HomeMy WebLinkAboutPackets - Council Packets (31) ta Town of Oro Valley
Wf Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner Description of Work ;;Cost Type Priority Year Estimated Cost Funding
; Q Pima County
Install flared end and reconnect end of culvert,rip 'One Time-£ flay Stormwater
DC-1 401 E Strada Patania Tangerine Hills Drainage Designs and Repairs-Construction CIP 1 FY 2015:$ 7,500
rap `S ❑Unfunded
'
❑Pima County
Canada Hills Remove sediment in ROW north of Lambert- s Recurring-
s-1 Canyon Shadow Wash OV ; Sediment Removal-Maintenance 2 annual $ 5,000 OV Stormwater
OP
•Parcel K 'excessive sediment due to September 8,2015 storm. 4 r flunfunded
Soil cement wash bottom deteriorating at multiple ['Pima County
Canyon Shadow Wash(Lambert to Rancho Feliz 'One Time-
DC-2 OV locations with large erosion: also Repair concrete 'Drainage Designs and Repairs-Construction ,. 2 FY 2015 $ 10,000 ❑OV Stormwater
,CDO) `(442-647) CIP
inlet wing wall on north side of Lambert ❑Unfunded
❑Pima County
Canada Hills Remove vegetation/debris in Canyon Shadows wash, Recurring-•
v-1 Canada Hills Parcel K OV Vegetation Removal-Maintenance 2 annual , $ 2,000 DOV Stormwater
Parcel K ROW north of Lambert OPflUnfunded
This basin that is comprised of numerous tributaries ['Pima County
that have a 100 year flow of over 3,000 cfs as they flay stormwater,
leave the town boundaries. These tributaries are v One Time-' flunfunded
nn-1 Carmack Wash Basin Management Study1 FY $ 100,000
causing erosion,sedimentation,and flooding CIP
problems at numerous areas throughout the
subdivisions they traverse
Remove debris in ditches Linda Vista from Oracle to Recurrin ❑Pima County
s-2 Carmack Wash Box culverts excessive sediment due to September 8, Sediment Removal-Maintenance g 2 annual $ 7,000 Day Stormwater
=2015 storm. 3. OP J
❑Unfunded
Design drainage flow for Linda Vista,Oracle to Box ['Pima County
One Time- ❑OV Stormwater
DC-3 Carmack Wash culverts,new design to have concrete bottom for 'Drainage Designs and Repairs-Construction 1 FY $ 30,000
cleaning and sides armored for erosion control CIP flunfunded
Design repair from Con Arches to CDO,need 404 and ['Pima county
easements to control erosion-Demo approx 1/2 of _One Time- flay Stormwater
DC-4 Highlands Wash PC Drainage Designs and Repairs-Construction 1 FY $ 600,000
existing outlet south of Lambert Lane and build to CIP flUnfunded
correct outlet flow
❑Pima County
One Time- ❑OV Stormwater
DC-5 Unknown Wash PC Concrete wash repair behind Fry's off of La Canada Drainage Designs and Repairs-Construction CIP 2 FY $ 80,000
E Unfunded
Remove debris in channel upstream and down ❑Pima County
Recurring-
s-3 Highlands Wash stream and clean con arches excessive sediment due Sediment Removal-Maintenance OP 2 $ 30,000 ❑OV Stormwater
to September 8,2015 storm. QUnfunded
10/22/2015 2:16 PM Page 1 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
al Town of Oro Valley
Stormwater Projects •
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner Description of Work Cost: Type Priority Year Estimated Cost 3 Funding
- _
`Install short extension and flared Ends to all 4 El Pima County
One Time ❑OV Stormwater DC-6 Lambert Lane OV culverts under Lambert Lane,East of La Cholla,place Drainage Designs and Repairs-Construction 1 FY 2015 $ 25,000
rip rap QUnfunded
_ _. ['Pima County
An unnamed wash crosses Lambert road at a dip
crossing that causes significant flooding and sediment ❑ov Stormwater
Q Unfunded
•buildup at less than a 2 year storm event. In addition; One Time
DC-7 Lambert Lane(Casas) OV Drainage Designs and Repairs-Construction 1 $ 600,000
road edge erosion is affecting the structural integrity CIP _
of the road. A box culvert project would alleviate this
problem and provide all weather crossing. -
Moore road currently has 3 dip crossings that ❑Pima county
become a hazard annually during the monsoon
season and must be closed at a 5 year event. The
road is a safety concern during and after every rain ,One Time- ❑OV Stormwater
DC-8 Moore Road Box Culverts OV Drainage Designs and Repairs-Construction $ 800,000
event.This project will construct grade control CIP
structures and enhance the road structure with
ribbon curbs to improve the safety and reduce ['unfunded
maintenance during rain events.
