Loading...
HomeMy WebLinkAboutPackets - Council Packets (43)Council Meeting Regular Session November 4, 2015 1 Town Council Meeting Announcements 2 Upcoming Meetings 3 4 5 www.YourVoiceOV.com Town Council: November 4, 2015 Mayor Hiremath, Members of the Town Council, thank you for having us again tonight My name is Elisa Hamblin, I’m the Long Range Principal Planner in the Development and Infrastructure Services Department I’m excited to discuss the Your Voice, Our Future project with you and all those in the audience A lot of work has been completed in the last two years We are now at a critical juncture and asking for your tentative adoption of the 90% draft plan tonight I would like to take a moment and recognize six of the Your Voice Committee members that have been selected by their respective committees to represent their work, and include: Community Committee: Tom Gribb and Marilyn Lane Environment Committee: Bob Swope and Bob Milkey Development Committee: Bill Adler and Mike Schoeppach Three of them will be participating in portions of this presentation in just a bit I would also like to recognize many other committee members that are here in the audience – thank you for your support 6 Your Voice, Our Future Project Identify common values and opportunities Find improvements Guide critical decisions about: Our future Quality of life Build a community-owned plan of action 7 The Your Voice, Our Future project set out to identify what the community values and chart a plan of action to get there We are a community of excellence which constantly strives for ways to improve The plan is an update to the Town’s community plan, commonly referred to as a General Plan Our previous General Plan was adopted in 2005 and reflects the directions of that period in time The State does require an update to this plan every ten years and action by Council tonight will serve as meeting that requirement An update to the plan was also needed due to changes in the community’s demographics This plan covers many topics of importance for the Oro Valley community and the directions from it impact the Town’s future and quality of life for years to come 7 Project Schedule We are here! Phase 1 Phase 2 Phase 3 In conjunction with creating the Public Participation Plan, the project was laid out into 3 phases Phase 1 “Let’s talk” was the information gathering phase Through events, surveys and extensive outreach we created a foundation for the plan through the community’s Vision and Guiding Principles In Phase 2 “Let’s think” we pulled together resident committees to make some hard decisions They were charged with using the foundation of Phase 1 and building a plan – which is where we are now, as indicated by the star Coming up in Phase 3 “Do it! Make it so” we will be going back out to the community to share information about the plan before seeking final voter ratification in November of next year Town Council 11/4/15 8 Phase 1 – Let’s talk! Where we’ve been: Phase 1 In Phase 1 we went to people to where they live, work, shop and play We made every effort to make engagement with this project meaningful and accessible At our over 60 community events we collected over 2,600 post-it note comments We had almost 600 surveys completed and almost 2,000 people visit our project website We have had extensive media coverage to help spread the word, including news articles, school newspapers and social media Together the information that was gathered from many voices set a clear direction for the choices to be made One of the key components of the outreach in Phase 1 was our project surveys Town Council 11/4/15 9 Surveys Results Residents in Oro Valley… Most value: Safe community with low crime rate Scenic and natural beauty Sense of community Least value: Lack of services Rapid growth To build a better community focus on: Managing land development Maintaining safety Employment opportunities Parks Festivals or cultural events Shopping opportunities In order to gather key information from people in the community, we used 4 survey methods These surveys gave us statistically projectable and balanced data as well as an opportunity for broad community participation We had hundreds of people who participated through these survey methods The directions from these surveys affirmed what the people of Oro Valley value most – including public safety, natural beauty and the sense of community Although public safety and natural beauty have continued to be a top priority for residents since the last General Plan, the sense of community has increased in importance. In 2005 the community placed an emphasis on the rural character of the Town, whereas now that has shifted to thinking of Oro Valley as a complete community with its own distinct character and services meeting the needs of its residents These priorities were consistent across all our survey methods The people also told us what to focus on in the future, including managing development, maintaining safety, and increasing opportunities for employment and other amenities These directions shaped the Vision and Guiding Principles Town Council 11/4/15 Oro Valley’s Vision “What should Oro Valley be like in 10 years and beyond?” Oro Valley’s Vision for the Future To be a well-managed community that provides all residents with opportunities for quality living. Oro Valley will keep its friendly, small-town character, while increasing services, employment and recreation. The Town’s lifestyle continues to be defined by a strong sense of community, a high regard for public safety and an extraordinary natural environment and scenic views. The community’s V&GP were crafted to answer the question of what Oro Valley should be like in 10 years and beyond Key values like safety, natural beauty and community are repeated again and again The Vision