HomeMy WebLinkAboutPackets - Council Packets (1519)Budget Study Sessions
FY 2020-21 Recommended Budget
May 27 and 28, 2020
Order of Presentations
Budget Snapshot Review
Budget Adoption Process
Preliminary 5-Year Forecast
Public Works
Police
Community and Economic Development
Parks and Recreation
Water
Administrative functions
Capital
2
Budget Snapshot
FY 2020/21 Town Manager’s Recommended Budget
Recommended Budget total = $100.9 M
$10.1 M, or 9.1%, decrease from
FY19/20 adopted budget
General Fund is 3.7% less than last year
$2.3 M in planned use of excess
reserves; $900,000 for capital
Ending fund balance is $14.8M (35.8% of
budget), leaving $4.7 above Town
Council 25% reserve policy
$5 M in contingency included in General
Fund
3
Budget Adoption Process
David Gephart, CFO
Budget Defined
A budget is a financial plan or estimate of all Resources
and Requirements .
A financial representation projecting Activities/Operations
during a fiscal year.
Each budget looks to the future and tells a “story” through
what expenditures will accomplish.
Budgets are also a prioritization document.
5
The Need for a Budget
Establishes the legal authority for a local government to
spend money (called “appropriations”)
Required by Arizona Revised Statute
Provides accountability to the taxpayer
Facilitates the efficient and effective use of limited
resources .
6
Developing a Budget
Teamwork is required
Requirements Drive Resources
OR
Resources Drive Requirements
Conservatism
7
Developing a Budget
Town-
Wide
Budget
Summary
Summaries by Department/Category/Fund
Detail by Line Item
8
Budgetary Control
All local governments must establish a “legal level of
budgetary control”
For the Town of Oro Valley, the legal level of budgetary control is
established at the Fund level
Provides management flexibility and efficiency, while protecting
the government from over-expenditure violations
Establishes the budgetary amounts that are reported on and
compared against actual expenditures in the Comprehensive
Annual Financial Report
9
Balanced Budget Required
Can be defined a number of ways depending on the
financial policies of the local government:
Resources = Requirements (the minimum)
Deficit budget
Surplus budget
Revenues = Expenditures
Operating revenues = Operating Expenditures
Etc.
10
Budget Cycle
Proposals
Requested/
Received
Proposals
Scored/
Graded
Preliminary
Budget
Developed &
Presented
Public
Input
Budget
Approved/
Adopted
Budget
Monitoring
Throughout
Year
Budget
Amendments
Throughout
Year
11
Role of elected officials
Local elected officials are advocates and gatekeepers
Allocate local government resources to best serve the
public
Keep taxes down and also deliver services that voters
expect
Have direct involvement in budget/policy/strategic
direction and participation in public hearings
Meet with Town leadership
12
Lower revenues mean fewer resources
Always a degree of uncertainty in budget process
Planned expenditures have to be balanced against
anticipated revenues
If the revenues do not meet expectations, adjustments
have to be made to reduce spending
If revenues exceed expectations, extra funds will be
available
Results of budget reductions affect Town operations
13
Resources
Beginning Fund Balance (Carryover)
Revenues
Transfers in
14
Revenues
Primary source of income for Town is Sales Taxes
State Revenue Sharing
Grants
Investment Income
Debt Issuances
Fees and taxes for services (Parks, permits, utility taxes,
etc.)
Other miscellaneous (donations, etc.)
