. Onsite Uses
The subject property is currently undeveloped and vacant, and zoned R1-144. The Town of Oro Valley is
currently reviewing a General Plan Amendment request on the subject property to redesignate the
property from Rural Low Density Residential (R-LDR) to Low Density Residential LDR1 on the General Plan
land use map.
Please refer to Exhibit 1-1-C: Existing General Plan Future Land Use Designations.
C. Project Vicinity
Please refer to Exhibit 1-1-D: Existing Zoning and Exhibit 1-1-E: Existing Land Uses. The subject property is
surrounded by the following existing zonings and land uses:
a/b: Existing Zoning and Land Uses
North: Existing zoning:
R1-36 (Single -Family Residential —Town of Oro Valley)
R1-144 (Single -Family Residential —Town of Oro Valley)
Existing land use:
Ironwood Ridge High School
LDR (low Density Residential)
R-LDR (Rural -low Density Residential)
East: Existing zoning:
R1-7 (Single -Family Residential —Town of Oro Valley)
R1-144 (Single -Family Residential —Town of Oro Valley)
Existing land use:
Medium Density Residential (MDR)
Public / Semi Public
LDR (low Density Residential)
R-LDR (Rural -low Density Residential)
Shannon 80 - Rezoning Site Analysis
%IAMBWLB No. 116028-A-001
Southeast: Existing zoning
Existing land use
South: Existing zoning:
Existing land use:
West: Existing zoning:
Existing land use:
Northwest: Existing zoning:
Existing land use:
Port 1— Inventory & Analysis
R1-144 (Single -Family Residential — Town of Oro Valley)
Public / Semi Public
LDR (low Density Residential)
R1-144 (Single -Family Residential —Town of Oro Valley)
R-LDR (Rural -Low Density Residential)
SR (Suburban Ranch — Pima County)
LIU-0.3 (Low Intensity Urban — Pima County)
SR (Suburban Ranch — Pima County)
LIU-0.3 (Low Intensity Urban — Pima County)
c: Number of Stories of Surrounding Structures
Adjacent structures within a quarter mile of the subject property include both one and two-story
single-family detached homes, and schools facilities up to three stories in height.
d: Pending Rezonings
The adjoining Capella property to the east is undergoing a rezoning from R1-144 to Planned Area
Development for a project that includes a mixture of residential densities from low density
residential to high density residential, commercial, and open space. Additionally, Saguaros Viejos
Phase 2 northeast of the proposed development, requests to rezone the subject property from R1-
20 to R1-7.
e: Conditionally Approved Zonings
There are no conditionally approved zonings within a quarter mile of the subject property.
f: Subdivisions and/or Development Plans Approved
There are several residential developments along La Cholla Boulevard that are in various stages of
construction and platting. These include the Estates at Capella (120 lots) east of Ironwood Ridge
High School, Saguaros Viejos (118 lots) on the north side of Naranja Drive, and Rancho de Plata (50
lots) and Rancho del Cobre (68 lots) to the north near Glover Road.
g: Architectural Styles Used in Adjacent Projects
The architectural styles used in adjacent projects are mainly wood frame or block homes that utilize
a stucco and/or stone veneer and have either a flat or tiled roof.
2. Environmentally Sensitive Lands
A. ESL Categories Onsite
The subject property consists of three Environmentally Sensitive Land categories. Approximately 31% or
23.8± acres of the property is within the Core Resource Area. Approximately 60% or 45.4 ± acres of the
Tt % Shannon 80 - Rezoning Site Analysis
MWP WLB No. 116028-A-001
Part I — Inventory & Analysis
property is within the Resource Management Area Tier 1. The remaining 9% or 7.2 acres of the site is within
in the Critical Resource Area. The vegetation community on the property is typical of the Sonoran Desert
scrub Paloverde-Mixed Cacti, which includes Saguaro, Ironwood, Palo Verde, Mesquite, Cholla, Prickly pear,
Ocotillo, and Barrel Cactus.
B. Additional ESL Characteristics
No regulated rock outcrops occur on site.
Please refer to Exhibit 1-2-A: Environmentally Sensitive Lands.
C. Total acreage present on -site for each Conservation Category.
Major Wildlife Linkage
...................
0
.............-..............................................--
Critical Resource Area
..................................................................... ............................ ---
-----------------------------------------------------...
7.2±
----------....----------------------------------
Core Resource Area
.....-------------------------- ---- -
23.8±
------------------------------
RMA Tier 1
-1------- .......................................... - -- --
45.4±
------------.....------....---........---------
--------------------
RMA Tier 2 ...-
- .-..... --............... --------- _,....
0
.-----....................-...........-------------
...
RMA Tier 3
0
3. Topography
A. Topographic Character & Features
The topography of the subject property is characterized by relatively flat terrain and some undulating areas
adjacent to the washes that run across the site. The property generally slopes downward from northeast
to southwest. Elevations range from approximately 2,664 feet at the highest point on the northeast side
to 2,628 feet at the lowest point on the southwest side of the property. The site contains no areas of
regulated slopes greater than 15%. The site does not contain any restricted peaks, ridgelines or other
significant topographic features. No areas of this development are subject to the ESL Hillside Area
Category.
Please refer to Exhibit 1-3-A: Topography.
15%to less than 18%
-------------------------------------------------------------------------------------------------
0
18% to less than 20%
-----------------------
0
---------------------------- - ---------------
20%to less than 25%
-.------------------------------------------
--------------------------
0
-----------------------------------------------------
25% to less than 33%
.................. ------------------.........------------......................---------------
----- -- ... -
0
----------------
33% or greater
---- ......................................... -...... _..e-.....-.._........---------
0
------------------
Ridgelines
............................................... -
0
--------------------.-.............-
Rock Outcrops & Boulders
........------
0
The Shannon 80 - Rezoning Site Analysis
LO1P WLB No. 116028-A-001
Part I — Inventory & Analysis
4. Cultural / Archaeological / Historic Resources
A. Archaeological Survey Status / Results
i. The project site has been surveyed for cultural resources by Westland Resources, and the report has
been submitted to the Town for review.
ii. No significant cultural resources meeting the Arizona or the National Register of Historic Places
eligibility criteria have been found on the property.
iii. In the unlikely event that cultural resources are uncovered during construction, a professional
archaeologist will evaluate the exposed material before any work continues in the area of the discovery.
If any human remains or funerary objects are discovered during the construction of this project, all
work will stop within the area of the remains and all such discoveries will be treated in accordance with
Arizona Revised Statute §41-865
Tw
Shannon 80 - Rezoning Site Analysis
MI WLB No. 116028-A-001
Part I — Inventory & Analysis
Prepared by.
Erina Gruner
Reviewed and submitted by:
John M. Lindly, Ph.D.
Cultural Resources Report 2017-77
September 15, 2017
Project Number. 2019.01
Westland Resources
WestLand Resources, Inc. • 40016 Paradise Fa Us Drive• Tucson, Arizona 85712. 520-206.9585
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part I — Inventory & Analysis
5. Hydrology
A. Offsite Watersheds
The primary off -site watershed impacting the project site feeds to an unnamed wash that follows a
southwesterly route across the Property's northwestern corner. This portion of the property is designated
as being within Zone 'A' while the remaining site is within a Clear Zone 'X' per the FEMA Flood Insurance
Rate Map (FIRM) Panel 04019C1070L, Revised June 16, 2011. The off -site terrain of the upstream
watersheds is mostly native desert vegetation, several roadway crossings and some lower to medium
density residential development. Ironwood Ridge High School has significantly affected the drainage
patterns immediately north of the project. Two minor watersheds also impact the property
Please refer to Exhibit 1-5-A: Offsite Watersheds.
B. Balanced / Critical Basins
The entire Town of Oro Valley is classified as a critical basin.
C. Offsite Features Affecting or Affected by the Property
Ironwood Ridge High School is located directly upstream of the site. Downstream of the site are large lot
single-family residential homes. The low density nature of the existing development generally allows most
drainage to flow naturally. The northwestern side of the project site is impacted by an unnamed wash which
is mapped by FEMA as subject to 1% annual chance of flood, and which is estimated by Pima County to
have a 100-year discharge of approximately 1000-2000 cfs.
D. Area of Upstream Watersheds Greater than 100 CFS
The wash running through the center of the property ("Wash A") has a watershed area of approximately
155 acres. The wash running through the eastern portion of the property ("Wash B") has a watershed area
of approximately 98 acres. The major watershed impacting the western portion of the sites has a
watershed area of approximately 1,656 acres.
Please refer to Exhibit 1-5-B: Onsite Hydrology Characteristics.
E. Location / Ownership of Well Sites within 100' of Site
According to the Arizona Department of Water Resources, there is one (1) well located in the southwest
portion of the project site. Well registry ID: 55-206095.
F. Onsite Hydrology Characteristics
Three braided washes run through the site in a south -southwesterly direction. The wash along the
northwest corner of the site is classified as a FEMA floodplain. The entire site is typical of the upland desert
biome, featuring a mix of cactus, mesquites, palo verde, and other species. Pima County GIS data describes
the soils as a mixed hydrological soil group. Onsite hydrologic analysis has been performed using the
Rational Method. The runoff coefficients were prepared using the Town of Oro Valley Drainage Criteria
Manual, and are based on soil types noted in the National Resource Conservation Service soils study. The
hydrologic soil type within the project boundary is comprised of soils: Hayhook-Sahuarita complex A-60%
Shannon 80 - Rezoning Site Analysis
DwIXMBWLB No. 1160284001
Part I — Inventory & Analysis
and C-40%. The vegetative cover and density have been determined using recent aerial photographs and
field reconnaissance. The rainfall data was determined using the NOAA 14 (upper 90% confidence) and
Generalized I-D-F Curves as found within Figure 3-3 of the TOV Drainage Criteria Manual.
Please refer to Exhibit 1-5-B: Onsite Hydrology Characteristics
i. Approximate 100-year floodplains with discharges equal to or greater than 50 cfs.
The project site contains three 100 year floodplains with discharges equal to or greater than 50 cfs. On
the northwest corner of the site is an unnamed wash that contributes approximately 1000-2000 cfs at
the downstream outlet. Two other washes dividing the site contribute less than 500 cfs at their
downstream outlets.
ii. Areas of sheet flooding, with average depths
The project site is not subject to sheet flooding.
iii. Federally mapped floodways and floodplains
The site has a federally mapped floodplain located on the northwest corner of the project site, as
illustrated with the FEMA FIRM Panel: 04019C1070L
iv. Calculation of all 100-year peak discharges exceeding 50 cfs
There are no on -site sub -basins with 100-year peak discharges exceeding 50 cfs.
G. Existing Drainage Conditions along the Downstream Property Boundary
The existing low density nature of development along the downstream property boundary allows the
drainage to flow naturally.
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part I — Inventory & Analysis
6. Wildlife
A. Arizona Game & Fish Dept. Letter
Arizona Environmental Online Review Tool Report
Arizona Game and Fish Department Mssion
To conserve Arizona's diverse wildlife resources and manage for safe, compatible outdoor recreation
opportunitiesforcurroal and future generations
Project Name:
Shannon 80
User Project Number
11 e]028-A-001
Project Description
Single-family residential developmentwith apprcodmately 121 lots
Project Type
Development WRhin Municipalities (Urban Growth), Residentialsubdiursion and associated infrastructure.
