HomeMy WebLinkAboutPackets - Council Packets (113)Council Meeting
Regular Session
February 4, 2015
1
2
Announcements
Meetings are subject to change. Check the Town website for meeting status.
February 5 at 3:30 p.m.
Council Chambers
Stormwater Utility Commission
Work Study Session
February 9 at 6 p.m.
Hopi Conference Room
Water Utility Commission
February 18 at 6 p.m.
Council Chambers
Town Council Regular Session
February 10 at 6 p.m.
Council Chambers
Conceptual Design Review Board
3
Town of Oro Valley
4
5
Caliber Collision Auto Service
Conditional Use Permit
Town Council
February 4, 2015
Town of Oro Valley
Thank you Mayor, members of the Council
Our purpose for this item is to consider...
6
Town of Oro Valley
Pusch View Lane
Oracle Road
TARGET
Subject property is located on Lot 11 of the Mercado del Rio shopping center
Located approximately ¼-mile east of Oracle Road.
Lot 11, the furthest setback and least visible from Pusch View Lane
Proposed facility will serve as an auxiliary center to the existing facility located on lot 12
Proposed Use requires a CUP in the C-2
7
What is a Conditional Use Permit
Two types of Uses
Permitted by right
Conditional
Conditional
May be permitted, but due to their nature require additional examination
CUP Evaluation Criteria
Town of Oro Valley
Background
Conditional Uses…typically have characteristics which can have an impact on adjacent areas and therefore may not be appropriate for every site
Zoning Code establishes Criteria for evaluating CUP’s
Proposed use requires a CUP as Automotive Service, which is really meant as a “catch all” for all automobile uses.
8
TARGET
PLANET FITNESS
Site
Situated near existing automotive service uses.
Existing building was previously used as a Carwash.
Primary concern with the proposed use, as with the car wash, is screening..
The conditional use permit granted for the carwash included a condition to add additional screening *
- this screening will similarly be utilized to screen the proposed facility.
Additionally, there is an existing screen wall between the subject property and the rear of the Target Shopping center to the east.
9
Screening
As you can see on the picture on the left…from internal roadways…screen walls & existing vegetation thoroughly screen the center.
Picture on the right is a view from the CDO multi-use path to the north…
Parking of vehicles awaiting service…
Additional Condition..
10
Summary and Recommendation
Planning and Zoning Commission
Consistent with CUP Evaluation Criteria
Recommends approval, with conditions listed in Attachment 1
Town of Oro Valley
Planning and Zoning Commission heard Jan. 6
PZC…found the request consistent with CUP criteria
PZC…has recommended approval, subject to the conditions listed in Attachment 1.
11
Conditions of Approval
Screening must be provided along the northern property line to ensure stored vehicles are not visible from the shared use path along the Canyon del Oro Linear Park.
Town of Oro Valley
12
Town of Oro Valley
13
The applicant intends to construct two additional overhead rolling doors oriented east (away from internal roadways)
- will require the relocation of the two existing handicap spaces
- applicant also intends to add additional parking spaces along the eastern property line.
14
15
Conditional Use Permit
Town of Oro Valley
Town Council Hearing
February 4, 2015
16
17
18
19
Zoning Code Amendment to
Economic Expansion Zone (EEZ)
Innovation Park
Town Council
February 4, 2015
20
Town of Oro Valley
Tangerine Road
Oracle Road
RV Boulevard
Economic Expansion Zone
All Seasons Senior Care
Securaplane
Innovation Way
21
EEZ Process
Proposed Code Amendment
Town of Oro Valley
Conceptual design process is a public process, with several opportunities for public input. The final design is an administrative process.
22
Permitted in EEZ
Subject to review criteria
CDRB approval
Alternative Parking Ratios
Proposed Code Amendment
Administrative approval
23
Amendment Review
General Plan
Ensure financial and economic stability
Strive for diverse economic base and alternative revenue sources
24
Recommendation
If approved, the proposed amendment would:
Enable more efficient and streamlined process
Better serve the parking needs of targeted job industries
Further incentivize EEZ Overlay District
Better conform to goals and policies of General Plan
Recommend approval of zoning revisions in Attachment 1
25
25
26
Town of Oro Valley
Environmentally Sensitive Lands Zoning Code Amendment
Town Council
February 4, 2015
Thank you!
Mayor…members of the Council
Our purpose for this item is to consider a proposed code amendment to ESL section of the Zoning Code
Amendment initiated by Town Council after a recent rezoning case had to be reconsidered several times.
27
What’s the issue?
September 2014
Lot Shift for Sewer
December 2014
Internal Setbacks
Town of Oro Valley
That case…known as Meritage on Naranja demonstrated that under a modified review process
Not just significant changes, but even minor changes had to be reconsidered by TC
Sept. 2014 –for a minor reconfiguration to accommodate a sewer connection from a neighboring property. Same # of lots, layout and circulation.
