ORO VALLEY TOWN COUNCIL
Satish Hiremath, Mayor
Lou Waters, Vice Mayor
Brendan Burns, Council Member
Bill Garner, Council Member
Joe Hornat, Council Member
Mary Snider, Council Member
Mike Zinkin, Council Member
ORO VALLEY WATER UTILITY COMMISSION
Robert Milkey, Chair
Richard Davis, Vice Chair
Javier Arriaga, Commissioner
Anne Campbell, Commissioner
Richard Reynolds, Commissioner
Elizabeth Shapiro, Commissioner
Richard Verlaque, Commissioner
TOWN STAFF
Greg Caton, Town Manager
Stacey Lemos, Finance Director
Philip C. Saletta, P.E., Water Utility Director
Shirley Seng, Water Utility Administrator
TOWN OF ORO VALLEY
WATER UTILITY COMMISSION
WATER RATES ANALYSIS REPORT
NOVEMBER 2014
TABLE OF CONTENTS
SECTION TITLE
rr
IJ
Index of Appendices
n
LnJ
Executive Summary
Introduction
1
Growth Rates
Water Use Trends
L
Debt Service
Debt Service Coverage Requirements
Cash Reserve Policy for Operating Fund
Operating Fund
Groundwater Preservation Fee
Alternative Water Resources Development Impact Fee Fund
Potable Water System Development Impact Fee Fund
Preferred Financial Scenario
Recommendation on Water Rates, Fees & Charges
Other Service Fees & Charges
1
Jl
Conclusion
J
Appendices
PAGE
i
1
3
4
4
5
6
7
7
10
12
13
14
15
17
17
INDEX OF APPENDICES
APPENDIX
A. Assumptions for Preferred Financial Scenario
A-1 Operating Fund ( l
A-5 Alternative Water Resources Development Impact Fee Fund
A-6 Potable Water System Development Impact Fee Fund
B. Preferred Financial Scenario
B-1 Operating Fund
B-2 Groundwater Preservation Fee
B-3 Alternative Water Resources Development Impact Fee Fund
B-4 Potable Water System Development Impact Fee Fund
B-5 Summary of all Funds
C. Rate Schedules & Tables for Bill Comparisons for Preferred Financial Scenario
C-1 Potable & Reclaimed Water Rates
C-2 Tables for Bill Comparisons by Meter Size -Potable
C-8 Tables for Bill Comparisons by Meter Size —Reclaimed
D. Other Service Fees & Charges
D-1 Proposed Security Deposits
D-2 Proposed Meter Installation Fees
D-3 Supporting Documentation for Meter Installation Fees
E. 5-Year Capital Improvement Schedules
E-1 Operating Fund
E-2 Groundwater Preservation Fee
E-2 Alternative Water Resources Development Impact Fee Fund
E-2 Potable Water System Development Impact Fee Fund
i
I■.
ICI
ll
u
I
I
I
I
TOWN OF ORO VALLEY
WATER UTILITY COMMISSION
WATER RATES ANALYSIS REPORT
NOVEMBER 2014
Executive Summary
The functions and duties of the Oro Valley Water Utility Commission include reviewing and
developing recommendations for water revenue requirements, water rates and fee structures. The
Commission annually evaluates staff recommendations based on a rates analysis to assure the
recommendations meet Town policies and bond covenants. Water rates and charges shall be
reviewed annually under Mayor and Town Council Water Policies— II.A.2.b(4).
The Utility has based its financial analysis on the American Water Works Association (AWWA) Cash
Needs. Approach. The AWWA is the largest national organization that develops water and
wastewater policies, specifications and rate setting guidelines accepted by both government -owned
and private water and wastewater utilities worldwide.
This Water Rates Analysis Report contains detailed information on the three funds that comprise the
Oro Valley Water Utility:
➢ Operating Fund
➢ Alternative Water Resources Development Impact Fee Fund (AWRDIF Fund)
➢ Potable Water System Development Impact Fee Fund (PWSDIF Fund)
Each fund is individually analyzed with regard to revenue and revenue requirements. The Utility is
an enterprise of the Town and generates revenue from rates, fees and charges and does not receive
revenue from any taxes or payments from the General Fund.
The Water Utility Commission has made a recommendation for a Preferred Financial Scenario.
Under the Preferred Financial Scenario, the Operating Fund will have an ending cash balance of $1.6
million at the end of the five-year projection period. The cash balance of Groundwater Preservation
Fees at the end of the five-year projection period is $5.8 million. The Preferred Financial Scenario
includes cash funding for all capital projects except the Advanced Metering Infrastructure (AMI) and
Meter Replacement Project which is funded by a loan from the Water Infrastructure Finance
Authority of Arizona (WIFA). The Preferred Financial Scenario proposes no other new debt for
capital expenditures.
Each year the water rates analysis is prepared based on the most up-to-date information available
for a five-year projection period. Operational needs and capital improvement requirements change
annually and are carefully evaluated when they are included in the analysis.
JThe Preferred Financial Scenario results in increasing cash balances in the AWRDIF Fund and the
PWSDIF Fund. These cash balances will be used to finance capital projects to meet the demands of
new growth and development. Pursuant to Arizona Revised Statute 9-463.05, revenue from the
individual impact fee funds may not be consolidated nor used for any purpose other than for which
they were originally established.
The Preferred Financial Scenario includes five year projections for each fund and evaluates the
impact of future costs and the revenue sources that will be required to meet those costs. Based on
the data contained within the Preferred Financial Scenario, the Water Utility Commission has made I 1
the following recommendations on water rates for FY 2014-15: I J
➢ Decrease in the potable and reclaimed Groundwater Preservation Fee (GPF)
➢ Increase in the potable and reclaimed commodity rates
➢ No increase in the monthly base rates for potable and reclaimed water
➢ Increase in the potable and reclaimed construction water rates
➢ Increase in meter installation fees to recover costs
➢ Increase in residential security deposits for non -property owner accounts
➢ Increase in residential security deposits for landlord accounts
Current and proposed commodity rates and GPF are provided in the table below
Table 1
Customer Classifications
Current
Commodity Rate
Proposed
Commodity Rate
Increase
(Decrease)
Single Family Residential
Tier 1
2.23
2.27
0.04
Tier 2
3.01
3.10
0.09
Tier 3
4.07
4.23
0.16
Tier4
5.49
5.76
0.27
Irrigation
Tier 1
2.23
2.27
0.04 f
Tier 2
3.01
3.10
0.09
Tier3
4.07
4.23
0.16
Tier4
5.49
5.76
0.27
Commercial
2.23
2.27
�.
0.04
Master Metered Multi -Family Residential
2.23
2.27
0.04
Turf
2.23
2.27
0.04
Construction
6.49
6.76
0.27
All Reclaimed Classes
2.20
2.23
0.03 L
Groundwater Preservation Fee - Potable
0.95
0.90
(0.05)
Groundwater Preservation Fee - Reclaimed
0.50
0.47
(0.03)
Cast per 1,000 gallons
With a small increase in commodity rates and a decrease in the GPF, the financial impact of the
proposed rates for the average residential customer is a decrease of $0.03 per month. The average
residential customer has a 5/8 x 3/4-inch meter and uses 8,000 gallons of water per month. The
average commercial customer with a 2-inch meter using 60,000 gallons of water will experience a
$0.60 decrease per month. Tables providing the financial impact to all meter sizes and customer
classifications may be found in Appendix C.
The Commission presents this Water Rates Analysis Report for the review and consideration of the l_
Mayor and Council. The Oro Valley Water Utility Commission is proud to serve the Town of Oro
Valley, its citizens and the customers of its water utility.
h
I
7
7
I
TOWN OF ORO VALLEY
WATER UTILITY COMMISSION
WATER RATES ANALYSIS REPORT
NOVEMBER 2014
Introduction
The Oro Valley Water Utility was established in 1996 as a self-supporting enterprise of the Town.
The Utility is comprised of three separate funds that have been established for specific purposes.
The Funds are as follows:
➢ Operating Fund
➢ Alternative Water Resources Development Impact Fee Fund
➢ Potable Water System Development Impact Fee Fund
The Operating Fund is the primary fund for the Utility. Revenue for this fund includes water sales,
service fees, miscellaneous charges and interest income. The Utility does not receive any revenue
from taxes or money from the Town General Fund. The expenditures managed from this fund
include personnel, operations and maintenance for both potable and reclaimed water systems,
capital costs for existing potable water system improvements and related debt service. The Utility
pays the General Fund for services received including finance, human resources, fleet services,
information technology, legal, insurance and rental of office space. Groundwater Preservation Fee
(GPF) revenue is accounted for within the Operating Fund. GPF revenue is currently dedicated to
fund capital expenditures for renewable water resources and related debt. Under current policy,
this revenue may not be used to pay for operating costs. More information on the GPF may be
found on page 10 of this report.
The Alternative Water Resources Development Impact Fee Fund (AWRDIF) was established in 1996
to manage capital expenditures related to alternative water resources including reclaimed water
and Central Arizona Project (CAP) water. Revenue for this fund is received from impact fees
collected at the time water meters are purchased and from interest income. Based on the recent
impact fee analysis, expenditures include capital repayment obligation charges for the Town's CAP
allotment and infrastructure and associated debt service to deliver CAP water to the Town for future
growth and development.
The Potable Water System Development Impact Fee Fund (PWSDIF) was established in 1996 to
manage capital expenditures related to expansion or growth -related potable water capital projects
and related debt service. Revenue for this fund is received from impact fees collected at the time
water meters are purchased and from interest income. Expenditures may include wells, pump
stations, reservoirs and mains for the potable water system required to meet the demands of future
growth and development.
The revenue and expenditures of all three funds are combined to determine if the Utility meets the
debt service coverage requirement established in the Mayor and Town Council Water Policies and
-3-
current bond covenants. Otherwise, each fund is independent with regard to revenue and Ll
expenses. Pursuant to Arizona Revised Statute (ARS) 9-463.05 Section B.9., impact fees must be
placed in a separate fund and accounted for separately. ARS 9-463.05 Section B.S. states that the
impact fees may not be used for operations and maintenance of existing facilities. Each fund is
addressed in more detail on pages 12 and 13 of the report.
Growth Rates
The Utility's growth rates have fluctuated over the past several years. Figure 1 illustrates the
Utility's growth rate of 2,023 new metered connections over the last nine years.
Figure 1
Growth Rates
600
500 508
400 368
v 346
2 300
214
z 200 196
97 165
100 68 61
0
2005-06 2006-07 2007.08 2008-09 2009-10 2010.11 2011-12 2012-13 2013-14
i
The growth projections used for this report are consistent with the Town's financial forecasting and
are shown in following table.
Table 2 l
New Metered Connections 2014-15 2015-16 2016-17 2017-18 2018-19
Single Family Residential 200 300 275 200 100 �-
Commercial, Multi -Family, Irrigation 11 15 13 10 5
r
Water Use Trends
The Utility has experienced an overall reduction in water use, both potable and reclaimed, over the -
last nine years. Figure 2 reflects a 9.8 percent reduction in total water use from FY 2005-06 through
FY 2013-14. The trend line emphasizes a continuous decline in water use even though the utility
experienced growth of 11.9 percent equivalent to 2,023 new connections in that same time frame.
During FY 2013-14, the average single family residential customer with a 5/8 x 3/4 inch water meter
r,
F
used 7,880 gallons. For the analysis in this report, the average monthly water use for a single family
residential customer with a 5/8 x 3/4 inch water meter is calculated at 8,000 gallons per month.
Figure 2
Water Use History
3,500
3,395
3,400
c 3,300
3,191
3,200 --.-- --.
3,111
3,300 3,161 31060 31062
0
3,02
3,
09
7 3,000
2,900 2,945
2,800
2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
Debt Service
Annual debt obligations are met with the revenue generated in the Operating Fund, the AWRDIF
and the PWSDIF. A summary of the existing debt allocated to each of these funds and the
outstanding balances at the beginning of FY 2014-15 are provided in Table 3.
Table 3
Fund
Year
Debt
Purpose
Balance
Operating
2005
Excise Tax Bonds
Land for MOC
$
1,324,950
Operating
2007
Excise Tax Bonds - Refinance
Existing Potable System
$
14,770,440
Operating-GPF
2008
WIFA Loan
Reclaimed Water System
$
3,235,942
Operating
2009
WIFA Loan
Existing Potable System
$
1,777,300
Operating
2012
Sr. Lien Revenue Bonds - Refinance
Existing Potable System
$
4,417,909
Operating-GPF
2012
Sr. Lien Revenue Bonds - Refinance
Reclaimed Water System
$
8,052,849
Operating
2013
Excise Tax Bonds - Refinance
Existing Potable System
$
4,935,000
Operating
2014
WIFA Loan
AMI & Meter Replacement
$
1,000,711
PWSDIF
2012
Sr. Lien Revenue Bonds - Refinance
Potable System Expansion
$
2,484,241
Total Debt
$ 41,999,342
No new debt is proposed throughout the five-year projection period.
-5-
Debt Service Coverage Requirements 11
The method for calculating the debt service coverage ratio is pursuant to the Town Financial and l
Budgetary Policies adopted by the Town Council in 2008. Section CA — Debt Capacity, Issuance &
Management states the following with respect to debt service coverage ratios: �l
"When utility revenues are pledged as debt service payments, the Town will strive to maintain a 1.3
debt service coverage ratio or the required ratio in the bond indenture (whichever is greater) to
ensure debt coverage in times of revenue fluctuation."
The Water Utility currently pays debt service on a number of outstanding debt issuances and loans.
For the Series 2012 Senior Lien Water Revenue Bonds, the 2008, 2009 and 2014 Water
Infrastructure Finance Authority (WIFA) Loans, water utility revenues are specifically pledged as the
repayment source for these obligations at 1.3 times coverage per the Town's adopted financial
policy.
