HomeMy WebLinkAboutMeeting Presentation 3-15-17Council Meeting
Regular Session
March 15, 2017
1
Town Council Meeting Announcements
2
Upcoming Meetings
3
4
5
Strategic Plan 2017
Town Council
March 15, 2017
6
Strategic Plan 2017 Focus Areas
Economic Development
Complete Community
Parks and Recreation
Public Safety
Town Assets
Water Resources and Energy
Cultural Resources
Land Use and Design
Transportation
Cost of Services
7
Relationship to the General Plan
8
Your Voice, Our Future General Plan
9
Advancing the community’s vision
The Strategic Plan Process
25 Goals
163 Actions
14 Goals
27
Actions
10
Implementing the community’s vision
Next Steps
Ongoing efforts:
Department work plans
Annual budget process
Reporting:
Progress reviewed periodically
Report before next Strategic Plan initiated
11
Recommendation
Staff recommends adoption of the Strategic Plan 2017.
12
13
Final Plat
Mattamy Homes
Viewpointe at Vistoso Trails
Town Council
March 15, 2017
14
Good evening…
Purpose
Final Plat
37 homes
Block “A” - 1.6 acres future commercial
Moore Rd.
Honey Bee
Village Preserve
Rancho Vistoso Blvd.
Our purpose here tonight is to consider…
Conceptual Site Plan and Landscape Plan that includes the Honey Bee Village Archaeological Display Area and entrance.
15
Subject Property (Yellow)
Immediately adjacent to HB Village preserve
Hohokam Mesa (Purple)
The retreats (Blue) – previously approved
Mattamy residential (Orange)
16
Final Plat
Honey Bee
Village Preserve
Rancho Vistoso Boulevard
Moore Road
Future entrance & display area
Property is part of the RV TC which requires a mix of uses including residential & commercial
37 residential lots
Avg. lot size 5022sf
Max building height 30 ft.
Sidewalks and landscaping in all common areas
2 points of access
Staff worked w/the applicant to include commercial as well..
Future Commercial
advantageous as the location will benefit from the increased traffic on Moore Rd.
Compliment to the future users of the Preserve
Archaeological display area
17
Staff recommends approval, subject to the conditions in Attachment 1.
Summary and Recommendation
18
19
Steam Pump Self-Storage
Town Council
March 15, 2017
20
Purpose
Amend Planned Area Development (Item 2A)
Conceptual Design (Item 2B)
Site Plan
Landscape Plan
Architecture
Thank you Mayor, members of Town Council.
Our purpose tonight is to consider 2 requests relative to a proposed mixed use commercial project in the Steam Pump Village development. The dominant use is an indoor self-storage facility.
The mixed use project also include ground floor office/retail facing Oracle Road
The first request is an amendment to the Planned Area Development zoning to allow the use and related changes.
The second request is the proposed Conceptual Site plan, Landscape Plan and Architecture for the facility.
21
Location
Oracle Road
Canada del Oro Wash
So just to get us oriented…the property is shown in yellow.
Going from the south to the north…this is the historic Steam Pump Ranch property shown in darker green
Lighter green area is the private park/retention basin,
Quik Trip / Hotel / Basis
The Canada Del Oro wash forms the western border of the property. Multi-Use Path is located on the east side of the wash adjacent to the site, shown in the dashed line.
This area of the development is about a football field away from Oracle Road and two football fields away from the nearest home to the west. As such, this envisioned for taller buildings
and you can see that intent with the location of the taller buildings in the development including the charter school, hotel and now this project.
22
Planned Area Development Amendment (Item 2A)
I. Allow indoor self-storage as a permitted use
II. Establish Architectural Concept
III. Establish Parking Standard
IV. Increase Floor Area Ratio
This slide shows the components of the first request, the request to amend the Planned Area Development.
I will briefly touch on each one of these areas.
23
I. Allow Use (Item 2A)
Requires mixed use commercial development
Limitation on self-storage:
Restricted to one property
No outdoor storage
No rental of vehicles or equipment
No window signs on units
29% reduction in overall traffic
Architecture
The primary amendment is to allow an indoor self storage facility within the Steam Pump Village development. Currently, mini-storage facilities are listed as not permitted. The stated
intent of not permitting mini-storage facilities was “to maintain a high quality development and prohibit uses which may not be compatible on the site”.
Historically, mini-storage facilities have consisted of linear buildings with roll up doors and units accessed externally from drive aisles. These facilities have evolved over the years
to now include indoor climate controlled facilities. With proper design, these facilities can have more of a office building appearance and can be compatible with a retail development
such as the Steam Pump Village development. Several notable items regarding use:
First, the amendment requires the project to be mixed use, with ground floor office and retail facing Oracle Road. This was a key piece of the puzzle as it integrates the project into
the overall development with planned office or retail uses.