and Guiding Principles provide high level guidance and allow us to move forward They reflect the community’s voice and serve as the foundation of the plan Town Council 11/4/15 11 Where we’ve been: Phase 2 41 Your Voice Committee members 29 Your Voice Committee meetings 6 open houses and forums 25 goals 77 policies 163 actions 7 Planning and Zoning Commission meetings 3 review drafts 1,080 comments during review period 39 updates with Town Boards and Commissions Phase 2 – Let’s think! Now using the V&GP in phase 2, we brought together many committee members to actually build the plan You can see some of the numbers up on the screen, but I really want to emphasize the work of the committee members 41 of our committee members met for a total of 29 committee meetings Their work built this draft plan of action – which includes 25 goals, 77 policies and 163 actions Town Council 11/4/15 05/12/2016 12 Committee Challenges Stay on track with the Vision and Guiding Principles The Your Voice committees truly accomplished a great amount of work The members of these committees were recruited through an open application process to ensure balance and diversity We have committee members ranging from high school students to retirees, from professionals to stay at home parents, and from recent transplants to 30 year residents Together they were collectively challenged to be thorough, productive and collaborative all while working with the V&GP These committee members came together across a series of meetings, that ran from September 2014 all the way through this last month There was not always agreement on every issue, but there was always healthy debate These committee members truly dove into their work Town Council 11/4/15 13 Review Drafts Committee Review 30% Draft Public Review 60% Draft Recommended 90% Draft April June September What you have before you tonight is the 90% draft of the plan But there were many steps to get here Through the committee process there were roughly 5-7 versions of each committees work before we even got to the 30% version in April Through review and refinement, a 60% plan version was released this last summer This included a state-mandated 60 day review period The resulting 90% plan was released in September This draft was truly inspired and shaped by the community It was written for the all of the community and its language, themes, organization and graphics are all designed to engage people into using this action-oriented plan Town Council 11/4/15 05/12/2016 14 25 Goals “What do we strive for?” 77 Policies “What is the path?” 163 Actions “What actions do we take?” Ch. 6 GETTING TO WORK Ch. 4 ENVIRONMENT Ch. 5 DEVELOPMENT Ch. 3 COMMUNITY VISION AND GUIDING PRINCIPLES The plan itself, which is before you tonight was built off the community’s V&GP The main chapters of the plan lay out the community’s goals, policies and actions Chapter 3, 4 and 5 tell us what we strive for and the path to get there Chapter 6 is a truly unique feature of this plan as it outlines specific actions to take to achieve those goals and policies Town Council 11/4/15 15 The process was driven by the desires of the people Began with the foundation of the Vision and Guiding Principles V&GP Goal Policy Action A True Community Process High level On the ground Mid level Unfortunately Bill Adler is unable to be with us tonight. I would like to share a few points that he has spoken to previously and will strive to do them justice. This is a community process that started with the Vision and Guiding Principles and has filtered through every level of the plan. If Bill were here he would give you an example of how to use the plan. . . Planned Area Development amendment, Commercial office to Medium density residential Guiding Principle: Manage how we grow and maintain high design standards Goal: V. Neighborhoods that include access and effective transitions to open space, recreation, and schools and that are supported by shopping and services which meet daily needs. Policy: LU.5. Provide diverse land uses which meet the Town’s overall needs and effectively transition in scale and density adjacent to neighborhoods. Action: 125. Maintain the unique character of Oro Valley by studying and updating: . . . Land use regulations that define and incorporate effective compatibility standards. Town Council 11/4/15 16 A Proactive Plan FORWARD THiNKiNG Again, one of the points that I believe resident and committee member Bill Adler made at the last meeting was that this plan is forward thinking. Bill has years of experience working in the community and participating in numerous General Planning efforts. He spoke of times in the past that the Town has played ‘catch-up’ Now, this plan sets a future looking path, which all started with the Vision and Guiding Principles. They answer that fundamental question of “what should Oro Valley be like in 10 years and beyond?” Now to present more about the plan I have representatives from each committee We will first hear from Marilyn Lane from the Community Committee, then by Bob Swope from the Environment Committee and lastly Mike Schoeppach will present for the Development Committee Town Council 11/4/15 17 Community Goals and Policies Community Goals Economy Complete Community Healthy Lifestyles Neighborhoods Lifelong Learning Town Services, Buildings and Facilities Pages 19 – 27 (Marilyn Lane) Town Council 11/4/15 18 Community Vision and Guiding Principles Focus on community safety and maintain low crime Keep the unique community identity as a special place Create a complete community with a broad range of shopping, dining and places to gather Grow the number of high quality employment opportunities Keep Oro Valley a family- friendly community Support and build on high quality of schools Provide more parks, recreation and