The remaining outstanding debt obligations of the Water Utility are excise tax pledged obligations
meaning that the Town's unrestricted sources of sales taxes, fines, permit fees and state shared
revenues are pledged as the repayment sources for these bonds in the bond indentures. Even
though the bond indentures pledge these excise taxes as the repayment source, the Water Utility is
and will continue to be responsible for these debt service payments. However, since excise taxes
are pledged as coverage, a calculated debt service coverage ratio of 1.0 (rather than the 1.3) is
applied to avoid double coverage when calculating the debt service coverage ratio for the water
rates analysis.
It is important to note that the bond indentures for the excise tax -backed bonds require that the
Town's excise tax collections each fiscal year total at least 2.5 times the annual debt service
requirements in order to avoid having to fund a debt service reserve fund. These conditions have
been met annually in the past and are expected to continue in the future. For FY 2013-14 the debt
service coverage ratio was 8.26 for the General Fund which substantially exceeds the 2.5
requirement.
This methodology of segregating the water utility revenue -pledged debt from the excise tax -pledged
debt in the rates analysis process is an accepted practice in the industry and has been reviewed by
the Town's Finance Director and the Town's financial advisors with Stifel, Nicolaus & Company, Inc.
The debt service coverage ratio is determined by dividing the annual net operating revenue by the
annual debt service payments. Using the methodology described above is in accordance with the
2008 policy and reduces the amount of the debt service coverage requirement amount. Applying
this methodology has been key in minimizing water rate increases.
Debt service coverage for the Water Utility's outstanding senior lien debt issuances and loans in the
Preferred Financial Scenario is shown in Table 4.
Table 4
2014-15 2015-16 2016-17 2017-18 2018-19
Debt Service Coverage 2.02 2.11 2.07 1.92 1.73
-6-
L
F1
Cash Reserve Policy for Operating Fund
The Town of Oro Valley Mayor and Council Water Policies were adopted in 1996. The policy specific
to cash reserves may be found in Section II.A.1.d. and states "The Utility shall maintain cash reserves
for known future obligations plus an allowance for unbudgeted contingencies set at 5 percent (5%)
of the total annual budget." The Commission is recommending that this policy be reviewed in the
coming year. Interpretation of the policy for this analysis is that the Utility must have five percent of
the total annual operating budget including debt service and capital expenditures. In the Preferred
Financial Scenario, the projected cash reserve balance for the Operating Fund for each year in the
analysis is listed in Table 5 showing compliance in all years.
Table 5
Operating Fund 2014-15 2015-16 2016-17 2017-18 2018-19
n Cash Reserve Requirement $ 731,321 $ 723,318 $ 745,380 $ 745,699 $ 780,564
L1 Cash Reserve Balance $ 6,517,505 $ 5,291,215 $ 3,950,866 $ 2,956,502 $ 1,612,884
Cash reserve balances in the Operating Fund are the main driver for the proposed changes in water
rates. The projected cash reserve balances shown in Table 5 include revenue from the proposed rate
n changes. Those changes include increases in the commodity rates with corresponding decreases in
Jthe GPF. These proposed changes allow for the cash balances to be at appropriate levels for both
the Operating Fund and the GPF. The impact to the customers from these proposed changes are
n minimal except for single family residential and irrigation customers who are high water users.
JDetails of the impact to all water users are in Appendix C.
The use of cash to fund capital expenditures results in a projected decrease of $6.6 million in cash
reserves over the five-year projection period. In light of this, the Commission is recommending that
the current cash reserve policy be reviewed. A consideration may be to evaluate implementing a
cash reserve policy similar to the one currently in place for the Town's General Fund. The General
Fund cash reserve policy states, "The Town shall maintain, at a minimum, a fund balance
contingency reserve in the General Fund that represents 25 percent of the General Fund's annual
expenditures with no use of the General Fund contingency to support ongoing operational
expenditures. This minimum reserve amount will be incorporated into the General Fund budget
adopted by formal action taken by the Town Council. Accordingly, these reserves will be classified as
committed fund balances." Reviewing the Water Utility's cash reserve policy will be placed on the
Water Utility Commission's work plan for the coming year.
Operating Fund
Revenue Forecast
The Operating Fund had a cash balance of $8.2 million at the beginning of FY 2014-15 and is
projected to have a balance of $1.6 million at the end of FY 2018-19. These funds may be used for
operating costs including personnel, operations and maintenance, capital improvements for the
existing potable water system and debt service.
7
The revenue forecast was based on analysis of the Utility's monthly billing data for FY 2013-14 and a
projection of water usage and growth in number of new connections detailed in Table 2 on page 4.
Analysis of the water use trends for FY 2013-14 indicated the average monthly use for a single family
residence with a 5/8 x 3/4 inch water meter was 7,880 gallons per month. For this analysis, 8,000
gallons per month was used to project water sales revenue. The revenue forecast includes
proposed increased commodity rates shown below in Table 6. The GPF revenue is also shown in
Table 6 for informational purposes and to illustrate the proposed decrease.
Table 6
Commodity Rate
Current
Proposed
Proposed Proposed Proposed
Proposed
Rates
Rates
Rates
Rates Rates
Rates
Customer Classifications
2014-15
2015-16 2016-17 2017-18
2018-19
Single Family Residential
Tier 1
2.23
2.27
2.32
2.37 2.44
2.51
Tier 2
3.01
3.10
3.19
3.29 3.40
3.52
Tier 3
4.07
4.23
4.40
4.58 4.76
4.95
Tier 4
5.49
5.76
6.05
6.36 6.67
7.01
Irrigation
Tier 1
2.23
2.27
2.32
2.37 2.44
2.51
Tier 2
3.01
3.10
3.19
3.29 3.40
3.52
Tier 3
4.07
4.23
4.40
4.58 4.76
4.95
Tier 4
5.49
5.76
6.05
6.36 6.67
7.01
Commercial
2.23
2.27
2.32
2.37 2.44
2.51
Master Metered Multi -Family
2.23
2.27
2.32
2.37 2.44
2.51
Turf
2.23
2.27
2.32
2.37 2.44
2.51
Construction
6.49
6.76
7.05
7.36 7.67
8.01
All Reclaimed Classes
2.20
2.23
2.26
2.31 2.38
2.45
Groundwater Preservation Fee
Potable
0.95
0.90
0.85
0.85 0.85
0.85
Reclaimed
0.50
0.47
0.44
0.44 0.44
0.44
Cost per 1,000 gallons.
The water use included
in each tier is detailed
on the proposed
water
rates table in Appendix C.
Table 7 provides the
water sales revenue
forecast for the five-year projection period using the
proposed commodity
rates in Table 6.
The GPF and associated
revenues and expenditures are
detailed on pages 10 -
11.
Table 7
Water Sales Revenue
2014-15
2015-16
2016-17
2017-18
2018-19
Potable Water
$10,252,130
$10,542,605
$10,852,834
$11,166,348
$11,473,209
Reclaimed Water
$ 1,796,098
$ 1,818,296
$ 1,850,323
$ 1,899,317
$ 1,949,954
Total Water Sales
$12,048,228
$12,360,901
$12,703,157
$13,065,665
$13,423,163
M
Other revenue generated by the Utility includes interest income and charges for services. Charges
r for service include, but are not limited to, new service establishment fees, late fees, reconnection
fees, convenience fees, and plan review fees. These service fees are projected to generate annual
revenue ranging from $845,000 to $896,000. Projections for interest income are a cumulative total
of $892,147 over the five-year period. A two percent interest rate was assumed for each year in the
projection period. This interest rate is consistent with the Town's financial planning.
I
I
I
1
J
Revenue Requirements
The following table is a summary of revenue requirements for the Operating Fund that were used in
the financial analysis. These revenue requirements do not include expenditures to be paid with GPF
revenue.
Table 8
Utility Expenditures
2014-15
2015-16
2016-17
2017-18
2018-19
Personnel
$ 2,874,528
$ 3,003,882
$ 3,139,056
$ 3,280,314
$ 3,427,928
Operations/Maintenance
2,043,303
2,063,736
2,086,437
2,111,474
2,138,924
Powerfor Pumping
900,000
900,000
900,000
1,035,000
1,035,000
Water Resource Mgmt.
450,000
450,000
450,000
450,000
450,000
CAP Wheeling Costs
1,164,300
1,188,192
1,198,192
1,208,192
1,214,192
CAP Recharge Costs
1,324,000
1,401,680
1,443,205
1,484,730
1,509,645
Reclaimed Maintenance
890,360
899,264
909,156
920,065
932,026
Subtotal Expenditures
$ 9,646,491
$ 9,906,753
$ 10,126,046
$ 10,489,775
$ 10,707,715
Debt Service
3,582,907
3,576,601
3,585,554
3,575,207
3,578,569
Capital Outlay
1,397,020
983,000
1,196,000
849,000
1,325,000
Total Expenditures
$ 14,626,418
$ 14,466,354
$.14,907,600
$ 14,913,982
$ 15,611,284
Projected personnel costs do not include any new personnel; however, a four percent annual merit
increase and a 0.5 percent increase in retirement benefits have been projected. These projected
increases are consistent with the General Fund's financial planning.
The projected operations and maintenance (0&M) costs for both the potable and reclaimed water
systems include inflationary increases that average 1.7 percent annually. The inflation factors were
provided by the Arizona Department of Revenue and are consistent with the General Fund's
financial planning.
Power for pumping costs were segregated from the traditional 0&M costs because they are not
Jsubject to annual inflationary increases. A 15 percent rate increase by Tucson Electric Power was
projected in FY 2017-18. The Utility recently began implementation of an energy efficiency program
l which will reduce power costs as the pumps and motors are replaced. After all the equipment has
J been installed, the projected energy savings will be reflected in the power costs.
The Utility plans to purchase groundwater extinguishment credits. These credits will be pledged to
the Groundwater Allowance Account (GWA) to help maintain a balance in the GWA that will
facilitate growth in the water service area. It is anticipated that the Utility will purchase
approximately 3,000 acre feet of extinguishment credits annually over the five-year projection
period.
J
Projected costs for wheeling CAP water through the Tucson Water delivery system represent 2,000
acre feet annually. The rate charged by Tucson Water is a contract price and remains constant over
the five years. The cost to take delivery of the CAP water increases annually. The CAP water delivery
rates are established by Central Arizona Project.
CAP water recharge costs represent costs to take delivery of the Utility's entire CAP water allotment �l
of 10,305 acre feet annually. This water will be recharged in various recharge facilities including the
2,000 acre feet in Tucson Water's facilities. Recharge costs increase by $15 per acre foot when the
water is recharged in Central Arizona Water Conservation District (CAWCD) facilities. ( l
Projected capital outlay for existing system improvements in this analysis includes the replacement
of approximately 10,000 water meters and installation of AMI equipment in the Oro Valley water
service area; water main replacements; and installation of energy efficient pumps and motors.
Capital outlay also includes the purchase of vehicles, computer and security equipment. The
schedule for five-year capital improvements may be found in Appendix E.
The meter replacement project is being financed with a loan from the Water Infrastructure Finance
Authority of Arizona (WIFA) and will be completed in FY 2015-16. This loan was approved by the
Town Council in January 2014. There is no additional new debt proposed in this analysis. All other
capital expenditures are proposed to be funded with revenue generated from water sales, fees,
charges and cash reserves.
Groundwater Preservation Fee
The Groundwater Preservation Fee (GPF) was established in 2003 to generate revenue to finance
alternative water resources, capital expenditures for infrastructure needed to deliver alternative
water to the Town and related debt service. The current policy for GPF revenue specifically excludes
the use of those funds for operations and maintenance costs. The Water Utility Commission will
consider making a recommendation to the Town Council to amend this policy. The consideration
will be placed on the Commission's work plan in the coming year.
Prior to FY 2013-14, the GPF revenue was transferred from the Operating Fund to the AWRDIF Fund
to pay the debt service on the reclaimed water system and the capital component of costs
associated with the CAP water allotment and CAP water wheeling costs. The GPF revenue was used
to pay these costs in conjunction with the impact fees collected in the AWRDIF Fund.
While updating the impact fees in FY 2013-14, it was determined that construction on the reclaimed
water system was complete and beneficiaries of the reclaimed water system were the existing
customers. As such, the debt associated with the reclaimed water system was removed from the
AWRDIF Fund and placed in the Operating Fund. Additionally, GPF revenue is no longer transferred
to the AWRDIF Fund. Revenue from the GPF will continue to pay the debt associated with the
reclaimed water system and other authorized capital costs from within the Operating Fund.
As previously mentioned, the current policy for GPF revenue dedicates the use of GPF revenue to
alternative water capital expenditures and related debt service. For this reason, the GPF will now be
accounted for separately within the Operating Fund. Currently the GPF revenue received is in excess
of the allowable expenditures resulting in the cash reserves growing by $3.1 million over the five-
-10-
year projection period. This is inclusive of a projected five percent reduction in the GPF rate in FY
2014-15 and FY 2015-16. Table 9 shows the current and proposed GPF rates.
Table 9
Current
2014-15
2015-16 2016-17 2017-18
2018-19
Rate
Proposed
Proposed Proposed Proposed
Proposed
GPF — Potable Rate
$0.95
$0.90
$0.85 $0.85 $0.85
$0.85
GPF—Reclaimed Rate $0.50
$0.47
$0.44 $0.44 $0.44
$0.44
Cost per 1,000 gallons.
The table below
provides the revenue
forecast
for the five-year projection period using the
proposed GPF rates
in Table 9.
Table
10
GPF Revenue
2014-15
2015-16
2016-17 2017-18
2018-19
Potable Water
$ 2,181,231
$ 2,085,419
$ 2,027,458 $ 2,044,543
$ 2,054,097
Reclaimed Water
361,568
339,402
325,105 325,105
325,105
Total GPF Revenue
$ 2,542,799
$ 2,424,821
$ 2,352,563 $ 2,369,648
$ 2,379,202
The revenue from the GPF is dedicated to capital expenditures to deliver alternative water resources
to the Town and related debt service. Table 11 provides the proposed expenditures that will be
funded with GPF revenue.
