HomeMy WebLinkAboutPackets - Council Packets (335)Council Meeting
Regular Session
April 5, 2017
1
Town Council Meeting Announcements
2
Upcoming Meetings
3
4
5
Department Reports – Big Wash Project
6
7
Final Plat Amendment
Stone Canyon Neighborhood II
Lot 227
Town Council
April 5, 2017
8
Good evening…
Location
9
Lot 227
New
“No-build” Area
Golf Course
Area to be removed
Removed
800 sf
New
3,059 sf
Property is part of the RV TC which requires a mix of uses including residential & commercial
37 residential lots
Avg. lot size 5022sf
Max building height 30 ft.
Sidewalks and landscaping in all common areas
2 points of access
Staff worked w/the applicant to include commercial as well..
Future Commercial
advantageous as the location will benefit from the increased traffic on Moore Rd.
Compliment to the future users of the Preserve
Archaeological display area
10
11
Oro Valley Main Streets
Town Council
April 5, 2017
12
Tonight’s Meeting
Project overview
Review the Concept Plan
Discuss next steps
Request Town Council action
Endorse big-picture idea
Signal approval to move forward on more detailed planning
13
Proactive and pragmatic action
Looking to the Future
Community desire for a town center
As reflected in the Your Voice, Our Future General Plan
Economic development and community planning
Oro Valley’s character and appeal
Growth pressure and redevelopment
Public/private partnerships at appropriate locations
14
Some are historic, some are new, some are both
What is a Main Street?
In Oro Valley . . .
Create areas for gathering, dining and shopping that serve as a town center and are walkable and unique
Enhance Oro Valley’s lifestyle and the local economy
15
Local and Regional Main Street
16
Unique in Oro Valley
Location Characteristics
Many housing units within walking distance
Nearby parks and recreation
Nearby civic uses
Varied and vibrant commercial areas
Available parking and circulation areas
La Cañada
Lambert
½ mile radius
17
The Main Streets Project
Driven by community desires
Enabled by public/private partnerships
Sustained commitment over time
2016-2017
2017-2018
2018 onward
We are here
18
The Vision
Oro Valley’s unique Main Streets serve as the center of the town and reflect the community character. People come from near and far to walk around, check out local shops and grab a bite
to eat. Visitors can meet locals, bring friends and share with family. Main Streets are inviting, walkable and vibrant and offer recreation, commercial, entertainment and cultural activity.
19
20
21
Community Outreach
Advertisements and announcements
Online surveys
Social media engagement
“Walk the Block” public event
Responses:
Mostly positive comments or curiosity about project, the ideas and what comes next
80
survey responses
400
Walk the Block attendees
700 Facebook fans
22
Walk the Block
23
“Oro Valley turns out in crowds to walk the block”
-Explorer newspaper 2/15/17
24
Walk the Block
25
Modern Southwest
26
Walk the Block
41
83
187
114
Total 425
27
Walk
28
Your Voice, Our Future General Plan Policies
Economic Development
Advance the Town’s economic prosperity*
Oro Valley as an ideal destination*
Complete Community
Physical and social health of the community
Walkable and vibrant gathering areas*
Diverse housing types
Complete neighborhoods
Land Use and Design
Diverse land uses*
Cohesive development with focus on pedestrians*
Transportation
Unique roadway designs enhancing character
Opportunities for walking, biking and mass transit
* Notes policies directly related to
strategies in the 2017 Strategic Plan
29
Your Voice, Our Future General Plan Actions
Policy CC.6. Promote the creation of unique community gathering places that are inviting, walkable, attractive and vibrant and offer commercial, entertainment or cultural activity.
Action 10. Develop a plan for designating areas in Oro Valley that serve as the community’s gathering places and are envisioned to:
Reflect the character of the Town.
Include such amenities as sidewalk cafes, outdoor seating and desert landscaping.
Emphasize the pedestrian experience.
Action 11. Update existing Town programs, plans and regulations to create or expand Oro Valley’s community gathering places, such as:
Capital improvement plans to include the construction of public and transportation amenities.