15
Requirements
Expenditures
Transfers out
Contingency
Ending Fund Balance (Carryover)
Can include reservations of Fund Balance
16
Expenditures
Grouped by either Category or Function, and can include
the following:
Personnel
Operations & Maintenance
Debt Service (Principal & Interest on all Debt)
Capital Outlay
General Government
Public Safety
Transit
Culture & Recreation
17
One time vs. ongoing
Personnel
Operations & Maintenance
Capital Outlay
Debt Service
18
Personnel
A majority of the annual budget is typically allocated to
personnel expenses
Personnel costs include much more than the advertised
salaries
Includes fringe benefits, such as:
Retirement contributions
Health benefits
Worker's compensation
Life insurance
Social Security and Medicare
19
Operations & Maintenance (O&M)
Covers the basic expenditures that support the day-to-day
operations, such as:
New and replacement uniforms/protective clothing
Fuel and utilities
Telephone/cell phone charges
Hardware and software
Vehicle and facility maintenance
Training of employees
Office Supplies
Printing and Advertising
Usually allocated in categories that allow for some
flexibility
Typically the first area to be cut back
Need to account for items that require replacement
within the upcoming fiscal year
Includes operating capital of durable items below $50K 20
Capital Outlay
Purchase of durable items and assets
Cost more than $50,000
Will last for more than one budget year
Inventory record documents purchase price, source, assignment, and
disposal of capital items
Vehicles are part of the Town’s capital budget
21
Contingency
Is strictly a budgetary account meaning no actual costs are
posted against it
Protects governments for the “unexpected”
Natural disasters
Economic distress
Provides flexibility to take advantage of opportunities
Requires Town Council approval
22
Capital Improvement Plan (CIP)
Annually updated ten -year planning document for major
capital expenses having high community visibility
Runs concurrently with budget process
Includes all items associated with the investment,
including source of funding and operating impact on the
budget
The first year is the most important year of the document
because it directly feeds the budget
23
Budget Monitoring
Critical to ensure that actual < budgeted expenditures
Provides managers/directors the opportunity to manage
their respective budgets throughout the year and make
necessary adjustments
Provides a basis for developing next year’s budget
Some budget adjustments or reallocations may require
Town Council approval (ie. Contingency, supplemental
budgets, transfers between funds, etc.)
24
PRELIMINARY
Five-Year Forecast
General Fund and Highway Fund
Wendy Gomez
Finance and Budget Administrator
Forecast Overview
Required per adopted financial policies
PRELIMINARY forecast -will be updated in late fall when more
data on COVID impacts are available
Snapshot based upon current known information
Serves as foundation for future budgets
Sources: University of Arizona, AZ Dept. of Revenue, Joint
Legislative Budget Committee, State Finance Advisory
Committee, AZ Dept. of Transportation, as well as the
knowledge, expertise and professional judgment by Town
management and staff
26
General Fund Revenue Assumptions
COVID impacts cause a continued slump of retail, restaurant/bar,
and bed tax heading into FY 21/22
Construction sales tax and building permit revenues see earlier
rebound
Pent-up demand in residential and commercial building activity; buyers market?
Effect of buildout plays a part towards tail end of forecast, but that could be
extended
Two-year lag for State shared income tax extends impact on
revenues
Assumes normal development and recreation fee increases
200 –400 SFR permits per year
No annexations included
27
General Fund Expenditure Assumptions
Merit increases of 2.5% -3% and step increases included each year
after FY 20/21
Increased pension contribution costs
Health insurance premiums assume normal increases with gradual
transition towards increased employee coverage of dependent costs
Forecast includes some capacity, albeit limited, for potential new FTEs
CARES act capacity of $1M included in FY 20/21; removed thereafter
Pent-up O&M needs assumed in near term (after FY 20/21)
Utilizing vehicle reserve/set-aside balances for replacements
Continued funding of facility repair and maintenance program
Forecast includes continued commitment to capital investment at 5%
of projected sales tax collections
Forecast preserves Council’s 25% fund balance reserve policy 28
General Fund Forecast
29
General Fund Revenues
Town of Oro Valley
Five-Year Forecast
PRELIMINARY
FY 20/21
Recommended
FY 21/22
Projected
FY 22/23
Projected
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
Beginning Fund Balance 17,157,346 14,819,218 12,132,024 11,452,263 11,586,123 11,654,651
REVENUES
Taxes 18,128,304 19,428,421 22,148,364 22,697,958 22,835,923 23,615,697
State Shared Revenue 13,194,438 12,502,522 12,488,661 14,121,931 15,070,210 15,890,585