Second, the amendment proposes restrictions on the self-storage use: The amendment restricts the facility to a single property. It prohibits outdoor storage, equipment/vehicle rental
or visible corporate colors and graphics. These limitations create a compatible use with other uses in the shopping center.
Allowing this use has another benefit in regard to reduction on traffic. This center challenged by traffic associated with the charter school and this use has a 29% reduced impact on
traffic than the currently planned use.
Finally, a key aspect in support of this use is the enhanced architecture.
II. Architectural Concept (Item 2A)
An important component of the amendment is the adoption of a binding architectural concept. Techniques were used to reduce the appearance as a self storage facility and to ensure the
building would mirror design elements within the Steam Pump Village development and appear more like an office building. This was an area where the applicant really stepped up.
The top image is looking from the direction of Oracle Road and the bottom image is looking from the vantage point of the CDO wash and multi-use path.
Colors and Materials
Window eyebrows
Elements to accentuate the pedestrian scale (shaded colonnades)
Use of faux windows and building recesses to break up facades
Building Forms
The resulting building more closely resembles an office building and draws elements from the development to create a consistent and compatible design.
The loading area was an issue of concern at the neighborhood meeting. Originally a loading area was planned on the elevation facing the hotel. Following input at the neighborhood meeting
is was relocated to the rear of the building and screened on the sides and top due to visibility from the elevated multi use path in this location.
25
III. Floor Area Ratio (Item 2A)
3
3 Stories
3 Stories
Hotel
Proposed
Self Storage
The applicant has requested an increase in the allowed floor area ratio for this site. Floor area ratio basically is how much building mass or bulk is permitted in relation to the property
size.
This slide shows the building footprint for the proposed facility, as compared to the footprint for the Holiday Inn Express to the north.
In terms of actual bulk, remember that one floor of the self storage facility is below grade and not visible. If you excluded the basement, the actual visual bulk is equal to the hotel
to the north.
Both buildings are comparable in height at 3 stories as shown on the lower portion of the slide.
((Having a vastly different FAR’s on adjoining properties can in some cases produce an extreme difference in building height and bulk, resulting in contrasting building forms.))
26
III. Floor Area Ratio (Item 2A)
Oracle Road
Canada del Oro Wash
This area of the development was envisioned for a greater building height and intensity based on the distance from Oracle Road, which is about 350 feet. You can see on this image that
the taller buildings within the development are located toward the rear of the property, including the hotel and the charter school.
The greater building height in this area is moderated when viewed from the residential on the west side of the wash, which serves as a natural buffer at 730 feet wide, or approximately
two and a half football fields.
27
IV. Parking (Item 2A)
Current
1 per 300 sq. ft. office/retail
Proposed:
1 per 50 units
1 per 300 sq. ft. office/retail
A related amendment to the request is the establishment of a new parking standard for self storage uses at 1 parking stall per 50 units.
Office and/or retail on the ground floor will still require parking at 1 stall per 300 feet.
((So, we initially started with no with regard to the request, but as the project evolved, with the enhanced architecture, inclusion of ground floor office, pedestrian scale elements,
the location restriction and the limitations on operations, we came to support the use as a compatible project with the overall Steam Pump Village development.))
28
Conceptual Site / Landscape Plan (Item 2B)
Switching now to the second component of the request, the Conceptual Design.
The site plan has been integrated into the overall development and uses existing pedestrian and vehicles drive aisles.
The pedestrian walkways are extended through the site, connecting to the multi-use path along the CDO wash.
Due to visibility from the hotel, the private park and the multi-use path, enhanced landscaping has been included to soften the visual impact of the building.
29
Architectural Concept (Item 2B)
Proposed
Adjacent Buildings
As I stated, an important element of the review was focused on the architectural appearance of the building. Techniques were used to reduce the appearance as a self storage facility
and to ensure the building would mirror design elements within the Steam Pump Village development and appear more like an office building. This was an area where the applicant really
stepped up.
Colors and Materials
Window eyebrows
Elements to accentuate the pedestrian scale (shaded colonnades)
Use of faux windows and building recesses to break up facades
Building Forms
Given the visibility of the building from the hotel, the multi-use path along the CDO and the park to the south, careful attention was focused on the architecture to ensure a compatible
and attractive design.
During the neighborhood meeting process, concern was expressed with the location and screening of the loading area for the facility. The applicant eliminated a loading area on the north
façade and provided a enhanced screening of the loading area on the west side. This screening includes a lattice top to minimize visibility from the multi-use path, which is elevated
in this area.
The resulting building more closely resembles an office building and draws elements from the development to create a consistent and compatible design.
This design is included in the PAD document and will be required as a matter of zoning.