New construction
Contact Person:
Brian Sabri
Organizition
The WLB Group
On Behalf a
PIMA
Project ID
HGIS-046165
Please review the entirempod for project type and/or species recommendations for the location
information entered Please retain a copy forfuture reference.
P age t or t t
T Shannon 80 - Rezoning Site Analysis
group WLB No. 116028-A-001
Part I — Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Artzons flame and Fish Department projeciLreport_shannon 130 21083 21002.pdf
ProjectlD: HGISO4M5 Review Date: 12N5=00340:10 PM
DIsclat mer:
1. This EnviroomentalReview is based onthe projectstudy area thatwas entered. The reportmust be
updated If the projectstudy area, location, or the type of project changes.
2. This is a pfelirninary environmental screening tool. It Is not a substitute for the potential knoWedge
gained by having a biologist conduct afield survey of the project area. This review Is also not Intended to
replace environmental consultation (including federal consultation under the Endangered Species Aet),
land use permitting, or the Departments review ofslte•speciffc projects.
3. The Departments Heritage Data Management System (HD MS) data is not intended to include potential
distribution of special status species. Arizona is large and diverse with plants, animals, and
environmental condlions that are ever changing. Consequently, many areas may contain species that
biologists do notknow about or species previously noted In a particular area may no longer occur there.
HDMS data contains information about species occurrences that have actually been reported to the
Department Not AN ofArIzona has been surveyed for special status species. and surveys that have been
conducted have varied greatly in scope and Intensity. Such surreys may reveal previously
undocumented population of species of special concern.
4. HablMapAri`ona data, specifically Species of Greatest Conservation Need (SGC11) under our State
WiWlffeAction Plan (SWAP) and Species of Economic and Recreational Importance(SERD. represent
potential species distribution models for the State of Arizona which are subject to ongoing change,
modification and relinemerk The status of awildIde resource can change quickly, and the Availability of
new data will necessitate a refined assessment
Locations Accuracy Dsclaimw:
Project locations are assumedto be both precise and accurate for the purposes of environmental review. The
creator/owner of the Project Review Report is solely responsible for the project location and thus the correctness
of the ProjectRevfew Report content
rO2of11
Shannon 80 - Rezoning Site Analysis
MMMBWLB No. 116028-A-001
Part I — Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Artzona flame and Fish Department projecLreport shannon 8021093 21002pdf
ProjectlD: HGISW695 Revkw Date: iiPO-01003.40:10 PM
Recommendations Disclaimer:
1. The Department is interested in the conservaton of allfish andwildide resources, including those
species fisted inthis report andthosethat mayhave not been documentedw" the projectvicinify as
well as other game and nongame wildlife.
2. Recommendations have been made by the Department, under authority of Arizona Revised Statutes
TiUe B(Amusements and Sports). 17 (dame and F ish), and 28 (Transportation).
3. Potential impacts tofish andwildlife resources may be minimized or avoided by the recommendatons
generated from kiformationsubmilted for your proposed project. These recommendations are preliminary
in scope, designed to provide earlycorclderatons on all species ofwildide.
4. Making this information directy available does notsubstilute for the Departments review of project
proposats, and should notdectease our opportunky to review and evaluate addtional project information
and/or new project ptoposals.
5. Further coordinationwth the Department requires the subm3tal of this Environmental Review Reportwith
a cover letter and project plans or dooumentaton lhatincludes projectnarratve, aueage to be impacted,
how construction or projectactivityjs) are 10 be accomplished, and project locality iniotmation(includmg
site map). Once AGFD had received the information. please allow 30 days for completion of project
reviews. Send requests to:
Project Evaluation Program, Habd;t Branch
Arizona Oa me and Fish Depart mwd
5000 West Carefree Highway
Phoenix, Arizona 85086-5000
Phone Number: (M)2367600
Fax Number: (623) 236.7366
Or
P P(!�37cfd nov
0. Cootdinaton may also be necessary under the National Environmental Policy Act(NEPA) and/or
Endangered Species Act (ESA). Ste specific tecommtndatons may be proposed duringfurther
NEPMESA. analysis or through coordinationwith affected agencies
►agr 3 of It
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part 1— Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Game and Fish Department protect_report_shannon_80_21093_21602 pdf
Project ID HGIS-04565 Review Date 12/5/2016 03,40 16 PM
Shannon 80
Aerial Image Basemap With Locator Map
Benin Layfr Cf"ft SourM Eon. H£RE. GeLo m , T"lom. Inwrnep
� wawfd P Cory GESCO. USG8, FAO, NPS. NRCAN GwBf" IGN.
KedS6b( NL. O'dnW" SIP%". EIM APfn. ME11, Ern CI Nu tHwV Konpl,
`'age d of t 1
Shannon 80 - Rezoning Site Analysis
I WLB No. 116028-A-001
Part I — Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Anzona Game and Fish Department pro)ed_report_shannon 80 21093 21602 pdf
Project ID HGIS-04565 Review Date 12/5/2016 03 40 16 PM
Shannon 80
Web Map As Submitted By User
[] Buffered Protect Boundary LattLong (DD) 32.40" / -111 0255
County(s) Pima
AGFD Region(a) Tucson
lownarryRarge(s) T12S R13E
USGSOuad(s) RUELASCANYON
a tw. (.IyM,ia:4u '��«I'r• r ..ay Y•'• _itl A•�. ,.
.YSCr': wroCA �Rlv rn N r:. •. �w t on +w. .
Page Sot 11
Shannon 80 - Rezoning Site Analysis
o1max WLB No. 116028-A-001
Part I — Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Game and Fish Department project_report_shannon_60_21D93_21602 pdf
Project ID HGIS-04565 Review Date 12/5/2016 03 40 16 PM
Shannon 80
Topo Basemap With Township/Ranges and Land Ownership
i
rr .-
1
Nnn _-
W+E
11��I1 0 0.3 06 12 1.8 2.1
$ Mi1ea
Project Boundary Mtcedlothsr Protect Size facrest 77.80
Wftmd Project Boundary
National Park/Mon
LWAonp (Do) 32.40" / •111 0255
TownentprRanpes
Private
Gounly(s). Pima
AZ Garne ano rtsn Dept
State end ns"rw Parka AGFD Region(s) Tucson
BLM
StMe Trust
lowsrapfRangots) 1125 R13E
am
US Forest Service
USGS Ousd(s) RUELAS CANYON
tntisn Res
wkWe Area efups
Metary
S.— s., HOW, w...... uses r u
0% r.rriin
bus
on tar c..n..b
Pape 6 of 11
TrMIe� Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Oame and Fish Department
ProiectlD. HOIS-04 5
Part I — Inventory & Analysis
projed_report Shannon 80_ 1=_21E02.pdf
R*Yiav Date: 1ZS201003:40:10 PM
Special Status Species and Special Areas Doa-imerded �-Ahin3 Mies of Project \ir_inity
Sclerotic Name
Common Name
FWS USFS BLM NPL
SOCN
Aquila chrysaetor
Golden Eagle
1B
Glsuedium bra5dlanum cactorum
Cactus Ferruginous Pygmy owl
>C =
1B
Oophem morafkai
Sonoran Desert Tortoise
C 5
1A
Leptonycters curasoae
Lesser Long -nosed Bat
LE
to
verb a bu en ae
Tucson• Tortolita• Santa Catairna
Wildlife Corridor
Mountains Linkage Design
;lixp$:atuscode oefnntrcr:cars beloundathtjps_fhoiwis ?gti corryligisild In 6& [a rinirigift&jildlifeawdelin slstat,<lefirifons
SpF_re=cf Greatest Conservation Neel
Predicte] Athir, Froject Mcindy based on Predicted Range Models
ScierdlicName
Common tiame
FINS
USF$
,BIM�MPlti8OCN_
Ah sponsa
blood Duck
iB
Arnmoepermophilus hanr i
Harrs' Antelope Squirrel
1B
Ana>,yrus retiformis
Sonoran Oreen Toad
S
1B
Anthus spragueu
Sprague's Pipit
C'
1A
Antrostomus ridgniayi
Buff•collaied Night;ar
S
18
Aquila chrysaetos
Golden Eagle
BOA
S
1B
Aspidosceks stictogtamma
Oiant Spoted Whiptaii
SC
S
18
Athene cuniculana hvpugaea
Western Burrowing Owl
Sc
S
S
1B
Botaurus lentiginosus
American Bittern
18
Buteo regals
Ferruginous Hawk
Sc
S
18
Chilomenscusstramineus
variable Sandsnake
19
Colapte_ chrysordes
+•fded Flicker
S
18
Coluber bilmeatus
Sonoran Whipsnake
1B
Corynorhinus townsendh palle::er,;
Pale Townsend's Big eared Bat
SC
S
S
1B
Crotalus tigns
Tiger Rattlesnake
18
Cynardhw latirostris
Broad billed Humrrongbod
S
1B
Cypitnodon macularius
Desert Pupfish
LE
1A
Dipodomys spectabiles
Banner -tailed kangaroo Rat
S
1B
Euderma maculatum
Spotted Bat
SC
S
S
18
Eumops perots calirornicus
'-renter Western Bonneted Bat
SC
S
18
Falco peregrinus anaturn
American Peregrine Falcon
SC
S
S
1A
Olaucidium brasdianum cactorum
Ca,:t, Ferruginous, Pygmy owl
SC
S
S
18
Oopherus moralkai
Sonoian Desert Tortoise
CCA
S
1A
Haliaeetus leucocephaluc
Bari Eagle
SC.
