Loading...
HomeMy WebLinkAboutPackets - Council Packets (1878)Town Council Budget Study Sessions May 8 & 9, 2024 1 Day 1 – May 8 •Capital Improvement Plan •Public Works •Parks & Recreation •Town Court •Administration •Police •Community and Economic Development (CED) •Water Utility Day 2 – May 9 2 F Y 2 4 / 2 5 R e c o m m e n d e d B u d g e t - $ 1 5 6 . 4 M i l l i o n 3 Capital Fund •Town Court Expansion ($2.9M*) •Building expansion and space improvements •VTNP Restoration and Revegetation ($2M) •Restoration, revegetation and beautification of the Vistoso Trails Nature Preserve •Community Center Elevator and ADA Improvements ($1.6M*) •Full elevator and lowered entrance to the facility •Vehicle Replacements ($1.6M*) •Non-enterprise fund vehicle replacements •680 Fuel Station Renovation ($450,000) •Renovation and modernization of fuel station at 680 Calle Concordia facility * Project includes carryover from the current budget 9 Community Center Fund •Pusch Ridge Golf Course Improvements ($475,000) •Golf course bridge repair and turf reduction •Pusch Ridge Tennis Facility Improvements ($200,000) •Tennis bleacher replacement and ADA improvements •Community Center Jacuzzi Restroom Conversion ($300,000) •Conversion of Community Center jacuzzi to outdoor accessible restroom •VTNP Improvements ($200,000) •Site and safety improvements at the Vistoso Trails Nature Preserve •Golf Equipment Replacement ($230,000) •Tractor and mower replacement •Community Center Roof Surface Replacement ($223,000*) •Replacement of flat roofing material * Project includes carryover from the current budget 10 Streets and Roads •Pavement Preservation Program ($3.2M) •Annual roadway treatments per the Town’s pavement preservation and management program •La Cañada Mill/Overlay ($1.3M) •Mill and overlay of La Cañada from CDO Bridge to Lambert Lane •Equipment Replacement ($360,000) •Replacement of heavy equipment dump trucks •Bridge Maintenance Program ($140,000) •Annual bridge maintenance program to address non -structural needs of Town bridges * Project includes carryover from the current budget 11 Water and Stormwater Infrastructure •Sierra Wash at Via Mandarina Drainage Improvements ($365,000*) •Pending grant award, improvements to the outlet apron protecting the box culvert and roadway •Oro Valley Country Club Drainage and Pavement Improvement ($300,000) •Drainage and pavement improvements to address standing water and storm runoff at Oro Valley Country Club •Partnered and Independent Portions of NWRRDS ($23.3M*) •La Cañada Booster Station Expansion ($2.2M*) •Additional source water to "F" and "G" Zones from "E" Zone reservoir at La Cañada to improve system reliability •Steam Pump Well Equipping ($543,494*) •Well equipping and system tie in for replacement of retiring well •La Posada Well Equipping ($471,946*) •Complete equipping at the La Posada development at First Ave and Lambert Ln * Project includes carryover from the current budget 12 Anticipated Project Carryover Category Project Carryover Source Projected Carryover Amount Total FY 24/25 Project Budget Parks & Recreation ADA/Safety Walkway Concrete Improvements System Wide*Capital Fund $ 150,000 $ 150,000 Community Center Elevator and Entryway Improvements $ 1,565,490 $ 1,565,490 Community Center Flat Roof Surface Replacement*Community Center Fund $ 223,000 $ 223,000 Community Center Restaurant Cooler/Freezer Modernization and Floor Repair*Community Center Fund $ 75,000 $ 75,000 MUP –Phase II -Naranja Dr. (La Cañada Dr to Naranja Park entrance)*Capital Fund $ 165,000 $ 165,000 Parks Maintenance Toro Reelmaster Mower Replacement*Capital Fund $ 85,000 $ 85,000 Steam Pump Ranch - Solar Lighting $ 71,000 Vistoso Trails Nature Preserve Site Improvements Community Center Fund $ 242,802 $ 2,200,000 Total Parks & Recreation Carryover $ 2,577,292 Public Facilities, Vehicles & Equipment Fuel Management Software (Gasboy Replacement)*Capital Fund $ 70,000 $ 70,000 Town Court Expansion*Capital Fund $ 1,624,244 $ 2,948,488 Traffic Camera Video Recording System*Capital Fund $ 110,000 $ 110,000 Vehicle Replacement Program*Capital, Grants & Water Utility Fund $ 839,000 $ 3,789,199 Total Public Facilities, Vehicles & Equipment Carryover $ 2,643,244 Stormwater Sierra Wash at Via Mandarina Drainage Improvements*Stormwater Utility Fund $ 365,000 $ 365,000 Total Stormwater Carryover $ 365,000 Water System Big Wash Building Improvements*Water Utility Fund $ 67,884 $ 67,884 Control Systems - SCADA*Water Utility Fund $ 65,000 $ 265,000 La Cañada Booster Station Expansion*Water Impact Fee/ GPF $ 2,200,000 $ 2,220,000 La Posada Well Equipping*Water Impact Fee/ GPF $ 421,946 $ 471,946 Steam Pump Well*Water Impact Fee/ GPF $ 243,494 $ 543,494 Total Water System Carryover $ 2,998,324 Grand Total $ 8,583,860 13 CIP Projects Added for FY 24/25 Project Cost Pusch Ridge Turf Reduction $75,000 F450 Regular Cab $105,000 CRC Golf Maintenance Sewer Connection $125,000 Class 8 Truck with Dump Body $255,000 Magee Road Mill Overlay $591,000 14 FY 2025 Pavement Preservation •Prior to 2007, Pavement Preservation was ad -hoc because the Town was much smaller than today with far less street assets to manage. •2003 to 2007 – Town street inventory increased due to expansive development and annexations •Pavement Preservation in its current form started in 2007 out of necessity to manage the streets asset and has been consistently applied for nearly the past 20 years •Street asset management is data driven with a pavement degradation model and constant updating the system wide OCI based on field inspections. The main process for street management and pavement preservation is: •Choose streets and treatment type based on individual PCI within the asset management software •Field check to confirm current condition •Adjust pavement preservation list based on site condition findings •Adjust pavement preservation list for allocated budget •Bid & contract final preservation list •Perform pavement preservation work •Reevaluate post preservation results and adjust individual street PCI’s •Asset Management software then produces new system wide OCI 15 Historic Cost Trends •Only utilizing 3 forms of treatment for FY25 – HA5, Liquid Road & SAM’s •Treatment based on best material for each road lifecycle requirements •From FY20 to FY25, treatment costs have increased from 57 to 64% •Those arterials receiving Mill & Overlay treatments are considered reconstruction and are accounted as an individual CIP project •FY20 thru FY24 – actual costs. FY25 based on conversations with the contractors. Actual cost is determined at time of contracting •Town follows State mandated procurement rules & regulations Surface Treatments Cost per SQ YD FY20 FY21 FY22 FY23 FY24 FY25 Overall increase HA5 Holbrook Asphalt $2.17 $1.90 $1.90 $2.76 $2.80 $3.50 61% Fog Coat $0.90 $1.17 $1.84 $2.67 Slurry $2.28 $2.68 Liquid Road $3.99 $3.87 $5.45 $6.25 57% Gilsonite $2.19 $2.91 SAM (Chip Seal with Fog Coat) $3.96 $5.50 $6.19 $6.50 64% Cape Seal (is a Chip seal with slurry ) $8.42 •Causes for cost increases: •Material Inflation •Supply & Demand – too much work available region wide •Age of the Town’s Streets – requires more robust treatments 16 Overall FY25 Streets Treated 2024 2025 TOTAL COST PROPOSED ROADS lane miles 23 SUBDIVISIONS ( LOCAL STREETS)61.84 3 COLLECTORS (MAJOR ROADS)5.1 TOTAL 66.94 SAMS Lane Miles Area (SY) Collector 4.34 52201 local streets 13.26 98648 TOTAL 17.6 150849 NEW UNIT COST $6.50 $980,518.50 OLD UNIT COST $6.19 $933,755.31 DELTA $46,763.19 LIQUID ROAD Lane Miles Area (SY) local streets 24.58 230917 TOTAL 24.58 230917 NEW UNIT COST $6.25 $1,443,231.25 OLD UNIT COST $5.45 $1,258,497.65 DELTA $184,733.60 HA5 ROAD Lane Miles Area (SY) Collector 0.76 11590 local streets 24 195055 TOTAL 24.76 206645 NEW UNIT COST $3.50 $723,257.50 OLD UNIT COST $2.80 $578,606.00 DELTA $144,651.50 NEW UNIT COST $3,147,007.25 OLD UNIT COST $2,770,858.96 Delta $376,148.29 17 FY25 PAVEMENT PRESERVATION PROJECT LIST STREET / SUBDIVISION TREATMENT ESTIMATED COST CURRENT OCI NEW OCI Woodburne Av SAM $339,307 67 80 Suffolk Hills SAM $374,289 65 80 Ironwood Ranch SAM $32,019 73 80 Naranja Ranch 1 SAM $207,603 67 80 Egleston Dr ( Between Linda Vista and Desert Sky)SAM $27,300 58 80 TOTAL $980,518 Shadow Mountain Estates - East ( 2018 Currently a SAM)LIQUID ROAD $92,306 62 72 Sunnyslope ( 2018 Currently a SAM)LIQUID ROAD $128,219 67 77 Fairhaven Village ( 2018 Currently a SAM)LIQUID ROAD $91,394 82 95 Vista Del Oro Estates (2019 Currently a SAM) LIQUID ROAD $126,244 80 92 Canada Del Oro Estates (old first Avenue) ( 2017 currently a SAM)LIQUID ROAD $34,963 69 79 Lambert Lane Subdivision ( 2014 Currently a SAM)LIQUID ROAD $87,294 68 78 R.V. NH 7 Par. C and K (2018 currently a CSS) LIQUID ROAD $194,400 72 83 Desert Vista (2019 currently a SAM)LIQUID ROAD $208,769 73 84 Rancho Catalina (2019 currently a SAM)LIQUID ROAD $479,644 68 78 TOTAL $1,443,233 R.V. NH 2 Phase . 1 and Phase 2 (2019 currently a SAM)HA5 $202,846 80 92 Rivers Edge ( 2018 currently a CSS)HA5 $44,100 70 81 R.V. NH 7 (2018 currently a CSS)HA5 $90,811 72 83 R.V. NH 3 ( 2015 Currently a CSS)HA5 $10,584 69 79 R.V. NH 5 Par. C (2018 currently a CSS)HA5 $73,034 70 81 Sun City Vistoso Unit 15 (2015 currently an HA5)HA5 $47,842 65 75 Viewpointe 2 at Vistoso Hills (-New)HA5 $23,548 88 98 VIEWPOINTE AT VISTOSO TRAILS (-New)HA5 $23,034 88 98 R.V. NH 7 Par F The Overlook (2018 currently a CSS)HA5 $69,048 75 86 Arrowsmith Drive (2018 currently a CSS)HA5 $27,815 70 81 Verde Ranch (2016 Currently a CSS)HA5 $97,846 73 84 Cool Dr ( 2018 Currently a SAM)HA5 $12,751 84 97 TOTAL $723,259 CURRENT OCI NEW OCI 76 8718 FY 25 Pavement Preservation Details •Not considered a pavement preservation treatment, the following streets are being mill & overlays: •La Cañada Drive Mill/Overlay - CDO Bridge to Lambert Lane - $1,310,000 •Magee