Loading...
HomeMy WebLinkAboutPackets - Council Packets (31) ta Town of Oro Valley Wf Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner Description of Work ;;Cost Type Priority Year Estimated Cost Funding ; Q Pima County Install flared end and reconnect end of culvert,rip 'One Time-£ flay Stormwater DC-1 401 E Strada Patania Tangerine Hills Drainage Designs and Repairs-Construction CIP 1 FY 2015:$ 7,500 rap `S ❑Unfunded ' ❑Pima County Canada Hills Remove sediment in ROW north of Lambert- s Recurring- s-1 Canyon Shadow Wash OV ; Sediment Removal-Maintenance 2 annual $ 5,000 OV Stormwater OP •Parcel K 'excessive sediment due to September 8,2015 storm. 4 r flunfunded Soil cement wash bottom deteriorating at multiple ['Pima County Canyon Shadow Wash(Lambert to Rancho Feliz 'One Time- DC-2 OV locations with large erosion: also Repair concrete 'Drainage Designs and Repairs-Construction ,. 2 FY 2015 $ 10,000 ❑OV Stormwater ,CDO) `(442-647) CIP inlet wing wall on north side of Lambert ❑Unfunded ❑Pima County Canada Hills Remove vegetation/debris in Canyon Shadows wash, Recurring-• v-1 Canada Hills Parcel K OV Vegetation Removal-Maintenance 2 annual , $ 2,000 DOV Stormwater Parcel K ROW north of Lambert OPflUnfunded This basin that is comprised of numerous tributaries ['Pima County that have a 100 year flow of over 3,000 cfs as they flay stormwater, leave the town boundaries. These tributaries are v One Time-' flunfunded nn-1 Carmack Wash Basin Management Study1 FY $ 100,000 causing erosion,sedimentation,and flooding CIP problems at numerous areas throughout the subdivisions they traverse Remove debris in ditches Linda Vista from Oracle to Recurrin ❑Pima County s-2 Carmack Wash Box culverts excessive sediment due to September 8, Sediment Removal-Maintenance g 2 annual $ 7,000 Day Stormwater =2015 storm. 3. OP J ❑Unfunded Design drainage flow for Linda Vista,Oracle to Box ['Pima County One Time- ❑OV Stormwater DC-3 Carmack Wash culverts,new design to have concrete bottom for 'Drainage Designs and Repairs-Construction 1 FY $ 30,000 cleaning and sides armored for erosion control CIP flunfunded Design repair from Con Arches to CDO,need 404 and ['Pima county easements to control erosion-Demo approx 1/2 of _One Time- flay Stormwater DC-4 Highlands Wash PC Drainage Designs and Repairs-Construction 1 FY $ 600,000 existing outlet south of Lambert Lane and build to CIP flUnfunded correct outlet flow ❑Pima County One Time- ❑OV Stormwater DC-5 Unknown Wash PC Concrete wash repair behind Fry's off of La Canada Drainage Designs and Repairs-Construction CIP 2 FY $ 80,000 E Unfunded Remove debris in channel upstream and down ❑Pima County Recurring- s-3 Highlands Wash stream and clean con arches excessive sediment due Sediment Removal-Maintenance OP 2 $ 30,000 ❑OV Stormwater to September 8,2015 storm. QUnfunded 10/22/2015 2:16 PM Page 1 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx al Town of Oro Valley Stormwater Projects • The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner Description of Work Cost: Type Priority Year Estimated Cost 3 Funding - _ `Install short extension and flared Ends to all 4 El Pima County One Time ❑OV Stormwater DC-6 Lambert Lane OV culverts under Lambert Lane,East of La Cholla,place Drainage Designs and Repairs-Construction 1 FY 2015 $ 25,000 rip rap QUnfunded _ _. ['Pima County An unnamed wash crosses Lambert road at a dip crossing that causes significant flooding and sediment ❑ov Stormwater Q Unfunded •buildup at less than a 2 year storm event. In addition; One Time DC-7 Lambert Lane(Casas) OV Drainage Designs and Repairs-Construction 1 $ 600,000 road edge erosion is affecting the structural integrity CIP _ of the road. A box culvert project would alleviate this problem and provide all weather crossing. - Moore road currently has 3 dip crossings that ❑Pima county become a hazard annually during the monsoon season and must be closed at a 5 year event. The road is a safety concern during and after every rain ,One Time- ❑OV Stormwater DC-8 Moore Road Box Culverts OV Drainage Designs and Repairs-Construction $ 800,000 