HomeMy WebLinkAboutPackets - 3-15-23 Meeting PresentationsTown Council Meeting
Regular and Study Session
March 15, 2023
Town Council Meeting
Announcements
Upcoming meetings
Meetings are subject to change. Check the Town website for meeting status.
Stormwater Utility Commission Meeting
March 16 at 4 p.m.
Hopi Conference Room
Town Council Special Session
March 16 at 6 p.m.
Council Chambers
Budget and Finance Commission
March 21 at 4 p.m.
Council Chambers
Town Council Special Session
March 22 at 6 p.m.
Council Chambers
Board of Adjustment –CANCELED
March 28 at 3 p.m.
Council Chambers
Town Council Special Session
March 29 at 5 p.m.
Hopi Conference Room
Town Council Special Session
March 30 at 5 p.m.
Hopi Conference Room
Historic Preservation Commission
April 3 at 5 p.m.
Hopi Conference Room
Planning and Zoning Commission -CANCELED
April 4 at 6 p.m.
Council Chambers
Town Council Regular Session
April 5 at 6 p.m.
Council Chambers 4
Town Council Meeting
Regular and Study Session
March 15, 2023
6
Jaden Wu
BASIS Oro Valley, 11th Grade
Spotlight on Youth
Town Council Meeting
Regular and Study Session
March 15, 2023
8
Town Council Meeting
Regular and Study Session
March 15, 2023
Public Hearing: Grading Exception, Conceptual Site and
Landscape Plans and Architecture for a proposed
commercial development
March 15, 2023
Purpose
Lambert LaneAthletic Field
Applicant’s requests
Item A: Amendment to Grading Exception
Item B: Conceptual Site and Landscape Plans
Item C: Architecture
Commission recommendation
Discussion and possible action
Location Map
Oro Valley
Library
Cañada
Hills
Copper
Creek
History and Background
1983: Zoned Area D (Commercial) in the El
Conquistador Planned Area Development
(PAD)
Enabled commercial uses
Traffic Plan established access to La Cañada Drive
and Naranja Drive
2006: Grading Exception approved by Town
Council
Included numerous conditions to limit impacts to
surrounding neighbors including building height,
screening, etc.
2023: Conditional Use Permit conditionally
approved by Town Council
Traffic key focus
Item A: Amendment of Grading Exception Condition
Concept Plan as part of Grading Waiver
2006 Grading Exception required:
15-foot landscape area outside of
drainage channel
6-foot screen wall adjacent to residential
properties
Grading Waiver Concept Plan vs. Applicant’s New Plan
Concept plan as part of Grading Waiver Applicant’s new plan
Item A: Amendment of Grading Exception Condition
Proposed changes:
Remove additional 15-foot landscape
requirement
Site design meets 30-foot buffer yard
requirement
Remove 6-foot screen wall requirement
Code requires a 5-foot screen wall and
overlapping tree canopy adjacent to
residential properties
Conditions of Approval to maintain
landscape requirements Drainage channel
Item B: Conceptual Site Plan and Landscape Plan
Three office buildings totaling ~18,000 square feet
2,055 square foot drive-thru
Access from La Cañada Drive and Naranja Drive
Exterior screen walls and landscaping
Pedestrian courtyard areas
20% of site retained as landscaped open space
30-foot landscaped buffer yards adjacent to residential
properties and roadways
Overlapping tree canopies
50% of site must be developed before drive-thru can
be operational
Naranja Dr.La Cañada Dr.Office BuildingDrive-thru
Item B: Conceptual Site and Landscape Plans -Compatibility
Strategic placement of office buildings
screens commercial activity from
neighbors:
Traffic
Parking lot lighting
Building signage
Noise
No “back of house” activities
Drive-thru located as far from neighbors as
possible
Buffer yards and screen walls adjacent to
neighbors
Item C: Architecture
Item C: Architecture
Review Criteria
Conformance with the Your Voice, Our Future General Plan
Goals and Policies
Community Goal D:A community with a wide range of services, amenities, shopping
and dining opportunities and housing types that meet the needs of current and
future residents.
Development Goal X:Effective transitions between differing land uses and
intensities in the community.
Policy CC.6:Promote the creation of unique community gathering places that are
inviting, walkable, attractive and vibrant and offer commercial, entertainment or
cultural activity.
Policy LU.5:Provide diverse land uses that meet the Town’s overall needs and
effectively transition in scale and density adjacent to neighborhoods.