Transportation plans to include bike, pedestrian and accessible design.
Development and zoning regulations to include new designations, such as mixed-use zoning.
Action 12. Develop public/private partnerships in order to create synergy and achieve common goals and desired improvements for Oro Valley’s community gathering places.
30
Next Steps
1. Concept Plan – The Big Picture Idea
The Planning and Zoning Commission recommends adoption to the Town Council
2. Improvement Plan – The Details
3. Implementation – Action!
Contents
Creative design solutions
Public/private partnerships
Economic development integrated
Financial planning
Process
Targeted research
Stakeholder groups
Community engagement
Briefings and updates
PZC recommendation
TC adoption
31
www.orovalleyaz.gov/mainstreets
www.facebook.com/mainstreetsov
MainStreetsOV@orovalleyaz.gov
(520) 229-4800
Join the Conversation
32
33
Naranja Park
Funding and Construction
of Additional Sport Fields and Amenities
April 5, 2017
34
Background
At the February 15, 2017 regular Town Council meeting, a significant number of youth sport parents, athletes, and Oro Valley user group representatives requested additional sport fields
at Naranja Park.
Council direction was given to staff to return at a future Council meeting with a plan to finance additional sport fields in response to this community request.
Today, staff is seeking direction from Town Council on a proposal to build and finance additional sport fields and related amenities at Naranja Park.
35
17 years in the making
History of Naranja Park
In 2000, the Town purchased a former gravel pit for $2.6 million with the intent to build a park, Naranja Park
Significant master planning took place with an adopted master plan (2002) and associated design report (2007) estimated at $156 million
In November, 2008, the Town held an election to request voter approval to issue $48.6 million in General Obligation bonds to begin the first phase of park construction
This bond election was unsuccessful
36
Recent History of Naranja Park
In 2012, through community advocacy, an archery range was installed. Private fundraising and a grant from Arizona Game & Fish Department provided the financing for this project.
In 2014, the Town began the process of updating the (2002/2007) Naranja Park master plan
Community outreach and statistically valid survey results noted a significant shift in priorities as a result of the shifting demographics. The need for additional playgrounds, ramadas,
sport fields and diamond fields rose to the top.
37
Naranja Park - Updated Master Plan
April 1, 2015 Town Council meeting saw a significant number of Oro Valley residents and user group representatives in attendance to support the new plan.
Council approved the updated Master Plan with an estimated $33 million build out
38
General Plan receives 70% voter approval, November, 2016
Provide more parks, recreation, cultural opportunities for all ages
Develop strategies to increase opportunities for recreational and community events by:
“Planning for sports tournaments”
Address the adequacy of Town Parks and Recreation programs and facilities by:
“Assessing the availability of recreation opportunities for all residents within the Town”
“Enhancing and maintaining open space, park and recreation facilities and programs through existing
new resources, private and public recreation providers,
partnerships, volunteers and others as appropriate”
“Considering the affordability and availability of existing and future parks and recreation programs
to residents”
Your Voice Our Future – General Plan
39
Naranja Park Investments
Council’s Commitment to Residents
December, 2015, Council approved $2.3 million for Naranja Park improvements to include:
Mass grading and site improvements
Utilities: electric, potable water, and reclaim water
Improved roadway
Lit asphalt parking lot
Dog park (small/large)
Multi-sport lit fields (2 oversized)
Fiscal Years 2016/17 and 2017/18
Multi-sport fields (2 oversized)
40
February 15, 2017 Council Meeting
Community Request
A significant number of Oro Valley residents, athletes, and sport team representatives requested that the development of Naranja Park (Master Plan) take place at an accelerated pace.