30
Public Participation
Two Neighborhood Meetings August 25th and December 15th
Discussion Topics:
Architecture
Screening of loading areas
Visibility from multi-use path
Impact to existing self-storage uses
There were two neighborhood meeting held on this case, August 25th and December 15th which were attended by approximately 6-8 people at each meeting.
Discussion items from these meeting included
Architecture: I covered how the architecture was enhanced to address this concern
Screening of loading areas and visibility from the multi-use path, which I have covered in previous slides.
Finally, concern was raised at the neighborhood meeting regarding impact on existing self storage facilities in the area. The concern was whether the level of competition created by
this development is equitable? This is a private market issue, not part of our criteria in evaluation the amendment.
31
Conforms with applicable Planned Area Development criteria, Your Voice, Our Future General Plan and Design Principles
Planning and Zoning Commission recommends approval of Planned Area Development Amendment (Item 2A)
Conceptual Design Review Board recommends approval of the Conceptual Design, subject to housekeeping conditions (Item 2B)
Recommendation
The amendment has been reviewed and conforms with applicable Planned Area Development criteria and the General Plan. The Conceptual Design meets the Town’s Design Principles.
PZC recommends approval of the PAD Amendment
CDRB recommend approval of the Conceptual Design, subject to several housekeeping conditions.
A reminder that there are two motions needed, one for each item (2A and 2B)
Mr. Major, that concludes my presentation and I would be happy to answer any questions you may have.
________________________________________________________
This is an ask, so you can consider these factors in making your recommendation. I would point out that there is no specific zoning criteria relative to market impact. I would also reiterate
that a market forecast is not an exact science and is reliant on many factors.
______________________________________________________________
Main Street. We were cognizant of the overall goals of main street as we have reviewed this case. For that reason, we have pushed for retention of ground floor office/ retail, pedestrian
scale design on most elevations of the building, connectivity to the trail, screening of loading. Form based design…Concept Plan has not been adopted
____________________________________________________________
Action item in General plan was intended to pursue strategies to help businesses such as looking at sign code, omsbudsman for business. Never intended to promote protectionist zoning.
32
33
STEAM PUMP VILLAGE PAD AMENDMENT
March 15, 2017
ORO VALLEY TOWN COUNCIL HEARING
34
REQUEST
PAD AMENDMENT
Use
Parking Requirements
Floor Area Ratio (FAR)
CONCEPTUAL SITE PLAN/LANDSCAPE PLAN
CONCEPTUAL ARCHITECTURE
35
36
Floor Area Ratio (FAR)
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
QUESTIONS?
53
54
55
Proposed Overhead Fiber Optic Cable
Amphi School District
Town Council
March 15, 2017
56
OV1700311
Applicant’s Request
Install one overhead cable
35 existing utility poles
Requires Conditional Use Permit
Proposed New
Cable
The purpose for this next case is to review a request for conditional use permit to allow the Amphi school district to install a new fiber optic line on 35 existing utility poles in
the Town.
The zoning code requires a conditional use permit for the installation of any new over head utility wires in excess of 600 feet in length.
57
Location
- -
Outside of Town
CDO
High
School
Within the Town boundaries, the project will include approximately 8,100 feet of fiber optic line, as shown by the blue line on this slide.
The line will run from the CDO high school on Calle Concordia down to Hardy Road at which time the project leaves the Town boundaries as indicated by the blue dash lines.
The black lines indicate the Town limit.
58
Review Criteria
General Plan
Zoning Code criteria
Conditional Use Permit criteria
Proposed
New Cable
The new fiber optic line will join several other utility lines on existing poles located in the right-of-way as demonstrated in this photo.
When evaluating this type of request, we look to the General Plan and the zoning code, which instructs us to evaluate the impact to views and aesthetics while continuing to provide high
quality telecommunications and broadband services for the community.
This new fiber optic line added onto existing poles among other lines, is compatible with the area will not create a discernable impact to views.
59
Summary & Recommendation
Neighborhood meeting
Planning and Zoning Commission recommends approval
Last month, A neighborhood meeting was held to ensure citizens living the area were informed of the proposal.
Two residents came to the meeting to learn about the project and there were no objections.
The project was also reviewed at last weeks Planning and Zoning Commission and was recommended for approval.
If you would like more specific details about the overall project, the applicant is here tonight to answer questions.
Thank you,
60
61
Presentation for Oro Valley Residents
Welcome !
Introductions:
Scott Little (Amphitheater Public Schools)
Steve Frost (Amphitheater Public Schools)
Jay Loesche (Conterra Limitless Communications)
Justin Moffitt (Golden Field Services INC.)
62
Brief Description of New Services
Amphitheater Unified School District is in the process of expanding network bandwidth to schools in the district. The district has contracted with Conterra Communications to build a
closed fiber network to serve the Amphitheater School District.