Road Mill/Overlay - Northern to SR77 - $591,000 •Brings these two streets up to OCI of 100 •FY25 Pavement Preservation projects amount to 15.26% of the total roadway network •Current system wide rating: 75.58 OCI •Pavement degradation anticipated per year: -2 OCI •System wide pavement condition rating with no treatment: 73.58 OCI •FY25 Pavement Preservation will restore the system wide pavement rating to 75.38 OCI 19 FY 2025 Bridge Management •FY25 is the second year that Bridge Management & Repair has been included within the budget as a line item. •For the FY24 Budget, within the PAG/RTA Fund Operations, $50,000 was line itemized for Bridge Maintenance. •This funding is intended to be utilized for minor repairs as outlined by ADOT Biennial Inspections and bridge deck spot delamination's (potholes). •Prior to FY24, Bridge Repair was managed as and within routine street maintenance. •The reason that it’s being itemized separately now ($140,000 for minor ADOT identified repairs as a new program) is that some bridge decks within the 10yr projected CIP may require replacement. So, a line item within the CIP offers a means of tracking bridge specific maintenance. •NOTE - A theme within this presentation is referring to the same bridge as “two separate bridges”. This is because most were built as two independent structures, sometimes at different dates. They are generally inspected and rated by ADOT as two independent bridges. 20 Deck Conditions •Inspection Frequency - Routine inspections for bridge structures are to be performed at regular intervals not to exceed 24 months •Critical Findings - Structural or safety related deficiency discovered which would require immediate follow up inspection or action on the bridge or safeguard the travelling public -- NONE NOTED •Critical finding shall be issued when the following condition exists: A condition rating of 2 or less for any of the following bridge components: Deck, Superstructure or Substructure •Deck - Condition rating shall be based on the deck top and the deck undersurface condition •All TOV Bridge Decks are rated 5 to 7, which has inhibited our eligibility to receive funding in the past because our bridges are considered to be in good shape overall 21 Deck Conditions ADOT BRIDGE INSPECTION National Bridge Inspection Standards (NBIS) Code of Federal Regulations, 23 CFR 650, Subpart C Deck Deterioration (N58 - ADOT)BRIDGE DECK SUMMARY Bridge No.Bridge Name 2012 2014 2016 2018 2020 2022 7799 Rancho Vistoso Blvd @ Honey Bee Wash - E.B.6 6 7 7 7 7 7800 Rancho Vistoso Blvd @ Honey Bee Wash - W.B.7 7 7 7 6 6 7801 Rancho Vistoso Blvd @ Big Wash - W.B.6 6 6 6 6 5 7802 Rancho Vistoso Blvd @ Big Wash - E.B.6 6 6 6 6 6 8910 First Ave @ CDO Wash - N.B.5 5 5 5 5 5 10427 First Ave @ CDO Wash - S.B.6 6 6 6 6 6 9816 La Cañada Dr. @ CDO Wash -S.B.6 6 6 6 6 6 10428 La Cañada Dr. @ CDO Wash -N.B.7 7 6 6 6 6 11708 Tangerine Rd @ Big Wash - W.B.-----6 11709 Tangerine Rd @ Big Wash - E.B.-----6 10845 Pusch View Lane @ CDO Wash E.B. & W.B.7 7 7 7 7 7 22 Costs •The following Bridges have been submitted to our representatives for Congressionally Directed Spending requests: •La Canada Bridge over the CDO Wash, condition 6/6 - $7,221,256 (Current Estimate is $7,657,800, with $436,544 or 5.7% Local Matc h) •First Ave. Bridge NB over the CDO Wash, condition - $2,509,723 (Current Estimate is $2,662,000, with $152,277 or 5.7% Local Mat ch) •Note - First Ave. Bridge SB is relatively new (built in 2007), so that’s why it’s not in consideration for deck replacement •Rancho Vistoso over Big Wash - $3,846,512 (Current Estimate is $4,079,016, with $232,504 or 5.7% Local Match) •Tangerine Road Bridge at Big Wash - $3,658,000 (Current Estimate is $3,449,494 with $208,506 or 5.7% Local Match) •All of the above represent requests for conventional bridge deck replacements •Conventional Bridge Deck Replacement unit cost is $120 to $140/sf, and this has been corroborated by contractor estimate and adding in a Federal Funding factor (Federal environmental clearances, Davis-Bacon wages, etc.). •Rancho Vistoso Blvd. contains two separate sets of bridges, one set over the Big Wash (within the CIP as $4,079,016 in FY27) and the other set over the Honeybee Wash (within the CIP as $685,000 in FY25 and $750,000 in FY27). •The 10y CIP has identified the La Canada over the CDO as $1,657,800 – this is a very rough estimate for an alternative means of deck replacement for both Bridges in their entirety. Staff is still researching alternatives for Bridge Deck replacement. •The reason this same bridge is identified as $7,657,800 within the Grant request is because this cost represents a conventional deck replacement. 