❑['Pima.oU
P County
Clean Culverts at Preakness/Review Maintenance to HOA has drainage issues with in the subdivision
DC-56 Saddle Valley/Logan's Crossing PRI OneTime annual $ 4,500 2 OV Stormwater
Gabion baskets in dipsection adjacent to Water Tank which need to be re-engineered by them ❑unfunded
❑Pima County
Evaluate and redesign wash to improve water flow One Time-
DC-9 Mutterer's Wash OV Drainage Designs and Repairs-Construction TBD 2 o Stormwater
while designing walking path along side wash. CIP r2 unfunded
❑Pima County
Recurring-
v-2 Mutterer's Wash OV Remove vegetation/debris in wash Vegetation Removal-MaintenanceOP 1 FY 2015 $ 15,000 Dov Stormwater
['Unfunded
Add Rip Rap/Filter Fabric to south slope of Ball fields ❑Pima County
One Time-
DC-10 Naranja Park Town Site OV @ 560'x 70 =39,200 sq.ft.Find Alternative to Drainage Designs and Repairs-Construction CIP 2 $ 250,000 Dov Stormwater
Stabilize Slopes
✓Unfunded
Design and build drainage structures to reduces ❑Pima County
One Time-
DC-89'Naranja Park Town Site OV deterioration of"slope/berm"along Monterra Hills road Drainage Designs and Repairs-Construction CIP 1 $ 100,000 Dov Stormwater
impacting sidewalks. 2 Unfunded
❑Pima County
Shot create repair along hill side east of Sawtooth - One Time
DC-11`Naranja Road @ Sawtooth OV Drainage Designs and Repairs-Construction 2 $ 40,000 COV Stormwater
within ROW CIP
❑✓Unfunded
10/22/2015 2:16 PM Page 2 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
it Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision i Owner,Description of Work .`Cost Type Priority Year Estimated Cost Funding
New culverts at existing dip crossing to allow all
❑Pima County
weather access during hazardous rain events. The all> ❑OV Stormwater
s
weather crossings will provide access to Ironwood _ DUnfunded
One Time
Dc-12'Naranja Drainage Improvements OV ;High School which is designated as an emergency Drainage Designs and Repairs-Construction CIP , $ 1,700,000
,'management contact location during local
t
emergencies. The improvements include nine 24"
RCP,a 6 cell 4'X10'culvert,
❑Pima County
Northern Avenue Drainage Comprehensive Drainage study and Construction of One Time-
DC-13 OV Drainage Designs and Repairs-Construction2 $ 2,500,000 ❑OV Stormwater
Improvements ,Culverts for all low water crossings on Northern. 5 CIP
✓Unfunded
This project involves studying the Peglar Wash Basin ['Pima County
(North of Magee Road between Northern Ave.& }
❑OV Stormwater
{ Oracle Road)within the Town of Oro Valley that is One Time- .
M-2 `Peglar Wash Basin < OV 'Management Study 2 ` $ 75,000 ❑✓Unfunded
composed of numerous tributaries that have a 100 CIP
year flow of over 1,500 cfs as they leave the town
boundaries. 7
:.:....... ,....... . ....
This project
❑Pima County
p sis to implement the recommendations
❑OV Stormwater
DC-14 Peglar Wash Basin OV from the Peglar's Wash Basin Mgt Study. This area Drainage Designs and Repairs-Construction One Time- 2 TBD
:primarily deals with waters that travel through the CIP ['Unfunded
'Suffolk Hill's portions of the Town.