cultural opportunities for all ages Maintain financial stability (Marilyn Lane) Town Council 11/4/15 19 Environment Vision & Guiding Principles Preserve the scenic beauty and environment Keep the unique community identity as a special place Promote conservation of natural resources (Bob Swope) Town Council 11/4/15 20 Environment Goals and Policies Sonoran Desert Resources Water Resources Cultural Resources Clean Environment Pages 28 – 37 (Bob Swope) Town Council 11/4/15 21 Development Goals and Policies Development Goals Land Use and Design Conservation of Natural Resources Neighborhoods and Quality of Life Planned Built Environment Land Use Map Development, Growth Areas and Special Planning Areas Infrastructure Community Services/Utilities Transportation/Circulation Pages 38 – 60 (Mike Schoeppach) Town Council 11/4/15 22 Development Vision and Guiding Principles Keep the unique community identity as a special place Promote conservation of natural resources Manage how we grow and maintain high design standards Minimize traffic and increase ways to get around Town (Mike Schoeppach) Town Council 11/4/15 23 Designates potential development Larger planning area Limited land use changes Use the amendment process One change: Oracle/El Conquistador area New growth areas Clean-up work - accuracy Land Use Map Page 51 (Mike Schoeppach) Town Council 11/4/15 24 Getting to Work: Actions Pages 61 – 85 Fulfill the Vision and Guiding Principles Includes: Actions to be taken Related policies Timeframe to complete Responsible departments Ideas to action: Strategic Plan, workplans and future work Details – TBD! Before talking more about the plan I want to quickly thank those committee members who have taken their time to present to us tonight – they have truly represented the work of their diverse groups well In chapter 6 of the plan we have outlined specific actions to fulfill the desires of the community These actions are based all the way back on the V&GP and line up with the plans goals and policies These actions demonstrate a real commitment to carrying the plan forward into the future Each action includes a timeframe, within the next ten years, that the work will be started and also identifies the Town department that will be responsible for working on that action They will be implemented through various mechanisms, including the Town’s strategic plan and department work plans and the annual budgeting process There is still much more work to be done Town Council 11/4/15 25 Your Voice, Our Future Plan Tone and content Accessible Voice of the people Themes and values Reflects changing demographics Affirmed existing and new community values Use and future plans User-friendly Actions imbedded in the plan In sum total this plan before you is accessible and reflects the voice of the people It affirms key values that we heard from the very beginning – like safety, natural beauty and community The plan aims to be user-friendly and live on through combined community action Town Council 11/4/15 26 05/12/2016 What’s Next PHASE II PHASE III We have held three meetings with the Planning and Zoning Commission At their last meeting on October 20 they unanimously voted to forward a recommendation to the Town Council for tentative adoption of the plan This recommendation included one condition and two minor modifications, which were offered by the Planning and Zoning Commission to further clarify the work of the Your Voice Committees and do not change the intent or substantial work already completed These items are included with your materials tonight Tonight we’re here with you at this public hearing to ask you for tentative adoption of the plan Tentative adoption is being offered on this version of the plan so that we can first, recognize the substantial work that has been completed by the Your Voice Committees, second it allows for continued clarification and refinement to fill in the last 10% of the plan over the next year, and lastly action tonight serves to meet the 10-year legally required timeframe set by State lawy Action tonight sets us up to do the work of phase 3 – where we will be back out in the community talking to people about the plan In order to do this in the most effective way, we’ll be working with residents to chart a course to reach people We’ll be creating a custom-tailored approach for outreach and education on the plan to ensure as many people as possible know about the plan A 100% version of the plan will then be prepared – which will be presented to the Planning and Zoning Commission and Town Council in late summer of 2016 before proceeding to the public vote in November of next year Town Council 11/4/15 05/12/2016 27 Tonight Staff recommends that the Town Council ‘tentatively adopt’ the draft plan November timing is key – within the 10 year legal timeframe Allow for: Technical edits Ability to fill in the last 10% Return for recommendation in 2016 with the Final Plan Tonight we are asking that the Town Council tentatively adopt the plan, with an acknowledgment that we still need to fill in the last 10% of the plan with the community’s help This adoption is important on many levels, as I’ve already mentioned, but again timing on this is key to ensure action within the 10 year legal timeframe Town Council 11/4/15 28 www.YourVoiceOV.com Thank you for having us here tonight We appreciate your time and attention I would again like to acknowledge the countless residents who have helped with this plan over the last two years, including a Scoping Committee, Communications Advisory Committee, the Your Voice Volunteers, and the Your Voice Community, Environment and Development Committees as well as many others who helped spread the word and share their ideas for the future of Oro Valley – thank you I also wish to acknowledge the support of two