23 Alternatives •Conventional Bridge Deck Replacement – removing the top 4” of deck wearing course via milling and replacing back with concrete. It does not entail the complete removal of the bridge deck. The structural component remains. •But because this process is so expensive, Staff is researching alternative means to accomplish the same results: •Keep the top wearing surface free of divots, cracking and delamination •Protect the inner structural deck section from cracking, allowing water to infiltrate and degrade the structural carrying capacity of the Bridge – keeping free from needing weight restrictions. •The alternatives we are exploring are: •Applying an Asphalt top wearing course – this was done on the Pusch View Bridge. We are checking on the structural capability to carry the same traffic loading. This would entail scoring the bridge concrete instead of complete milling. Then an Asphalt surface is applied. •Multi-Layer Epoxy Overlay – being tested in the Phoenix metro area •Polyester Concrete Overlay 24 Questions? 25 Scheduled Break 6:30-6:45 p.m. 26 Public Works FY 24/25 Budget Presentation 27 Public Works Services Administration •Town Engineer •CIP •Department Oversight Engineering•Pavement Preservation •Traffic signal, signs and marking maintenance •Asset Management •Roads •Sidewalks •Bridges •Engineering Street Maintenance•Street maintenance •Street sweeping •Vegetation management •Wash maintenance Fleet and Facilities•Vehicle, bus, and equipment maintenance •Fuel dispensing •Small and Large Facility Upgrades and Projects •Routine facility maintenance Stormwater•Floodplain Management •Pollution prevention program •GIS/Mapping •Engineering •Development review Transit•Dial a Ride Transportation Services •Seniors •ADA Certified •General Public ROADS, WATER, AND TOWN ASSETS: GOAL 4.3 Maintain and improve the community’s infrastructure by ensuring the effective utilization of Town and regional resources. 28 •Community Center Elevator ADA - Underway •Town Court Expansion - Underway •Naranja Park Expansion •CRC Fire Alarm System Upgrade •Pusch Golf/Tennis ADA External and Tennis Restrooms •Honey Bee Park Restroom Roof Repair •Vistoso Trails Nature Preserve Restrooms #2 and #3 ADA compliant •La Cañada Dr. MUP •First Ave. Mill & Overlay (CDO Bridge to SR77) •La Cañada Dr. & Tangerine Rd. Intersection - Mill & Overlay •Lambert Lane Reconstruction (La Cholla Blvd. to west Town limits) •RV Blvd. Mill /Overlay - Vistoso Highland to Honey Bee Bridge •Westward Look Improvements •Cañada Golf Course Irrigation Replacement & Pathway Improvements •CRC Parking Lot Reconstruction & Expansion Facilities CIP Roadway and Pedestrian CIP Major Accomplishments FY 2024 29 Highlights over the past year •Record Ridership on the Sun Shuttle •Began a new sidewalk repair program •100% Adopted Roadways – Keep OV Beautiful •50 Projects completed •Goals met •OCI 76 •Pavement Repairs Anticipated Annual Passenger Trips 65,000 30 FY 2025 Budget O&M Changes Administration •Insurance costs moved to general administration •Offset by increases in material costs and outside professional services Transportation Engineering •Focused Sidewalk and Bridge Maintenance Program •Small Equipment – Line driver & Road Vista Street & Drainage Maintenance •Increase in 3rd Party use •Increase material costs •Equipment replacements Transit •Addition of Fleet cost to transit budget repairs & gas 31 FY 2025 Budget O&M Changes Fleet & Facilities •Reallocation of Parks and Recreation facility maintenance program to Parks budget •Reduction in the type of small maintenance projects •Reallocation of one staff member from Procurement Stormwater •Evaluation and pursuit of a rate increase this year for FY 2026 Facility Maintenance Program ⚫ TH Building F - Replace water heater and aging water lines and mixing valves in mechanical room ⚫ TH Building F - Replace exterior double doors below bell tower ⚫ Interior lighting upgrade to LED @ Tangerine Substation & TH Building B & Building C & 680 exterior ⚫ OVAC - Mechanical Room hot water recirculation repair ⚫ Golf Maintenance Wash Rack Repair ⚫ Pusch Ridge - Replace exterior doors on Racquetball court ⚫ TH Building A - Exterior restroom door operators and drinking fountains with bottle fillers (2ea) ⚫ Streets shed @ 680 maintenance bay replace electrical line ⚫ Safety ladder ports for rood access to TH Building F and Pusch Ridge and Community Rec Center ⚫ CRC - Replace deteriorated siding on roof Included in O&M, Capital in Fleet, Facilities and Community Center budgets 32 Public Works - Divisions FY 23/24 Adopted FY 24/25 Recommended Variance Administration $1,965,637 $1,906,558 $(59,079) Fleet & Facilities Maintenance 3,335,096 2,902,873 (432,223) Transportation Engineering 4,607,291 5,053,786 446,495 Street Maintenance 749,500 1,137,000 387,500 Stormwater 1,457,461 1,514,692 57,231 Transit 3,227,168 4,044,386 817,218 Total $15,342,153 $16,559,295 $1,217,142 33 Public Works FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $6,290,164 $6,668,317 $378,153 O&M 4,096,189 4,224,939 128,750 Capital 4,955,800 5,666,039 710,239 Total $15,342,153 $16,559,295 $1,217,142 34 Scheduled Break 8:15-8:30 p.m. 35 Parks & Recreation Fiscal Year 2024/25 Budget Presentation 36 Parks & Recreation Department Administration Parks Management Recreation & Culture Aquatics Community Center Golf Mission: Inspire Connection Through Recreation Connecting people to people, people to community, and people to nature! 