The new fiber based network will enable Amphitheater School District to provide over 10 times greater network based services to all schools in the District. This will enhance the teaching
and learning ability for all students in the District. The network will consist of a Fiber Plant covering nearly 34 miles of route. The route will consist of a combination of New Underground
Buildout, use of Existing Conduit where possible, and Aerially Attached fiber utilizing existing utility poles (about 50%).
63
Current Microwave Wide Area Network
Here is a virtual mapping of Amphitheater School District’s current hybrid Microwave/Fiber Wan. The District has utilized this technology for approximately 10 years. While it has served
the District well, School/Site bandwidth demands have rendered this technology insufficient for our current and future needs. This Microwave Network is also somewhat susceptible to
outages or partial outages during severe storms.
64
Proposed Amphitheater Fiber Network
The new Fiber WAN will be capable of speeds exceeding 10 gbps. This Fiber Network will be dedicated to only Amphitheater Public School’s Intranet traffic. (No traffic other than Amphi’s
will traverse this network. This new fiber network will meet the District’s needs for many years to come.
65
Proposed Fiber Pathway:
Canyon Del Oro High School
Part of the project entails building fiber on existing TEP and CenturyLink owned utility poles within
the right of way (ROW) of the Town of Oro Valley.
Conterra proposes to attach approximately 8,132 linear feet of fiber optic cable to
existing utility poles.
Conterra will be attaching to 35 TEP poles within Oro Valley ROW: 9 Poles on W.
Hardy Road, 14 poles on N. Calle Buena Vista & 12 poles on W. Calle Concordia.
TEP dictates what height we attach at and these heights are included on the
construction plans and photo simulations, but typically there is at least 12 inches of
spacing between each telecommunications line.
The thickness of the proposed wire including the strand will be approximately 0.77
inches.
Conterra will also place eight (8) Anchors for guying purposes.
Construction will be done during normal business hours established by the town
which is typically 7am to 6pm.
The following pages depict the view of the existing poles with the proposed new
attachment added. If you count up from the bottom cable, Conterra's new cable is shown as the top attachment in each photo.
66
View Impact Slides
Poles on route to the Canyon Del Oro High School
67
View Impact Slides
Poles in front of School
68
Questions & Answers
Feel Free to voice any questions or concerns that you may have.
69
70
Oro Valley Water Utility
CAP WHEELING
INTERGOVERNMENTAL AGREEMENT
WITH CITY OF TUCSON
Town of Oro Valley Mayor and Council Meeting
March 15, 2017
71
Oro Valley Water Utility
Amending the IGA with The City of Tucson for CAP Wheeling
Existing IGA approved and in effect since June 28, 2011
CAP water deliveries reduces our demands on groundwater
Protects and preserves our groundwater for future use
CAP water deliveries expands the utilities water supply portfolio
Successful operation and delivery of our CAP water over the last 5 years
Oro Valley CAP water is delivered (wheeled) through the Tucson Water system
72
Oro Valley Water Utility
Summary of Amended IGA
Same operations
Pricing increase
Annual increase instead of 5-year fixed
Adding additional delivery amount
Adding additional delivery location
OVWU responsible for all capital costs for additional delivery location connection
Ten year term-renewable administratively
73
Oro Valley Water Utility
Summary of Pricing
Current price: $499.89 per acre-foot of wheeled CAP water
Proposed price: $571.40 per acre-foot (initial annual amount)
Components of pricing
Tucson Water base rate of $419.65 per acre-foot
Electric rate of $151.75 per acre-foot
Electric rate varies with delivery location ($115.59 to $158.65)
Annual escalation based upon Tucson City Council approved increases
Currently estimated at 7% per year for base rate
Pricing reviewed and updated every 5 years
74
Oro Valley Water Utility
CAP Wheeled Delivery
Current IGA: Allows for 2,000 acre-feet of CAP delivery per year
Amended IGA: Allows for an additional (as available) 600 acre-feet of CAP delivery per year with current Tucson Water infrastructure
Additional (as available) 600 acre-feet is not added in addition to the total delivery expansion potential of 4,000 acre-feet
Current delivery locations
Naranja east of Shannon: North of Ironwood Ridge High School
Calle Buena Vista: North of Hardy
Countryside (Camino de Oeste): North of Linda Vista
Additional delivery location near Oracle and Hardy
Original & amended IGA allows for delivery expansion for a total of 4,000 acre-feet
OVWU responsible for all capital costs for additional delivery
location connection
75
Oro Valley Water Utility
City of Tucson / Town of Oro Valley Wheeling IGA
Schedule
Discussed at the Water Resources Subcommittee meeting in January 2017
Discussed at the Water Utility Commission Meeting February 2017
Recommendation
Water Utility Commission unanimously recommends Council approval
Water Utility Staff recommends Council approval
76
77