HomeMy WebLinkAboutOV999111 ORDINANCE NO. 00-01
AN ORDINANCE AMENDING ORDINANCE NO. 99-52,
APPROVED BY TOWN COUNCIL ON SEPTEMBER 22ND, 1999,
THE STEAM PUMP RANCH PLANNED AREA DEVELOPMENT
DOCUMENT, AMENDING CONDITIONS FOR VESTING OF
ZONING AND EXTENDING THE CONDITIONAL ZONING FOR A
PERIOD OF FIVE YEARS FROM THE DATE OF APPROVAL OF
ORDINANCE NO. 99-52, AS REQUESTED BY OV9-99-111, AND ,
REPEALING ALL ORDINANCES IN CONFLICT HEREWITH.
WHEREAS, Century Development Corporation, the owners of the Steam Pump Ranch
Planned Area Development,have requested an amendment to the Steam Pump Ranch Planned Area
Development Document, relating to deleting a requirement for a multi-purpose staging area,
amending conditions for vesting of zoning, modification of the pad sub-areas and performance
standards, amending prohibited uses to allow a maximum of four convenience uses, amending
landscaping standards, deletion of project phasing and conditional approval requirements,
amending exclusions from the Oracle Road Scenic Corridor Overlay District (ORSCOD), and
consolidation of the Riverpark trail along the Canada del Oro wash; and
WHEREAS, an application to amend said Planned Area Development has been filed with
the Town by the Century Development Corporation; and
WHEREAS, Article 10-3 of the Oro Valley Zoning Code Revised provides for the
establishment of, and amendments to, a Planned Area Development District; and
WHEREAS, the Planning and Zoning Commission has considered said application for
amendment to the Planned Area Development, at a duly noticed Public Hearing, in accordance with
State Statutes, and has made its recommendations to the Town Council; and
WHEREAS, the Oro Valley Town Council has considered the requested Planned Area
Development amendment at a Public Hearing and finds that it to be consistent with the Town's
General Plan and Ordinances,
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND TOWN COUNCIL OF
THE TOWN OF ORO VALLEY:
SECTION 1. The Planned Area Development Document may be amended as it pertains
to conditions for vesting of zoning, subject to condition no. 1 of the attached Exhibit "A", as
amended.
SECTION 2. That the conditional zoning of the property be extended for five years from
September 22, 1999, the date of approval of Ordinance No. 99-52, per condition no.11 of the
attached Exhibit"A", as amended.
SECTION 3. That all ordinances and parts of ordinances in conflict herewith be and the
same are hereby repealed to the extent of such conflict;
SECTION 4. That this ordinance and the various parts thereof are hereby declared to be
severable. If any section, sub-section, sentence, clause, word or phrase of this ordinance is, for any
(0)00-01 p.2
reason, held to be unconstitutional, such holdings shall not affect the validity of the remaining
portion of this ordinance.
PASSED AND ADOPTED by the Mayor and Town Council of the Town of Oro Valley,
Arizona this 5th day of January, 2000
Paul H. Loomis, Mayor
ATTEST:
Kathryn uvelier, Town Clerk
APPROVED AS TO FO
Dan L. Dudley, Town Attorney
F:10V\OV9\1999\9-99-1 1 1\ORDTCAmend.RPT.doc
PUBLISH: Daily Territorial
February 9, 10, 11 , & 14, 2000
POSTED: February 7 - March 8, 2000
rg
(0)00-01 p.3
AMENDED EXHIBIT "A"
CONDITIONS OF APPROVAL
OV9-99-111 STEAM PUMP RANCH
PAD AMENDMENT
1. The PAD zoning shall be ordinanced and become vested upon completion of $500,000
worth of improvements. The following improvements shall be required:
• The Riverpark Trail is be constructed by the developer along the full length of the
rear property line, and is to be built as a minimum 12' wide asphalt path in
accordance with AASHTO standards.
• CONSTRUCTION OF MAIN WATER AND WASTEWATER TRUNK
LINES ON-SITE
• Construction of two entrances to the project site.
2. The following conditions shall apply to the architectural design of all future development
on-site:
• Buildings shall be designed to express human scale at the ground or pedestrian level.
• Variations in roof lines shall be used to add interest and to reduce the scale of larger
buildings.
• The mass of large buildings shall be broken up by dividing into basic geometric
components,with intersecting wall planes.
• Facades shall be articulated to reduce the scale and mass of buildings, and provide
elements of visual interest. This is to be accomplished by:
• Ground level facades shall have one-story pedestrian scale features for at least 2/3rds
of the horizontal length of the side of a building. These features may include
windows, entry areas, arcades, and/or overhangs(awnings,trellis, etc.)
• Facades greater than 100' in length shall be broken by recesses or off-sets.
Alternatively, the horizontal length may be broken by vertical elements. Off-sets or
vertical elements shall be of sufficient size to effectively mitigate the visual impact
of the horizontal line and mass.
3. The parking provision and design requirements of the OVZCR shall apply, with the
following exceptions:
• A 1 space per 300 square feet parking ratio shall apply.
• The location of parking spaces are to be distributed across the site, with a goal of
75% of the parking occurring in front of the buildings, with 25% of the spaces
located to the sides and rear of the structures.
4. All convenience uses shall be subject to the convenience use regulations of the OVZCR.
5. A maximum of four convenience uses shall be permitted on-site, with the following
conditions:
• A maximum of two drive-through or drive-in convenience use pads, limited to Area
A or B
• A maximum of one gasoline station may be substituted for one of the
(0)00-01 p.4
two drive-through or drive-in convenience use pads in Area A or B
• A maximum of two non-pad convenience uses, which must be part of a primary
cluster of buildings
• Drive-through or drive-in convenience uses are prohibited
• One of the two non-pad convenience uses shall only be permitted upon
completion of a movie theatre on-site
6. A maximum of four free-standing single use structures shall be permitted for the PAD. The
maximum of four free-standing single use structures shall include any pads used for
convenience uses.
7. All landscaping shall be in conformance with the landscape requirements listed in the Oro
Valley Zoning Code Revised (OVZCR).
8. Submittal of any development plan containing a convenience use shall include a traffic
study by a qualified traffic engineer to ensure safe access and free flow of traffic both
internally and externally, and adequate stacking areas for drive-throughs.
9. The minimum building setback for Sub-Area"D" will be a 120' average from Oracle Road,
with a 80' average setback if used to reduce the amount of parking in front of the buildings.
10. Resubmittal of the revised PAD document as amended.
11. THE CONDITIONAL ZONING SHALL BE EXTENDED FOR A PERIOD OF FIVE
YEARS FROM THE DATE OF APPROVAL OF ORDINANCE NO. 99-52, THAT
BEING THE 22ND DAY OF SEPTEMBER, 1999.
F:\OV\OV9\1999\9-99-111\TC EXHIBIT A-Amended.doc
L
JP� EY ' i, TOWN OF ORO VALLEY
(4-
0 0� COMMUNITY DEVELOPMENT DEPARTMENT
v - ,, / , -7;
Planning and Zoning • Building Safety
4 0
0. 11000 N.La Canada Drive,Oro Valley,AZ 85737•(520)229-4800•Fax(520)742-1022
Oro ValleyPublic Library
rY
AA .„. .. 1305 W.Naranja Drive,Oro Valley,AZ 85737• (520)229-5300•Fax(520)229-5319
:; Parks and Recreation
NOUN D ED�gA 680 W.Calle Concordia,Oro Valley,AZ 85737•(520)229-5050•Fax(520)797-2202
December 15, 2003
Mark Weinberg
Diamond Ventures
2200 East River Road, Suite 115
Tucson,AZ 85718-6586
Fax: 520. 299-5602
RE: OV9-99-111, One year time extension for Steam Pump Village Planned Area
Development (PAD) zoning amendment.
Dear Mr. Weinberg:
On December 2, 2003 the Town Council unanimously(5—0) approved your request for a time
extension for the Steam Pump Ranch PAD. The one year time extension, authorized by
Ordinance No. (0)03-37, would extend the Steam Pump Ranch PAD conditional approval to
September 22, 2005. Enclosed please find a copy of the signed Ordinance with its attachments
for your files.
If you have any questions or concerns,please feel free to contact me at 229-4814 or
smontana@orovalley.net.
Sincerely,
—CALO't4--.0 "
Susana Montana, Planner II
Attachment
C: TOV: Shirley Gay;Bayer Vella.
F:\OV\OV9\1999\9-99-111\Time Ext.Ordinance cover ltr.doc
www.townoforovalley.com
ORDINANCE NO.(0)03-3 7
AN ORDINANCE EXTENDING THE CONDITIONAL ZONING FOR A PERIOD OF ONE
YEAR FROM THE DATE OF THE EXPIRATION DATE SET FORTH BY ORDINANCE NO.
(0)00-01 WHICH ON SEPTEMBER 22, 1999 EXTENDED FOR A FIVE YEAR PERIOD THE
STEAM PUMP RANCH PLANNED AREA DEVELOPMENT CONDITIONAL ZONING
AMENDMENTS OF ORDINANCE NO. (0)99-52,AND REPEALING
ALL ORDINANCES IN CONFLICT HEREWITH
WHEREAS,that certain real property known as the Steam Pump Ranch Planned Area Development
(PAD),approximately 41 acres in size, and consisting of five parcels (Parcel numbers 220-04-009C,
220-04-009E,220-11-003A,220-07-0060 and 220-08-001 L) and further described by the map attached
to this Ordinance was first adopted by Ordinance No. (0)96-26 on July 10, 1996 (Case No. OV9-96-1);
and
WHEREAS, owner of the real property known as the Steam Pump Ranch PAD requests a one year
extension of the conditional zoning approved by Town Council on January 5, 2000 by Ordinance No.
(0)00-01 (Case No. OV9-99-111)which extended the PAD conditional zoning for a five year period
from September 22, 1999 and which would expire on September 22, 2004; and
WHEREAS,the Oro Valley Zoning Code Revised, Section 3-133 states that any extension of zoning
shall be treated as a new application; and
WHEREAS,the Planning and Zoning Commission,having considered said application and request
at a duly noticed public hearing in accordance with State Statue on November 4, 2003, and having made
its recommendation to the Town Council; and
WHEREAS,the Oro Valley Town Council has considered the requested rezoning extension at a
duly noticed public hearing and finds it consistent with the Town's General Plan and Ordinances.
NOW, THEREFORE,BE IT ORDAINED BY THE MAYOR AND TOWN COUNCIL OF THE
TOWN OF ORO VALLEY:
SECTION 1: That certain real property known as the Steam Pump Ranch Planned Area
Development, consisting of Lots 220-04-009C,220-04-009E, 220-11-003A,220-07-0060 and 220-08-
001 L, and further described by the map attached to and made part of this Ordinance,hereby extends the
conditional zoning of Ordinance No. (0)00-01 for a period not to exceed one year, expiring September
22,2005, subject to the conditions of Ordinance No. (0) 00-01 as specified in Exhibit A attached hereto.