41
Proposal Per Master Plan
42
Construction Cost Estimate - $16,733,900
43
General Obligation (GO) Bond
Financing Plan
Estimated $17 million GO bond
$16.7M project costs + related bond issuance costs
20-year bond
Annual principal and interest estimated at $1.4 million
Requires voter approval in November election
Implementation of voter-approved secondary property tax
Dedicated specifically for paying principal and interest on GO bonds
Sunsets at end of 20-year bond term, reauthorization requires voter approval
Estimated average secondary property tax rate
$0.22/$100 of assessed valuation
$4.50/month per household with a home value of $250,000
$39.35/month per commercial property with value of $1.2 million
44
Estimated Revenues
$370,000 annually
User fees
Tournament fees
Special event fees
Bed tax revenues
$1.1 million estimated economic impact
$200,000
General fund revenues
Anticipated Revenues and Expenses
Annual Operations
Estimated Expenses
$230,000 one-time for equipment
$570,000 annually
Personnel $120,000
O&M $450,000
45
Questions
46
47
Oro Valley Water Utility
Northwest
Recharge, Recovery
and Delivery System (NWRRDS)
Intergovernmental Agreement
Town of Oro Valley Mayor and Council Meeting
April 5, 2017
48
Northwest Recharge, Recovery and Delivery System
IGA Overview
Partnering with Metro Water and Town of Marana Water Utility
Project will recharge CAP water at the Lower Santa Cruz Recharge
Project and at the Avra Valley Recharge Project
Recovery of the stored CAP water through shared recovery wells
IGA governs the design, construction, financing, management
and operation of the project
IGA is specific to the shared portion of the project
IGA has a clause to withdraw prior to construction
Re-design costs would be paid by withdrawing entity
Minimal cost if within one year
49
Northwest Recharge, Recovery and Delivery System
Partnered System Overview
50
Northwest Recharge, Recovery and Delivery System
IGA and project overview
NWRRDS Project delivery allocation
Metro – 4,000 acre feet
Oro Valley – 4,000 acre feet
Marana – 2,400 acre feet
NWRRDS Project estimated project cost share
Metro Water: $12,467,660
Oro Valley: $12,467,660
Marana Water: $3,351,680
Total estimated project cost for Oro Valley: $23,650,000
OVWU Independent pipeline/booster cost: $11,182,340
Worked closely with Metro and Marana staff on technical matters and
operations and maintenance cost estimates
51
Northwest Recharge, Recovery and Delivery System
Total NWRRDS & OVWU System Overview
52
Northwest Recharge, Recovery and Delivery System
Twin Peaks Reservoir and Booster Schematic
53
Northwest Recharge, Recovery and Delivery System
Elements of the IGA
Metro Water would own, operate and manage the project facilities
Each party has a contractual right to its allocated capacity for delivery
of its CAP water
Metro is the Operating Agent subject to the terms and conditions of the IGA
Each party is equally represented on the NWRRDS Committee
Members of the NWRRDS Committee are:
Director of the Oro Valley Water Utility
Director of the Marana Water Utility
General Manager of Metro Water
Committee Chair is rotated every year
54
Northwest Recharge, Recovery and Delivery System
Elements of the IGA
Elements of the IGA
Committee will participate in design and construction of the project
Committee is responsible for reviewing and approving an annual operating plan
As Operating Agent, Metro Water is responsible for implementing the design,
construction, management, and operation of the project
Individual parties will pay their share of the capital costs and the annual
operations and maintenance costs
Individual parties will be responsible for their own debt financing
The term of the NWRRDS IGA is effective through the year 2075
IGA has a clause to withdraw prior to construction
If Operating Agent assigns its rights to another party, the remaining parties vote
for a new Operating Agent
55
Northwest Recharge, Recovery and Delivery System
Elements of the IGA
Water Quality
Water quality studies completed by HDR Engineering and Carollo Engineers
Water quality meets all regulatory standards
Water quality study included a review of emerging contaminants
which are not yet regulated
Water quality will improve when blended with OVWU groundwater
Water quality monitoring – ADEQ requirements
Metro & Marana sample at wellheads
OVWU will sample at the booster station
Provides double check on water quality
Operating Agent will notify other parties within 24 hours regarding
the exceedance of any water quality standard
56
Northwest Recharge, Recovery and Delivery System
Funding and Financing
Funding
50% funded with impact fees from new development
50% funded with Groundwater Preservation Fees (GPF) from existing
customers
Financing
Financing for shared project portion and independent portion –
Bonds and/or WIFA loan
May not need to borrow for impact fee portion if collected prior to
construction
Impact fees and Infrastructure Improvements Plan will need to be
revised in 2018
GPF may increase to cover annual debt service estimated at $675,800
57
Northwest Recharge, Recovery and Delivery System
Cost Comparison Analysis
Cost Comparison
Comparing additional CAP delivery through Tucson Wheeling
to the NWRRDS Project
Net Present Value (NPV) Analysis
2017 through 2050 time frame
Capital costs, O&M costs and annual debt service
CAP Wheeling costs with Tucson Water
NWRRDS NPV = $539/AF
TW Wheeling NPV = $607/AF
58
Northwest Recharge, Recovery and Delivery System
Recommendation
Water Utility Commission recommended forwarding IGA
to Council with recommendation for approval
Staff also recommends approval of the NWRRDS IGA
59
60
Amending Town Code Chapter 17 Floodplain and Erosion Hazard Management
Community Development and Public Works
Aimee Ramsey, Assistant Director
April 5, 2017
Good evening Mayor and Council
I will try and keep this brief my name is Aimee Ramsey and I am the assistant director to the Community Development & Public Works department.