Charges for Services 2,239,675 2,503,987 2,820,905 2,946,090 3,036,079 3,130,799
Licenses & Permits 1,592,500 2,288,650 2,796,679 2,460,316 2,348,132 2,207,773
Intergovernmental 1,672,000 1,745,720 1,895,423 1,932,189 1,969,680 2,007,907
Grants 1,579,816 584,532 590,377 596,281 602,244 608,266
Miscellaneous 262,500 275,625 303,188 309,251 315,436 321,745
Fines 125,000 128,750 132,613 136,591 140,689 144,909
Interest Income 150,000 187,500 234,375 292,969 322,266 338,379
Transfers In 120,000 120,000 120,000 120,000 120,000 120,000
Total Revenues 39,064,233 39,765,707 43,530,585 45,613,576 46,760,659 48,386,060
GENERAL FUND
30
General Fund Expenditures
Town of Oro Valley
Five-Year Forecast
PRELIMINARY
FY 20/21
Recommended
FY 21/22
Projected
FY 22/23
Projected
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
Beginning Fund Balance 17,157,346 14,819,218 12,132,024 11,452,263 11,586,123 11,654,651
EXPENDITURES
Personnel 28,909,163 29,880,797 30,894,845 31,715,917 32,544,973 33,313,801
O&M 10,025,678 9,865,849 10,406,244 10,791,782 11,164,751 11,448,897
Capital Outlay 738,000 575,000 585,000 585,000 590,000 610,000
Transfers Out 1,729,520 2,131,255 2,324,257 2,387,017 2,392,407 2,429,655
Total Expenditures 41,402,361 42,452,901 44,210,346 45,479,716 46,692,131 47,802,353
Surplus/Deficit (2,338,128) (2,687,194) (679,761) 133,860 68,528 583,707
Ending Fund Balance 14,819,218 12,132,024 11,452,263 11,586,123 11,654,651 12,238,358
Reserve as % of Expenditures 35.8%28.6%25.9%25.5%25.0%25.6%
GENERAL FUND
31
Highway Fund Revenue Assumptions
Near -term boost in HURF revenues after FY 20/21 due to pent -
up demand and economic recovery
Growth averages 3% per year in tail -end of forecast consistent with ADOT
projections
HURF forecast assumes preservation of State public safety fee
or other replacement funding, should fee be discontinued
Reimbursement from Regional Transportation Authority for
contract administration of La Cholla project ends after FY
20/21 (subject to project timeline; corresponds with personnel
reduction for temporary staff)
32
Highway Fund Expenditure Assumptions
Personnel budget increases consistent with General Fund
Reduction in FY 21/22 corresponds to completion of La Cholla project
O&M assumptions consistent with General Fund
Utilizing vehicle reserve/set -aside balances for replacements
Pavement preservation funding of $1.4 million to $1.8 million
per year maintains current overall condition index (OCI) rating
Other capital funding consistent with CIP 10 -year plan
Shannon Road construction project timeline assumed over two fiscal years
Fund balance ranges from $450 to $1.6 million
33
Highway Fund Forecast
34
Highway Fund Revenues
Town of Oro Valley
Five-Year Forecast
PRELIMINARY
FY 20/21
Recommended
FY 21/22
Projected
FY 22/23
Projected
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
Beginning Fund Balance 612,883 367,599 145,657 453 622,450 1,110,450
REVENUES
State Shared Revenue 3,458,929 3,977,768 4,395,434 4,527,297 4,663,116 4,803,009
Grants 210,000 - - - - -
Licenses & Permits 25,000 28,750 31,625 28,463 27,039 25,687
Interest Income 5,000 6,250 7,813 9,766 10,742 11,279
Miscellaneous 2,000 2,100 2,310 2,356 2,403 2,451
Total Revenues 3,700,929 4,014,868 4,437,182 4,567,882 4,703,300 4,842,426
HIGHWAY FUND
35
Highway Fund Expenditures
Town of Oro Valley
Five-Year Forecast
PRELIMINARY
FY 20/21
Recommended
FY 21/22
Projected
FY 22/23
Projected
FY 23/24
Projected
FY 24/25
Projected
FY 25/26
Projected
Beginning Fund Balance 612,883 367,599 145,657 453 622,450 1,110,450
EXPENDITURES
Personnel 1,387,651 1,173,597 1,206,967 1,239,957 1,273,880 1,308,761
O&M 648,062 712,868 748,513 785,940 809,517 833,801
Capital Outlay 1,910,500 2,350,345 2,626,906 1,919,988 2,131,903 2,238,558
Total Expenditures 3,946,213 4,236,810 4,582,386 3,945,885 4,215,300 4,381,120
Surplus/Deficit (245,284) (221,942) (145,204) 621,997 488,000 461,306
Ending Fund Balance 367,599 145,657 453 622,450 1,110,450 1,571,756
HIGHWAY FUND
36
We’ll be back in 10 minutes (7:40)
FY 2020-21 Recommended Budget
May 27 and 28, 2020
Public Works Department
Paul Keesler, Director
Public Works -Awards
In the category of Transportation
Projects less than $5 million 39
Functional Areas
Department Overview
Administration
Highway Fund
Transportation Engineering
Street Maintenance
Fleet and Facility Maintenance
Stormwater Utility Fund
Transit Services
40
Administration –General Fund
Highlights & Accomplishments
Obtained ADOT’s commitment to rehabilitate Oracle Road
Pima County rehabilitation of Calle Concordia
Construction of Naranja Park Playground site infrastructure
Oversight to over 100 completed projects
Implementation of Town wide Traffic Safety Committee
Created Continuity of Operations Plan (COOP)
Primary Duties & Structure
General Department wide administration
Office of the Director/Town Engineer/ Floodplain
Administrator. Includes Assistant Director and Administrative
Coordinator.