SECTION 2: That all ordinances and parts of ordinances in conflict herewith be and the same are
hereby repealed to the extent of such conflict.
SECTION 3: That this ordinance and the various parts thereof are hereby declared to be severable.
If any section, sub-section, sentence, clause, word or phrase of this ordinance is, for any reason,held to
be unconstitutional, such holdings shall not affect the validity of the remaining portion of this ordinance.
Ordinance(0) 03- 37
Paget
PASSED AND ADOPTED by the Mayor and Town Council of the Town of Oro Valley,Arizona,this
3rd day of December,2003.
,de. ;; Oe//
Paul H. Loomis,Mayor
ATTEST:
Kat n E. Cuvelier, Town Clerk EXHIBIT "A" IS ON FILE IN THE OFFICE OF THE
TOWN CLERK FOR REVIEW BETWEEN THE HOURS OF
APPROVED AS TO FORM: 8:00 A.M. & 5:00 P.M. , MONDAY THRU FRIDAY, AT
TOWN HALL LOCATED AT 11,000 N LA CANADA DRIVE.
Mark J. Lang itz, Tr.
PUBLISH: DAILY TERRITORIAL POSTED: DECEMBER 15, 2003 - JANUARY 15, 2(
DECEMBER 18, 19, 22, 23, 2003 .'RG
,---'-'>\\\,--, I ,,,, ,0 .,''' ' /
1--' '' \'')- H---. Z ,/ i FO tgi
‹// 7/.___ } ``�k_________A , .,� �.7 s��t:.ram
/ If
fie
,,,
1 . oui
' .---A7/ z 4e 44) 1-10
\it, , ,„„„
77 All ' .-tt. - 1
,____„_____ , • -...,* „ 41,
_.....________ ..._. ._____
,„
7
f iolat
,•,7
..„„
,,,
, Z 7 4-.---------...--\,,,,
77
' ' \
/ / --....-_____.„
\\// 7/7 ,
y/ \ :, ,./ \
\\. ‹. l:/..': C'''-... /
\ /// \ A ( \ 'i'''/' '
V VX \ /' \-\
, , ., ///' y".\ \<\ ‘ Z/ \ \ Z \
--s.-- / / / \\V2,, \ ,X,,,‘ 2\ / ''' /
___,-- r
,),.. \ '..\\ .--.. , \\\,- , ,__,,,-
, \ _______—
/- / _._. --, /:.---,.. \,--
, .s.,....._.,
._ ,,\. ,/ ,*,,,,.,- N
,/ --- /
, z \\, ,
/ - \ '.\\ Ntil_10?-"..,‹ ______ .,,
.,-.Z
i \ / --.72„,„:. ..i.: ) �
\\.\. Ns-0:A / \
\ // -,--.......,. r.. ir
,_,_., ,,,,:::„.,,..„........,
...,,,, „,,,. ,
si
„\ \,\ \ „.
....„....,....„.
,__ .,„....,„
,/ .\ \\ \/ „.
,<„,„
\\ \, . /./.,./
1,\_"_...:.,._...,:
Q.,,/ ,
,\„.. „... _...„......
,\ .\ \___ //,,
t\ ,\ ,/
co,./ \
,, ,
_.
< }) , \
,/ ./ �' ,)„, `- 1 \\
\\
y y /
/ / ,
\ 2 L.__,.., -1 ---
\, 1:711-- II-' / ---7
..., / \ /1' / ,,./VI-1 _ 7, \r----11-, / '-• I -,_,
0V9 - 99 - 111 Location Map0
•
Z
ORDINANCE NO. 99-52
AN ORDINANCE AMENDING THE STEAM PUMP RANCH
PLANNED AREA DEVELOPMENT DOCUMENT,
DELETING A REQUIREMENT FOR A MULTI-PURPOSE
STAGING AREA, AMENDING CONDITIONS FOR
VESTING OF ZONING, MODIFICATION OF THE PAD
SUB-AREAS AND PERFORMANCE STANDARDS,
AMENDING PROHIBITED USES TO ALLOW A
MAXIMUM OF FOUR CONVENIENCE USES, AMENDING
LANDSCAPING STANDARDS, DELETION OF PROJECT
PHASING AND CONDITIONAL APPROVAL
REQUIREMENTS, AMENDING EXCLUSIONS FROM THE
ORACLE ROAD SCENIC CORRIDOR OVERLAY
DISTRICT, AND CONSOLIDATION OF THE RIVERPARK
TRAIL ALONG THE CANADA DEL ORO WASH, AS
REQUESTED BY OV9-99-111, AND REPEALING ALL
ORDINANCES IN CONFLICT HEREWITH.
WHEREAS, Century Development Corporation, the owners of the Steam Pump Ranch
Planned Area Development, have requested an amendment to the Steam Pump Ranch Planned Area
Development Document, relating to deleting a requirement for a multi-purpose staging area,
amending conditions for vesting of zoning, modification of the pad sub-areas and performance
standards, amending prohibited uses to allow a maximum of four convenience uses, amending
landscaping standards, deletion of project phasing and conditional approval requirements,
amending exclusions from the Oracle Road Scenic Corridor Overlay District (ORSCOD), and
consolidation of the Riverpark trail along the Canada del Oro wash; and
WHEREAS, an application to amend said Planned Area Development has been filed with
the Town by the Century Development Corporation; and
WHEREAS, Article 10-3 of the Oro Valley Zoning Code Revised provides for the
establishment of, and amendments to, a Planned Area Development District; and
WHEREAS, the Planning and Zoning Commission has considered said application for
amendment to the Planned Area Development, at a duly noticed Public Hearing, in accordance with
State Statutes, and has made its recommendations to the Town Council; and
WHEREAS, the Oro Valley Town Council has considered the requested Planned Area
Development amendment at a Public Hearing and finds that it to be consistent with the Town's
General Plan and Ordinances,
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND TOWN COUNCIL OF
THE TOWN OF ORO VALLEY:
SECTION 1. The Planned Area Development Document may be amended as it pertains
to deletion of a requirement for a multi-purpose staging area.
sit
RP
(01 99-52 p.2
SECTION 2. The Planned Area Development Document may be amended as it pertains
to conditions for vesting of zoning, subject to condition no. 1 of the attached Exhibit"A".
SECTION 3. The Planned Area Development Document may be amended as it pertains
to modification of the PAD sub-areas and development standards, subject to condition no. 2, no. 3,
no. 6, no. 8, and no. 9 of the attached Exhibit"A".
SECTION 4. The Planned Area Development Document may be amended as it pertains
to modifying the prohibited uses to allow a maximum of four convenience uses, subject to
condition no. 4, no. 5, and no. 8 of the attached Exhibit"A".
SECTION 5. The Planned Area Development Document may be amended as it pertains
to landscaping standards, subject to condition no. 7 of the attached Exhibit"A".
SECTION 6. The Planned Area Development Document may be amended as it pertains
to deletion of project phasing and conditional approval requirements.
SECTION 7. The Planned Area Development Document may be amended as it pertains
to exemptions from the setbacks and landscape buffers for Employment and Institutional
regulations of the Oracle Road Scenic Corridor Overlay District(ORSCOD).
SECTION 8. The Planned Area Development Document may be amended as it pertains
to consolidation of the Riverpark Trail along the Canada del Oro wash.
SECTION 9. That all ordinances and parts of ordinances in conflict herewith be and the
same are hereby repealed to the extent of such conflict;
SECTION 10. That this ordinance and the various parts thereof are hereby declared to be
severable. If any section, sub-section, sentence, clause, word or phrase of this ordinance is, for any
reason, held to be unconstitutional, such holdings shall not affect the validity of the remaining
portion of this ordinance.
PASSED AND ADOPTED by the Mayor and Town Council of the Town of Oro Valley,
Arizona this 22nd day of September, 1999.
Mor.-
Paul H. Loomis,Mayor
ATTEST:
C&zwt44,%;
Ka n Cuvelier, Town Clerk
APPROVED AS TO F 1►RM:
—44) "19)
anq
Due le Town�:'� rne
Y Y
PUBLISH: Daily Territorial
October 4, 5, 6, 7, 1999
POSTED: September 28 - October 28, 1999
rg
(0)99-52 Ex. A
EXHIBIT "A"
CONDITIONS OF APPROVAL
OV9-99-111 STEAM PUMP RANCH
PAD AMENDMENT
1. The PAD zoning shall be ordinanced and become vested upon completion of $500,000
worth of improvements. The following improvements shall be required:
• The Riverpark Trail is be constructed by the developer along the full length of the
rear property line, and is to be built as a minimum 12' wide asphalt path in
accordance with AASHTO standards.
• Construction of all water and wastewater lines, and drainage systems
• Construction of two entrances to the project site.
2. The following conditions shall apply to the architectural design of all future development
on-site:
• Buildings shall be designed to express human scale at the ground or pedestrian level.
• Variations in roof lines shall be used to add interest and to reduce the scale of larger
buildings.
• The mass of large buildings shall be broken up by dividing into basic geometric
components,with intersecting wall planes.
• Facades shall be articulated to reduce the scale and mass of buildings, and provide
elements of visual interest. This is to be accomplished by:
• Ground level facades shall have one-story pedestrian scale features for at least 2/3rds
of the horizontal length of the side of a building. These features may include
windows, entry areas, arcades, and/or overhangs(awnings,trellis, etc.)
• Facades greater than 100' in length shall be broken by recesses or off-sets.
Alternatively, the horizontal length may be broken by vertical elements. Off-sets or
vertical elements shall be of sufficient size to effectively mitigate the visual impact
of the horizontal line and mass.
3. The parking provision and design requirements of the OVZCR shall apply, with the
following exceptions:
• A 1 space per 300 square feet parking ratio shall apply.
• The location of parking spaces are to be distributed across the site, with a goal of
75% maximum of the parking occurring in front of the buildings, with 25%
minimum of the spaces located to the sides and rear of the structures.
4. All convenience uses shall be subject to the convenience use regulations of the OVZCR.
5. A maximum of four convenience uses shall be permitted on-site, with the following
conditions:
• A maximum of two drive-through or drive-in convenience use pads, limited to Area
AorB
• A maximum of one gasoline station may be substituted for one of the
two drive-through or drive-in convenience use pads in Area A or B
• A maximum of two non-pad convenience uses, which must be part of a primary
cluster of buildings
• Drive-through or drive-in convenience uses are prohibited
• One of the two non-pad convenience uses shall only be permitted upon
completion of a movie theatre on-site
6. A maximum of four free-standing single use structures shall be permitted for the PAD. The
maximum of four free-standing single use structures shall include any pads used for
convenience uses.
