Loading...
HomeMy WebLinkAboutOV1501398 t Mov5 0 1 3 9 ? O'J ' 50 t i' o.tp Y A �r R TOWN OF ORO VALLEY oQ' ckr DEVELOPMENT & INFRASTRUCTURE SERVICES DEPARTMENT V GI) ir 11000 N. LA CANADA DRIVE, ORO VALLEY, AZ. 85737 PHONE: (520) 229-4800 FAX: (520) 742-1022 �► -----° a www.orovalleyaz.gov/dis ��QUNDED AAA 1,2 GENERAL APE ::ATION FORM , Office Use Only OVCase#: t V � 0 )-39R. X.0-Li g v 3 nfi ,__,;catio n Typa: tajor General Plan Amendment ❑ Final Plat SEP 2 4 2015 R • ezoning/PAD Amendment ❑ Pre-Application ❑ I lanned Area Development ❑ Zoning Verification BY. Li Conditional Use Permit ❑ Sign Criteria ❑ oning Code Amendment ❑ Sign - PAD Exemption J Lonceptual Site Plan Cl Master Sign Program • onceptual Public Art ❑ Communication Facility—Tier 1 and 2 Minor ❑ onceptual Architecture ❑ Communication Facility—Major ❑ nal Site Plan ❑ Revised Development Plan ❑ ;onceptual Landscape Plan ® Other Existing Conditions Drainage Report Sub get Prcperty Information: 220-06-001G; 220-06-001F; Address: First Avenue Projects Parcel/Tax Code: 220-09-0300 thru 220-09-1000; 220-09-016A F`ubdi isio^/Commercial Center Name: Nakoma Sky; Sanctuary at Silverhawke,Villages at Silverhawke Look/Page or Sequence Number: Lot Number(s) Legal Description: Portion of Sections 6 and 7, T12S, R14E Section/Township/Mange: Sec. 6 and 7, T12S, R14E Area of Property: 358 Ac Existing Land Use: Vacant Proposed Land Use: Single Family Residential Appilcant Information: * If more than one, attach list App'`oant *: Name.: Corey Thompson Firm: The WLB Group r-ddress: 4444 E. Broadway City: Tucson State: AZ Zip: 85711 Telephone: (520) 881-7480 Fax: Email: cthompson@wlbgroup.com Property Owner(s) if different from Applicant *: Name: Firm: Address:- City: State: Zip: Telephone: Fax: Email: Consultant*: Civil Engineer (Discipline) r..ame: Corey Thompson Firm: The WLB Group, Inc. Address: 4444 E. Broadway City: Tucson State:AZ Zip: 85711 Telephone: (520) 881-7480 Fax: Email: cthompson@wlbgroup.com 6 • a.3 CI" C7PTUAL, DESIGN REVIEW PACKAGE — SUBMITTAL CHECKLIST: All submittal r'quirements are included herein. please note additional site specific information may be required. Fees (Refer to the Section 1.4 Fee Schedule of this process guide) C Traffic Impact Analysis (4 copies) A` rrnative Parking Analysis (if applicable) (2 copies) • Pblic CAreach Report (see Section 1.4 of this process guide) (2 copies) • Narrative providing a brief description and overview of project (10 copies) a Letter of Authorization from property owner(s) (2 copies) • A, items included in Section 2.0 and Section 3.0 Sub iittie ^— • Full CDRB Conceptual Design Package: Written response to Pre-Application Comment Letter(6 copies) Conceptual Site Plan —Size 24"x36" (10 copies) Conceptual Model Home Architecture — Size 11"x17" or 24"x36" (4 copies) Conceptual Landscape Plan — Size 24"x36" (10 copies) • Native Plant Preservation, Salvage and Mitigation Plan — Size 24"x36" (2 copies) • Site Resource Inventory—Size 24"x36" (2 copies) • Preliminary Traffic Impact Statement (2 copies) Ofcsite Dranage Conveyance Letter by downstream property owner (2 copies) • Individual Plan Suhrnittals: Conceptual Site Plan —Size 24"x36" (10 copies) Ccnceptual Model Home Architecture Plan — Size 24"x36" (4 copies) Ti a following will require additional fees. Please contact the agencies below for additional in )rmation. CJ Pima County Wastewater Management - (520) 740-6609 Cl Pima County Addressing — (520) 740-6586 ❑ Arizona State Museum (See Section 3.2 of this process guide) — (520) 621-6320 ❑ Pima County Department of Environmental Quality — (520) 740-3340 ❑ Signed notification of potential state or federal issues (see Section 3.1 of this process guide) 8 N\-LE Y q9„ ro : ?