event.This project will construct grade control CIP structures and enhance the road structure with ribbon curbs to improve the safety and reduce ['unfunded maintenance during rain events. ❑['Pima.oU P County Clean Culverts at Preakness/Review Maintenance to HOA has drainage issues with in the subdivision DC-56 Saddle Valley/Logan's Crossing PRI OneTime annual $ 4,500 2 OV Stormwater Gabion baskets in dipsection adjacent to Water Tank which need to be re-engineered by them ❑unfunded ❑Pima County Evaluate and redesign wash to improve water flow One Time- DC-9 Mutterer's Wash OV Drainage Designs and Repairs-Construction TBD 2 o Stormwater while designing walking path along side wash. CIP r2 unfunded ❑Pima County Recurring- v-2 Mutterer's Wash OV Remove vegetation/debris in wash Vegetation Removal-MaintenanceOP 1 FY 2015 $ 15,000 Dov Stormwater ['Unfunded Add Rip Rap/Filter Fabric to south slope of Ball fields ❑Pima County One Time- DC-10 Naranja Park Town Site OV @ 560'x 70 =39,200 sq.ft.Find Alternative to Drainage Designs and Repairs-Construction CIP 2 $ 250,000 Dov Stormwater Stabilize Slopes ✓Unfunded Design and build drainage structures to reduces ❑Pima County One Time- DC-89'Naranja Park Town Site OV deterioration of"slope/berm"along Monterra Hills road Drainage Designs and Repairs-Construction CIP 1 $ 100,000 Dov Stormwater impacting sidewalks. 2 Unfunded ❑Pima County Shot create repair along hill side east of Sawtooth - One Time DC-11`Naranja Road @ Sawtooth OV Drainage Designs and Repairs-Construction 2 $ 40,000 COV Stormwater within ROW CIP ❑✓Unfunded 10/22/2015 2:16 PM Page 2 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx it Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision i Owner,Description of Work .`Cost Type Priority Year Estimated Cost Funding New culverts at existing dip crossing to allow all ❑Pima County weather access during hazardous rain events. The all> ❑OV Stormwater s weather crossings will provide access to Ironwood _ DUnfunded One Time Dc-12'Naranja Drainage Improvements OV ;High School which is designated as an emergency Drainage Designs and Repairs-Construction CIP , $ 1,700,000 ,'management contact location during local t emergencies. The improvements include nine 24" RCP,a 6 cell 4'X10'culvert, ❑Pima County Northern Avenue Drainage Comprehensive Drainage study and Construction of One Time- DC-13 OV Drainage Designs and Repairs-Construction2 $ 2,500,000 ❑OV Stormwater Improvements ,Culverts for all low water crossings on Northern. 5 CIP ✓Unfunded This project involves studying the Peglar Wash Basin ['Pima County (North of Magee Road between Northern Ave.& } ❑OV Stormwater { Oracle Road)within the Town of Oro Valley that is One Time- . M-2 `Peglar Wash Basin < OV 'Management Study 2 ` $ 75,000 ❑✓Unfunded composed of numerous tributaries that have a 100 CIP year flow of over 1,500 cfs as they leave the town boundaries. 7 :.:....... ,....... . .... This project ❑Pima County p sis to implement the recommendations ❑OV Stormwater DC-14 Peglar Wash Basin OV from the Peglar's Wash Basin Mgt Study. This area Drainage Designs and Repairs-Construction One Time- 2 TBD :primarily deals with waters that travel through the CIP ['Unfunded 'Suffolk Hill's portions of the Town. 0 Pima County - Recurring- V-3 RooneyWash OV Complete yearly landscape work RooneyWash Vegetation Removal-Maintenance 2 annual OP $ 60,000 ❑ov Stormwater ❑Unfunded Remove sediment in drainage easement behind ❑Pima County Recurring- Dov StormwaterS-4 Shadow Mountain Estates West OV homes excessive sediment due to September 8,2015 Sediment Removal-Maintenance OPr 2 $ 7,500 storm. ❑✓Unfunded ❑Pima County Design and repair alley drainage-erosion to area of One Time- ❑ov Stormwater Shadow Mountain Estates West OV Drainage Designs and Repairs-Construction 2 $ 20,000 exposed gas lines CIP ElUnfunded QPima County Shadow Mountain Estates vegetation removal in alley Recurring- V-4 Shadow Mountain Estates West OV Vegetation Removal-Maintenance 2 $ 89,000 Dov stormwater drainage ways OP ❑Unfunded This project requires studying the area from Shannon road ❑Pima County to Thornydale Road,from Tangerine Road to Naranja Road ❑ov Stormwater M-3 Un-named(Shannon)Basin OV that would be used for future Town Management Study One Time- 2 $ 100,000 E Unfunded CIP Development/incorporation.This is roughly 640 acres that is composed of numerous tributaries. 