7. All landscaping shall be in conformance with the landscape requirements listed in the Oro
Valley Zoning Code Revised (OVZCR).
8. Submittal of any development plan containing a convenience use shall include a traffic
study by a qualified traffic engineer to ensure safe access and free flow of traffic both
internally and externally, and adequate stacking areas for drive-throughs.
9. The minimum building setback for Sub-Area"D" will be a 120' average from Oracle Road,
with a 80' average setback if used to reduce the amount of parking in front of the buildings.
10. Resubmittal of the revised PAD document as amended.
F:\OV\OV9\1999\9-99-111\TC EXHIBIT A.doc
ORO VALLEY PLANNING & ZONING DEPARTMENT
PLANNING AND ZONING COMMISSION REPORT
MEETING DATE: July 6th, 1999
TO: PLANNING AND ZONING COMMISSION
FROM: David Marsh, Planner I
SUBJECT: PUBLIC HEARING: OV9-99-111 REQUEST TO AMEND THE STEAM
PUMP RANCH PAD, MODIFICATION OF THE PAD SUB-AREAS,
LOCATED WEST OF ORACLE ROAD, IMMEDIATELY OPPOSITE
ALLIED SIGNAL
1. DELETION OF A REQUIREMENT FOR A MULTI-PURPOSE
STAGING AREA
2. AMEND CONDITIONS FOR VESTING OF ZONING
3. DELETION OF CONDITION FOR A 'FULL-SERVICE' HOTEL
4. MODIFICATION OF THE PAD SUB-AREAS AND PERFORMANCE
STANDARDS
5. AMEND PROHIBITED USES TO ALLOW A MAXIMUM OF FIVE
CONVENIENCE USES
6. AMEND LANDSCAPING STANDARDS
7. DELETION OF PROJECT PHASING AND CONDITIONAL
APPROVAL REQUIREMENTS
8. AMEND EXCLUSIONS FROM THE ORACLE ROAD SCENIC
CORRIDOR OVERLAY DISTRICT (ORSCOD)
9. CONSOLIDATION OF THE RIVERPARK TRAIL ALONG THE
CANADA DEL ORO WASH
1
Iv.s t/
OWNERSHIP:
Century Development Corporation
3323 North 107th Street
Omaha,Nebraska 69134
AGENT:
Gordon Stone,ASLA
Cella Barr Associates
4911 East Broadway
Tucson,AZ 85711
PETITIONER'S PROPOSED USE AND STATED REASON:
The property owner requests Town approval to amend the adopted Planned Area Development
document for the Steam Pump Ranch PAD. The applicant contends that the proposed PAD
Amendment will allow the property to be more marketable, and allow for greater flexibility on site.
The applicant's amendment proposal involves nine separate issues,which are as follows:
1. The applicant proposes to delete a requirement for a movie theatre with a multi-purpose staging
area for performances and presentations.
2. The applicant proposes to amend the conditions of the PAD to permit vesting of the zoning
once $500,000 worth of infrastructure and/or on-site improvements have been completed. The
applicant also proposes to extend the zoning expiration date for a period of five years to July
10th, 2004.
3. The applicant proposes to delete a condition that any hotel developed on site be a 'full-service'
hotel, in which the hotel is required to have room service, meeting spaces, and food and
beverage services.
4. The PAD amendment proposal includes the modification of the PAD sub-areas and
performance standards. The applicant proposes to modify the four existing sub-areas to provide
greater flexibility in terms of site design, permit uses throughout the site instead of specific
areas, and to cluster like-uses.
5. The applicant proposes to allow a maximum of five (5) convenience uses on-site, of which no
more than four(4)will be drive-through restaurants, limited to Areas A and B.
6. The proposal includes amendments to the landscaping standards for the PAD, which include a
consistent 30' landscape buffer along Oracle Road, and modifications to landscape berm design
requirements.
2
i
7. The application includes the deletion of project phasing and conditional approval requirements.
8. The applicant proposes to exclude the PAD from the required 150' setback and 100' landscape
buffer for Employment and Institutional uses under the Oracle Road Scenic Corridor Overlay
District(ORSCOD).
9. The amendment proposal includes the consolidation of the River Park Trail. 10' bike path and
the 8' pedestrian path into a single path on top of the Canada del Oro wash levee.
BACKGROUND:
The current Steam Pump Ranch Planned Area Development was adopted by the Mayor and
Council in 1996. The project encompasses approximately 41.6 acres, and is located on the west
side of Oracle Road, opposite the Allied Signal complex. (see attached location map). The Town's
General Plan projects that this area will be an area of commercial development, with a
Neighborhood Commercial designation. The adopted PAD provides for a mix of uses, including
hotels, professional offices, small scale commercial, a theatre, and a small park site on the extreme
northeastern portion of the site. The CDO Wash provides a wide, natural buffer between the site
and the low density residential developments to the north and west.
SURROUNDING LAND USES/GENERAL CHARACTER:
North -Canada del Oro Wash; Palisades Point
East -Allied Signal; Foothills Business Park; and Rams Canyon
South -the Steam Pump Ranch complex(not part of the PAD); Rooney Ranch PAD Area A
West - Canada del Oro Wash
PREVIOUS REZONING CASES ON PROPERTY:
A PAD was originally approved by Mayor and Council for this property in August of 1988;
however, a time extension beyond the original 18 month approval period was denied, and the
zoning reverted to R 1-144 in July, 1991. A subsequent rezoning to PAD for this property was
approved for this property by Mayor & Council in February, 1992. Since no construction was
begun onsite within the required three-year period, the PAD lapsed and the zoning reverted to R1-
144. Steam Pump Ranch was rezoned to the current PAD by Mayor and Council in 1996.
PREVIOUS REZONING CASES IN GENERAL AREA:
The Rooney Ranch properties were rezoned to PAD in February of 1989. In June, 1997, Town
Council approved a PAD Amendment that retained permitted uses but removed the specific sub-
areas within the PAD, thus allowing developers more flexibility to meet market demands. In
November and December of 1998, Town Council approved several amendments to Area B of the
Rooney Ranch PAD, which is located approximately 1/4 mile to the southwest on Oracle Road.
3
While under Pima County jurisdiction, an 86-acre parcel of land, now known as Palisades Point,
was rezoned for 66 single family residences on lots of two-thirds of an acre, or greater. This project
lies to the northwest of subject property. To the north of the subject property, the Rancho Vistoso
PAD was approved in July, 1987. The portions of Rancho Vistoso adjacent to Steam Pump Ranch
are not developed at the present time; however, the intended use of this portion of the PAD is
Regional Commercial, and the projected time frame for development indicated at the time of
annexation was the year 2005.
NOTIFICATION:
In compliance with State Statutes and the OVZCR,notices have been mailed to all property owners
within 600 feet of the Steam Pump Ranch PAD boundary. To date, Staff has received one letter
from Mr. Bill Adler, which is attached herewith.
GENERAL PLAN CONFORMANCE:
Staff has evaluated the request for amendments to the Steam Pump Ranch PAD against the General
Plan Land Use Plan and Policies and finds, overall, that the proposal conforms to the General Plan
policies,with specific exceptions noted below and in Planning Considerations.
Land Use - Specifically, the PAD amendment conforms with the projected uses for this area of
Oracle Road on the Land Use Map. The Land Use Element recommends Neighborhood
Commercial uses for the Steam Pump Ranch PAD.
Economic Development - The Town's economic development, as discussed in the General Plan
policies, is of vital importance to the future of the Town. The proposed amendments to the Steam
Pump Ranch PAD provides the permitted commercial uses with some flexibility in the siting and
physical design of new commercial structures, as well as permitting some new uses. These
provisions will increase the development potential of the land, potentially resulting in an influx of
businesses, new sources of tax revenue and increased employment opportunities. The attraction of
new businesses to the Town of Oro Valley will improve the economic health of the Town by
"ensuring long-term financial and economic sustainability".
Community Design — The Community Design Element of the General Plan states that one should
"ensure that the built environment is aesthetically pleasing". While the PAD Amendment proposed
does conform with the Community Design aspect of General Plan, Staff is concerned about the
potential impacts of the proposed convenience uses for the PAD, in terms of the uses permitted, and
the clustering of the convenience uses themselves. This is discussed in additional detail below.
PLANNING CONSIDERATIONS:
Staff has reviewed the proposed PAD Amendment, and the planning considerations are as follows:
4
Deletion of a Requirement for Multi-Purpose Staging Area:
The applicant has proposed to delete a requirement for a theatre with a multi-purpose staging area
for presentations and performances to be constructed. The applicant believes that this requirement
is no longer valid, as the Town is currently pursuing plans to provide community staging areas for
presentations and performances elsewhere.
Staff has no objection to the deletion of this requirement, and supports the applicant's proposal. The
approved CDO Riverfront Park will feature an outdoor stage area for public presentations and
performances. Deletion of the movie theatre is also not a hindrance, given the current market
saturation on the northwest side with the expansion of the Foothills Mall theatres.
Amending the Conditions for Vesting of PAD Zoning After$ 500,000 Worth of Infrastructure and
/or On-Site Improvements
The amendment proposes to alter the conditions of the PAD to permit the vesting of the PAD
zoning after $500,000 worth of infrastructure and / or on-site improvements have occurred. These
improvements could include construction of utilities on-site, improvements to Oracle Road,
installation of landscaping, and installation of the River Park Trail. Upon completion of these
improvements, the property's zoning would be vested and `hard-zoned' to PAD. The amendment
also includes an extension of the current zoning expiration date for five years until July 10t, 2004.
Staff concurs with the applicant's request, with the conditions. Staff recommends that the applicant
construct all main utilities on-site, construct two entrances to the project from Oracle Road, and that
the Riverpark Trail along the CDO wash be constructed by the developer (this is discussed in
further detail below). Staff has discussed these conditions with the applicant, and they are in general
agreement.
Deletion of a Condition Requiring All Hotels to be"Full-Service".
The applicant has proposed to delete a condition that any hotel developed on site be a 'full-service'
hotel, in which the hotel is required to have room service, meeting spaces, and food and beverage
services. The applicant has stated that given the current trends in hotel development, and the
location of the site, any potential hotel to be developed within Steam Pump Ranch would likely be
of a "suites" variety. Potential hotels on-site would most likely cater to travelers, seasonal visitors,
and local businesses, and would be serviced by local restaurants and services, thus eliminating the
need for a"full-service"hotel. The proposal also includes listing "motels" as a prohibited use under
the PAD.