�2� Town of Oro Valley Development And Infrastructure Services r ' 11000 N. La Canada Drive Oro Valley, AZ 85737 • Phone: 229-4800 Fax: 742-1022 uNOEp,(si Receipt **************************************************************************************** ****". ** * * **Ir *******************, Reference OV1501398 f edit#: Number: Site Address: 0 UNKNOWN Taxcode: Copy Date and 12/14/2015 11:31:34 Time: Comp Type: DEVELOPMENT PROJECT Type: OV12 Final $0.00 Valuation: Description: DRAINAGE REPORT (EXISTING CONDITIONS) FOR NAKOMA SKY,SANCTUARY AT SILVERHAWKE AND VILLAGES AT SILVERHAWKE Applicant: THE WLB GROUP INC. Owner: CAPRI CO LLC Notation: Receipt By: jwilliams ****************************************************************************************************************************************************** jwilliams Paid By: Type Method Description Amount Payment Check PARTIAL PAYMENT CHECK 1 OF 2 $216.00 Total: $216.00 Fees Paid: Description Account Code Current Payment POV12 N56002 64435 00000060 - 3045 $216.00 Total: $216.00 APA Account#: 756577 Remaining APA Balance: $ o�PL• I.EY AA'5o Town of Oro Valley 440, Development And Infrastructure Services 11000 N. La Canada Drive Oro Valley AZ 8573 Phone: 229-4800 Fax: 742 4 = I ANT Po-- -it,-Ag Receipt CoPYs*�t�t�k*Ytir�t it it�F i�Yt ir�r�F�t Yt�F it it�tir it�F ir�t�t*ir*i(ic ici Reference OV1501398 Receipt#: 98215 Number: Site Address: 0 UNKNOWN Taxcode: Date and 12/14/2015 11:35:12 Time: Comp Type: DEVELOPMENT PROJECT Type: OV12 Final $0.00 Valuation: Description: DRAINAGE REPORT (EXISTING CONDITIONS) FOR NAKOMA SKY,SANCTUARY AT SILVERHAWKE AND VILLAGES AT SILVERHAWKE Applicant: THE WLB GROUP INC. Owner: CAPRI CO LLC Notation: Receipt,By: jwilliams ****************************it************************it**'A'*.A.**.A'.AA..A..A'.A..A.**.A.*.A..*****]4************'.A..A..A.*.I`..A..!`**.A.*.k..A'.A..A.******.A.*.A.A.**.A.*.A.*******Jt.F..A..h*****/f.A**A..A.*.A..A.***. jwilliams Paid By: Type Method Description Amount Payment Check PARTIAL PAYMENT $434.00 Total: $434.00 Fees Paid: Description Account Code Current Payment POV12 N56002 64435 00000060 - 3045 $434.00 Total: $434.00 APA Account#: 756577 Remaining APA Balance: $ '&1 3 , onn irr..1 .7? roup r --�.. D Inc. S E P 2 3 2015 Engineering • Planning • Surveying • Urban Design • Landscape Architecture Offices located in Tucson, Phoenix, Las Vegas • E-mail tucson@wlbgroup.com 4444 East Broadway • Tucson, Arizona 85711 • (520) 881-7480 • FAX (520) 881-7492 Transmittal To: David Laws Date: September 22, 2015 Town of Oro Valley 182053-J002-0400 11,000 N. La Canada Drive Subject: First Avenue Projects — Existing Conditions Drainage Report We Transmit 0 Herewith El Under Separate Cover 0 Via Errands Material Format Requested Action El Letter 0 Blacklines ❑ For Your Approval El Your Review El Memo ❑ Assurances El For Your Signature El Please Comment El Form El Consent El Information El Make Recommendation El Sketch El Specifications ❑ Resubmit El Issue Construction Order El Disk El Report El For Your Use El Check Comments: Attached per your meeting last April with Paul Oland and Erik Beam, please find: ■ Two (2) copies of the Existing Conditions Drainage Report for the First Avenue projects (includes Nakoma Sky, Sanctuary at Silverhawke and Villages at Silverhawke) Please give me a call at 390-1086 if you have any questions or require additional information. Thank you! Copies To: Corey Thompson, Erik Beam Signed: Linda Thompson 390-1086 Received By: Date: y • Drainage Review of the Existing Drainage Floodplains for The First Avenue Properties Oro Valley Project number:OV1501398 Prepared by WLB Stormwater Utility Fritz Laos October 13,2015 1. Correct or clarify the data for drainage area B3: Drainage area B3 as shown in the Table of Off- site/On-site Pre developed 2-, 10-, 50-, and 100-Year Discharges indicates a drainage area of 48.8 acres while figure four shows a much smaller area for B3 of approximately 15 acres. The hydrologic design data sheet also indicates 48.8 acres. The items shown on this table are presented as individual sub-watersheds and not a cumulative value of upstream areas. 