Streets Operations Staff –Maintains over 400 lane miles of
public streets, which includes:
Upcoming Goals & Objectives
Support the efforts of RTA Next
Creation of a CIP Management committee
Department operational review to identify and implement
Town process improvement tools
Support ADOT’s Oracle Rd. rehabilitation efforts
FY19/20 –FY20/21 Strategic Leadership Plan
Focus Area 4: Roads, Water and Town Assets
Goal 4A: Support investments and strategies
that maintain and enhance a quality,
integrated and connected
transportation network for the
community.
OBJECTIVES:
Explore the feasibility of partnering with the
Arizona Department of Transportation to
improve Oracle Road pavement conditions
and traffic signal coordination.
Partner with the Regional Transportation
Authority (RTA) in evaluating long -term
transportation needs for future RTA
continuation, ensuring Oro Valley’s needs
are fairly represented.Pavement Crack
Sealing
Sidewalk repairs
Vegetation
maintenance
Minor street
reconstruction
Shouldering
Pothole prevention
& maintenance
Street sweeping
Capital
Improvement
Projects Noteworthy General Fund Budget
Variance from FYF20 to FY21
24.2% decrease in O&M due to:
decrease in general liability insurance
Greatly reduced travel & training
Minor utility cost reductions, efficiency
improvements 41
Transportation Engineering –Highway & PAG/RTA Funds
Highlights & Accomplishments
Continued and accelerated construction on the La Cholla
Boulevard roadway widening project –First pavement
lift done
Shannon Road Design
Via De La Verbenita cul -da-sac rehabilitation
La Canada Drive & Moore Road Roundabout
Tangerine Road safety access (Safeway Vistoso Plaza)
Pusch View Lane Mill/Overlay pavement
La Canada @ Canada Hills Rectangular Rapid Flashing
Beckons (RRFB) Crosswalk
Annual main line striping
Maintained a pavement overall condition index (OCI) of
76.95.
Primary Duties
Manage all road construction projects
Issue ROW Permits
Review and Inspect all public streets constructed or
altered by others
Manage and operate 21 traffic signals –24/7/365
Regional roadway and traffic signal coordination with
RTA
Asset Management
• Bridges • Traffic Signals • Signs
• Street Marking • Pavement Condition
FY19/20 –FY20/21 Strategic
Leadership Plan
Focus Area 4: Roads, Water and Town
Assets
Goal 4A: Support investments and
strategies that maintain and
enhance a quality, integrated
and connected transportation
network for the community.
OBJECTIVES:
Maintain an Overall Condition
Index (OCI) rating of 76 for all
paved streets.
Upcoming Goals & Objectives
Continue Pavement Preservation –maintain
OCI of 76 or greater
Complete the La Cholla Blvd. Widening
Project
Lambert Ln. Pavement Overlay from Lambert
Park to La Cholla
La Canada Blvd. Safety Improvements
PAG TABY Art Project
Equipment replacements 42
Street Maintenance –Highway Fund
Street Maintenance within the Highway
Fund is for O&M only and includes:
ADC Funding
Outside professional services, such as weed
spraying abatement
Waste Disposal
Materials, such as asphalt, aggregate base, crack
seal, etc.
Equipment rentals
Field supplies –material handling consumables
Street Maintenance staff are funded
under Administration within the General
Fund.
Since Highway Fund revenue sources are
restricted to roads only –placing staff in
Administration, which is funded by the
General Fund, allows work outside the
roadway, such as the Naranja Playground
construction project.
FY19/20 –FY20/21 Strategic Leadership Plan
Focus Area 4: Roads, Water and Town Assets
Goal 4A: Support investments and strategies that
maintain and enhance a quality, integrated and
connected transportation network for the
community.
OBJECTIVES:
Maintain an Overall Condition Index (OCI) rating of
76 for all paved streets.