Staff concurs with the applicant's request. The requirement for the 'full-service' hotel in the
current PAD document was placed as a means of assuring development of a 'high-quality' hotel,
and not a 'motel'. Staff believes that this requirement is no longer necessary, as the design criteria
in the PAD,the Oro Valley Design Guidelines, and DRB review of all projects on-site will ensure a
high quality of development. Moreover, the amendment will prohibit "motels" as a use, which is
5
defined by the OVZCR as "any building or group of buildings containing guest rooms or dwelling
units, some or all of which have a separate entrance leading directly from the outside of the
building,with the garage or parking space located on the lot and designed, used or intended wholly,
or in part, for the accommodation of automobile transients." This is to be contrasted with the
OVZCR definition of a"hotel", which is "an establishment that offers temporary lodging in rooms,
for less than one month (30 days), that has interior common corridor access to rooms, may include
a restaurant and may contain accessory uses and services, including, without limitation, newsstands,
gift shops, and similar incidental uses conducted entirely within the principle building..."
Modification of the PAD Sub-Areas and Performance Standards.
The applicant's proposed amendment includes a variety of changes to the PAD sub-areas and the
performance standards for each. The current PAD document includes four PAD sub-areas, with
specific uses listed for each, which resulted in four distinct `clusters' of uses and activities. The
proposed amendment would allow the four sub-areas more flexibility and permit a more `mixed-
use' development. Areas A and B would essentially be clustered around the two principle entrances
to the site, and will permit retail, services, restaurants, financial institutions, professional offices,
and convenience uses (discussed in further detail below). Areas C and D, which occupy the
remainder of the site, will essentially retain the same uses as the current PAD. These include retail,
services, restaurants, hotels, financial institutions, and professional offices. A small two-acre park
site at the northeast corner of the PAD will remain.
In terms of performance standards, the amendment proposal includes a series of changes for Areas
A & B, including a reduced front setback of 60' from Oracle Road, a 30' buffer yard along Oracle
Road, and a maximum building height of 25'. In contrast, the current Area A & B requirements
include an average setback from Oracle Road of 120', a 30' buffer yard along Oracle Road, and a
maximum height of 3 9'. For Areas C & D there are no substantial changes from the current PAD.
While the elimination of the previously proposed sub-areas and their specific uses may appear to
give the impression of`lowering standards', Staff believes that the remaining design criteria listed
in the PAD and the contents of the Oro Valley Design Guidelines will provide for ample safeguards
for high-quality and aesthetically pleasing development.
Amend the Prohibited Uses to Allow for a Maximum of Five Convenience Uses
While the current PAD does not permit convenience uses, the applicant proposes to amend the
prohibited uses to allow a maximum of five (5) convenience uses on-site, of which no more than
four (4) will be drive-through restaurants. The proposal also restricts the maximum of four drive-
through restaurants to Areas A & B only, which are designed to be primarily convenience use
clusters around the two principle entrances to the PAD. The applicant contends that permitting the
convenience uses, particularly in Areas A &B will allow future development to avoid a `strip-mall'
appearance and break up an otherwise long and monolithic street frontage.
6
While the additional convenience uses are in conformance with the General Plan's Neighborhood
Commercial designation for the site, Staff has concerns over two issues: 1)the potential for an over
proliferation of gas stations along the west side of Oracle Road; and 2) the aesthetic impact of the
additional convenience uses. With the proposed amendment,there will be the potential for possibly
seven gas stations along the west side of Oracle Road for the one mile stretch between Pusch View
Lane and the north end of the Steam Pump Ranch. It is important to note that this does not include
the development potential for gasoline stations on the east side of Oracle Road. While the applicant
has not expressed interest in developing more than one gas station on-site, Staff recommends that a
maximum of one gas station be permitted in the PAD, and that it be restricted to Areas A & B.
Staff has concerns over the potential aesthetic impact of several convenience uses `clustered'
together, as the applicant proposes in Areas A & B. While the design criteria listed in the PAD and
the Oro Valley Design Guidelines will minimize the aesthetic impact of `clustered' convenience
uses, Staff recommends that no more than two convenience uses be permitted in each of Area A &
Area B. This will ensure an even distribution of convenience uses at the entrances of the
development, and avoid the potential of four convenience uses locating at the same entrance. In
addition, Staff also recommends that all convenience uses be subject to the convenience use
regulations of the OVZCR.
Amend the Landscaping Standards of the PAD
The PAD amendment includes a proposal to modify the landscaping standards for the PAD, which
include a consistent 30' landscape buffer along Oracle Road, and modifications to landscape berm
design requirements. The current PAD requires that all landscape berm slopes shall not exceed 3:1
with a minimum two-foot wide flat crown, a specification that the applicant wishes to delete to
permit greater flexibility in landscape design.
Staff has no objection to the modification of the landscape standards, with the condition that all
landscaping be in compliance with the landscape requirements of the OVZCR.
Deletion of Project Phasing and Conditional Approval Requirements
The applicant's proposal also includes a request to delete the project phasing and conditional
approval requirements of the PAD. The project phasing requirements of the PAD state that
development shall reflect a number of conditions and factors influencing project implementation,
including: 1) current and future trends in office, research and development, and commercial
demand and absorption rates; and 2) development and timing of infrastructure and other
improvements, and available financing opportunities. The conditional approval requirements of the
PAD state that once construction commences on buildings representing 5% of the floor area of any
development area,the PAD zoning would be ordinanced and 'hard-zoned'.
Staff has no objections to the applicant's proposal. The project phasing requirements reflect market
conditions as opposed to zoning considerations, and the conditional zoning requirements will be
superceded by the applicant's request to 'hard-zone' the PAD after$500,000 worth of infrastructure
and/or on-site improvements (discussed above).
7
Exclusions from the Oracle Road Scenic Corridor Overlay District(ORSCOD)
The applicant has requested to exempt the PAD from the required 150' building setback and 100'
landscape buffer per the Employment and Institutional Regulations of ORSCOD. This will allow
greater flexibility on site, and will permit a `mixed-use' development approach. The amendment
also proposes to alter the sub-areas of the PAD to allow a variety of uses, and will essentially
`eliminate' the office-specific use of Area D; therefore, the Employment and Institutional
regulations of ORSCOD, such as increased setbacks, would be no longer applicable to this
development.
Staff has no objections to this request.
Consolidation of the Riverpark Trail along the Canada del Oro Wash
As part of the PAD amendment, the applicant has proposed to amalgamate the 10' bike path and 8'
pedestrian path shown in the current PAD into a single 10' trail on top of the CDO wash levee. The
8' wide pedestrian path would be eliminated, as it is located at the bottom of the levee, and views
from the path would essentially be limited to that of the levee walls and the rear elevations of the
buildings to be constructed. Staff has expressed some concern over safety issues with the applicant,
and the applicant has agreed to widen the path to 12' in width, or the width of the levee if the 12'
wide path would not fit.
Staff has requested the 12' minimum width for the path to conform with the American Association
of State Highway and Transportation Officals (AASHTO) minimum safety guidelines for a multi-
use path of this kind, AASHTO guidelines being the national standard for bicycle and pedestrian
facilities. Upon visiting the site, Staff is convinced that the earth berm on the top of the levee could
be widened, where required,to accommodate the 12' wide path with minimal engineering and cost.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed amendments to the Steam Pump Ranch PAD, with
those conditions listed Exhibit"A" attached herewith.
SUGGESTED MOTIONS:
The Planning and Zoning Commission may wish to consider one of the following motions:
I move to recommend approval to Council of OV9-99-111, amendments to the Steam Pump Ranch
PAD,with those conditions listed in Exhibit "A" attached herewith.
OR
I move to recommend approval to Council of OV9-99-111, amendments to the Steam Pump Ranch
PAD, with those conditions listed in Exhibit "A" attached herewith, and the following added
conditions:
8
OR
I move to recommend denial to Council of OV9-99-111 amendments to the Steam Pump Ranch
PAD, finding that:
OR
I move to continue OV9-99-111, amendments to the Steam Pump Ranch PAD.
ATTACHMENTS:
1. Exhibit"A"—Conditions for Approval
2. PAD Amendment Proposal
3. Letter from Mr. Bill Adler.
F:\OV\OV9\1999\9-99-111\PADAMDPZ.RPT.doc
9
EXHIBIT "A"
PLANNING AND ZONING COMMISSION CONDITIONS OF APPROVAL
OV9-99-111 STEAM PUMP RANCH
PAD AMENDMENT
1. The PAD zoning shall be ordinanced and become vested upon completion of $500,000
worth of improvements. The following improvements shall be required:
• The Riverpark Trail is be constructed by the developer along the full length of
the rear property line, and is to be built as a minimum 12' wide asphalt path in
accordance with AASHTO standards.
• Construction of all water and wastewater lines, and drainage systems
• Construction of two entrances to the project site.
2. The following conditions shall apply to convenience uses:
• All convenience uses shall be subject to the convenience use regulations of the
OVZCR.
• No more than one (1) gasoline station may be constructed, and shall be limited
to Areas A& B.
• No more than two convenience uses shall be constructed in each of Area A and
Area B.
• Drive-through convenience uses shall be restricted to Area A&B.
3. All landscaping shall be in conformance with the landscape requirements listed in the Oro
Valley Zoning Code Revised(OVZCR).
10
PROPOSED AMENDMENT TO STEAM PUMP RANCH PAD, OV9-99-111
June 17, 1999
The following text amendments to the Steam Pump Ranch PAD are requested in order to
provide the Town of Oro Valley with updated design standards that reflect current market
conditions. (please note that referenced page numbers are different from the 1996 PAD
document due to reformatting of the report from Wordperfect to Word)
1. Delete zoning condition no. 2 from the 1996 approval, in which a movie theatre is
required to incorporate a multipurpose capability by providing a staging area for
performances and presentations. The Town is currently pursuing plans to provide
community staging areas elsewhere, and therefore the staging requirement at Steam
Pump Ranch is no longer necessary.
2. Amend zoning condition no. 3 from the 1996 approval,to define that the zoning may
be vested and ordinanced to PAD, once $500,000 worth of perimeter project
infrastructure, i.e., utilities extension, Oracle Road improvements, landscaping,
Riverpark trail, etc. is installed. The riverpark trail will be constructed by the
developer along the full length of the rear property line. The trail will be 12 feet wide
or the width of the berm. The trail will be an asphalt path in accordance with
AASHTO standards. All main utilities will be constructed onsite. Two entrances will
be provided onto the project site. The project will not be mass-graded prior to
construction. In addition, amend condition no. 3, to include an extension of the
zoning expiration date for a period of five years from 1999 to July 10, 2004.