2. Use the three hour design storm for Rational Method calculations: The report text indicates, and all rational calculations use the one hour design storm. (Section 3.2 Introduction—drainage criteria manual) 3. Correct the following discrepancies: a. Wash A Lower(Nacoma Sky) HEC-RAS—Water Surface ELevations(WSELs)for River Station (RS) 2 and 1 are not consistent between the summary table and the Figure 4 cross sections. b. Wash A Middle (Sanctuary at Silverhawke) HEC-RAS—WSEL for RS 6, 5,4,3, and 2 are not consistent between summary the table and the Figure 4 cross sections. c. Wash B Upper(Sanctuary at Silverhawke) HEC-RAS—WSEL for RS 7, 6,5,4, 3, and 1 are not consistent between summary the table and the Figure 1 cross sections. d. RS 1 for Wash B Upper is shown as 2635.0 in the HEC-RAS summary table but is labeled 2637.3 on Figure 4. RS 1 is also the upper boundary for RS 6 of Wash B Lower HEC-RAS runs. e. Wash B2 (Sanctuary at Silverhawke) HEC-RAS—WSEL for RS 3 is not labeled on the Figure 1 cross section. 4. Display existing FEMA floodplain on Figures 3 and 4 5. Display existing property boundaries; exclude eth existing subdivision of the 6. Display all existing easements on Figure 4 7. Display Critical Resources Area on Figure 4 C:\Users\jpotter\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\CIOWPZK\The First Avenue Properties.docx 8. Provide Town with electronic Tiff image versions of Figure 3 and 4. C:\Users\jpotter\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\CJOVYPZK\The First Avenue Properties.docx . » ` . Town of Oro Valley Development and Infrastructure Services November 3, 2O15 Corey Thompson, P.E. The VVLB Group, Inc. Tucson, AZ85711 RE: OV1501398, EXISTING DRAINAGE AND FLOODPLAIN ANALYSIS FOR THE FIRST AVENUE PROPERTIES`" 1s' Submittal Dear Corey, We have completed the first review of Drainage Report for the Existing Onsiuoge and Roodplo|n Analysis for the First Avenue Properties. Please provide the following information with the next aubrniUo|: o A copy of this TOV comment letter o A comment response letter o Two copies of the revised Drainage F<eprot o Original redlines o Review Fees: $850 Review of these construction documents is in accordance with the 2012 International Building Code (IBC), Section 108. The following comments are to verify conformance with all applicable requirements of the IBC, Town of C)nn Va|ley, Pima County, State of Arizona, and Federal codes, regu|ationa, ordinances, and/or laws: General Comments 1. Address all ned|ined nornrnenta within the attached Drainage Report. Provide o comment response letter and return all red|ined originals to the Town of Oro Valley. [Oro Valley Zoning Code, Seo22.Q.F8.o.ii] 2. Provide the soils Data in the appendix, as referenced in the report. 3. A portion of the Nakorno Shy property is shown as o FEK8A flood zone. Revise the text to describe this, and reflect the limits on the figures included in the report. 4. There are several references to the drainage concepts and proposed designs throughout the report. This report analyzes only the existing conditions. Remove references to any proposed designs or oonoap1m within this report. 5. Add Town of C}no Valley Case Number"OV1501308^ to the coweroheet of the report. 