HomeMy WebLinkAboutOV1802194oPO�P�IEY qR?0 TOWN OF ORO VALLEY
COMMUNITY DEVELOPMENT & PUBLIC WORKS DEPARTMENT
11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737
PHONE: (520) 229-4800 FAX: (520) 742-1022
www.orovalleyaz.gov
�OOVDED A9'
1.2 GENERAL APPLICATION FORM ice
Application
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Tvpe:
Major General Plan Amendment
Rezoning/PAD Amendment
Planned Area Development
Conditional Use Permit
Zoning Code Amendment
Conceptual Site Plan
Conceptual Public Art
Conceptual Architecture
Final Site Plan
Conceptual Landscape Plan
®' `�
❑ Final Plat rjs�
❑ Pre -Application A�%k3
❑ Zoning Verification 022011
❑ Sign Criteria 'RJ , .
❑ Sign - PAD Exemption
❑ Master Sign Program
d Communication Facility — Tier 1 and 2 Minor
❑ Communication Facility — Major
❑ Revised Development Plan
❑ Other
Subject Property Information:
Address: 11167 N. Oracle Rd., Oro Valley, 85737
Parcel/Tax Code: N/A, ROW
Subdivision / Commercial Center Name:
Book / Page or Sequence Number:
Lot Number(s)
Legal Description: Lessor's Legal Description on Site Plan page LS-1
Section/Township/Range: T12S, R14E, S5
Area of Property:
Existing Land Use: ADOT Right -Of -Way
Proposed Land Use: Installation of Verizon Wireless
Communication Facility
Applicant
Information:
* If more than one, attach list
Applicant *:
Name: Michelle Lamoureux Firm:
Pinnacle Consulting. Inc.. c/o Verizon Wireless
Address: 1426 N. Marvin St., #101
City:
Gilbert State: AZ Zip: 85233
Telephone: 480 664 9588 x 230 Fax:
Email:
Michelle.Lamoureux@pinnacleco.net
Property Owner(s) if different from Applicant *:
Name: Arizona Department of Transportation Firm:
Address: 205 S. 17th St.
City:
Phoenix State: AZ Zip: 85007
Telephone: 602 712 8811 Fax:
Email:
Consultant: (Discipline)
Name:
Firm:
Address:
City:
State: Zip:
Telephone: Fax:
Email:
7
Project Description/Narrative: (Separate sheet is preferred)
Co -location of Venzon Wireless antenna equipment on EXISTING 57' Tucson Electric Power utility power
pole. Installation of 5'x13' ground equipment cabinet in ADOT ROW adjacent to pole.
I hereby certify that I have read and examined this application and know the same to be true and correct. I am the owner
of the property or the Owner's authorized representative, and if not the owner, I have obtained the owner's permission to
perform stated work. All provisions of laws and ordinances governing this type of work will be complied with whether
specified herein or not. The approval of this application does not presume to give authority to violate or cancel the
provisions of any other federal, state or local law for which this project may be subject to.
Notice: It is the applicant/owner's responsibility to ensure all private rules and regulations (such as Covenants, Conditions
& Restrictions (CC&R's)) of the subdivision and/or commercial center are adhered to. Contact your Home Owners
Association or property management to determine applicable requirements.
It is also the applicant's responsibility to coordinate with all outside agencies to secure their acceptance or clearance.
Failure to do so may delay issuance of -permits. See attached list of agencies.
Applicant's Si '`re Print Name Date
Important Note: All submittals received after 4:00 p.m. will be processed the next day
Submittals will be reiiected if:
• There are missing items on the checklist unless otherwise approved by Planning and Zoning Administrator or Town
Engineer.
• Re -submittals cannot be accepted without a transmittal and a response to staff comments.
8
1.3 CONDITIONAL USE PERMIT - SUBMITTAL CHECKLIST
No application for a Conditional Use Permit will be accepted until the applicant has scheduled and
completed a pre -application conference.
All applications for a conditional use permit must include the following materials to be
accepted for processing:
❑ Fees (Refer to Section 1.5 Fee Schedule of this process guide)
❑ General application
❑ Narrative detailing request (5 Copies)
❑ Site plan or location map, if applicable — size 11" x 17" (5 Copies)
❑ Please note, additional site specific information may be required
❑ All contents of Section 2.0 of this process guide (5 copies)
❑ Public Outreach Report, in accordance with Section 22.15.E (2 copies)
❑ Letter of authorization from the property owner, if applicable (2 copies)
❑ Copy of Deed or Title Report
❑ Signed notification of potential state or federal issues (Section 4.0)
❑ Electronic version of all submitted items in PDF form.
Additional copies will be required for the public hearing process.
E
verfZOnwireless 1 PINNACLE
C0NSULTING. IN''C
Public Outreach Plan'
f
Project: AUG 0 2 2018
TUC Ram —TEP Colocation
11167 N. Oracle Road, $'►����wr............
Oro Valley, AZ 85737
ADOT ROW
Applicant:
Neal Talaske
Pinnacle Consulting, Inc.