3. Delete zoning condition no. 4 from the 1996 approval, in which any project hotel
must be a 'full-service' hotel, in which the hotel is required to have room service,
meeting spaces, and food and beverage services. Given this location, it is more likely
that any project hotel will be a business or "all suite" hotel that will only require two
to three acres in size. The performance standards have been amended to refer to the
hotel definition as embodied in the Oro Valley Zoning Code and motels have been
included on the prohibited use list.
4. Amend the prohibited use list found on pages 25-28 of the performance standards for
Development Areas A-D, to include a maximum of five convenience uses of which
not more than four will be drive-through restaurants, limited to Areas A and B, for the
Steam Pump Ranch project. The inclusion of these is to avoid a"strip-mall"
appearance and break up an otherwise long and monolithic frontage.
5. Amend the performance standards for all development areas to include a consistent
30' landscape buffer along the project's Oracle Road frontage.
ti
6. Development Areas A-D have been modified to include the clustering of convenience
uses at the project's primary entries within development Areas A and B and the
revision of development Areas C and D to include a wider range of permitted uses
(pages 25-28).
7. Page 33 has been amended to include reference to the Oro Valley Zoning Code
(Revised). Page 34 has been amended to delete the requirement that landscape berm
slopes shall not exceed 3:1 with a minimum two-foot wide flat crown.
8. Page 42 has been amended to list exclusions from the Oracle Road Scenic Corridor
Specific Plan.
9. Page 44 has been amended to delete project phasing and conditional approval. It also
now refers to the current Oro Valley General Plan.
10. Exhibit II H.2 has been modified to consolidate the Riverpark trail on top of the CDO
levee. In addition, a trail node area will be constructed in the park site at the northeast
end of the PAD. The trail node will consist of a shaded area with benches and/or
picnic tables, a drinking fountain and a bicycle rack. The other specifications for the
trail listed in item two will also apply.
11. Upon Town Council approval of this PAD amendment, all Part II PAD exhibits
which utilize the Tentative Development Plan as a basis will be revised to reflect the
new TDP and a finalized PAD report with consistent page numbers and graphics will
be transmitted to the Town.
SITE ANALYSIS AND
PLANNED AREA DEVELOPMENT DISTRICT
SUBMITTAL FOR
STEAM PUMP RANCH
OV9-99-111
June 28, 1996
Revised May 14, 1999
Revised June 17, 1999
CBA File No. 105243-08-0014
CELLA BARR ASSOCIATES
4911 East Broadway Boulevard
Tucson, Arizona 85711
COPYRIGHT 1999 CELLA BARR ASSOCIATES
III. PLANNED AREA DEVELOPMENT GUIDELINES
A. Development Performance Standards
The Steam Pump Ranch PAD Development Standards establish the intensity and
character of project development by prescribing site specific use and performance
standards that are tailored to the unique qualities of the site. All development
within the Steam Pump Ranch PAD will comply with the following Development
Performance Standards and Design Guidelines, as well as the applicable
provisions of the Town of Oro Valley Zoning Code, which have not been
amended herein.
The Steam Pump Ranch PAD will produce a mixed-use activity center
environment that is superior to that provided under traditional C-i and C-2
standards. The PAD will provide an overall fabric and character for Steam Pump
Ranch, that draws together the nearly mile-long development site into a unified
project of compatible land uses and building architecture, consistent landscape
design, integrated signage and entry monumentations, and interconnecting
circulation systems for automobiles and pedestrians.
The following summarizes the primary land use designations:
DEVELOPMENT
AREA LAND USE AREA
*A Convenience Uses 4.0 acres
*B Convenience Uses 4.0 acres
C Retail/Services 14.5 acres
D Retail/Services 19.1 acres
* Note: There will be a maximum of five convenience uses throughout
Development Areas A to D. Not more than four of these will be drive-through
restaurants. Drive-through restaurants will be limited to Areas A and B only.
Steam Pump Ranch Page 24
DEVELOPMENT AREA A 4.0 acres (net usable)
Primary Uses: Convenience Use, including
Drive-through Restaurants clustered at
primary project entries
Secondary Uses: Retail/Services
Restaurant
Bank/Financial Institution
Professional and Medical Offices
Property Development Standards for Primary Uses, Secondary Uses refer to standards for
Development Areas C and D:
1) Maximum Floor Area Ratio (FAR): 0.25
2) Maximum Building Height: 25'
3) Minimum Building Setbacks: 60' (Oracle Road)
4) Minimum Landscaped Open Space: 20%
5) Landscape Buffers: 30' (Oracle Road)
Note: The design standards of the Oro Valley Zoning Code, including Parking and
Loading Requirements, Signs,Native Plant Salvage and Landscape Plan
Requirements and Oracle Road Scenic Corridor Specific Plan and Overlay
District are required for this Development Area, unless modified herein.
The Oro Valley Design Guidelines apply to this Development Area.
The following uses are prohibited: hazardous materials and storage, heavy
equipment manufacturing,refining and salvaging facilities, outdoor equipment
storage facilities, outdoor auto repair or painting, adult entertainment
establishments and motels as defined in the OVZCR(Section 2-101,Nos. 208 &
209).
A maximum of five convenience uses, of which no more than four will be drive-
through restaurants, will be permitted in Areas A and B only.
Steam Pump Ranch Page 25
DEVELOPMENT AREA B 4.0 acres (net usable)
Primary Uses: Convenience Use, including
Drive-through Restaurants clustered at
primary project entries
Secondary Uses: Retail/Services
Restaurant
B anlc/Financial Institution
Professional and Medical Office
Property Development Standards for Primary Uses, Secondary Uses refer to standards for
Development Areas C and D:
1) Maximum Floor Area Ratio (FAR): 0.25
2) Maximum Building Height: 25'
3) Minimum Building Setbacks: 60' (Oracle Road)
4) Minimum Landscaped Open Space: 20%
5) Landscape Buffers: 30' (Oracle Road)
Note: The design standards of the Oro Valley Zoning Code, including Parking and
Loading Requirements, Signs,Native Plant Salvage and Landscape Plan
Requirements and Oracle Road Scenic Corridor Specific Plan and Overlay
District are required for this Development Area, unless modified herein.
The Oro Valley Design Guidelines apply to this Development Area.
The following uses are prohibited: hazardous materials and storage, heavy
equipment manufacturing, refining and salvaging facilities, outdoor equipment
storage facilities, outdoor auto repair or painting, adult entertainment
establishments, and motels as defined in the OVZCR(Section 2-101,Nos. 208 &
209).
A maximum of five convenience uses, of which no more than four will be drive-
through restaurants, will be permitted in Areas A and B only.
Steam Pump Ranch Page 26
DEVELOPMENT AREA C 14.5 acres
Primary Uses: Retail/Services
Restaurant(not drive-through)
Hotel, as defined in OVZCR Section 2-101
Bank/Financial Institution
Professional and Medical Office
Property Development Standards:
1) Maximum Floor Area Ratio (FAR): 0.35 (retail/office)
1.0 (hotel)
2) Maximum Building Height: 39' (hotel)
3) 30' (retail/office)
4) 25' (restaurant)
3) Minimum Building Setback: 120' average (Oracle Road)
30' (Rear property line)
4) Minimum Landscaped Open Space: 20%
5) Landscape Buffers: 30' (Oracle Road)
25' (rear property line,
measured from edge of
riverpark trail)
Note: The design standards of the Oro Valley Zoning Code, including Parking and
Loading Requirements, Signs,Native Plant Salvage and Landscape Plan
Requirements and Oracle Road Scenic Corridor Specific Plan and Overlay
District are required for this Development Area, unless modified herein.
The Oro Valley Design Guidelines apply to this Development Area.
The following uses are prohibited: hazardous materials and storage, heavy
equipment manufacturing,refining and salvaging facilities, outdoor equipment
storage facilities, outdoor auto repair or painting, adult entertainment
establishments and motels as defined in the OVZCR(Section 2-101,Nos. 208 &
209).
Steam Pump Ranch Page 27
DEVELOPMENT AREA D 19.1 acres, including 2 acre park
Primary Uses: Retail/Services
Restaurant(not drive-through)
•
Hotel, as defined in OVZCR Section 2-101
Bank/Financial Institution
Professional and Medical Office
Property Development Standards:
1) Maximum Floor Area Ratio (FAR): 0.35 (retail/office)
1.0 (hotel)
2) Maximum Building Height: 39' (hotel)
30' (retail/office)
25' (restaurant)
3) Minimum Building Setback: 120' average (Oracle Road)
30' (Rear property line)
4) Minimum Landscape Open Space: 20%, including 2 acre park
5) Landscape Buffers: 30' (Oracle Road)
25' (rear property line,
measured from edge of
riverpark trail)
Note: The design standards of the Oro Valley Zoning Code, including Parking and
Loading Requirements, Signs,Native Plant Salvage and Landscape Plan
Requirements and Oracle Road Scenic Corridor Specific Plan and Overlay
District are required for this Development Area, unless modified herein.
The Oro Valley Design Guidelines apply to this Development Area.
The following uses are prohibited: hazardous materials storage, heavy equipment
manufacturing, refining and salvaging facilities, outdoor equipment storage
facilities, outdoor auto repair or painting, adult entertainment establishments and
motels as defined in the OVZCR(Section 2-101,Nos. 208 & 209).
Steam Pump Ranch Page 28
plant material masses, and lighting.
Grouped masses of plant material should be designed to
complement architectural elevations and roof lines through color,
texture, density and form on both the vertical and horizontal
planes.
Landscaping design shall establish project identity and accentuate
common entrance areas. Landscaping should be interspersed
within parking areas and used to screen parking areas and
non-residential storage areas.
Native and drought-tolerant plant material shall be used and non-
drought-tolerant plant material will be limited to 25% of the
landscaped area.
Appropriate plant materials should be used to define space, create a
visual image and separate differing land uses.
Landscaping shall consider solar rights of adjacent structures.
Landscaping and walls or a combination, shall be utilized to
visually screen and/or physically enclose outdoor storage areas,
loading docks and ramps, transformers, storage tanks, and other
appurtenant items of poor visual quality.
All landscaped areas will utilize underground drip irrigation.
All landscaping shall comply with Oro Valley Zoning Code
Revised (OVZCR) and the Oracle Road Scenic Corridor Specific
Plan and Overlay District.
Steam Pump Ranch Page 34
• Streetscapes
Generally,parking lot design shall emphasize efficient circulation
patterns, which allow for reduced speeds, variations of views and
flexibility of building orientations. Setbacks of buildings will be
varied to create an interesting Oracle Road street scene.
In order to achieve a uniform landscape theme within the Plan
Area,the areas within the medians,parking strips, and streetscape
setback areas shall have a coordinated landscape palette.
Parking areas which are situated along Oracle Road shall be
screened by a combination of landscape berm or vegetative screen
or walls with an average height of 40" measured from the parking
surface.
