HomeMy WebLinkAboutPackets - Council Packets (701) AGENDA
ORO VALLEY TOWN COUNCIL
STUDY SESSION
OCTOBER 14, 2009
ORO VALLEY TOWN COUNCIL CHAMBERS
11000 N. LA CANADA DRIVE
STUDY SESSION - AT OR AFTER 6:00 p.m.
CALL TO ORDER
ROLL CALL
1. Fiscal Year 2009/10 Update: Water Rates Analysis
2. Update on discussions with Tucson Water regarding the delivery
(wheeling) of Central Arizona Project Water
3. Presentation and Discussion of Environmental Sustainability Plan and
Energy Efficiency Community Block Grant (Green Team)
4. Future Agenda Items
ADJOURNMENT
POSTED: 10 07 09
3:00 p.m.
cp
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person
with a disability needs any type of accommodation, please notify the Town Clerk's Office at
(520)229-4700.
r �
TOWN OF ORO VALLEY
Page 1 of 3
COUNCIL COMMUNICATION STUDY SESSION DATE.,
OCTOBER 14, 2009
TO: HONORABLE MAYOR AND COUNCIL
FROM: Philip C. Saletta, P.E. Water UtilityDirector
or
Shirley Seng, Water Utility Administrator
SUBJECT: Fiscal Year 2009/10 Update: Water Rates s Analyses
SUMMARY:
The functions and duties of the Water UtilityCommission n include reviewing and developing
recommendations for water revenue requirements, water rates and fee structures. Commission The Commission has
evaluated financial considerations related to significant short and longcapital term capital expenditures, the
Utility's existing cash reserves, the existingoutstandingdebt and •
the annual debt service payments.
During this process, the Commission's goals were to ensure that all
existing rate setting policies and bond
covenants were met. Cash reserves were utilized to minimize future debt. The proposed
p posed rate increases,
under the existing tiered rate structure, will continue to encourage voluntaryconservation.
water conservation.
The Oro Valley Water Utility Staff has prepared for the Commission p sion a Preferred Financial Scenario that
recommends the following changes for water rates, fees and charges for FY 2009-10:
g
• Increase the base rates for both the potable and reclaimed water rates
by 2.0%
• Increase the potable water commodity rates for the tiers as follows:
o Tier 1 = 1.0%
o Tier 2 = 1.5%
o Tier 3 = 2.0%
o Tier 4 = 2.5%
• Increase the commodity rate for the reclaimed rates by 1.0%.
• The construction rate for potable water will increase from $6.25 to6.3
$ 8 per 1,000 gallons.
• The construction rate for reclaimed water will increase by1.0% and will remain remain equal to the reclaimed
commodity rate.
• Increase the Groundwater Preservation Fee by $0.20, from $0.55 to0.
$ 75 per 1,000 gallons for
potable water use.
• Increase the Groundwater Preservation Fee by $0.10, from $0.30 to0.4
$ 0 per 1,000 gallons for
reclaimed water use.
• Increase the existing meter installation fees to recover labor and material
costs.
• Increase the new service establishment fees to recover labor and material costs.
• Increase the reconnection fees to recover labor and material costs.
• Increase the backflow permit fees to recover labor and material costs.
• Increase security deposits to minimize bad debt that is written off.
TOWN OF ORO VALLEY
Page 2 of 3
COUNCIL COMMUNICATION STUDY SESSION DATE: OCTOBER 14, 2009
Based on the financial analysis, the proposed rates will be a total increase of$2.06 or 5.6% to an average
residential customer with a 5/8 x 3/4 inch water meter. When comparing the impact to the monthly bill
from the overall rate increase (water rates & GPF) with the monthly bill from the existing rates, 1.2% of
the increase is due to the water rate increase and 4.4% is due to the GPF increase.
The above recommendations were based on analysis of the Utility's estimated revenue requirements for
the three Funds that comprise the Water Utility. The three Funds are listed below:
• Enterprise Fund: The Enterprise Fund manages the operations and maintenance of the potable and
reclaimed water system including personnel, O&M, existing system improvements and debt service.
Revenues are received from water rates, fees and charges.
• Alternative Water Resources Development Impact Fee Fund: The AWRDIF Fund manages the
alternative water resource capital costs (reclaimed and CAP water) and related debt service. Revenues are
received from alternative water resource development impact fees. Groundwater Preservation Fees are
contributed from the Enterprise Fund to this fund to assist with the reclaimed water system debt service
and future CAP water infrastructure debt.
• Potable Water System Development Impact Fee Fund: The PWSDIF Fund manages the potable
water capital improvements that are growth-related and debt service. Revenues are received from potable
water system development impact fees.
The Water Rates Analysis Report also contains an Alternate Financial Scenario which provides the
Council with an option for a different water rate increase. The Alternate Financial Scenario includes the
following changes for water rates, fees and charges proposed for FY 2009-10:
• No increase in the monthly base rates or the commodity rates for potable or reclaimed water use.
• Increase the Groundwater Preservation Fee by $0.20, from $0.55 to $0.75 per 1,000 gallons for
potable water use.
• Increase the Groundwater Preservation Fee by $0.10, from $0.30 to $0.40 per 1,000 gallons for
reclaimed water use.
• Increase the existing meter installation fees to recover labor and material costs.
• Increase the new service establishment fees to recover labor and material costs.
• Increase the reconnection fees to recover labor and material costs.
• Increase the backflow permit fees to recover labor and material costs.
• Increase security deposits to minimize bad debt that is written off.
M . A
TOWN OF ORO VALLEY
Page 3 of 3
COUNCIL COMMUNICATION STUDY SESSION DATE: OCTOBER 14, 2009
The following is the proposed schedule for the rate setting process:
09/28/09 Commission made recommendation on proposed water rates
10/07/09 Council to consider approval of Notice of Intent (NOI) to Increase Water Rates
10/14/09 Council Study Session on the proposed water rates
11/18/09 Public Hearing on water rates if NOI is approved
12/19/09 If adopted, the proposed water rates will become effective
-----) 0
AO 1 , Q
I
Shir Seng, Wate U;lity A d inistrator
' i // A
Philip C. aletta, P.E., Water Utility Director
Jer e Watson, Assistant Town Manager
Water Rates Analysis
Council Study Session
October 14, 2009
Oro Valley Water Utility
Town of Oro Valley
OVERVIEW
Background
Mayor & Council Water Policies
Revenue & Revenue Requirements
Financial Scenarios
Customer Analysis
Other Fees & Charges
Schedule
Town dOro Valley
1
•
BACKGROUND
July 8 - Council Study Session
— Council Direction: Perform Water Rates Analysis
in accordance with policies and provide Alternate
Financial Scenario
September 28 - Water Utility Commission
unanimously approved Water Rates Analysis
Report with Preferred and Alternate Financia!
Scenarios
October 7 - Council unanimously approved
Notice of intent to increase water rates
Town uom Valley
Mayor & Council Water Policies
Policy Document adopted by Resolution (R) 05-09
March 2, 2005
— Self supporting with rate based revenues
— Debt service coverage ratio of 1.30
- No transfer of excess revenues to General Fund
— Cash reserves of at least 5% of budget
— Reduced or subsidized rates will be paid by General Fund
— Cost of Service Approach (AWWA methodology)
— Water rates and charges reviewed annually
— Avoid sudden or large scale shifts in rates
• Minimize rate shock
— Rate structure to encourage water conservation
— Rates to encourage use of reclaimed water
2
Enterprise Fund
Operating Revenue
Sources of Revenues
-- Base rate
— Commodity Rate
— Other fees and charges
-- Interest income
— GW Preservation Fee
(to AWRDIF Fund)
Town of Oro Va71ey
Revenue Requirements
Debt Service
Personnel
Operations and Maintenance
— Least Control
Power costs Reclaimed water payments
Billing and postage costs CAP capital repayment
CAGRD obligations Water quality testing
Water disinfection costs Insurance
— Minimal Control
Water management and recharge costs
Maintenance& repair costs—wells, reservoirs, pumps, pipelines
Vehicle operations and maintenance
— Most Control
Office supplies/uniforms Memberships and subscriptions
Training and travel Outside services
Telecommunications
Torn at Oro Vallvy
3
Enterprise Fund Operating Expenses
Operating Expenses for FY 2009-10
(excluding capital outlay)
O&M Most Control
O&M Minimal $167,392
Control 3%
$1,001,188
10% Personnel
$2,517,450
24°J°
illk
a � �
O&M Least Control 44,:t4::_,411-f} f
558
��, , ��.-� r: Debt Service
32% »` '` :? __— $3 261 863
31%
J
Town of Oro Vaifey
Financial Scenarios
Nine Financial Scenarios were analyzed
— Five year revenue & expense projections
— Key assumptions in Water Rates Analysis Report
-- Phase-in Groundwater Preservation Fee
• Critical to pay off existing Reclaimed Project debt
— Base rates
-- Commodity rates
— Other fees and charges
Town of Oro Valley
4
Customer Analysis
Preferred Scenario
— Increase to average residential customer is 5,6°/a
• Increase in Base Rates of 2.0%
• Increase in Commodity Rates
— Tier 1 = 1.0%
— Tier 2 = 1.5%
— Tier 3 = 2.0%
— Tier 4 = 2.5%
• Increase in GPF of $0.20 per 1,000 gals. or 4.4% of total
monthly bill
Alternate Scenario
— Increase to average residential customer is 4.4%
• No base or commodity rate increases
• Increase in GPF of $0.20 per 1,000 gals. or 4.4%of total
monthly bill
Town d Oro Volley
Customer Analysis
Average residential customer uses 8,000
gallons per month
Preferred Scenario
— $2.06 Increase per month from $36.52 to
$38.58 per month
Alternate Scenario
— $1.60 Increase per month from $36.52 to
$38.12 Per month
5
. a
Other Fees & Charges
Included in all financial scenarios
Increase to recover associated costs
- New Service Establishment Fees
- Reconnection Fees
- Backflow Permit Fees
- Security Deposits
- Meter Installation Fees
Town of Oro Val.,
Review of Schedule
09/28 WUC review and recommendation
10/07 Town Council adopted Notice of Intent
10/14 Town Council Study Session on rates
10/26 Notice of Intent to be published
10130 Mail Public Hearing notice to customers
11/18 Public Hearing to consider water rates
12119 It adopted, new water rates are effective
Tom w opo vwey
6
TOWN OF ORO VALLEY 2
COUNCIL COMMUNICATION STUDY SESSION October 14, 2009
TO: HONORABLE MAYOR AND COUNCIL
FROM: Philip C. Saletta, Water Utility Director
SUBJECT: Update on discussions with Tucson Water regarding the delivery (wheeling) of Central
Arizona Project Water
SUMMARY:
Recently Oro Valley Water Utility purchased groundwater extinguishment credits from Tucson Water.