Highlights & Accomplishments
Over 80 sidewalk and curb repairs
Annual crack sealing over 25 lane miles
(over 90,000 LBS)
Shouldering material placement
Upcoming Goals & Objectives
Returning to regular maintenance
activity volume upon completion of the
NTP Playground
Resuming ADC and restore 100% of all
ROW landscaping maintenance to Pre-
COVID conditions 43
Fleet & Facility Maintenance –General Fund
Highlights & Accomplishments
PWCED Front Counter Safety Remodel
Police Department Substation and Evidence Facility
completion
Town Campus Roof Renewal Project
PD Property Room Renovation
680 electrical system assessment
Sound abatement of select offices in the
Administration building.
Aquatic Center Restroom Floor Resurfacing
Aquatics Center interior and exterior painting
Community Center emergency structural beam
repair
Hopi Room improvements
Canada Golf Maintenance electrical assessment
PD Main sally port evaporative cooler replacement
Town Admin Restroom Renovation -Exterior
Community Center Fire Suppression system
emergency repair
Development of a Preventative Maintenance
program with in Cartegraph OMS.
Building C (Modular) flooring replacement
680 Fuel Island –Canopy light shield structures
FY19/20 –FY20/21 Strategic Leadership Plan
Focus Area 4: Roads, Water and Town Assets
Goal 4A: Support investments and strategies that
maintain and enhance a quality,
integrated and connected transportation
network for the community.
OBJECTIVES:
Integrate the capital asset replacement and
maintenance plan into the Town’s capital
improvement program.
Identify ways in which the Town can further
reduce its consumption of energy
Library boiler repair assessment
Community Center electrical system emergency
repair
PD main station soffits stabilization
Fleet Management Plan for use of 3rd Bay @ 680
Calle Concordia
Developed new preventative fleet maintenance
schedule within Cartegraph to decrease the labor
hours attributed to manual processing.44
Fleet & Facility Maintenance –General Fund
Primary duties
Annual contract management and
inspections
Elevators, Custodial, HVAC, Supplies, Library, Fire
and General Facility Management
Project construction management
All facility asset management -troubleshoot,
maintain, and repair
Routine repairs and daily operations of
164,000 sf over 26 buildings
All fleet/equipment asset management -
troubleshoot, maintain, and repair
Develop and implement a preventative
maintenance program
Fabrication work
Inspect and maintain fuel island for
damage/repair needs
Respond to emergency breakdowns
Vehicle registrations
Prepare vehicles for auctions
Work with procurement on new vehicles
Upcoming Goals & Objectives
680 Roof Replacement
Aquatic center painting
Council Chambers bollards
CRC Golf and Overlook stairs
Town Hall campus exterior painting
Administration Building
CRC aerobics floor refinish
PD Main Privacy Fence
PW MOC Security Gate
Above is just a sampling of the
larger anticipated projects
All cosmetic projects were
removed, the projects to
accomplish will either be related
to safety or to asset management.
Noteworthy General Fund Budget
Variance from FY20 to FY21
11.1% increase in O&M due to continued
necessary facility maintenance activities 45
Stormwater Utility Fund
Highlights & Accomplishments
Revised the Drainage Criteria Manual to
submit to stakeholders
Further developed the ten -year capital
improvement program for Stormwater
Developed the stormwater pollution
prevention plan (SWPPP) inspection &
tracking program
Further developed the Municipal Separate
Strom Sewer System (MS4) program
Further developed town wide stormwater
asset inspections and tracking system
Submitted Pre-Disaster Mitigation Grant
(PDM) application for Highland Wash
Completed Highland, North Ranch, and
Carmack Wash Watershed Studies with
our partners at Pima County Regional
Flood Control District
Completed Arizona Disaster Emergency
Mitigation Assistance Grant (ADEMA) of
$220K for Lambert Lane drainage CIP
project Phase 2
FY19/20 –FY20/21 Strategic Leadership Plan
Focus Area 5: Land Use
Goal 5A: Ensure quality development with
integrated architecture and natural
open space while maintaining and
enhancing the character of the
community.
OBJECTIVES:
Update the Drainage Criteria Manual in the
Town’s Stormwater Code and Floodplain
Ordinance to incentivize commercial
property maintenance of drainage facilities
and minimize pollutant runoff.