1426 N. Marvin St., Gilbert
(480) 664-9588 x 220
Neal.Talaske@Pinnacleco.net
Client:
Verizon Wireless
126 W Gemini Dr.,
Tempe AZ, 85283
Site Name: TUC Ram Ll
Table of Contents
Section 1.0 Project Description........................................................................................................................1
Section 2.0 Identification of Interested Stakeholders..................................................................................1
Section 3.0 Proposed Neighborhood Meetings.............................................................................................2
Attachments:
Photo Simulations
Zoning Drawings
Notification Area Map
0
A
1.0 Project Description
Verizon Wireless is proposing to install a new wireless communications facility at 11167 N. Oracle Road,
Oro Valley. The new facility would be located atop an existing Tucson Electric Power utility pole and
would not require the installation of a new vertical structure. The required ground equipment would
be located in Arizona Department of Transportation -owned Right -of -Way. The facility would be 70' to
the top of antennas, which would be concealed in a stealth canister, mitigating visual impacts to the
area.
The installation of this facility will provide the surrounding area with enhanced, high-speed Verizon
Wireless voice and data capacity. Verizon Wireless strives to identify future gaps or lack in coverage and
tailors their infrastructure accordingly to stay ahead of the needs of subscribers. When this new site is
activated, businesses, homes, and travelers in the area will see an increase in data transfer speeds and
connectivity.
2.0 Identification of Interested Stakeholders
Pinnacle Consulting, Inc. has identified the primary stakeholders for this proposed development to be
the adjacent land owners in the area, which is primarily composed of commercially zoned lots and Right -
of -Way. Per Town of Oro Valley code section 22.15.F.4.a.i, all landowners within 600' of the proposed
development will be notified of the neighborhood meeting.
3.0 Proposed Neighborhood Meetings
Pinnacle Consulting, Inc. will be facilitating two neighborhood meetings on behalf of Verizon Wireless
for this proposed project.. The first neighborhood meeting will be held on 6/20/2018 at 6pm at the
Fairfield Inn & Suites Conference Room, 10150 N. Oracle Rd, Oro Valley AZ 85737 for the purpose of
answering any questions and addressing any concerns attendees may have. The second meeting will be
organized and held by the Town of Oro Valley staff and will be held on 7/12/2018 in order to further
inform neighboring land owners and gain feedback towards the proposed development.
■
lu I:rm
DEPART 126 W GEMINI DR, TEMPE, AZ 85283 ON W GEMINI DR.
CONTINUE ONTO S PRIEST DR. TURN RIGHTONTO W ELLIOT RD. USE
THE LEFT 2 LANES TO TURN LEFT TO MERGE ONTO 1-10 E TOWARD
TUCSON. MERGE ONTO 1-10 E. TAKE EXIT 240 FOR TANGERINE RD. TURN
LEFT ONTO W TANGERINE RD. TURN RIGHT ONTO N ORACLE RD. AFTER
1.4 MILES THE SITE WILL BE ON THE RIGHT.
VICINITY MAP
PROJECT AREA
TUC RAM
AP N : N/A
11167 N. ORACLE ROAD
ORO VALLEY, AZ 85737
PIMA COUNTY
SCOPE OF WORK
• INSTALL PROPOSED 57'-0" TEP UTIUTY POLE (BY UTILITY)
• INSTALL PROPOSED 5k13' ELEVATED PLATFORM WITH S'TALL
STEALTH SCREENING
• INSTALL (1) PROPOSED POLE EXTENSION SECTOR FRAME
(DESIGN BY OTHERS)
• INSTALL (1) PROPOSED ANTENNA STEALTH SCREENING (DESIGN
BY OTHERS)
• INSTALL PROPOSED OUTDOOR CABINET
• INSTALL PROPOSED ELECTRICAL SERVICE
• INSTALL PROPOSED TELCO SERVICE
• INSTALL (6) PROPOSED ANTENNAS
• INSTALL (12) PROPOSED REMOTE RADIO HEADS
•' INSTALL (2) PROPOSED H-FRAME
• INSTALL (1) PROPOSED OVP AT GROUND LEVEL
• INSTALL (1) PROPOSED OVP AT ANTENNA LEVEL
• INSTALL (2) PROPOSED HYBRID CABLES
SHEET INDEX
T-1
PROJECT INFORMATION
LS-1
TOPOGRAPHIC SURVEY
Z-1
SITE PLAN
Z-2
ENLARGED SITE PLAN AND ANTENNA PLAN
Z-3
ELEVATIONS
Z-4
ELEVATIONS
CLIENT
VERIZON WIRELESS
126 W. GEMINI DR.
TEMPE, AZ 85283
CONTACT: RICK MIRANDA
PHONE: 1602) 390-9844
PROPERTY OWNER
A.D.O.T,
205 S 17TH AVE.
PHOENIX, AZ 85007
CONTACT: TIM MAHONEY
PHONE: (602) 712-8811
TOWER OWNER
TUCSON ELECTRIC POWER
88 E. BROADWAY BLVD.
TUCSON, AZ 85701
CONTACT: DANNY MADRIL
PHONE: (520) 661-9460
SITE ACQUISITION
PINNACLE CONSULTING. INC.
1426 N. MARVIN STREET #101
GILBERT, AZ 85233
CONTACT: MICHELLE LAMOUREUX
PHONE: (480) 664-9588 e#. 230
PROJECT DATA
ZONING: R.OW.