Existing General Plan Land Use: Neighborhood/Commercial Office
Traffic and circulation
Compatibility with the surrounding area
Conformance with PAD and all applicable Zoning Code
requirements
Public Participation
Informational video
Two neighborhood meetings
Key concerns:
Traffic and safety
Noise
Drive-thru type and feasibility
Building heights and views
Odor
Impact to property values
Planning and Zoning Commission and Town Council action
Public hearing held on January 10, 2023
Staff recommendation
Traffic was key topic of focus and concern
Planning and Zoning Commission
recommendation
Grading Exception Amendment
Conceptual Site and Landscape Plan
Architecture
Town Council action
Conditional Use Permit
Summary
Lambert LaneAthletic Field
Reviewed for conformance with PAD and
Zoning Code Criteria and the General Plan
Planning and Zoning Commission
recommendations
Discussion and possible action
Ñ
Town Council Meeting
Regular and Study Session
March 15, 2023
Community Engagement Strategy for the
2026 General Plan
March 15, 2023
36
37
Purpose of the Community Engagement Strategy for the General Plan
Community Engagement Plan establishes
the tools and methods to:
Achieve voter ratification
Create an actionable General Plan that reflects the
community’s vision and values
Inspire confidence to implement over 10-year
duration
Reflects the values and methods
identified by residents through a survey
and advisory group
Planning and Zoning Commission
recommended approval
38
Voter Ratification
2016 effort = 71% approval rate
Community awareness and ownership is critical to
achieving a high approval margin
Must have all residents aware of the process
Must have advocates in the community
Town staff can educate but not advocate
39
Beyond the vote –Importance of Community Input
A community-driven, 10-year document guiding Town decisions
The General Plan:
Sets the values, vision, goals and priorities that build on Oro
Valley’s quality of life
Builds a sense of community by reflecting the diverse
perspectives of all residents
Provides a roadmap that guides Town decisions
Provides continuity and certainty that results will be achieved
Identifies shared priorities of all age groups
Is a living document, ensuring flexibility and relevance over time
Represents the community’s proposed action plan
40
Beyond the vote -Importance of Community Input
Plan must reflect the community’s broad range of demographics to stay relevant and useable over 10-year timeframe
41
Beyond the vote -Importance of Community Input
Land Use Circulation Open Space Growth Area Environmental
Planning
Cost of
development Water Conservation Recreation Public Facilities
and Services
Public Buildings Housing Economy Safety Bicycle
Energy Cultural
Resources
Redevelopment
and
Rehabilitation
Neighborhood
Revitalization Other
Required by state law
in 2016
Additional elements
included in 2016
New elements for 2026
The extent of change or key areas of focus are unknown until we get out in the community
Elements based on
community input and state
law requirements
42
Community Engagement Plan
Community participation and ownership of the General Plan process is critical
Outlines tools and opportunities to:
Provide diverse and meaningful opportunities to voice
ideas and concerns
Target the Town’s full range of demographics
Instill a high level of confidence to prioritize completion of
identified General Plan action items over the next ten
years
Help translate intensive community awareness and
involvement into a high approval margin in 2026
43
Plan is Unique –Created by a Resident Advisory Group
Advisory Group members:
Board of Adjustment
Budget and Finance Commission
Historic Preservation Commission
Parks and Recreation Advisory Board
Planning and Zoning Commission
Stormwater Utility Commission
Water Utility Commission
Youth Advisory Council
Town Council
44
Plan is Unique –Built on Resident Input
Current Notification Preferred
Tier
1
Vista Newsletter
Town’s main website
Explorer
Non-Town managed social media
Email
Website
Text
Tier
2
P&R email blasts
Town social media
Media release emails
HOAs
PlayOV.com
Vista newsletter
Social media
Press release
Other existing
Newsletters
Tier
3
Meetings or events
Other Town emails
OV Chamber of Commerce
Flyers or handouts
Explorer
Flyers
Survey promoted through:
Town Vista Newsletter
Explorer ad and article
Press release
Social media
Direct emails
Boards and Commissions
706 respondents:
Self-selected to participate
More older adults (51+) responded than
young adults (18-50)
36% moved here in the past 5 years
45
“Must-do’s” for community engagement
Guiding Principles
Inclusive and prioritize community input
Engaging and effective
Organized, efficient and timely
Fair and open
Understandable and accessible
46
Input from all residents is top priority!
Key Stakeholders
Priority #1 -Work closely together with residents to get
involved and reach consensus on the community’s vision,
values, and goals and elements of the General Plan
Priority #2 -Work together with interested parties and
field experts to share ideas and information
Priority #3 -Work with regulatory groups to gather
information and consult on goals, policies, and actions
47
Communication Methods and Tools
General
Plan
Phase 1 Phase 2 Phase 3Various tools and methods
implemented during different phases
of the project
Phase 1 = Highest amount of community
outreach to raise awareness and gather
feedback
Phase 2 = Focused committee work to take
the community’s input and turn it into an
action plan
Phase 3 = Community review to make sure
we got it right and promote the vote
48
General awareness
Communication Methods and Tools
Purple notes added by the advisory group
Use traditional tools that were
successful in 2016
Interactive website
Meeting people out in the community
Survey in multiple methods
Incorporate new tools to
increase general awareness and
transparency
Videos
Mapping
Text messaging subscriptions
Signs
49
Targeted Engagement
Communication Methods and Tools
Resident input is top priority
Ambassadors
Events
Committees
Stakeholder groups
1:1 interviews
Forums and summits
Committees
Regulatory groups
Meetings and workshops
State-required reviews, etc.