members of Council in particular, Joe Hornat and Mike Zinkin, who served as members of an Oversight Committee which provided feedback on the process and making sure we were reaching people in the community For those in the audience, please check out our website which also includes a link to the plan itself Keep us in mind – if you have a group you would like us to come to next year, please let us know There is also a sign-up sheet in the back if you would like to included in our project mailing list With that, we are willing to answer any questions or offer clarification on any items that we have presented here tonight Q: What about the last 10% A: We believe the last 10% of the plan will be filled in over the next year. Because of the extensive outreach that has been done, we don’t anticipate any changes in direction. We expect that last 10% will help further the work and direction already establishes as well as help clarify and refine what’s in place. We also plan on pulling together a resident Communications Advisory Committee to help outline the path for Phase III. Town Council 11/4/15 30 Addressing Finance Role of funding Use existing resources and funding Community will be included in funding conversations Reference in: Foreword Chapter 3-6 Chapter 7, new section on “Implementing the Plan” Town Council 11/4/15 31 Existing: Low Density Residential 1 (0.4-1.2 DU/AC) Proposed: Medium Density Residential (2.1-5 DU/AC) Recommended: No Change Land Use Map Proposals Tangerine Road near La Cholla Blvd Town Council 11/4/15 32 Existing: Commerce/Office Park (COP) Proposed: Community/Regional Commercial (CRC) Neighborhood Commercial Office (NCO) Recommended: No Change Land Use Map Proposals Oracle Road near Linda Vista Town Council 11/4/15 33 Existing: Low Density Residential 1 (0.4-1.2 DU/AC) Proposed: Neighborhood Commercial/Office Recommended: No Change Land Use Map Proposals Oracle Road near Hardy Road HARDY RD HARDY RD ORACLE RD Town Council 11/4/15 34 Work with Building and Development Interests Developers Forum (including MPA and SAHBA) Mailing and emails: Nov and Dec (2014) Event: Dec 9 (2014) Land Owners and Developers Open House (+3 acres) Mailing and emails: Feb and Apr (2015) Event: Feb 23 (2015) Metropolitan Pima Alliance (MPA) Communications: May (2014), Jun, Jul, Aug (2015) Information booth: May 1 (2014) Presentations: May 5 (2014), Jun 23 (2015) Southern Arizona Home Builders Association (SAHBA) Communications: Jun, Jul, Aug (2015) Presentation: July 7, Aug 17 (2015) 84 comments from SAHBA and MPA Town Council 11/4/15 35 36 Fry’s Fuel Center Town Council November 4, 2015 Thank you Mayor, members of the Council 37 Purpose Planned Area Development Amendment Conditional Use Permit Conceptual Site Plan and Landscape Plan Conceptual Architecture 1st Avenue Pusch View Lane Oracle Road Our purpose for tonight is to consider the Applicant’s request for a proposed Fry’s Fuel Center in the Rooney Ranch Shopping Center between*… Proposed fuel center requires… Planned Area Development Amendment Conditional Use Permit Conceptual Site Plan and Landscape Plan Conceptual Architecture for… I have separated the presentation into each of the pieces and will address each in the upcoming slides. Please note: 4 separate motions will be required. 38 1st Avenue Pusch View Lane Oracle Road 1. Planned Area Development Amendment Site Design Grouping of uses Automotive group 500 feet Primary aspect of the 1st request, the PAD Amendment, is to consider Site Design -Current PAD intended for grouping of similar uses, which resulted in* - in-line stores near rear of site* - individual pads closer to Oracle Road along the street frontage PAD permits 2 gas stations and*…Existing Shell gas station on…Idea was to establish an “Automotive cluster” w/gas stations no more than 500 ft apart.* Challenges with locating high traffic auto uses near one another, results in… - congestion/traffic Applicant’s PAD amendment request is to ….* Gas stations require a CUP in the Rooney Ranch PAD 39 2. Conditional Use Permit Additional review to address potential impacts CUP Evaluation Criteria Town of Oro Valley Conditional Uses…typically have characteristics which can have a negative impact on adjacent areas and therefore may not be appropriate for every site. Generally require additional review. Code establishes specific CUP criteria for evaluating these types of uses. 40 Conditional Use Permit Review Criteria Not be materially detrimental to the public health, safety, or welfare Noise, smoke, odor, dust, vibration or illumination; Explosion, contamination, fire or flood; Unusual volume or character of traffic. Reasonably compatible with the types of use permitted in the surrounding area. The criteria is summarized on the screen: As discussed in your report, the proposal is consistent with the these criteria. Staff primarily focused on traffic and circulation related to the proposed gas station*…I will focus on this. Conditional Use Permit Managing traffic Background on the Shopping Center As discussed in your report… two drives w/in the center* 1. Access drive near store fronts that provides convenient access for customers. - expect to have to slow down (lots of traffic) - Traffic calming (speed bumps/stop signs)* 2. Ring Road designed as alternative to allow for faster traffic w/fewer potential conflicts. For example: - if someone entered on First Avenue and wanted to go to Rubios. Much faster route. The ring road was deliberate and must be preserved. 42 Traffic 1st Avenue Proposed fuel center shown in context of existing center Proposed fuel center as outlined… Maintains the ring road providing access to the light Separates fuel center traffic from ring road traffic by - removed parking - incorporating 2 landscape islands to limit access points Condition of approval has been included in Attachment 2 requiring extending the island to restrict the access points and reduce the potential for traffic conflicts Sidewalk connections greatly improving pedestrian connectivity w/in the center to minimize traffic conflicts. 