Dec. 2014 – Applicant request to reduce internal building setbacks
Both of these requests were really minor in scope and resulted in substantial delays for the applicant
LESSON LEARNED: EVERYBODY THOUGHT MORE FLEXIBILITY WAS NEEDED
Proposed Amendment is intended to be a DIRECT FIX to inefficiency in the system that has resulted in these types of delay.
Create separate categories for evaluating requests.
28
Proposed Code Amendment
Administrative Approval
Minor changes to Tentative Development Plans
Flexible Design Options
Town of Oro Valley
Two components
Allows for administrative approval of minor changes to TDP’s under a modified review process…
Utilizing existing Zoning Code criteria that has been further defined.
WOULD HAVE ALLOWED US TO APPROVE THE APPLICANT’S RECONFIGURATION REQUEST TO ACCOMMODATE THE SEWER.
Currently all Flexible Design Options require TC approval as part of a rezoning application. Second component would amend the approval process for the Flexible Design Options associated
with rezoning & subsequent applications that are least likely to have an impact on neighboring property owners.
WOULD HAVE ALLOWED US TO APPROVE THE APPLICANTS INTERNAL BUILDING SETBACK REQUEST.
29
Proposed Review Process
Administrative Approval
Building Setbacks (Internal)
Landscape Buffer Yards (not adjacent to residential)
Minimum Lot Size
Off-street Parking
Recreation Area Credit
Native Plant Preservation
Town Council Approval
Building Heights
Building Setbacks (External)
Landscape Buffer Yards (when adjacent to residential)
Open Space
Mixed-Use
Modified Review Process
Town of Oro Valley
As shown on the screen, the amendment would separate the Flexible Design Options associated with rezoning applications and subsequent approvals into two categories, by amending the review
process:
Those on the left
Approved administratively because they are the least likely to have impacts on neighboring property owners
Those on the right
Do have a larger impact and will still require Town Council approval on a case-by-case basis.
30
Summary and Recommendation
General Plan
Planning and Zoning Commission
Town of Oro Valley
Proposed Amendment is consistent with the Vision, Goals and Policies.
PZC heard the proposed amendment in December of last year.
PZC …consistent with Genral Plan Vision, Goals and Policies
PZC…recommended approval as described in the report
Summarize
This amendment helps achieve the overall intent of ESL by…
preserving contiguous OS
providing offsets for preserved OS
really help make ESL more functional
31
Questions
Substantial
A significant change shall be determined by, but not be limited to, the following criteria:
Any change to the permitted use or uses.
Any change to the development standards or zoning conditions.
Building height; PERIMETER setbacks; open space; parking; floor area ratios; density
Any change to the Tentative Development Plan associated with this rezoning which would vary any material terms or conditions of the rezoning.
Exempt any changes approved as part of a Flexible Design Option
Town of Oro Valley
Currently, the zoning code allows the Planning and Zoning Administrator some flexibility
in dealing with TDP’s…establishing criteria for changes not under the modified review process
1. permitted use(s)
2. development standards
3. material terms/conditions of the rezoning.
33
34
Lot 167, Stone Canyon II
Final Plat Revision and
Slope Encroachment
Town Council
February 4, 2015
35
Lot 167, Stone Canyon II
36
“No Build Areas” and Steep Slopes
Town of Oro Valley
Conceptual design process is a public process, with several opportunities for public input. The final design is an administrative process.
37
Views and Elevations
Town of Oro Valley
+5’
+14’-15’
3045’
+9’
Mountain Views
38
Architecture
Town of Oro Valley
39
Summary
Absence of significant environmental features within existing “No Build Area”
Elevation of home mitigates view impacts
Architectural design minimizes view impacts
Proposed encroachment into slope areas meets Zoning requirements
40
40
Recommendation, Attachment #1
Town of Oro Valley
41
Recommendation
The building height is restricted to 18 feet from the finished floor elevation.
The finished floor elevation must be amended to the lowest functional point relative to the adjacent floodplain, as determined by the Town Engineer.
Town of Oro Valley
42
Questions and
Applicant Presentation
Town of Oro Valley
43
44
John & Cherie Runewicz
Oro Valley Full Time Residents
Owners of:
1063 W. Tortolita Mountain Circle
Stone Canyon
Lot 167
45
Lot with house location for picture reference
46
Lot 167 Driveway Entrance
47
Lot 167 Looking East through wash
48
From Northern wash looking up mountain.
49
Lot 167 looking Northwest on Lot Southwest corner
50
Lot 167 NB looking south
51
Lot 167 NB looking southwest
52
Lot 167 NB looking northwest
53
Top of No Build Lot 167 looking South
54
Lot 167 Top of lot looking Northeast driveway here
55
Where home will sit low in lot, looking South
56
Where house will sit here looking
South
57
Lot 167 looking East House finished floor area.
58
Where house sits 6 feet below the Top of lot looking west
59
Where the house sits looking North at 3044 elevation
60
61