Purple stars added by the advisory group
50
Strategy for Community Engagement
Project Phase Fiscal Year Estimated Cost for
Engagement Tools
Estimated
Personnel Costs
1: Let’s Talk FY 23/24 $192,714.86 $90,829.36
2: Let’s Plan FY 24/25 $87,951.86 $90,829.36
2-3: Let’s Plan
& Make it so FY 25/26 $52,009.00 $90,829.36
3: Make it so FY 26/27 $62,822.68 $45,414.68
Budget will be evaluated and adjusted accordingly each fiscal
year.
Comprehensive and multi-layered approach
Mix of traditional and new tools
Refined to emphasize social media and eliminate network
advertising
Cost of single topic plans: 100K -250K
Parks and Recreation Master Plan –177K
Vistoso Preserve Master Plan -100K
Trails Master Plan –Est. 100K-150K
Transportation design standards –Est. $250K
General Plan includes 19+ topics
Divided between 4 fiscal years
Majority of budget is people power (temporary staff and
consultants) to facilitate and implement the Community
Engagement Plan
Phase 1 is highest cost = most community outreach
Future costs are estimates only –change based on community
input and need
51
Previous Effort vs. Proposed Estimates
30%
5%3%4%1%
57%
38%
4%3%7%3%
45%
0%
10%
20%
30%
40%
50%
60%
Consultant
and
Website
Advertising Promotion
and
Supplies
Printing
and
Mailing
Meetings
and Events
Temporary
Project
Personnel
Previous Effort vs. Proposed Effort
Previous Effort Proposed Estimates
Facilitating community engagement is
the main cost of the General Plan
effort
Estimated project costs are in-line with
the 2016 effort –increase cost due to
inflation and new tools to raise
awareness and transparency
Consultant costs -video design and production
Printing and mailing –sending postcards to all
households and all voters
Meeting and event costs -using polling
software and supporting more meetings and
events than previous effort
52
Next steps in the General Plan process
Community
Engagement
Plan
Official Public
“Kick-Off”
Committee
Work
Adoption and
Ratification
We
Are
Here
Community Engagement Throughout Entire Process
Branding and naming of the next General Plan
Volunteer opportunities to help gather community input and spread the word
Focused committee work to development goals, policies and actions
Routine check-ins with Town Council, boards and commissions
53
Summary and recommendation
The Community Engagement Plan creates a robust
strategy to:
Achieve a high margin of approval by the voters in 2026
Create an actionable General Plan reflective of the
community’s vision and value
Inspire confidence to implement over 10-year duration
Reflects the values and methods identified by residents
through a survey and advisory group
Shared opportunities and concerns
Built consensus among participants
Planning and Zoning Commission recommended
approval
Town Council Meeting
Regular and Study Session
March 15, 2023
V
I
S
T
O
S
O
T
R
A
I
L
S
MASTER
PLAN
Town
Council
Study Session
March 15, 2023
Oro Valley
Council Chambers
11000 North La Cañada
Drive
The goal of the master plan process is to create a working document that:
•Addresses the long-term protection of the site ecological and cultural resources.
•Provides educational opportunities for a wide-range of user groups that is inclusive of all ages and abilities.
•Creates site-sensitive passive recreational attributes that blend the built environment within the natural surroundings.
•Addresses fiscal responsibility.
Master Plan Goals
•Create a system of looped walking/biking trails.
•Provide natural surface trails for walking.
•Create separate areas for wildlife viewing.
•Connect the Preserve trail system to the Town trail system.
•Provide dispersed parking areas and directional signage.
•Repurpose the former pond for habitat, education and wildlife viewing.
•Provide an area for family gatherings by the former pond area.
•Repurpose the former driving range area to include educational gardens.
•Provide educational programming for habitat and dark sky viewing.
•Address wash area erosion and safe crossing concerns.
•Create natural structures and water features to support habitat.
•Re-establish native vegetation throughout the Preserve.
•Provide shade and seating areas.
•Develop operations and management protocols.
Programming Suggestions Summary
Community Input Received to Date
(Survey, Interviews, Workshops and Public Meetings)
“KEEP IT SIMPLE AND NATURAL”
Educational Recommendations
Best Practices
Adopting and applying best practices will ensure that programs at Vistoso Trails Nature Preserve are relevant and
authentic for each target audience, outcome-based, and reflective of Oro Valley Parks and Recreation
Department’s mission statement. We offer the following suggestions to help ensure that programs succeed in
delivering place-based experiences and cultivating Preserve stewards among an enthusiastic and receptive
student audience.
Test the Waters
Before an education program is developed, staff will need to more fully assess receptivity among the school audience and Town staff.