PARCEL #: N/A
USE: UNMANNED COMMUNICATIONS
NEW LEASE AREA: 220 SO. FT
JURISDICTION: ORO VALLEY
GOVERNING CODES: 20121BC, 20121FC, 20121MC,
2011 NEC
ALL BUILDING CODES LISTED ABOVE
SHALL INCLUDE AMENDMENTS BY THE
GOVERNING JURISDICTION
A&E FIRM NEW SITE LOCATION
PINNACLE CONSULTING, INC. 1426 N. MARVIN STREET #101 LATITUDE 32.40857' 32`24' 30.8514" N (NAD83)
GILBERT, AZ 85233 LONGITUDE 110.94366` 110' 56' 37.1754" W (NAD83)
CONTACT: KYLE FORTIN GROUND ELEVATION 2616.7' (NAVD88)
PHONE: (623) 217-4235
1. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEET THE
HEALTH AND SAFETY STANDARDS FOR ELECTROMAGNETIC FIELD
EMISSIONS AS ESTABLISHED BY THE FEDERAL COMMUNICATIONS
COMMISSION OR ANYSUCCESSOR THEREOF, AND ANY OTHER
FEDERAL OR STATE AGENCY.
2. THIS WIRELESS TELECOMMUNICATIONS FACILITY WILL MEET THE
REGULATIONS OF THE FEDERAL COMMUNICATIONS COMMISSION
REGARDING PHYSICAL AND ELECTROMAGNETIC INTERFERENCE,
3. LIGHTING OR SIGNS WILL BE PROVIDED ONLY AS REQUIRED BY
FEDERAL OR STATE AGENCIES.
4. DEVELOPMENT AND CONSTRUCTION OF THIS PROJECT WILL
COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES.
5. EXISTING PARKING IS NOT AFFECTED BY THIS PROJECT.
6. THIS PROJECT DOES NOT INCLUDE WATER OR SEWER.
(RF):
DATE:
(CONST.):
(RE):
DATE:
DATE:
LANDLORD:
DATE:
PRE -RED FOR
verizonv
125 W. GEMINI DR. TEMPE. AZ 85283
PHONE (480) 7774380
FAX (480) 7774391
CONSULTING FIRM
PINNACLE
_,_rsi�uclon P,olect Management $,le Develnpnx::t
1426 N MARVIN STREET # 101
GILBERT AZ 85233
PROJECT NO: TUC RAM
DRAWN BY: CGS
CHECKED BY KF
REV
DATE
DESCRIPTION
BY
A
02/26/18
90%ZONING
CGS
0
04/23/18
100%ZONING
JMC
FINAL
FOR ZONING
lw
ONLY u li "�
!.\�fv/w`
AUG O 2CC99101.Y
BT:
TUC RAM
11167 N. ORACLE ROAD
ORO VALLEY, AZ 85737
PIMA COUNTY
SHEET TITLE
PROJECT INFORMATION
SHEET NUMBER
T-1
I �
I
A h I
NATRUAL
GROUNC J' I
4 I APN: 220084660 BOUNDARY DETAIL I I I
( / ZONING: PAD SCALE: 1 " = 30' I
o CD
aN Z
4O 1 ��
\
\ �I VIE a
— SEE SURVEY
\ DETAIL a o
___---- __________-__, NATRUAL� � II
1 \ 4 (E) 50' BUILDING SET-BACK.LINE GROUND '
' — — \ = — — — — — — — � — — — — — — — — r
\ t0 11—IE) 20' UTILITY 8 GAS EASEMENT
)
f _-_ •((E)20' UTILITY EASEMENT
(E)DANy - J-- _-_ _END ACFL
END ACLF
IF — (3.1WEST)
FND PK NAIL -- - — — — _ - 1 _ {E}Btd2BED WIRE FENCE
1
W/SHINERLS26923
(0.9' SOUTH)
I (E) BACK OF CURB
I (E) EDGE OF PAVEMENT
ORACLE ROAD
00 (E)100'R/W
(E) MONUMENT LINE
LEGEND
0
ALUMINUM CAP FLUSH
A
PKNJASHER
03
ELECTRICAL PULL BOX
®
ELECTRIC MANHOLE
ED
ELECTRIC CABINET
FIBER PEDESTAL
POWER POLE
#
LIGHT POST
pd
GAS VALVE
—
GAS MARKER
WATER VALVE
0
WATER METER
BACKFLOW PREVENTER
IRRIGATION CONTROL VALVE
ft
DECIDUOUS TREE
SIGN
BREAKLINE
X 52e WNG
SPOT ELEVATION
O
SCHEDULE 13HEX
POSITION OFGEODETIC COORDINATES
— —
PROPERTY LINE
— —
PROPERTY LINE (OTHER)
—
MONUMENT LINE
— — — —
EASEMENT LINE
x x
WIRE OR BARBED WIRE FENCE
—ONE ONE—
OVERHEAD ELECTRIC LINE
ucE UGE—
U/G ELECTRIC LINE
--- - _:'
U/G FIBER OPTIC LINE
—G—G—G—
U/G GAS LINE
WATER LINE
APN
ASSESSORS PARCEL NUMBER
CAB
CABINET
CS
CONCRETE SURFACE
D/W
DRIVEWAY
INV
INVERT
NG
NATURAL GRADE
PV
ASPHALT
SL
STREET LIGHT
RAN
RIGHTOFWAY
TBC
TOP OF CURB
TW
TOP OF WALL
VLT
VAULT
�lw
s
--- sF — —� --- \-------------------------
BRICK \
/ PAVERS
\ 10 11 (E) 15' UTILITY —8 EMENT
—
W s
�--� W
Vie_ F G
SURVEYOR NOTES
1. ALLTITLE INFORMATION IS BASED UPON A COMMITMENT FOR TITLE
INSURANCE PREPARED BY FIRST AMERICAN TITLE INSURANCE CO.,
ORDER NO 21800324 EFFECTIVE DATE: 01232018.