0 Pima County
- Recurring-
V-3 RooneyWash OV Complete yearly landscape work RooneyWash Vegetation Removal-Maintenance 2 annual
OP $ 60,000 ❑ov Stormwater
❑Unfunded
Remove sediment in drainage easement behind ❑Pima County
Recurring- Dov StormwaterS-4 Shadow Mountain Estates West OV homes excessive sediment due to September 8,2015 Sediment Removal-Maintenance OPr 2 $ 7,500
storm. ❑✓Unfunded
❑Pima County
Design and repair alley drainage-erosion to area of One Time- ❑ov Stormwater
Shadow Mountain Estates West OV Drainage Designs and Repairs-Construction 2 $ 20,000
exposed gas lines CIP ElUnfunded
QPima County
Shadow Mountain Estates vegetation removal in alley Recurring-
V-4 Shadow Mountain Estates West OV Vegetation Removal-Maintenance 2 $ 89,000 Dov stormwater
drainage ways OP
❑Unfunded
This project requires studying the area from Shannon road ❑Pima County
to Thornydale Road,from Tangerine Road to Naranja Road ❑ov Stormwater
M-3 Un-named(Shannon)Basin OV that would be used for future Town Management Study One Time- 2 $ 100,000 E Unfunded
CIP
Development/incorporation.This is roughly 640 acres
that is composed of numerous tributaries.
10/22/2015 2:16 PM Page 3 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects •
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner;Description of Work :Cost Type Priority Year Estimated Cost Funding
['Pima County
Remove sediment Vista del Oro Estates excessive Recurring-
5-5 Vista Del Oro Estates Sediment Removal-Maintenance2 $ 7,500: Dov Stormwater
sediment due to September 8,2015 storm. OP f DUnfunded
r,
❑Pima County
Recurring-
v-5 Vista Del Oro Estates Landscape in Vista Del Oro Estates Wash Vegetation Removal-Maintenance OP 2 $ 5,000' Day Stormwater
QUnfunded
,This project requires studying the drainage areas that hold ❑Pima County
,future annexation potential for the Town of Oro Valley. 2a Stormwater
M-4 Un-named Basin The study area would extend(south and west)from Management Study One Time- 1 TBD - Dunfunded
existing Town limits to the boundaries of Orange Grove(to CIP
the south)&Thornydale(to the west).
STORM RELATED SMALL PROJECTS
Recurring- ❑Pima county
C-1 Newport Drive Concrete drainage channel repair Channel-MaintenanceOP 2 TBD DON/Stormwater
❑✓Unfunded
❑Pima County
Recurring-
C-2 Valle Del Oro Concrete drainage channel repair Channel-MaintenanceOP 2 TBD , Dov Stormwater
D Unfunded
Recurring- ❑Pima county
C-3 Atua Drop inlet add riprap repair erosion Channel-MaintenanceOP 2 TBD , Dov Stormwater
D Unfunded
Recurring- ['Pima county
C-4 Lambert Lane-Rancho Sonora Reconstruct drop inlet Channel-MaintenanceOP 2 TBD Day Stormwater
QUnfunded
❑Pima County
SR-1 9130 N Shadow Mnt Berm construction-evaluate Storm Related Issue-Maintenance TBE 2 TBD Dov Stormwater
• ❑Unfunded
['Pima County
SR-2 10865 N.1st Ave Erosion control and stabilization-evaluate Storm Related Issue-Maintenance TBE 2 TBD ' DD./Stormwater
D Unfunded
: ❑Pima County
SR-3 901 W.Valle De Oro Erosion Control-evaluate Storm Related Issue-Maintenance TBE 2 TBD i DON/Stormwater
D Unfunded
' ['Pima County
SR-4 321 W.Golf View Erosion repair,rip rap shoulder-evaluate Storm Related Issue-Maintenance TBE 2 TBD Dov stormwater
D Unfunded
10/22/2015 2:16 PM Page 4 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner Description of Work .Cost Type Priority Year Estimated Cost Funding
Pima County
SR-5 180 E Catalina Shadows ?Berm construction to protect driveway-evaluate 'Storm Related Issue-Maintenance TBE 2 = TBD s D• ov Stormwater
['unfunded
❑• Pima County
SR-6 14255 N.Ave :Erosion mail box and ponding driveway-evaluate Storm Related Issue-Maintenance TBE 2 TBD 3 Dov Stormwater
D unfunded
❑Pima County
SR-7 8980 N.Camino de Anza :Erosion at mail box-evaluate Storm Related Issue-Maintenance TBE 2 TBD DOV Stormwater
['unfunded
3 ?❑Pima County
SR-8 422 W.Hardy Repair berm -evaluate 'Storm Related Issue-Maintenance TBE 2 TBD QOV Stormwater
Q Unfunded
❑Pima County
SR-9 '255 E.Newport Erosion edge of pavement-evaluate Storm Related Issue-Maintenance TBE 2 TBD ❑ov Stormwater