Integration of recommendations in the Preserve’s master plan, determining sources of funding for site improvements and teaching
supplies, and assignment of Town and District staff to design and pilot-test the program(s) will be critical. Department staff should
also assess capacity. Are there adequate numbers of staff and docents to do this work without straining the resources that support
the Preserve? What role will Preserve Vistoso play in the recruitment, training, and management of docents? Will these programs
complement, not duplicate, programs already taking place in nearby communities? Will these programs celebrate the uniqueness of
Vistoso Trails Nature Preserve and help cultivate a sense of place?
Embrace Backward Design
We recommend using a program development practice championed by curriculum developers Grant Wiggins and Jay McTighe and
business strategists, including Stephen Covey. Rather than begin with preferred topics and instructional activities, we suggest
beginning with the end—the desired results—in sight. This backwards approach brings content standards, performance expectations,
and goals and objectives to the forefront of curriculum planning.
Typically, backward design encompasses three stages of planning:
Phase One: identify desired results or curriculum expectations. Identify the big ideas (the “enduring understanding”) as well as broad
goals and specific, measurable objectives.
Phase Two: determine acceptable evidence and identify appropriate assessment tools.
Phase Three: plan the learning experiences and instruction. Determine what activities, materials, and resources are needed in order to
achieve desired results.
Mix It Up
We recommend that the Preserve offer education programs that span grade-group levels, ages, content, time commitments, and experiences. At the
same time, we encourage staff to start slowly by pilot-testing a program(s) and refining it (them) based on student/faculty feedback.
For formal programs, flexibility is key to accommodating varying needs of teachers which can be dictated by bus schedules. This could mean offering
the field programs and field/classroom lab programs in blocks of 1 hour, 1.5 hours, and 2.5 -3 hours. Regardless of time spent at the Preserve, the
District requires that all students return to school by 1 p.m.
Programming Governance
State Governance, District Governance, Oro Valley Parks and Recreation and interviews with educators.
Proposed School Programs
The Acorn Group recommends that three on-site programs spanning K-6 are developed. Two focus on science; one focuses on history-social science.
Each can be academically robust, providing structured opportunities that extend and build upon classroom learning. At the same time, each can be
well poised to facilitate student understanding of a “sense of place.” This is particularly possible if field trips to the Preserve are spiraled throughout the
K-6 curriculum, taught either in traditional classrooms or in homeschools. By focusing on place-based instruction and celebrating the Preserve as a
community-based asset, OV Parks and Recreation can promote excitement and appreciation for the Preserve, the broader region, and students’ place
within it.
Given the class schedules adopted by middle and high schools, field trips are not easily scheduled at these levels. Instead, the Preserve can be
considered a site for community service projects taking place on weekdays after school and on weekends. Such work could include habitat care and
restoration, as well as interpretation (e.g., leading weekend tours).
Science
Discovering the Desert, grades K-2 -We see a K-2 program, called Discovering the Desert, as a primary program dedicated to cultivating student’s
sense of place. It celebrates the essence of place and answers seemingly basic questions, such as “Where am I?” and “What is the nature of this place?”
As members of the community of Oro Valley, students take stock of the nearby desert, their neighbors (the resident and migratory species with whom
they share the desert), and the uniqueness of the setting.
Such a program requires that students fine-tune their observation skills and sensory perception. They take part in a guided walk at the Preserve, learn
to record observations in a nature journal, and hon the skills of a naturalist. Led by trained docents, they begin to expand their senses, interpret the
language of birds, track wildlife, and negotiate a special “sit spot,” likely near the pond, where they each sit quietly and take stock of the desert’s
activity. After a few minutes, they reconvene and share their experiences.
Discovering the Desert is student-focused. Trained docents serve as facilitators of experiences rather than dispensers of information. The program
requires very little equipment—just nature journals and possibly student-grade binoculars and hand lenses. A small bird blind near the pond would
expand bird-watching opportunities.
Exploring the Desert, grades 3-6 -This program builds upon the Discovering the Desert program and further reinforces the skill sets of a naturalist. It
also introduces the role of technology in science. Students explore the Preserve where they use smartphones to access apps and record their
observations. They assume the role of community scientists, taking photographs of the plants, animals, and phenomena they notice during their visit,
and recording the time, location, and conditions. Possible apps include iNaturalist, Project Noah, Journey North, Nature’s Notebook, Bumble Bee
Watch, eBird, eButterfly, and SpiderSpotter.
Journey North, for example, tracks seasons and migrations of such animals as hummingbirds and orioles, both of which are present at the Preserve.
Students can submit their observations and teachers can access numerous resources, including suggestions for activities that build vocabulary,
enhance comprehension skills related to reading and map-making, strengthen inquiry skills, and explore environmental concepts.
This could be an exciting, authentic way to record observations; however, it comes with caveats. 1. Parents would need to be informed that their
children are accessing science-based apps that do not collect or compromise personal information nor lead the user to any other sites. Their written
permission would need to be secured for this activity. 2. To ensure equity and inclusion, the Preserve would need to have some spare smartphones
available for use by students who do not have smartphones.