S
S
1A
BOA
Helodeimasuspectum
7ila Moreter
1A
Hypsigiena sp nou
Hooded Nightsnake
18
iagt?ofII
Tw
Shannon 80 - Rezoning Site Analysis
A WLB No. 116028-A-001
Part 1— Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Osme and F'sh D epwfinent projecLreport_sharmon 80_;210g3 2100Zpdf
Project ID: HOISO4M5 Review Date: ' ?ZS201003:40:10 PM
Spedesof Greatest Conservation Need
Predicted within Project Mcinity based on Predicted Range Models
SdentNic Name
Common Names
FWS USFS BLM
NPL SOCN
Incilus ahrarius
Sonoran Desert Toad
1B
Wostemon sonoriensesonodense
Desert Mud Turtle
S
18
Laskxus blossevllii
Western Red Bat
S
18
Lasiurus xardhinus
Western Yellow Bat
S
18
Leopardus pardslis
Ocelot
LE
1A
Leptonycteris curmoae
Lesser Lonpnosed Bat
LE
1A
yerbabuenae
Lepus alenl
Antelope Jackrabbit
18
Lithobatesyavapaiensis
LoMand Leopard Frog
Sc S S
1A
Macrotus cirdomicus
California Leal -nosed Bat
SC S
18
Melanerpes uropygiars
Ola Woodpecker
18
Meleagris galopavo mexicana
0ouId's Turkey
S
18
Mel osptza IIncotn➢
Lincoln's Sparrow
I
Melazone aberi
Aborts Towhee
S
18
Micruroides euryxanihus
Sonoran Coraitnake
18
Walls occurs
Arizona Myols
SC S
18
Myotis veiher
Cave Myotis
Sc S
18
Myotk yumanoreIs
Yuma Wolfs
SC
1B
Nyctkwmops femorasaccus
Pocketed riot -tiled Bat
18
Panthofa ones
Jaguar
LE
1A
Passeroulus sandwichensis
Savannah Sparrow
18
Perognathus amplus
Arizona Pocket Mouse
18
Perognathus longimembris
L"tPocketMovie
18
Peucaes bottetii aftonse
Arizona Botterrs Sparrow
S
18
Peucaea carpalis
Rufous -winged Sparrow
18
Phrynasomasotare
Regal Homed Lizard
18
Phylorhynchus browns
Saddled Leaf -nosed Snake
18
Poecilopskt occidentars
Ola Topminnow
LE
to
occid entalls
Progne subis hesperia
Desert Purple Martin
S
18
Setophagapetechta
YellowWwNer
19
Sonorefa papagorum
Black Mountain Tahusnal
18
Tadarids brasliensis
Brazilan Free -tailed Bat
18
Thomomys umbrinus kdermedius
Southern Pocket Gopher
1B
Troglodytes pacificus
PacifeWren
18
Vireo bells arizonme
Arizona Belts Woo
18
Wipes macrofs
10 Fox
18
PV wait
Shannon 80 - Rezoning Site Analysis
O1a WLB No.116028-A-001
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Game and Fish Department
ProiectlD HGI1&046B5
Part I — Inventory & Analysis
projecLreport shannon 80 21= 21E02.pdf
Review D ate: 12i5We 03.40:16 PM
:'peaes ct Eco,nornc -rid Recreation Importance Predicted ."thin Project Vicinity
Scientific Name Common Name FWS USFS BLM NPL SOCN
Callipepla gambelii
-:•arnbefs Quail
Qdocorleus hem.onus
Nlule Deer
Pecantalacu
Jak,ehna
Puma conc:olor
Adountain Li- r,
Zenaida asiatica
VYfide varnged D ove
Zenaida mactouia
Mourning t,,x e
Project Type Develop anent Within Miniapalities i Urban Grovfh), Resrd+rrtial subdivision w,d 3 DD, +, fed
infrastructure, Newconstrkx tion
Project Type Recommendations
Fence re co mme nd atio ns w ill be de p en da rd upon the goals of th a fence project and the wildlife species expede d to be
impacted try the project General guidelines for ensuring wildlife -friendly fences include barbless wire on rietop and
bottom with the maximum fence height42", minimum height for botom 16" Modifications to this design may be
considered for fencing anticipated to be routinely encountered by ek, bighorn sheep of pronghorn (e.g.. Pronghorn
fencing would require 19' minimum height on the bottom) Please refer to the Departments Fencing Guidelines boated
on 1piddlrte F rienciy, Guidelines page, which is part of the Wildlife Planning button at
httrr ' kh, A--crri rnm;, r1, ;4ro/Alannin nl Ideg utd Irne;/
During the planning stages ofyour project, please consider the local or regional needs ofvhrildlYfe in regards to movement,
connectrvty, and access to habitat needs Loss of this permeabilityprevents wildlife from accessing resources, finding
mates, reduces gene low, prevent; wildlife from re -colonizing area where local extirpations may have occurred. and
uRunatey prevents wildlife from contributing to ecosystem functiorx, such as pollination, seed dispersal, control of prwy
numbers, and resistance to invarve species In many eaes,streams andv,rashes provide natural movement corridors
for wddlite and should be maintained in their natural state. U plands also support a large diversity of species, and should
be contained within important wildlife movement corridors. In additio4 maintaining brodrversity and ecosystem functions
can be facilitated through improving designs of structures, fences, roadways, and culverts to promote passage for a
variety of wildlife. Guidelines for many of these can be found
at: Attns lAnerara azatd comAn.fdld iolann n �lhnuldlR ahsiAatint5/,
Consider impacts of outdoor lighting on wildlife and develop measures or afternatives that car. be taken to increase
human safety while minimizing potential impac4 to wildlife Conduct wild fife survey- to determine species within project
&* a. and evaluate proposed activities based on species biology and natural hstory to determine of artdreial lighting may
disrupt behavior patterns or habitat use Use only the minimum amount of light needed for satety N arrow spectrum bulbs
should be used as often as possible to lower the range of species attecbed by log Ming All lighting should be shielded,
cantered, or cut to ensure that Aght reaches only areas needing rllurnination
Minimize potential introduction or spread of exotic invasive species Invasive species can be plants, animals i ofi<
snails), and other organisms (e.g , microbes), which may cause afteration to ecological functions or compete with or prey
upon native species and can cause social impact (e g , livestock forage reduction, increase wildfire risk) The terms
noxious weed or waive plant are often used interchangeably. Precautions should be taken to wash all equipment
utilized in the project activities before leaving the site Arizona has noxious weed regulations (Arizona Re -red Statutes,
Rules R3.4244and R3.4246) See Arizona Department of Agriculture webs Re for restricted plants,
hftpl!lagric tt�gov/ Additionally, the U S. Department of Agriculture has information regarding pest and rraasn,e
plant control methods including pesticide, herbicide, biological control agent, arid mechanical control,
http-Mum usdA govAaRSlportaVusdahoma The Department regulates the importation, purchasing. and transportation of
tWdGfe and fah(Restricted Live Witdifel please refer to the hunting regulations for further
information httnslhjn_m_azgld :or mJhuntn regylatio s
P age 9 or i t
R��%� � Shannon 80 - Rezoning Site Analysis
� �/ W LB No. 116028-A-001
Arizona Game & Fish Dept. Letter (cont'd)
Arizona Game and Fish Departrrient
ProiectID: HGIS04M5
Part I — Inventory & Analysis
proiect_report_shannon 80 210sr3_21l802.pdf
Review Date: 12NSJ20113 03 40:18 PM
The construction or maintenance of uvater development should include incorporation of aspects of the natural
environment and the visual resource_. maintaining the ranter for a variety or speua=, v,ater surface area(e g , bats
requite a greater area due to in light drirking), accessiblith,. yeaaround availability, minimizing potential for water quaMty
problems, frequency of flushing, shading of natural features, regular clean-up of debris, escape ramps, minimizing
obstacles, and minimizing accumulaton of sift and mud
Minimization and mitigation of impact towildlite and Ash species due to changes in water quality, quantity, chemistry,
temperature, and afterationtoflow regimes(jming, magnitude, duration, and frequency otfloods)should be evaluated.
Minimize impacts to springs, in -stream flow, and consider irrigation improvements to decrease water use If dredging is a
project component, consider timing ofthe project in order to minimize Impacts to spawning fish and other aquatic species
(include spa,vningseasonsl and to reduce spread of exotic invast a species We recommend early direct coordination
worth Project Evaluation Program for projects that cord impactwater resources, wetlands, streams, springs, andror
riparian habitats.
The Department recommends that wildlife surveys are conducted to determine if noise•sensdnre species oeeurwMhinthe
project area. Avoidance or minimization measures could include conducting project acti.Rles outside of breeding
seasons
Based on the project type entered, coordinator. ... rth State Historic Preservation Office may be required
( e1lazs at oat s nomitSHP"in Y I I
Trenches should be covered or ba&-Sled as soon as passible. Incorporate escape ramjr in ditches or fencing along the
perimeter to, deter small mammals and herptefa una (snakes. lizards, tortoise) from entering ditches
Communities car. actively support the sustainabilrty and mobility of wildlife by ineorporat ngwAdlife planning into their
regionaVcomprehensive plans, their regional tiansportaton plans, and their open spacelcorservaton landsystem
programs An effecirve approach to wildlife planning begins with the identification ofthe wildlife resources in need of
protection, an assessment of important habitat blocks and connective corridors, and the incorporation of these critical
wildlife components Into the community plan- and programs Community planners should identify open spaces and
habitat blocks that can be maintained in their area, and the necessary connections between those blocks to be preserved
or protected. C ommundy planners should also uvo* roper State and local transportation planning entities, and planners
from other communities, to foster coordination and cooperation in developing compatible development plans to ensure
wildlife habitat connectivity The Departments guidelines for incorporating wildlife considerations into community
planning and developments can be found on the Widlife Friendly Guidelines portion of the Wildlife Planning page at
[dtjgj'A,*uw azg1d asl.
Design culvert to minimize Impacts to channel geometry. or design channel geometry (low flow, ovetbark, Aoodplains)
and substrates to carry expected discharge using local drainages of appropriate size as templates R educe/minimize
barriers to allouv movement of amphibians or fish(e.g., eliminate tails). Also for terrestrial wildlife, vuashes and stream
corridors often provide important corridors for movement a,erall cul'leitwidth, height and length should be opbrneed
for movement of the greatest number and diversity of species expected to utilize the passage C uNert design- should
consider moeture, light and noise, while providing clear views at both ends to maximze utilization For many species,
fencing a an important design feature that can be utilized with culverts to funnel wildlife into these areas and mininize
the potential for roadroay collisions. Guidelines for culvert designs to facilitate wildlife passage can be found on the home
page of 1he application at httW rrL+&wy azjld ,omiwidlifeloljr. ni ngAN 'Id Idaguidefin cci
Based on the project type entered. coordination with Arizona Department of Environmental Quality may be required
.............. [�tte:ii. tu.azde�_�avI
Based on the project type entered, coordinator with Arizona Department of Water Resources maybe required
(yMG qtnigGui z iw[fd fanrta<_ ,rl
Based on the project type entered, coordination with U S army C orps of Engineers may be required
(httoltl ivyw usace_armv mill)
page 100111
i�UMB Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part 1— Inventory & Analysis
Arizona Game & Fish Dept. Letter (cont'd)
Aiavna C=arne and Fc h D epartment proiect_r.port_shannon 80}1O9C3 21t102.pdf
Project 1[ H,=1 Csk`t5 Re-,iero Dates 12r5iW6O3:40'10 PM
Based on the protect type entered, cc ordrnator. vvdh County F lood C cfit ol dctncts i may be fequired
Deve topment ptins should provide for open natural space for wddlte movement. vwhde ais o minimkin 9 the potential for
wddWe-human interactions through design features Please cordact Project Evaivaton Program for more Wormation on
Wingwrth urbanvuddfffe A PFPQazcdd cow or
at #dins f1lrAAaN a_zafd convl ildfifetolanrnnaMrildldeeurdeLne:sL and httn ! mimnt Arrifel comWiic[LteJLtvinaWAh
Vegetation restoration projects (including treatments of invasrwe or exotic species) should have a completed site -
evaluation plan (identifying environmental conditions necessary to re establish native vegetation), a reoegetation plan
(species, density. method of establishment. a short and longterm monitoring plan. including adaplive management
guidelines to address needs for replacement vegetation
Project Location and±or Species Recommend lions
HDMS records indicate that one or more fisted, proposed, or candidate species or Critical Habdat(Desrgnated or
Proposed) have been documented in the vicinity of your project The Endangered Species Act (ESA) gives the US F ish
and Wildlife Service (U SFWS) regulatory authority over all federally listed species. Please contact USFWS Ecological
Services Offices at WT-r •wyhK gov±so,t nmstresl r a±or
Ftnoenix Main Office
=1 UU Royal Patin Rd. Suite 103
Phoenix. AZ 85021
Phone 802.242.0210
Fax CO2-242.2513
Tucson Sub -Office
201 N. Bondi Suite 141
Tucson. AZ 85745
Phone 52A-870-8144
Fax 5M-87O-8155
Flagstaff Sub -Office
SW Forest Science Complex
2500 S Pine Knoll Dr
Flagstaff, AZ 86001
Phone. 928.556i 2157
Fax 928-55&2121
HDMS records indicate that Sonoran Desert Tortoise have been documented within the vicinity of your project area
Please review the Tortoise Handling Guidelines found at #,gob livuwi Qafd_cams,uildlesrnonoamemanaoemerr}/tortoe/
HDMS records indicate that Lesser Long -nosed Bab have been documented within the vicinity of your pio)ect area
Please review the Lesser Long, nosed Bat Management Guidelines
at httns ,:4twev azafd cordPo aflmaae<_A I .vt1 dhteJol nr naFotAu Id f F riendhrC• ude me<±FINALIecuveNab' �dG Ir,-edf
Analysis indicates thatyour projects located in the vicinity of an identifiedwildlife habitat fink age corridor Project
planning and implementation eforts should focus on maintaining adequate opportunities for wildlife permeability. For
information pertaining to fu liricage assessment and wildlife species that may be affected, please refer to
h�tntMmw .erridord agrl ors ar ona Please contact your local Ancona Game and Fish Department Regional Office for
specific project recommendations .............. .0 .r . nt-omfAaenev�Otfires
Page 11 orII
jLeg WM Shannon 80 - Rezoning Site Analysis
rare WLB No. 116028-A-001
Part I — Inventory & Analysis
7. Viewsheds
Due to the relatively flat character of the project site, the perimeter areas are the only locations of high visibility
from adjacent roadways and properties. The areas of higher vegetation densities along the site perimeter
reduce visibility into and across the property.
A. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor
Overlay District, provide a Viewshed Analysis as defined in Section 27.10.D.3.f.iv.a.1.
The subject property does not fall within either Overlay district.
B. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor
Overlay District, provide a View Preservation Plan (VPP) for nonresidential developments that meet the
criteria defined in Section 27.10.D.3.f.iv.2.
Not Applicable
C. For proposals within the Tangerine Road Corridor Overlay District and/or Oracle Road Scenic Corridor
Overlay District, map and identify all Core Character Vegetation (CCV), in accordance with Section
2 7. 10. D. 3.f. iv. b.
Not Applicable
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part I — Inventory & Analysis
8. Traffic
A. Connection to Arterial Roadway Network
Access to the project site will be from Shannon Road. The proposed access point aligns with the existing
intersection of Sahuaro Divide and Shannon Road.
B. Arterial Roadways within One Mile of the Property
i. Existing and proposed right-of-way widths. See tables below.
ii. Whether or not said widths conform to Oro Valley minimum requirements. See tables below.
iii. Ownership (public orprivate). See tables below.
iv. Whether or not rights -of -way jog or are continuous. See tables below.
V. Number of travel lanes, theoretical capacity and design speed for existing streets. See tables below.
vi. Present Average Daily Traffic (ADT) for existing streets. See tables below.
vii. Describe surface conditions on existing streets providing access to the site. See tables below.
viii. Program for completion of roadway and intersection improvements. See tables below.
Road Segment:
Shannon Road to
La Cholla Boulevard
La Cholla Blvd. to
La Canada
Existing ROW:
------------------------------------------------------------..----.---------------------------
150'
-------------------------------..............................................................--------------......---.--------.....
150'
Ultimate ROW:
- - - - - --------------------
150'
---- . ---
150'
Travel Lanes:
.... --.----.--.......................................... ... ................................-----------------..............
------------...-------------------------------------------------------..-..
2
------.-.....------------------------------.----------..-....---..................
2
Theoretical Capacity*:
................................................... -------- ----......-....------------.......---------....------•-------
........---.........---------...----......---------..._..-........----
15,040
..........------------------------------------------
.---------------.......... ............................
------ - -- - -.... 15,040
ADT (PAG 2014):
-- - --- :...................
5,098
...... ............ -.... ----------------------------- -...... ---... ----..........
__._.......------
7,714
------- -- -
SpeedLimit: .... ----------..........----------------------------
.-....
Condition:
------ -- --------------------------------------- --
.......
. ................ Paved
-----.....-- ------............................................--..._.........-
Paved
Scheduled Improvements:
--------------------------...---....-...-----------
Completed 2015
.............................. .............. — ......................... -...... -
None Scheduled
Road Segment:
Naranja to
Lambert Lane
Existing ROW:
------------------------------------------------------------------ - - - -
60'
------...---....---------------..............................-......
Ultimate ROW:
-- -
150'
Travel Lanes:
...................................... ------------------------------..................-----
- - .---.......---------------------------------------------...._._-...
2
Theoretical Capacity*:
--------------------------------- - -..... - ------------------
--...------..........------------...............................---......
15,040
-------------------- - - -- -
ADT (PAG 2013):
----------------------------------------------- -..................................
7,366
-------.._....--..... ........................ _......... ..........
Speed Limit:
-.......................------------------.......------------------.
45
-
Condition:
---------------------------------- - -- -- - ------------------------------
---------.....-----------------............------------------------............--.
Paved
Scheduled Improvements:
-------------.-........-----------.......--------------------------------------
Scheduled 2018-2020
Naranja to
Tangerine
150'
............ -------------150 ...-.... ------.......
--..-................... ----------------------- -._._.._..
2
...... -..... -.................................................
15,040
8,723
-... ...........................45.... ......................
-.--------.-............................................ ................
Paved
........ --................... -------------- -----............
Scheduled 2018-2020
MIN"
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
ix
x
Part I — Inventory & Analysis
Road Segment:
Shannon Rd. to
La Cholla Blvd.
Thornydale Rd. to
Shannon Rd.
Existing ROW:
........... ...........-------------------------------------------
150'
60'-150'
--- -- -
Ultimate ROW:
----------------_ .-----------......................................_.................--
--------....--------....................-- ..... --- --- _
150'
------------.----------------............... ... --. _........ .
150'
Travel Lanes:
.......................................... ------
-- -----.............-----------------------...---------------......-----.......-----------......------
2
2
.--------------- ............ ---- _
Theoretical Capacity*:
.............................-----.._.-........................ --.... .......................
--------------....... -.......................................... -- ...... --------
15,040
--------------------------------------------- - -....
------------ -------------...................................... ........ ._......
15,040
- ---------------------...................----------------..__
ADT (PAG 2015):
. ........................................----------...._...............--
6,228
----------------------- - -..................._..................._.............----------------------........----...........-............_.�:_.
3,826
Speed Limit:
_ -------------....
-.......45
................ -----
45
--
Condition:
---...... ----.................................. ------
-----�-.----------- ------------ -_.......-----.....------------....-----.......-----------.....-----------
Paved
--- - - - -
Paved
............. -.............
Scheduled Improvements:
---........................................------------------.....-------------.._------.....
None Scheduled
---------.....---------....------.......--------------------...--------...................
None Scheduled
Road Segment:
Naranja Drive. to
Lambert Lane
Lambert Lane to Overton
Road
Existing ROW:
.......... ...............................---------.._.....---------.....---..._......---------
150'
-------.---------------------..------.........-_.................................---
150'
........---......._.._._._.-----...............................................
Ultimate ROW:
----------------------------------------------------- --------------
150,
.......................... -............................
150'
Travel Lanes_:
--_.�....:_...-------- ---
2
- ----------------.------------------------................---
.......................................................................... - -
.----- -- -- - _._..---.... -.........
. ----------15,040-.............. -.................
........................ --... ------------------ ..... ..... -...... -......
ADT (PAG 2014):
............................................-------._.................----- -
2,805
------------- - ....... .......................
—-
4,798
-----------------------------------.. -----------------------
Speed Limit:
-------------------- -- -------------_------------ ..............-......... ----------
45
.....----....................................................... ......................... ..:.........................
45
Condition:
-Scheduled
Paved
P
_...... -... -............................... --... ---......... .
Paved
Improvements: - -
_ - -
-.......None Scheduled
--- - ..... ......None Scheduled- -
*Theoretical capacity based on City of Peoria, TIA Criteria Table 4 assuming a L.O.S. "C".
Please refer to Exhibit 1-8-A: Transportation.
Existing and proposed intersections on arterials within 1 mile of the site most likely to be used by traffic
from the site.
Arterial intersections within one mile of the site that will likely carry traffic generated by this
development include Shannon Road and Lambert Lane, Thornydale Road and Lambert Lane, Naranja
Drive and La Cholla Boulevard, La Cholla and Lambert Lane, and La Cholla and Tangerine Boulevard.
Existing bicycle and pedestrian ways adjacent to the site and their connections with arterial streets,
parks and schools.
A half mile east of the subject property, there is a signed bike route with a striped shoulder along La
Cholla Boulevard that extends from Lambert Lane to Tangerine Road. There is also a signed bike route
with striped bike lane along Tangerine Road. These routes provide connectivity to Casas Church and
Christian School, and numerous neighborhoods to the East of La Cholla Boulevard. Two shared -use
paths are also within proximity of the site located along Naranja Drive extending from Shannon Road
to La Canada Drive along La Cholla Boulevard, north of Naranja Drive. These shared use paths provided
connections to additional bike routes, notably the Canada Hills Drive bike route and the Naranja Drive
bike route.
Refer to Exhibit 1-8-A: Transportation.
galpwm
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part I — Inventory & Analysis
9. Recreation / Trails
A. Trails, Parks and Recreation Areas within One Mile of the Property
There are no neighborhood parks within one mile of the subject property. The El Conquistador Country
Club is a public golf course that offers 36-holes of golf and is located approximately 3/ of a mile to the east
of the project site. West Lambert Lane Park is just over one mile southeast of the project site. Multi -use
pathways are located along Naranja Drive, extending from Shannon Road to La Canada Drive and along La
Cholla Boulevard, north or Naranja Drive.
Park Name:
Park Size (in Acres)
Park Type (Active of Passive)
El Conquistador Country Club
252±
Active
West Lambert Lane Park
40±
Passive
Refer to Exhibit 1-9-A: Trails, Parks & Recreation.
iTw Shannon 80 - Rezoning Site Analysis
ll — IN" WLB No. 116028-A-001
Part I — Inventory & Analysis
10. Schools
A. Schools within One Mile of the Property
Ironwood Ridge High School is located immediately north of the subject property. Wilson K-8 School is 3/
of a mile to the north. Casas Christian School neighbors the subject property to the east.
Refer to Exhibit 1-10-A: Existing & Proposed Schools.
B. Schools Expected to Serve the Project
Shannon 80 is located within the Amphitheater Public School District. Existing schools in the District that
may serve this project include:
• Ironwood Ridge High School located immediately north of the subject property. The school
accommodates 9th through 121h grades
• Wilson K-8 school located to the north of the project site. The school accommodates Kindergarten
through 8th grades.
• Copper Creek Elementary School located 2.5 miles northeast of the subject property. The school
accommodates Kindergarten through 5th grades.
• Casas Christian School to the east of the property. The school accommodates Kindergarten through
8th grades.
• Basis Oro Valley, a charter school not part of Amphi School District, located 4 miles east. The school
accommodates Kindergarten through 12th grades.
Shannon 80 - Rezoning Site Analysis
MIAMBWLB No.116028-A-001
Part I — Inventory & Analysis
11. Water
A. Water Service Provider
This project falls within the Oro Valley water service area. The closest water main is a 12" line near the
intersection of Naranja Drive and Shannon Road. The exact nature of necessary offsite improvements will
be determined during the platting process, and will be the financial responsibility of the developer.
B. Other Information
Tucson Water abuts the site to the west and to the south. There is a 16" transmission main within Shannon
Road and a 6" line to the south of the property serving the existing residential areas.