8. Revise the table of contents bz remove the reference to the Highlands Wash. 7. The ranges of watershed areas and run-off ornounio described in the text do not appear to be consistent with tob[aa ahnvvn in the report. Revise as necessary. 8. The area of watershed A4 listed in report text is not consistent with the area listed on the figures 3 and 4 Oro PbJ&ev, //'s/n our nu/uru. 11000 N. La Cahada Drive, Oro Valley, Arizona 85737 vvww.orovai(eyaz.gov | phone: (520) 229-4800 1 fax: (520) 742-1022 . . Q. Several WSEL's are not consistent as shown in the HEC-Ras model and Fig. 4. Revise Fig. 4aa necessary. See redlines for additional information. Ono Va|leV StornnVVater Utility (Fritz Laos) 10. See attached comments, You may contact nleat (52O) 220-4824if you have any questions. Sincerely, Josh Potter, P.E. Senior Civil Engineer Attachment: RedUned Improvement Plans, Oro Vu/&v it's/n Our nature. 11000 N. La [aFiada Drive, Oro Vaiiey, Arizona 85737 v«*w.nrovai\eyaz.gov | phone: (520) 229'4800 1 fax: (520) 74I-1022 t ' • The Engineering • Planning IVLB December 9, 2015 Surveying • Urban Design Group Landscape Architecture Inc. David Laws Town of Oro Valley 11,000 N. La Canada Drive Oro Valley AZ 85737 Re: First Avenue Properties Existing Drainage & Floodplain Analysis, 2nd Submittal OV1501398 WLB No. 182053-J002-0104 Dear David, Attached for review and approval, please find: • One (1) copy of the November 3, 2015 Comment Letter • Two (2) copies of the comment response letter • Two (2) copies of the revised Drainage Report • Original Redlines • Check in the amount of $216.00 for the Nakoma Sky portion of the review fee (NOTE: Briana Radar will drop off a check for the remaining $434.00 for the Meritage portion tomorrow afternoon) In response to the various pre-application comments received, we offer the following: • TOWN OF ORO VALLEY - Engineering Josh Potter Comments dated November 3, 2015 General Comments 1. Address all redlined comments within the attached Drainage Report. Provide a comment response letter and return all redlined original to the Town of Oro Valley. RESPONSE: All redlines have been addressed accordingly. 2. Provide the soils data in the appendix, as referenced in the report. RESPONSE: Soils data is provided in Appendix A. 3. A portion of the Nakoma Sky property is shown as a FEMA flood zone. Revise the text to described this, and reflect the limits on the figures included in the report. RESPONSE: The test has been revised acknowledging the portion of Nakoma Sky property located within the FEMA flood zone. Engineering • Planning • Surveying • Urban Design • Landscape Architecture Offices located in Tucson, Phoenix, Flagstaff, Las Vegas • E-mail: tucson@wlbgroup.com 4444 East Broadway • Tucson, Arizona 85711 • (520) 881-7480 • FAX (520) 881-7492 David Laws First Avenue Properties, Existing Drainage&Floodplain Analysis—2'Submittal December 9,2015 Page 2 The 1VLB group Inc. 4. There are several references to the drainage concepts and proposed designs throughout the report. This report analyzes only the existing conditions. Remove references to any proposed designs or concepts within this report. RESPONSE: All references to the drainage concepts and proposed designs have been removed from the report. 5. Add Town of Oro Valley Case number "OV1501398" to the coversheet of the report. RESPONSE: Town Case Number has been added to the cover sheet. 6. Revise the table of contents to remove the reference to the Highlands Wash. RESPONSE: Table of contents has been revised, removing the Highlands Wash Reference. 