HomeMy WebLinkAboutPackets - Council Packets (95)Council Meeting
Regular Session
April 1, 2015
1
2
Town Council Meeting Announcements
3
Upcoming Meetings
4
5
6
Water Utility Commission
Annual Report
April, 2015
Oro Valley Town Council Meeting
April 1, 2015
7
PURPOSE OF REPORT
Required by Council
Documentation of actions of the Water Utility Commission
Documentation of activities of the Water Utility
Public Information
8
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Customer Service
Water Quality
Water Supply
Water Resource Planning & Management
Water Conservation
Operations
Security & Emergency Response Planning
Engineering & Planning
Capital Projects
Financial Highlights & Rates
9
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Customer Service
19,107 water service connections
Approximately 41,884 people
191 new connections in 2014
2.28 billion gallons of potable water delivered to our customers
719 million gallons of reclaimed water delivered
Customers conserving water
Advanced Metering Infrastructure
Countryside and Oro Valley Phase 1 and 2 complete – 8,788 meters
Project complete in March, 2016
10
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Water Conservation Program
Conducted 113 free water audits
Education
Conservation literature
Youth Water Conservation Program
Rain Sensor Program
AquaHawk alerting
Member of Water Conservation Alliance of Southern Arizona
11
ORO VALLEY WATER UTILITY COMMISSION ANNUAL
REPORT
Water Quality
58 sample sites
1,360 tests in 2014
Met all federal and state water quality standards
No violations – 13 years
12
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Water Utility Operations – Potable & Reclaimed
22 operating wells
OVWSA - Water level decline of 1.58 feet in 2014
CS WSA– Water level rise of 0.7 feet in 2014
19 reservoirs – 11.6 MG Potable -1.5 MG Reclaimed
27 booster stations
364 miles of water mains
2,147 fire hydrants
7,844 valves
13
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Engineering & Planning
New Development
9 Water Improvement Plans reviewed & approved
14 Water Plans were constructed, inspected and accepted
Capital Projects
CAP Interconnect Projects
Countryside and Calle Buena Vista
Glover Road system connection Project
Naranja Park reclaimed and potable water lines
14
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Water Supply
Pumped 5,612 acre feet of groundwater
Delivered 2,206 acre feet of reclaimed water
Delivered 1,828 acre feet
of wheeled CAP water
Recharged 9,000 acre feet
of CAP water
All recovery wells
No longer reliant
on CAGRD
Less water level declines
15
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
Financial Highlights and Rates
Three Water Utility Funds
Enterprise Operating Fund
Potable Water System Development Impact Fee Fund
Alternative Water Resources Development Impact Fee Fund
Debt Obligations as of 12/31/14
Annual Debt Service - $5,297,957
Total Outstanding Debt -$42,830,828
Confirmation of AA- bond rating
Water Utility Commission reviewed Water Rates Analysis and recommended an increase in commodity rate and decease
in GPF
16
ORO VALLEY WATER UTILITY COMMISSION ANNUAL REPORT
WUC recommends Council accept the Annual Report
Staff requests acceptance of Annual Report
Final report will be on website and posted at Town Administration and Water Utility Office
17
18
Strategic Facilities Plan
Parks & Recreation Department
April 1, 2015
19
Strategic Facility Planning
Council Directive (Oct. 1, 2014)
Develop a strategic plan that will guide the development of a comprehensive park system
Recognize key program elements that were recognized in the 2014 community outreach efforts
Identify place-holder locations for program elements that will not be included in the Naranja Park Programming & Conceptual Design Update
Ensure there is a net gain of facilities as part of the implementation plan
20
How we got here
Town of Oro Valley Strategic Plans
Town of Oro Valley Strategic Plan 2011
Finance & Economic Development Strategy: Encourage the attraction, expansion and retention of diverse employment, retail, and tourism opportunities
Town of Oro Valley Strategic Plan 2013
Economic Development Strategy: Support local, national and international sporting events
Community Services Strategy: Seek to make continuous improvements to Town parks and other facilities. Initiate an update of the Naranja Park Master Plan and Programming & Conceptual
Design documents
Town of Oro valley Strategic Plan 2015
Economic Development Strategy: Support cultural, entertainment, and sporting venues
Parks, Recreation, and Cultural Development Focus Area: Develop exceptional recreation and cultural facilities and programs that attract visitors and events that enhance residents’ quality
of life and strengthens the economy
21
Summer 2014
Community Outreach Continued
Community open house “tell us what Parks & Recreation amenities you want in Oro Valley” (June 5)
Community survey available on-line (June 5 – July 5)
Statistically valid telephone survey (June)
Special event attendance
Farmers Market (June)
4th of July Celebration
Put me in Coach (August)
Focus group meetings (July 10 and Oct 6)
Organized sports groups (baseball, softball, soccer, football, lacrosse, aquatics, cycling, ultimate frisbee, etc.)