%�
Shannon 80 - Rezoning Site Analysis
L ���MB WLB No. 116028-A-001
Part I — Inventory & Analysis
12. Wastewater
A. Sewer Service Connection
There is an existing 8" PVC sewer line and manhole to the east of the property (G-97-129). Based on
sewer depth and existing site topography it is estimated that the site can be serviced by gravity sewer to
that location.
Refer to Exhibit 1-12-A: Sewer Service.
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
13. Exhibits
Part I — Inventory & Analysis
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
31
NARANJA DR
Z
o
Q IRONWOOD
_ RIDGE
HIGH SCHOOL
SUBJECT
PROPERTY
s '
DIVIDE
CASAS
CHURCH
�,'a: -" •�;. ads �,g#
Exhibit 1-1-B ® 01 500'
Aerial Photo
The iii� Shannon 80 - Rezoning Site Analysis
WLB
Group WLB No. 116028-A-001
a
MILE FROM
NARANJA DR
PROJECT SITE
I
1
1
W I
Z
O SUBJECT
Z PROPERTY
I =
I U
I z
z
7
0
UMEN
I
' f J
iz ¢ '
1 w 0
~ W
O
0 /
O
` O O /
z
Rural Low Density Residential (0-0.3 DU/AC)
Low Density Residential (0.4-1.2 DU/AC)
Medium Density Residential (2.1-5 DU/AC)
Public/Semi Public
School
Master Planned Community
Exhibit 1-1-C ® 0, 700'
ExistingGeneral Plan Land Use Designations
The Shannon 80 - Rezoning Site Analysis
sfa P- WLB No. 116028-A-001
R1-144
Single Family Residential
(Oro Valley)
R1-20
R1-36 Single Family Residential
Single Family (Oro Valley)
Residential
(Oro Valley) MILE FROM
_ PROJECT SITE
NARANJA DR
/ o `
Z
Z R1-7
Z Single Family
= Residential
07 (Oro Valley)
1
I
I
I � -
SR I
I Suburban SUBJECT
Ranch
I (Pima County) PROPERTY
I Rt-144 I
Single Family Residential I
I (Oro Valley)
I
' Z I
1 O w '
a � /
EL >
ULI of
o p
0- Z
Z o 010,
.001
R1-144
Single Family Residential
(Oro Valley)
Exhibit 1-1 -D ® 0. 700'
Existing Zoning
The
Shannon 80 - Rezoning Site AnalysisWLB
,
oup WLB No. 116028-A-001
r;
-
r �
� ter
�('x�P K���♦ °P �f *n +�yy..
3 MILE FROM
PROJECT SITE
-
®
NARANJA DR
O
i
,
,
L . r Ironwood Ridge
-
fiZ
High School
,�
The Estates a
Capella
1
ol
2.47 DU/Ac.
Single Family*r
f
Residential
,
SUBJECT
I
Vacant
PROPERTY
Casas
Church `� 4.
Single Family]
Residential
z
--
1
Y
.
-
a
>
y
O
, 0
-
Single Family
O
,
Residential
1
O
U
O
F.
�s
/ ,
�•
LAMBERT LN
771
Exhibit 1-7 -E
m
o, 700'
Existing Land Uses
The
wee
Group
�\Im��mmoi
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
ESLO Critical Resource Area (t7 Acres)
ESLO Core Resource Area (t24 Acres)
NARANJA DR
ESLO Resource Management Area Tier 1
(t46 Acres)
ESLO Resource Management Area Tier 2
0
h,
Z
0
Z
z
SUBJECT
Q
co
PROPERTY
z
O
U
Q
r
W
a
Q
o
w
>
O
O
O
d
O
O
Z
U
_Z
O
Z
ELL- I
Exhibit
1-2-A
m 0, 500,
Environmentally Sensitive Lands m
The Shannon 80 - Rezoning Site Analysis
WLB
Group WLB No. 116028-A-001
Exhib
NARANJA DR- — � '7�r r �` > �
c
/ 7� vo
`, 1 ^' u fi �-�.,." ' � i "1 ! ? �' ," •" +.. = � liJ
1 ; S 2670t.�
�� vt,s• n rrJ jfr'i} ', � ry''�L
vS
-I'�el - -
.7+1
i��i /riA {+ir.
ff�T { �'��yJ 1�r �5 1jt��A(1l,�1,�i�f��ti/I�'l['- J•i p�` r•s.o�.,���`_- \s�,,\/`J
►��' ^S , ~
�cJ'^1 poi 4v✓ w �Ji7 / w,—��Z J^C� f f� iA41� N /
Z..r.��. t,✓f t �r Zrtsi `ji..r tiJj„ 1� l '} 5 Rr /v (`�
°z 2660" --,
Z '..� '�.1 _T S^...... /'Zna ' i '�✓��t r..-...a.✓au.L T i, „suet i ♦,
Q Sr r/ �.f )S5 2•rZ.. �� _( {" t� \� �r-'„ �•'r
co
16,
1f i / / �� t .,n Ct �p y v�r? '•. r' l.r� j
2650,+« - / /�Cn•%`^1�..�+/"t. r -f
.tyy r ; r , ` / ✓ ^ i t i'f\r .rP t+fir
y, r�..� � � 1 �� n,,..f / � ; "� 5 ; v..^1 ��fr'� ? �..,. ray/ )? �-r'%t � ti♦ {{��
1 tf r�°i ti Alt \rb� fs ✓ t� fti�J i} f �✓ C �i„fw `{ �i �•\1 �`•t �� r �r1
!r .i "►ir�ta
f J
�� r'b La S e2 t t � -t s•.f t c
rT ,`2640� `� tf F 5 w n / f Ms , �s ✓ at/ �✓ �. s 't } j r �♦ i i n\
�..r /ti/ �� a 1 �` S t t{ tl� J'�,/ d�'� r• .�S i uLr t � ``'.i«v^rY }�"M4t'r
r� ✓ a d o ti` 2�'}►
1�1k �� �`► tti'�'tr" ♦i �fti ri �-`, !} SUBJECT
�;A M� =1;} �� �,, PROPERTY-♦r'`, l 3 . ✓ , f �. ,,, ; }�r' �_�,� i��s,F
t l t" ^ i r, .ri rf e L.... • ti fir, r Y a L Zs ✓� 5 i !
,� h � � '' � { I fir \ t /,.8}i : =.� l,,f" L+.f � � vT � �`' �' � "�.� 1e � ✓ J>'
Sl h' «-�,.,� j-.,�i-a{ ? ! rY `�,_ rl'•1'� Y Si *��1 f^✓t�i:' /• �.,.^' �` �.�1 �� Z `� 1 1( t
- ti
r 3 p `f r 4 Z R /{ !�^ t T r1 •�/ �1/ r n
i� ToL w r 4 1,e ti-"{ t •h J� T.r,`a 3` f «r !.`^. ^�tI / ♦ t 4 f4� µ �V Jxtf S 1( ? A
i t�tw�r\ N r? H �, �• s r��J b , r 1 "'t i ✓ �.`n 3 { = 2 t ?� } , \S C'!
`2630,- � �,t � ou✓c� � ,.,, �
!t't. ./"Lf ni ` i/.r1�' al�-r 1 1 '1I?�J'
\krif
U },� ;V�,,.,r7�`\Yt4 3; t`✓ y rf ✓ IJ sJJ\ {n i �rjJAjs} �� ��•✓^"4 •; ��{z.j
U W ) C 1 r_t ' 3- Iiln r)^.js l `` ��n �y f \ a{„` /J y\3
Qy rl/t_� ) `: �1 tilt ��/ s f s ) if / t t -i 11�«
d �{ t S r 1 bti ?. Z i `} IJvli` 1 turf. »r it7- '
o o� 2624} r.
lt. +.ar r -1 �7{ r' ter } S .� 1i ` (+��` 5 f f"
O Z t 11 � �s d w f^, 73 t� jri..T � ,�. S, t _ t It ? r s J o f d .,,ern {.'1 F eel t TY �' `Nd��
U 0
U i- Jt `+ ` y / .3` L� t4�; !+� 1 r✓ �fL ��X fv (C L �i� l { -CIS t ��
�'�./ � iy ( �J-!'�'..y�` .•� � � �.r�.� �L r t I(?,���.., t't � �" N ?2 of ?
261�1/`�'} f r n� 4 i r } %• . d V �6JA f Vt ^f J
-t • +�r it fp i f v j (.. Inn Z. C
(} t (r�fl i�✓�' ; r �e `-� ` r '4 e,3 �•r rIra Z.. ; i )..1y iJ (1 �.,..%�^' -� /�,.� t� �ar�i
{l,
.� f �n.r,�4�-� 7J� r 2 l � ^S�� t"��r� ,'7 �..� �'" l l� wr � �� -sS 7 w F r � �1;�♦-�y...,� i
at
r i,, -' �P.•st r` -,.4 \ r ll'f b �,r� f It 1tT ''at� .t. �t lr�� tia« ti"V
y.w
it 1-3—A Vm o soo*
Topography Contour Interval =2Ft m
The Shannon 80 - Rezoning Site Analysis
Group« WLB No. 116028-A-001
Exhibit 1-5-A
Offsite Watersheds N.T.S.
The Shannon 80 - Rezoning Site Analysis
WLBGroup WLB No. 116028-A-001
�- \ FEMA FLOODPLAIN ZONE 'A'
NARANJA DR 100 YEAR LOCAL FLOODPLAIN
2670 ...� GENERAL FLOW DIRECTION
EXISTING CULVERT
O,
z 2660 \ ��
z \\
2650
�640
� WASH A
WASH B
SUBJECT �.
PROPERTY "
2630
EXISTING fy
o CULVERTS
< a /2620-� 3x12" PIPES-
0
w
0
F O
O O
a
O O
D
2610
Ubit 1-5-9 m o' 500'
Onsite Hydrology Characteristics
The
WLB
Group
Contour Interval = 2 Ft. W
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
40
41
42
NARANJA DR
IRONWOOD
RIDGE
HIGH SCHOOL
Z co
0
Z
Z
SUBJECT
PROPERTY co
CASAS
"""0L
4685-04 CHURCH
Z
O
U
w 8"
J
a ¢
0 >
Qw 0
K 0
O
—0— L-
a 0
0' Z
O 3:
U 0
Z
Exhibit 1-12-A n
0' 600'
Existing Sewer Service
The 91114
Shannon 80 - Rezoning Site Analysis
cou WLB No. 116028-A-001
NARANJA DR
J
. d
o
Z
_ -
0
Z
Z
s ■..�■■
`■■WME
.:.
—
.................. .....
..................... ......
... .. ........
S n .
640
_ t ■
SUBJECT
PROPERTY
■ r
Z'
2630.-
0
U17■
■ ■
_
/ 2
J
/ LLl
H
Q
>
O
f .
W,
O
0_
t
LL
O
�v
.