This purchase will benefit the Water Utility by reducing payment obligations to the Central Arizona
Groundwater Replenishment District (CAGRD). The Water Utility is required to replace ground water
P
pumped under our Designation of Assured Water Supply through the CAGRD. Replacement by CAGRD
is made under a contract that the Town has with the CAGRD. The price of CAGRD replenishment water
is increasing and the amount under our contract also increases annually.
Another option to reduce the payment to CAGRD is the delivery of our Central Arizona Project Water.
We are working on a long-term plan with the Northwest Water Providers (Flowing Wells, Marana,
Metro and Oro Valley) to directly deliver our CAP water. However, this project will not be on line for
several more years. Another way to reduce our obligations to CAGRD is to deliver Oro Valley's CAP
water through the Tucson. Water System.
The discussions with Tucson Water are preliminary and conceptual at this oint. The concept is to
P
deliver our CAP water to Tucson Water's Central Avra Valley Storage and Recovery Project ect and/or
Southern Avra Valley Storage and Recovery Project. The Town would then have its CAP water stored to
be delivered to Oro Valley through the existing Tucson Water System. The concept is to do this on an
P
interim basis until we have the system in place to directly deliver our CAP Water.
We are still investigating this possibility with Tucson Water as to the best locations for delivery. One
possible location is near Naranja and Shannon. In addition to the location, there are several technical
issues that need to be studied further. That includes system pressure, flow capacity and water quality.
Currently we are drafting a proposed agreement with Tucson Water that will look into the cost to
deliver our CAP water through the Tucson Water system to the Oro Valley Water Service Area.
This has been discussed with the Water Utility Commission at their recent meetings and the Commission
supports the concept and moving forward with the cost of service study withTucso .
Pii
,4,- ,
'r
Philip C. Sagtta, P.E., Water Utility Director
• ,...W/-1, -p>z__,
it
Jere-e Watson, Assistant Town Manager
Delivery of Oro Valley's CAP Water through
Tucson Water System
Council Study Session
October 14, 2009
Oro Valley Water Utility
town of au Valley
BACKGROUND
Oro Valley has a Municipal and industrial Subcontract
with the Central Arizona Water Conservation District
Subcontract is for 10,305 acre-feet of Central Arizona
Project water annually
Currently we store approximately 4,000 of per year
This recharge is used for replacement obligations to
CAGRD and for our recovery wells
Although this benefits the Water Utility and its customers
financially—it does not provide wet water
Discussion with Tucson Water have occurred on a
preliminary basis regarding the delivery of our CAP
water through the Tucson Water system
tw.n m nrovaoy
1
CONCEPT
The concept is to deliver our purchased CAP
water to recharge facilities owned and operated
by Tucson Water
We would then build up groundwater storage
credits to use at a later time
The groundwater stored would then be pumped
by TW through its system and then delivered to
Oro Valley's Water System
This provides for the delivery of wet water and not
just paper water credits
This is similar to how we deliver our reclaimed
water
Tcmrn of Oro Valley
Discussions to date
Tucson is interested because it has system capacity
available on a short-term interim basis
Oro Valley is interested because it provides short
term delivery of our CAP water while we plan,
design and construct the CAP Water Treatment and
Delivery System with the NW Water Providers
Metro Water is also interest in this concept
NW Water Providers are aware of these discussions
The benefit to TW is that they get the revenues
The benefit to OVWU is that we pay a price similar
or slightly higher than what we pay for paper water
and get wet water delivered,
2
Currrent and Future Activities
Need to perform a Cost of Service study with TW
and Metro Water
Drafting an IGA for the COS Study
OVWU is interested in delivery of 3,000 to 5,000
af on a short-term interim basis
Need to investigate the tie-in to our system
- Naranja and Shannon
— Water quality
— Pressure an flow capacity
— Additional infrastructure required
Town.Oro Valley
Council Direction
Water Utility Commission (WUC) has been
briefed and supports the discussions
Any Intergovernmental Agreements would
be reviewed by WUC and then brought to
Council
Staff recommends pursuing discussions
with Tucson Water and Metro Water
regarding wheeling of our CAP water and
seeks direction from Council
Turn,cif Oro VA,
3
TOWN OF ORO VALLEY 3
Page 1 of 2
COUNCIL COMMUNICATION MEETING DATE: 10/14/09
TO: HONORABLE MAYOR AND COUNCIL
FROM: Bayer Vella, AICP, Conservation and Sustainability Manager
SUBJECT: Environmental Sustainability Plan and Energy Efficiency Community Block
Grant (Green Team)
OBJECTIVE
The purpose of this Town Council Study Session is to inform the Council regarding recent and pending
Green Team activity.
EXECUTIVE SUMMARY
Over the past several months, the Oro Valley Green Team has refined methods, approaches, and
actions to address the Town's commitment to sustainability. The primary result is the latest draft
Sustainability Plan. It summarizes current and proposed sustainability practices for Town facilities,
operations, and staff.
The draft Plan has been revised and improved. Greater effort has been applied to refining each
section, especially those titled "Introduction", "Stormwater" and "Procurement". The draft is
approximately ninety percent complete. It will be scheduled for the December 16, 2009 Town Council
meeting for potential acceptance.
A significant component of the Sustainability Plan and Energy Efficiency Community Block Grant is the
completion of an energy audit. The purpose of the audit is to comprehensively assess all Town
buildings and facilities (including water wells and pumping stations) for energy saving opportunities.
Projects will then be evaluated based on anticipated investment return. To reach this point, specific
project costs and energy savings must be pinpointed.
A request for audit work proposals was published and three firms were considered. The successful
firm, APS Energy Solutions, has now reached the project milestone of sixty percent complete. All
fieldwork, including use of data loggers in each building to record energy use, has been completed.
This includes inventory and evaluation of all lighting, HVAC systems, thermostats, etc. Final results will
be reported to Town Council at the November 18th regular session.
BACKGROUND
In response to Town Council direction and commitment, the Green Team was formed with
representatives from all Town departments. The objective of the Green Team is to complete an internal
plan, gain Council input and support, and implement policies.
The work of the Green Team began with an introspective review of our current practices. New
operational goals were developed and assigned to specific Town Departments for completion within
allotted time frames. By developing a Sustainability Plan, the Town will model sustainable practices
and set an example for the public.
THE SUSTAINABILITY PLAN
This is the second study session regarding the Plan over the past year. Staff requests feedback to
ready the draft Plan (attached) for formal consideration in December. While developing the Plan, work
TOWN OF ORO VALLEY
Page 2 of 2
COUNCIL COMMUNICATION MEETING DATE: 10/14/09
has already commenced on several key action items:
• Comprehensive Energy Audit of all Town Facilities (please see attached progress summary)
• Solar Energy Plan for Town Hall
• Review of all Energy Efficiency Funding Tools
• Greenhouse Gas Emissions Study
• Consolidation of Fleet Management
• Town Vehicle Efficiency Assessments
• Website Development
ENERGY EFFICIENCY COMMUNIITY BLOCK GRANT STATUS
As approved by Town Council, staff originally requested $30,000 to conduct an independent energy
audit. The purpose of the audit, as specified in the Town grant application, is to develop a
comprehensive energy efficiency "strategy". In order to receive all $164,200 in grant funding, a Town
"strategy" is required by the Department of Energy. It is a prudent requirement to fulfill the intent of the
grant, which is to promote energy efficiency, serve as seed money to effectuate long range programs
rather than single projects, and create jobs.
From the notice of grant award date, the recipients are allowed 120 days to develop a "strategy". This
is the primary reason why staff quickly commenced the energy audit. As previously mentioned, the
audit is now 60% complete, and 100% completion is anticipated early in November. The Town energy
efficiency "strategy" is due no later than December 2, 2009.
Because we are using a performance contracting company, fees for the audit will be assessed only if
the Town does not enter into a future contract to effectuate energy efficiency improvements. This
approach has several advantages:
• The initial request to draw $30,000 is no longer a necessity. Performance contracting firms do
not charge up front costs for an energy audit. If the Town does not enter into an actual contract
for specific improvements, we will be assessed costs at a later date.
• Costs for energy audits are generally lower when completed by a performance contractor. The
audit will cost no more than $8,000.00. Whether or not the Town enters into a contract, this will
result in more money reserved for hard improvements, rather than upfront consulting.
• Accuracy will be high. Performance contracting firms must financially guarantee that savings
identified in the energy audit are realized.
• Improvements will be ranked on a return on investment basis. This enables a sound basis to
select priority efficiency upgrades.