Caveats aside, this presents a remarkable opportunity for students to become researchers and contribute to a project that connects their class to a
larger community. It also supports STEM and STEAM initiatives.
History and Social Science
Discovering the Past, grades 3-5 -The Preserve is home to a former Hohokan native village called Sleeping Snake. Covering nearly 100 acres, it consists
of a ball court site that has yielded numerous artifacts that reveal information about community structure, social organization,and trade dating back
to 950-1150 A.D. during its most intensive occupation.
While the village site is off limits, we recommend that OV Parks and Recreation consider developing a fabricated archaeological dig site elsewhere at
the Preserve for use to teach history. The pit could contain concrete-cast artifact replicas that are secured at various depths.Students on a field trip
would learn how to establish a grid, uncover the site, record the location of artifacts, learn about stratigraphy and cross-dating, and generate
hypotheses about the artifacts. At the same time, they would also learn about the importance of not disturbing real sites and not removing artifacts
when found in the field. We recommend that OV Parks and Recreation discuss the idea of a fabricated archaeological dig site with tribal
representatives to ensure that concerns are addressed.
The Acorn Group in
collaboration with
Sites Southwest
This station could take advantage of an existing sand trap site and therefore avoid disturbing habitat. A shade sail would offer protection from the Sun.
Because the materials would be exterior-grade and anchored to the pit’s floor and sides, they would hold up against the elements and not “walk away.”
While one group would be at the pit, another group would be at the petroglyphs. While created by a modern-day artist, the petroglyphs nevertheless
attempt to replicate art created thousands of years ago. Here, students would learn the difference between a petroglyph and a pictograph and the
meaning of various symbols. The last activity at this station could be an art project—creating their own rock art on kraft paper using a bleach-dipped
cotton swab.
Implications for the Master Plan
Both the interviews and the recommendations yield a few physical improvements to the site. These include a shaded, solar panel-powered outdoor
classroom where students can gather upon arrival, eat lunch, and convene at a program’s conclusion. A charging station would be helpful, given
smartphones would be used during the Discovering the Desert program. Pullouts along the existing pathways would allow small groups of students, as
well as general visitors, to step aside and pause as they view the scenery or wildlife known to frequent a particular location. Two additional elements
include the shaded fabricated archaeo pit (in an existing sand trap) and the small bird blind at the pond.
Both the outdoor classroom and the archaeo pit should be located near Innovation Academy.
Interpretive Summary
Best Practices in the Field
The following recommendations are considered “best practices”in the field of interpretation.Future development of the
Preserve’s interpretive media should reflect these qualities.Interpretive panels,other signage,interactives,digital media,and
experiences at the Preserve have purpose.These elements support the Town of Oro Valley’s mission statement,as well as the
interpretive goals identified in this summary.
•Trailheads,interpretive media,experiences,staff,and volunteers create a welcoming environment where all visitors are valued and receive equal
access to opportunities and services.
•The Preserve offers high recreational and educational value.Interpretive panels,other signage,interactives,digital media,and experiences are
enjoyable and accessible.Visitors appreciate the experience and gain knowledge and inspiration in the process.
•The interpretive panels,other signage,interactives,digital media,and experiences are meaningful.Visitors will readily embrace them because
they find them personally relevant.
•All of these elements are strategically organized:well-planned,well-designed,and guided by storylines that resonate with visitors.At the same
time,their placement invites free choice.The audience can decide the sequence and time commitment for visiting each element.
•Last,these elements reflect an overarching theme that connects various facts and concepts together.The theme organizes all the content and
makes it easier for the audience to grasp the message behind the subject matter.Understanding the “big ideas”behind the Preserve’s natural
and cultural resources and stories is an essential step in this work.
Without a thematic approach,people are less likely to find meaning that is relevant to them and easily organized within their
own minds.Linking the Preserve’s tangible elements—its landscapes,viewsheds,life forms,and artifacts—to intangible
meanings is one way to achieve this.While important in their own right,these elements can also serve as portals to deeper
meaning.
Our goal is to enhance the narrative so that visitors are inspired,open to understanding how the Preserve and larger Sonoran
Desert matter to them,and willing to adjust behaviors that better reflect desert stewardship values.
Message Hierarchy
The message hierarchy presents information in a logical and relevant manner. It consists of an overarching theme, subthemes, and subtheme-specific
key concepts. It should serve as an “advance organizer,” giving visitors a sense of where the exhibit media are going and making it easier to connect
their content to other information.
Theme
Once a golf course and now a Preserve, this site demonstrates nature’s resiliency. Plants and wildlife of the Sonoran Desert continue to “take back” the
land, increasing the richness of both the Preserve and the visitor’s experience.
Subthemes
•Thanks to Preserve Vistoso,The Conservation Fund,and the Town of Oro Valley,the Vistoso Golf Course was purchased and repurposed as a
nature preserve.