0-
0
ZAlf
o
s
ESLO Critical Resource Area
Z
,z ESLO Core Resource Area
_
f �
k ESLO Resource Management Area Tier 1
— — FEMA Floodplain Zone 'A'
100 Year Floodplain
;1
;
�^-► General Flow Direction
High Visibility
cJ
}
6
Dense Vegetation
L ^=
�
Exhibit
1-13-A
m o, soo,
McHarg Composite Ma
The
WLB
Group
nnon 80 - Rezoning Site Analysis
WLB No.116028-A-001 C
Part 11 — Land Use Plan
Part II — Land Use Plan
T Shannon 80 - MMBRezoning Site Analysis
�ro„p WLB No. 116028-A-001
Part 11 — Land Use Plan
(This po_o,e intentionolly blank)
T ��%� Shannon 80 - Rezoning Site Analysis
Gr�av niii/ WLB No. 116028-A-001
Part 11 — Land Use Plan
1. Land Uses
A. Project Description
This request is to rezone the subject property from R1-144 to R1-36. The project proposes a low density
cluster residential subdivision with 1.0 DU/AC, consisting of 80 single-family detached homes on 76.4+/-
acres. Most of the lots will have a minimum size of 70' x 125', though the home sizes will vary. A row of
lots closest to Shannon Road will be a minimum of one third acre in order to reduce the visual impact of
this development. The architectural design of the homes will be consistent with surrounding residential
developments and will adhere to the Town of Oro Valley Design Guidelines. They will be constructed out
of materials such as stucco, adobe, and wood frame, and will have either a gabled, tiled or flat roof.
Property line walls will meet the Town of Oro Valley Design Guidelines, and landscape treatments and
design will utilize native desert vegetation.
Refer to Exhibit II-1-A: Tentative Development Plan.
B. General Plan Conformance
The proposed development of the property is consistent with the General Plan, as it will maintain a balance
among the variety of uses and characteristics of the area. First, the development will preserve significant
open spaces, will comply with the ESLO, and will provide appropriate bufferyards and density transition
between land uses. Next, this development will also bring new, quality housing to an area located in close
proximity to several activity centers including two public schools, three churches, a private school, and a
golf course. Finally, the development will allow for appropriate and sensitive infill to a growing area of Oro
Valley.
C. Flexible Design Options / Conservation Subdivision Design
As part of this rezoning application, the subject property seeks to utilize some of the Flexible Development
provisions available as part of the site's compliance with the Environmentally Sensitive Lands Ordinance
(ESLO) (Section 27.10.F.2.c).
ESL Incentives Request:
ZONING INCENTIVES Section 27.101
(a) Building Setbacks
--
(b) Landscape Buffer Yards
(c) Minimum Lot Size
(d) Minimum Lot Width
--
(e) Alternative Parking Analysis
(f) Building Height
(g) Open Space
--
(h) Mixed Use
(i) Modified Review Process
(J) Recreation Area Credit
(k) Native Vegetation Preservation
Section 27.10.F.2.b —Applicability
i. The following design options may be applied to property or portions of property when ESOS
is applied to twenty-five (25%) or more of a project site, except as provided herein.
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part 11— Land Use Plan
ESOS Total for site = 66%
(a) Building Setbacks: Per Section 27.10(F)(2)(a) — We request that the side setbacks be reduced to no less
than five (5) feet, front setbacks shall be reduced to no less than ten (10) feet for the use of side entry
garages and non -garage elements only, and the rear setbacks be reduced to fifteen (15) feet —
consistent with zoning districts with comparable lot sizes. This request will not result in an on -lot
driveway length of less than twenty (20) feet. This request will allow for a residential subdivision to
incorporate more diverse details and massing conditions, which will lead to a more attractive and varied
streetscape.
(c) Minimum Lot Size: Per Section 27.10(F)(2)(c) —We request the ability to reduce the minimum lot size
to no less than 8,750 square feet. The reduction in lot size allows for the clustering of development,
an instrumental element of the Conservation Subdivision Design. Lot Size Reduction allows for the
maximization of contiguous protected open space, as well as reduce the amount and improve the
efficiency of necessary, critical infrastructure systems.
(d) Minimum Lot Width: Per Section 27.10(F)(2)(d) — We request the ability to reduce the minimum lot
width to 70 feet.
(f) Building Height: Per Section 27.10(F)(2)(f) — We request the ability to raise the building height limit of
18 feet (per the R1-36 zoning), to 23 feet for single -story gable -roofed residences only. The increase
in in building height allows the future developer/builder to meet the current market demands of
homebuyers wants and needs in terms of both living space and design, while adequately providing
enough pitch for structural integrity and drainage. The building height in reference to this request is
appropriate due to the significant buffer area provided in the project.
(g) Open Space: Per Section 27.10(F)(2)(g) — We request the ability to reduce the required open space of
the Resource Management Area 1 by 25% percent in exchange for preserving more than the required
amount of Critical (96%) and Core (97%) Resources.
(j) Recreation Area Credit: Per Section 27.10(F)(2)(j) — We request the use of the Recreation Area Credit
to allow for passive and active recreational amenities located within resource management area 1. The
proposed rec area meets the locational requirements and criteria outlined in Section 26.5.
(k) Native Vegetation Preservation: Per Section 27.10(F)(2)(k) — We request the right to waive the
requirements for native plant salvage and mitigation within the development envelope. The site
contains —66% ESOS, exceeding the 50% minimum requirement. This modification cannot be applied
to areas of distinct vegetation which are designated as a core resource area or native plants that are
considered threatened or endangered under the Endangered Species Act or highly safeguarded by the
Arizona Department of Agriculture.
D. Effect on Existing Land Uses
Since the subject property is currently vacant, there will be no negative impact to existing land uses.
Developing this property as single-family residential will unify existing neighborhoods, increase the sense
of community, and provide needed housing in a rapidly growing area of town.
Shannon 80 - Rezoning Site Analysis
RI WLB No. 116028-A-001
Part 11— Land Use Plan
2. Environmentally Sensitive Lands
A. ESOS Selection & Preservation Methods
This project will be in conformance with the ESL guidelines of the Zoning Code. The site plan provides 50.5±
acres of ESOS (66% of the site) and it avoids the existing three washes and associated Critical Resource
Areas except for necessary roadway and utility crossings. The designated Critical Resource Areas crossing
project site will be preserved with 96% open space. The Core Resource Areas will be preserved with 97%
open space. The remaining Resource Management Area Tier 1 will contain all of the lots, and will preserve
45% open space. The onsite ESOS areas maintain open space connectivity within and beyond the project
site, and will allow for minimal impact to wildlife movement. These ESOS areas along the southern (300'-
600') and western (300'-450') edges will be permanently protected within an open space easement to be
granted to the Town. Additionally, any vegetation that is disturbed will meet the mitigation requirements
as set forth in the Town of Oro Valley Zoning Code.
Shannon 80 - Rezoning Site Analysis
EMM WLB No. 116028-A-001
Part II — Land Use Plan
3. Topography
A. Design Response to Site Topography
Due to the relatively flat character of the subject property and the lack of challenging topographic
constraints, the development of this property can proceed without special grading considerations.
B. Slope Encroachment
The subject property does not contain any regulated 15% or greater slopes, and as such there are no areas
of encroachment.
C. Hillside Conservation Areas
There are no Hillside Conservation Areas on the subject property.
D. Quantified Site Disturbance
Approximately 30.6± acres (40.1%) of the site will be developed/un restored, and 45.8 acres (59.9%) of the
site will be left in its natural condition or restored condition. Approximately 3.7± acres (4.8%) of the graded
area will be revegetated with native vegetation and will become landscaped common area, and the 1 acre
rec area abutting the CRA will be improved and credited towards RMA1 per Town Code Section 27.10.E.3.c
bringing the effective open space area to approximately 50.5± acres (66%).
Shannon 80 - Rezoning Site Analysis
MMM WLB No. 116028-A-001
Part 11— Land Use Plan
4. Cultural / Archaeological / Historic Resources
A. Resource Protection
If any cultural resources are discovered during construction, State and local rules will be followed regarding
the handling and treatment of such cultural resources.
B. Treatment Plan
The project site has been surveyed for cultural resources by Westland Resources, and the report has been
submitted to the Town for review. No significant cultural resources meeting the Arizona or the National
Register of Historic Places eligibility criteria have been found on the property. In the unlikely event that
cultural resources are uncovered during construction, a professional archaeologist will evaluate the
exposed material before any work continues in the area of the discovery. If any human remains orfunerary
objects are discovered during the construction of this project, all work will stop within the area of the
remains and all such discoveries will be treated in accordance with Arizona Revised Statute §41-865
T
Shannon 80 - 1AMBRezoning Site Analysis
M6 WLB No. 116028-A-001
Part 11 — Land Use Plan
5. Hydrology
A. Design Response to Site Hydrology
The low density nature of this development will have a minimal impact on the hydrological characteristics
of the site. Additionally this project will incorporate appropriate mitigation measures in accordance with
the Town of Oro Valley Floodplain Management Code and the Drainage Criteria Manual.
B. Modifications of Drainage Patterns
There is one federally mapped floodplain crossing the northwest corner of the site located in FEMA
floodplain Zone A with a 1% annual chance of flood.
Minimal encroachment into the existing drainage patterns on site will occur. The project includes three
crossings into the mapped local floodplains only where necessary to provide access to the site. There will
also be slight encroachment into the FEMA floodplain at the entrance of the site where it aligns with the
existing intersection of Sahuaro Divide and Shannon Road. The low density nature of the existing offsite
upstream development allows most drainage to flow in its natural state. Offsite flows from upstream
watersheds will for the most part be allowed to flow in their natural state. Excess runoff created by this
development will be collected in detention basins, channels and/or culverts directing the runoff through
the project site, and will be metered out at less than pre -developed flows for the local non-FEMA
floodplains. This development will attenuate pre-existing storm water flow rates by 15%-25%. Basins onsite
are to be owned and maintained by the HOA. Drainage will be designed in such a way to provide all-weather
access to each lot within the proposed subdivision.
C. Mitigation
Drainage design within the proposed development will convey offsite and onsite flows using constructed
channels, storm drain pipes, and onsite detention basins in accordance with the Town of Oro Valley
Floodplain Management Code and the Drainage Criteria Manual. Channel and basin geometry and
construction will follow accepted standards regarding erosion and flow velocity control as well as
maintenance access. Horizontal elements constructed within the project will be set at or near existing
grade so as to minimize impacts to existing drainage patterns. Finished floor elevations will be set to one
foot above the established base flood elevations of adjacent floodplains. Lots will be graded according to
Town standards, which will provide adequate room and grades to handle stormwater runoff. In order to
mitigate for existing flooding issues adjacent to the project, an easement will be provided for maintenance
improvements to Owl Vista Place. Improvements along Owl Vista Place will include larger culverts,
armoring the road, and raising the road in flood prone areas.
D. Town Policy Conformance
Town policy requires all development to conform to "critical basin" requirements and not result in any
adverse impacts for adjacent or downstream property owners. The Town Engineer has determined that
this development should detain more than the stormwater runoff increase created by development, thus
reducing the flows exiting the southern property boundary. As such, not only will this development avoid
adverse impacts to downstream properties, it will actually benefit them by reducing existing flooding issues
south of the project.
R��%� Shannon 80 - Rezoning Site Analysis
O niii� WLB No.116028-A-001
Part 11— Land Use Plan
6. Wildlife
A. Mitigation
This development will preserve a minimum 96% of the onsite Critical Resource Areas crossing the site in
the wash areas. These areas will be designated as open space and will maintain open space connectivity
within and beyond the project site, which will allow for uninterrupted wildlife movement. Additionally,
Core Resource Areas on the southern portion of the site will remain largely undeveloped serving as a buffer
between the proposed project and its neighbors to the south, while at the same time, providing open space
for the movement of wildlife.