• Performance contracting firms offer financial arrangements that do not require outlays from the
Town general fund. Projects are financed via guaranteed energy cost reductions over the term
of the arrangement. Once the term is completed, the town will enjoy true budget reductions.
Both the final energy audit results and grant "stra -9y" will be .r- -nted at the December 18, 2009
Town Council meeting. ./ /7
ATTACHMENTS
f .
Draft Sustainability Plan Paul Popelka, Acting Plan ing & Zoning Director
Energy Audit Progress Summary
Jer e Watson, Assistant Town Manager
'
P‘'LE Y ''1�/,
O O
(: 4 )AIIIII
b� t).-,:111,°UNDER A<1
y
jj L
immo, illpiza 7,,,t,,,,,,..;;;,t,.„,„:„„,,,,,,,,,,:,.. , ,
ll'
re.n.u.v ^
, .:
, ,- \ \
•
"ilk- ." ' illiflil ‘
r
. n
b
,
', °, ihiktidlar 4.0, _ '„
r
°” 1,gli,f( vl m',r e' A�,�p dF ,=,,,,,,,,,/, 4 + 2
Lt
Y
w *4a `5 p
.'•v/r
\N. 1r ,l„,,N.r
}
.�r� '411147144v''"
4- ♦ 1 .. t-„'tti- * y',l'Z'w•I-jk
•A..1,...:::..„:,-4 ,••+ ' 4 v:f sw T' .�.4 Fi[�.2.4
, . I ... ,-. . ” ° y i ,ems• ..,
ct", t''.. . te,.: ..,' .i, . 4,**,,•,':,, i
1 Y N
•
• f
a.
.,. 5 tiii; ,it
�d y
,, 4,i '‘.
'* '° f'Ili,T s�,.•:,`t,k '}i s.6� t,, r,f .. g �� �};:,y l :�K r *,- 4,.• R. ,.'�,f
rI�" F' e
ti ,
•
' `'yy 2,..'5,k
*", 7. AL.'
,`.. �' w .t ' .. , y, 1 "''�t r r - , . _ r,a ."i 4,r« .
wiy .
t � �
f
r
"'- r1
i� 'S,.,� �r+(` :stii, ! 1, ,- ''.: ,' �! *� ,• � *� ,J "+� � ,�r I r t. l . R:#111"$'
�iii��" � �� y�
1 x
'
t.
41114. , -k:•..t..,,,, ,"-,t."' * * , i.:t.„.0 , ;74,. ..--,,,,A,„, •.,- ..–., ••..:.,.---,,;;44.„...14
1, • f • .,, . -',..4 .
•r ti
.0 ki.'It .t....,:,iY ' 4' '.'it°' '' ''''' '. :1:- '': '
cis
-;,1.--4,31-.i...r,-,.. .,...,,,,. -. ,.. ie.'-;'i, * ' -'
. ••.�".,y _
.
♦'I. r•. t ...
. •:„.. ' `,'�
,q
+
'an '
fes
•.. .. '., , - .
4.
• « W' y �,*kmsF♦..' J •4'i *p � '� ;-:
,QM *�Ter ' ,;•'. •
s'ott
•
't�, „,NT4 y'C to . ..3.1M' > ' 51
..r .,r'`",a.64 , , i. r, � . ym . y =rin , Y � i .r
6+. ; , IR " yy. yv � , ,." ,M_ ''''.4-'4'...,,
1 w . s . * tep 4 . q �' n. rYt'gII
& xteP ' I
,•• e ,,.ayy „ lR,,w, t. e �M . 4 " •S t*•
a
, - r *,y
„."1..'!'�II. "'"'iM"' iK''/ . , R p
an
yyr
7r•- r
1 •
mx.9Nx"y Y
•
+�,.; '.�� ,..,' _ _' A o i 9 x Y '« - < J #
17 7-Virt.
r 1,—,---111- * .. r.i.. ,ti., „�.,'.�" _ 'A + 'p - wx • ,.�, +.. '�• ,7-.;;„
�R•dam 4
•
.. .. .! ,•, Y ' Yj a -161.""r.
4
" ,.4;,.. R,
SI
• • •
ustainability ,
Methods of App
Highlightsts of Success
Table of Contents
Introduction 3
Sustainability Program 5
Transportation Efficiencies7
Land Planning & Conservation 12
Buildings, Facilities, and Equipment 15
Water Conservation 21
Renewable Resources24
Waste Reduction 26
StormWater 28
Procurement3131
Introduction
The Town of Oro Valley is committed to operating in a manner that balances
social,economic,environmental and institutional considerations to meet
our needs and those of the community. Balance brings"sustainability"to
Town operations, and, by example to the larger community. Sustainability
is a journey—not a destination. It requires creativity and innovation to work
toward a common goal of ensuring our community's health now and
in the future.
This plan represents the Town's first effort to guide this journey. In May
2008,the Oro Valley Town Council formally affirmed its commitment to
sustainability with its unanimous passage of Resolution No. (R) 08-39.
In addition to highlighting current energy efficiency and conservation
practices,the need for further study to improve the sustainability of existing
municipal facilities, buildings and parks was established.
The Town Council approved two significant benchmarks to measure the
success of our"green"efforts: The U.S.Conference of Mayor's Climate
Change Agreement and the Environmental Protection Agency's Energy Star
Challenge are programs with specific sustainability goals.With these two
efforts as our guide,the Town staff set forth to develop a plan with two key
goals in mind:
1. Reduce greenhouse gas emissions seven percent below levels
produced in 1990
2. Reduce overall energy consumption by ten percent
To this end,the Town formed the"Green Team,"with staff representatives
from the following departments:
• Public Works
• Parks&Recreation �►
• Town Manager's Office
• Water Utility
111Ailla
• Planning &Zoning
• Police
• Library
• Building Safety4111b
The Green Team has worked for more than a year to develop this action
plan. By working collaboratively, each participant became fully aware of the
interdependency of actions required to achieve the Town's Sustainability
goals. Implementation will also require an ongoing team approach.
3
The Plan includes the following focus areas:
• Sustainability Program
• Transportation Efficiencies
• Land Planning &Conservation
• Buildings, Facilities and Equipment
• Water Conservation
• Renewable Resources
• Waste Reduction
• StormWater
• Procurement
Each focus area includes a descriptive statement,goals and implementation
items, highlights of current success and an action timetable. Each was
assembled using a process recommended by the Environmental Planning
Agency's Energy Star program.The process requires a four-step approach to
implement change:
1. Benchmark
2. Assess
3. Implement
4. Track
As a result,there are consistent references to benchmarks such as
establishing typical paper consumption levels for a government office
of similar size.Another component of benchmarking entails creating a
measurable goal such as a ten percent reduction in paper use over the next
year.The next step is to assess existing conditions as a baseline to measure
performance improvements.
Implementation and tracking are components addressed by insuring that
every initiative should result in action.To insure accountability,a yearly
report will be provided to indicate performance.
The Plan is designed to establish realistic and meaningful change.With
regard to cost,the Green Team has been sensitive to current budgetary
constraints.There are many items in the Plan that will result in significant
improvements to efficiency and conservation that simply require
organization. Paper use reduction, replacement light bulb standards and
consolidated building and fleet maintenance are examples. Items that
require a significant budgetary commitment are generally programmed for
consideration as the local economy improves.
"Sustainability" is truly achieved by balancing a myriad of considerations
within a changing environment.To that end,the plan will be updated every
five years to adjust to changing conditions and new technologies.
4
Sustainability Program
Statement
The long-term impacts of policy choices must be analyzed to ensure a
sustainable legacy. Decisions regarding internal operations will impact the
long-term Sustainability of Oro Valley.
Goals and Implementation Items
Internal Outreach and Education
Employee awareness, responsibility, participation and education are key
elements of a sustainability initiative.
• Provide monthly Sustainability tips to Town employees.The aim is to
provide employees with up to date and creative information to help
make positive and sustainable choices
• Review key elements of the Sustainability Plan with all Departments on
a reoccurring basis. Milestones and challenges specified in Plan must be
well understood by all employees
• Publish a Town progress report that reflects performance by
each department
0-3 years,Office of Conservation&Sustainability
Boards&Commissions
Raise general awareness of sustainability principles for use by
decision makers.
• Provide training opportunities for the Planning &Zoning Commission,
Development Review Board,and Water Utility Commission
• Promote the establishment of a Sustainability Commission to develop a
comprehensive program,coordinate activities in concert with the Town's
overall sustainability program, insure accountability,and implement
sustainability initiatives
0-3 years,Office of Conservation&Sustainability
Green Team
The Green Team is working to integrate sustainability principals and goals
into the management and operation of all Town Departments.
• Upon adoption of the Sustainability Plan by Town Council, immediately
proceed with implementation
• The internal Sustainability Plan is to be revised on an annual basis
0-3 years,Office of Conservation&Sustainability
5
Audit and Develop Benchmarks
Develop specific baseline information regarding current levels of key
indicators to measure savings created by action
• Greenhouse gas emissions generated by Town government
• Energy use and technology currently employed by all Town energy
using facilities and functions
• Levels of internal recycling
• Paper use
• Water consumption of building,facilities,and landscaping
• Provide an annual report regarding progress and milestones
0-3 years,Office of Conservation&Sustainability
0-3 years, Water Utility for Water consumption baseline
Highlights of Current Successes
The following efforts are underway.
• The Town has been allocated a Department of Energy funding
opportunity. Monies will be targeted to enable energy saving retrofits
• Retrofit funding opportunities have been identified.Advance
research is underway. Results will be presented to Town Council with
recommendations to implement comprehensive energy efficiency
retrofit programs
• An energy audit of all Town building and facilities has commenced.