•Vistoso Trails Nature Preserve is a remarkable piece of the Sonoran Desert.Spanning over 200 acres,it is home to remarkable cacti,trees,shrubs,
and wildflowers,as well as a dazzling array of wildlife.
•Nature is resilient, but still, it can benefit from human intervention. Removal of invasive weeds and revegetation with native desert plants are
ongoing projects at the Preserve.
•The Hohokam and other Indigenous People have lived on this land for thousands of years. Resilient and resourceful, the Hohokam were
sophisticated desert farmers.
Subthemes & Key Concepts
Subtheme One -Thanks to Preserve Vistoso, The Conservation Fund, and the Town of Oro Valley, the Vistoso Golf Course was purchased and
repurposed as a nature preserve.
Key Concepts
•Key concept: The Preserve is situated on the former Vistoso Golf Course which was established in 1995-1996 and shuttered in 2018.
•Key concept: The Preserve lies adjacent to the Rancho Vistoso development within the Town of Oro Valley. The combined efforts of Preserve
Vistoso, The Conservation Fund, and the Town of Oro Valley ensured that the Golf Course property was purchased as a nature preserve.
•Key concept: The Preserve is a significant asset to the Town of Oro Valley. Not only does it offer prominent recreational and educational value, but
also ecological value.
•Key concept: The Preserve is framed by the Tortolita Mountains to the north and Coronado National Forest to the east. The Preserve’s vistas are
expansive; its landscape beckons both people and wildlife.
•Key concept: Dark skies are particularly noteworthy from the Preserve’s high points.
•Key concept: The Preserve is part of the Sonoran Desert which contains globally remarkable biological diversity. Plant communities that are present
on the Preserve are in the process of being restored.
Subtheme Two -Vistoso Trails Nature Preserve is a remarkable piece of the Sonoran Desert.Spanning over 200 acres,it is home to remarkable
cacti,trees,shrubs,and wildflowers,as well as a dazzling array of wildlife.
Key Concepts
•Key concept: The Sonoran Desert covers 120,000 square miles across five states and two countries. On a global scale, both its pollinator diversity
and reptile diversity are renowned. The Vistoso Trails Nature Preserve “returns” 200 acres to this remarkable desert.
•Key concept: A snapshot of the Sonoran Desert, the Preserve is home to numerous mammals, birds, reptiles, amphibians, and invertebrates,as well
as plants. As sections of the Preserve become restored, more wildlife will likely be attracted to it.
•Key concept: The Preserve’s wildlife is generally subdued and shy, with the exception of the javelinas, cottontails, and some of the birds.Calls and
songs often announce the presence of birds before they are seen.
•Key concept: The Preserve features plants native to the desert scrub and mesquite bosque communities. Shrubs (jojoba, creosote, chuparosa,
acacia), cacti, and succulents form medium-height clusters of scrub, while taller trees, including palo verde, mesquite, and ironwood form taller
woodlands, or bosques, especially near intermittent streambeds.
Subtheme Three -Nature is resilient, but still, it can benefit from human intervention. Removal of invasive weeds and revegetation with native
desert plants are ongoing projects at the Preserve.
Key Concepts
•Key concept: Plants that are native to this region are adapted to the desert’s growing conditions. Native wildlife recognizes them as sources of food.
Exotic species, such as the remnant Bermuda grass are not necessarily adapted to the desert’s growing conditions or controlled by or recognized by
native wildlife.
•Key concept: Volunteers and students engaged in service-learning and community service work, raise native plants in the Preserve’s nursery, and
weed and revegetate sections of the Preserve.
•Key concept: Nature is reclaiming the Preserve. Native desert plants continue to take hold and wildlife continues to frequent the Preserve as
residents and as migratory species.
Subtheme Four -The Hohokam and other Indigenous People have lived on this land for thousands of years. Resilient and resourceful, the Hohokam
were sophisticated desert farmers.
Key concepts
•Key concept: The Hohokam were present on this land and left clues of their presence. Both they and their ancestors are known for their
sophisticated irrigation systems that watered crops, including maize (corn), beans, and squash.
•Key concept: The Hohokam native village of Sleeping Snake covers 99 acres within the Preserve boundaries. Archaeological evidence indicates that
a ball court anchored the village, pit houses and terraced gardens surrounded it, and art was produced with imported pottery,obsidian, and shell.
Intensive occupation of Sleeping Snake Village occurred between 950 and 1150 AD.
•Key concept: Artist-created petroglyphs are found at the Preserve. While not authentic, the petroglyphs nevertheless represent a replication of art
created thousands of years ago.
•Key concept: A petroglyph is an image that is carved, incised, or scratched into stone. It differs from a pictograph that is painted on stone, using
natural pigments.
•Key concept: Today, descendants of the Hohokam—citizens of the Tohono O’odham Nation—remain connected to the Sonoran Desert.
