HomeMy WebLinkAboutInformational Records - Town Council ReportsProject NameActualsBudget% RemainingActuals Budget% RemainingStatus Comments/NotesGENERAL GOVERNMENT PROJECTSCourthouse Seating and Remodel‐ 200,000 100.0% 10,150 210,150 95.2%On hold. Evaluating overall space needs.El Conquistador Country Club & Golf Course Acquisition 350,000 350,000 0.0% 1,000,000 1,000,000 0.0%Complete. FY 17/18 was 3rd and final payment of 3‐year payment purchase plan.Virtual Desktop Infrastructure 36,747 53,000 30.7% 36,747 53,000 30.7%In progress. Final components will be purchased in the third quarter of the fiscal year. Project is expected to be complete in spring 2018. Property/ID and Southern Substation Building 18,383 2,622,700 99.3% 666,756 3,271,073 79.6%In progress. Plans are complete; staff is currently reviewing and discussing the bidding process for the project.3‐D Mapping Equipment 73,025 76,087 4.0% 73,025 76,087 4.0%Complete. Equipment is in use.Two Additional Multi‐Use Fields at Naranja Park 1,019,160 966,675 ‐5.4% 1,049,506 1,080,000 2.8%Complete. Final invoices being processed.Parks Maintenance Tractor‐ 54,000 100.0%‐ 54,000 100.0%Complete. Tractor is in use. Invoice is being processed. Transport Bus‐ 70,000 100.0%‐ 70,000 100.0%On hold. Evaluating existing transport resources.Steam Pump Ranch Improvements‐ 55,120 100.0%‐ 55,120 100.0%In progress. Town Manager and staff met with the Historic Preservation Commission and the Oro Valley Historical Society to develop priorities. Staff is securing price estimates with the intent to begin work the third quarter of the fiscal year.Gate and Generator ‐ 680 Calle Concordia‐ 62,500 100.0%‐ 62,500 100.0%In progress. Installation to be completed by June 30, 2018.Bond‐Funded Park Infrastructure ‐ 5,000,000 100.0%‐ 5,000,000 100.0%On hold. Based on results of November bond election.TOTAL 1,497,314 9,510,082 84.3% 2,836,183 10,931,930 74.1%HIGHWAY FUND PROJECTSPavement Preservation Program 342,524 1,501,415 77.2% 342,524 1,501,415 77.2%In progress. Winter treatment completed. Fog seals currently being applied.Tangerine Access to Safeway (1st Ave) ‐ Safety‐ 250,000 100.0% 36,439 286,439 87.3%In progress. Plans are at 100% and are with ADOT for right‐of‐way application. Council passed resolution on April 5, 2017 to take over the Tangerine right‐of‐way from ADOT at Oracle to just past First Avenue. Currently awaiting pavement treatment by ADOT and State Board action. Construction documents are being developed.TOTAL 342,524 1,751,415 80.4% 378,963 1,787,854 78.8%COMMUNITY CENTER PROJECTSGolf Course Cart Path Improvements 29,464 50,000 41.1% 29,464 50,000 41.1%In progress. First phase completed; seal coat planned for the spring, depending on funding.Energy Efficiency Project 525,797 700,000 24.9% 1,907,710 1,950,250 2.2%In progress. Golf course irrigation pump station has been replaced; pool system improvements and lighting retrofits are complete; water fixtures have been replaced. HVAC replacements are underway. Tennis Court Improvements 96,323 75,000 ‐28.4% 96,323 75,000 ‐28.4%Complete. Budget overage will be covered by bed tax revenues.TOTAL 651,583 825,000 21.0% 2,033,496 2,075,250 2.0%QUARTERLY CIP STATUS REPORTFOR THE QUARTER ENDING DECEMBER 31, 2017TOTAL PROJECTFiscal Year 17/18Page 1 of 3 F:\CIP\Quarterly Status Reports\FY 17‐18\Q2\Q2 FY 17‐18 CIP Status Report
Project NameActualsBudget% RemainingActuals Budget% RemainingStatus Comments/NotesQUARTERLY CIP STATUS REPORTFOR THE QUARTER ENDING DECEMBER 31, 2017TOTAL PROJECTFiscal Year 17/18ROADWAY PROJECTSLambert Lane from La Cañada to Rancho Sonora 2,528,242 4,561,000 44.6% 6,408,171 7,400,000 13.4%Complete. Working on project close‐out; final invoices being processed. Naranja Drive Two‐Way Left Turn (at Naranja Park) 33,926 458,500 92.6% 33,926 458,500 92.6%In progress. Project is under construction with anticipated completion in early spring 2018. Transportation Art by Youth Program‐ 75,000 100.0%‐ 75,000 100.0%On hold. Bulk of project activity will occur in summer 2018, when participants are on school summer break. Application due January 26, 2018. Project may roll over into FY 18/19.La Cañada Moore Intersection Study 18,093 25,000 27.6% 29,233 50,000 41.5%In progress. Initial study has been completed. Public meeting to present options to the community is scheduled for January 18, 2018.Palisades Multi‐Use Path‐ 284,000 100.0%‐ 284,000 100.0%In progress. Currently in design. Traffic Light ‐ La Cañada at Oro Valley Community Center 29,833 500,000 94.0% 29,833 500,000 94.0%In progress. An intergovernmental agreement (IGA) with the