10/22/2015 2:16 PM Page 3 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects • The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner;Description of Work :Cost Type Priority Year Estimated Cost Funding ['Pima County Remove sediment Vista del Oro Estates excessive Recurring- 5-5 Vista Del Oro Estates Sediment Removal-Maintenance2 $ 7,500: Dov Stormwater sediment due to September 8,2015 storm. OP f DUnfunded r, ❑Pima County Recurring- v-5 Vista Del Oro Estates Landscape in Vista Del Oro Estates Wash Vegetation Removal-Maintenance OP 2 $ 5,000' Day Stormwater QUnfunded ,This project requires studying the drainage areas that hold ❑Pima County ,future annexation potential for the Town of Oro Valley. 2a Stormwater M-4 Un-named Basin The study area would extend(south and west)from Management Study One Time- 1 TBD - Dunfunded existing Town limits to the boundaries of Orange Grove(to CIP the south)&Thornydale(to the west). STORM RELATED SMALL PROJECTS Recurring- ❑Pima county C-1 Newport Drive Concrete drainage channel repair Channel-MaintenanceOP 2 TBD DON/Stormwater ❑✓Unfunded ❑Pima County Recurring- C-2 Valle Del Oro Concrete drainage channel repair Channel-MaintenanceOP 2 TBD , Dov Stormwater D Unfunded Recurring- ❑Pima county C-3 Atua Drop inlet add riprap repair erosion Channel-MaintenanceOP 2 TBD , Dov Stormwater D Unfunded Recurring- ['Pima county C-4 Lambert Lane-Rancho Sonora Reconstruct drop inlet Channel-MaintenanceOP 2 TBD Day Stormwater QUnfunded ❑Pima County SR-1 9130 N Shadow Mnt Berm construction-evaluate Storm Related Issue-Maintenance TBE 2 TBD Dov Stormwater • ❑Unfunded ['Pima County SR-2 10865 N.1st Ave Erosion control and stabilization-evaluate Storm Related Issue-Maintenance TBE 2 TBD ' DD./Stormwater D Unfunded : ❑Pima County SR-3 901 W.Valle De Oro Erosion Control-evaluate Storm Related Issue-Maintenance TBE 2 TBD i DON/Stormwater D Unfunded ' ['Pima County SR-4 321 W.Golf View Erosion repair,rip rap shoulder-evaluate Storm Related Issue-Maintenance TBE 2 TBD Dov stormwater D Unfunded 10/22/2015 2:16 PM Page 4 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner Description of Work .Cost Type Priority Year Estimated Cost Funding Pima County SR-5 180 E Catalina Shadows ?Berm construction to protect driveway-evaluate 'Storm Related Issue-Maintenance TBE 2 = TBD s D• ov Stormwater ['unfunded ❑• Pima County SR-6 14255 N.Ave :Erosion mail box and ponding driveway-evaluate Storm Related Issue-Maintenance TBE 2 TBD 3 Dov Stormwater D unfunded ❑Pima County SR-7 8980 N.Camino de Anza :Erosion at mail box-evaluate Storm Related Issue-Maintenance TBE 2 TBD DOV Stormwater ['unfunded 3 ?❑Pima County SR-8 422 W.Hardy Repair berm -evaluate 'Storm Related Issue-Maintenance TBE 2 TBD QOV Stormwater Q Unfunded ❑Pima County SR-9 '255 E.Newport Erosion edge of pavement-evaluate Storm Related Issue-Maintenance TBE 2 TBD ❑ov Stormwater ❑✓Unfunded STORM RELATED ROAD CLOSURE-SAFETY Buena Vista north of Spring Valley Engineer,design and construct to make road and :One Time- ❑Pima County DC-15 Dr. sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD fiov Stormwater to sediment-improving safety ['Unfunded Buena Vista south of Calle Engineer,design and construct to make road and 'One Time- ❑Pima County DC-16 sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due TBD Dov Stormwater Concordia CIP to sediment-improving safety QUnfunded Engineer,design and construct to make road and ❑Pima County DC-17 Calle Concordia near Buena Vista sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due One Time- TBD Dov Stormwater CIP to sediment-improving safety Dunfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-18 Calle Loma Linda @ Calle Bonita sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flov Stormwater to sediment-improving safety