❑✓Unfunded
STORM RELATED ROAD CLOSURE-SAFETY
Buena Vista north of Spring Valley Engineer,design and construct to make road and :One Time- ❑Pima County
DC-15 Dr. sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD fiov Stormwater
to sediment-improving safety ['Unfunded
Buena Vista south of Calle Engineer,design and construct to make road and 'One Time- ❑Pima County
DC-16 sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due TBD Dov Stormwater
Concordia CIP
to sediment-improving safety QUnfunded
Engineer,design and construct to make road and ❑Pima County
DC-17 Calle Concordia near Buena Vista sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due One Time- TBD Dov Stormwater
CIP
to sediment-improving safety Dunfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-18 Calle Loma Linda @ Calle Bonita sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flov Stormwater
to sediment-improving safety QUnfunded
Engineer,design and construct to make road and ' ❑Pima County
One Time-
DC-19 Calle Solano wash area sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD floe Stormwater
to sediment-improving safety ❑✓unfunded
Engineer,design and construct to make road and El Pima County
DC 20 CDO south of Riverfront Park sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due One Time-
CIP TBD floe Stormwater
to sediment-improving safety 11]Unfunded
10/22/2015 2:16 PM Page 5 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No Location/Name Subdivision Owner Description of Work :Cost Type ` Priority Year Estimated Cost Funding
Hardy Road,wash west of the Engineer,design and construct to make road and One Time ' ❑• Pima County
DC-21 Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD Dov Stormwater
roundabout. CIP
to sediment-improving safety DUnfunded
Engineer,design and construct to make road and ❑• Pima County
One Time-
DC-22 Highlands Mobile Park ,sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety Dunfunded
Engineer,design and construct to make road and • ❑Pima County
DC-23 La Cholla North of Glover Road Closure-SAFETY sediment removal all weather road and eliminate road closure due One Time TBD 3 Dov Stormwater
CIP
to sediment-improving safety Dunfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-24 La Cholla South of Casas Entrance Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD Dov Stormwater
-to sediment-improving safety D• unfunded
Engineer,design and construct to make road and -` ❑Pima County
One Time-
DC-25 La Cholla South of Lambert Road Closure-SAFETY sediment removal `all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety Dunfunded
`Engineer,design and construct to make road and '- ❑Pima County
One Time-
DC-26 La Cholla South of Naranja Road Closure-SAFETY sediment removal all weather road and eliminate road closure dueCIP TBD Dov Stormwater
to sediment-improving safety D• unfunded
Engineer,design and construct to make road and ! ❑Pima County
One Time-
Dc-27 Lambert east of La Cholla Road Closure-SAFETY sediment removal 'all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety DUnfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-2s Lambert Lane west of La Cholla 'sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety Dunfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-29 Landoran Ln sediment cleanup>Road Closure-SAFETY ,all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety Dunfunded
Engineer,design and construct to make road and ❑Pima County
DC-30 Limewood East of Camino Del Plata sediment cleanup>Road Closure-SAFETY :all weather road and eliminate road closure due One Time- TBD ' Dov Stormwater
to sediment-improving safety CIP Dunfunded
;Engineer,design and construct to make road and [• 'Pima County
One Time-
DC-31 Linda Vista near Eglestonsediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD ,; Dov Stormwater
to sediment-improving safety Dunfunded
10/22/2015 2:16 PM Page 6 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Sa.