37 Major Accomplishments 50th Anniversary Parade, Event, & Tree Planting Obtained $1M Grant for the Naranja Park Project Increase in Memberships Multiple New Programs 9 Staff Promotions 6 Staff Received 7 Certifications Naranja Park Expansion Project Vistoso Trails Nature Preserve Master Plan Ribbon Cuttings Santa Cruz Valley National Heritage Area Designation Sign SPR Barbecue Building and Bunkhouses 38 FY 24/25 P & R Department Budget 39 Parks & Recreation - Divisions FY 23/24 Adopted FY 24/25 Recommended Variance Administration $564,730 $542,371 $(22,359) Parks Management 1,884,981 1,898,390 13,409 Recreation & Culture 746,400 731,500 (14,900) Aquatics 1,520,929 1,610,700 89,771 Community Center 6,727,482 7,443,468 715,986 Total $11,444,522 $12,226,429 $781,907 40 Parks & Recreation FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $3,974,813 $4,065,129 $90,316 O&M 6,931,146 7,761,255 830,109 Capital 327,879 177,100 (150,779) Debt Service 210,684 222,945 12,261 Total $11,444,522 $12,226,429 $781,907 41 Community Center - Indigo Golf FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $1,738,221 $1,839,522 $101,301 Food & Beverage 550,992 701,378 150,386 O&M 2,513,367 2,640,332 126,965 Equipment Leases 162,684 162,661 (23) Total $4,965,264 $5,343,893 $378,629 42 Parks Management Installed Solar Lighting @ CRC Renovation of Naranja Park Large Dog Park Tree Planting for 50th Anniversary Increase in Donation Program (Trees & Benches) Improved Turf Conditions Across Sports Fields Improved Landscaping at Pusch Ridge Golf & Tennis Pro Shops Vistoso Trails Nature Preserve ADA Restroom Project Honeybee Canyon Restroom Project Upcoming Project Expansion of Event Lawn at SPR 43 Recreation and Culture New and Enhanced Programs Increased Senior Programs Movies at the Ranch Series Increased Number of Camp Offerings Oro Valley Hiking Series Bark in the Park Contracted Archery Program New IGA with Marana for Move Across 2 Ranges Expanded HallOVeen Spooktacular Upcoming Projects New Shade Structure at SPR Expansion of Event Lawn at SPR 44 Aquatics Best of the Northwest, Sports & Recreation, Best Aquatic Center New Programs High Yo (Yoga) Sunset Beginner Yoga Shallow Water Aqua Aerobics Lifeguard Instructor Training Program Upcoming Project Recreation Pool Tile Replacement 45 Community Center Increase of Approximately 1,000 Members Center Averages Over 80 Classes a Week Camp Filled in 36 Hours New and Enhanced Programs Began offering Silver Sneaker Memberships in January 2024 (260 individuals took advantage of this program) Youth Acting Classes Group Voice Lessons for Older Adults Youth Scrapbooking Classes The Artists Way Program (Expressive Art Classes) Expansion of group fitness classes at CRC into the Sunset Room Increase in Free Outdoor Community Movie Events Upcoming Projects Replace Circuit Room Flooring Sunset Room Improvements New Water and Ice Machines Replace Shade Awnings at Pusch Ridge 46 Indigo Golf Partners Operational focus on 45-holes of golf Retain loyalty base (membership and mobile app) New member and customer acquisitions Promote youth golf with PGA Junior League, First Tee & Operation 36 Support and host golf events that raise funds for local & state charities Coordinate with Park & Rec on community outreach events 47 El Conquistador 36 -Holes 36 Holes of Golf – Open Year Round Conquistador Closed for Overseeding September 16 th – October 6 th Canada Closed for Overseeding October 7 th – October 27th Membership Levels Remain Stable – 387 Full Time Golf Memberships Demand for Golf Remains Flat to a Slight Increase in Play Levels Staff Model Remains the Same for All Divisions – No Anticipated Increase in Minimum Wage Continue with Consistent Maintenance Practices for Better Course Conditions FY2023/2024 CIP Update 48 Food & Beverage Restaurant Operated Consistently as a Municipal F & B Operation Themed Dinner Nights Twice Monthly (November – April) Partner with Golf to Host Charity or Social Outings Host Community Life or Club Events Staffing Model Remains the Same 49 Pusch Ridge 9 -Holes Open October 25th, 2024 – May 26th, 2025 – Weather Permitting 7 Day Per Week Operation Closed Thanksgiving, Christmas, and New Year’s Day Overseeding Schedule will be September 23 rd – October 25 th Disc Golf will Operate June 1st – September 22nd Maximize Revenue by Marketing of Memberships, Tee Times, and Events FY 2023/2024 CIP Update 50 El Conquistador Golf (36 -Hole) Revenue El Conquistador - 36 hole FY22/23 FY23/24 FY24/25 Actual Forecast Budget Rounds 82,796 80,500 84,275 Green Fee Revenue $1,809,037 $1,830,000 $1,823,400 Cart Fees $315,385 $325,000 $325,000 