Arts and culture groups (SAACA, Oro Valley Historical Society, Great American Playhouse)
Other park user groups (equestrian, hiking, archery, RC flyers, BMX, skateboarding, etc.)
22
Parks & Recreation Advisory Board
Strategic facilities plan concept and outline presentation; request for PRAB assistance (December 9, 2014)
Strategic facilities plan first draft presentation (January 20, 2015)
Strategic facilities plan final draft presentation and unanimous support (March 10, 2015)
23
Overview
Strategic Facilities Plan
“To develop future plans which incorporate the community’s values and needs while having the capacity to facilitate, promote, and enhance economic development and sports tourism as the
Town grows”
The plan includes
Definitions – park types
Current inventory
Strategic facilities direction
24
Four focus areas
Strategic Facilities Direction
Traditional park facilities
Focus on community needs
Park amenities
Consolidate large user groups
National standards comparison
Tourism emphasis
Sport tourism
Historic and cultural tourism
Eco-tourism
Park facility acquisitions
Collaboration and partnerships
25
Summary
Strategic Facilities Plan
“it is anticipated that this plan will address the requirements of all users through a plan that emphasizes a net gain in facilities, while building capacity for tourism opportunities
through the continued building of partnerships and funding relationships in the community”
26
Strategic Facilities Plan
Questions
27
28
Naranja Park
Facility Program and Conceptual Site Plan
Presentation to Mayor and Council - April 1, 2015
29
Project History – Highlights
Project Initiation
Public Outreach
Facility Programming
Conceptual Site Plan
Adjustments to Program and Site Plan
PRAB Review and Approval
30
Guiding Principles
Address community needs and preferences
Accommodate wide range of users
Encourage visitation and economic activity
Consider feasibility
Ensure consistency with the vision /
plan for overall park system
31
Facility Program Overview
Family Recreational Facilities
Lighted Sports Fields
Outdoor Performance Venue
Event Center
Supporting Infrastructure
32
Conceptual Site Plan
33
General / Family Recreational Facilities
Walking Paths and Trails
Picnic Ramadas / Group Use Area
Playgrounds
Splash Pad
34
General / Family Recreational Facilities
Community Lawn
Skate / Bike Park
Bicycle Staging Area
Dog Park (Existing)
Archery Range (Existing)
35
General / Family Recreational Facilities
36
Lighted Sports Fields
(8) Multi-Sport Fields (2 Existing)
(4) Baseball Fields
37
Lighted Sports Fields
38
Outdoor Performance Venue
Permanent Stage
Seating (Accessible and Lawn)
Infrastructure for Temporary
Light and Sound Systems
39
Outdoor Performance Venue
40
Event Center
Large - Flexible Space (40,000 – 50,000 SF)
Accommodates wide range of users / activities
Integrates indoor / outdoor spaces
Cost effective to construct and operate
41
Event Center
42
Event Center – Features / Floor Plan
43
Event Center – Potential Uses
Indoor Sports
44
Event Center – Potential Uses
Fairs and Exhibits
45
Event Center – Potential Uses
Community Festivals and Gatherings
46
Event Center – Outdoor Spaces
47
Event Center – Outdoor Spaces
48
Event Center – Outdoor Spaces
Playground / Splash Pad
Community Lawn
Outdoor Patio
Food Truck Area
49
Utilities and Infrastructure
Park Operation and Maintenance Facility
Utility Systems
50
Utilities and Infrastructure
51
Requirements to Complete Master Plan
Council approval of Program and Conceptual Site Plan
Integration of Council Recommendations
Draft Master Plan
PRAB Review of Draft Master Plan
Mayor & Council Adoption of Plan
52
53
54