2 SURVEYOR HAS NOT PERFORMEDA SEARCH OF PUBLIC RECORDS TO
DETERMINE ANY DEFECT IN TITLE.
3 THE BOUNDARY SHOWN HEREON IS PLOTTED FROM RECORD
INFORMATION AND DOES NOT CONSTITUTE A BOUNDARY SURVEY OF
THE PROPERTY
4. SURVEYOR DOES NOT GUARANTEE THAT ALL UTILITIES ARE SHOWN OR
THEIR LOCATIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND
DEVELOPER TO CONTACT BLUE STAKE AND ANY OTHER INVOLVED
AGENCIES TO LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION.
REMOVAL, RELOCATION AND/ OR REPLACEMENT IS THE RESPONSIBILITY
OF THE CONTRACTOR.
PROJECT META DATA
1 ELEVATIONS SHOWN HEREON ARE REPRESENTED IN NORTH
AMER/CAN VERTICAL DATUM OF 196E (NAV066) ESTABLISHED FROM
GPS DERIVED ELLIPSOID HEIGHTS, APPLYING GEOID 12B SEPARATIONS
CONSTRAINING TO NGS CORS STATIONS PROVIDED IN THE "ONLINE
POSITIONING USER SERVICE' (OPUS) SOLUTION FOR THIS SPECIFIC
SITE
2. BEARINGS SHOWED HEREON ARE BASED UPON U S. STATE PLANE
NAD83 COORDINATE SYSTEM ARIZONA STATEPLANE COORDINATE
ZONE CENTRAL, DETERMINED BY GPS OBSERVATIONS.
3 FIELD WORK FOR THIS PROJECT WAS PERFORMED ON 02/19/2018.
LESSOR'S LEGAL DESCRIPTION
LOT 4, OF STEAM PUMP VILLAGE PHASE 3, ACCORDING TO THE PLAT OF
RECORD IN THE OFFICE OF THE COUNTY RECORDER OF PIMA COUNTY.
ARIZONA, RECORDED IN BOOK 64 OF MAPS AND PLATS, PAGE 95
FLOOD ZONE DESIGNATION
THE PROPOSED LEASE PREMISES SHOWN HEREON APPEAR TO BE WITHIN FLOOD
ZONE "X' AS DELINEATED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY
FIRM MAP NO. 04019C1090L DATED 06/'.62011
(E) DRIVEWAY
Ilf 2618
-- f
W W W$ W
FLOOD ZONE "X' IS DEFINED AS AREAS DETERMINED TO BE OUTSIDE 500-YEAR
FLOODPLAIN; DETERMINED TO BE OUTSIDE THE 1%AND 0.2%ANNUAL CHANCE
SCHEDULE B EXCEPTIONS FLOODPLAINS
OEASEMENTS, RESTRICTIONS, RESERVATIONS, CONDITIONS AND SET -BACK
LINES AS SET FORTH ON THE PLAT RECORDED IN BOOK 64 OF MAPS,
PAGE 29, BUT DELETING ANY COVENANT, CONDITION OR RESTRICTION
INDICATING A PREFERENCE, LIMITATION OR DISCRIMINATION BASED ON
RACE, COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS OR NATIONAL
ORIGIN TO THE EXTENT SUCH COVENANTS. CONDITIONS OR RESTRICTIONS
VIOLATE 42 USC 3604(C).
4O EASEMENTS, RESTRICTIONS, RESERVATIONS, CONDITIONS AND SET -BACK
ONES AS SET FORTH ON THE PLAT RECORDED IN BOOK 64 OF MAPS,
PAGE 95, BUT DELETING ANY COVENANT, CONDITION OR RESTRICTION
INDICATING A PREFERENCE, LIMITATION OR DISCRIMINATION BASED ON
RACE, COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS OR NATIONAL
ORIGIN TO THE EXTENT SUCH COVENANTS, CONDITIONS OR RESTRICTIONS
VIOLATE 42 USC 3604(C), 10' 41 ,
10. AN EASEMENT FOR PUBLIC UTILITIES AND ALL MATTERS AS SET FORTH ,NET C
THEREIN, RECORDED IN DOCKET 13817, PAGE 3194 OF OFFICIAL RECORDS OR
ry 00AN EASEMENT FOR GAS LINES AND ALL MATTERS AS SET FORTH THEREIN, DECLINATION
RECORDED IN DOCKET 1383Z PAGE 808 OF OFFICIAL RECORDS.
ITEMS 1-2, 5-9 AND 12-13OF THE CLIENT PROVIDED TITLE REPORT DO NOT GRAPHIC SCALE
CONTAIN GRAPHICALLY PLOTTABLE EASEMENTS, SETBACKS, RESTRICTIONS 10 0 5 10 20 ..