Driving Range $40,017 $43,900 $44,150 Pro Shop Sales $254,383 $250,000 $255,050 Other Revenue (club rental, locker)$47,101 $50,000 $44,150 Clinic / School Revenue $37,130 $28,000 $36,250 Membership Fees $1,376,384 $1,500,000 $1,487,000 Total Revenue $3,879,437 $4,026,900 $4,015,000 Cost of Goods Sold $181,819 $170,000 $179,990 Gross Income (Rev-COGS)$3,697,618 $3,856,900 $3,835,010 51 El Conquistador Golf (36 -Hole) Expenses El Conquistador - 36 hole FY22/23 FY23/24 FY24/25 Actual Forecast Budget Golf Ops Labor $378,538 $375,000 $375,900 General and Administrative Labor $151,336 $150,000 $169,050 Golf Course Maintenance Labor $768,144 $825,000 $835,132 Sales and Marketing Labor $83,638 $85,000 $89,186 Total Direct Labor $1,381,656 $1,435,000 $1,469,268 Payroll Burden (Taxes, Benefits, WC)$230,494 $275,000 $248,080 Total Labor Expense $1,612,150 $1,710,000 1,717,348 Golf Operations Expense $70,836 $65,000 $74,370 General & Administrative Expense $473,902 $373,000 $367,770 Golf Course Maintenance Expense $1,241,665 $1,560,000 $1,482,175 Sales and Marketing Expense $50,938 $30,000 $36,450 Management Fees $124,848 $127,344 $131,160 Leases $123,241 $134,448 $134,425 Insurance - P and C $57,079 $45,000 $60,000 Total Other Operational Expenses $2,142,509 $2,334,792 $2,276,350 Total Expenses $3,754,659 $4,044,792 $4,003,698 EBITDA (-$57,041)(-$187,892)(-$168,688) 52 Food & Beverage – Revenues & Expenses Food and Beverage FY22/23 FY23/24 FY24/25 Actual Forecast Budget Projected F&B Revenue $725,222 $690,000 $746,550 Expenses F&B Payroll $282,845 $305,000 $320,848 F&B Benefits and Payroll Taxes $54,022 $40,000 $50,000 Total F&B Labor $336,867 $345,000 $370,848 F&B Operating Expenses $40,067 $45,000 $52,165 Cost of Sales 219,977 $235,500 $238,365 Total Expenses $596,911 $625,500 $661,378 EBITDA $128,311 $64,500 $85,172 53 Pusch Ridge Golf (9 -Hole) Revenue Pusch Ridge - 9 Hole FY22/23 FY23/24 FY24/25 Actual Forecast Budget Rounds 16,266 18,000 18,680 Green Fee & Cart Fee Revenue $323,503 $370,490 $379,752 Pro Shop Sales $25,301 $27,000 $27,675 Other Revenue (club rental, locker)$6,950 $11,000 $11,330 Membership Fees $12,312 $14,000 $14,560 Other Income (Disc Golf Events)$23,603 $20,000 $20,400 Food and Beverage $22,556 $24,500 $25,308 Total Revenue $414,225 $466,990 $479,025 Cost of Goods Sold $21,716 $25,170 $25,858 Gross Income (Rev-COGS)$392,509 $441,820 $453,167 54 Pusch Ridge Golf (9 -Hole) Expenses Pusch Ridge - 9 Hole FY22/23 FY23/24 FY24/25 Actual Forecast Budget Golf Ops Labor $57,602 $62,793 $64,049 Golf Course Maintenance Labor $45,308 $47,000 $47,940 Total Direct Labor $102,910 $109,793 $111,989 Payroll Burden (Taxes, Benefits, WC)$15,509 $9,981 $10,185 Total Labor Expense $118,419 $119,774 $122,174 Golf Operations Expense $4,190 $4,500 $4,635 General & Administrative Expense $10,926 $12,995 $13,385 Golf Course Maintenance Expense $65,127 $50,820 $82,785 Sales and Marketing Expense $2,229 $2,800 $2,884 Leases $28,237 $28,236 $28,236 Utilities $132,964 $188,000 $171,660 Insurance – P and C $7,151 $7,000 $7,210 Total Other Operational Expenses $250,824 $294,351 $310,795 Total Expenses $369,243 $414,125 $432,969 EBITDA $23,266 $27,695 $20,198 55 Budget Study Sessions Day 2 June 9, 2024 56 Town Court FY 2024/25 Budget Presentation 57 Town Court •Completed the Design phase and began construction on Court Remodel in partnership with many town departments •Worked with OVPD and their volunteers to comply with changes in the law that exponentially increased the number of mandatory criminal fingerprints •Complete the Court Remodel on time and within budget authorized •Continue to provide quality service to all Court users during the Court remodel to include Town residents, Town Departments and the Oro Valley Police Department Major Accomplishments FY 2023/24 Objectives FY 2024/25 58 Town Court FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $760,239 $890,260 $130,021 O&M 250,423 224,950 (25,473) Total 1,010,662 1,115,210 104,548 (1) (2) (1)Increase due to Presiding Magistrate moving from a contract position to a Town employee (2)Decrease due to general liability insurance costs to Non-Departmental 59 Town Administration FY 2024/25 Budget Presentation 60 Administration Departments/Functions Town Manager’s Office Town Council Town Clerk Finance Legal Services Human Resources Information Technology Non-departmental 61 Highlights of Budget Changes Personnel – 2.41% Increase Compensation adjustments Increases to medical insurance costs New wellness incentive program Operations & Maintenance – 5.26% Increase Elections costs 50th anniversary celebration Migrating “Visit Tucson” costs from Nondepartmental to CED Migrating property/casualty insurance from various departments 62 B ud g e t Co mp ar i s o n b y De p ar tme n t – A d mi n i s t r at i ve De p ar t me n t s FY 23/24 Adopted FY 24/25 Recommended Variance % Variance Town Clerk $419,897 $564,966 $145,069 