Landscaping will be permitted within the Oracle Road/State Route
77 right-of-way to provide a continuity of landscape character
between the project and right-of-way streetscape.
• Project Entries
Primary and secondary project entries on Oracle Road serve to
introduce and define the limits and character of the Steam Pump
Ranch activity center. The landscape concept at these project
entries is intended to announce the project theme through the use
of decorative walls, special signing, enriched accent landscaping
and a widened roadway.
Entries into interior sites will consist of defined areas and should
include such features as monumentation, signage, and native and
introduced vegetation. All entries shall be consistent with the
project's integrated design program of landscaping,
monumentation, signage and lighting.
Steam Pump Ranch Page 34
approval of the Design Review Committee.
All roof and ground mounted mechanical equipment shall be screened
from public view on all sides by an enclosure which is an integral part of
the overall building design and volume.
No mechanical equipment shall be exposed on the wall surface of a
building.
All gutters and downspouts shall be integrated with the building
architecture.
Vents, louvers, exposed flashing, overhead doors and service doors shall
be painted consistent with the color scheme of the building.
The requirements of the Oracle Road Scenic Corridor Specific Plan and
Overlay District of the Oro Valley Zoning Code, shall be adhered,
excluding the required 150' building setback and 100' landscape buffer
per Employment and Institutional Regulations, Section 10-407D2.
Steam Pump Ranch Page 42
Severability - If any provision, sentence, clause, section or subsection or
phrase of this Plan is for any reason held to be invalid or unconstitutional,
such decision shall not affect the validity of the remaining portion or
portions of this Plan.
2. Consistency
All of the provisions of the Steam Pump Ranch PAD, as well as any land
use authorized by the Plan, shall be consistent with the Town of Oro
Valley General Plan,adopted July 10, 1996 (Focus 20-20). Consistency
shall mean that the Steam Pump Ranch PAD, as described herein, is in
conformance with the objectives,policies, general land uses and programs
specified in the Oro Valley General Plan, Oro Valley Zoning Code
Revised (adopted March 13, 1981, Ordinance No. 58) and the Oro Valley
Convenience Use Ordinance. Where standards are not specified, the Oro
Valley Zoning Code Revised shall govern development.
3. Assessments
Prior to the issuance of any permits for grading or construction on Steam
Pump Ranch, a Development Opportunity Assessment, will be prepared to
reflect required offsite Oracle Road improvements and will stipulate each
Development Area A through D, or portion thereof, be required to escrow
with the Town an amount equal to a pro rata share of the road
improvements based upon the acreage of the development area or portion
thereof. It is anticipated that ADOT will fund one-half the cost of future
traffic signalization.
4. Convenience Uses
Freestanding banks and financial institutions, service stations, convenience
uses, drive-through/drive-in restaurants shall be subject to the
requirements and development standards of Article 9-1 of the Oro Valley
Steam Pump Ranch Page 44
Zoning Code, except these specific uses will not be subject to a
Conditional Use Permit.
Steam Pump Ranch Page 45
*LEY
TOWN OF ORO VALLEY
COMMUNITY DEVELOPMENT DEPARTMENT
• Building Safety • Parks and Recreation
4 • Planning and Zoning • Transit Services
A
�► Planning and Zoning
A'PO/
O 1g�D� 11,000 N.La Canada Drive,Oro Valley AZ 85737
//N D ED Phone: (520)797-9797 Fax(520)742-1022
December 2, 1999
Gordon Stone, ASLA
Assistant Vice President
Stanteck Consulting
4911 E. Broadway
Tucson AZ 85711
Dear Gordon:
For your convenience, one copy of the minutes from the September 22, 1999 Town
Council meeting and one signed copy of Ordinance (0)99-52 , including Exhibit "A" are
enclosed.
Thank you for your continued interest in the Town of Oro Valley. Should you have any
questions and/or comments please call me.
Sincer y,
•
B odine, AICP
Planning and Zoning Administrator
F:\ov\ov9\1999\9-99-111\TCapproval.ltr.doc
CELLA BARR May 14, 1999
ASSOCIATES ,
4911 EAST BROADWAY Mr. Bryant Nodine r �'
TUCSON, ARIZONA 85711 , ,
[520] 750-7474 Town of Oro Valley �99
FAX [520] 750-7470 11000 N. La Canada Drive
Oro Valley, Arizona 85737
Re: Steam Pump Ranch PAD Amendment, OV9-96-1
CBA File No. 105243-14-0014
Dear Bryant:
Herewith transmitted is a request for a text amendment to the Steam Pump Ranch
PAD for the 41.6 acre property located on the north side of Oracle Road,
approximately one-quarter mile north of First Avenue. The PAD amendment
submittal conforms to staff requirements as discussed during the pre-application
conference on May 10, 1999.
Attached are the following:
1. Proposed PAD Text Amendment
2. Review fee in the amount of$500
3. List of property owners within 600 feet of the subject property
4. Letter of Authorization
5. Assessors Map and Parcel Information
6. 12 copies of the Application Package, including revised TDP
Please schedule this request for the July 6, 1999, Planning and Zoning
Commission public hearing. Should you have any questions or require additional
information in order to process this matter,please contact me at your
convenience.
Sincerely,
CELLA BARR ASSOCIATES
or onStone, ASLA
Assistant Vice President
c: Mark Weinberg, Diamond Ventures, Inc.
OFFICES IN ARIZONA
CALIFORNIA & NEVADA
ENGINEERING • PLANNING • LANDSCAPE ARCHITECTURE • WATER RESOURCES • SURVEYING
PROPOSED AMENDMENT TO STEAM PUMP RANCH PAD, OV9-96-1
The following text amendments to the Steam Pump Ranch PAD are requested in order to
provide the Town of Oro Valley with updated design standards that reflect current market
conditions. (please note that referenced page numbers are different from the 1996 PAD
document due to reformatting of the report from Wordperfect to Word)
1. Delete zoning condition no. 2 from the 1996 approval, in which a movie theatre is
required to incorporate a multipurpose capability by providing a staging area for
performances and presentations. The Town is currently pursuing plans to provide
community staging areas elsewhere, and therefore the staging requirement at Steam
Pump Ranch is no longer necessary.
2. Amend zoning condition no. 3 from the 1996 approval, to define that the zoning may
be vested and ordinanced to PAD, once $500,000 worth of perimeter project
infrastructure, i.e., utilities extension, Oracle Road improvements, landscaping,
Riverpark trail, etc. is installed (project will not be mass graded prior to construction).
In addition, amend condition no. 3, to include an extension of the zoning expiration
date for a period of five years from 1999 to July 10, 2004.
3. Delete zoning condition no. 4 from the 1996 approval, in which any project hotel
must be a 'full-service' hotel, in which the hotel is required to have room service,
meeting spaces, and food and beverage services. Given this location, it is more likely
that any project hotel will be a roadside hotel that will only require two to three acres
in size. The performance standards have been amended to refer to the hotel definition
as embodied in the Oro Valley Zoning Code and motels have been included on the
prohibited use list.
4. Amend the prohibited use list found on pages 25-28 of the performance standards for
Development Areas A-D, to include a maximum of five convenience uses of which
not more than four will be drive-through restaurants for the Steam Pump Ranch
project, considering the amount of highway frontage and total square footage allowed
for this project.
5. Amend the performance standards for all development areas to include a consistent
30' landscape buffer along the project's Oracle Road frontage.
6. Development areas A-D have been modified to include the clustering of convenience
uses at the project's primary entries within development areas A and B and the
revision of development areas C and D to include a wider range of permitted uses
(pages 25-28).
7. Page 34 has been amended to delete the requirement that landscape berm slopes shall
not exceed 3:1 with a minimum two-foot wide flat crown.
8. Page 42 has been amended to list exclusions from the Oracle Road Scenic Corridor
Specific Plan.
9. Page 44 has been amended to delete project phasing and conditional approval.
10. Exhibit II H.2 has been modified to consolidate the Riverpark trail on top of the CDO
levee.
11. Upon Town Council approval of this PAD amendment, all Part II PAD exhibits
which utilize the Tentative Development Plan as a basis will be revised to reflect the
new TDP and a finalized PAD report with consistent page numbers and graphics will
be transmitted to the Town.
NOTICE OF PUBLIC HEARING
BEFORE THE ORO VALLEY TOWN COUNCIL
In accordance with ARS 9-462,9-471 and Section 3-108 of the Oro Valley Zoning Code Revised,NOTICE
OF PLANNED AREA DEVELOPMENT (PAD) AMENDMENT PUBLIC HEARING BEFORE THE
ORO VALLEY TOWN COUNCIL IS HEREBY GIVEN:
TIME : at or after 7:00 p.m.on WEDNESDAY,JANUARY 5TH,2000
PLACE: Oro Valley Town Hall
11,000 N. La Canada Drive
Oro Valley,Arizona
SUBJECT: OV9-99-111 REQUEST TO AMEND ORDINANCE NO.(0)99-52, THE STEAM PUMP
RANCH PLANNED AREA DEVELOPMENT AMENDMENT
A request by Town Staff to amend Ordinance No. (0)99-52, Amendment to the Planned Area Document
for the Steam Pump Ranch Planned Area Development,to correct two errors relative to the following:
1. Extension of the conditional zoning for five years from the date of approval of Ordinance
No.(0)99-52.
2. Amending the conditions for vesting the zoning once$500,000 in improvements have been
completed on-site,relative to the construction of main water and wastewater trunk lines on-
site.
If approved, the proposed changes will affect the amendment to the Steam Pump Ranch PAD approved
by Town Council on September 22nd, 1999.
LOCATION: The Steam Pump Ranch Planned Area Development encompasses the area west of
Oracle Road, bounded by the Steam Pump Ranch buildings to the south, and the
CDO wash to the west and north. The area is immediately opposite the Allied
Signal complex on Oracle Road.
DESCRIPTION: A map of the Steam Pump Ranch Planned Area Development is available for
review at the Oro Valley Town Hall, Community Development Services Building,
11,000 N. La Canada Drive,Oro Valley,Arizona,during normal business hours.