11
Expenditures 1 2014-15 _2015-16 2016-17 2017-18 2018-19
Debt Service- Reclaimed System
$1,372,628
$1,385,641
$1,380,450
$1,385,861
$1,384,754
Capital Costs for CAP Wheeling
142,360
142,360
142,360
142,360
142,360
Capital Cost for CAP Allotment
148,456
155,204
161,952
168,700
168,700
Reclaimed Main Relocation
100,000
350,000
Total Expenditures
$1,763,444
$2,033,205
$1,684,762
$1,696,921
$1,695,814
- 11 -
Development Impact Fee Funds
Alternative Water Resources Development Impact Fee Fund
The Alternative Water Resources Development Impact Fee Fund (AWRDIF) had a cash balance of
$3.3 million at the beginning of FY 2014-15 and is projected to have $5.3 million at the end of FY
2018-19. The revenue sources for the AWRDIF Fund are from impact fees collected when a water
meter is purchased and from interest earned on cash balances. Interest income is projected to be a
total of $585,547 for this analysis. A two percent interest rate was assumed for each year in the
projection period and is consistent with the Town's financial planning. l
The revenue forecast was based on new service units related to the number of new connections. A
service unit is the equivalent of one single family residential (SFR) 5/8 x 3/4-inch water meter. The
SFR service units are equal to the number of new connections. The other service units are forecast
based on historic trends and pending development projects within the Town. Other service units l
include commercial, multi -family and irrigation units.
The Town Council adopted new impact fees that became effective July 1, 2014. The new impact fee
for a SFR 5/8 x 3/4-inch water meter or one service unit is $4,045. Table 12 provides the projected
growth in service units and the revenue associated with that growth.
Table 12
Growth / Revenue 2014-15 2015-16 2016-17 2017-18 2018-19 ,
SFR Service Units 200 300 275 200 100
Other Service Units 145 120 104 80 40
Projected Revenue $1,409,646 $1,698,900 $1,553,055 $1,132,600 $566,300
i
AWRDIF funds may be used for capital expenditures related to alternative water resources including
reclaimed water and CAP water. The capital expenditures during this projection period total $4.9
million and include the capital costs assessed by CAP for 3,557 acre feet of our CAP water allotment;
construction of a CAP water blending booster station; and design and construction of facilities that
will deliver an additional 1,000 acre feet of CAP water. The table below lists the capital expenditures
for the AWRDIF Fund.
Table 13
Capital Expenditures 2014-15 2015-16 2016-17 2017-18 2018-19
CAP Capital Charges $ 78,254 $ 81,811 $ 85,368 $ 88,925 $ 88,925 L
CAP Facilities 700,000 400,000 3,410,000
Total Capital Expenditures $ 778,254 $ 81,811 $ 85,368 $ 488,925 $ 3,498,925 [ .
There is no outstanding debt in the AWRDIF Fund. The outstanding reclaimed water system debt
was transferred to the Operating Fund. This is discussed in detail in the Groundwater Preservation
Fee section on page 10 of this report.
-12-
i17
'
Potable Water System Development Impact Fee Fund
n
The Potable Water System Development Impact Fee Fund (PWSDIF) had a cash balance of $4.5
million at the beginning of FY 2014-15 and is projected to have $6.5 million at the end of FY 2018-19.
The revenue sources for the PWSDIF Fund are from impact fees collected when a water meter is
n
purchased and from interest earned on cash balances. Interest income is projected to be a total of
J
$568,624 for this analysis. A two percent interest rate was assumed for each year in the projection
period and is consistent with the Town's financial planning.
The revenue forecast was based on new service units related to the number of new connections. A
service unit is the equivalent of one single family residential (SFR) 5/8 x 3/4-inch water meter. The
n
SFR service units are equal to the number of new connections. The other service units are forecast
J
based on historic trends and pending development projects within the Town. Other service units
include commercial, multi -family and irrigation units.
The Town Council adopted new impact fees that became effective July 1, 2014. The new impact fee
for a SFR 5/8 x 3/4-inch water meter or one service unit is $2,015. Table 14 provides the projected
growth in service units and the revenue associated with that growth.
Table 14
I
I
Growth / Revenue 2014-15 2015-16 2016-17 2017-18 2018-19
SFR Service Units 200 300 275 200 100
Other Service Units 145 120 104 80 40
Projected Revenue 1 $707,691 $846,300 $763,685 $564,200 $282,100
PWSDIF funds may be used for capital expenditures related to potable water system improvements
including wells, booster stations, reservoirs and water mains that are required to meet the demands
of new growth. There are no 0&M expenditures in this fund. The projections detailed in the
Preferred Financial Scenario for the PWSDIF Fund assume no growth -related capital projects
throughout the projection period. This will be reviewed annually for changes, but until the growth
rate changes, it is unlikely that the Utility will need to construct growth -related facilities. Debt
service for previously constructed growth -related facilities will be paid from revenues collected from
impact fees and use of cash reserves. The Potable Water System Development Impact Fees are not
projected to increase or decrease during the five year period. The table below lists all expenditures
forecast for the PWSDIF.
Table 15
J Expenditures 2014-15 2015-16 2016-17 2017-18 2018-19
Debt Service $ 327,424 $ 331,478 $ 329,916 $ 331,627 $ 331,328
Capital Projects
Total Expenditures I $ 327,424 $ 331,478 $ 329,916 $ 331,627 $ 331,328
-13-
I,.
Preferred Financial Scenario
Prior to developing financial forecasts, financial considerations were evaluated relating to proposed
future operating costs, significant short and long term capital expenditures, the Utility's existing
cash reserves, existing outstanding debt and the related debt service payments. To develop a
Preferred Financial Scenario, the goals of the Commission were to ensure that all existing rate 1
setting policies were met, cash reserves were utilized to minimize future debt and proposed rate
increases would not result in rate shock. r i
The Water Utility Commission has made a recommendation for a Preferred Financial Scenario. The
Scenario generates the revenue needed to maintain an adequate cash balance in all funds over the
projected five-year period. Additionally, the Scenario uses available cash for capital projects and
meets the debt service coverage requirements in each year of the projection period. The Preferred
Financial Scenario includes projections for five years; however, water rates are approved annually l
for the first year in the projection period.
The cash balance in the AWRDIF and PWSDIF funds increase over the five year period. The cash
balance will be important in the future as the Town moves forward with increased deliveries of CAP
water and constructing potable water system infrastructure to meet the demands of new growth.
State statutes preclude the use of impact fees for general operating expenses of the Utility.
The financial projections for the Operating Fund, AWRDIF Fund and the PWSDIF Fund were
combined to evaluate the overall debt service coverage at the end of each fiscal year. Analysis
indicates that, under the Preferred Financial Scenario, the Utility will meet the debt service coverage
requirement established by the Mayor and Council Water Polices and Bond Covenants for all five
years. Proformas for the Preferred Financial Scenario may be found in Appendix B.
The assumptions used to develop the financial projections contained in the Preferred Financial
Scenario may be found in Appendix A.
-14-
li
Recommendation on Rates, Fees & Charges
n After reviewing the analysis of the three funds and their respective revenue requirements contained
in the Preferred Financial Scenario, the Water Utility Commission is recommending:
➢ Decrease in the potable and reclaimed Groundwater Preservation Fee (GPF)
l J ➢ Increase in the potable and reclaimed commodity rates
➢ No increase in the monthly base rates for potable and reclaimed water
j� ➢ Increase in the potable and reclaimed construction water rates
J ➢ Increase in meter installation fees to recover costs
➢ Increase in residential security deposits for non -property owner accounts
➢ Increase in residential security deposits for landlord accounts
Table 16 illustrates the proposed water rates for a single family residential customer with a 5/8 x 3/4
inch water meter. Approximately 93 percent of the utility's residential customers fall into this
'L category. Other water providers in the region are included for comparison. Tucson Water's
commodity rates are assessed on the use of 100 cubic feet which is equivalent to 748 gallons. To
j simplify the comparison, the rates for Tucson Water have been converted to represent a charge for
1,000 gallons.
Table 16
Water Provider Monthly Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 GPF or Water
Base Rate Resource Fee
Oro Valley Current 14.19 2.20 2.99 4.03 5.38 --- 0.95
Oro Valley Proposed 14.19 2.27 3.10 4.23 5.76 0.90
Metro Water 22.00 2.00 2.70 4.05 5.62 7.02 0.20
Marana Water 16.18 2.63 3.67 4.77 5.89 8.45 0.43
Tucson Water 11.00 1.85 4.02 9.38 15.08 --- 0.84
l Cost per 1,000 gallons.
J For comparison purposes, the following table provides a calculation of a monthly bill amount for a
1 single family residential customer with a 5/8 x 3/4 inch meter for the water utilities surrounding the
JOro Valley Water Utility service area. Direct comparison of specific base rates and commodity rates
is less effective because of the varying rate structures of each utility. A better comparison is to
j calculate the cost for specific consumption levels for one month. The following bill comparisons
Jinclude water rates and water resource fees similar to the Utility's GPF.
Water Provider
Cost for
8,000 Gallons
Table 17
Cost for
15,000 Gallons
Cost for
25,000 Gallons
Cost for
40,000 Gallons
Oro Valley Current
40.41
68.13
117.27
203.16
Oro Valley Proposed
40.38
68.38
118.55
207.74
Metro Water
40.80
68.74
122.71
231.01
Marana Water
40.66
67.28
113.78
202.98
Tucson Water
32.98
87.43
204.33
434.15
-15-
The following table illustrates the financial impact to customers with varying meter sizes based on
the average monthly
water use
for specific customer
classifications. These charges are for Oro Valley
Water Utility customers and include the base rates, commodity rates and groundwater preservation [
fees.
Table 18
Classification
Meter Size
Water Use
Current Bill
Proposed Bill
Change.
SF Residential
5/8
8,000
$ 40.41
$ 40.38
- $ 0.03
SF Residential
5/8
15,000
$ 68.13
$ 68.38
$ 0.25
SF Residential
5/8
25,000
$117.27
$118.55
$ 1.28
SF Residential
5/8
40,000
$203.16
$207.74
$ 4.58
Irrigation
1
27,000
$129.14
$129.37
$ 0.23
Commercial
2
57,000
$294.79
$294.22
-$0.57
MF Residential
4
550,000
$ 2,103.77
$ 2,098.27
-$ 5.50
Turf —Potable
4
3,000,000
$ 9,894.77
$9,864.77
-$30.00
Reclaimed - Turf
6
15,000,000
$41,209.54
$41,209.54
$ 0.00
Proposed rates for all Oro Valley Water Utility meter sizes may be found in Appendix C. Tables that
calculate monthly bills under the existing rates may also be found in Appendix C. Monthly bill
amounts are calculated in 1,000 gallon increments for the 5/8 x 3/4 inch meters and a variety of
increments for larger meter sizes.
Table 19 contains the proposed reclaimed rates. Tucson Water's rates have been included for
comparison. Tucson Water's reclaimed rate is assessed on the use of 100 cubic feet which is
equivalent to 748 gallons. To simplify the comparison, the rates for Tucson Water have been
converted to represent a charge for 1,000 gallons.
Table 19 I
Water Provider Commodity Rate GPF
Oro Valley Water — Current $2.20 $0.50
Oro Valley Water — Proposed $2.23 $0.47
Tucson Water $2.50 N/A
1
Each year the water rates analysis is prepared based on the most up-to-date information available.
Operational needs and capital improvement requirements change annually and are carefully I
evaluated when they are included in the analysis. It is important that the Utility perform a water l_
rates analysis every year because any changes in debt service, operating or capital costs could result
in the need for a rate increase.
Other Service Fees & Charges
The Utility charges fees for services rendered in an amount designed to recover the cost to provide
that service. These fees and charges are evaluated annually to determine if any adjustments are
needed. It is recommended that water meter installation fees be increased to recover labor costs
and a price increase in the meters and transceivers. The amount of the increase depends on the size
and type of water meter. In some instances, there is a slight decrease in the fees. A complete
schedule of the fees may be found in Appendix D.
It is also recommended that residential security deposits for non -property owner accounts be
n increased to minimize the Utility's risk when these customers move without paying their bills. This
` would impact customers who are renting homes from the property owners. During FY 2013-14,
security deposits totaling $1,770 were applied to final bills when the tenants moved out. An
additional $2,712 was written off as uncollectible on these accounts. To reduce the potential for
financial loss in the future, it is recommended that residential security deposits for non -property
owner accounts be increased from $100 to $150. These deposits will continue to be held by the
n Utility until the account is closed. Additionally, the Utility experienced losses when landlords sold
their property leaving unpaid balances. Currently, landlord accounts are charged a security deposit
of $50 per account that is refunded after one year. It is recommended that security deposits for
7 landlord accounts be increased from $50 to $75 per account and that the deposit be held by the
Utility until the landlord agreement is terminated and the account is closed.
IConclusion
The Commission presents this Water Rates Analysis Report for the review and consideration of the
Mayor and Council. The Commission and Water Utility Staff are available to discuss this report in
greater detail at Council's request. Utility Staff will be requesting Council's approval of the Notice of
Intent to increase water rates on December 3, 2014.
The Oro Valley Water Utility Commission is proud to serve the Town of Oro Valley, it citizens and the
customers of its water utility. The Commission extends their appreciation to the Mayor and Council
for their consideration and guidance and looks forward to their continued direction.
