HomeMy WebLinkAboutMinutes - Water Utility Commission - 4/12/2018 MINUTES
ORO VALLEY WATER UTILITY COMMISSION
STUDY SESSION
THURSDAY,APRIL 12,2018
HOPI CONFERENCE ROOM
11000 N.LA CANADA DRIVE
CALL TO ORDER-Chair Campbell called the meeting to order at 1:29 p.m.
ROLL CALL
PRESENT: Anne Campbell,Chair
Byron McMillan,Vice Chair
Robert Milkey,Commissioner
Winston Tustison,Commissioner
EXCUSED: Chuck Hollingsworth,Commissioner
Thomas Kibler,Commissioner
Bill Leedy,Commissioner
STAFF PRESENT: Peter Abraham,P.E.,Water Utility Director
Lee Jacobs,Engineering Division Manager
1. DISCUSSION REGARDING THE CENTRAL AVRA VALLEY STORAGE AND
RECOVERY PROJECT TOUR
Mr.Abraham discussed the tour of Tucson Water's recharge and recovery facilities.He
detailed how the Central Arizona Project water is recharged into the aquifer,recovered
and pumped to the Forebay Reservoir.Mr.Abraham explained how the water is then
wheeled to Oro Valley.
Discussion ensued regarding:
-How the facility compares to the Northwest Recharge&Recovery Delivery System
project facility
-Forebay reservoir and booster station proximity to recharge basins or recovery wells
-How future water wheeling with Tucson Water will affect operations and wheeling
stations
-Water storage at the Avra Valley facility
-Water recharge locations
ADJOURNMENT
MOTION:A motion was made by Commissioner Tustison and seconded by Commissioner
Milkey to adjourn the meeting at 1:38 p.m.MOTION carried,4-0.
1
04-12-18 Water Utility Commission
Prepared by:
Danielle Tanner
Senior Office Specialist
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the
study session of the Water Utility Commission of Oro Valley,Arizona held on the 12th day
of April,2018.I further certify that the meeting was duly called and held and that a quorum
was present.
04-12-18 Water Utility Commission 2