Comprehensive results will be presented to Town Council in November
• Staff and the Pima Association of Governments are currently working on
a Greenhouse gas emissions study. Study will address Town facilities and
the entire community
• Town Council is considering formation of a Sustainability Technical
Advisory Team to help develop community wide programs
• Staff is working with City of Tucson Sustainability Department and
Pima County Administrators Office to bolster regional efforts,share
information,and pursue opportunities
• Array of financial tools available for energy efficiency and renewable
energy projects are being evaluated
• A new Office of Conservation &Sustainability has been established in
order to focus on development and implementation of related programs
6
Tansportation Efficiencies
Statement
Vehicle use in general is a significant contributor of greenhouse gas
production. Use of vehicles will always be necessary for employees to fulfill
specific tasks and every effort should be made to reduce the number of
vehicle trips. Furthermore,the Town must insure that vehicles utilized meet
acceptable efficiency standards.
Goals and Implementation Items
Facility Placement
All public facilities that include heavily utilized services should be located in
a manner to minimize vehicle trips by citizens and employees.
• Proposals for new sites must include an evaluation of population
density in the immediate service area and anticipated miles traveled by
customers and Town employee
• As part of identifying new locations for Town facilities,consider the
availability of nearby services such as restaurants, banks,drugstores etc.
to reduce customer and employee vehicle miles traveled
• Site design is to emphasize safe and efficient pedestrian movement and
multi-use paths to encourage walking and biking
Ongoing effort,Building Safety,Planning,Public Works,and Parks&Recreation
Fleet Management
Carbon emission capability of all Town owned cars, motorcycles,trucks,
transit vehicles,and heavy equipment must be reduced.
• Responsibility for vehicle purchase, monitoring,storage,and repair
responsibility must be consolidated into one team
3-5 years,Public Works
• An inventory of all vehicles by year, make, EPA rated average
miles per gallon (mpg),and actual mpg must be completed.
Mileage evaluations are to be analyzed on an annual basis with
the aim of increasing efficiency
3-5 years,Public Works
• Systematic repairs must be conducted to reduce diesel
and gas consumption
3-5 years,Public Works
7
• The frequency and type of vehicle use must also be tracked by one
team.The aim is to identify suitability of vehicle type,specific users,and
opportunities for fleet consolidation by establishing a pool
3-5 years,Public Works
• Vehicles are to be evaluated on a cost per mile basis at least once a year.
Low efficiency and aging vehicles must be systematical replaced as
budgeting permits
3-5 years,Public Works
Reduce fuel consumption by at least 10%
• A fleet management team is to monitor gasoline consumption and
establish current needs to establish a consumption baseline. This
information is to be utilized to monitor success of fuel saving programs
3-5 years,Public Works
• Enable all vehicles to utilize gasoline and diesel from one source to insure
quality and enable consistent monitoring
3-5 years,Public Works
The Town must adopt specific standards for gas mileage,safety, number of
passengers accommodated,and functionality.
• Criteria must be adopted by Town Council prior to any new vehicle
budgetary requests. Specific allowances are to be made for police patrol
cars and heavy machinery requirements to insure functionality
3-5 years,Public Works with support from Procurement
• The average of regular duty passenger cars in the fleet must be at least?
mpg by year 2016 for all staff passenger vehicles
3-5 years,Public Works with support from Procurement
• The fleet of light trucks must average at least? mpg by year 2016
3-5 years,Public Works with support from Procurement
• Large truck and patrol vehicle purchases are to reflect best available
functionality and fuel efficiency
3-5 years,Public Works with support from Procurement
• Use of recycled materials and extent of waste production by the
manufacturer must be considered as part of new vehicle purchase
3-5 years,Public Works with support from Procurement
• All diesel trucks must be converted to exclusively utilize clean diesel
3-5 years,Public Works
• The quality of gasoline utilized must be analyzed relative to vehicle
mileage and actual maintenance costs
Pi* 3-5 years,Public Works with support from Procurement
• Ten percent of the fleet is to utilize alternative technology by year 2016.
Clearly identify Town vehicles that use alternative fuels to promote the
Town's commitment
5-10 years,Public Works with support from Procurement
• Use of flex fuel will be discouraged until more sustainable non-food
sources are readily available
0-3 years,Public Works with support from Office of Conservation&Sustainability
Educate employees regarding best fuel efficiency driving practices.
• Post information on all vehicle use sign in and sign out logs
• Develop a brochure to be included in all vehicles and posted at
fuel stations
• Clearly mark appropriate Town vehicles so they can be easily identified
by the public and, in doing so, reduce the potential for unofficial use
• Prohibit practice of letting vehicle idle while employee completes a
function outside of a vehicle unless such action compromises safety
0-3 years,Public Works
Reduction of Vehicle Miles Traveled
Develop a comprehensive plan and associated requirements to reduce one
person per vehicle work commutes
• Participate in development and adoption of the Pima Association of
Governments Trip Reduction Program Ordinance to reduce traffic to
the worksite.The Ordinance includes a commitment to educate and
encourage employees with incentives to leave their car at home-at
least one day a week
• Increase use of carpooling and alternative modes by 5%
3-5 years,Public Works with support from Office of Conservation&Sustainability,
Human Resources and/T
Opportunities and incentives for employees to carpool and utilize public
transit are to be promoted.
• Establish an alternative mode information center for employees on the
Town intranet site to facilitate carpool matching
• Provide specific intranet links to the Pima Association of Governments
Sun Rideshare Match list website and Sun Tran
• Sponsor rideshare fairs,carpool sign-ups,or brown bag lunches at the
work place
• Establish "carpool"only parking in the few spaces that are truly afforded
tree shade in the Town Hall parking lot
• Require use of a carpool to conferences when two or more employees
are scheduled to attend an off-campus training session
• Promote carpooling to off-campus training sessions or conferences that
will be attended by colleagues in nearby jurisdictions
• Work with PAG/RTA to enhance transit alternatives to better serve OV
Employees by establishing reverse commute alternatives
3-5 years,Public Works with support from Office of Conservation&
9
Sustainability,Human Resources and IT
y
Special programs to encourage employees to use alternative transportation
modes to reduce the carbon footprint of travel to and from work must
be implemented:
• Participate and promote the yearly Clean Air Days and Bike Fest (work
commute) that is held throughout Pima County and seek privately
funded donations from local businesses to provide incentives/awards
• On the Town intranet site, recognize those who use alternative modes of
transportation and share cost savings realized
• On the Town intranet site, promote bring your lunch campaigns and
lunch bunch carpools
• Increase awareness of bike parking,shower,and dressing facilities in the
Town Hall Administration Building
0-3 years,Public Works with support from Office of Conservation&Sustainability,
Human Resources and IT
Schedule and location work adjustments should be encouraged to reduce
the carbon footprint of travel to and from work.
• Enable and promote use of compressed work weeks,telework,and off-
peak commuting times at discretion of each Department
• Allow employees to go to different work sites from home and/or return
directly home from different work sites when there is a reduction in miles
driven in Town vehicles
• Encourage meeting and conference participation via teleconference
0-3 years,Human Resources with support from Office of
Conservation&Sustainability
Transit Stops and Park& Ride Facilities
The promotion and development of regional and local transit routes and
Park&Ride facilities is a priority to increase use.
• All new public facilities with high levels of customer and employee
traffic are to provide Park&Ride facilities and encourage transit
• Update the Town Transit Development Plan and specifically identify
needs, locations,and funding opportunities for such facilities
• Update the Bike and Pedestrian Plan to work seamlessly with the
requirements of a Transit and Park&Ride Plan
• Update the Town zoning code to require provision of Park& Ride
spaces in larger developments as accomplished within the Steam
Pump Village PAD
• Add at least one transit stop and Park& Ride opportunity
3-5 years,Public Works with support from Planning and Parks&Recreation
Road Maintenance and Operational Functions
Use recyclable material to the greatest extent feasible for roads in a manner
that insures durability.
• Continue to utilize asphalt and chip seal with recycled rubber
• Review selective use of pervious pavement options and actively test
10
products for potential use
• Review options to minimize use of pavement as part of subdivision street
standards etc.
• Research and possibly implement use of light colors-opposed to black-
in paving to minimize heat island effects
3-5 years,Public Works
Incorporate renewables or high efficiency technology into traffic operation
facilities requiring power.
• Use of light emitting diode traffic signals is the standard
• Use of Solar powered flashing school zone lights is the standard
• Work with all surrounding jurisdiction to maximize traffic light
synchronization to reduce gas consumption
• Implement use of round-a-bouts in lieu of stop signs where appropriate.
• Solar powered parking lot lights are to be utilized
3-5 years,Public Works
Highlights of Current Successes
• A traffic round-a-bout has been designed for future implementation
at the intersection of Buena Vista and Hardy Roads
• Twenty five Sun Shuttle stops have been established, including one
at Town Hall and the Municipal Operations Center
• The Public Works Department is utilizing clean diesel for
operations equipment
• Since 2003,the Police Department has purchased "administrative use"
vehicles not normally associated with Law Enforcement use rated
for high fuel economy and low maintenance.As of 2009 almost all of the
"administrative use"vehicle fleet has been converted accordingly
• The Police Department is prepared to utilize"flex fuel" in vehicles when/
if it is identified as a Town preferred fuel. The current fleet includes 29
"flex fuel" patrol vehicles. Beginning with the 2009 model year,all Ford
Crown Victoria patrol cars will be"flex fuel"capable
• In FY 2008-2009,the Police Department has implemented the efficiency
replacement program by reducing the fleet by two vehicles
• In 2009,the Town opened its first dedicated Park and Ride facility in
Rancho Vistoso and established a second location at Riverfront Park.