QUnfunded Engineer,design and construct to make road and ' ❑Pima County One Time- DC-19 Calle Solano wash area sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD floe Stormwater to sediment-improving safety ❑✓unfunded Engineer,design and construct to make road and El Pima County DC 20 CDO south of Riverfront Park sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due One Time- CIP TBD floe Stormwater to sediment-improving safety 11]Unfunded 10/22/2015 2:16 PM Page 5 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No Location/Name Subdivision Owner Description of Work :Cost Type ` Priority Year Estimated Cost Funding Hardy Road,wash west of the Engineer,design and construct to make road and One Time ' ❑• Pima County DC-21 Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD Dov Stormwater roundabout. CIP to sediment-improving safety DUnfunded Engineer,design and construct to make road and ❑• Pima County One Time- DC-22 Highlands Mobile Park ,sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety Dunfunded Engineer,design and construct to make road and • ❑Pima County DC-23 La Cholla North of Glover Road Closure-SAFETY sediment removal all weather road and eliminate road closure due One Time TBD 3 Dov Stormwater CIP to sediment-improving safety Dunfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-24 La Cholla South of Casas Entrance Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD Dov Stormwater -to sediment-improving safety D• unfunded Engineer,design and construct to make road and -` ❑Pima County One Time- DC-25 La Cholla South of Lambert Road Closure-SAFETY sediment removal `all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety Dunfunded `Engineer,design and construct to make road and '- ❑Pima County One Time- DC-26 La Cholla South of Naranja Road Closure-SAFETY sediment removal all weather road and eliminate road closure dueCIP TBD Dov Stormwater to sediment-improving safety D• unfunded Engineer,design and construct to make road and ! ❑Pima County One Time- Dc-27 Lambert east of La Cholla Road Closure-SAFETY sediment removal 'all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety DUnfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-2s Lambert Lane west of La Cholla 'sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety Dunfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-29 Landoran Ln sediment cleanup>Road Closure-SAFETY ,all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety Dunfunded Engineer,design and construct to make road and ❑Pima County DC-30 Limewood East of Camino Del Plata sediment cleanup>Road Closure-SAFETY :all weather road and eliminate road closure due One Time- TBD ' Dov Stormwater to sediment-improving safety CIP Dunfunded ;Engineer,design and construct to make road and [• 'Pima County One Time- DC-31 Linda Vista near Eglestonsediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD ,; Dov Stormwater to sediment-improving safety Dunfunded 10/22/2015 2:16 PM Page 6 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Sa. Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. =Location/Name Subdivision 'Owner Description of Work :,Cost Type Priority F Year Estimated Cost Funding Engineer,design and construct to make road and ❑Pima County One Time- DC-32.Lomas De Oro at Lambert sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD t D• ov Stormwater to sediment-improving safety QUnfunded Engineer,design and construct to make road and ['Pima County One Time- DC-33 Moore East of La Cholla Road Closure-SAFETY sediment removal -all weather road and eliminate road closure due CIP TBD floV Stormwater -to sediment-improving safety ' Dunfunded Engineer,design and construct to make road and ! [• 'Pima County One Time- DC-34 Moore east of La Cholla Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD ;[Dov Stormwater -to sediment-improving safety CIP 2 Unfunded '`:Engineer,design and construct to make road and ❑Pima county •One Time- DC-35 Naranja @ Ironwood Ridge HS Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD , Dov Stormwater ;to sediment-improving safety ['unfunded ,Engineer,design and construct to make road and ❑• Pima county One Time- DC-36 Naranja East of Shannon °Road Closure-SAFETY sediment removal -all weather road and eliminate road closure due CIP TBD - D• ov Stormwater to sediment-improving safety flunfunded Engineer,design and construct to make road and • ❑• Pima County One Time- DC-37:Naranja West of La Cholla near HS Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD Dov stormwater `to sediment-improving safety flunfunded Engineer,design and construct to make road and OPima County One Time- DC-38 Northern Ave behind Walmart 'sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due CIP TBD flay Stormwater to sediment-improving safety flunfunded Engineer,design and construct to make road and ['Pima county One Time- DC-39`Northern Ave north of Cool sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flay Stormwater to sediment-improving safety [1]Unfunded Northern Ave south of Camino Engineer,design and construct to make road and One Time- ❑Pima County DC-40 Cortaro sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flov stormwater to sediment-improving safety flunfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-41 Northern Ave south of Magee sediment cleanup>Road Closure-SAFETY ,all weather road and eliminate road closure due CIP TBD flay Stormwater to sediment-improving safety ['Unfunded Engineer,design and construct to make road and ❑Pima County One Time- DC-42 Overlook south of Calle Concordia 'sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD flay Stormwater to sediment-improving safety flunfunded 10/22/2015 2:16 PM Page 7 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. 'Location/Name Subdivision Owner Description of Work Cost Type Priority Year Estimated Cost Funding Engineer,design and construct to make road and ❑Pima County One Time DC-43'Pistachio @ culverts sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety ❑✓unfunded Engineer,design and construct to make road and ❑Pima county One Time- DC-44 Pistachio @ Pomegranate sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD ` ❑✓ov Stormwater to sediment-improving safety E unfunded Engineer,design and construct to make road and ❑Pima County One Time- ' DC-45'Rancho Sonora Dr sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure dueCIP TBD =Eov Stormwater to sediment-improving safety ' E unfunded Engineer,design and construct to make road and One Time- ❑Pima County DC-46 Shannon South of Naranja sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD • Dov Stormwater to sediment-improving safety ['unfunded Engineer,design and construct to make road and ❑Pima county Shannon to stop traffic from One Time- DC-47 sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due TBD ° Eov Stormwater crossing the wash at the north end. to sediment-improving safety CIP E unfunded Engineer,design and construct to make road and ❑Pima county One Time- DC-48 Suffolk Dr @ Village sediment cleanup>Road Closure-SAFETY all weather road and eliminate road closure due CIP TBD Dov Stormwater to sediment-improving safety Unfunded Tangerin Rd Engineer,design and construct to make road and ❑Pima county One Time DC-49 Tangerine-by Camino Del Plata construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due CIP TBD ❑ov Stormwater 2016 to sediment-improving safety Unfunded Tangerin Rd Engineer,design and construct to make road and ❑Pima county One Time- DC-50 Tangerine-one at town boundary construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure dueCIP TBD ❑ov Stormwater 2016 to sediment-improving safety Eunfunded Tangerin Rd Engineer design and construct to make road and: ❑Pima County One Time- DC-51 Tangerine @ Camino Del Plata construction FY Road Closure-SAFETY sediment removal 'all weather road and eliminate road closure due CIP TBD ❑ov Stormwater 2016 to sediment-improving safety Unfunded Tangerin Rd Engineer design and construct to make road and ❑Pima county Tangerine and area between La One Time- DC-52 construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due TBD Qov Stormwater Cholla and La Canada. 