61
Stormwater Utility Chapter 17 Overview
Enable the Town to participate in the FEMA Community Rating System (CRS) program
Addresses the 2012 audit (Community Assistance Visit) by Arizona Department of Water Resources (ADWR)
Tonight we are here for too discuss changes to Chapter 17 – FLOODPLAIN AND EROSION HAZARD MANAGEMENT ordinance for two reasons.
First the Stormwater Utility Division wants to be in a position to be participate in FEMA’s Community Rating System.
The National Flood Insurance Program (NFIP) Community Rating System (CRS) is a voluntary program. It recognizes and encourages community floodplain management activities TO exceeding
the minimums. Basically the CRS uses a rating system similar to fire insurance rating to determine flood insurance premium reductions for our residents. CRS rating are from 9 to 1
with most communities entering the program at a Class 9 or Class 8 rating, which entitles residents in Special Flood Hazard Areas (SFHAs) a 5 percent discount on their flood insurance
premiums. Each class produces an additional 5% discount.
Secondly, and step one to entering the program is that these changes address deficiencies found in our Town Code from a 2012 audit (Community Assistance Visit) by Arizona Department
of Water Resources (ADWR). Our current code is non-compliant.
62
Chapter 17 Changes
Meets state compliance requirements from 2010
Eliminates antiquated language
Eliminates redundancies
Add required language from the model state ordinance.
Notable Changes
Our last update to this ordinance was in 2005. Significant state code changes were made in 2010. And our Town Code does NOT reflect those changes. In addition, what is before you
eliminates antiquated language, eliminates redundancies and add required language from the model state ordinance.
You also have in your packet a list of notable change. If you would like to address those I will bring Justin Turner our Senior Stormwater Engineer to the podium to address any technical
changes. –
63
Stormwater Utility Overview
Reviewed by ADWR
Reviewed by the Stormwater Utility Commission
Reviewed by Staff
Reviewed by the Town Engineer
He has spent numerous hours working with ADWR, staff and the Town Engineer on the document in front of you. The Stormwater Commission reviewed and recommended the document move forward.
Would you like him to come up?
64
Questions
Thank you
Michael Todnem P.E. – Stormwater Utility Division Manager
mtodnem@orovalleyaz.gov
Justin Turner P.E. – Sr. Stormwater Utility Engineer
jturner@orovalleyaz.gov
Stormwater Utility Division
stwov@orovalleyaz.gov
Phone: (520) 229-4816
Fax: (520) 229-5075
680 W. Calle Concordia
Oro Valley, AZ 85704
If not this concludes my presentation and I will leave you contact information should anyone have questions about Stormwater Management Plan – Low Impact Development – Is their home
in a FEMA or local flood plain? Our Stormwater staff is available to answer these and many more questions. It is one of our goals to improve Public Education and Public Outreach to
the community.
Thank you for your time.
65
66