Both facilities support the new Sun Shuttle and Sun Express bus services.
• The Oro Valley Marketplace transit facility was made fully operational
with bus service
• Steam Pump Village shopping center now includes dedicated Park&Ride
spaces. It is currently being served by the new Sun Shuttle
• The Police Department currently has two Ford E150 passenger vans
that other departments use when needed for efficient transportation
of groups
• The Public Works Department uses rubberized asphalt and chip seal on
all new road projects (including La Canada)when possible
LncLF. Ian ning & Conservation
Statement
The Town's desire to preserve, protect,and enhance the Sonoran Desert
environment,visual resources, natural open space connections,and
significant cultural resource sites is clearly expressed in the General Plan.
Internal measures must be oriented to achieve these objectives.
Sustainable development strategies save taxpayer money, improve the
profits of local businesses,and make the community much more livable.
Economic progress and environmental quality are compatible goals.
Goals and Implementation Items
Land Acquisition
Institute a Town program for the acquisition, management and maintenance
of public open space with significant natural,visual,and/or cultural resources
• Develop a specific inventory of environmentally sensitive lands
and cultural resources to further the objectives of the General Plan,
Environmentally Sensitive Lands Ordinance and Sonoran Desert
Conservation Plan
0-3 years,Planning
• Establish a cost-benefit analysis methodology to determine
acquisition priorities
5-10 years,Planning
• Research and seek formal consideration of potential funding
partnerships and mechanisms identified in the General Plan. Funding
opportunities include targeted development fees,Town funds,sales
taxes,or highly focused bond measures to meet Environmental Sensitive
Lands planning objectives
5-10 years,Planning
Identify and require protection of significant natural and cultural resources
as a part of the planning and zoning process
• Implement an Environmentally Sensitive Lands Ordinance that has been
integrated with the objectives of the Sonoran Desert Conservation Plan
0-3 years,Planning
12
Facility and Infrastructure Placement
New facilities and infrastructure must be designed to avoid impact to
environmentally sensitive lands,which include designated riparian habitat,
significant resource areas,floodplains and cultural resources.
• All Capital Improvement Projects are to be reviewed for compliance
with environmentally sensitive lands and native plant salvage ordinance
requirements
• If impacts to environmental sensitive lands are unavoidable, mitigation is
to be provided to the same extent required of private development
Ongoing,Planning with support of Public Works and Building Safety
Promote dedication of facilities,such as a police substation, in large scale
developments where public need is anticipated.
• Establish criteria to seek such dedications upon private land owner
request for rezoning or development plan
• Identify new facility costs and benefits prior to dedication
0-3 years,Planning with support of OVPD and Parks&Recreation
Systematically reduce capital outlays by encouraging smart growth decisions
to promote the most efficient use of infrastructure.
• Conduct an analysis of the Town utilizing the Arizona Smart Growth
Scorecard and review areas of"improvement"with Planning &Zoning
Commission and Town Council
• Staff reports relevant to new land use are to include analysis of current
and future infrastructure impacts. Infrastructure includes roads, sewer
and water
• Emphasize General Plan objectives to limit sprawl and facilitate
development in areas with high capacity infrastructure. In particular,
locate new Town facilities used by the public in areas where high
capacity infrastructure already exists
Ongoing,Planning with support of Public Works and Water Utility
Land, Facilities and Infrastructure Management
Monitor and manage Town land,facilities and infrastructure to achieve the
goals of the General Plan, Environmentally Sensitive Lands Ordinance,and
Sonoran Desert Conservation Plan
• Develop long range maintenance plans for the grounds of all
Town properties
• Implement long term maintenance and evaluation of restoration
areas that may have been disturbed in construction of facilities
and infrastructure
0-3 years,Public Works and Parks&Recreation with support of Planning
13
Manage biological and cultural resources to ensure their integrity,diversity,
and long term viability.
• As specified in the General Plan,the Town shall prepare,adopt,
and periodically update a Natural Open Space Management Plan
to determine the appropriate level of use and protection of the
environmentally sensitive opens space areas within and
surrounding the Town
• Review and inspect lands on a yearly basis and conduct a needs
assessment. The assessment is to be utilized to formulate a specific
action plan
3-5 years,Planning and Public Works
Implement educational programs to improve the environmental and cultural
resource literacy in the Town.
• Dedicate space on the Town website with appropriate level of
information and links
0-3 years,Planning with support of Town Manager's Office
• Provide regular seminars as part of the Citizen Planning Institute
Continuing Education series
0-3 years,Planning
• Host annual cultural resource celebration events in locations such as
Steam Pump Ranch or Honey Bee Village
0-3 years, Town Manager's Office
Highlights of Current Successes
• In 2008,the Town Council adopted smart growth policies for the Arroyo
Grande planning area, including adoption of General Plan policies and
a land use map to assure preservation of wildlife habitat, linkages and
open space
• The Town adopted policies in the General Plan Focus 2020 for
instituting programs for acquisition, management and maintenance
of environmentally sensitive lands and public open space
• In 2008,the Town Council adopted and implemented the Sonoran
Desert Conservation Plan. It will be utilized to guide the development of
Environmentally Sensitive Lands ordinance
• The Town applies Native Plant Preservation, Salvage and Mitigation and
the Riparian Habitat Protection Overlay District regulations to all new
development projects
• The Town actively manages cultural resources at Steam Pump Ranch and
Honey Bee Village
• Work has commenced on development of an Environmentally Sensitive
Lands Ordinance to comprehensively address preservation of key
habitat, riparian areas,visual,and cultural resources
• All Environmentally Sensitive Lands and Cultural/Historic sites are
currently being inventoried
14
• Water harvesting has been incorporated into areas between
Development Services and the Library
• Innovative water harvesting riparian channel design concepts have
been developed by Public Works and incorporated into private sector
developments such as Oro Valley Marketplace
Buildings, Facilities & Equipment
Statement
Green building systems and operational practices are dependent on siting,
solar access, light penetration,architectural design, product specification,
and maintenance.Green buildings must take all of these factors into
consideration on a "whole-building,"integrated basis.This approach is not
linear; rather it is circular and multi-dimensional.
High-performance buildings use less energy,cost less to operate,and
have less of an environmental impact than conventional buildings.To
successfully achieve these goals,the process of designing,constructing,
or renovating ahigh-performance building must be different from
traditional design/build methods.
The greatest opportunities for incorporating energy efficiency and
sustainability into a building come in the design phase, but there are many
opportunities during construction and renovation.All improvements must
be judged on a cost effective basis- both in the short and long term.
Viewed over a 30-year period, initial building costs generally account for
approximately two percent of the total,while operations and maintenance
costs equal six percent,and personnel costs equal 92 percent.
Use of high efficiency facilities and equipment is also a significant step
to achieve energy and budgetary savings.The Town is committed to
make the most of gains in energy efficiency technology to reduce our
carbon footprint.
Goals and Implementation Items
Building Design and Construction
A building project and its components must be viewed on a full life cycle
basis.This"cradle-to-cradle"approach considers a building's total economic
and environmental impact and performance.These range from material
extraction and product manufacture to product transportation, building
design and construction,operations and maintenance,and building
reuse or disposal.
15
• Design must incorporate recommendations of the Sustainable
Building Technical Manual, produced jointly by the U.S. Department
of Energy (DOE) and Public Technology, Inc. (PTI).The manual entails
specific methods to design,operate and maintain environmentally
friendly buildings
• Employ a design,construction,and maintenance team that utilizes the
whole building integrated design approach. Design and maintenance
teams must include LEED certified professionals with specific experience
in sustainable design
• To set a community and building industry standard, promote
Town building and renovation efforts as Green Building
demonstration projects
• Balance environmental and economic considerations when selecting
building and replacement/renovation materials
Ongoing,Building Safety,Planning,and Public Works
• Insure key project management, building and maintenance staff received
training and opportunities to become LEED certified
3-5 years,Public Works and Building Safety
All new buildings are to achieve maximum efficiencies in energy use and
energy performance.
• Buildings will meet the LEED standard of Silver per the
Town Council resolution
• Key review staff must achieve accreditation as LEED
Certified Professionals
• Increase building longevity through durable construction elements
and adaptable design
• Solar energy to heat water must be utilized when hot water demand
is high and interior use areas are concentrated
• All structures must include solar photovoltaic technology as an energy
source or be designed to readily accommodate it in the future
• Passive solar orientation must be a primary consideration in building
design. Building orientation must take advantage of solar access,solar
cooling,solar shading,thermal storage and natural lighting
• Evaluate effects of micro-climate on building
• Buildings must be insulated to achieve an R34 or higher rating utilizing
environmentally friendly materials
• All windows and doors on south and/or west elevations must incorporate
screening via awnings,overhangs and/or vegetation to minimize
summer sun exposure
• Buildings must be designed to minimize emissions and negative indoor
and outdoor air quality impacts by utilizing a 20%over minimum code
design values
• Building design shall maximize the quality of the indoor environment for
the comfort, health,safety and productivity of occupant and visitors by
exceeding minimum code design values by 5%
• Select materials such as carpets,glues,adhesives,etc.with aim of
eliminating vapor emissions. Plan to minimize use of water by occupants
and mechanical systems and maximize on site water harvesting and
16 graywater use
• Minimize electric loads from HVAC, lighting,appliances,and equipment
• Design must address the aim of reduced and simplified maintenance
• Design shall minimize the extent of exterior impervious surface area
(such as pavement)
• Grading plans and implementation must include extensive water
harvesting elements
• Promote energy conservation by establishing below grade office
and storage space
Ongoing, Building Safety,Planning,and Public Works
Green building concepts are to be applied during the construction process.