7. The ranges of watershed areas and run-off amounts described in the text do not appear to be consistent with tables shown in the report. Revise as necessary. RESPONSE: The tables in the report and on the figures have been updated with the correct information. 8. The area of watershed A4 listed in report text is not consistent with the area listed on the Figures 3 and 4. RESPONSE: The discrepancy has been corrected. 9. Several WSELs are not consistent as shown in the HEC-RAS model and Figure 4. Revise Figure 4 as necessary. See redlines for additional information. RESPONSE: All the water surface elevations on Figure 4 have been revised to the correct elevations. • TOWN OF ORO VALLEY— Stormwater Utility Fritz Laos Comments dated October 13, 2015 1. Correct or clarify the data for drainage area B3: Drainage area B3 as shown in the Table of Off-site/On-stie Pre-developed 2-, 10-, 50- and 100- Year Discharges indicates a drainage area of 48.8 acres while Figure 4 shows a much smaller area for B3 of approximately 15 acres. The hydrologic design data sheet also indicates 48.8 acres. David Laws First Avenue Properties, Existing Drainage&Floodplain Analysis—2"d Submittal December 9,2015 Page 3 The 1VLB group Inc. The items shown on this table are presented as individual sub-watersheds and not a cumulative value of upstream areas. RESPONSE: The drainage area discrepancy in the tables has been corrected. 2. Use the three hour design storm for Rational Method calculations: The report text indicates, and all rational calculations use the one hour design storm. RESPONSE: Since the Wash B watershed is less than 100 acres, the 1-hour storm event is the correct design storm. 3. Correct the following discrepancies: a. Wash A Lower (Nakoma Sky) HEC-RAS —Water Surface elevations (WSELs) for River Station (RS) 2 and 1 are not consistent between the summary table and the Figure 4 cross sections. RESPONSE: Wash A (Nakoma Sky) water surface elevations have been corrected on Figure 4. b. Was A Middle (Sanctuary at Silverhawke) HEC-RAS —WSEL for RS 6, 5, 4, 3 and 2 are not consistent between the summary table and the Figure 4 cross sections. RESPONSE: Wash A (Sanctuary at Silverhawke)water surface elevations have been corrected on Figure 4. c. Wash B Upper (Sanctuary at Silverhawke) HEC-RAS —WSEL for RS 7, 6, 5, 4, 3 and 1 are not consistent between the summary table and Figure 1 cross sections. RESPONSE: Wash B Upper (Sanctuary at Silverhawke)water surface elevations have been corrected on Figure 4. d. RS 1 for Wash B Upper is shown as 2635.0 in the HEC-RAS summary table but is labeled 2637.3 on Figure 4. RS 1 is also the upper boundary for RS 6 of Wash B Lower HEC-RAS runs. RESPONSE: The water surface elevation has been revised on Figure 4. e. Wash B2 (Sanctuary at Silverhawke) HEC-RAS —WSEL for RS 3 is not labeled on the Figure 1 cross section. RESPONSE: Wash B2 water surface elevations have been corrected on Figure 4. David Laws First Avenue Properties, Existing Drainage&Floodplain Analysis—2nd Submittal December 9,2015 Page 4 The WLB Group Inc. 4. Display existing FEMA floodplain on Figures 3 and 4. RESPONSE: FEMA floodplain is now shown along with FEMA BFEs on Figure 4. 5. Display existing property boundaries; exclude the existing subdivision of the RESPONSE: Existing properties are shown on Figure 4. 6. Display all existing easements on Figure 4. RESPONSE: All right-of-ways and easements are shown on Figure 4. 7. Display Critical Resources Area on Figure 4. RESPONSE: The Critical Area has been added. 