OR OTHER ENCUMBRANCES, AND/OR BLANKET IN NATURE OR DO NOT AFFECT
SUBJECT SITE.. THE SURVEYOR CANNOT GUARANTEE THAT NON-PLOTTABLE
ENCUMBRANCES DO NOT EXIST THAT MAY AFFECT THE SUBJECT LEASED ( IN FEET )
PREMISES.
L inch = 10 ft.
\ SURVEY DETAIL
\ SCALE: 1"= 70'
s'\\ NATURAL
\ GROUND
\ \ q (E)50' BUILDING SET -BACK LINE
(E) BACK OF CURB
W W
ORACLE ROAD
00(E) 100' RNJ
(E) RETAINING U
`LESSOR'S PARCEL LINE
UGE UGEUG2
!/
/'NATURAL s
/ GROUND --
�Psi>
W W _
VLT
nfi sss 3 4 (E)10' UTILITY EASEMENT
— - — — — — — — c - . e
ao1 (E)WIRE FENCE
—
55439M
2 1111' — — —
TI \1yl T 81.49—
-
m I z6,H
2617 A
41
T,A. ''' NATURAL
OIYGROUND
c Rq�a �92. Rop°eggG� <P 2—
CgT'Y
WW WF D��iN—W WW WW
—
verizowl
126 W. GEMINI DR.
TEMPE. AZ 85283
PINNACLE
CONSUL'rING, INC.
Construction - Project Management - Ste Development
1426 N. MARVIN STREET # 101
GILBERT, AZ 85233
FIELD BY:
CEF
DRAWN BY:
CRS
CHECKED BY:
ABM
REVISIONS
I
LNI.
02/22/18 PRELIMINARY
DATE DESCRIPTION
RL_F--
CC3NSLJLTINC3
SFTACE
. ti R CONSUL'�i.vG CD•� .. q_
NG s
E014NA G
EXPIRES 03/51/13
REUSE OF DOCUMENT
THE IDEAS 8 DESIGN INCORPORATED HEREON, AS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE
PROPERTY OF RLF CONSULTING, LLC 8 IS NOT TO BE
USED FOR ANY OTHER PROJECT WITHOUT WRITTEN
AUTHORIZATION OF RILE CONSULTING, LLC
PROJECT No.
10008555
SITE NAME:
TUC RAM
SITE ADDRESS:
11167 N ORACLE ROAD
ORO VALLEY, AZ 85737
SHEET TITLE:
TOPOGRAPHIC SURVEY
N
SHEET NO. REVISION:
LS-1
/
EXISTING 50' WIDE /
BUILDING /
SETBACK UNE /
/
/
/
/
/
_ EXISTING 20' WIDE
UTILITY AND GAS
/ EASEMENT
/
EXISTING TREE, TYP.
/ /FG /
G /
/ EXISTING 20' WIDE
/ UTIUTY EASEMENT
/ /G GF° / / / G
/ /
f
/ \,nJlnw�i'S i CrS�
1-1
/
J
S` C ��-
3
Z-2
/G
PROPOSED VERIZON 9'-0" / C
e x 24'-6" LEASE AREA o/f
/ /
G .\
1p
Y G� /4°
SITE PLAN
/ /
EXISTING R.O.W. LINE.
EXISTING TEN UTILITY POLE, TO BE .
REMOVED AND REPLACED /
r"o
PROPOSED 5T0" TALL TEPUTILITY POLE (BY UTILITY)
EXISTING UNDERGROUND
FIBER OPTIC UNE, TYP.
44 / EXISTING UNDERGROUND
/ WATER LINE, TYP.
T4° `
O 110,
�90Oa
06IPO /
--\\ /
V-
24'k30"SCALE; 1" = 5'
11 k17" SCALE: 1`= 11'
EXISTING OVERHEAD
ELECTRICAL LINE, TYP.
EXISTING UNDERGROUND
ELECTRICAL LINE, TYP.
PREPNRED FOR.
verizon
128 W. GEMINI DR. TEMPE. AZ B52B0
PHONE (480)7T7-
FAX (480) 777-4391
QPINNACLE
Consiructgn aro�eci Ma v�- �I ��Ie DevEl":prrv_nt
1426 N MARMN STREET # tot
GILBERT, AZ 85233
PROJECT NO: TUC RAM
DRAWN BY: CGS
CHECKED BY: KF
IIIIII'IIIIIIIIIIIII'-IIIIIII'
FINAL
FOR FOR ZONING
ONLY
TUC RAM
11167 N. ORACLE ROAD
ORO VALLEY, AZ 85737
PIMA COUNTY
SH EET TITLE
SITE PLAN
SHEET NUMBER
Z-1
5 1' 3 1
EXISTING UNDERGROUND
GAS UNE, TYP.
NEW COAXIAL CABLE TABLE
SECTOR
AZIMUTH
LENGTH
OTY,
SIZE
TYPE
ALPHA
50°
1100,
2
11/4"0
HYBRIFLEX CABLE
BETA
170'
GAMMA
290'
NOTE:
ALL AZIMUTHS SHOWN ARE RELATIVE TO TRUE NORTH, UNLESS
NOTED OTHERWISE
'IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY
AZIMUTHS DEPICTED HEREIN WITH RF DEPARTMENT PRIOR TO
INSTALLING ANTENNAS.