• Lower energy costs by installing energy monitoring equipment, energy-
efficient lamps and fixtures,and using occupancy sensors to control
lighting fixtures
• Lower water costs by monitoring consumption and reusing stormwater
and/or construction wastewater where possible
• Lower site-clearing costs by minimizing site disruption and movement of
earth and installation of artificial systems. The footprint of buildings can
be minimized by using two or three stories
• Lower landfill dumping fees and associated hauling charges,through
reuse and recycling of construction and demolition debris
• Lower materials costs,with more careful purchase and reuse of
resources and materials
Ongoing, Building Safety,Planning,and Public Works
Existing buildings must be retrofitted to utilize cost effective technology to
achieve a high standard of efficiency and low energy use.
• A comprehensive energy audit must be conducted for all Town
structures to identify current performance and specific opportunities
for energy saving upgrades. The audit will specify conservation
and renewable energy opportunities,costs,and priorities based on
anticipated budgetary return on investment
0-3 years,Office of Conservation&Sustainability with support from Public
Works, Water Utility,and Parks&Recreation
• Town must develop a facilities maintenance plan that includes methods
to systematically upgrade facilities in accord with energy audit results.
The plan must include a specific schedule of improvements
0-3 years, Office of Conservation&Sustainability with support from Public
Works, Water Utility,and Parks&Recreation
• Retrofits to heating,cooling,and lighting are the number one priority. In
general,approximately 50 percent of the energy use in office buildings
is devoted to producing an artificial indoor climate through heating,
cooling,ventilation,and lighting
17
• Buildings must be re-used rather than demolished and replaced to
the maximum extent thereby conserving resources and the embodied
energy from prior construction.Structures must be rehabilitated and
adapted using LEED standards for existing buildings
5-10 years,Office of Conservation&Sustainability with support from Public
Works, Water Utility,and Parks&Recreation
• Water use fixtures must be replaced with modern low use
fixtures recognized by the EPA Water Wise program to reduce
water consumption
5-10 years,Public Works
Building Operation and Maintenance
Successfully meet the ENERGYSTAR Challenge by reducing energy
consumption by 10%.
• All energy billing and records must be reviewed on a regular basis by
one facilities management team. The team will then be able to quickly
respond to repair needs or further educating building/facility occupants
or users
0-3 years,Public Works, Water Utility,and Parks&Recreation
• The utility rate structure assigned to the Town must be evaluated to
derive savings. There are multiple rates being assessed on different
buildings and facilities
0-3 years,Finance Department with support of Office of Conservation&
Sustainability,Public Works, Water Utility, and Parks&Recreation
• Install separate monitoring devices on all Town Hall buildings to
measure monthly energy use. Data is to be utilized for benchmarking,
planning "high return on investment"efficiency upgrades,and identify
maintenance issues
0-3 years,Public Works
• Install and utilize technology to enable centralized control and
programming of all heating &cooling, lighting (internal and parking lot),
copying machines,computers etc.
0-3 years,Public Works
• Utilize ENERGY STAR tools and Town internal marketing to educate and
motivate Town staff to employ basic energy saving practices. Practices
to include:
• Instituting a "lights out at night/when not in use" policy
• Insure conference rooms remain closed while cooling/heating
systems are in operation
• Presentations to all departments regarding energy conservation
practices-and follow-up with documented results
0-3 years, Office of Conservation and Sustainability and Town Manager's office
18
Establish specific standards for thermostatic controls and non-essential plug
in use to insure energy savings and comfort.
• Consistently maintain the following heating and cooling building
temperatures in accord with time of actual building use:
• Heating =68 degrees (occupied) and 55 degrees (unoccupied)
• Cooling = 75 degrees (occupied) and 85 degrees (unoccupied)
• Prohibit use of personal space heaters and refrigerators in
Town buildings
0-3 years,Public Works
Overall performance of buildings must be regularly monitored and
systematically addressed.
• Development,adoption,and funding of an overall maintenance plan for
all Town facilities must be accomplished
• A proactive building maintenance schedule and action must be
implemented to not only enhance energy efficiency but to insure
building longevity
3-5 years,Public Works
Utilize products and maintenance methods to reduce indoor-air pollution,
smog-forming particles,odor and occurrences of eye, nose,throat and
skin irritation.
• Low-VOC paint products are to be utilized for indoor spaces
0-3 years,Public Works
• Least harmful pest and rodent sprays must be utilized. Sprays are to
be applied when buildings are not being utilized -and preferably on a
Friday afternoon to allow dissipation over the weekend
0-3 years,Public Works
Emphasize use of recycled materials for building maintenance.
• Use of recycled latex paint (exterior) when available
0-3 years,Public Works
Facilities
Save energy and cost by using energy-efficient lighting technology.
• Audit and systematically upgrade all lighting systems with an emphasis
on building, parking lot, street light,and traffic lighting to insure energy
efficiency gains. Extent and schedule of upgrades is dependent on
completion of a "return on investment" based analysis
• Standardize, replace and retrofit lamps and ballasts.The most efficient
new lamps produce ten times as many lumens per watt of power as a
conventional incandescent bulb
• Incorporate use of low-voltage lighting where appropriate
• Plan and provide for renewable energy sources for lighting and other
outdoor power
0-5 years,Public Works
19
Minimize impacts to the night sky and surrounding property owners.
• Meet and exceed Town ordinances relative to preservation of dark
sky conditions by using outdoor lighting fixtures that reduce sky
glow impacts
Ongoing,Public Works
Light the minimum area for the minimum time to achieve safety objectives.
• Limit all-night illumination to areas with actual all-night use or
security concerns
0-3 years,Public Works
• Utilize simple timers or photocells that can be used to turn lights on and
off at seasonally appropriate times. For security lighting, motion-sensors
can spotlight intruders without operating constantly
0-3 years,Public Works
• Use cut-off fixtures, shades,or highly focused low-voltage lamps
to avoid spillover
Ongoing,Public Works
• Use Linear"tube lights"and fiber-optics to light the way for pedestrians
without illuminating a whole area where appropriate
Ongoing,Public Works
Equipment
All new office, kitchen,computer,and non-vehicle equipment purchases by
the Town must meet a high standard of energy efficiency.
• All departments must specify and buy ENERGY STAR®-qualified products
or,when ENERGY STAR products are not available, FEMP-designated
products which are among the highest 25 percent of equivalent
products for energy efficiency. This is the same standard utilized by
all federal agencies
Ongoing,Finance Department
Use of energy efficient computer systems must be utilized to achieve
energy savings.
• All CRT computer screens must be replaced with LCDs
• All Town PC's must include devices that sense periods of inactivity and
automatically power down after 30 minutes of inactivity
• Use of the Energy Star rated computer equipment, including servers,
must be heavily emphasized in purchase of Information Technology
equipment
• Achieve power savings by migrating from the use of several servers
to one
• The data center requires air conditioning twenty four hours a day
and seven days a week. Only the most efficient air conditioning units
available should be utilized for this function
20
• Utilize cell phones and similar devices that include highly efficient
battery technology that enables extended time between charges and
relatively low energy use for recharge
0-3 years,Information Technology
As the greatest energy use in the Town,water well and reservoir distribution
pumps must meet high efficiency standards.
• NEMA PremiumTM label,a program sponsored by the National Electrical
Manufacturers Association (NEMA) and endorsed by the Consortium for
Energy Efficiency(CEE), must be consistently applied
0-3 years, Water Utility
Highlights of Current Successes
• The OV Water Utility consistently upgrades pumps and motors utilizing
the NEMA PremiumT'label.The majority in operation currently meet
this standard
• To date,99%of all computer screens have LCD technology.The
remaining CRT's have been scheduled for replacement
• An Energy Audit of all buildings,facilities,and wells is being conducted
• The Town has installed lower wattage bulbs in street lights
147
ater Conservation & Management - ------ 4
Statement
Conservation and efficiency programs result in substantial decreases in the
use of water.Water-efficient appliances and fixtures, behavioral changes,
and changes in irrigation methods can reduce consumption by up to thirty
percent or more.
Goals and Implementation Items
Buildings and Landscaping
Manage water use in a comprehensive manner. O''
• Designate one team to review all Town water utility bills on a consistent
basis to address changes in consumption
0-3 years,Public Works with support of Parks&Recreation and Water Utility
• Establish water use benchmarks for all Town facilities by utilizing
EPA WaterSense, ENERGY STAR,and Arizona Department of Water
Resource standards. Benchmarks are to be utilized to assess operational
issues, under performing systems and enable measurable results of
conservation measures
0-3 years, Water Utility
• Establish a specific water budget for interior and exterior
water consumption
0-3 years, Water Utility
• All parks, buildings and associated landscaping must be on separate
meters or sub-meters—in order to accurately monitor use.Separate
meters are not required if landscaping no longer receives irrigation
3-5 years,Public Works and Parks&Recreation
• Using the ENERGY STAR Portfolio Manager,track water use alongside
energy use in order to understand how these resources relate to one
another, make integrated management decisions that increase overall
efficiency,and verify savings from improvement projects in both energy
and water systems
0-3 years,Public Works with support from Office of Conservation&Sustainability
Buildings
Specific water conservation measures must be incorporated into designs of
all new Town facilities.
• EPA WaterSense approved (or equivalent)fixtures, lavatories and toilets
must be utilized
• • Design, installation and use of graywater is required in all new
Town buildings
Ongoing,Building Safety and Public Works
Retrofit existing Town facilities in a cost effective manner to reduce
water use.