-17-
APPENDIX A
Assumptions for Preferred Financial Scenario
A-1 Operating Fund
A-5 Alternative Water Resources Development Impact Fee Fund
A-6 Potable Water System Development Impact Fee Fund
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR OPERATING FUND
Growth
n SFR growth rates were provided by the Finance Department and are consistent with Town financial
Il JI forecasting. Other growth rates include commercial and irrigation connections.
I
I
Connections
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
SFR
200
300
275
200
100
Other
it
15
13
10
5
Current Water Rate Structure
The following commodity rates are the cost per 1,000 gallons:
Classifications
Tier
Tier
Tier
Tier
SF Residential & Irrigation
$2.23
$3.01
$4.07
$5.49
MF Residential & Commercial
$2.23
---
---
---
Construction Water
$6.49
---
---
---
Reclaimed Water
$2.20
---
---
---
GPF-Potable
$0.95
---
---
---
GPF- Reclaimed
$0.50
---
---
---
Proposed Water Rate Structure for FY 2014-15
The following proposed commodity rates are the cost per 1,000 gallons:
Classifications
Tier 1
Tier 2
Tier 3
Tier 4
SF Residential & Irrigation
$2.27
$3.10
$4.23
$5.76
MF Residential & Commercial
$2.27
---
---
---
Construction Water
$6.76
---
---
Reclaimed Water
$2.23
---
---
---
GPF-Potable
$0.90
---
---
---
GPF-Reclaimed
$0.47
---
---
There are no proposed changes to the usage allowed in each tier of the SF Residential and Irrigation
classifications.
JProposed Potable Water Rate Increases
The "overall increase" and "monthly impact'
are representative
of a residential
customer
with a 5/8 x 3/4 inch water meter averaging 8,000 gallons
of water use
per month.
Base
Overall
Monthly
Rate Tier Tier
Tier
Tier4
GPF
Change
Imoact
FY 14-15 N/A 2.0% 3.0%
4.0%
5.0%
-5.3%
-0.1%
-$0.03
FY 15-16 N/A 2.0% 3.0%
4.0%
5.0%
-5.6%
0.1%
$0.04
FY 16-17 N/A 2.0% 3.0%
4.0%
5.0%
0.0%
1.1%
$0.45
FY 17-18 N/A 3.0% 3.5%
4.0%
5.0%
0.0%
1.5%
$0.60
FY 18-19 N/A 3.0% 3.5%
4.0%
5.0%
0.0%
1.5%
$0.61
Proposed Reclaimed Water Rate Increases
The proposed reclaimed rate increases
are shown
below:
i
FY 14-15 FY 15-16
FY 16-17
FY 17-18
FY 18-19
Base Rate N/A N/A
N/A
N/A
N/A
Commodity Rate $2.23 $2.26
$2.31
$2.38
$2.45
Percent Increase 1.5% 1.5%
2.0%
3.0%
3.0%
A-1
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR OPERATING FUND
(continued)
Groundwater Preservation Fee Rates (cost per 1,000 gallons)
GPF is no longer transferred to the AWRDIF Fund effective FY 13-14.
5.3% decrease in GPF in FY 14-15 for both potable & reclaimed ($0.05 and $0.03 respectively).
5.6% decrease in GPF in FY 15-16 for both potable & reclaimed ($0.05 and $0.03 respectively).
No other decreases in remaining years of projection period.
Water Use Trends
Projections include similar water use trends as those in FY 13-14. The average monthly
water use for a residential customer with a 5/8 x 3/4 inch water meter decreased to 7,880
gallons per month in FY 13-14 from 8,200 gallons in FY 12-13. For this analysis 8,000
gallons was used as the average monthly water use.
Other Revenue
Other revenue is based on FY 14-15 proposed budget. Other revenue is not projected to
increase because mist. charges fluctuate annually. Other revenue includes late fees, reconnect fees,
new service establishment fees, sewer billing, stormwater billing, and meter income.
Beginning Cash Balance
Taken from 6/30/14 Balance Sheet of respective funds (MUNIS reports dated 9/17/14)
Interest Income
The interest rate for all 5 years in the analysis period is projected to be 2.0%. Information provided by the
Finance Department on 7/02/14.
Personnel Costs
No new employees were added over the 5 year projection period. The following increases were
provided by the Finance Department on 7/26/14 and are consistent with Town financial forecasting.
Fiscal Year
Merit
ASRS
New FTE
14-15
4.0%
0.5%
N/A
15-16
4.0%
0.5%
N/A
16-17
4.0%
0.5%
N/A
17-18
4.0%
0.5%
N/A
18-19
4.0%
0.5%
N/A
O&M Costs - Potable
Based on Utility's proposed budget for FY 14-15 updated with the most recent information.
Projected 15% increase in power costs for potential Tucson Electric rate increase in FY 17-18.
O&M Costs - Reclaimed
Based on Utility's proposed budget for FY 14-15 updated with the most recent information.
Projected 15% increase in power costs for potential Tucson Electric rate increase in FY 17-18.
A-2
I
I
I
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR OPERATING FUND
(continued)
Inflation Rates
The following inflation rates were provided by the Arizona Department of Revenue:
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
1.7%
1.6%
1.7%
1.8%
1.7%
Water Resource Management Costs
Costs are for the purchase of groundwater extinguishment credits. These credits will be
pledged to the Groundwater Allowance Account to help maintain a balance that will
facilitate growth in the water service area. Annual costs are based on purchasing
3,000 AF at $150/AF.
Reclaimed Water Wheeling Costs
Pursuant to the existing IGA, the reclaimed water rate is non -interruptible at an interruptible rate.
It is assumed that when the IGA is renegotiated, the utility will opt for an interruptible rate; therefore,
only inflationary increases are included annually. The rate for FY 14-15 is $292 / AF plus a monthly base rate.
CAP Wheeling Costs
Costs include the CAP water delivery costs - rates adopted by CAP on 6/5/14 (refer to CAP
recharge costs table below). Costs also include fees charged by Tucson Water to wheel the
JCAP water through their recharge and recovery system. Tucson Water fees are fixed pursuant
to an IGA and subject to re -negotiation.
Tucson Water Rates
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
CAP Volume Wheeled
2,000
AF
2,000
AF
2,000
AF
2,000
AF
2,000
AF
Commodity Rate per AF
$ 499.89
$ 499.89
$ 499.89
$ 499.89
$ 499.89
Base Rate 4-inch Meter (2)
$ 203.83
$ 203.83
$ 203.83
$ 203.83
$ 203.83
Base Rate 8-inch Meter (1)
$ 323.32
$ 323.32
$ 323.32
$ 323.32
$ 203.83
CAP Recharge Costs
Based on the rate schedule adopted by CAP 6/5/14. The following table reflects the amount
projected to be recharged annually:
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
Recharge at Tucson Water
2,000 AF
2,000 AF
2,000 AF
2,000 AF
2,000 AF
Recharge at Kai Farms
4,000 AF
4,000 AF
4,000 AF
4,000 AF
4,000 AF
Recharge at CAWCD
4,305 AF
4,305 AF
4,305 AF
4,305 AF
4,305 AF
Cost to Recharge
$ 157.00
$ 161.00
$ 166.00
$ 171.00
$ 174.00
Additional for CAWCD
$ 15.00
$ 15.00
$ 15.00
$ 15.00
$ 15.00
A-3
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR OPERATING FUND
(continued)
Debt Service
The following table describes the debt service included in this proforma:
Bonds
Type
Description
Amortization Schedule By
2005
Excise Tax
Land —MOC
Stone&Youngberg
2007
Excise Tax
Refunding (1996 & 1999)
Stone & Youngberg
2008
Sr. Lien
Reclaimed Ph. 2
WIFA
2009
Sr. Lien
Existing System CIP
WIFA
2012
Sr. Lien
Refunding (Reclaim Ph. 1)
Stone & Youngberg
2012
Sr. Lien
Refunding (2003)
Stone & Youngberg
2013
Sr. Lien
Refunding (2003)
Stifel & Nicolaus & Co.
2014
Sr. Lien
AMI Project
WIFA
Debt Service Coverage
1.30 debt service coverage ratio for 2012 & 2013 Sr. Lien Bonds & WIFA Loans
1.00 debt service coverage ratio for all Excise Tax Pledged Bonds
Capital Improvements —Operating Fund
The following table identifies the amount of the capital projects for each fiscal year and
the related financing as identified in the revised 5-Year CIP dated 8/27/14:
Fiscal
Year
Total
Capital Costs
Cash
Reserves
Project Financing
Existing
WIFA Loan
New Debt
2014-15
$ 3,597,020
$1,397,020
$2,200,000
N/A
2015-16
$ 2,783,000
$ 983,000
$1,800,000
N/A
2016-17
$ 1,196,000
$1,196,000
N/A
2017-18
$ 849,000
$ 849,000
N/A
2018-19
$ 1,325,000
$1,325,000
N/A
$ 9,750,020
$5,750,020
$4,000,000
Assumed no additional debt in throughout the 5-year forecast period.
Capital Improvements — Groundwater Preservation Fee
The following table identifies the amount of the capital projects for each fiscal year and the
related financing as identified in the revised 15-Year CIP dated 8/27/14:
Fiscal
Total
Project Financing
Year
Capital Costs
Cash
New Debt
Reserves
2014-15
$ 100,000
$ 100,000
N/A
2015-16
$ 350,000
$ 350,000
N/A
2016-17
N/A
N/A
N/A
2017-18
N/A
N/A
N/A
2018-19
N/A
N/A
N/A
A-4
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR AWRDIF FUND
ll
Growth
n SFR growth rates were provided by the Finance Department and are consistent with Town financial
forecasting. Other Service Units (SU's) include commercial and irrigation connections.
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
SFR SU's
200
300
275
200
100
Other SU's
145
120
104
80
40
AWRD Impact Fees
Decreased to $4,045 per EDU, Ordinance No. (0) 14-05, effective 7/1/14
Not projected to change in the 5 year projection period.
i
Beginning Cash Balance
Taken from 6/30/14 Balance Sheet of respective funds (MUNIS reports dated 9/17/14).
Interest Income
The interest rate for all 5 years in the analysis period is projected to be 2.0%. Information provided by the
Finance Department on 7/02/14.
CAP Capital Costs
Based on 3,557 AF at rate schedule adopted by CAP 6/5/14.
Debt Service
Debt service for the reclaimed water system has been moved to the Operating Fund.
Capital Improvements
The following table identifies the amount of the capital projects for each fiscal year and
the related financing
as identified
in the revised 5-Year CIP dated
8/27/14:
-� Fiscal
Total
Project Financing
Year
Capital Costs
Cash Reserves
New Debt
2014-15
$ 700,000
$ 700,000
N/A
2015-16
$ 0
$ 0
N/A
2016-17
$ 0
$ 0
N/A
2017-18
$ 400,000
$ 400,000
N/A
lI 2018-19
J
$3,410,000
$3,410,000
N/A
A-5
Growth
PREFERRED FINANCIAL SCENARIO
ASSUMPTIONS FOR PWSDIF FUND
SFR growth rates were provided by the Finance Department and are consistent with Town financial
forecasting. Other Service Units (SU's) include commercial and irrigation connections.
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
SFR SU's
1 200
300
275
200
100
Other SU's
1 145
120
104
80
40
PWSD Impact Fees
Decreased impact fees to $2,015 per EDU, Ordinance No. (0) 14-05, effective 7/1/14.
Not projected to change in the five year projection period.
Beginning Cash Balance
Taken from 6/30/14 Balance Sheet of respective funds. (MUNIS reports dated 9/17/14).
Interest Income
The interest rate for all 5 years in the analysis period is projected to be 2.0%. Information provided by the
Finance Department on 7/02/14.
Debt Service
The following table describes the debt service included in this proforma:
Bonds Type Description
Amortization Schedule By
2012 Sr. Lien Refunding (2003) Stone & Youngberg
Debt Service Coverage
1.30 debt service coverage ratio for 2012 Sr. Lien Bonds
Capital Improvements
No capital projects were identified in the revised 5-year CIP dated 8/27/14.
F-IT I
r
II
r
APPENDIX B
Preferred Financial Scenario
B-1 Operating Fund
B-2 Groundwater Preservation Fee
B-3 Alternative Water Resources Development Impact Fee Fund
B-4 Potable Water System Development Impact Fee Fund
B-5 Summary of All Funds
I
�1
J
Oro Valley Water Utility
Prepared: October 22, 2014
REVENUES
Water Sales
Potable Water Sales (excluding golf courses)
Potable Water Sales from Growth - Res. & Com.