CABLING DETAIL
*NOTE:
• ALL AZIMUTHS SHOWN ARE RELATIVE TO TRUE
NORTH, UNLESS NOTED OTHERWISE
• IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO
VERIFY AZIMUTHS DEPICTED HEREIN WITH RF
DEPARTMENT PRIOR TO INSTALUNG ANTENNAS
PROPOSED STEALTH SCREENING
(DESIGN BY OTHERS)
PROPOSED VERIZON
STACKED REMOTE RADIO
HEAD, (4) PER SECTOR FOR
(3) SECTORS
PROPOSED POLE
EXTENSION SECTOR
FRAME W/ (2) ANTENNA
PIPE MOUNTS (DESIGN
BY OTHERS)
ANTENNA PLAN
EXISTING TREW-TYP.q-
I
PROPOSED VERIZON
PANEL ANTENNAS (2)
PER SECTOR FOR (3)
SECTORS
(1) PROPOSED
VERIZON OVP
MOUNTED ON
ANTENNA MOUNT
PROPOSED 57'-0"TALL
TEP UTILITY POLE (BY
UTILITY)
24
24'x36"SCALE:1/2"=1'-0'kt ]`SCALE: 1/4'= 1-0' " 12 1 ENLARGED SITE PLAN
'
y
9 a
N J
O
w
m �
EXISTING UNDERGROUND
WATER UNE, TYP.
� I
EXISTING OVERHEAD
ELECTRICAL LINE, TYP.
o EXISTING UNDERGROUND
ELECTRICAL LINE, TYP.
EXISTING UNDERGROUND
FIBER OPTCI UNE, TYP.
EXISTING TEP UTILITY POLE, TO BE
—FO REMOVED AND REPLACED
� o
oW
i-a
0
7
PROPOSED 57'-0" TALL TEP
UTILITY POLE (BY UTILITY)
IN
III
ZON LEASE AREA
2'-Z' (2) PROPOSED 4" CONDUITS
LOCATED BELOW GRADE
11 o—UGE—U[
FUTURE VERIZON CABINET �wE
WE-UPe�
UGE�
(4) PROPOSED. WIDE ACCESS DOORS
I
FUTURE VERIZON OVP
MOUNTED ON H-FRAME
(1) PROPOSED VERIZON OVP
MOUNTED ON H-FRAME
I�
PROPOSED VERI ION 200A OUTDOOR RATED INTEGRATE[
LOAD CENTER ON PROPOSED H-FRAME
I
PROPOSED VERIZON GPS ANTENNA
I
PROPOSED VERIZON CABINET MOUNTED
TO PROPOSED PLATFORM
PROPOSED 5'x13' WIDE ELEVATED PLATFORM
WITH B' TALL STEALTH SCREENING
III
(2) PROPOSED 4' WIDE ACCESS DOORS
9
PROPOSED VERIZON TELCO
DEMARCATION ON PROPOSED H-FRAME
PROPOSED VERIZON METER/DISCONNECT
BANK MOUNTED TO PROPOSED H-FRAME
I
PROPOSED VERIZON 9'-0"
x 24'-6" LEASE AREA
EXISTING UNDERGROUND
4'-5" 2'-5" ELECTRICAL LINE, TYP.
I
EXISTING R.O.W. UNE.
3
3
3
3
3
3
3
3
PREPARED FOR'.
■
verizon
126 W, GEMINI DR. TEMPE. AZ BU83
PHONE (480) ]]74360
FAX (480)
PINNACLE
LTING, INC.
COrtstrucl.,n pll' iNnw3ement Sne DeveloPn�eM
1426 N. MARVIN STREET # 101
GILBERT. AZ 85233
PROJECT NO'
TUC RAM
DRAWN BY:
CGS
CHECKED BY:
KF
11111111111111111-
I I I I I,
III♦IIIIIIII■—III■
III♦IIIIIIII♦—III♦
FINAL
FOR ZONING
ONLY
3
TUC RAM
3
11167 N. ORACLE ROAD
ORO VALLEY, AZ 85737
PIMA COUNTY
3
SHEET TUt
ENLARGED SITE PLAN
AND ANTENNA PLAN
SHEET NUMBER
Z-2
24'k38"SCALE: B/B'=7'-0'
11 k17' SCALE Z. 3
I$ TOP OF PROPOSED VERIZON ANTENNAS
Y ELEVATION 70'-0" A.G.L
*r.fAT9BLiNE4EPAD2DaE�, IR ZQNANTENNAS---
ELEVATION 66'-0" A.G.L
40 TOP OF PROPOSED TEP UTILITY POLE
ELEVATION 57'-0" A.G.L
J� TOP OF EXIS ING OVERHEAD LINE
ELEVATION 51'-0" A.G.L
J� TOP OF EXISTING OVERHEAD LINE
V ELEVATION 48'-0" A.G.L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 45'-0" A.G. L
STOP OF EXISTING OVERHEAD LINE
ELEVATION 42'-0" A. G.L
n TOP OF EXISTNG OVERHEAD LINE
V ELEVATION 36I-0" A.G.L
n TOP OF EXISTING OVERHEAD LINE
V ELEVATION 24'-0" A. G.L
PROPOSED VERIZON
GPS ANTENNA
PROPOSED 5'x13' WIDE _
ELEVATED PLATFORM WITH
8' TALL STEALTH
SCREENING
x
PROPOSED VERIZON
TELCO DEMARCATION ON i
PROPOSED H-FRAME
PROPOSED VERIZON METER/DISCONNEC
BANK MOUNTED TO
PROPOSED H-FRAME
EXISTING GRADE
NEW SOUTHEAST ELEVATION
PROPOSED STEALTH SCREENING
(DESIGN BY OTHERS)
PROPOSED VERIZON PANEL
ANTENNAS (2) PER SECTOR FOR (3)
SECTORS
PROPOSED POLE EXTENSION
SECTOR FRAME W/ (2) ANTENNA
PIPE MOUNTS (DESIGN BY OTHERS)
PROPOSED VERIZON STACKED
REMOTE RADIO HEAD, (4) PER
SECTOR FOR (3) SECTORS
(1) PROPOSED VERIZON OVP
MOUNTED ON ANTENNA MOUNT
EXISTING TEP UTILITY POLE, TO BE
REMOVED AND REPLACED
PROPOSED 57'-0" TALL TEP
UTILITY POLE (BY UTILITY)
(2) PROPOSED VERIZON HYBRID
CABLE(S) ROUTED ALONG INSIDE
OF PROPOSED TEP UTILITY POLE.