Shannon 80 - Rezoning Site Analysis
MIX" WLB No. 116028-A-001
Part 11— Land Use Plan
7. Viewsheds
A. Design Response to Site Viewsheds
With the subject property being relatively flat, the internal roadway network and homesites within this
project will minimally disturb vewsheds. Expansive bufferyards of approximately 300' t0 600' will be
provided along the southern and western boundaries of the property to help mitigate views into the site
from Shannon Road and Owl Vista Place. The proposed building height is 23 feet, and development will be
limited to one story homes.
B. ORSCOD / TRCOD Conformance
This property does not fall within the Tangerine Road Corridor Overlay District (TRCOD) and/or Oracle
Road Scenic Corridor Overlay District (ORSCOD).
Shannon 80 - Rezoning Site Analysis
Row i�i�i%� M WLB No. 116028-A-001
Part 11— Land Use Plan
8. Traffic
A. Traffic Impact Analysis
Provide a traffic analysis report to include:
i. The proposed internal circulation and access to/from arterial streets, explaining location and
rationale for placement.
The subject property will have one ingress/egress point that will connect this neighborhood directly
to Shannon Road. Access to the project site will align with the existing intersection of Sahuaro
Divide and Shannon Road.
ii. If off -site road improvements are required, indicate which roads and time frame for improvements.
The following off -site road improvements will be installed to reflect the traffic analysis and
agreement with neighbors:
Northbound and southbound left -turn lanes on Shannon Road at the project entrance
(Shannon Road/ Sahuaro Divide intersection).
Southbound left -turn lane at the Shannon Road/ Owl Vista Place intersection.
iii. Projected ADT for internal circulation system at build out and level of service to all streets. Include
a projection of traffic volumes and capacity analysis for intersections.
When fully completed, the proposed Shannon 80 development is predicted to generate an
additional 856 vehicle trips per day (vtpd) on weekdays to the adjacent street system from the new
project site. Fifty percent of these new trips (428 vehicle trips) will be into the project and fifty
percent will be out of the project.
iv. Impact to existing development abutting off -site streets.
All intersections adjacent to the subject property currently operate and are predicted to continue
to experience an adequate level of service (LOS) for all movements on weekday and weekend peak
hours.
v. Capacity analyses for proposed internal and off -site streets, including right-of-way and pavement
widths, geometrics, design speeds and traffic control improvements needed.
Shannon Road
Shannon Road is a two-lane paved arterial road with a posted speed limit of 45 mph. The existing
and ultimate right-of-way is 150 feet, which is continuous. According to the Pima Association of
Governments (PAG) 2014 Traffic Volumes, the average daily trip volume (ADT) for this arterial
roadway between Lambert Lane and Naranja Drive ranges from 2,702 to 2,908 ADT. Using a 2%
growth rate as used in the Traffic Impact Analysis the 2018 volumes are estimated to range from
2,983 to 3,211 ADT, which is roughly 20% of the roadway's theoretical capacity..
Shannon 80 - Rezoning Site Analysis
MMM WLB No. 116028-A-001
Part 11— Land Use Plan
vi. A description of improvements required for those streets described in sub -paragraph v. above.
Both northbound and southbound left -turn lanes at the project entrance (intersection of Shannon
Road and Sahuaro Divide) as well as a southbound left -turn lane at the intersection of Shannon
Road/ Owl Vista Place will be installed to reflect the traffic analysis and agreement with neighbors.
In addition, the developer will provide an in -lieu fee to the Town for constructing a future multi-
use path along Shannon Road.
vii. The party/agency that the applicant believes to be responsible for making necessary
improvements.
The developer will be responsible for making necessary improvements.
viii. Evidence that proposed turning movements will meet safety standards in relationship to traffic
volumes.
The proposed ingress/egress point aligned with Sahuaro Divide is located a safe distance from
neighboring intersections. Vegetation adjacent to these ingress/egress points will be maintained
to provide safe site visibility for vehicles exiting the site and will allow safe turning movements to
and from the site. The proposed residential roadways meet the Town of Oro Valley Minimum
Design Standards.
B. Proposed Rights -of -Way
The proposed roadways within this development will have a right-of-way width of 50 feet and will meet the
Town of Oro Valley Minimum Design Standards. The internal roads of this development will be private and
maintained by an HOA if gated, otherwise they will be public. The gated entry will be designed and located
a safe distance from the Shannon Road right-of-way line in order to prevent the back up of traffic onto
Shannon.
C. Proposed Pedestrian / Bicycle Circulation
the developer will provide an in -lieu fee to the Town for constructing a future multi -use path along Shannon
Road. Recent road improvements to Naranja Drive include sidewalks, a multi -use path, and a striped bike
lane. Also within the vicinity is the La Cholla Boulevard multi -use path which lies within a % mile of the site
and heads north to Glover Road.
94MUM7yy ��g Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part II — Land Use Plan
9. Recreation / Trails
A. Offsite Trail Access
There aren't any public or neighborhood parks located within one mile of the subject property. However,
West Lambert Lane Park is located just over a mile away. The 40 acre park provides just under one mile of
natural hiking trails. Additionally, there are approximately 3.9± miles of sidewalks and paved walking paths
that exist within one mile of the Shannon 80 property. The Oro Valley community and recreation center
also provides golf and tennis recreational facilities and is open to the public.
B. Open Space Ownership
The future HOA of this proposed development will own and maintain the common area within this project.
The open space tracts along the southern and western boundaries of the site will be permanently protected
within a conservation easement, to be granted to the Town of Oro Valley.
Shannon 80 - Rezoning Site Analysis
MUM WLB No. 116028-A-001
Part 11— Land Use Plan
10. Schools
A. Student Generation
This proposed development is expected to generate approximately 17 elementary students, 18 middle
school students, and 11 high school students (using the accepted standard student multiplier of 0.2075
elementary school students per home, 0.2197 middle school students per home, and 0.1282 high school
students per home).
B. School Capacity
According to the letter supplied by the Amphitheater School District, there is available capacity for this
proposed development.
��%� Shannon 80 - Rezoning Site Analysis
O11P �WLB No. 116028-A-001
Part 11— Land Use Plan
Amphitheater Capacity Letter
OFFICE. OF LEGAL COUNSEL
(520) 6965 15 5
F 1.\ (M) 6J6.5074
AM�MRN�ATt!
/• ■ • ! ( r S e k • • I TI W. Wetmore Rod • Tumcn. AZ OM, • (520) H>6.5(W • TDD (520) 6A6.5055
00ttr.1a+oD0AM)'kieFps DemaaMDa/.)!Ed J•C-9 F.•mPailAam1+e.FbD 761wCoe■!.MFA SceaALeska
Pr -did %h"R.&a
f 1FTxtMNnrt?T
Ptnh t.e!ao■
December 22, 2016
Via email
Linda Thompson
Subdivision Coordinator
The WLB Group
4444 E Broadway
Tucson AZ 85711
RE Proposed Development of 124t single family homes
on approximately77t acres within the Amphitheater District
Southeast corner of Naranja Drive and Shannon Road
Dear Ms. Thompson:
I am responding to your request for information regarding the capacity of
Amphitheater schools Impacted by your proposed development
Using 2000 demographic multipliers developed by the U.S. Department of Census,
Bureau of Census, and adjusted for Amphitheater Districts school organizational patterns,
we project the following student populations to result from this projectwhen built
Academic Level 124 Single Family Homes
Elementary 3
Middle 27
High School 16
The census multipliers we use to obtain these projections are 0.2075 elementary
students per household, 0.2197 middle school students per household and 0.1282 high
school students per household.
The capacity of our schools noted below Is based on our last confirmed enrollment
calculations. The schools which would be Impacted by this population are fisted below,
along with the physical capacity available at each school presenty. Please note that these
schools will also be impacted by other developments in this area which may have already
been approved by the County butwhich are not yet built
Arerh+.ern Hr.%•C."m M Oronrh •Irm.oudLteflfh
Am; ea l.atn M 41 a School • Chas aia F.3 Stho 4 • Cma 114 1e :droll • La 0 ma 1.58Se Scholl • W O sm V..-8 Srhod
Orm0"*Eem•ntay•iirApan)Inn.ntaT ts7•F.r.1ajF]mrtary•MnaVnder—t ry
14A Etmentr7 • Panted 1)7 F] een-rdr7 • Pnnct DemmtrF • Flo Vim Demeeary • W dktr El awriary • F4110 Ctets
Shannon 80 - Rezoning Site Analysis
_ WLB No.116028-A-001
Amphitheater Capacity Letter (cont'd)
Part 11— Land Use Plan
RE
Shannon 80 - Rezoning Site Analysis
W LB No. 116028-A-001
Part 11 — Land Use Plan
11. Water
A. Water Demand
A reasonable estimate for domestic water usage is 230 gallons per day per lot dry weather flow. With 80
lots being proposed in this development, the total domestic water use is projected at 20,930 gallons per
day.
B. Water Service Provider & Capacity
Oro Valley Water has water service available to the property under the conditions stated in a capacity letter
received December 201h, 2016.
Shannon 80 - Rezoning Site Analysis
M6MMBWLB No. 116028-A-001
Water Service Provider Letter
ciP Ya
y i
Oro Valle• Water Utility
December 20. 2016
WLB
4444 East Broadway
Tucson. AZ 85711
Part 11— Land Use Plon
Subject: WATER AVAILABILITY
Parcel: Pima County Parcel numbers 224-21-0020, 224-21-0030, 224-21-0040,
224-21-0050
To whom it may concern'
The Town of Oro Valley Water Utility currently has water service available to the
above property under the following conditions.
A Water Plan is submitted by the applicant and approved by the Water
Utility
A Line Extension Agreement is executed by the applicant.
All construction is in accordance with the approved Water Plan and the new
facilities are accepted by the Water Utility in accordance with the
requirements of the Line Extension Agreement.
Payment of all water development impact fees, meter fees and other
required fees and charges. (A water meter for residential and/or
commercial use cannot be sold until after the issuance of an approved
building permit.)
WATER SUPPLY
The Town of Oro Valley Water Utility has been designated by the State of Arizona,
Department of Water Resources, as having an Assured Water Supply (AWS No.
2003-001 Decision and Order No. 26-400765). This development lies within the
boundary of the Oro Valley Water Utility's planned water service area. Once the
property is platted, it will be noted on the plat(s) for these properties that the
property meets the State requirement of an Assured Water Supply because it will
be served by Oro Valley Water Utility.
www.orovalleyaz,gov
11000 N. La Canada Drive • Oro Valley, Arizona 85737
Phone: (520) 229-5000 • fax: (520) 229.5029
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
Part 11 — Land Use Plan
Oro Valle Water Utility
WATER SERVICE
The developer shall be required to submit a Water Plan identifying water system
improvements These include but are not limited to
: Water Use
: Fire Flow Requirements
Offsite/ Onsite Water Facilities
Loops and Proposed Connection Points to Existing Water System
: Easements/Common Areas
Once a Water Plan is submitted, It will be determined if the proposed plan can
meet the water requirements of the proposed development. The developer shall
be fiscally and financially responsible for all water system improvements and
modifying/enhancing the existing water system to meet those needs. It is
recommended that the applicant contact the Water Utility to discuss the
construction of water system improvements prior to submitting a Water Plan for
the property.
This letter and the comments herein regarding water availability are valid for a
period of one year only through December 20, 2017 Issuance of this letter is not
to be construed as approval of a Water Plan and/or acceptance of any
construction for water service.
If you have any questions or would like more details regarding any construction
improvements that may be required in a Water Plan, please call me at 229-5017.