The Acorn Group in
collaboration with
Sites Southwest
Existing Conditions
Existing Conditions –ADA Assessment
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Proposed Trail Plan Diagram –Option A
Existing Cart Path with Proposed Loops and ADA Trails
Section: Existing Cart Path
Existing and Proposed Trail Sections –Option A
Existing Cart Path with Proposed Loops and ADA Trails
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Section: Proposed Cart Path Loop Extension
Section: Proposed Cart Path Shoulder Improvements Option I Section: Proposed Cart Path Shoulder Improvements Option II
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Proposed Trail Plan Diagram –Option B
Existing Cart Path with Proposed Loops, Walking and ADA Trails
Section: Existing Cart Path
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Section: Proposed Cart Path Loop Extension,
Walking Trail and ADA Trails
Section: Proposed Cart Path Shoulder Improvements Option I Section: Proposed Cart Path Shoulder Improvements Option II
Existing and Proposed Trail Sections–Option B
Existing Cart Path with Proposed Loops, Walking and ADA Trails
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Proposed Trail Plan Diagram –Option C
Existing Cart Path with Proposed Loops, Nature and ADA Trails
Section: Existing Cart Path
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Section: Proposed Cart Path Loop Extension and ADA Trails
Section: Proposed Cart Path Shoulder Improvements Option I Section: Proposed Cart Path Shoulder Improvements Option II
Existing and Proposed Trail Sections –Option C
Existing Cart Path with Proposed Loops, Nature and ADA Trails
Section: Proposed Nature Trail
Driving Range
Node
Pond Node –Option A
Pond Node –Option B
Pond Node –Option C
POND AND DRIVING RANGE NODES BENEFITS MATRIX
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
P
R
O
P
O
S
E
D
V
E
G
E
T
A
T
I
O
N
Z
O
N
E
S
E
X
I
S
T
I
N
G
V
E
G
E
T
A
T
I
O
N
Z
O
N
E
S
1.Existing treatment plan for invasive plant material to continue thru 2024.
2.Determine reusability of former irrigation lines.
3.Develop phased revegetation plan based on former hole layout.
4.Remove Bermuda grass.
• Rip and contour furrow
• Seed with native grass mix and straw
• Compact area to cover native seed mix
• Time planting around monsoon season cycles
• Rip and contour furrow area
• Seed with native grass mix and straw
• Compact area to cover native seed mix
• Time planting around monsoon season cycles
• Spot treat invasive plants
• Harvest native species seeds and place throughout native grass seeded zones
• Accept rescued native plants and place throughout native grass seeded zones
Revegetation/Land Management Process
PHASING
RECOMMENDATIONS
V
I
S
T
O
S
O
T
R
A
I
L
S
DRAFT
MASTER
PLAN
Phase I –Safety, Access, Education, Revegetation
The phase will focus on the development and implementation of a main trailhead, address existing
concrete path cracks and breaks, install informational, educational, and wayfinding signage, begin
revegetation in three areas (north and south), and stabilize the existing pond.
Phase II –Accessibility and Revegetation
This phase will focus on the development and implementation of ADA trails, adding two small trailheads
adjacent to the ADA trails and continued implementation of the revegetation plan.
Phase III –Driving Range Node
This phase will focus on the development and implementation of the education and program areas
associated with the former driving range along with the continued implementation of the revegetation
plan.
Phase IV -Pond
This phase will focus on the development and implementation of approved final concept of the former
pond along with the continued implementation of the revegetation plan.
Next Steps
January –March 2023
•First Master Plan Draft presented to community via Community Workshop and Stakeholder Meetings (January) -Completed
•First Master Plan Draft presented to Parks and Recreation Advisory Board (February) -Completed
•First Master Plan Draft presented to Town Council Study Session (March)
April –May 2023
•Final Master Plan Draft presented to Parks and Recreation Advisory Board (April)
•Final Master Plan Draft presented to Town Council (May)
V
I
S
T
O
S
O
T
R
A
I
L
S
MASTER
PLAN
Questions
and
Comments
Town Council Meeting
Regular and Study Session
March 15, 2023
Presentation and Possible Discussion Regarding
the Town’s Capital Improvement Program
March 15, 2023
Overview
Capital Improvement Program
Snapshot based upon known current information
10-year CIP budget serves as planning document for future budgets (individual
project needs will be re-evaluated during each annual budget cycle)
Only funds for FY 2023/24 would be appropriated as part of the budget process