PROPOSED VERIZON CABINET
MOUNTED TO PROPOSED
PLATFORM
PROPOSED VERIZON 200A OUTDOOR
RATED INTEGRATED LOAD CENTER
ON PROPOSED H-FRAME
(1) PROPOSED VERIZON OVP
MOUNTED ON H-FRAME
FUTURE VERIZON OVP
MOUNTED ON H-FRAME
(2) PROPOSED 4" CONDUITS
LOCATED BELOW GRADE
ih TOP OF PROPOSED VERIZON ANTENNAS
Y ELEVATION 70'-0" A.G.L
ELEVATION 56-0" A.G.L
$TOP OF PROPOSED TEP UTILITY POLE
ELEVATION 57'-0" A.G.L i^
TOP OF EXISTING OVERHEAD LINE
Y ELEVATION 51'-0" A.G.L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 48'-0" A.G,L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 45'-0" A. G.L
TOP-OF',EXISTING OVERHEAD LINE
ELEVATN 42'-0" A. G.L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 36'-0" A.G. L
I$ TOP OF EXISTING OVERHEAD LINE
ELEVATION 24'-0" A. G.L
EXISTING GRADE
PROPOSED STEALTH SCREENING
(DESIGN BY OTHERS)
PROPOSED VERIZON PANEL
ANTENNAS (2) PER SECTOR FOR (3)
SECTORS
PROPOSED POLE EXTENSION
SECTOR FRAME W/ (2) ANTENNA
PIPE MOUNTS (DESIGN BY OTHERS)
PROPOSED VERIZON STACKED
REMOTE RADIO HEAD, (4) PER
SECTOR FOR (3) SECTORS
(1) PROPOSED VERIZON OVP
MOUNTED ON ANTENNA MOUNT
PREPARED FOR
verizon✓
126 W. GEMINI OR TEMPE. A2 —83
PHONIE (aefi) n7rafi0
FAX (480) 71713B,
CONSULTING FIRM
PINNACLE
Go, —lqn P,,,I-Management Ste Develop—,
1426 N. MARVIN STREET # 101
GILBERT. AZ 85233
PROJECT NO'. TUC RAM
I
DRAWN BY CGS
I
CHECKED BY. KF
PROPOSED VERIZON
GPS ANTENNA _
PROPOSED VERIZON CABINET
MOUNTED TO PROPOSED
PLATFORM
x
PROPOSED VERIZON 200A OUTDOOR —
RATED INTEGRATED LOAD CENTER
ON PROPOSED H-FRAME
t =
(1) PROPOSED VERIZON OVP
MOUNTED ON H-FRAME
FUTURE VERIZON OVP
MOUNTED ON H-FRAME -
\� (2) PROPOSED 4" CONDUITS
LOCATED BELOW GRADE
11M7SCALE'3K 1 NEW NORTHWEST ELEVATION
EXISTING TEP UTILITY POLE, TO BE
REMOVED AND REPLACED
PROPOSED 5T-0" TALL TEP
UTILITY POLE (BY UTILITY)
(2) PROPOSED VERIZON HYBRID
CABLE(S) ROUTED ALONG INSIDE
OF PROPOSED TEP UTILITY POLE.