Members of the public are invited to this meeting and will be given an opportunity to speak. An agenda for
the mee g will be made available 24 hours prior to meeting time. Should you have any questions
regard?!this matt r,please contact David Marsh at(520)797-9797,or at dmarsh@orovalley.net
• + ti
B Mrsdine AICP
Planning&Zoning Administrator
Town of Oro Valley
F:\OV\OV9\1999\9-99-111\NOTICE ORD AMEND.TC.doc
POSTED: 12/16/99
4:30 PM
SR
AFFIDAVIT OF PUBLICATION
STATE OF ARIZONA)
. :ss. ;Ali k IY>
COUNTY OF PIMA ► LAURA M I KEL L. being first
duly sworn, deposes and says that (he) (she) is the Legal Advertising Manager
NOTICE OF PUBLIC
HEARING BEFORE THE ORO
VALLEY TOWN COUNCIL of THE DAILY TERRITORIAL, a daily newspaper printed and published in the
In accordance with ARS 9-462,
9-471 and Section 3-108 of the
Oro Valley Zoning Code Revised,
NOTICE OF PLANNED AREA County of Pima, State of Arizona, and of general circulation in the City of Tucson,
DEVELOPMENT (PAD)
AMENDMENT PUBLIC HEAR-
ING BEFORE THE ORO VAL-
LEY TOWN COUNCIL IS County of Pima, State of Arizona and elsewhere, and the hereto attached
HEREBY GIVEN:
TIME: at or after 7:00 p.m. on
WEDNESDAY, SEPTEMBER
15TH, 1999 THE STEAM M 'UMP RANCH
PLACE: Oro Valley Town Hall PLANNED AREA
11,000 N. La Canada Drive Oro Valley, Arizona DEVELOP!I ENT
SUBJECT: OV9-99-111 RE-
QUEST TO AMEND THE PUBLIC NOTICE
STEAM PUMP RANCH
PLANNED AREA DEVELOP-
MENT
A request by the land owner to
amend the Planned Area Docu-
ment for the Steam Pump Ranch
Planned Area Development,rela- was printed and published correctly in the regular and entire issue of said THE
tive to the following:
1. Amend a variety of develop-
ment standards, including: dele-
tion of a multi-purpose state area, DAILY TERRITORIAL for issues; that the first was made
landscape buffers along Oracle
Road to 30' in width, setbacks
from Oracle Road,and amending
exclusions from the Oracle Road on the day of 19
Scenic Corridor Overlay District
(ORSCOD). 30 h .AU.1G1_+ "l..
2. Amend the conditions for ves-
ting the zoning once$500,000 in and the last publication thereof was made on the day of
improvements have been corn- : 0 h
plated on-site.
3.Allow for the development of a
• maximum of four convenience . 19 ;that said publication
uses on site. AUGUST ,9
If approved, the proposed
changes will affect the uses ap-
proved and development require- , was made on each of the following dates,to-wit:
ments for the Steam Pump
Ranch PAD.
LOCATION: The Steam Pump
Ranch Planned Area Develop- 08/30/99
ment encompasses the area west
of Oracle Road, bounded by the
Steam Pump Ranch buildings to
the south, and the CDO wash to
the west and north. The area is •
immediately opposite the Allied
Signal complex on Oracle Road. , . , Cl/
DESCRIPTION: A map of the • 1
Steam Pump Ranch Planned Request of '
Area Development is available TOWN' F I: RCS VALLEY
for review at the Oro Valley Town
Hall, Community Development
Services Building, 11,000 N. La
Canada Drive, Oro Valley, Ar-
izona, during normal business
hours.
Members of the public are invited
to this meeting and will be given �
an opportunity to speak. An The I.I Territorial'
agenda for the meetin will be
9 9
made available 24 hours prior to
meeting time. Should you have
any questions regarding this mat-
ter, please contact David Marsh
at(520) 797-9797,or at dmarsh- By LV-Ltiti@orovalley.net. �1, ryik.
Bryant Nodine Bryant Nodine
AICP Planning 8 Zoning Admini-
strator Town of Oro Valley Subscribed and sworn to before me this day of •
Pub: The Daily Territorial
August 30, 1999 AUGUST
Reg: Town of Oro Valley
pnsteamp 08/30/99 be 19 OFFICIAL SEAL
:c
�!!`- DAWN LEIGH DOUGALL
NOTARY PUBLIC-ARIZONA
►topr PIMA COUNTY
‘4),A3_,)-C) M Comm. Extires Sept.20,2002
Notary Public in and for the County of Pima, State of Arizona
My Commission Expires:)1 (:)10',3—
NOTICE OF PUBLIC HEARING
BEFORE THE ORO VALLEY TOWN COUNCIL
REVISED DATE
In accordance with ARS 9-462, 9-471 and Section 3-108 of the Oro Valley Zoning Code Revised,NOTICE
OF PLANNED AREA DEVELOPMENT (PAD) AMENDMENT PUBLIC HEARING BEFORE THE
ORO VALLEY TOWN COUNCIL IS HEREBY GIVEN:
TIME : at or after 7:00 p.m. on WEDNESDAY,SEPTEMBER 22ND , 1999
PLACE: Oro Valley Town Hall
11,000 N. La Canada Drive
Oro Valley, Arizona
SUBJECT: OV9-99-111 REQUEST TO AMEND THE STEAM PUMP RANCH PLANNED AREA
DEVELOPMENT
A request by the land owner to amend the Planned Area Document for the Steam Pump Ranch Planned
Area Development, relative to the following:
1. Amend a variety of development standards, including: deletion of a multi-purpose stage
area, landscape buffers along Oracle Road to 30' in width, setbacks from Oracle Road, and
amending exclusions from the Oracle Road Scenic Corridor Overlay District(ORSCOD).
2. Amend the conditions for vesting the zoning once $500,000 in improvements have been
completed on-site.
3. Allow for the development of a maximum of four convenience uses on site.
If approved, the proposed changes will affect the uses approved and development requirements for the
Steam Pump Ranch PAD.
LOCATION: The Steam Pump Ranch Planned Area Development encompasses the area west of
Oracle Road, bounded by the Steam Pump Ranch buildings to the south. and the
CDO wash to the west and north. The area is immediately opposite the Allied
Signal complex on Oracle Road.
DESCRIPTION: A map of the Steam Pump Ranch Planned Area Development is available for
review at the Oro Valley Town Hall, Community Development Services Building.
11.000 N. La Canada Drive. Oro Valley, Arizona, during normal business hours.
Members of the public are invited to this meeting and will be given an opportunity to speak. An agenda for
the me- �g will be made available 24 hours prior to meeting time. Should you have any questions
regar. g this ma e , .lease contact David Marsh at(520) 797-9797, or at dmarshaorovallev.net .
itens, .
Br7Vre ine AICP
Planning&Zoning Administrator
Town of Oro Valley
F.\OV\0 V9\1999\9-99-III\NOTICE2.TC.doc
POSTED: 9/7/99
IL 9:00 AM
SR
NOTICE OF PUBLIC HEARING
BEFORE THE ORO VALLEY PLANNING AND ZONING COMMISSION
In accordance with ARS 9-462, 9-471 and Section 3-108 of the Oro Valley Zoning Code Revised,NOTICE
OF PLANNED AREA DEVELOPMENT (PAD) AMENDMENT PUBLIC HEARING BEFORE THE
ORO VALLEY PLANNING AND ZONING COMMISSION IS HEREBY GIVEN:
TIME : at or after 6:00 p.m.on TUESDAY,JULY 6TH,1999
PLACE: Oro Valley Town Hall
11,000 N.La Canada Drive
Oro Valley,Arizona
SUBJECT: OV9-99-111 REQUEST TO AMEND THE STEAM PUMP RANCH PLANNED AREA
DEVELOPMENT
A request by the land owner to amend the Planned Area Document for the Steam Pump Ranch Planned
Area Development,relative to the following:
1. Amend a variety of development standards, including: deletion of a multi-purpose stage
area, amending the requirement for a "full-service" hotel, landscape buffers along Oracle
Road to 30' in width, and amending exclusions from the Oracle Road Scenic Corridor
Overlay District(ORSCOD).
2. Amend the conditions for vesting the zoning once $500,000 in improvements have been
completed on-site.
3. Allow for the development of a maximum of five convenience uses on site.
If approved, the proposed changes will affect the uses approved and development requirements for the
Steam Pump Ranch PAD.
LOCATION: The Steam Pump Ranch Planned Area Development encompasses the area west of
Oracle Road, bounded by the Steam Pump Ranch buildings to the south, and the
CDO wash to the west and north. The area is immediately opposite the Allied
Signal complex on Oracle Road.
DESCRIPTION: A map of the Steam Pump Ranch Planned Area Development is available for
review at the Oro Valley Town Hall, Community Development Services Building,
11,000 N.La Canada Drive,Oro Valley,Arizona,during normal business hours.
Member/•f the public are invited to this meeting and will be given an opportunity to speak. An agenda for
the eting will se 'ad• available 24 hours prior to meeting time. Should you have any questions
reg. din:this m. !.,pl a contact David Marsh at(520)797-9797.
' _
Bryn :dine AICP
Planning&Zoning Administrator
Town of Oro Valley
\\OV PZD\PZ1\OV\OV9\1999\9-99-111\NOTICE.PZ.doc
POSTED: 6/17/99
3:00 PM
SR
MOMPIPMPw
AFFIDAVIT OF PUBLICATION
• mrATE OF ARIZONA)
:ss.
COUNTY OF PIMA STACEY S T I NSON being first
NOTICE OF duly sworn, deposes and says that (he) (she) is the Legal Advertising Manager
PUBLIC HEARING
BEFORE THE ORO VALLEY
PLANNING AND
ZONING COMMISSION of THE DAILY TERRITORIAL, a daily newspaper printed and published in the
In accordance with ARS 9-462.
9-471 and Section 3-108 of the
Oro Valley Zoning Code Revisec,
NOTICE OF PLANNED AREA County of Pima, State of Arizona, and of general circulation in the City of Tucson,
DEVELOPMENT (PAD) AMEND-
MENT PUBLIC HEARING BE-
FORE THE ORO VALLEY PLAN-
NING AND ZONING COMMIS- County of Pima, State of Arizona and elsewhere, and the hereto attached
SION IS HEREBY GIVEN:
TIME: at or after 6:00 p.m. on
TUESDAY, JULY 6TH, 1999 THE STEAM PUMP RANCH
PLACE: Oro Valley Town Hall
11,000 N. La Canada Drive Oro P'L.ANNED AREA
Valley, Arizona •• -• -•-
SUBJECT: 0,19-90-1l1 RE- ,. . DEVELUPMEIII
QUEST TO AMEND THE PUr•SLwIC NO+••IC,E
STEAM PUMP RANCH
PLANNED AREA DEVELOP-
MENT
A request by the land owner to
amend the Planned Area Docu-
ment for the Steam Pump Ranch
Planned Area Development,rela-
tive to the following: was printed and published correctly in the regular and entire issue of said THE
1. Amend a variety of develop-
ment standards, including: dele-
tion of a multi-purpose stage
area, amending the requirement DAILY TERRITORIAL for issues; that the first was made
for a "full-service" hotel, land-
scape buffers along Oracle Road �.
to 30' in width, and amending
exclusions from the Oracle Road on the day of 19
Scenic Corridor Overlay District -.