Potable Water Sales - Golf Courses
Total Potable Water Sales
Reclaimed Water Sales
Total Water Sales
Other Operating Revenue
Service Fees & Charges
Interest Income
Total Other Operating Revenue
Total Operating Revenue
OPERATING EXPENSES
Potable Operating Expenses
Personnel
Operations & Maintenance
Power for Pumping
Water Resource Management Costs
CAP Wheeling Costs
CAP Water Recharge Costs
Total Potable Operating Expenses
Reclaimed Operating Expenses
Operating & Maintenance
Total Reclaimed Operating Expenses
Total Operating Expenses
PREFERRED FINANCIAL SCENARIO
Operating Fund
FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
$ 10,065,575 $ 10,229,109 $ 10,397,653 $ 10,585,864 $ 10,809,196
58,508
182,973
322,133
443,572
523,122
128,047
130,523
133,048
136,912
140,891
10,252,130
10,542,605
10,952,834
11,166,348
11,473,209
1,796,098
1,818, 296
1,850, 323
1,899,317
1,949,954
12,048,228
12,360,901
12,703,157
13,065,665
13,423,163
689,200
689,200
689,200
689,200
689,200
207,233
189,964
174,894
164,753
155,303
896,433
879,164
864,094
853,953
844,503
$ 12,944,662
$ 13,240,065
$ 13,567,251
$ 13,919,618
$ 14,267,666
2,874,528
3,003,882
3,139,056
3,280,314
3,427,928
2,043,303
2,063,736
2,086,437
2,111,474
2,138,924
900,000
900,000
900,000
1,035,000
1,035,000
450,000
450,000
450,000
450,000
450,000
1,164,300
1,188,192
1,198,192
1,208,192
1,214,192
1,324,000
1,401,680
1,443,205
1,484,730
1,509,645
$ 8,756,131 $ 9,007,490 $ 9,216,890 $ 9,569,710 $ 9,775,688
890,360 899,264 909,155 920,065 932,026
$ 890,360 $ 899,264 $ 909,155 $ 920,065 $ 932,026
$ 9,646,491 $ 9,906,753 $ 10,126,046 $ 10,489,775 $ 10,707,715
Net Operating Revenue $ 3,298,170 $ 3,333,312 $ 3,441,205 $ 3,429,843 $ 3,559,951
DEBT SERVICE - POTABLE
P&I - Excise Tax Bonds - Land for MOC (2005)
P&I - Excise Tax Bonds - Refinance 1996 (2007)
P&I - WIFA Loan - Exist. System CIP (2009)
P&I - Sr. Lien Bonds - Existing System (2012)
P&I - Refunding - Excise (2013)
P&I -WIFA Loan - Sr. Lien -AMI (2014)
Total Potable System Debt Service
Other Obligations
Machinery & Equipment
Vehicles
Capital Improvements: Existing System
Total Other Obligations
Net Balance From Operations
Beginning Cash Balance
Net Balance From Operations
Ending Cash Balance
152,516
152,227
151,691
152,417
152,668
1,255,948
1,258,530
1,259,936
1,255,326
1,258,553
149,368
149,322
149,275
149,226
149,175
582,284
589,494
586,716
589,759
589,227
1,046,558
1,022, 420
1,033,428
1,024,073
1,024, 645
396,233
404,608
404,508
404,406
404,301
$ 3,582,907 $ 3,576,601 $ 3,585,554 $ 3,575,207 $ 3,578,569
$ 103,020 $
98,000 $
91,000 $
69,000 $
200,000
234,000
155,000
230,000
70,000
75,000
1,060,000
730,000
875,000
710,000
1,050,000
$ 1,397,020 $
983,000 $
1,196,000 $
849,000 $
1,325,000
$ (1,681,757) $ (1,226,289) $ (1,340,349) $ (994,365) $ (1,343,618)
$ 8,199,262 $ 6,517,505 $ 5,291,215 $ 3,950,866 $ 2,956,502
(1,681,757) (1,226,289) (1,340,349) (994,365) (1,343,618)
$ 6,517,505 $ 5,291,215 $ 3,950,866 $ 2,956,502 $ 1,612,884
B-1
Oro Valley Water Utility PREFERRED FINANCIAL SCENARIO
Prepared: October 22, 2014 Operating Fund
Groundwater Preservation Fee
FY 2014.15
FY 2015-16
FY 2016-17
FY 2017-18
FY 2018-19 r
GPF Beginning Balance
$ 2,670,948 $
3,450,303 $
3,841,919 $
4,509,720 $
5,182,447
GPF Revenue (existing+growth)
2,542,799
2;424,821
2,352,563
2,369,648
2,379,202
Less Capital Component of TW Wheeling Costs
(142,360)
(142,360)
(142,360)
(142,360)
(142,360)
Less Capital Charge for CAP Allotment 6,748 AF
(148,456)
(155,204)
(161,952)
(168,700)
(168,700)
Less Reclaimed Project- Main Relocation
(100,000)
(350,000)
Less P&I - Sr. Lien - WIFA -Reclaimed Ph.2 (2008)
(311,256)
(311,130)
(311,001)
(310,866)
(310,727)
Less P&I - Sr. Lien Bonds - Reclaimed Ph.1 (2012)
(1,061,372)
(1,074,511)
(1,069,449)
(1,074,995)
(1,074,027)
GPF Ending Balance
$ 3,450,303 $
3,841,919 $
4,509,720 $
5,182,447 $
5,865,835
M
Oro Valley Water Utility
Prepared: October 22,2014
REVENUES
AWRD Impact Fee Revenue
Subtotal Revenue
Other Operating Revenue
Interest Income
Subtotal Other Operating Revenue
Total Operating Revenue
PREFERRED FINANCIAL SCENARIO
Alternative Water Resources Development Impact Fee Fund
FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
$ 1,409,646 $ 1,698,900 $ 1,553,055 $ 1,132,600 $ 566,300
1,409,646 1,698,900 1,553,055 1,132,600 566,300
72,510 95,623 128,508 152,879 136,027
72,510 95,623 128,508 152,879 136,027
$ 1,482,156 $ 1,794,523 $ 1,681,563 $ 1,285,479 $ 702,327
OPERATING EXPENSES
N/A - - - - -
Total Operating Expenses $ - $ - $ - $ - $ -
Net Operating Revenue $ 1,482,156 $ 1,794,523 $ 1,681,563 $ 1,285,479 $ 702,327
DEBT SERVICE
N/A
Total Debt Service
OTHER OBLIGATIONS
Capital Improvements:
CAP Capital Charges 3557 acre feet
$
78,254
$
81,811 $
85,368 $
88,925
$
88,925
CAP Facilities Engineering & Construction
700,000
-
-
400,000
3,410,000
Total Other Obligations
$
778,254
$
81,811 $
85,368 $
488,925
$
3,498,925
Net Balance From Operations
$
703,902
$
1,712,712 $
1,596,195 $
796,554
$
(2,796,598)
Beginning Cash Balance $ 3,336,099 $ 4,040,001 $ 5,752,713 $ 7,348,908 $ 8,145,462
Net Balance From Operations $ 703,902 $ 1,712,712 $ 1,596,195 $ 796,554 $ (2,796,598)
Ending Cash Balance $ 4,040,001 $ 5,752,713 $ 7,348,908 $ 8,145,462 $ 5,348,864
B-3
Oro Valley Water Utility PREFERRED FINANCIAL SCENARIO
Prepared: October 22,2014
Potable Water System Development Impact Fee Fund
FY 2014-15
FY 2015-16
FY 2016-17
FY 2017-18
FY 2018-19
REVENUES
Development Impact Fees
$
707,691
$ 846,300
$ 763,685
$
564,200
$
282,100
Subtotal Revenue
$
707,691
$ 846,300
$ 763,685
$
564,200
$
282,100
Other Operating Revenue
Interest Income
93,598
104,309
115,949
125,099
129,669
Subtotal Other Operating Revenue
93,598
104,309
115,949
125,099
129,669
Total Operating Revenue
$
801,289
$ 950,609
$ 879,634
$
689,299
$
411,769
OPERATING EXPENSES
N/A
-
-
-
-
-
Total Operating Expenses
$
-
$ -
$ -
$
-
$
-
Net Operating Revenue
$
801,289
$ 950,609
$ 879,634
$
689,299
$
411,769
DEBT SERVICE
M -Sr. Lien Bonds -Expansion Related(2012)
$
327,424
$ 331,478
$ 329,916
$
331,627
$
331,328
Total Water System Debt Service
$
327,424
$ 331,478
$ 329,916
$
331,627
$
331,328
OTHER OBLIGATIONS
N/A
Total Other Obligations
Net Balance From Operations
Beginning Cash Balance
Net Balance From Operations
Ending Cash Balance
$ 473,865 $ 619,131 $ 549,718 $ 357,672 $ 80,441
$ 4,505,635 $ 4,979,500 $ 5,598,631 $ 6,148,349 $ 6,506,021
$ 473,865 $ 619,131 $ 549,718 $ 357,672 $ 80,441
$ 4,979,500 $ 5,598,631 $ 6,148,349 $ 6,506,021 $ 6,586,462
B-4
M
I
Oro Valley Water Utility
Potable & Reclaimed Water Systems
Prepared: October 22, 2014
REVENUES
Water Sales
Potable Water Sales (exclude golf courses)
Potable Water Sales from Growth
Potable Water Sales - Golf Courses
Total Potable Water Sales
Reclaimed Water Sales
Total Water Sales
Other Operating Revenue
Groundwater Preservation Fees
Groundwater Preservation Fee - Potable
Groundwater Preservation Fee- Reclaimed
Groundwater Preservation Fee - Growth
Total Groundwater Preservation Fees
Potable Water Impact Fees
Alternative Water Impact Fees
Service Fees & Charges
Interest Income
Total Other Operating Revenue
Total Operating Revenue
OPERATING EXPENSES
Potable Operating Expenses
Personnel
Operations & Maintenance
Power for Pumping
Water Resource Management Costs
CAP Wheeling Costs -
CAP Recharge Costs
Costs paid by GPF Revenue
Total Potable Operating Expenses
Reclaimed Operating Expenses
Operating & Maintenance
Total Reclaimed Operating Expenses
Total Operating Expenses
PREFERRED FINANCIAL SCENARIO
Summary of all Funds
FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
$ 10,065,575 $ 10,229,109 $ 10,397,653 $ 10,585,864 $ 10,809,196
58,508
182,973
322,133
443,572
523,122
128,047
130,523
133,048
136,912
140,891
10,252,130
10, 542,605
10,852,834
11,166,348
11,473,209
1,796,098
1,818,296
1,850,323
1,899,317
1,949,954
12,048,228
12,360,901
12,703,157
13,065, 665
13,423,163
2,168,917
2,052,785
1,974,252
1,974,252
1,974,252
361,568
339,402
325,105
325,105
325,105
12,314
32,634
53,206
70,291
79,845
2,542,799
2,424,821
2,352,563
2,369,648
2,379,202
707,691
846,300
763,685
564,200
282,100
1,409,646
1,698,900
1,553,055
1,132,600
566,300
689,200
689,200
689,200
689,200
689,200
373,341
389,896
419,351
442,731
420,999
5,722,677
6,049,117
5,777,854
5,198,379
4,337,801
$ 17,770,905 $ 18,410,018 $ 18,481,011 $ 18,264,044 $ 17,760,964
2,874,528
3,003,882
3,139,056
3,280,314
3,427,928
2,043,303
2,063,736
2,086,437
2,111,474
2,138,924
900,000
900,000
900,000
1,035,000
1,035,000
450,000
450,000
450,000
450,000
450,000
1,164,300
1,188,192
1,198,192
1,208,192
1,214,192
1, 3 24, 000
1,401, 680
1, 443, 205
1,484,730
1,509,645
290,816
297,564
304,312
311,060
311,060
$ 9,046,947 $ 9,305,054 $ 9,521,202 $ 9,880,770 $ 10,086,748
890,360 899,264 909,155 920,065 932,026
$ 890,360 $ 899,264 $ 909,155 $ 920,065 $ 932,026
$ 9,937,307 $ 10,204,317 $ 10,430,358 $ 10,800,835 $ 11,018,775
Net Operating Revenue $ 7,833,598 $ 8,205,701 $ 8,050,653 $ 7,463,209 $ 6,742,189
l Debt Service
JDebt Service - Potable- Existing System
P&I - Excise Tax Bonds - Land for MOC (2005)
P&I - Excise Tax Bonds - Refinance 1996 (2007)
P&I - WIFA Loan - Exist. System CIP (2009)
P&I - Sr. Lien Bonds - Existing System (2012)
P&I - Refunding- Excise (2013)
1 P&I - WIFA Loan - Meter Replacement (2014)
JI Total Potable Existing System Debt Service
Debt Service - Potable - Expansion Related
P&I - Sr. Lien Bonds - Expansion Related (2012)
Total Potable Expansion Related Debt Service
Debt Service - Non -Potable
P&I - Sr. Lien - WIFA-Reclaimed Ph.2 (2008)
P&I - Sr. Lien Bonds - Reclaimed Ph.l (2012)
Total Non -Potable System Debt Service
Total Water System Debt Service
152,516
152,227
151,691
152,417
152,668
1,255,948
1,258,530
1,259,936
1,255,326
1,258,553
149,368
149,322
149,275
149,226
149,175
582,284
589,494
586,716
589,759
589,227
1,046, 558
1,022,420
1,033,428
1,024,073
1,024, 645
396,233
404,608
404,508
404,406
404,301
$ 3,582,907 $ 3,576,601 $ 3,585,554 $ 3,575,207 $ 3,578,569
327,424 331,478 329,916 331,627 331,328
$ 327,424 $ 331,478 $ 329,916 $ 331,627 $ 331,328
$ 316,526 $ 316,402 $ 316,273 $ 316,140 $ 316,002
1,061, 372 1,074, 511 1,069,449 1,074,995 1,074,027
$ 1,377,898 $ 1,390,913 $ 1,385,722 $ 1,391,135 $ 1,390,029
$ 5,288,229 $ 5,298,992 $ 5,301,192 $ 5,297,969 $ 5,299,926
B-5
Oro Valley Water Utility
Potable & Reclaimed Water Systems
Prepared: October 22, 2014
Other Obligations
Machinery & Equipment
Vehicles
Capital Improvements:
Existing System
GPF Projects
Alternative Water Resources
Total Other Obligations
Net Balance From Operations
Growth - New Connections
Increase from Water Rates
Decrease from Groundwater Preservation Fees
Increase(Decrease) to Residential Customer using 8K gals.
Increase(Decrease) to Residential Customer using 8K gals.