34.5% Finance 850,456 867,790 17,334 2.0% Human Resources 590,520 764,022 173,502 29.4% Information Technology 6,271,309 6,007,794 (263,515)-4.2% Town Manager’s Office 1,638,716 1,742,972 104,256 6.4% Town Council 209,203 241,105 31,902 15.2% Legal Services 1,132,503 1,175,996 43,493 3.8% Total $11,112,604 $11,364,645 $252,041 2.3% 63 B ud g e t Co mp ar i s o n b y Cate g o r y – A d mi n i s t r at i ve De p ar t me n t s FY 23/24 Adopted FY 24/25 Recommended Variance % Variance Personnel $6,289,478 $6,440,748 $151,270 2.4% O&M 4,823,126 4,923,897 100,771 2.1% Total $11,112,604 $11,364,645 $252,041 2.3% 64 Non -departmental Budget highlights Children’s Museum - $75,000 Greater Oro Valley Chamber of Commerce - $42,500 UA Center for Innovation - $30,000 General Liability and Property Insurance - $985,759 Vehicle Reserves - $933,490 65 B ud g e t Co mp ar i s o n – N o n -d e par t me nt al an d O t h e r U s e s FY 23/24 Adopted FY 24/25 Recommended Variance % Variance Non-departmental 2,440,536 2,721,603 281,067 11.5% Contingency 5,000,000 2,000,000 -3,000,000 -60.0% Transfers out 12,274,644 9,403,341 -2,871,303 -23.4% 66 General Fund Transfers 67 Major Initiatives for FY24/25 Support elections Continue Town 50th Anniversary celebrations Examine current tax structure and propose potential changes Continue pursuit of 100% PSPRS funding ratio Implement new wellness incentive program Bullwall Ransomware Containment Town accounts for Police Volunteers (CVAP) – secure accounts and standardized email communication to ensure CJIS accreditation standards 68 Police Department Fiscal Year 2024/25 Budget Presentation 69 Administration Division •Travel & Training •Health & Wellness •Tangerine Furniture 70 Support Services Division •Travel & Training •Evidence Refrigerator •IT Budgeted Items 71 Field Services Division •Travel & Training •Health & Wellness •Pima Regional SWAT 72 Recruitment & Retention 73 FY24/25 Police Dept. Budget FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $18,858,244 $18,091,624 $(766,620) O&M 1,940,204 1,655,110 (285,094) Capital 203,500 483,500 280,000 Total $21,001,948 $20,230,234 $(771,714) (1)Decrease in retirement contributions (2)Decrease from insurance moved to Non-Departmental (3)Increase for grant equipment capacity (1) (2) (3) 74 Scheduled Break 6:30-6:45 p.m. 75 Community and Economic Development Paul Melcher, Community and Economic Development Director 76 Community and Economic Development (CED) Department ➢Implementing the Your Voice, Our Future General Plan ➢Developing the OV Path Forward Plan Update ➢Planning,permitting, inspections and monitoring of construction projects ➢Protection of property and public health via review, approval, and inspection processes ➢Business retention, expansion and attraction programs ➢Entrepreneurial opportunities ➢Creation of new primary and secondary employment opportunities ➢Expansion of sales tax base to generate new financial resources for the community ➢Development and Implementation of an OV-centric group stay strategy 77 Department Goals by Division Planning •Your Voice GP Implementation •Path Forward Development •Dark Skies Updates •Design Standards •Zoning Complaints Resolution 70% •Neighborhood meeting satisfaction 75% Permitting •98% Accurate Permit Reviews •98% Permit on- time Review •100% Code compliant development •100% Satisfactory Customer Service Inspections •98% Inspections On Time •5%< Permits rolled over •100% Code Compliant determinations •100% Satisfactory Customer Service Ec Dev •200 BRE Visits •100% of BRE Issues: 3 days •100% of Annual PE Visits •160 SM STU Attendees •100 STU Zone Attendees •3 STU launches •Public Art Tour Pilot •2 Certified PE Leads •Complete GBS 78 Budget based on the approved Community Engagement Plan (CEP). The CEP Plan includes methods and tools to: ➢Achieve community ownership of the plan. ➢Ensure the plan reflects the community’s priorities and expectations for the future. ➢Create a plan that stays relevant over a 10 -year timeframe. Project Phases Fiscal Year CEP Estimate Proposed Budget 1 FY23/24 $283,544.42 $294,326.00 1 & 2 FY 24/25 $178,781.22 $175,884.00 2 & 3 FY 25/26 $145,838.36 TBD 3 FY 26/27 $105,237.36 TBD Phase 2 Phase 3 2025 2026 We are here Phase 1 79 •Strategic and CEDS Plan(s) Links: •FY21 -23 Goal1D: Identify strategies to entice area residents and visitors to choose Oro Valley as a premiere place to dine, shop, play and stay. •FY21 -23 Objective 1.4.2--Partner with stakeholders to develop and implement actions and strategies that highlight the Town’s flourishing arts and culture opportunities to both visitors and residents. •CEDS Focus Area 8--Identify opportunities to increase tourism investment in the community. •Strategic and CEDS Plan(s) Links: •FY23-25 Objective 1.2.1 --Support and encourage the current key economic sectors in Oro Valley while exploring opportunities for new growth. •FY21-23 Goal 1B--Implement