PROPOSED 5'x13' WIDE
ELEVATED PLATFORM WITH
8' TALL STEALTH
SCREENING
PROPOSED VERIZON —
TELCO DEMARCATION ON
PROPOSED H-FRAME
PROPOSED VERIZON
METER/DISCONNECT
BANK MOUNTED TO
PROPOSED H-FRAME
2Yk.. SCALE:
tlwt]' SCA LE
III�III��®
—III■
--�IIIII,
—III■
FINAL
FOR ZONING
ONLY
TUC RAM
11167 N. ORACLE ROAD
ORO VALLEY, AZ 85737
PIMA COUNTY
SHEET TITLE
ELEVATIONS
SHEET NUMBER
Z-3
OOIOOPOSED VERIZON ANTENNAS
ET'-0" A.G.L
QLMI3LLHF QE-ER0R!Q3FG YERIZIMANTENNAS---
ELEVATION 66'-0" A.G.L
TOP OF PROPOSED TEP UTILITY POLE
ELEVATION 57'-0" A.G.L
J TOP OF EXISTING OVERHEAD LINE
Y ELEVATION 51'-0" A.G.L
I\ TOP OF EXISTING OVERHEAD LINE
ELEVATION 48'-0" A.G.L
&TOP OF EXISTING OVERHEAD LINE
ELEVATION 45'-0" A. G.L
n TOP OF EXISTING OVERHEAD LINE
J' ELEVATION 42'-0" A. G.L
p TOP OF EXTING OVERHEAD LINE
Y' ELEVATIOISN 36'-0" A. G.L
n TOP OF EXISTING OVERHEAD LINE
ELEVATION 24'-0" A. G.L
26'-2"
TO BACK OF CURB
EXISTING GRADE
NEW SOUTHWEST ELEVATION
PROPOSED STEALTH SCREENING
(DESIGN BY OTHERS)
PROPOSED VERIZON PANEL
ANTENNAS (2) PER SECTOR FOR (3)
SECTORS
PROPOSED POLE EXTENSION
SECTOR FRAME W/ (2) ANTENNA
PIPE MOUNTS (DESIGN BY OTHERS)
PROPOSED VERIZON STACKED
REMOTE RADIO HEAD, (4) PER
SECTOR FOR (3) SECTORS
(1) PROPOSED VERIZON OVP
MOUNTED ON ANTENNA MOUNT
EXISTING TEP UTILITY POLE, TO BE
REMOVED AND REPLACED
PROPOSED 57'-0" TALL TEP
UTILITY POLE (BY UTILITY)
x
(2) PROPOSED VERIZON HYBRID
CABLE(S) ROUTED ALONG INSIDE
x OF PROPOSED TEP UTILITY POLE.
v..-1�
PROPOSED VERIZON CABINET
MOUNTED TO PROPOSED
PLATFORM
PROPOSED 5'x13' WIDE
ELEVATED PLATFORM WITH
8'TALL STEALTH
SCREENING
(2) PROPOSED 4" CONDUITS
LOCATED BELOW GRADE
ELEVATPROPOSED VERIZON ANTENNAS
ION 70'-0" A.G.L
CCMFRLWF-Qf-EaOPOSEQYERIZQCLAN.TENNAS _-_
ELEVATION 66'-0" A.G.L
TOP OF PROPOSED TEP UTILITY POLE
ELEVATION 5T-0" A.G.L
f� TOP OF EXISTING OVERHEAD LINE
�' ELEVATION 51'-0" A.G.L
J� TOP OF EXISTING OVERHEAD LINE
ELEVATION 48'-0" A. 6.1-
n TOP OF EXISTING OVERHEAD LINE
V ELEVATION 45'-0" A.G.L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 42'-0" A.G. L
TOP OF EXISTING OVERHEAD LINE
ELEVATION 36'-0" A. G.L
\ /
�( PROPOSED 5'x13' WIDE
? ELEVATED PLATFORM WITH
8'TALL STEALTH
SCREENING
EXISTING GRADE
0
24k36"SCALE .. 3;16'32'
1`° 11 1 NEW NORTHEAST ELEVATION
1tk17"SCALE'. 3!' t'�0
PROPOSED STEALTH SCREENING
(DESIGN BY OTHERS)
PROPOSED VERIZON PANEL
ANTENNAS (2) PER SECTOR FOR (3)
SECTORS
PROPOSED POLE EXTENSION
SECTOR FRAME W/ (2) ANTENNA
PIPE MOUNTS (DESIGN BY OTHERS)
PROPOSED VERIZON STACKED
REMOTE RADIO HEAD, (4) PER
SECTOR FOR (3) SECTORS
(1) PROPOSED VERIZON OVP
MOUNTED ON ANTENNA MOUNT
of o
x EXISTING TEP UTILITY POLE. TO BE
REMOVED AND REPLACED
PROPOSED 57'-0" TALL TEP
UTILITY POLE (BY UTILITY)
i(2) PROPOSED VERIZON HYBRID
CABLE(S) ROUTED ALONG INSIDE
OF PROPOSED TEP UTILITY POLE.
x
PROPOSED VERIZON
GPS ANTENNA
PROPOSED VERIZON CABINET
MOUNTED TO PROPOSED
PLATFORM
PROPOSED VERIZON
METER/DISCONNECT
BANK MOUNTED TO
PROPOSED H-FRAME
26'-2"
TO BACK OF CURB
(2) PROPOSED 4" CONDUITS
LOCATED BELOW GRADE
24k36' SCALE: 3/18" = 1'-0"
I tkt7"SCALE: 1(16' = 1-0'
PREPARED FOR
verizon✓
126 W. GEMINI DR. TEMPE. AZ 85283
PHONE (480) 7774—
FAX (480) 7774391
PINNACLE
-„r�st,uclr�n Prolxt Maregement Site Oevelopmen;
1426 N. MARVIN STREET # 101
GILBERT, AZ 85233
PROJECT NO: TUC RAM
DRAWNBY. CGS
CHECKED BY KF
REV DATE DESCRIPTION BY
A 02 25 18 90--::ZONING CGS
0 O4i23: 18 100 _ ZONING JMC
FINAL
FOR ZONING
ONLY
TUC RAM
11167 N. ORACLE ROAD
ORO VALLEY. AZ 85737
PIMA COUNTY
\ SHEET TITLE
ELEVATIONS
SHEET NUMBER
Z-4
2