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. =Location/Name Subdivision 'Owner Description of Work :,Cost Type Priority F Year Estimated Cost Funding
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-32.Lomas De Oro at Lambert sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD t D• ov Stormwater
to sediment-improving safety QUnfunded
Engineer,design and construct to make road and ['Pima County
One Time-
DC-33 Moore East of La Cholla Road Closure-SAFETY sediment removal -all weather road and eliminate road closure due CIP TBD floV Stormwater
-to sediment-improving safety ' Dunfunded
Engineer,design and construct to make road and ! [• 'Pima County
One Time-
DC-34 Moore east of La Cholla Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD ;[Dov Stormwater
-to sediment-improving safety CIP 2 Unfunded
'`:Engineer,design and construct to make road and ❑Pima county
•One Time-
DC-35 Naranja @ Ironwood Ridge HS Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD , Dov Stormwater
;to sediment-improving safety ['unfunded
,Engineer,design and construct to make road and ❑• Pima county
One Time-
DC-36 Naranja East of Shannon °Road Closure-SAFETY sediment removal -all weather road and eliminate road closure due CIP TBD - D• ov Stormwater
to sediment-improving safety flunfunded
Engineer,design and construct to make road and • ❑• Pima County
One Time-
DC-37:Naranja West of La Cholla near HS Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD Dov stormwater
`to sediment-improving safety flunfunded
Engineer,design and construct to make road and OPima County
One Time-
DC-38 Northern Ave behind Walmart 'sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due CIP TBD flay Stormwater
to sediment-improving safety flunfunded
Engineer,design and construct to make road and ['Pima county
One Time-
DC-39`Northern Ave north of Cool sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flay Stormwater
to sediment-improving safety [1]Unfunded
Northern Ave south of Camino Engineer,design and construct to make road and One Time- ❑Pima County
DC-40 Cortaro sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flov stormwater
to sediment-improving safety flunfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-41 Northern Ave south of Magee sediment cleanup>Road Closure-SAFETY ,all weather road and eliminate road closure due CIP TBD flay Stormwater
to sediment-improving safety ['Unfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
DC-42 Overlook south of Calle Concordia 'sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flay Stormwater
to sediment-improving safety flunfunded
10/22/2015 2:16 PM Page 7 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. 'Location/Name Subdivision Owner Description of Work Cost Type Priority Year Estimated Cost Funding
Engineer,design and construct to make road and ❑Pima County
One Time
DC-43'Pistachio @ culverts sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety ❑✓unfunded
Engineer,design and construct to make road and ❑Pima county
One Time-
DC-44 Pistachio @ Pomegranate sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD ` ❑✓ov Stormwater
to sediment-improving safety E unfunded
Engineer,design and construct to make road and ❑Pima County
One Time-
'
DC-45'Rancho Sonora Dr sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure dueCIP TBD =Eov Stormwater
to sediment-improving safety ' E unfunded
Engineer,design and construct to make road and One Time-
❑Pima County
DC-46 Shannon South of Naranja sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD • Dov Stormwater
to sediment-improving safety ['unfunded
Engineer,design and construct to make road and ❑Pima county
Shannon to stop traffic from One Time-
DC-47 sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due TBD ° Eov Stormwater
crossing the wash at the north end. to sediment-improving safety CIP E unfunded
Engineer,design and construct to make road and ❑Pima county
One Time-
DC-48 Suffolk Dr @ Village sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater
to sediment-improving safety Unfunded
Tangerin Rd Engineer,design and construct to make road and ❑Pima county
One Time
DC-49 Tangerine-by Camino Del Plata construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD ❑ov Stormwater
2016 to sediment-improving safety Unfunded
Tangerin Rd Engineer,design and construct to make road and ❑Pima county