(ORSCOD). f«.1 :i'l J UNE:.
2. Amend the conditions for ves-
ting the zoning once $500,000 in and the last publication thereof was made on the day of
improvements have been corn- 1 s
pleted on-site.
3.Allow for the development of a
maximum of five convenience 19 ;that said publication
uses on site.
If approved, the proposed
changes will affect the uses ap-
proved and development require- was made on each of the following dates,to-wit:
ments for the Steam Pump
Ranch PAD.
LOCATION: The Steam Pump 6/2 1/9 9
Ranch Planned Area Develop-
ment encompasses the area west
of Oracle Road, bounded by the
Steam Pump Ranch buildings to •
the south, and the CDO wash to
the west and north. The area is
immediately opposite the Allied
Signal complex on Oracle Road.
DESCRIPTION: A map of the Re quest of ,
Steam Pump Ranch Planned qTOWN OF ORO VALLEY
Area Development is available
for review at the Oro Valley Town
Hall, Community Development
Services Building, 11,000 N. La
Canada Drive, Oro Valley, Ar-
izona, during normal business
hours.
Members of the public are invited
to this meeting and will be given The •an opportunity to speak. An D 11 Territorial•agenda for the meeting will be
made available 24 hours prior to
meeting time. Should you have
any questions regarding this mat-
ter, please contact David Marsh
at (520) 797-9797. By ?
Bryant Nodine Bryant Nodine
AICP Planning & Zoning Admini-
strator Town of Oro Valley
Pub: The Daily Territorial Subscribed and sworn to before me this day of
June 21, 1999
Req: Town of Oro Valley `: woun. OFFICIAL SEAL
pnsteam 6/21/99 tie 19 r. '.l DAWN LEIGH DOUGALL
_• 1 NOTARY PUBLIC-ARIZONA PIMA COUNTY
k.,
Corr. Ey ices Sept.20,2112
Notary Public in and for the County of Pima, State of Arizona
My Commission Expires: i'144b‘'',4
Itt31 CBA File No. i05243-14-0014\T:\Admin\0524314\abbubsor.doc
Date: May 14, 1999
Re: Steam Pump Ranch
Page 1 of 2
LIST OF PROPERY OWNERS WITHIN
600' OF STEAM PUMP PAD AREA
1. Vistoso Partners L.L. C. Assessor Parcel No. 220-04-008J
5861 S. Kyrene Road, Suite 1
Tempe, AZ 85283-5219
2. State of Arizona Assessor Parcel No. 220-04-008D
3. Parcel Z L.L.C. Assessor Parcel No. 220-04-010E
Attn: W.J. Harrison&Associates, P.C.
3 561 E. Sunrise Drive, Suite 201
Tucson, AZ 85718-3204
4. Garrett Corporation Assessor Parcel No. 220-04-010B
Attn: Jacalyn A. Askin
M/S 79 ADM-2.
P.O. Box 38001
Tucson, AZ 85740
5. Garrett Corporation Assessor Parcel No. 220-11-002H
Attn: Jacalyn A. Askin
M/S 79 ADM-2.
P.O. Box 38001
Tucson, AZ 85740
6. Foothills Business Park
Rusty Adams Investments L.L.C. Assessor Parcel No. 220-10-006A
10960 N. Stallard P1.
Tucson, AZ 85737
Roussel Hoechst Marion Inc. Assessor Parcel No. 220-10-013A
P.O. Box 9627 Assessor Parcel No. 220-10-014A
Kansas City, MO 64134-0627
Stephen D. Lunceford& Assessor Parcel No. 220-10-015A
Glenn Luchies & Triple S. Realty Co. Assessor Parcel No. 220-10-016A
P.O. Box 100 Assessor Parcel No. 220-10-017A
Durango, CO 81302
nyll CBA File No. .i5243-14-0014\T:\Admin\0524314\as-or.doc
Date: May 14, 1999
Re: Steam Pump Ranch
Page 2 of 2
Netmedia, Inc. Assessor Parcel No. 220-10-018A
P.O. Box 68416
Tucson, AZ 85737-8416
RCDK Realty I Ltd. Partnership Assessor Parcel No. 220-10-020B
19367 Camino Del Aquila
Escondido, CA 92025-3502
7. Henry E. Leiber Jr. & Assessor Parcel No. 220-08-001C
John L. Leiber Assessor Parcel No. 220-08-001G
10500 N. Oracle Road Assessor Parcel No. 220-08-002A
Tucson, AZ 85704
41-24•
�'
41-24 3�`
r,,
� �O CA TALINA
1\
40-32 � W C
,°� STATE
-pALISADtS M�AII T y o PARK
J
, ,
1
O�
i o ORS WASH
) /CAN I.ORAILNAGEWA
L. ORO VALLEY
•
PIMA COUNTY 7 :: ,
: ..PS�
0- 0
OROIMP 411111111111 �� ��P
iALLEYi -; 4 4,\A
, .....•••••••••••
6p0
CO'
i •••••••••••••••••
••••••••• G A
, #//'" 40,
.•
16 .60 �, .,o, _,;„ ozio., 4dz's°
.._____- , , ,,.ft,4r N. f
_ _ _
.,.- --, •• , 4
•
S� Pu 0�1NlCOcRNE 41-75
\\IP 0 KarocE ai 46-20
SCALE: 1" = 880'
NOTIFICATION AREA
•
•
• FOUNDERS BUSINESSPA
.._
COO PATH
. .
ORO VALLEY , ARIZON
i JR_1 ! 1 ' 1 1 i i 1 r •8' i 1 1 ! + j i t i i i i ; I ! 1 i I I i l ' ( ! i yy 1 ! ' I 1 i ; ! i i ( ! ' I I i i ! i , ; "i t ' i j !
:9; ! t ; I • ;9' ! i i '9. I 1451___ ! , y t , j i t ( 1 1 1 1 I + ! }
t t i + . • . . . I 1 i • i I 9j 9i I 8 f 1 9i ` i g I 9) 1 + 9 ' I �8, I i ;9: 1 j 6' i i7 I } 1 '
BASIN1 , ; 1• I i t • r 1 i I I s I I 1 1 1 I 1 1 1 L� 11 ( t i ! f I I ! I I I I t t 1 t I ( i 1 i __ 1 _� ! 1 i9 I
S PACES ; r
•
-- 90PARKINGS ;
,6 I. g ; I I I 1 1 i • 1 1 { ; Lcmowc T_ {._ 1 ! i i I', ! ; ! i , i ' i , i I s ( l ; 1 l 1 ' ' i i I i i 1
! ' n t t ! ' i }11 1 , :71 i I i _ , 6t 1 I i9' ; ; ; :9; ; I 1 ; , !9 1 1 1 1 1 I l I i�i I i + ! i i { ,91 ( I E2 t
p E ! t ` i ' I L0Ap9JG I I ,ri
N.
t e r
a 8
�g • '
f 6 •
FLR: 11,880 SF 6 9 6 ` 6 i81 ( 1 1 ' 1 aT FLft_ 5,000 S%-
./ 10,500SF 1ST..... �,4...e•.l ( 1 ( 7 al '.
2iD..F1F.` 21,880 SF i iT10 FLtZ. .,,0. • ic! 1 1 ( a0 ! ( ,r
i I 0 : i
00 S
{{
9 6 1___ 25 0 F •i . fi ' ; 1 ( 51 I + !61 1 I Is I
• ... ......_ ,
1 � ' i i i �• � 1 ` i 1 ` ' S-}5 � �j i i � I '
. . 11 _, 1 . 111 1 J L._
/� o, I ;9 1 { I r _ i 9 i 1 ! 1 i�{` ..
91 1 i I i ` �9' 8' I I i { i I I ' '
9
` 9 ' 1 I. ( 17i ; ` f ' ! l i j I ( ^" :7 CROSS
05 - { = • ; I i + I I t j 5( 11 !7! , •1 i ( QPT{ONALANCH
j i. !
ooSF I . 1 1 . . t , ri . 1 . 31 i
-\
3,0 / OVER WITH STEAM MP
•
9 9 9—r-9 $�� 5 �— 5
�.J - -=---• ____ •---is��� __ g 7
SF -�` ;
4,000 9 ,
'.\\J
---=--- --; 7,500 SF 36S El
, Lt.) 7 CI
(> E A 1�/1 PUMP RANCH
----',�--� 5,5G0 SF }�
� 10 � i r -' ( ) L0401,
i , 1::::::[
1 9/ I 1 16!
o tp.'
� ! •
i !81 1 0 ' i I I ! 1 i 1 i LOADING i t , O
. \
2 t '4 -'
,610 S
` 3 .7 4,200 SF 6. �..
i .4 i `t
i6! 1 ! 1. •
1.2.
.!
r
t
•
}iC ;5 !
1 4
.TEA 4,000 SF 0 4; , 1
0-_,
a L
s a p
7 STRUCT i0
0 SF41
ORACLE ROAD
t -
� TA -
DA 1 PARKING TIO
.
SOV/IRE FEET PARKING RA
155
NO- et.. 2,610 SF S�t000�0 11-t>S
2,bt0 Sr t 20
RETAIL
3 RE1Atl ♦.000 SF 3 t 9
3.000 Sr Si.,
a OFFICE 5/1000 tCq♦
PLAN 1a.s°°Si
- SITE S RE1� 2t 6E0 Si 5/1— 65.6t
6 t5T FLOOR gETA1L 2t,6a0 SF 3J t�0 t25
OFFICE
7 RETAIL OOR 25,000 SF ]r tO00000 9.376
a ornCE 3.126 Sr la/��ppt0p����� h
�"-4flr-O�' .. 7.5005E Sd('�' 10
` y RESTAURANT 2,000 Sf
10 REtA1l
6 ;� _ l�l R[STAURM/T 3.SOOSF t0/t000 76
___________4
r l -t 1,600 5F t♦.7
_ .. l y \ 71 RE57AURANT S,g/1O00
14 t2 9A A.200 SF n's
- 4.500 SF 5/1000 25
t3 6RAIfE 910P 5/1000
5.000 Sr
DATE: 12-02-03 _ ,s SCE Sr
�� '/t000
�-.,_,��_�.._---"' 1►m fL00R Of1'ICE t.000 SF S/1000
Z.
a6 RETAIL
721 SPACES
122.906 SF
NORTH roTALS ztt )
•
i�Ts.2 s
A
1pTN.SlE AREA ta2,90E SF.
v
0
TOTAL gl)tOMIG AREA 721 SPACES
TOTAL PARKING REl%Hi£0 tag SPACES
7+01AL PARKMG PROMOEO (659 SPACES+90 SPACES OFF yTE)
• 2t.56 ;
r CO'.E1.E
4
F
e
i
D
!n
;1
P
L