8. Provide Town with electronic Tiff image versions of Figure 3 and 4. RESPONSE: Electronic PDF and Tiff for Figures 3 and 4 are provided on the attached CD. This addresses all of the comments received to date. If you have any questions or require additional information, please give me a call at 390-1086. Sincerely, THE WLB GROUP, INC. l� ! Cam. Linda Thompson Subdivision Coordinator N Drainage Review of the Existing Drainage Hmodp|mYns for The First Avenue Properties Oro Valley Project number:OV1501398 Prepared byVVLB Stmrnmvxater Utility 2"" Review Fritz Laos December 18,2O15 1. Clarify drainage area convention in the"Table of Off-site/On-site Pre developed Z-, 10-, SO-' and 100-YearOischarges" CP83 indicates a drainage area of4D.O acres while the actual area ofB3 as shown on figure 4is much smaller area of approximately 1S-2Oacres. Earlier CP |n the same table suggests that cumulative areas are indicated with brackets(example: CP A5 64(294)). 2. Correct the following discrepancies: a. RS 1 for Wash B Upper is shown as 2635.0 in the HEC-RAS summary table but is labeled Z637.3on Figure 4. RS1is also the upper boundary for RSGof Wash B Lower HEC-R4S runs. b. Correctly label cross-section 3 -Wash B2 (Sanctuary at Silverhawke)CS 3 is incorrectly labeled CS4. EY q�l dr Q O - :F 3 2 2016 I 4, e i,,+7 ert t)72 �at/rapED y'� BY • .'a,'. Town of Oro Valley a Development and Infrastructure Services Y' •••• January 21, 2016 Corey Thompson, P.E. The WLB Group, Inc. Tucson, AZ 85711 RE: OV1501398, EXISTING DRAINAGE AND FLOODPLAIN ANALYSIS FOR THE FIRST AVENUE PROPERTIES; 2nd Submittal Dear Corey, We have completed the second review of Drainage Report for the Existing Drainage and Floodplain Analysis for the First Avenue Properties. Please provide the following information with the next submittal: ❑ A copy of this TOV comment letter • A comment response letter • Two copies of the revised Drainage Report • Original redlines Review of these construction documents is in accordance with the 2012 International Building Code (IBC), Section 106. The following comments are to verify conformance with all applicable requirements of the IBC, Town of Oro Valley, Pima County, State of Arizona, and Federal codes, regulations, ordinances, and/or laws: General Comments 1. Address all redlined comments within the attached Drainage Report. Provide a comment response letter and return all redlined originals to the Town of Oro Valley. [Oro Valley Zoning Code, Sec 22.9.F.6.a.ii] 2. The table of pre-developed discharges on Figure 3 is not consistent with the tables shown in the text and on Figure 4. Revise as necessary. 3. The WSEL for the Wash B Lower section 6 and Wash B Upper section 1 are not the same elevation in the models, as represented on Figure 4. Revise the model as necessary so the WSEL's are consistent. Oro Valley Stormwater Utility (Fritz Laos) 4. See attached comments. Oro Ialley, its in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 I fax: (520) 742-1022 You may contact me at(520) 229-4824 if you have any questions. Sincerely, i Josh Potter, P.E. Senior Civil Engineer Attachment: Redlined Improvement Plans, Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovalleyaz.gov I phone: (520) 229-4800 I fax: (520) 742-1022 so4,LEY AHi OQ 29 v.9 °UNDEO' Town of Oro Valley Development and Infrastructure Services March 7, 2016 Corey Thompson, P.E. The WLB Group, Inc. Tucson, AZ 85711 RE: OV1501398, EXISTING DRAINAGE AND FLOODPLAIN ANALYSIS FOR THE FIRST AVENUE PROPERTIES; 3'Submittal Dear Corey, We have completed the third review of Drainage Report for the Existing Drainage and Floodplain Analysis for the First Avenue Properties and do not have any additional comments. You may contact me at (520) 229-4824 if you have any questions. Sincerely, Josh Potter, P.E. Senior Civil Engineer Attachment: Redlined Improvement Plans, Oro Valley, it's in our nature. 11000 N. La Canada Drive, Oro Valley, Arizona 85737 www.orovallevaz.00v I nhone: (5201 229-4800 I fax: (5201 742-1022