43 Traffic The new gas station will generate traffic from the following sources: Internal capture – essentially traffic that is already visiting the shopping center, will also use the gas station. This is considered existing onsite traffic that was already using the shopping center. Pass-by – which is a portion of newly generated offsite traffic originating from the adjacent streets, seeing the gas station, and making an on the spot decision to enter onsite and utilize the station Destination or Net New Trips – again, this a portion of newly generated offsite traffic, but they have made the decision to travel to the shopping center with the expressed desire to utilize the gas station only, and then leave without utilizing the shopping center for any other business. The criteria is summarized on the screen: As discussed in your report, the proposal is consistent with the these criteria. Staff primarily focused on traffic and circulation related to the proposed gas station*…I will focus on this. Traffic 1st Avenue 50% Shopping center traffic 50% Fuel only traffic Paul K. 45 Existing Site Traffic Distribution 21% 9% 16% 18% 12% 7% 8% 6% 3% Property is located… 46 Traffic The existing total shopping center has the potential of generating 19,243 ADT and 1597 PH (PM) trips with a distribution as noted on the previous slide: According to the newly generated offsite traffic volumes represented in the applicant’s traffic analysis, this project will add approximately 20% additional trips to the two driveway ingress/egress points on 1st Ave. This equates to approximately 70 new trips in the peak hour at the signal on 1st Ave. And 28 new trips in the peak hour at the 1st Avenue right-in/right-out pork chop just to the east. The criteria is summarized on the screen: As discussed in your report, the proposal is consistent with the these criteria. Staff primarily focused on traffic and circulation related to the proposed gas station*…I will focus on this. Traffic Proposed fuel center will displace approximately 43 parking spaces.. - expect these* parking fields to be better utilized Displaced parking = minimal impact During the PZC hearing, discussion focused on the north parking field specifically. 48 Parking lot improvements PZC concerns, specifically <picture>. Overhang = narrow Additional conditions were included: The main elements are: *Sidewalk *Cart Corral *ADA sidewalk 49 3. Conceptual Site Plan Fuel center 7 pumps Customer parking Connectivity Sidewalk connections Oracle Road Scenic Corridor Overlay District (ORSCOD) Conceptual Site Plan - 7 gasoline pumps - Customer Parking - Landscape Islands…separating traffic. - Sidewalk connections…filling in “gaps” - Subject property within ORSCOD - Consistent with these requirements, including Building height Setbacks Architecture 50 Oracle Road Scenic Corridor Overlay District (ORSCOD) 1st Avenue Oracle Road As you can see on the images, the subject property is located at a lower elevation than the surrounding roadways and properties…reducing the visual impact of the center. 51 1st Avenue Conceptual Landscape Plan Landscaping Connectivity CLP: - Utilize the existing landscaping in the buffer yard along First Avenue Additional landscaping along the east and west sides of the proposed fuel center, as well as the new landscaping in the two landscape islands. All landscaping to be consistent with the Rooney Ranch PAD and match the existing center. 52 4. Conceptual Architecture Town of Oro Valley East elevation North elevation Worked extensively with the applicant… This is not a typical gas station. Mission style architecture. Applicant has revised the architecture to be “site specific”, by pulling in numerous architectural details common to the center. 53 Rooney Ranch Architecture Common Arch. Features: Red tile roof Medallions Condition added to revise columns to match existing store 54 Summary and Recommendation Requests consistent with: General Plan Vision, Goals and Policies Conditional Use Permit Review Criteria Rooney Ranch Planned Area Development Zoning Code Planning and Zoning Commission recommends approval, with the attached conditions. Conceptual Design Review Board recommends approval, with the attached conditions. Town of Oro Valley Requests consistent with: General Plan Vision, Goals and Policies Conditional Use Permit Review Criteria Rooney Ranch PAD Zoning Code PZC recommends approval….with conditions listed in Attachment 2. CDRB recommends approval…with conditions listed in Attachments 3 & 4 55 56 Condition of Approval – Conditional Use Permit The landscape island between the fuel center and the ring road shall be extended to reduce the width of the access points into the fueling area. Mountable curb can be provided to accommodate the turning movements for the fuel truck. Notwithstanding an extension to the current allowance for the outdoor display of goods, all outdoor dispensers must be removed no later than February 1, 2016. 57 Conditions of Approval – Site Plan The landscape island between the fuel center and the ring road shall be extended to reduce the width of the access points into the fueling area. Mountable curb can be provided to accommodate the turning movements for the fuel truck. Provide an ADA compliant sidewalk connection to the existing sidewalk on First Avenue at the signalized intersection. Provide a “no u-turn” sign in the landscape median oriented toward the parking field on 58 Conditions of Approval - Architecture The proposed stone columns adjacent to the fuel dispensers, shall be revised to match the existing columns on the Fry’s Grocery store. The existing architectural detail on the Fry’s Grocery store fascia shall be added to the gas canopy fascia. 