Required Cash Reserves (5% of budget)
(does not include depreciation/amortization)
Debt Service Coverage Requirement Amount
DS Coverage Ratio: Sr. Lien Bonds & WIFA
Debt Service Coverage Requirement = 1.30
Beginning Cash Balance
Net Balance From Operations
Ending Cash Balance
Operating Fund
Groundwater Preservation Fees
AWRD Impact Fee Fund
PWSD Impact Fee Fund
Total Ending Cash Balance
Contingent Reserve Fund:
Contingent Reserve Requirement = 130%
PREFERRED FINANCIAL SCENARIO
Summary of all Funds
FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19
$ 103,020 $
98,000 $
91,000 $
69,000 $
200,000
234,000
155,000
230,000
70,000
75,000
1,060,000
730,000
875,000
710,000
1,050,000
100,000
350,000
-
-
-
778,254
81,811
85,368
488,925
3,498,925
$ 2,275,274- $ 1,414,811 $ 1,281,368 $ 1,337,925 $ 4,823,925
$ 270,095 $ 1,491,898 $ 1,468,093 $ 827,314 $ (3,391,662)
200
300
275
200
100
1.1%
1.3%
1.1%
1.5%
1.5%
-1.2%
-1.2%
0.0%
0.0%
0.0%
-0.1%
0.1%
1.1%
1.5%
1.5%
($0.03)
$0.04
$0.45
$0.60
$0.61
$ 875,041 $
845,906 $
850,646 $
871,836 $
1,057,131
$ 6,452,159 $
6,465,462 $
6,468,062 $
6,465,037 $
6,466,538
2.02
2.11
2.07
1.92
1.73
$ 18,711,944 $ 18,982,038 $ 20,473,936 $ 21,942,029 $ 22,769,344
270,095 1,491,898 1,468,093 827,314 (3,381,662)
$ 18,982,038 $ 20,473,936 $ 21,942,029 $ 22,769,344 $ 19,387,682
$ 6,517,505 $ 5,291,215 $ 3,950,866 $ 2,956,502 $ 1,612,884
3,450,303 3,841,919 4,509,720 5,182,447 5,865,835
4,040,001 5,752,713 7,348,908 8,145,462 5,348,864
4,979,500 5,598,631 6,148,349 6,506,021 6,586,462
$ 18,987,308 $ 20,484,478 $ 21,957,843 $ 22,790,432 $ 19,414,045
359% 387% 414% 430% 366%
M
APPENDIX C
Preferred Financial Scenario
Rate Schedules & Tables for Bill Comparisons
C-1 Potable & Reclaimed Water Rates
C-2 Tables for Bill Comparisons by Meter Size
ORO VALLEY WATER UTILITY
PREFERRED FINANCIAL SCENARIO
PROPOSED WATER RATES
POTABLE & RECLAIMED
METER SIZE
BASE RATE
(in inches)
5/8 x 3/4
$14.19
3/4 x 3/4
$21.29
1
$35.48
1.5
$70.95
2
$113.53
3
$227.05
4
$354.77
6
$709.54
8
$1,135.26
COMMODITY RATES - POTABLE WATER
RESIDENTIAL & IRRIGATION CLASSIFICATIONS
METER
COMMODITY
COMMODITY
COMMODITY
COMMODITY
SIZE
TIER 1
TIER 2
TIER 3
TIER 4
$2.27
$3.10
$4.23
$5.76
COST PER 1000 GALS. COST PER 1000 GALS.
COST PER 1000 GALS.
COST PER 1000 GALS.
5/8x 3/4
0-7,000
7,001-16,000
16,001 - 32,000
OVER 32,000
3/4 x 3/4
0 - 10,000
10,001 - 24,000
24,001 - 48,000
OVER 48,000
1
0 - 17,000
17,001- 40,000
40,001 - 80,000
OVER 80,000
1.5
0 - 35,000
35,001- 80,000
80,001 - 160,000
OVER 160,000
2
0 - 56,000
56,001- 128,000
128,001 - 256,000
OVER 256,000
3
0-112,000
112,001 - 256,000
256,001 - 512,000
OVER 512,000
4
0-175,000
175,001 - 400,000
400,001 - 800,000
OVER 800,000
6
0-860,000
860,001 - 2,000,000
2,000,001 - 3,500,000
OVER 3,500,000
8
0 - 860,000
860,001- 2,000,000
2,000,001- 3,500,000
OVER 3,500,000
COMMERCIAL CLASSIFICATION
$2.27 per 1000 gallons for all water use
MASTER -METERED MULTIFAMILY CLASSIFICATION
$2.27 per 1000 gallons for all water use
CONSTRUCTION WATER
$6.76 per 1000 gallons for all water use
COMMODITY RATES - RECLAIMED WATER
ALL RECLAIMED WATER USES & CLASSIFICATIONS 1 $ 2.23 per 1000 gallons for all water use
GROUNDWATER PRESERVATION FEES
POTABLE WATER $ 0.90 per 1000 gallons for all water use
RECLAIMED WATER $ 0.47 per 1000 gallons for all water use
C-1
TABLE FOR MONTHLY CHARGES & PERCENT INCREASE COMPARISON
RESIDENTIAL & IRRIGATION CUSTOMERS WITH A 5/8 X 3/4" METER
E
I
Imo.
I
I
I
GALLONS
USED
CURRENT
WATER
RATE
PROPOSED
WATER
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
14.19
14.19
0.00
0.0%
0.00
0.00
0.00
0.00
14.19
0.0%
1,000
16.42
16.46
0.04
0.2%
0.95
0.90
-0.05
-0.01
17.36
-0.1%
2,000
18.65
18.73
0.08
0.4%
1.90
1.80
-0.10
-0.02
20.53
-0.1%
3,000
20.88
21.00
0.12
0.6%
2.85
2.70
-0.15
-0.03
23.70
-0.1%
4,000
23.11
23.27
0.16
0.7%
3.80
3.60
-0.20
-0.04
26.87
-0.1%
5,000
25.34
25.54
0.20
0.8%
4.75
4.50
-0.25
-0.05
30.04
-0.2°%
6,000
27.57
27.81
0.24
0.9%
5.70
5.40
-0.30
-0.06
33.21
-0.2%
7,000
29.80
30.08
0.28
0.9%
6.65
6.30
-0.35
-0.07
36.38
-0.2%
8,000
32.81
33.18
0.37
1.1%
7.60
7.20
-0.40
-0.03
40.38
-0.1%
9,000
35.82
36.28
0.46
1.3%
8.55
8.10
-0.45
0.01
44.38
0.0%
10,000
38.83
39.38
0.55
1.4%
9.50
9.00
-0.50
0.051
48.38
0.1%
11,000
41.84
42.48
0.64
1.5%
10.45
9.90
-0.55
0.09
52.38
0.2%
12,000
44.85
45.58
0.73
1.6%
11.40
10.80
-0.60
0.13
56.38
0.2%
13,000
47.86
48.68
0.82
1.7%
12.35
- 11.70
-0.65
0.17
60.38
0.3%
14,000
50.87
51.78
0.91
1.8%
13.30
12.60
-0.70
0.21
64.38
0.3%
15,000
53.88
54.88
1.00
1.9%
14.25
13.50
-0.75
0.25
68.38
0.4%
16,000
56.89
57.98
1.09
1.9%
15.20
14.40
-0.80
0.29
72.38
0.4%
17,000
60.96
62.21
1.251
2.1%
16.151
15.30
-0.851
0.40
77.511
0.5%
18,000
65.03
66.44
1.41
2.2%
17.10
16.20
-0.90
0.51
82.64
0.6%
19,000
69.10
70.67
1.57
2.3%
18.05
17.10
-0.95
0.62
87.77
0.7°%
20,000
73.17
74.90
1.73
2.4%
19.00
18.00
-1.00
0.73
92.90
0.8%
21,000
77.24
79.13
1.89
2.4%
19.95
18.90
-1.05
0.84
98.03
0.9%
22,000
81.31
83.36
2.05
2.5%
20.90
19.80
-1.10
0.95
103.16
0.9%
23,000
85.38
87.59
2.21
2.6%
21.85
20.70
-1.15
1.06
108.29
1.0%
24,000
89.45
91.82
2.37
2.6%
22.80
21.60
-1.20
1.17
113.42
1.0°%
25,000
93.52
96.051
2.53
2.7%
23.751
22.50
-1.251
1.28
118.551
1.1%
26,000
97.59
100.28
2.69
2.8°%
24.70
23.40
-1.30
1.39
123.681
1.1%
27,000
101.66
104.51
2.85
2.8%
25.65
24.30
-1.35
1.50
128.81
1.2%
28,000
105.73
108.74
3.01
2.8%
26.60
25.20
-1.40
1.61
133.94
1.2%
29,000
109.80
112.97
3.17
2.9%
27.55
26.10
-1.45
1.72
139.07
1.3%
30,000
113.87
117.20
3.33
2.9%
28.50
27.00
-1.50
1.83
144.20
1.3%
31,000
117.94
121.43
3.49
3.0%
29.45
27.90
-1.55
1.94
149.33
1.3%
32,000
122.01
125.66
3.65
3.0%
30.40
28.80
-1.60
2.05
154.46
1.3%
33,000
127.50
131.421
3.92
3.1%
31.351
29.70
-1.65
2.27
161.12
1.4%
34,000
132.99
137.18
4.19
3.2%
32.30
30.60
-1.701
2.49
167.78
1.5%
35,000
138.48
142.94
4.46
3.2%
33.25
31.50
-1.75
2.71
174.44
1.6%
36,000
143.97
148.70
4.73
3.3%
34.20
32.40
-1.80
2.93
181.10
1.6%
37,000
149.46
154.46
5.00
3.3°%
35.15
33.30
-1.85
3.15
187.76
1.7%
38,000
154.95
160.22
5.27
3.4%
36.10
34.20
-1.90
3.37
194.42
1.8%
39,000
160.44
165.98
5.54
3.5%
37.05
35.10
-1.95
3.59
201.08
1.8%
40,000
165.93
171.74
5.81
3.5%
38.00
36.00
-2.00
3.81
207.74
1.9%
41,000
171.42
177.501
6.08
3.5%
38.951
36.90
-2.05
4.03
214.40
1.9%
42,000
176.91
183.26
6.35
3.6%
39.90
37.80
-2.101
4.25
221.06
2.0%
43,000
182.40
189.02
6.62
3.6%
40.85
38.70
-2.15
4.47
227.72
2.0%
44,000
187.89
194.78
6.89
3.7%
41.80
39.60
-2.20
4.69
234.38
2.0%
45,000
193.38
200.54
7.16
3.7°%
42.75
40.50
-2.25
4.91
241.04
2.1%
46,000
198.87
206.30
7.43
3.7%
43.70
41.40
-2.30
5.13
247.70
2.1%
47,000
204.36
212.06
7.70
3.8°%
44.65
42.30
-2.35
5.35
254.361
2.1%
48,000
209.85
217.82
7.97
3.8%
45.60
43.20
-2.40
5.57
261.02
2.2%
49,000
215.34
223.58
8.24
3.8°�
46.55
44.10
-2.45
5.79
267.68
2.2%
50,000
220.83
229.34
8.51
3.9%
47.50
45.00
-2.50
6.01
274.34
2.2%
C-2
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR RESIDENTIAL & IRRIGATION CUSTOMERS WITH A 3/4" x 3/4" METER
BASE RATE $ 21.29
COMMODITY RATE: TIER 1 = $ 2.27 FOR 0 - 10,000 GALLONS
TIER 2 = $ 3.10 FOR 10,001- 24,000 GALLONS
TIER 3 = $ 4.23 FOR 24,001- 48,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 48,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
21.29
21.29
-
0.0%
0.00
0.00
0.00
0.00
21.29
0.0%
7,000
36.90
37.18
0.28
0.8%
6.65
6.30
-0.35
-0.07
43.48
-0.2%
11,000
46.60
47.09
0.49
1.1%
10.45
9.90
-0.55
-0.06
56.99
-0.1%
28,000
102.01
104.31
2.30
2.3%
26.60
25.20
-1.40
0.90
129.51
0.7%
50,000
194.39
200.43
6.04
3.1%
47.50
45.00
-2.50
3.54
245.43
1.5%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 3/4" x 3/4" METER
BASE RATE $ 21.29
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
21.29
21.29
-
0.0%
0.00
0.00
0.00
0.00
21.29
0.0%
7,000
36.90
37.18
0.28
0.8%
6.65
6.30
-0.35
-0.07
43.48
-0.2%
11,000
45.82
46.26
0.44
1.0°%
10.45
9.90
-0.55
-0.11
56.16
-0.2%
28,000
83.73
84.85
1.12
1.3°%
16.60
25.20
-1.40
-0.28
110.05
-0.3%
50,000
132.79
134.79
2.00
1.5%
47.50
45.00
-2.50
-0.50
179.79
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR RESIDENTIAL & IRRIGATION CUSTOMERS WITH A 1" METER
BASE RATE $ 35.48
COMMODITY RATE: TIER 1 = $ 2.27 FOR 0 - 17,000 GALLONS
TIER 2 = $ 3.10 FOR 17,001 - 40,000 GALLONS
TIER 3 = $ 4.23 FOR 40,001 - 80,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 80,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
35.48
35.48
-
0.0°%
0.00
0.00
0.00
0.00
35.48
0.0%
16,000
71.16
71.80
0.64
0.9°%
15.20
14.40
-0.80
-0.16
86.20
-0.2%
27,000
103.49
105.07
1.58
1.5°%
25.65
24.30
-1.35
0.23
129.37
0.2%
38,000
136.60
139.17
2.57
1.9%
36.10
34.20
-1.90
0.67
173.37
0.4%
50,000
183.32
187.67
4.3.5
2.4%
47.50
45.00
-2.50
1.85
232.67
0.8%
C-3
I
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 1" METER
BASE RATE $ 35.48
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILL AT THE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
35.48
35.48
-
0.0%
0.00
0.00
0.00
0.00
35.48
0.0%
16,000
71.16
71.80
0.64
0.9%
15.20
14.40
-0.80
-0.16
86.20
-0.2%
27,000
95.69
96.77
1.08
1.1%
25.65
24.30
-1.35
-0.27
121.07
-0.2%
38,000
120.22
121.74
1.52
1.3%
36.10
34.20
-1.90
-0.38
155.94
-0.2
50,000
146.98
148.98
2.00
1.4%
47.50
45.00
-2.50
0
193.98
%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR IRRIGATION CUSTOMERS WITH A 1.5" METER
BASE RATE $ 70.95
COMMODITY RATE: TIER 1 = $ 2.27 FOR 0 - 35,000 GALLONS
TIER 2 = $ 3.10 FOR 35,001 - 80,000 GALLONS
TIER 3 = $ 4.23 FOR 80,001- 160,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 160,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILL ATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
70.95
70.95
-
0.0%
0.00
0.00
0.00
0.00
70.95
0.0%
38,000
158.03
159.70
1.67
1.1%
36.10
34.20
-1.90
-0.23
193.90
-0.1%
64,000
236.29
240.30
4.01
1.7%
60.80
57.60
-3.20
0.81
297.90
0.3%
90,000
321.11
332.20
7.05
2.2%
85.50
81.00
-4.50
2.55
413.20
0.6%
125,000
467.60
480.25
12.65
2.7%
118.75
112.50
-6.25
6.40
592.75
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 1.5" METER
BASE RATE $ 70.95
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
70.95
70.95
-
0.0%
0.00
0.00
0.00
0.00
70.95
0.0%
38,000
155.69
157.21
1.52
1.0%
36.10
34.20
-1.90
-0.38
191.41
-0.2%
64,000
213.67
216.23
2.56
1.2°%
60.80
57.60
-3.20
-0.64
273.83
-0.2%
90,000
271.65
275.25
3.60
1.3%
85.50
51.00
-4.50
-0.90
356.25
-0.3%
125,000
349.70
35,170
5.00
1.4%
118.75
112.50
-6.25
-1.25
467.20
-0.3%
C-4