Sincerely,,
91hvv
Mark Moore
New Development Coordinator
cc. Phillip C Saletta, P.E Water Utility Director
K w %4.oroval►cyaz.gov
11000 N la Cai)ada Drive - Oro Valley, Arizona 95737
Phone: (520)229-5000•fax. (520) 229-5029
TWr e� Shannon 80 - Rezoning Site Analysis
Group WLB No. 116028-A-001
Part 11 — Land Use Plan
12. Wastewater
A. Sewer Service Method
Pima County Regional Wastewater Reclamation Department will provide sewer service to this
development. Capacity is currently available for this project in the public sewer G-97-129, downstream
from manhole 4685-04.
7t
Shannon 80 - Rezoning Site Analysis
ft WLB No. 116028-A-001
Part 11 — Land Use Plan
Wastewater Service Provider Letter
A
Ahl
PTMA COUNTY
WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS
DIRECTOR
PH: (520)724.65M
FAX: (520) 724-9635
December 21, 2016
Linda Thompson
The WLB Group, Inc.
4444 E Broadway
Tucson, Arizona 85711
Sewerage Capacity Investigation No. 2014-118 Type I
RE: Shannon 80,124 Lots on Parcels 224210020, 224210030. 224210040.
Estimated Flow 26,784 gpd (ADWF).
Greetings:
The above referenced project is tributary to the Tres Rios Water Reciamation Facility via
the Canada Del Oro Interceptor
Capacity is currently available for this project in the public sewer G-97-129, downstream
from manhole 4685-04.
This letter is not a reservation or commitment of treatment or conveyance capacity for
this project. It is not an approval of point and method of connection. It is an analysis of
the system as of this date and valid for one year. Allocation of capacity is made by the
Type III Capacity Response.
If further information is needed, please feel free to contact us at (520) 724-6642
Reviewed by: Kurt Stemm, CEA
Shannon 80 - Rezoning Site Analysis
MN" WLB No. 116028-A-001
Part 11 — Land Use Plan
13. Bufferyards
A. Mitigation (if applicable)
A landscape bufferyard will be provided around the entire perimeter of the project site to help soften any
visual impacts to surrounding landowners. The bufferyards will be composed from a variety of native
vegetation and will help blend this residential neighborhood with the surrounding developments. They will
be a minimum of 20-40 feet wide and will be in accordance with the Bufferyard "A" and "B" criteria in the
Town of Oro Valley Zoning Code.
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
14. Exhibits
Part 11— Land Use Plan
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
B•
—_-IRONWOOD
RIDGE
•
PARCEL SIZE: 76.4±AC.
SCHOOL
•
EXISTING ZONING: SINGLE-FAMILY RESIDENTIAL (R1-144)
.:' � ;; � �.�.,�
•
PROPOSED ZONING: SINGLE-FAMILY RESIDENTIAL (R1-36)
•
PROPOSED NUMBER OF LOTS WITH BASE MIN. LOT SIZE: 0
THE ESTATES
— •
PROPOSED NUMBER OF LOTS WITH REDUCED MIN. LOT SIZE: 80
AT CAPELLA
•
PROPOSED MINIMUM LOT SIZE: 70' x 125'�
•
PROPOSED DENSITY: 1.0 D.U./Ac.."{
f'
p
•
PROPOSED OPEN SPACE: 50.5 ± AC. 66% ( OF THE SITE)
�
•
ONSITE ESOS WILL BE OWNED AND MAINTAINED BY THE HOA
ESOS CK
• • • • REVEGETATED AND
COUNTED AS ES -
tht
NJ _
Q FFE R r Q O 0 0 p® O O
OJ
w
LL-
.
. a
ch p o p o Q a o o
o
• ,- o O o o w
.. z
. • ® o 0 o p o • - �. �y
• � p p c, o O �' o s
• - o 0 0 0 `.
o �y REc AREA
• v Q (1.Ot Ac.) Q O O
O O O O �• =�c — v p J '
O
OWL VISTA PL.,�,,►
t.
RMA 1 PROVIDED ONSITE: 20.6± Ac.
,
CORE RESOURCE AREA PROVIDED ONSITE: 23.0±Ac.
-._ CRITICAL RESOURCE AREA PROVIDED ONSITE: 6.9± Ac.
EXISTING FEMA FLOODPLAIN qA
�
PROPOSED SCHEMATIC BASIN LOCATION
rt�,
Exhibit 11-1-A
Tentative Development Plan
ATION EA ; NT TO CORE RESOURCE +
LISHED IN S AR A AREA
VISTA PLACES TED TO ADJACENT RESIDENTS
The 1111
WLB
Group AIM
Shannon 80 - Rezoning Site Analysis ,
WLB No. 116028-A-001 •
ESL
Area
Minimum ESOS
Total ESOS
Category
Onsite
Required
Provided
NARANJA DR
CRA (7.2t Ac.)
6.8t Ac. (95%)
6.9t Ac. (96%)
CORE (23.8t Ac.)
19.0 (80%)
23.0 (97%)
RMA1 (45.4 Ac.)
22.5(49.5%)
20.6 (45%)
Total
(76.4t Ac.)
48.3t Ac. (63.4%)
50.5t Ac. (66.0%)
Exhibit 11-2
Proposed ESOS Ma
Iw\ o, snn•
The
WLB
Group
-
Shannon 80 - Rezoning Site Analysis
WLB No. 116028-A-001
PROPOSED UNDISTURBED / RESTORED AREA (45.8± Ac. or 59.9%)
MAX. PROPOSED DEVELOPED / UNRESTORED (30.6± Ac. or 40.1 %)
CRITICAL RESOURCE AREA
O PROPOSED SCHEMATIC BASIN LOCATION 1
t
I r
/ 1
1
Z
O
Z ! !
Z APPROXIMATE
Q GRADING LIMITS ► / r/
(n !! t
/-------- / � �—
� I /� I l o I
1 j I 1
� I
1
O
1
Z
IO
U
Q
W
1
H
0
!
1
/
O
!
i/
!
a
IL
O
!
i
!
O
Z
�
t
U
Z
O
I �
1 t
' NOTE: Basins will be
I 1
1 I constructed outside of
1 1
the graded area shown
and will be revegetated.
t 6
Exhibit 11-3-A ® 0. 500'
Proposed Grading Limits
The
Shannon 80 - Rezoning Site Analysis
c P- WLB No. 116028-A-001
R1-144
Single Family Residential
(Oro Valley)
4d R1-20
R1-36 Single Family Residential
Single Family (Oro Valley)
Residential
(Oro Valley)
MILE FROM
PROJECT SITE
NARANJA DR — — — — — — —
Z
O R1-7
Z Single Family
Z
Q Residential
(Oro Valley)
MMMMM No MMMMM MEN
I
I
I �
SR I
I Suburban SUBJECT
Ranch I
I (Pima County) PROPERTY
R1-36 I
I Single Family
Residential I
I (Oro Valley)
I I
I Z I
1 Q / � Q
a >
w a /
0 o
Q. 3
Z O.000
0-0.000
Capella PAD
Pending Rezoning
Exhibit II-4-A m 0, 700'
Proposed Zoning m
The
Shannon 80 - Rezoning Site Analysis
c oup WLB No. 116028-A-001
—*LC /f,A 0/1
NOTICE FORM CHECKLIST
OV Number: D V 02 oL. 0V 1101
Meeting Name & Date: IC _ �P - I %
Application Type:
�1-§-�ay Notice DEADLINE: 1 -7
Publish in Daily Territorial? es No
2pm submission deadline:
Publishing #:
Paper copy (attached):
Affidavit scanned to OV file:
Day of Publishing: �T /�j 3 �}
Date/Time emailed:
Cost: lJ`�
Scanned to OV file: �i r
Original to Town Clerk:
HOA Notification? No All Affected Total:
HOAs:
Notification BoundaryY Yes No
Not=esidents:
ius:
Tot
61s
feet Spreadsheet into file:
Date mailed out:
ate mailed out:
Y �- a j I S-�
Property Posting? Yes No Stickers given to Planner: Ila j 1-7
Posting on Town property? Yes No Date posted:
Post on Planning Page? Yes No Date posted: — -�
Notes:
oPo'01'ay gR/%>' TOWN OF ORO VALLEY
DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARTMENT
11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737
PHONE: (520) 229-4800 FAX: (520) 742-1022
Y�
www.orovalleVaz.gov/dis
��UNDED �91�
1.2 GENERAL APPLICATION FORM o� Ice
1OV Case #: bvl"1 /JL I
Application
Type
i( \�" ,tsl
l'
®
Major General Plan Amendment
❑
Final Plat r 2�11 k
❑
Rezoning/PAD Amendment
❑
Pre-Application�1't�
❑
Planned Area Development
❑
Zoning Verificatio `
❑
Conditional Use Permit
❑
Sign Criteria � -- ................
❑
Zoning Code Amendment
❑
Sign - PAD Exemption
❑
Conceptual Site Plan
❑
Master Sign Program
❑
Conceptual Public Art
❑
Communication Facility — Tier 1 and 2 Minor
❑
Conceptual Architecture
❑
Communication Facility — Major
❑
Final Site Plan
❑
Revised Development Plan
❑
Conceptual Landscape Plan
❑ Other
Subiect Property Information:
Address:
Subdivision / Commercial Center Name:
Book / Page or Sequence Number:
ax Code: 224210020, 224210030, 224210040, 224210050
Lot Number(s
Legal Description: S2 NW4 SEC 9-12-13
Section/Township/Range: Section 9 Township 12S Range 13E Area of Property: 76.4+/- Ac.
Existing Land Use: undeveloped Proposed Land Use: Single -Family Residential
Applicant Information:
Applicant *:
* If more than one, attach list
Name: David Williamson Firm: Shannon 77 LLC
Address: 700 E. Broadway Blvd. Suite 200 City: Tucson State: AZ Zip: 85719
Telephone: 520-404-7681 Fax:
Property Owner(s) if different from Applicant *:
Name:
Address:
Telephone:
Consultant:
Fax:
Email: davidw0fairfiieldhomes net
Firm:
City: _
Email:
(Discipline)
State: Zip:
Name: Paul Oland Firm: The WLB Group. Inc.
Address: 4444 F Broadway Rlvd City: Tucson State: AZ Zip: 85711
Telephone: 520-881-7480 Fax: 520-881-7490 Email: gpnlandQwlbgroup Qom
1
Pro8ect Description/Narrative:
The request is to modify the General Plan Land Use Designation from Rural Low -Density Residential (R-LDR)
to Low Density Residential 2 (LDR2, 1.3-2.0 DU/AC) to allow for single-family residential cluster subdivision.
ti
I hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner
of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to
perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether
specified herein or not. The approval of this application does not presume to give authority to violate or cancel the
provisions of any other federal, state or local law for which this project may be subject to.
Notice: It is the applicant/owner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions
& Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners
Association or property management to determine applicable requirements.
It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance.
Failure to do so may delay issuance of permits. See attached list of agencies.
A/�4,
i :_— -�.____ Paul Oland 4-27-2017
Ap icant's Signature Print Name Date
Important Note: All submittals received after 4:00 p.m. will be processed the next day
Submittals will be relected If:
• Not folded using Pima County fold & collated;
• There are missing items on the checklist unless otherwise approved by Planning Division Manager or Town Engineer.
• Re -submittals cannot be accepted without a transmittal and a written narrative summary describing the purpose of
submittal.
2