strategies to attract, grow and retain primary employers and expand local job opportunities. •FY21-23 Objective 1.2.2--Develop strategies to incentivize entrepreneurial opportunities for start -up and home-based businesses, business expansion opportunities and adaptive reuse of vacant buildings. •CEDS Objective 1.2.4 -- Collaborate with the University of Arizona, Arizona State University, Pima and other higher education institutions to identify potential tech -transfer opportunities that can originate in or be located in Oro Valley. •CEDS Objective 1.2.1 -- Support the development of the planned UA Center for Innovation at Oro Valley incubator in Innovation Park, including a review of current performance and consideration of a future facility and operational expansions supported by the Town and local stakeholders. Group Bookings Strategy UACI Expansion E c o n o m i c D e v e l o p m e n t I n i t i a t i v e s 80 UACI Expansion Placeholder Value Proposition: The Arizona Daily Star named Oro Valley the “Upscale Tech Mecca of Southern Arizona,” AND the Town receives enormous benefit from the current jobs and salaries created by primary employers in the bioscience, aerospace, and tech industry clusters. However, there have not been any high-profile new tech -related company relocations or launches in the last 5 years. Therefore, staff is proposing the expansion of UACI in Oro Valley to increase to number of incubator spaces to facilitate increased bio - science/tech startup opportunities and resulting job creation and investment in the community. 81 Possible Scenario Expansion Cost Ranges •Bioscience ($300 per ft2) vs.Tech ($200 per ft2) •Tech Expansion triggers $150,000 FF&E Building Expansion •Current Annual Expense $400,000 •Project Increase $200,000 •Current OV Contribution $ 30,000 Additional Operating Expense 82 P erformance Analysis C o mmitment Expected Possible Outcomes and KPIs: •Increased # of UACI tenants •Decrease prospective tenant wait times •Increase job/wage creation •Increase Venture and Investment $ to Oro Valley •Increased Construction Sales Tax Revenue •Reserve 1 spot for sponsored launch when possible •UACI OV Annual Economic Report •Improves Tech Transfer CEDS Goal •Increased number of patents filed and issued •Access to Federal Grant funding: OV and Tenants 83 Co mmun i ty an d Eco n o mi c De v e l o p me nt ( CE D) FY 23/24 Adopted FY 24/25 Recommended Variance Personnel $3,058,889 $3,196,366 $137,477 O&M 823,556 1,092,969 269,413 Total $3,882,445 $4,289,335 $406,890 84 CED - Divisions FY 23/24 Adopted FY 24/25 Recommended Variance Administration $354,184 $373,645 $19,461 Permitting 1,160,335 1,202,026 41,691 Planning 1,190,567 1,094,310 (96,257) Inspection and Compliance 777,800 813,871 36,071 Economic Development 399,559 805,483 405,924 Total $3,882,445 $4,289,335 $406,890 85 Scheduled Break 8:00-8:15 p.m. 86 Oro Valley Water Utility FY 2024/25 Budget Presentation 87 Our Mission The Oro Valley Water Utility is committed to the long-term sustainable production and delivery of water resources that meets or exceeds all water quality standards in a cost -effective environmentally responsible manner The Water Utility is an Enterprise Fund Funded solely from water sales, fees and charges Not dependent on the Town’s General Fund Administrative services provided by the Town are paid to the General Fund 88 100% utilization of the Utility’s CAP allocation 2,573 AF used for CAP Delivery 4,925 AF used for aquifer recharge 2,807 AF saved in aquifer storage facilities Collected 2,661 water quality samples All federal and state safe drinking water standards met Expanded customer communications Improved messaging through customer service billing Second anniversary of quarterly newsletter “Behind the Meter” Increased customer participation in the WaterSmart Program Infrastructure reinvestments Well, reservoir & booster station rehabilitations Fiscal Year 2023/24 Accomplishments 89 Strategic Leadership Plan (SLP) SLP Goal 4.2: Deliver a safe, reliable and sustainable water supply that meets the long -term needs of the community Objective 4.2.1: Develop and evaluate strategies to reduce the use of potable water in Oro Valley for golf courses, parks, residential, etc. Objective 4.2.2: Identify & evaluate potential new water sources for the Town Objective 4.2.3: Begin phased construction of the NWRRDS Conservation WaterSmart workshop goals Water Quality Maintain Oro Valley’s high water quality standards through robust testing and water quality monitoring Infrastructure Rehabilitation Continue to fund and implement a robust CIP. This includes annual well, reservoir & booster station rehabilitations Fiscal Year 2024/25 Objectives 90 F Y 2 0 2 4 / 2 5 O p e r a t i n g & G P F F u n d B u d g e t 91 F Y 2 0 2 4 / 2 5 O p e r a t i o n & M a i n t e n a n c e E x p e n s e s 92 F Y 2 0 2 4 / 2 5 C a p i t a l P r o j e c t s & I m p a c t F e e F u n d 93