Noteworthy Utility Fund Budget
Variance from FY20 to FY21
98.2% decrease in Capital Outlay due to
removal of the two Grant funded projects
100% decrease in projected Grant
revenue due to the removal of these two
projects
8.5% decrease in O&M due to reductions
in outside professional services 46
Stormwater Utility Fund
Primary duties
Floodplain administration
Drainage reviews
Increased street sweeping and cleaning of town sewer catch basins
Detection and removals of illicit discharge of pollutants to the storm sewer system
Planning, construction, and maintenance of stormwater management structures
Development of good housekeeping practices and pollution prevention plans for
Town properties and infrastructure
Implementation of stormwater outreach programs to residents, businesses, and
developers
MS4 Permit administration and reporting
Perform all regulatory inspections of assets and Stormwater Pollution Prevention
Plan (SWPPP) of all active construction sites
Monsoon preparation
Upcoming Goals & Objectives
Coordinate the new Drainage Criteria Manual with outside stakeholders and adopt
Implement 2020 ADEQ Construction General Permit update requirements
Complete construction documents for Sierra Wash drainage improvements
Complete hydraulic and hydrologic study for Mutterer Wash
Inspect 50% of Town owned drainage infrastructure
Complete drainage study reviews as needed from CED 47
Transit Services –RTA/General Fund
Highlights & Accomplishments
Successfully awarded state grant funds ADOT 5310 program to reimburse
lift preventative
Maintenance
Prior to COVID-19 pandemic -increased ridership by an average of 150
riders per month from 2019
Prior to COVID-19 pandemic -decreased mileage per month by an average
of 300 miles from 2019
Improved accident prevention rate from 1 per 47k miles (2019) to 1 per
65k miles (2020)
Primary duties
Provide transportation mobility for seniors, passengers with disabilities
and general public
Grant administration for vehicle purchases
Partners with the Regional Transportation Authority as the primary
funding source
Upcoming Goals & Objectives
Restore ridership to pre-COVID volume and increase community
confidence in Transit.
Continue to receive state 5310 grant funds
Continue the partnership with the RTA and support efforts for RTA Next 48
Roadway Development Impact Fee Fund
Highlights & Accomplishments
CIP Funding –La Cholla Blvd Construction (partial)
CIP Funding –La Canada & Moore Road Roundabout
Noteworthy Fund Budget Variance from FY 19/20 to FY 20/21
The FY 19/20 budget anticipated that both the Moore/La Canada Roundabout
as well as the Town’s matching commitment for La Cholla Blvd. Widening
budget would be paid from this year’s budget.
Only the Roundabout was paid out of this year’s budget.
Advanced RTA funding to cover the $1,800,000 this year and hold off Town’s
commitment till the end of the project in FY21.
49
Police Department
Kara Riley, Chief of Police
Major Accomplishments -Police
Conducted department-wide training of sworn personnel in:
Interdiction for the Protection of Children -Assists in identifying children
who may be missing, exploited or at risk of being exploited
Officer Wellness and Suicide prevention to address national trends
Received $107,000 in funding from Governor’s Office of Highway Safety for
overtime and equipment to support DUI enforcement, hazardous moving
violation enforcement and participation during Southern Arizona DUI Task
Force Operations
Awarded $226,900 in funding from Operation Stonegarden for equipment,
overtime and mileage to combat illegal contraband/human smuggling and
apprehend terrorists entering the country
Opening of the Property and Evidence Magee Substation
Successful implementation of COOP for emergencies
FY 19/20
51
TOWN COUNCIL FOCUS AREA 3: Goal 3A
Strategic Plan and Public Safety
Support strategies that result in a safe community
with low crime, safe neighborhoods and positive
relationships between law enforcement and
community members.
52
Departmental approach
Policing –It’s in our nature
Priority in community policing and engagement
Continue to address each call for service with
integrity, excellence and fairness
Mitigation of the effects of increased traffic with
emphasis on safety
Providing essential and efficient police services
53
Fiscal year comparison
FY 19/20 FY 20/21
Personnel $16,314,156 $16,379,303
O & M $913,855 $705,122
Capital $303,450 $192,500
Totals $17,531,461 $17,181,136
54
COVID-19 Pandemic Response
October 2019, Departments created a Continuity of Operations Plan
(COOP)
National Incident Management Systems (NIMS)
Seamless service during pandemic
Collaborating with departments regional partners for supplies and
resources
Daily participation with Pima County Emergency Operations Center
Established weekly briefings for Town Council and Executive Leadership
Team
Communicated with the public
55
Future Goals
Community expectations –exceptional police service will
continue
Crime analysis, focus on trends
Best equipment for officers and staff
Community outreach
Regional collaboration of training
56
Thank you for watching!
We’ll be back tomorrow at 6 p.m.!
FY 2020-21 Recommended Budget
May 27 and 28, 2020