HomeMy WebLinkAboutMinutes - Water Resources Subcommittee - 2/2/2016 � MINUTES
THE ORO VALLEY WATER UTILITY COMMISSION
WATER RESOURCES SUBCOMMITTEE �
� February 2, 2016
ORO VALLEY WATER UTILITY CONFERENCE ROOM �
N
11000 N. LA CANADA DRIVE
. ORO VALLEY, ARIZONA
CALL TO ORDER— Chair Milkey called the meeting to order at 10:33 a.m. `
PRESE�IT: Robert Milkey— Chair
. � Shann,a Weagle - Commissioner
Philip Saletta —Water Utility Director
Peter Abraham —Water Resources and Planning Manager
CALL TO AUDIENCE — No speakers.
ITEM #1 — DISCUSSION AND UPDATE REGARDING FUTURE CAP WATER DELIVERY
AND POTENTIAL PARTNERING WITH METRO WATER DISTRICT AND MARANA
UTILITIES
There was discussion regarding the possible partnership with Metro Water District and Marana
Utilities to develop and deliver additional CAP water through recharge and recovery. The
proposed contemplates the delivery of recharged CAP water frorx� wells to be constructed near
the Avra Valley Recharge Project and the Lower Santa Cruz Recharge Project. A proposed
pipeline and pump system would be constructed to deliver the CAP water to the participating
�entities. The proposed project could be delivering CAP water in 2024. Numerous technical
financial and institutional issues will need to be evaluated. These include water quality, delivery
capacity, costs, participation level, project schedule, business �tructure and any
intergovernmental agreements. There was consensus that this item will be an ongoing
discussion, will be reviewed with the Commission and then presented to Council for approval.
It is anticipated that a decision would be made sometime this fall before the end of 2016.
No formal action was taken or required. - , -
ITEM ##2 — DISCUSSION AND UPDATE REGARDING HOOVER POWER REALLOCATION
THROUGH THE ARIZONA POWER AUTHORITY
There was discussion regarding the background and an update on the Oro Valley Water Utility
application for Hoover hydro-electric power. The Water Utility was allocated 203 kilowatts of
capacity and 442,914 kilowatt-hours �of energy from the Arizona Power Authority. The Water�
Utility is working with Tucson Electric Power regarding bill crediting to determine the potential
cost savings for the delivery of this power. The schedule for the contract with APA for delivery
of the power will need to be approved by October of 2016. The contract will be reviewed by the
Commission and a recommendation made to Council. . �
No formal action was taken or required.
ITEM #3 — DISCUSSION AND UPDATE REGARDING LONG TERM WATER
RESOURCE PLANNING
There was discussion regarding the elements of a long-term water resource planning study.
These included technical, business, environmental, financial, institutional and legal issues.
There was discussion regarding future demands, planning area and project schedule. There
was discussion regarding the 5,500 acre-foot per year groundwater production rate in relation
to long-term planning for the Oro Valley service area. This item will remain a topic for the
� subcommittee, particularly regarding future demands and source of supply.
No formal action was taken or required.
CALL TO AUDIENCE - No speakers.
FUTURE AGENDA ITEMS —
� Expansion of the Reclaimed Water System
Long-Term Water Resource Planning
NEXT MEETING — No date set
ADJOURNMENT — The meeting adjourned at 12:25 p.m. �
, Prepared by:
, Philip C. aletta, P.E.
Water Utility Director
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the
Regular session of the Water Resources Subcommittee of Oro Valley, Arizona held on the
2nd day ofi February, 2016. I further certify that the meeting was duly called and held and that a
quorum was present.
Dated this 4t" day of February, 2016.
� .