59 (per International Traffic Engineers (ITE) Manual) Traffic Volumes Already in shopping center Pass By Already on road network New Trips Specific trips to fuel center Rooney Ranch traffic capacity 19,000 ADT (Average Daily Trips) 60 Internal Elevations West Elevation South Elevation 61 “Peak-hour” parking 62 Available shared parking 63 Oracle Road vicinity 64 Conceptual Architecture – 1st East Elevation North Elevation 65 66 Fry’s Fuel Center 18 10661 N. Oracle Road Oro Valley, AZ 67 Project Description New fuel center within an existing Fry’s Grocery Store Parking lot Request: Town Council discussion and approval of: Adopt PAD text amendment to revise location requirements (o) 15-15 Approve CUP for fuel center within Rooney Ranch Shopping Center OV815-002 Conceptual site plan and landscape plan for fuel center Conceptual Architecture for fuel center 68 Project Location 69 Proposed Overall Site Plan Total Lot size: 301,396 S.F. 6.92 AC Existing Fry’s Area: 62,079 S.F. Total lot Building Area: 67,643 S.F Total Lot Coverage: 22.4 % Parking Required: 3.72 spaces/1000 S.F. = 250spaces (ratio requested by alternative parking analysis) Proposed: 326 Spaces 70 Proposed Site Plan Canopy: 5,418 S.F. Kiosk: 176 S.F. (±52 S.F. exposed) Max Height: 25’ within 100’ of 1st Ave. Canopy Height: 18’ – Top of canopy 21’3” – Top of feature Kiosk Height: 13’ 71 Project Summary Preapplication February 17, 2015 P C Hearing October 6, 2015 Approved 5-0 CDRB Hearing October 13, 2015 Approved 3-1 Conditions of Approval provided October 16, 2015 72 Fry’s Prototype 73 First Elevation Rendition 74 Proposed Elevation 75 Existing Conditions 76 First Landscape Rendition 77 Proposed Landscape 78 Overall Site Plan Conditions of Approval Note: Conditions of Approval provided October 11 no traffic concerns. The landscape island between the fuel center and the ring road shall be extended to reduce the width of the access points into the fueling area. Vehicle wheelstops shall be provided in all parking spaces in the row of parking immediately adjacent to the north side of the existing grocery store. A min. of 3 parking spaces in the row of parking adjacent to the north side of the existing grocery store shall be converted to ADA accessible spaces. The required cart corral shall extend the length of two parking spaces and shall be located immediately adjacent to the existing landscape island in the two “head-to-head” parking rows. Provide an ADA compliant sidewalk connection to the existing sidewalk on First Avenue in an area north of the existing grocery store. Provide a “no u-turn” sign in the landscape median oriented toward the parking field on the north side of the grocery store. 4. Complied 2. Complied 3. Complied 5. Under Design 6. Complied 1. Complied 79 Thank you. Any Questions? 80 81 TRAFFIC EXHIBIT 82 Trip Generation 83 Trip Generation Note: This trip generation calculation is provided for the entire development without applied volume reductions as part of this study. If applicable, trip net of interactions and pass-by trips are shown below. 84 Vehicle Tracking Exhibit 85 Photometry 86 Fuel Center Safety Emergency shut-off valve Reduces the risk of fire, explosion, personal injury, property damage and environmental contamination. Shear groove leaks to prevent fuel from leaking into sumps Fusible link releases to automatically close the valve to reduce fire hazards. Dry reconnectable Breakaway Upon separation the dual valves seat automatically, stopping the flow of fuel and limiting any fuel spillage while protecting the dispensing equipment. Sprinkler for Kiosk and Canopy Both the kiosk and canopy have automatic sprinklers 87 Tank Leakage Concerns 88 Tank Leakage Concerns 89 90 Nakoma Sky Planned Area Development Amendment Town Council November 4, 2015 91 Purpose Planned Area Development Amendment: 1) Land Uses 2) Tentative Development Plan 3) Architecture and building massing Tentative Development Plan Architecture / Building Massing Thank you Mr. Mayor, Town Council, I’m Chad Daines… Our purpose here tonight is to consider the applicants request for a Planned Area Development Amendment for the Nakoma Sky senior living project The requested change basically has three elements which I’ll cover in my presentation: First: The applicant proposes changes in the allowed land uses within the development Second: The applicant proposes a number of changes to the Tentative Development Plan which was adopted in conjunction with the rezoning Last, the applicant proposes changes to the architectural concept and building massing for the project 92 Location Oracle Road 1st Avenue Naranja Drive Lambert Lane CDO Wash This slide shows an overview of the site. It encompasses 77 acres on the southeast corner of Naranja and 1st Avenue. North of the site is planned large lot residential West across 1st Avenue is existing large lot residential The southern boundary of the site abuts the Canada del Oro wash corridor You can see the commercial development to the south with the Home Depot and Target shopping centers along Oracle Road 93 Background Rezoning approved January 2015 Land Uses Tentative Development Plan Architectural Concept Revised plans submitted in June Staff reviewed against approved plans “Significant changes” require reconsideration I wanted to provide a little background on the request. The Rezoning to PAD was approved in January 2015 Defined land uses allowed within the project Adopted a Tentative Development Plan to guide development of the property Adopted a specific architectural concept for the project The applicant submitted revised plans in June which were reviewed by staff for conformance with the approved PAD. The revised plans constituted a “significant change” as defined by the Zoning Code and require Planning and Zoning Commission and Town Council reconsideration of the rezoning and the proposed changes by the applicant. 