Regional Transportation Authority (RTA) for a traffic signal was approved by Council and the RTA in January 2017. The project is under construction.Tangerine Road from La Cañada to Shannon 2,485 1,700,000 99.9% 1,210,295 1,860,000 34.9%In progress. Utility relocation, easement acquisition and construction are underway. La Cholla Boulevard from Overton to Tangerine 348,317 1,864,160 81.3% 2,342,811 3,973,467 41.0%In progress. Construction documents are being prepared and a draft IGA with the RTA is underway.TOTAL 2,960,895 9,467,660 68.7% 10,054,268 14,600,967 31.1%STORMWATER FUND PROJECTS4.5 Cubic Yard Wheel Loader (Lease Purchase) 48,004 50,000 4.0% 48,004 50,000 4.0%Complete. FY 17/18 was final payment of 4‐year lease purchase plan.Lambert Lane Culvert Extension‐ 50,000 100.0%‐ 50,000 100.0%In progress. Design is complete. Construction to occur after roadway project is complete. Project will not impact travel lanes.Cañada Hills Estates Channel Repair Project‐ 80,000 100.0%‐ 80,000 100.0%Complete. Further evaluation allowed Town to complete the project with in‐house staff.TOTAL 48,004 180,000 73.3% 48,004 180,000 73.3%WATER UTILITY PROJECTSSteam Pump Replacement Well Drill and Construct 4,370 700,000 99.4% 4,370 700,000 99.4%On hold. Project construction has been pushed to FY 18/19, after the Nakoma Sky replacement well is complete.Nakoma Sky Replacement Well Drill and Construct 3,965 40,000 90.1% 3,965 40,000 90.1%In progress. Construction has been accelerated to FY 17/18, concurrent with development activity at the site. Arizona Department of Water Resources permit application and well impact analysis completed. Well site design grading plan completed. Well E2 Upgrade 114,116 250,000 54.4% 268,383 404,267 33.6%In progress. Notice to Proceed was issued June 29, 2017. Project scope has been expanded to incorporate additional improvements. Construction expected to be complete by March 1, 2018.Hydropneumatic (HP) Tank Replacement (Wells) 6,112 100,000 93.9% 6,112 100,000 93.9%On hold. HP tank design is complete for Well D‐8. Fabrication is on hold. Page 2 of 3 F:\CIP\Quarterly Status Reports\FY 17‐18\Q2\Q2 FY 17‐18 CIP Status Report
Project NameActualsBudget% RemainingActuals Budget% RemainingStatus Comments/NotesQUARTERLY CIP STATUS REPORTFOR THE QUARTER ENDING DECEMBER 31, 2017TOTAL PROJECTFiscal Year 17/18Water Plant 4 Reservoir Coating 32,400 100,000 67.6% 32,400 100,000 67.6%Complete.Hydropneumatic (HP) Tank Replacement (Boosters) 11,743 100,000 88.3% 11,743 100,000 88.3%On hold. HP tank design is complete for High Mesa "G" Zone booster station. Fabrication is on hold.West Lambert Lane 12‐Inch Main Relocation 412,586 200,000 ‐106.3% 893,502 800,000 ‐11.7%Complete. Retention will be released February 2018. Project came in over budget due to a higher bid as bundled with Public Works for the roadway project. Budget overage will be covered by capacity in other projects.24‐Inch Reclaimed Main Relocation Tangerine Road 57,450 200,000 71.3% 1,973,421 2,115,971 6.7%In progress. The 24‐inch reclaim main is in service. Punch list items and closeout scheduled to be complete by June 30, 2018. Rancho Feliz Valve and Drain Valve Assembly Replacement‐ 100,000 100.0%‐ 100,000 100.0%On hold. Project is on hold until FY 18/19. Funding in FY 17/18 will be used for Countryside drain valve assembly replacement project.Countryside Drain Valve Assembly Replacements 162,776 70,000 ‐132.5% 162,776 70,000 ‐132.5%Complete. Installation of 30 drain valve assemblies is complete. An additional 40 replacements are planned for FY 19/20.Rancho Verde Fire Hydrants‐ 75,000 100.0%‐ 75,000 100.0%On hold. Staff is reviewing project scope, with a potentially larger project possible in a future fiscal year.Main Valve Replacement Program‐ 50,000 100.0%‐ 50,000 100.0%In progress. Construction of new pressure‐reducing valve system is expected to be complete by March 2018. Oro Valley Community Center Main Replacement 8,133 75,000 89.2% 8,133 75,000 89.2%On hold. FY 17/18 budget is for design of the new 8‐inch main. Tucson Water Wheeling at Oracle Road and Hardy Road 11,408 100,000 88.6% 11,408 100,000 88.6%In progress. Design is 95% complete. Project completion targeted for June 30, 2018.La Cholla ‐ Lambert to Tangerine Main Relocation 35,517 700,000 94.9% 166,872 831,355 79.9%In progress. Design is 95% complete and included additional CAP water crossing design and pot holing. Construction is scheduled to start summer/fall 2018.TOTAL 860,576 2,860,000 69.9% 3,543,085 5,661,593 37.4%Page 3 of 3 F:\CIP\Quarterly Status Reports\FY 17‐18\Q2\Q2 FY 17‐18 CIP Status Report