• Audit all interior and exterior water fixtures and devices. Identify type,
water use,age, performance and condition
3-5 years, Water Utility with support of Public Works and Parks&Recreation
• Develop a maintenance plan to insure optimal performance and
replacement of outdated or damaged water fixtures and devices
0-3 years,Public Works and Parks&Recreation
• All new fixtures and devices must be EPA WaterSense approved or the
equivalent in performance
• Incorporate use of motion sensors for sinks and toilets in areas
of high use
5-10 years,Public Works
22
Town Landscaping and Parks
Reduce the amount of potable and reclaimed water used for landscape
irrigation at Town facilities and along public roadways.
• Landscaping must meet all requirements of the Oro Valley zoning code,
which includes water harvesting,water planning and monitoring, plant
type, irrigation and maintenance standards
Ongoing,Public Works and Parks&Recreation
• Roadway landscaping must be designed to survive without irrigation.
Irrigation may be enabled for a five year plan establishment period.After
establishment,water is not to be applied on landscaping unless severe
plant stress occurs due to drought
Ongoing,Public Works
Minimize use of landscape irrigation, herbicides, pesticides,and fertilizers.
• Systematically stop irrigating landscaping in all areas with drought
tolerant vegetation. Irrigation may be resumed to account for drought
or plant disease
0-3 years,Public Works and Parks&Recreation
• Develop a summary report to identify additional opportunities to extend
reclaimed water lines to all parks and identify funding mechanisms
0-3 years, Water Utility
• Plant species that are indigenous to the local area must be utilized when
landscaping next to natural open space or riparian areas
Ongoing
• Require that turf only be used for functional landscapes,such as play
areas and ball fields.Turf shall not be used for purely aesthetic purposes
Ongoing
• Implement the use of water-conserving practices and technologies
including "smart" irrigation timers and controls, moisture sensors,
drip irrigation,flow meters, master valves through water audits and
encourage hydro zoning and rainwater harvesting
5-10 years,Public Works and Water Utility
Employee and Citizen Education
• Explore a public education component in major Town landscape
projects where feasible,such as native plant demonstration gardens
and rainwater harvesting techniques
• Develop programs that educate businesses to conserve water by self
evaluation. Ratings could be similar to the LEED criteria
3-5 years, Water Utility and Office of Conservation&Sustainability
23
Tracking and Monitoring
• Track water consumption and water utility expenditures for each Town
facility on a regular and ongoing basis. Use the data to evaluate, make
improvements,and track the water efficiency of each facility
0-3 years, Water Utility,Public Works,and Parks&Recreation
Highlights of Current Successes
• The new landscape in the medians and edges of the La Canada Drive
roadway from Tangerine Road to Naranja are being irrigated with
reclaimed water as part of the new roadway widening project
• A hydrant was installed on the new 24-inch reclaimed water line in La
Canada Drive that will provide reclaimed water to contractors for use as
construction water for compaction of soils and dust control
• A hydrant was installed on the existing 16-inch reclaimed water line next
to the reclaimed water reservoir to provide reclaimed water to the Town's
Public Works Department to use for roadway sweeping and cleaning
• A connection has been provided to the new 24-inch reclaimed water line
in La Canada Drive to provide irrigation water to the Town campus
• The Town currently uses native or low water use plant choices on
Town properties and landscapes as set by the current landscape
code standards
• The Parks&Recreation Department closely monitors water use within
Town parks and landscapes
• The Parks&Recreation Department uses smart timers that are capable
of factoring in evapo-transpiration and have multiple programming
capabilities for seasonal changes
• All public restroom faucets within parks include automatic push button
shut off valves
Renewable Resources
Statement
Solar technologies diversify the energy supply, reduce the Town's
dependence on imported fuels, improve air quality,and offset greenhouse
gas emissions.A growing solar industry also stimulates our economy by
creating jobs in solar manufacturing and installation.
24
Goals and Implementation Items
Within the Town Hall complex, use photo-voltaic (PV) arrays to offset seven
to ten percent of energy use.A goal is to generate 200,000 kWh of solar
energy by 2015.
• Develop a specific"solar" plan for Town Facilities
0-3 years, Office of Conservation&Sustainability
• Strive for innovative ways to procure renewable energy for the
Town of Oro Valley facilities without negatively impacting the
general fund, including the use of power purchase agreements
and performance contracting
0-3 years, Office of Conservation&Sustainability
• Work with public and private partners to identify suitable sites for
renewable energy facilities
• Conduct a cost-benefit analysis of various renewable energy
resources to determine the most beneficial and cost-effective energy
source for a particular site given its location,features, land use and
infrastructure requirements
0-3 years, Office of Conservation&Sustainability
• Explore opportunities to coordinate with other large power users in
order to maximize the use of renewable energy and expand the market
for renewable energy alternatives in the community
0-3 years,Office of Conservation&Sustainability
• Identify grant opportunities and special funding sources to help offset
the cost of providing renewable energy to Town facilities
0-3 years, Office of Conservation&Sustainability
Reduce gas heating costs at the Jim Kreigh swimming pool by eighty
percent or 12,000 therms.
• Install solar water heating equipment to provide for seasonal needs
3-5 years,Parks&Recreation and Office of Conservation&Sustainability
Highlights of Current Successes
• The Town uses solar powered parking lot lights at the MOC and
Park&Ride
• Solar panels are utilized at five Town well sites to provide minor
power needs
25
T4Taste Reduction
Statement
Arizonans produce over 5 pounds of waste per person each day. It is clear
that such production will burden the capacity of regional landfills and
continue to increase associated operational costs.
Waste prevention is the preferred approach to waste management
because waste that never gets created doesn't have any associated waste
management costs. Conversely,disposal in a landfill is the least desirable
alternative. The Town will lead by example by reducing municipal waste.
Goals and Implementation Items
Reduce the total amount of municipal waste produced by 10%.
• Develop comprehensive recycling and reuse programs dealing with
traditional recyclables like paper, plastic and aluminum cans,and more
non-traditional items like electronics waste, batteries and light tubes
3-5 years,Office of Conservation&Sustainability
• Community events planned or financed by the Town (including holiday
celebrations,entertainment,and sporting venues) must minimize
production of land fill waste by incorporating recyclable products and
practices. The objective is to offer"no land fill"events. In all cases,the
Town will achieve a standard of recycling 50%of event waste
3-5 years,Parks&Recreation, Town Manager's Office,Office of
Conservation&Sustainability
Regard and treat waste as a valuable commodity, rather than garbage
• Develop a mulching program to convert landscape materials harvested
as part of routine maintenance into mulch for Town and public use
3-5 years,Public Works and Parks&Recreation
• Continue to offer furniture,filing cabinets,etc.that is no longer needed
by one department to others for use
Ongoing,all departments
Make waste reduction part of every Town employee's job. Resources and
mechanisms will be created or strengthened to better communicate to
employees waste reduction opportunities.
• Provide forums for employees to suggest new ways of reducing waste in
their work area through internal Sustainability focus groups
26
• Create and maintain an internal recycling marketing campaign to
encourage and remind Town staff and volunteers to recycle
0-3 years,Office of Conservation&Sustainability with support from Town
Manager's Office
Provide easy access to recycling facilities for building and facility users
• Include dedicated and secure space for recycling bins in all new Town
facilities,as well as encourage other forms of waste reduction
• Expand recycling into park facilities
• Insure recycle bins are established in multiple locations within the Town
Council chambers
3-5 years,Public Works and Parks&Recreation
Establish benchmarks for paper use to determine acceptable levels.
Furthermore,current paper use must be inventoried and reduced by 10%
• Use of double-sided documents is the rule-not the exception
• Set default duplex printing on all computers with access to
capable systems
• Use electronic documents (PDFs),scanned documents and email
in lieu of printed documents
• Smartboard or PowerPoint agendas are appropriate to better insure
paperless meetings
• Prior to meetings, distribute information electronically and notify
participants that paper copies will not be provided at the meeting
• Establish a process to review electronic drafts by all reviewers- in lieu of
multiple paper copies
• Use electronic transmittals for all Boards&Commissions
0-3 years, Office of Conservation&Sustainability with support from Town
Manager's Office and all Departments
Procure paper that meets or exceeds the Environmental Protection Agency's
guidelines for recycled content.
• All new paper orders must meet recycled-content standards
0-3 years,Finance Department
Focus on utilizing materials that may be readily recycled.
• Vendors must provide information on environmentally preferable
product options as applicable
• Encourage staff and volunteers to provide their own durable drinking
vessels. For guests, utilize cups and plates that have a low life cycle cost
and acceptable performance
0-3years,Finance Department
27
Highlights of Current Successes
• The Parks& Recreation Department instituted a recycling program for
aluminum, plastic,glass and paper in all Oro Valley buildings and parks,
including linear river parks
• The Town sponsors an annual household hazardous waste disposal
program for residents
• All Town facilities use'green'cleaning products
Stormwater
Statement
Stormwater management applies to both the quality and quantity of water
that falls during a storm event. The aim is to maximize the protection of life,
safety,and property.And ensure that stormwater is free of pollutants.
Goals and Implementation Items
The Stormwater Utility will provide for the safety and welfare of citizens,
Sr('MIIIATER property and the environment.
• Minimize disruptions caused by storm events through improved
1' UTILITY maintenance of all Storm Utility components and public roads
• Continue to develop mosquito monitoring and control programs
throughout the town
• Improve the quality of all stormwater discharge throughout the town.
• Identify and protect all unique or significant environmental or cultural
assets within the Town
0-3 Years Stormwater Utility
• Finalize the stormwater utility map by establishing a documented
maintenance/inspection program
• Create standard watercourse maintenance requirements to be included
in plats and CCR's for developments
• Finish and distribute the Watercourse Vegetation Management Plan to
ensure proper drainage throughout the Town while protecting riparian
and cultural areas
• Increase Community Participation in Stormwater programs such as
Adopt-a-Wash, buffelbusters,etc.