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR IRRIGATION CUSTOMERS WITH A 2" METER
BASE RATE $ 113.53
COMMODITY RATE: TIER 1 = $ 2.27 FOR 0 - 56,000 GALLONS
TIER 2 = $ 3.10 FOR 56,001 - 128,000 GALLONS
TIER 3 = $ 4.23 FOR 128,001 - 256,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 256,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
113.53
113.53
-
0.0%
0.00
0.00
0.00
0.00
113.53
0.0°%
57,000
241.42
243.75
2.33
1.0%
54.15
51.30
-2.85
-0.52
295.05
-0.2%
128,000
455.13
463.85
8.72
1.9%
121.60
115.20
-6.40
2.32
579.05
0.4%
250,000
951.67
979.91
28.24
3.0%
237.50
225.00
-12.50
15.74
1,204.91
1.3%
325,000
1,354.90
1,402.73
47.83
3.5%
308.75
292.50
-16.25
31.58
1,695.23
1.9%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 2" METER
BASE RATE $ 113.53
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2 = N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
113.53
113.53
-
0.0%
0.00
0.00
0.00
0.00
113.53
0.0%
57,000
240.64
242.92
2.28
0.9%
54.15
51.30
-2.85
-0.57
294.22
-0.2%
128,000
398.97
404.09
5.12
1.3%
121.60
115.20
-6.40
-1.28
519.29
-0.2%
250,000
671.03
681.03
10.00
1.5%
237.50
225.00
-12.50
-2.50
906.03
-0.3%
325,000
838.28
851.28
13.00
1.6%
308.75
292.50
-16.25
-3.25
1,143.75
-0.3%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR IRRIGATION CUSTOMERS WITH A 3" METER
BASE RATE $ 227.05
COMMODITY RATE: TIER 1 = $ 2.27 FOR 0 - 112,000 GALLONS
TIER 2 = $ 3.10 FOR 112,001- 256,000 GALLONS
TIER 3 = $ 4.23 FOR 256,001- 512,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 512,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
227.05
227.05
-
0.0%
0.00
0.00
0.00
0.00
227.05
0.0%
50,000
338.55
340.55
2.00
0.6%
47.50
45.00
-2.50
-0.50
385.55
-0.1%
150,000
591.19
599.09
7.90
1.3%
142.50
135.00
-7.50
0.40
734.09
0.1%
300,000
1,089.33
1,113.81
24.48
2.2%
115.00
270.00
-15.00
9.48
1,353.81
0.7%
500,000
1,903.33
1,959.81
56.48
3.0%
475.00
450.00
-25.00
31.45
2,409.81
C-5
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 3" METER
BASE RATE $ 227.05
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILL AT THE
CURRENT
RATE
BILL AT THE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
227.05
227.05
-
0.0%
0.00
0.00
0.00
0.00
227.05
0.0%
50,000
338.55
340.55
2.00
0.6%
47.50
45.00
-2.50
-0.50
385.55
-0.1%
150,000
561.55
567.55
6.00
1.1%
142.50
135.00
-7.50
-1.50
702.55
-0.2%
300,000
896.05
908.05
12.00
1.3%
285.00
270.00
-15.00
-3.00
1, 178.05
-0.3%
500,000
1,342.05
1,362.05
20.00
1.5%
475.00
450.00
-25.00
-5.00
1,812.05 1
-0.3%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR IRRIGATION CUSTOMERS WITH A 4" METER
BASE RATE $ 354.77
COMMODITY RATE: TIER 1= $ 2.27 FOR 0 - 175,000 GALLONS
TIER 2 = $ 3.10 FOR 175,001 - 400,000 GALLONS
TIER 3 = $ 4.23 FOR 400,001- 800,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 800,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
354.77
354.77
-
0.0%
0.00
0.00
0.00
0.00
354.77
0.0°%
300,000
1,121.27
1,139.52
18.25
1.6%
285.00
270.00
-15.00
3.25
1,409.52
0.2%
550,000
2,032.77
2,084.02
51.25
2.5%
522.50
495.00
-27.50
23.75
2,579.02
0.9%
700,000
2,643.27
2,718.52
75.25
2.8%
665.00
630.00
-35.00
40.25
3,19152
1.2%
850,000
3,324.77
3,429.52
104.75
3.2°�
807.50
765.00
-42.50
62.25
4,194.52
1.5%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 4" METER
BASE RATE $ 354.77
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILL AT THE
CURRENT
RATE
BILL AT THE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
354.77
354.77
-
0.0%
0.00
0.00
0.00
0.00
354.77
0.0%
300,000
1,023.77
1,035.77
12.00
1.2%
285.00
270.00
-15.00
-3.00
1,305.77
-0.2%
550,000
1,581.27
1,603.27
22.00
1.4%
522.50
495.00
-27.50
-5.50
2,098.27
-0.3%
700,000
1,915.77
1,943.77
28.00
1.5°�
665.00
630.00
-35.00
-7.00
2,573.77
-0.3%
550,000
2,250.27
2,284.27
34.00
1.5%
807.50
765.00
-42.50
-8.50
3,049.27 1
-0.3%
C-6
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR RESIDENTIAL & IRRIGATION CUSTOMERS WITH A 6" METER
BASE RATE $ 709.54
COMMODITY RATE: TIER 1= $ 2.27 FOR 0 - 860,000 GALLONS
TIER 2 = $ 3.10 FOR 860,001 - 2,000,000 GALLONS
TIER 3 = $ 4.23 FOR 2,000,001- 3,500,000 GALLONS
TIER 4 = $ 5.76 FOR ALL USAGE OVER 3,500,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILL AT THE
CURRENT
RATE
BILL AT THE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
709.54
709.54
-
0.0%
0.00
0.00
0.00
0.00
709.54
0.0%
425,000
1,657.29
1,674.29
17.00
1.0%
403.75
382.50
-21.25
-4.25
2,056.79
-0.2%
1,000,000
3,048.74
3,095.74
47.00
1.5%
950.00
900.00
-50.00
-3.00
3,995.74
-0.1%
1:520:000
4,553.74
4,645.74
92.00
2.0%
1,425.00
1,350.00
-75.00
17.00
5,995.74
0.3%
2,000,000
6,058.74
6,195.74
137.00
2.3%
1,900.00
1,800.00
-100.00
37.00
7,995.74
0.5%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL & MULTIFAMILY CUSTOMERS WITH A 6" METER
BASE RATE $ 709.54
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2 = N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILL ATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNT OF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
709.54
709.54
-
0.0%
0.00
0.00
0.00
0.00
709.54
0.0%
425,000
1,657.29
1,674.29
17.00
1.0%
403.75
382.50
-21.25
-4.25
2,056.79
-0.2%
1,000,000
2,939.54
2,979.54
40.00
1.4%
950.00
900.00
-50.00
-10.00
3,879.54
-0.3°%
1,500,000
4,054.54
4,114.54
60.00
1.5%
1,425.00
1,350.00
-75.00
-15.00
5,464.54
-0.3%
2,000,000
5,169.54
5,249.54
80.00
1.5%
1,900.00
1,800.00
-100.00
-20.00
7,049.54
-0.3%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 8" METER
BASE RATE $ 1,135.26
COMMODITY RATE: TIER 1 =
$
2.27
FOR 0 - 860,000 GALLONS
TIER 2 =
$
3.10
FOR 860,001 - 2,000,000 GALLONS
TIER 3 =
$
4.23
FOR 2,000,001 - 3,500,000 GALLONS
TIER 4 =
$
5.76
FOR ALL USAGE OVER 3,500,000 GALLONS
GALLONS
USEDIN
1 MONTH
BILL AT THE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
1,135.26
1,135.26
-
0.0%
0.00
0.00
0.00
0.00
1,135.26
0.0%
425,000
2,083.01
2,100.01
17.00
0.8°%
403.75
382.50
-21.25
-4.25
2,482.51
-0.2°%
1,000,000
3,474.46
3,521.46
47.00
1.4%
950.00
900.00
-50.00
-3.00
4,421.46
-0.1%
1,500,000
4,979.46
5,071.46
92.00
1.8°1
1,425.00
1,350.00
-75.00
17.00
6,421.46
0.3°%
2,000,000
6,484.46
6,621.46
137.00
2.1%
1,900.00
1,800.00
-100.00
37.00
8,421.46
0.4%
C-7
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR COMMERCIAL AND MULTIFAMILY CUSTOMERS WITH A 8" METER
BASE RATE $ 1,135.26
COMMODITY RATE: TIER 1 = $ 2.27 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER4= N/A
GALLONS
USEDIN
1 MONTH
BILL ATTHE
CURRENT
RATE
BILL ATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
1,135.26
1,135.26
-
0.0%
0.00
0.00
0.00
0.00
- 1,135.26
0.0%
425,000
2,083.01
2,100.01
17.00
0.8%
403.75
382.50
-21.25
-4.25
2,482.51
-0.2%
1,000,000
3,365.26
3,405.26
40.00
1.2%
950.00
900.00
-50.00
-10.00
4,305.26
-0.2%
1,500,000
1 4,480.26
4,540.26
60.00
1.3%
1,425.00
1,150.00
-75.00
-15.00
5,890.26
-0.3%
2,000,000
5,595.26
5,675.26
80.00
1.4%
1,900.00
1,800.00
-100.00
-20.00
7,475.26
-0.39/
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 1.5" METER - RECLAIMED WATER USE
BASE RATE $ 70.95
COMMODITY RATE: TIER 1= $ 2.23 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILL AT THE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
70.95
70.95
-
0.0%
0.00
0.00
0.00
-
70.95
0.0%
50,000
180.95
182.45
1.50
0.8%
25.00
23.50
(1.50)
(0.00)
205.95
0.0%
135,000
367.95
372.00
4.05
1.1%
67.50
63.45
(4.05)
0.00
435.45
0.0°%
200,000
510.95
516.95
6.00
1.2%
100.00
94.00
(6.00)
-
610.95
0.0%
250,000
620.95
628.45
7.50
1.2%
125.00
117.50
(7.50)
-
745.95
0.0%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 2" METER - RECLAIMED WATER USE
BASE RATE $ 113.53
COMMODITY RATE: TIER 1 = $ 2.23 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILL ATTHE
CURRENT
RATE
BILL ATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
113.53
113.53
-
0.0%
0.00
0.00
0.00
-
113.53
0.0%
150,000
400.95
405.45
4.50
1.1%
75.00
70.50
(4.50)
-
475.95
0.0%
300,000
730.95
739.95
9.00
1.2%
150.00
141.00
(9.00)
-
880.95
0.0%
450,000
1,060.95
1,074.45
13.50
1.3%
225.00
111.50
(13.50)
-
1,285.95
0.0%
600,000
1,390.95
1,408.95
18.00
1.3%
300.00
282.00
(18.00)
-
1,690.95
0.0%
C-8
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 3" METER - RECLAIMED WATER USE
BASE RATE $ 227.05
COMMODITY RATE: TIER 1 = $ 2.23 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASEIN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
227.05
227.05
-
0.0%
0.00
0.00
0.00
-
227.05
0.0%
20,000
271.05
271.65
0.60
0.2%
10.00
9.40
(0.60)
0.00
281.05
0.0%
50,000
337.05
338.55
1.50
0.4%
25.00
23.50
(1.50)
-
362.05
0.0%
120:0002
447.05
450.05
3.00
0.7%
50.00
47.00
(3.00)
(0.00)
497.05
0.0%
150,000
557.05
561.55
HO
0.8%
75.00
70.50
(4.50)
-
632.05
0.0%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 4" METER - RECLAIMED WATER USE
BASE RATE $ 354.77
COMMODITY RATE: TIER 1 = $ 2.23 FOR ALL WATER USAGE
TIER 2= N/A
TIER 3= N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
354.77
354.77
-
0.0%
0.00
0.00
0.00
-
354.77
0.0%
150,000
684.77
689.27
4.50
0.7%
75.00
70.50
(4.50)
-
759.77
0.0%
300,000
1,014.77
1,023.77
9.00
0.9%
150.00
141.00
(9.00)
-
1,164.77
0.0%
450,000
1,344.77
1,358.27
13.50
1.0%
225.00
211.50
(13.50)
-
1,569.77
0.0%
600,000
1,674.77
1,692.77
18.00
1.1%
300.00
282.00
(18.00)
-
1,974.77
0.0%
TABLE FOR MONTHLY CHARGES AND PERCENT INCREASE COMPARISON
FOR CUSTOMERS WITH A 6" METER - RECLAIMED WATER USE
BASE RATE $ 709.54
COMMODITY RATE: TIER 1 = $ 2.23 FOR ALL WATER USAGE
TIER 2 = N/A
TIER 3 = N/A
TIER 4= N/A
GALLONS
USEDIN
1 MONTH
BILLATTHE
CURRENT
RATE
BILLATTHE
PROPOSED
RATE
AMOUNTOF
INCREASE
Water Rate
PERCENT
INCREASED
Water Rate
CURRENT
GPF
PROPOSED
GPF
INCREASE IN
GPF
TOTAL
MONTHLY
INCREASE
TOTAL
AMOUNTOF
MONTHLY
BILL
TOTAL
PERCENT
INCREASED
0
709.54
709.54
-
0.0%
0.00
0.00
0.00
-
709.54
0.0%
5,000,000
11,709.54
11,859.54
150.00
1.3%
2,500.00
2,350.00
(150.00)
-
14,209.54
0.0%
10,000,000
22,709.54
23,009.54
300.00
1.3°%
5,000.00
4,700.00
(300.00)
-
27,709.54
0.0%
15,000,000
33,709.54
34,159.54
450.00
1.3%
7,500.00
7,050.00
(450.00)
-
41,209.54
0.0%
20,000,000
44,709.54
45,309.54
600.00
1.3%
10,000.00
9,400.00
(600.00)
-
54,709.54
C-9
I
I
I
I
APPENDIX D
Other Service Fees & Charges
D-1 Security Deposits
D-2 Proposed Meter Installation Fees
D-3 Supporting Documentation for Meter Installation Fees
SERVICE FEES AND CHARGES
Proposed Security Deposits
Purpose: To reduce the Utility's financial loss when tenants and landlords
leave their premises with unpaid balances on the accounts.