2016 to sediment-improving safety CIP ❑unfunded Tangerin Rd ,Engineer,design and construct to make road and DC-53 Tangerine West of La Cholla construction FY Road Closure-SAFETY sediment removal all weather road and eliminate road closure due One Time- TBD 2016 ,to sediment-improving safety CIP 10/22/2015 2:16 PM Page 8 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner Description of Work ,,Cost Type =: Priority =.. Year Estimated Cost Funding Engineer,design and construct to make road and El county One Time- DC-54 Valle Del Oro RD sediment cleanup>Road Closure-SAFETY gall weather road and eliminate road closure due CIP TBD a Eov Stormwater to sediment-improving safety Eunfunded Engineer,design and construct to make road and t 4 ❑• Pima County One Time- DC-55;Valle Del Oro Rd at CC sediment cleanup>Road Closure-SAFETY 'all weather road and eliminate road closure due CIP TBD D• ay Stormwater to sediment-improving safety s 1=1 Unfunded ❑Pima County DC-56 La Cholla @ Tangerine La Cholla Sediment removal from drop inlet culvert Add Berm and waddles to slow and control/direct 1 annual $ 1,500;❑�OV Stormwater flow into the inlet s ❑Unfunded ['Pima County Storm Drain under Northern blocked by Dov Stormwater DC-58 8151 Northern Ave. Northern Ave. Debris removal from outlet 1 annual $ 500 Veg/debris/Sediment at outlet ❑Unfunded ❑Pima County Storm Drain under Northern blocked by DC-60 8252 N Northern Ave. Northern Ave. Debris removal from inlets 1 annual $ 1,500 ❑ov Stormwater Veg/debris/Sediment at inlet ['Unfunded ❑Pima County Northern blocked by Veg/debris/Sediment at ❑OV Stormwater DC-61 Casas Lindas Apts Northern Ave. Debris removal from inlet in ROW 1 annual $ 1,500 inlet E Unfunded ❑Pima County DC-62 2005 W Glover Rd Ironwood Ranch Debris/Veg/Sediment Removal from outlet of box culvert 1 annual $ 2,500 DOV Stormwater and manage downstream veg D unfunded :1:=1 Pima County Debris/Veg/Sediment Removal from outlet of box culvert DC-63 Bridge on Monterra Vista Dr. Monterra Knolls Possible Detention Project-Engineer/Design 1 annual $ 3,000 ❑OV Stormwater and manage downstream veg ❑unfunded ['Pima County Box Culvert in ROW west of Eagle Crest Dr.-inlet/outlet DC-67 Naranja Dr. Canada Ridge 1 annual $ 2,000 I:1OV Stormwater need debris/veg removal E unfunded Discuss Easement behind lots from 625 E Windy ❑Pima County DC-69 605 E Windy Peak Rancho Catalina Drainage improvements Peak Dr-8530 N Ranch Catalina with possible 1 $ 10,000 DOV Stormwater detention project.Al Coons ❑.,Unfunded Veg removal and Channelization of wash running across ['Pima County DC-71 363 E Sunburst-Paul Parisi Rancho Catalina Rancho Catalina Ave between 455 E Windy Vista PI.and 1 $ 7,500 DOv Stormwater 8405 N Rancho Catalina Dr. ['Unfunded 10/22/2015 2:16 PM Page 9 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx it Town of Oro Valley Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. Location/Name Subdivision Owner Description of Work Cost Type _ Priority Year Estimated Cost ' Funding Shadow ,E]Pima County 'Drainage Study-900 cfs Coming across Oracle DC-73 Oracle Square @ Hardy Mountain Drainage improvements 1 $ 10,000 r ED/Stormwater thru box culvert into Shadow Mountain Estates Estates E Unfunded Drainage improvements-channelization of sheetflow ,,❑Pima County Oracle Rd.Drainage N'of Calle DC-76 Vista Mantana onto Egleston contributing to flooding in Vista Mantana Drainage Study/Temporary Solutions 1 $ 30,000�0o Stormwater Concordia Subdivision EUnfunded ❑Pima County Pusch View Drainage channell on S'side of Pusch View Lane Needs DC-79 Rock Ridge Apts ROW 1 annual $ 1,500 ❑ Lane Veg cleanup/debris removal ov Stormwater E Unfunded ❑ Pima county Rivers Edge(1- DC-81 Rivers Edge S' D 89) Drainage Channel outlet to CDO needs Veg Mgmt Private 1 Private ov Stormwater QUnfunded ['Pima County Rivers Edge(103 DC-83 Rivers Edge N 120 Box Culvert crossing Lambert needs sediment removed 1 annual $ 4,500 ❑OV Stormwater pUnfunded ['Pima County DC-84 Vista Catalina Vista Catalina Channel N'of Vista Catalina/S'of Highlands Mobile Park 1 TBD $ 10,000 Dov Stormwater requires