3-5 Years,Stormwater Utility and Planning and Zoning
28
• Continue to support monthly street sweeping for all public
roads and walkways
• Inspect all outfalls during dry weather twice per year
On-going Stormwater
Due to the occurrence of storms and other events that may cause periodic
flooding of land,the Utility will ensure that the Town's stormwater
conveyance infrastructure will safely drain and control the quantity and
quality of runoff.
• Provide stormwater technical support to all Town departments and
any commercial or residential activities in the Town that impact the
stormwater infrastructure
• Ensure that all future construction projects have adequate stormwater
infrastructure to meet the mission and goals of the Utility
• Improve roadway drainage to ensure all weather access throughout
the town
• Improve the preventive maintenance program for both public and
private stormwater drainage and stormwater quality infrastructure
0-3 years,Stormwater Utility
• Prepare Stormwater Best Management Practice Manual for Residents,
Businesses and Town Properties
• Inventory all public quality and quantity stormwater infrastructure
and establish preventive maintenance schedule in cartegraph
• Manage floodplain development to meet all Federal, State and
local requirements
• Begin reviews of all new construction drainage reports,development
and improvement plans and provide advice and recommendations to
the development community
0-3 years,Public Works and Planning and Zoning
• Use pervious surface materials on roads and parking lots,when practical,
to increase groundwater recharge opportunities
• Emphasize the maintenance and protection of riparian areas in a
natural state and avoid the use of artificial channels, levees and
stream diversions
• Encourage flood control projects to serve multiple purposes, including
maintaining and creating wildlife habitat and habitat connectivity
0-3 years,Stormwater Utility
• Continue to offer stormwater demonstrations to local schools
and at Town forums
• Provide Stormwater quality education at Homeowners
Association Forum
• Continue to participate in appropriate PAG and RCFD committees
0-3 years,Stormwater Utility,Information Technology
• Utilize Stormwater web page to disseminate program information
to the public
Ongoing
29
Highlights of Current Successes
• The Utility increased Adopt-A-Wash participation by 20% in the last year
• Cleared dozens of public drainage channels and road culverts clogged
with vegetation, debris and sediment to avoid potential flooding
• Constructed new spillways,sediment basins and rock embankments to
improve roadway drainage and minimize storm cleanup
• Increased operations to speed up storm cleanup and improve roadway
function including street sweeping,shoulder reshaping and wash
vegetation maintenance
• Monitored for pollution incidents by inspecting all commercial and
industrial drainage outlets that flow into our natural washes twice
during the year
• Responded to every pollution report, inspected,and issued corrective
action letters where appropriate
• Supported the installation and use of first flush technology in all new
commercial construction in Town for cleaning of oil and grease deposits
in parking lots
• Developed mosquito trapping,testing and abating procedures for
appropriate drainage ways and began treating any public locations
where the mosquitoes may breed
• Put a renewed emphasis on public participation and outreach through
the adopt-a-wash, buffelgrass removal,and education programs
resulting in the following:
• A 20%increase in adopt-a-wash groups
• Over 500 bags of buffelgrass removed from washes and
roadways with over 300 volunteer hours
• 5 interactive stormwater presentations to elementary classes in
Town of Oro Valley
• The Arizona Department of Environmental Quality complimented the
Town's efforts in complying with State requirements and that they
appreciated the Town's efforts in meting all six stormwater management
control measures and our protecting of the environment during the
last year
• Gained financial support from the Federal Emergency Management
Agency and Arizona Department of Emergency Management for a
$1.85 million drainage repair and mitigation project in Town
• Gained support from the Pima County Flood Control District in
accomplishing two projects costing over$300,000 and providing another
$250,000 of support for Oro Valley hydrology studies
30
Procu remen
Statement
Sustainable procurement means thinking carefully about what you buy:
buying only what you really need, purchasing products and services with
high environmental performance,and considering the social and economic
impacts of your procurement.
The Town will purchase materials, products,and services in a manner
that integrates fiscal responsibility,social equity, and community and
environmental stewardship.
Goals and Implementation Items
Implement a Sustainable Procurement Policy.
• As part of the selection process, include evaluation of"green elements"
as a part of the evaluation point system where applicable
• Participate in cooperative purchasing that leverages the Town's buying
power and provides for more cost-effective procurements
• Set standards for commonly purchased goods including paper, paper
supplies,janitorial and cleaning products and office supplies that enforce
the Town's commitment to sustainable procurement
Support Town vendors and contractors that use and identify"green
elements"of project approach and associated materials.
• Encourage use of products and services that have a lesser or reduced
negative effect on human health and the environment when compared
with competing products or services that serve the same purpose
• Encourage use of locally produced materials, products,and services,
when practical,to reduce the environmental impacts resulting
from transportation
Utilize best value procurement by means of a broader variety of
considerations, including performance and environmental attributes,when
making purchasing decisions.
• Encourage identification, evaluation and use of environmentally-friendly
products, services and practices by Town staff
• Utilize independent,third-party environmental product or service
label standards when writing specifications for,or procuring materials,
products,or services.Such labels include EcoLogo,Green Seal, ENERGY
STAR, LEED and EPEAT
• Develop life-cycle cost evaluations in procurement of goods and services
where applicable
• Encourage purchase of products that optimize the use of
recycled materials
• Encourage suppliers to use appropriate green supplies and
environmentally-preferable products. Provide preferences in
evaluations where appropriate
• Enhance employee awareness regarding opportunities to make
sustainable purchasing decisions
• Consider the ultimate disposition of purchased materials and,when
feasible,acquire products that can be recycled or re-used. For example,
contracts for computers (PCs, laptops,servers) are to include criteria
for manufacturer take-back and recycling,energy efficiency and other
sustainability attributes
0-3 years,Finance Department
•
Highlights of Current Successes
• The Town requires its janitorial services provider to use only
products certified as environmentally preferable by Green Seal,
EcoLogo or Greenstar
• The Town currently recycles and/or resells surplus equipment and
computers to reduce waste and create additional revenue for the Town
• In 2008,the Procurement Division created an online website for posting
solicitations and addenda to reduce printing requirements
• Similarly,the Procurement Division conducts contract correspondence
and negotiations via email to reduce printing and mailing requirements
• The Procurement Division provides information to Town Departments on
available"Green"alternatives for their purchasing needs
• The Procurement Division now uses over 50 cooperative contracts to
leverage the Town's buying power and provide for more cost-effective
procurements
32
Town of Oro Valley- Energy Audit Progress Summary October 7, 2009
Item Status
Audit Agreement Executed Complete
Prelim Audit Plan Complete
Prelim Budget Complete
Prelim MSProj Schedule Complete
Prelim Audit Client Meeting(introduction to audit and players)prelim walk Complete
Obtain Energy and Water Data FOR Base year Complete
Identify Site Priorities,if any Complete
Obtain Plans,Make Floor Plans each floor each building,verify SF(Evac Plan) Complete
Determine Access Requirements Complete
Review and Prepare Safety Plan for Prelim Audit Complete
Perform Site Visits Complete
Create Preliminary Standards of Operations Complete
Create Preliminary ECM Matrix Complete
City Council or Board Preparation Internal Meeting Complete
Perform Utilities Analysis Complete
Perform Benchmarking Complete
Perform preliminary savings estimate Complete
Finalize sites included Complete
Perform Tax Determination for all Sites Complete
Plan customer update meetings for entire audit(touch point plan) Complete
Prepare preliminary Standards of Operations Complete
Perform Customer review of Preliminary Standards of Operations Complete
Determine Base year for energy analysis baseline Complete
Perform Lighting Audits Complete
Perform Water Use Audits Complete
Identify Loggers/meters needs and Submeter locations for lighting projects Complete
Verify Meter locations and meter data Complete
Draft Scopes of Work for Various Work Types Complete
Determine energy and water rates to use in models and calculations Complete
Perform Utility Analysis Data Entry into Master Util Sheet each Building Complete
Review all Utility Analysis files for accuracy Complete
Perform Mechanical,Solar Thermal,and Domestic Hot Water System Audits Complete
Perform Controls System Audits Complete
Perform Solar Photovoltaic System Site Selection and Analysis Complete
Identify Loggers/meters needs and Submeter locations for Mech/Cntrls projects Complete
Perform Room Audits Complete
AHU Zone assignment from Room Analysis Complete
Prepare the ECM Matrix Complete
Prepare the draft M&V Matrix Complete
Disaggregation of Energy Uses all Meters In Progress
Specific Scope of Work Descriptions each ECM,each Building In Progress
Determine if O&M,avoided capital,and other Ops savings will be used In Progress
Prepare tax savings estimate(if any) In Progress
Prepare savings summary In Progress
Prepare draft M and V Plan In Progress
Perform Base Energy Models In Progress
Review Baseline Energy Models for each Building and compare to disaggregation In Progress
Model ECMs In Progress
Finalize energy models and calculations In Progress
Perform Rebate Plan,Analysis,and Schedule In Progress
Perform site walks with Contractors for Pricing In Progress
Secure Quotations for All ECM's In Progress
Finalize the Rebates Estimates In Progress
Finalize the Production Based Incentives Estimates In Progress
Finalize the Tax Incentives Estimates In Progress
Create Commissioning Plan and Commissioning Check sheets
Perform cost versus scope analysis for all proposals from contractors
Input the energy and water savings details into the Project Development Workbook
Input the final ECM by ECM costs from Cost Collection Template into PD Workbook
Perform technical review of all deliverables
Perform quality control review of all deliverables
Finalize the Deliverables for the 90%
Final Report Development
Prepare Final M&V Plan
Perform Final Contract Documents
Perform Final Presentation for Customer