94 Comparison – Approved and Proposed Plans Lambert Lane Approved Plan Proposed Plan 1st Avenue This slide shows a side by side comparison of the approved and proposed plans. I’ll go through a summary of the changes proposed by the applicant: The applicant proposes to move the memory care and assisted living to the main campus core area to locate these uses close to support services within the main campus core. Changed the independent living area to a parking lot to serve the al/mc. This change really precipitated that balance of the changes in the plan. The approved plan included a community park located just south of the main campus area. This community park was envisioned as a shared area between residents of Nakoma Sky and members of the larger community to promote interaction. The park area is proposed to be split, leaving a private park with amenities south of the main campus building and moving the community park area to First Avenue. This area along 1st Avenue is impacted by drainage, but the passive amenities (dog park, barbeques, ramadas) planned within the park area can be designed around these drainage corridors. The balance of this area is proposed for independent living units. The Planning and Zoning Commission felt it was important to maintain some community level amenities near the main campus building to foster interaction between the community and residents and has recommended a condition requiring the trailhead area to be enhanced with ramadas, walking paths, drinking fountains to serve the planned trail system along the CDO wash. Lastly, the applicant has proposed to add a new 81 space parking area near the front of the building for convenient parking for residents and guests. The underground parking area has not been reduced. 95 Approved Architectural Concept Resort architectural character Reduced building heights at ends of buildings Varied roof/wall planes and architectural features Variation in materials and colors Landscaping on terraces The central element of the project is a five story residential apartment building. This image is the approved architectural rendering for the project, which can be characterized as resort in appearance with the building materials, terrace landscaping and tower elements The architectural treatment of the building was fundamental to the original approval and included elements which were designed to reduce the visual impact of the five story building. These elements included reductions in the ends of the building to step down the building height. Use of varied roof and wall planes to articulate the building façade Use of varied materials and colors to modulate the building Use of landscaped terracing and shade elements to reduce the mass of the building 96 Proposed Architectural Concept Apartment architectural character Modified conditions to improve and enhance architectural elements, as determined by Conceptual Design Review Board and Town Council This image shows the proposed architectural rendering. As you can see, the proposed concept is a different style of architecture than the original, and is more apartment in character based on the building materials, flatter facades and elimination of the tower elements and reduction in terrace landscaping. The applicant will be going into a greater level of detail on the proposed architecture. The Commission has recommended conditions which require this plan to be enhanced and improved to restore the important architectural elements which were included with the original approval. (building height step downs on ends, varied roof and wall planes, landscaped terracing, architectural features). So, in short, the Commission felt the proposed architectural concept was a baseline, and the architectural concept needs to go further. The applicant did show improved elevations to the Commission, which have not been formally reviewed by staff. The recommended conditions from the Commission require refinement and improvement during the design phase of the project. If approved tonight, the expectation is that a refined design based on the conditions of approval will be submitted for staff review, with the ultimate design determined by the Conceptual Design Review Board and Town Council. 97 Planning and Zoning Commission recommends approval Conditions to enhance/improve architectural concept and restore some community level amenities south of main campus core Recommendation In summary, the Commission has recommended approval of the request, subject to a number of conditions which are aimed at enhancing and improving the architectural concept, as well as conditions designed to restore some community level amenities south of the main campus core area. 98 99 100 101 102 Community Park - Drainage 103 Attachment 6 104 105 106 107 108 109 110 111 112 113 114 115 116 Attachment 7 117 Attachment 9 118 Attachment 9 119 120 Residential Senior Living Units Public / Private Park Memory Care / Assisted Living Independent Living Units Independent Living Units Independent Living Units Retail / Welcome Center First Avenue Lambert Lane CDO Wash This shows the approved development plan for the site. The central element is a five story 400 unit senior living units structure (red) Adjacent is a planned public and private open space park area (ble) The area shown in yellow is a memory care / assisted living facility The area shown in purple is a retail area and welcome center The areas shown in green are independent living units A numbe3r of changes have been proposed to this plan, which the applicant will cover in greater detail in their presentation. 