CIP Forecasts are updated annually as part of the budget process
Carryforward amounts will be updated until tentative budget is presented to
Council
Capital Fund
Capital Improvement Program
Capital fund is supported by General Fund transfers primarily from one-time
revenues, vehicle reserves for fleet replacements, bond proceeds and grants
Transfers annually from the General Fund also reflect 5% of sales tax and excess
fund balance over 30% reserve
1-2% growth for miscellaneous revenues, including sale of assets and insurance
recoveries
Capital Improvement Program
Tentative Capital Fund Forecast Resource Trends for Capital
Fund
P&R Bond proceeds already
transferred and accounted
$3.4 million transfer to the
Capital Fund in FY 2022/23 to
fund golf course irrigation
Projecting transfers to Highway
Fund and Community Center
Fund in coming fiscal years
Capital outlay reflects 10-year,
tentative CIP schedule
New police station excluded as
specific funding has not yet been
identified
Capital Improvement Program
Tentative Capital Fund Forecast Capital Fund Inversion
Capital Fund expenditures exceed
revenue in several years of the forecast
Projections do not include possible
funding for a new police station since
revenue has not yet been identified
•Rough estimates from 10-Year CIP Budget:
•FY 24/25 -$4 million
•FY 25/26 -$18 million
•FY 26/27 -$18 million
Capital Fund FY 23/24
Capital Improvement Program
FY 22/23 Carryforward FY 23/24 New Funding Grand Total
$1,288,470 $1,396,740 $2,685,210
ADA/Safety walkway concrete improvements System wide 150,000 150,000
Community Center Elevator*737,260 962,740 1,700,000
Greenock Trail Improvements*51,210 51,210
OVAC Pump Room Upgrades - Phase Two 78,000 78,000
Parks Maintenance Toro Reelmaster Mower Replacemnt 85,000 85,000
Steam Pump Ranch - Solar Lighting 71,000 71,000
Steam Pump Ranch - Tack Building 50,000 50,000
Steam Pump Ranch BBQ & Bunk House Renovations*500,000 500,000
$4,387,694 $14,178,065 $18,565,759
CC Parking Lot Reconstruction & Expansion*200,000 400,000 600,000
Golf Course Irrigation Phase 2 (La Cañada Course)*2,000,000 2,000,000
MUP – Phase I - La Cañada Dr. (Lambert Lane to Naranja D 677,590 677,590
MUP – Phase II - Naranja Dr. (La Cañada Dr to 1st Ave)*50,000 150,000 200,000
Naranja Park Master Plan Implementation*3,460,104 11,628,065 15,088,169
$1,532,967 $3,361,700 $4,894,667
680 Fuel Station Renovation 55,000 55,000
Coronado Middle School Park Pre-Fab Restroom - Amphi Partnership 67,200 67,200
F450 4X4 Reg Cab Dump 100,000 100,000
Fuel Management Software (Gasboy Replacement)70,000 70,000
MOC Perimeter Fence & Entry Gate 30,000 30,000
Network Storage 60,000 60,000
Phone System Refresh*300,000 300,000
Public Works Operations Laydown Yard*200,000 200,000
Town Court Expansion*200,000 1,300,000 1,500,000
Town Hall Admin Building A, Remodel I&T area 50,000 50,000
Town Hall Data Center Migration*49,712 49,712
Town Hall Emergency Generator Replacements*527,395 527,395
Vehicle Replacement Program*255,860 1,629,500 1,885,360
$114,000 $114,000
Pavement Preservation - Non Roadways 114,000 114,000
$7,209,131 $19,050,505 $26,259,636
Grand Total
Capital Fund Projects for FY 23/24 by Category
Capital Fund Project
Parks & Recreation
Parks & Recreation - Bond Projects
Public Facilities, Vehicles & Equipment
Streets/Roads
Discussion and Questions?
Capital Improvement Program
Town Council Meeting
Regular and Study Session
March 15, 2023
Carryforward by Fund, FY 23/24
Capital Improvement Program
FY 22/23 Carryforward
General Fund 845,534
Westward Look Drive Improvements*845,534
Community Center Fund 109,635
Community Center Fire Alarm System Upgrade*54,635
Vistoso Trails Nature Preserve Improvements*55,000
Capital Fund 7,209,131
CC Parking Lot Reconstruction & Expansion*200,000
Community Center Elevator*737,260
Greenock Trail Improvements*51,210
MUP – Phase I - La Cañada Dr. (Lambert Lane to Naranja Dr)*677,590
MUP – Phase II - Naranja Dr. (La Cañada Dr to 1st Ave)*50,000
Naranja Park Master Plan Implementation*3,460,104
Phone System Refresh*300,000
Public Works Operations Laydown Yard*200,000
Steam Pump Ranch BBQ & Bunk House Renovations*500,000
Town Court Expansion*200,000
Town Hall Data Center Migration*49,712
Town Hall Emergency Generator Replacements*527,395
Vehicle Replacement Program*255,860
Roadway Impact Fee Fund 750,000
Rancho Vistoso & Woodburne Intersection*750,000
Water Utility Fund 105,000
Vehicle Replacement Program*35,000
Water Control System Operations New Vehicle*70,000
Water Impact Fee/ GPF 1,350,000
La Posada Well Equipping*100,000
NWRRDS (Independent) Shannon Road Booster Station*1,000,000
Steam Pump Well Equipping*250,000
Grand Total 10,369,300
CIP Project Listing by Funding Source