veg/debris/sediment removal Dunfunded ❑Pima County Storm Drain under Northern blocked by `Qov Stormwater DC-57 8305 Northern Ave. Northern Ave. Debris removal from outlet/Cannot find inlet 2 annual $ 500 Veg/debris/Sediment at outlet El Unfunded Storm Drain under Northern blocked by '['Pima county DC-59 8090/8041 Northern Ave. Northern Ave. Debris removal from inlets/outlets 2 annual $ 1,500 Ill OV Stormwater Veg/debris/Sediment at outlet ❑Unfunded ❑Pima County Tangerine Box Culvert-manage erosion cutting from road down DC-65 Ironwood Valley Dr. need to engineer permanent solution 2 annual $ 500;❑OV Stormwater Heights sides of box culvert 2 unfunded ❑Pima County Box Culvert in ROW east of Canada Ridge Dr.-outlet need DC-68 Naranja Dr. Canada Ridge 2 annual $ 1,500,❑OV Stormwater debris/veg removal ❑Unfunded ma Changes in Federal land to the east-altering ❑Pi omw DC-70 8620 N Glenhurst Pl. Sunnyslope Drainage improvements 2 TBD E Storater flows to the west 2 unfunded Oracle Rd.Drainage N'of Calle OV Aquatic ❑Pima County DC-75 Drainage improvements Drainage Study 2 $ 3,000:EOV Stormwater Concordia Center E unfunded w_, f'❑Pima County Oracle Road E' Drainage channel on E'side of Oracle Rd.Needs Veg DC-80 Rooney Wash ROW/ADOT.7 2 annual $ 1,500 ❑OV Stormwater side cleanup/debris removal at inlet ❑unfunded 10/22/2015 2:16 PM Page 10 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley Stormwater Projects. The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. °Location/Name Subdivision Owner=Description of Work ;Cost Type Priority Year Estimated Cost Funding ❑Pima County DC-85.10707 N Pomegranite Dr. Monte Del Oro Drainage requires refinement 2 $ 1,000 s Dov Stormwater a['Unfunded ,❑Pima County Tangerine Road @ Highlands Wash Debris/Veg/Sediment Removal from Inlet/outlet of boxov Stormwater DC-64 Monterra Knolls' 3 annual $ 5,000 ❑ (east of Monterra Knolls) culvert and manage downstream veg E Unfunded ❑Pima County Tangerine ROW erosion at entry from Tangerine and north alongov Stormwater DC-66 Reflection Ridge Dr Contact Water to discuss erosion around box 3 $ 500 ❑ Heights W'side ROW ['Unfunded ❑Pima County DC-72 Campo Bello Campo Bello Drainage improvements Drainage Study 3 TBD Dov Stormwater DUnfunded ❑Pima County Shadow Oracle Rd.Drainage S'of Calle DC-74 Mountain Drainage improvements Drainage Study 3 $ 1,500-EIOV Stormwater Concordia Estates DUnfunded Drainage from Wolfley/Ajacent Property adding to ['Pima County Oracle Rd.Drainage N'of El Mutterers Wash Discuss with property owners need for erosion DC-77 sediment Problem into Mutterers.Deep Erosion cuts next 3 TBD ❑OV Stormwater Conquistador Way S' to spillway on El Conquistador Way(Private Property) control ['unfunded ❑Pima County Mutterers Wash Drainage Channell exiting Valle Del Oro townhomes needs Discuss with property owners need for erosion DC-78 Valle Del Oro Town Homes 3 Private ❑ay Stormwater S to be cleaned...Veg/Debris/Sedimet control DUnfunded ['Pima County Pusch Ridge Hillside at 10831 N Pusch Ridge View PI.Needs Erosion Dov Stormwater DC-82 Rivers Edge N' Pusch Ridge Vistas II HOA 3 Private Vistas II Control ['unfunded ['Pima County Pusch Ridge DC-86 1001 E Linda Vista Blvd Sweep Road in front of house 3 $ 150 Day Stormwater Estates ['Unfunded ❑Pima County DC-87 Rancho Sonora Dr Rancho Sonora Trash in Wash up against barracades 3 $ 150 Day Stormwater ['Unfunded 10/22/2015 2:16 PM Page 11 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx Town of Oro Valley = Stormwater Projects The following Stormwater Maintenance Projects are categorized by: • Maintenance Recurring-Sediment Removal&Cleaning • Drainage Design and Repair-Construction • Storm Related Issues-Maintenance • Vegetation Removal. • Management Studies • Channel-Maintenance No. ,Location/Name Subdivision Owner Description of Work Cost Type Priority Year Estimated Cost Funding ❑Pima County Shadows of the DC-ss Shadows of the Ridge +Sediment removal from drop inlet culvert $ 2,500'❑OV Stormwater Ridge Q✓Unfunded 10/22/2015 2:16 PM Page 12 F:\2 DIV OPERATIONS\STORMWATER\PROJECTS\Projects 2015_ListingUpdated.xlsx