One Time-
DC-50 Tangerine-one at town boundary construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure dueCIP TBD ❑ov Stormwater
2016 to sediment-improving safety Eunfunded
Tangerin Rd Engineer design and construct to make road and: ❑Pima County
One Time-
DC-51 Tangerine @ Camino Del Plata construction FY Road Closure-SAFETY sediment removal 'all weather road and eliminate road closure due CIP TBD ❑ov Stormwater
2016 to sediment-improving safety Unfunded
Tangerin Rd Engineer design and construct to make road and ❑Pima county
Tangerine and area between La One Time-
DC-52 construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD Qov Stormwater
Cholla and La Canada. 2016 to sediment-improving safety CIP ❑unfunded
Tangerin Rd ,Engineer,design and construct to make road and
DC-53 Tangerine West of La Cholla construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due One Time- TBD
2016 ,to sediment-improving safety CIP
10/22/2015 2:16 PM Page 8 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner Description of Work ,,Cost Type =: Priority =.. Year Estimated Cost Funding
Engineer,design and construct to make road and El county
One Time-
DC-54 Valle Del Oro RD sediment cleanup>Road Closure-SAFETY gall weather road and eliminate road closure due CIP TBD a Eov Stormwater
to sediment-improving safety Eunfunded
Engineer,design and construct to make road and t 4 ❑• Pima County
One Time-
DC-55;Valle Del Oro Rd at CC sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due CIP TBD D• ay Stormwater
to sediment-improving safety s 1=1 Unfunded
❑Pima County
DC-56 La Cholla @ Tangerine La Cholla Sediment removal from drop inlet culvert Add Berm and waddles to slow and control/direct 1 annual $ 1,500;❑�OV Stormwater
flow into the inlet s ❑Unfunded
['Pima County
Storm Drain under Northern blocked by Dov Stormwater
DC-58 8151 Northern Ave. Northern Ave. Debris removal from outlet 1 annual $ 500
Veg/debris/Sediment at outlet
❑Unfunded
❑Pima County
Storm Drain under Northern blocked by
DC-60 8252 N Northern Ave. Northern Ave. Debris removal from inlets 1 annual $ 1,500 ❑ov Stormwater
Veg/debris/Sediment at inlet
['Unfunded
❑Pima County
Northern blocked by Veg/debris/Sediment at ❑OV Stormwater
DC-61 Casas Lindas Apts Northern Ave. Debris removal from inlet in ROW 1 annual $ 1,500
inlet E Unfunded
❑Pima
County
DC-62 2005 W Glover Rd Ironwood Ranch Debris/Veg/Sediment Removal from outlet of box culvert 1 annual $ 2,500 DOV Stormwater
and manage downstream veg D unfunded
:1:=1 Pima County
Debris/Veg/Sediment Removal from outlet of box culvert
DC-63 Bridge on Monterra Vista Dr. Monterra Knolls Possible Detention Project-Engineer/Design 1 annual $ 3,000 ❑OV Stormwater
and manage downstream veg ❑unfunded
['Pima County
Box Culvert in ROW west of Eagle Crest Dr.-inlet/outlet
DC-67 Naranja Dr. Canada Ridge 1 annual $ 2,000 I:1OV Stormwater
need debris/veg removal E unfunded
Discuss Easement behind lots from 625 E Windy ❑Pima County
DC-69 605 E Windy Peak Rancho Catalina Drainage improvements Peak Dr-8530 N Ranch Catalina with possible 1 $ 10,000 DOV Stormwater
detention project.Al Coons ❑.,Unfunded
Veg removal and Channelization of wash running across ['Pima County
DC-71 363 E Sunburst-Paul Parisi Rancho Catalina Rancho Catalina Ave between 455 E Windy Vista PI.and 1 $ 7,500 DOv Stormwater
8405 N Rancho Catalina Dr. ['Unfunded
10/22/2015 2:16 PM Page 9 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
it Town of Oro Valley
Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. Location/Name Subdivision Owner Description of Work Cost Type _ Priority Year Estimated Cost ' Funding
Shadow
,E]Pima County
'Drainage Study-900 cfs Coming across Oracle
DC-73 Oracle Square @ Hardy Mountain Drainage improvements 1 $ 10,000 r ED/Stormwater
thru box culvert into Shadow Mountain Estates
Estates E Unfunded
Drainage improvements-channelization of sheetflow ,,❑Pima County
Oracle Rd.Drainage N'of Calle
DC-76 Vista Mantana onto Egleston contributing to flooding in Vista Mantana Drainage Study/Temporary Solutions 1 $ 30,000�0o Stormwater
Concordia
Subdivision EUnfunded
❑Pima County
Pusch View Drainage channell on S'side of Pusch View Lane Needs
DC-79 Rock Ridge Apts ROW 1 annual $ 1,500 ❑
Lane Veg cleanup/debris removal ov Stormwater
E Unfunded
❑
Pima county
Rivers Edge(1-
DC-81 Rivers Edge S' D