121 Approved Tentative Development Plan Multi-use senior care facility Senior apartments Assisted living / memory care Independent living 400 units maximum Support commercial Community park Lambert Lane First Avenue Memory Care / Assisted Living Senior Apartments Community Park Commercial Independent Living Independent Living 122 Proposed Tentative Development Plan Memory care / assisted living relocated to main campus core Community park relocated to 1st Avenue New parking area added Lambert Lane 1st Avenue Memory Care Assisted Living Senior Apartments Community Park New Parking Private Park Independent Living Independent Living I’ll go through a summary of the changes proposed by the applicant: Moved memory care and assisted living to the main campus core area Replaced with small independent care cottages. Split the park area leaving a private park with amenities south of the main campus building and moving the community park area to First Avenue. We felt it was important to maintain some community level amenities near the main campus building to foster interaction between the community and residents. We have recommended a condition requiring the trailhead area to be enhanced with ramadas, walking paths, drinking fountains to serve the planned trail system along the CDO wash. Lastly, the applicant has proposed to add a new 81 space parking area near the front of the building for convenient parking for residents and guests 123 Approved Tentative Development Plan Multi-use senior care facility Senior apartments Assisted living / memory care Independent living Support commercial Community park Lambert 1st Avenue Senior Apartments Community Park Commercial Independent Living Independent Living Independent Living Memory Care / Assisted Living 124 Proposed Tentative Development Plan Memory care / assisted living relocated to main campus core Community park relocated to 1st Avenue New parking area added 1st Avenue Lambert I’ll go through a summary of the changes proposed by the applicant: Moved memory care and assisted living to the main campus core area Replaced with small independent care cottages. Split the park area leaving a private park with amenities south of the main campus building and moving the community park area to First Avenue. We felt it was important to maintain some community level amenities near the main campus building to foster interaction between the community and residents. We have recommended a condition requiring the trailhead area to be enhanced with ramadas, walking paths, drinking fountains to serve the planned trail system along the CDO wash. Lastly, the applicant has proposed to add a new 81 space parking area near the front of the building for convenient parking for residents and guests 125 126 127 Lisa Israel La Posada Introductory Comments 128 Sales tax for independent living $2.2 million in construction fees and taxes Annual economic impact in Green Valley of $52.9 million; likely to achieve millions in economic impact for O.V. 180 jobs for the community 23% average employer-paid benefit per employee per year $100,000 in scholarships per year in Green Valley. ($50,000 already donated for Oro Valley students.) 79.5 acres of land 35 +/- acres of open space. (44% of site) 180-220 apartments; 48 assisted living (same number and density as last submission) 129 Benefits TO ORO VALLEY of the Current Plan Public park with barbeque and dog park in visible and easily accessible location Lowered most of buildings to less than 5 stories Improved multi-use path along river bank Space for a well site Equestrian access Removed 2-story building from 1st Avenue Trail head with ramada 130 Rob Longaker The WLB Group, Inc. Overview of the Requested Modifications to the PAD 131 The following is a list of the items in the Nakoma Sky PAD that have been modified:   The Tentative Development Plan (TDP) with the following primary changes (please note that modifications have only occurred to Development Areas A, B and C):   a. Relocation of the public portion of the community park from Development Area C to Development Area A. (Please note this use is permitted in the Table of Permitted, Uses Section II-A.4 of the Nakoma Sky PAD). b. Relocation of the memory care and assisted living facility from Development Area A to Development Area C. (Please note this use is permitted in the Table of Permitted Uses, Section II-A.4 of the Nakoma Sky PAD). c. The change in land use of Development Parcel A from assisted living and memory care facility to public community park and residential. This is to be accomplished by changing the PAD zoning district of Development Area A from Commercial, Medical and Service District to Independent Living District. 132 d. The addition of a landscape maintenance and equipment area near the north boundary in Development Area C. e. A new surface parking lot located near the arrival plaza of the apartment building in Development Area C. A new parking lot located within the public community park in Development Area A. g. Modifications to the layout of Development Area C. h. Modifications to the road layout in Development Area B. 133 134 135 Existing TDP Proposed TDP 136 EXISTING TDP PROPOSED TDP DEVELOPMENT AREA “A” 137 Existing TDP Proposed TDP 138 EXISTING TDP PROPOSED TDP DEVELOPMENT AREA “B” 139 Existing TDP Proposed TDP 140 EXISTING TDP PROPOSED TDP DEVELOPMENT AREA “C” 141 Gary Koerner Three Living Architecture Discussion of Project Design and Architecture 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 Thank you for listening to our presentation. Questions and Comments. 161 162 Building Height Exhibits 163 164 165 Viewshed Exhibits 166 167 Rendered Buildings 168 169 170 171 Comparative Viewshed Illustrations 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 Misc Exhibits 205 206 207 208 209 210 211 212 213 214 215