Current Proposed
Non -Property Owner Accounts $100.00 $150.00
Landlord Accounts $50.00 $75.00
NOTES:
There are no proposed changes to the single family residential owner occupied accounts.
There are no proposed changes to the commercial, multifamily or construction accounts.
D-1
SERVICE FEES AND CHARGES
Proposed Meter Installation Fees
Purpose: To provide the Utility a means of recovering labor and material costs related
to installing water meters.
Costs: The costs related to installing water meters include staff labor, water meters
and travel. Refer to page D-3 for an itemized decription of all costs.
r
Due to increased costs to perform this service, it is recommended that the Meter Installation
Fees increase as shown:
Proposed Meter Installation Fees
Meter Size
Meter Type
Current Fees
Proposed Fees
5/8 x 3/4
standard
$
296.00
$
299.25
3/4 x 3/4
standard
$
296.00
$
312.75
1
standard
$
370.00
$
376.75
1.5
irrigation (turbine) T2
$
1,105.00
$
1,111.73
1.5
high use (compound) C2
$
1,568.00
$
1,571.73
2
irrigation (turbine) T2
$
1,280.00
$
1,261.73
2
high use (compound) C2
$
1,795.00
$
1,792.63
3
irrigation (turbine)
$
1,575.00
$
1,637.33
3
high use (compound)
$
2,224.00
$
2,222.33
4
irrigation (turbine)
$
2,868.00
$
3,038.37
4
high use (compound)
$
3,758.00
$
3,745.37
6
irrigation (turbine)
$
5,093.00
$
5,442.85
6
high use (compound)
$
6,452.00
$
6,442.85
8
irrigation (turbine)
$
7,635.00
$
8,398.60
8
high use (compound)
N/A
$
9,698.60
Meter installation fees are paid by developers at the time a new meter is purchased.
Meter installation fees are subject to 8.1% sales tax.
The proposed fees include the cost of meter plus labor costs to install.
D-2
I
I
I
I
Service Fees and Charges
Supporting Documentation for Proposed Meter Installation Fees:
Total
Labor
Total
Total
Meter
FTEs
Hours to
Cost
Labor
Labor &
Meter Size
Meter Type
Meter
AMI Equip.
Costs
Req'd
Install
Per Hour
Costs
Materials
5/8 x 3/4
standardiPerl
$ 122.50
$
151.00
$ 273.50
1
1.00
$
25.75
$ 25.75
$ 299.25
3/4 x 3/4
standardiPerl
$ 136.00
$
151.00
$ 287.00
1
1.00
$
25.75
$ 25.75
$ 312.75
1
standard iPerl
$ 200.00
$
151.00
$ 351.00
1
1.00
$
25.75
$ 25.75
$ 376.75
1.5
irrigation (turbo) Omni T2
$ 850.00
$
151.00
$ 1,001.00
2
2.15
$
25.75
$ 110.73
$ 1,111.73
1.5
high use (compound) Omni C2
$ 1,310.00
$
151.00
$ 1,461.00
2
2.15
$
25.75
$ 110.73
$ 1,571.73
2
irrigation (turbo) Omni T2
$ 1,000.00
$
151.00
$ 1,151.00
2
2.15
$
25.75
$ 110.73
$ 1,261.73
2
high use (compound) Omni C2
$ 1,500.00
$
151.00
$ 1,651.00
2
2.75
$
25.75
$ 141.63
$ 1,792.63
3
irrigation (turbo) Omni T2
$ 1,315.00
$
151.00
$ 1,466.00
2
2.75
$
31.15
$ 171.33
$ 1,637.33
3
high use (compound) Omni C2
$ 1,900.00
$
151.00
$ 2,051.00
2
2.75
$
31.15
$ 171.33
$ 2,222.33
4
irrigation (turbo) Omni T2
$ 2,593.00
$
151.00
$ 2,744.00
3
3.15
$
31.15
$ 294.37
$ 3,038.37
4
high use (compound) Omni C2
$ 3,300.00
$
151.00
$ 3,451.00
3
3.15
$
31.15
$ 294.37
$ 3,745.37
6
irrigation (turbo) Omni T2
$ 4,700.00
$
151.00
$ 4,851.00
4
4.75
$
31.15
$ 591.85
$ 5,442.85
6
high use (compound) Omni C2
$ 5,700.00
$
151.00
$ 5,851.00
4
4.75
$
31.15
$ 591.85
$ 6,442.85
8
irrigation (turbo)
$ 7,500.00
$
151.00
$ 7,651.00
4
6.00
$
31.15
$ 747.60
$ 8,398.60
8
high use (compound) Omni C2
$ 8,800.00
$
151.00
$ 8,951.00
4
6.00
$
31.15
$ 747.60
$ 9,698.60
Assumptions:
Sensus Meter & AMR equipment costs quoted by Dana Kepner 11/22/13.
Average hourly rate for an Operator I is $18.05 per hour plus benefits of $7.70 per hour.
Average hourly rate for an Opertor 2 and above is $22.95 per hour plus benefits of $8.20 per hour.
Hours to install includes travel time of 15 minutes each way.
Use of iPerl meters for 5/8, 3/4 and 1-inch are proposed because of the following reasons:
iPerl meters meansure flow as low as .03 gpm and up to 25 gpm (for 5/8-inch)
The current meters being used measure flow from .25 gpm and up to 20 gpm
The iPerl meter contain no moving parts & have a 20-year life
The current meters being used contain moving parts & have a 10-year life
Use of Omni meters for 1.5 and 2-inch meters are proposed because of the following reasons:
C2 meters measure flow as low as .5 gpm and up to 200 gpm
The current meters being used measure flow from 2 gpm to 200 gpm
T2 meters measure flow as low as 1.25 gpm up to 200 gpm (1.5-inch)
The current meters being used measure flow from 4 gpm to 120 gpm
T2 meters measure flow as low as 1.5 gpm up to 200 gpm (2-inch)
The current meters being used measure flow from 4 gpm to 160 gpm
Additionally C2 & T2 meters can be tested without removing the meter and has data logging
capability to record up to 31 days of of water use on an hourly basis.
D-3
APPENDIX E
5-Year Capital Improvement Schedules
E-1 Operating Fund
E-2 Groundwater Preservation Fee
E-2 Alternative Water Resource Development Impact Fee Fund
E-2 Potable Water System Development Impact Fee Fund
I
I■I
Il
I
I
I
Water Utility Operating Fund
Existing System Capital Improvements
Project No.
Project Name
2014-2015
2015.2016
1 2016-2017
1 2017-2018
1 2018-2019
1 5 YearTotal
1
Steam Pump Drill and Construct
$ 600,000
$
800,000
$
1,400,000
2
Well E2 Upgrade
$
100,000
$
100,000
3
Hydropneumatic Tank Replace.
$
60,000
$
60,000
4
Replace Well Pumps -
$
75,000
$
75,000
$
150,000
Subtotal
$
-
$
60,000
$
175,000
$ 600,000
$
875,000
$
1,710,000
Reservoirs
5
EI Con Storage - Ops. Improve.
$ 50,000
$
50,000
6
r
Big Wash Reservoir Coating
$
100,000
$
100,000
btotal
$
-
$
-
$
100,000
$ 50,000
$
-
$
150,000
Boosters
7
Energy Efficiency Bstr. Upgrades
$
150,000
$
100,000
$
250,000
8
Deer Run Booster PRV Installation
$
40,000
$
40,000
9
Hydropneumatic Tank Replace.
$
20,000
$
60,000
$ 60,000
$
140,000
10
Reclaimed Bstr. & Pump Replace.
$
200,000
$
200,000
Subtotal
$
150,000
$
120,000
$
300,000
$ 60,000
$
-
$
630,000
Mains
11
W. Lambert Ln. 12" Main Relo
$
75,000
$
350,000
$
425,000
12
Naranja Shannon / La Cholla Main Relo
$
50,000
$
50,000
13
Tangerine Shannon/ La Canada Main Relo
$
75,000
$
100,000
$
175,000
14
Relocate 3 PRV'S OV Area
$
100,000
$
100,000
15
New Tto D" 6Inch PRV Cliff Dweller
$
60,000
$
60,000
16
Rancho Verde Hydrants
$
200,000
$
200,000
17
Main Valve Replacements
$
50,000
$
50,000
18
ICS1 to CS2 12 Inch Main Replace.
$
500,000
$
500,000
19
El Con. Patio Homes/Casitas Main Repl-
$
100,000
$
100,000
20
System Connection Upgrades
$
100,000
$
100,000
$
200,000
Subtotal
$
910,000
$
550,000
$
300,000
$ -
$
100,000
$
1,860,000
Structures & Walls
21 ISecurity
Walls
$
75,000
$
75,000
Subtotal I
$
-
$
-
$
-
$ -
$
75,000
$
75,000
Meters & Equipment
22
AMI Meter Replacement - Oro Valley
$
2,200,000
$ 1,800,000
$
4,000,000
23
Machinery & Equipment
$
103,020
$
98,000
$
91,000
$ 69,000
$
361,020
24
SCADA server and monitors
$
50,000
$
50,000
25
SCADA Legacy Replacement
$
100,000
$
100,000
26
Golf Course Metering Stations Mod.
$
50,000
$
50,000
Subtotal
$
2,303,020
$ 1,898,000
$
91,000
$ 69,000
$
200,000
$
4,561,020
Vehicles
27
Meters Vehicles
$
70,000
$
45,000
$
115,000
28
Distribution Vehicles
$
85,000
$
70,000
$
50,000
$
205,000
29
Production Vehicles
$
30,000
$
50,000
$ 70,000
$
150,000
30
Director Vehicle
$
35,000
$
35,000
31
Pool Vehicles
$
25,000
$
25,000
$
50,000
32
Backhoe & Trailer
$
119,000
$
119,000
33
On Call Service Truck s
$
90,000
$
90,000
Subtotal
$
234,000
$
155,000
$
230,000
$ 70,000
$
75,000
$
764,000
Total Existing System Improvements
$
3,597,020
$ 2,783,000
$ 1,196,000
$ 849,000
$ 1,325,000
$
9,750,020
E-1
Groundwater Preservation Fee Revenue
Renewable Water Capital Projects
Project No. Project Name
2014-2015
2015-2016 1 2016-2017
2017-2018 2018-2019 1 5 Year Total
1
241nch Reclaim Main Tangerine (DIS) RTA
$ 100,000
$ 350,000
$ 450,000
Total Expansion Related Capital Improvements
$ 100,000
$ 350,000 $ -
$ - $ - $ 450,000
Alternative Water Resources Development Impact Fee Fund
CAP Water Capital Projects
Project No. Project Name 2014-2.015 2015-2016 2016-2017 2017-2018 2018.2019 5 Year Total
1
CAP La Cholla D-E Blending Booster Statioi
700,000
$ 700,000
2
CAP Wheeling TW Naranja 1000 AF/Yr
$ 400,000
$ 400,000
$ 800,000
3
24" pipe Naranja/ La Cholla/Tangerine
$ 1,600,000
$ 1,600,000
4
TW Naranja Booster Station Upgrade
$ 1,200,000
$ 1,200,000
5
TW Oasis Booster Station Upgrades
$ 30,000
$ 30,000
6
TW 12" Pipe
$ 80,000
$ 80,000
7
TW 16" Pipe Oasis Rd.
$ 100,000
$ 100,000
Total Alternative Water Capital Improvements $ 700,000 1 $ -Is - $ 400,000 1 $ 3,410,000 1 $ 4,510,000
Potable Water System Development Impact Fee Fund
Expansion Related Capital Projects
Project No. Project Name
2014-2015 2015-2016
2016-2017
2017-2018
2018-2019
5 Year Total
Total Expansion Related Capital Improvements
$ - $ -
$ -
$ -
$ -
$
r
E-2