89) Drainage Channel outlet to CDO needs Veg Mgmt Private 1 Private ov Stormwater
QUnfunded
['Pima County
Rivers Edge(103
DC-83 Rivers Edge N 120 Box Culvert crossing Lambert needs sediment removed 1 annual $ 4,500 ❑OV Stormwater
pUnfunded
['Pima County
DC-84 Vista Catalina Vista Catalina Channel N'of Vista Catalina/S'of Highlands Mobile Park 1 TBD $ 10,000 Dov Stormwater
requires veg/debris/sediment removal Dunfunded
❑Pima County
Storm Drain under Northern blocked by `Qov Stormwater
DC-57 8305 Northern Ave. Northern Ave. Debris removal from outlet/Cannot find inlet 2 annual $ 500
Veg/debris/Sediment at outlet
El Unfunded
Storm Drain under Northern blocked by '['Pima county
DC-59 8090/8041 Northern Ave. Northern Ave. Debris removal from inlets/outlets 2 annual $ 1,500 Ill OV Stormwater
Veg/debris/Sediment at outlet
❑Unfunded
❑Pima County
Tangerine Box Culvert-manage erosion cutting from road down
DC-65 Ironwood Valley Dr. need to engineer permanent solution 2 annual $ 500;❑OV Stormwater
Heights sides of box culvert 2 unfunded
❑Pima County
Box Culvert in ROW east of Canada Ridge Dr.-outlet need
DC-68 Naranja Dr. Canada Ridge 2 annual $ 1,500,❑OV Stormwater
debris/veg removal
❑Unfunded
ma
Changes in Federal land to the east-altering
❑Pi omw
DC-70 8620 N Glenhurst Pl. Sunnyslope Drainage improvements 2 TBD E Storater
flows to the west 2 unfunded
Oracle Rd.Drainage N'of Calle OV Aquatic ❑Pima County
DC-75 Drainage improvements Drainage Study 2 $ 3,000:EOV Stormwater
Concordia Center E unfunded
w_,
f'❑Pima County
Oracle Road E' Drainage channel on E'side of Oracle Rd.Needs Veg
DC-80 Rooney Wash ROW/ADOT.7 2 annual $ 1,500 ❑OV Stormwater
side cleanup/debris removal at inlet ❑unfunded
10/22/2015 2:16 PM Page 10 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
Stormwater Projects.
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. °Location/Name Subdivision Owner=Description of Work ;Cost Type Priority Year Estimated Cost Funding
❑Pima County
DC-85.10707 N Pomegranite Dr. Monte Del Oro Drainage requires refinement 2 $ 1,000 s Dov Stormwater
a['Unfunded
,❑Pima County
Tangerine Road @ Highlands Wash Debris/Veg/Sediment Removal from Inlet/outlet of boxov Stormwater
DC-64 Monterra Knolls' 3 annual $ 5,000 ❑
(east of Monterra Knolls) culvert and manage downstream veg
E Unfunded
❑Pima County
Tangerine ROW erosion at entry from Tangerine and north alongov Stormwater
DC-66 Reflection Ridge Dr Contact Water to discuss erosion around box 3 $ 500 ❑
Heights W'side ROW
['Unfunded
❑Pima County
DC-72 Campo Bello Campo Bello Drainage improvements Drainage Study 3 TBD Dov Stormwater
DUnfunded
❑Pima County
Shadow
Oracle Rd.Drainage S'of Calle
DC-74 Mountain Drainage improvements Drainage Study 3 $ 1,500-EIOV Stormwater
Concordia
Estates DUnfunded
Drainage from Wolfley/Ajacent Property adding to ['Pima County
Oracle Rd.Drainage N'of El Mutterers Wash Discuss with property owners need for erosion
DC-77 sediment Problem into Mutterers.Deep Erosion cuts next 3 TBD ❑OV Stormwater
Conquistador Way S' to spillway on El Conquistador Way(Private Property) control ['unfunded
❑Pima County
Mutterers Wash Drainage Channell exiting Valle Del Oro townhomes needs Discuss with property owners need for erosion
DC-78 Valle Del Oro Town Homes 3 Private ❑ay Stormwater
S to be cleaned...Veg/Debris/Sedimet control
DUnfunded
['Pima County
Pusch Ridge Hillside at 10831 N Pusch Ridge View PI.Needs Erosion Dov Stormwater
DC-82 Rivers Edge N' Pusch Ridge Vistas II HOA 3 Private
Vistas II Control ['unfunded
['Pima County
Pusch Ridge
DC-86 1001 E Linda Vista Blvd Sweep Road in front of house 3 $ 150 Day Stormwater
Estates
['Unfunded
❑Pima County
DC-87 Rancho Sonora Dr Rancho Sonora Trash in Wash up against barracades 3 $ 150 Day Stormwater
['Unfunded
10/22/2015 2:16 PM Page 11 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx
Town of Oro Valley
= Stormwater Projects
The following Stormwater Maintenance Projects are categorized by:
• Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance
• Vegetation Removal. • Management Studies • Channel-Maintenance
No. ,Location/Name Subdivision Owner Description of Work Cost Type Priority Year Estimated Cost Funding
❑Pima County
Shadows of the
DC-ss Shadows of the Ridge +Sediment removal from drop inlet culvert $ 2,500'❑OV Stormwater
Ridge
Q✓Unfunded
10/22/2015 2:16 PM Page 12 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx