HomeMy WebLinkAboutOV139922 MINUTES OF THE
ORO VALLEY DEVELOPMENT REVIEW BOARD MEETING
Tuesday March 9th, 1999
CALL TO ORDER: 6:00 p.m.
ROLL CALL:
Present
Patti Jo Lewis, Chair
Mary Glueck, Vice Chair
Richard Underwood,Member
Nancy Mager, Member
Jim Vogelsberg,Member
Verlin Smith,Member
Others Present:
Valerie Feuer, Senior Planner
Paul Nzomo, Engineer
Shirley Gay, Clerk
MOTION: Moved, seconded (Mager/Smith) and carried by a 5-0 vote (Underwood
absent)to approve the February 9th, 1999 Development Review Board Meeting as written.
Richard Underwood joined meeting.
CONSENT AGENDA
A. OV13-99-18 GOLF CART GARAGE ADDITON, 14645 N.DEL WEBB VLVD.
B. OV13-99-19 FRONT ROOM ADDITION, 14508 N.LOST ARROW
C. OV13-99-21 CUSTOM HOME, RANCHO VISTOSO 11 H & N, FOURTH
GREEN AT VISTOSO, LOT 24
D. OV13-99-23 FRONT AROOM ADDITION, 1794 E LONE RIDER WAY
E. OV13-97-68 RANCHO VISTOSO 10M, MARVILLA, DAVID BAIRD, MODEL
REVISION
F. OV13-97-68 RANCHO VISTOSO 10M, MARAVILLA, DAVID BAIRD,
MAILBOX SHELTER
G. OV13-97-68 RANCHO VISTOSO 10M, MARAVILLA, DAVID BAIRD, ENTRY
MONUMENT AND LANDSCAPE
H. OV13-99-20 RANCHO VISTOSO 11 AJ, VISTOSO GOLF CASITAS II
ARCHITECTURE
I. OV12-98-21 RANCHO VISTOSO 11 AJ, VISTOSO GOLF CASITAS II
03-09-99 Development Review Board Minutes Page 2
LANDSCAPE PLAN
Valerie Feuer informed the Board on item H, there was a change on the color of the tile at the
request of Vistoso Partners, this tile matched more closely the tile at the Vistoso Casitas.
MOTION: Moved, seconded (Smith/Vogelsberg) and carried by a 6-0 vote to recommend
approval of Consent Agenda Items A thru I subject to staff conditions.
REGULAR AGENDA
OV13-99-22 THE BOULDERS AT LA RESERVE REQUEST TO REMOVE CHIMNEY
CAPS
Valerie Feuer introduced the staff report into the record. She explained that Greystar Multi-
family Services is requesting the chimney cap be eliminated because they have become a serious
liability to the ownership of the property. Approximately six of the chimney caps that are
installed over the spark arrestors have been torn loose by high winds. The situation can pose
extreme liability to the applicant and potential danger to residents. The applicant has explored
replacing the caps with a heavier gauge steel or different design. Due to the replacement cost,
the applicant is requesting that the DRB allow the chimney caps to be removed entirely,
exposing the spark arrestor. The chimney cap has been required by DRB for aesthetics and is
not a building code requirement. Staff recommends that DRB remove the condition for the
chimney caps for this project only.
Member Smith commented that the condition states that an Oro Valley approved chimney cap be
used. Who approved it? Valerie Feuer explained that it is a standard design that was approved
by Oro Valley at one time, it is for aesthetic purpose to hide the spark arrestor.
David Vanek, Construction Manager, Greystar Services explained to the Board because of the
location of the Boulders, there is a lot of wind, these events are unpredictable and he feels this is
an extreme liability and dangerous situation, changes need to be made.
Member Underwood suggested that on one of the buildings take off the chimney caps paint the
arrestor the same color of the building and the DRB go on site to see what the building would
look like without the chimney cap. Valerie Feuer commented the Board needs to decide if it is
important to have a chimney cap or decide to remove them for this one time purpose only.
Member Glueck felt it was a tuff call because if this is approved would some one else want to do
the same thing. Member Smith felt it also a liability to the Town and the Town needs to look
into this with an engineer to see if a better, safer design would improve these situations.
Member Glueck agreed it would be a good idea to go on to the site and see what it would like
without the chimney cap.
03-09-99 Development Review Board Minutes Page 3
MOTION: Moved, seconded (Underwood/Smith) and carried by a 6-0 vote to continue
this item to the April 13t" DRB meeting pending a site tour and look at proposed
recommendation from the Town and Engineer staff to provide a safer chimney cap.
OV12-99-4 CASAS ADOBES BAPTIST CHURCH AMENDED DEVELOPMENT PLAN
Valerie Feuer introduced the staff report into the record. Cella Barr Associates, representing the
Casas Adobes Baptist Church request DRB recommendation for a revised development plan,
which was previously approved by Pima County. The Church is located within the newly
annexed area and is west of the Canada Hills PAD, approximately 1/2 mile east of Shannon
Road. The Church is 85 acres in size with twenty-five structures scattered throughout the site.
This site will consist of a church, daycare, and parochial school. One of the original classrooms
was deleted. Six modulars were also added. A Central Plant addition and storage units were
also added to this plan. The existing development was approved under Pima County standards
and since the amendments are less than 25%of the site, Oro Valley standards do not apply to the
existing buildings. The grading and paving for this site is completed and School, Daycare, and
Worship buildings are completed with the exception of the Chapel and Fellowship Hall which
will be added. The Workshop and Gymnasium are existing structures, which were approved
under Pima County standards. A multi-purpose athletic field and basketball courts are located
along the southeastern corner of the site. The access to this site is off Lambert Lane and La
Cholla Boulevard. Valerie Feuer had an added condition addressing the time frame that the
modulars would be set-up. Staff recommends a five year time frame and after that time an
option tocome back to Staff for approval of the extension of time allowed for the modulars to be
up.
Paul Nzomo introduced the Engineer's report into the record. The development of Casas Adobes
Church is not anticipated to significantly impact La Cholla Boulevard and Lambert Lane
intersection during weekdays operations. However, on Sundays, site generated traffic has the
potential to significantly impact traffic operations on La Cholla Boulevard and particularly at the
intersection of La Cholla Boulevard and key intersections from Ina Road north to Lambert Lane
during the Sunday entering and exiting peak hours. It is recommended to have at a minimum,
uniformed officer traffic control on Sundays prior to and extending throughout the peak hours of
the church. It is also recommended that a traffic management plan be developed in concert with
the Town and church officials that could promote car-pooling and ride sharing amongst the
congregation in order to reduce the total number of trips. This site has already been graded and
paved. Staff recommends approval for the Casas Adobes Baptist Church Amended Develop
Plan.
Member Glueck expressed her concern about the traffic, had there been a traffic study for future
trips as the school grows. She felt a condition should be added for future Traffic Management.
Warren Thompson, Cella Barr Associates, representing the applicant provided a visual of the
03-09-99 Development Review Board Minutes Page 4
existing area and explained what changes are being proposed.
Member Underwood felt this was a good plan that seems to be working and should be approved.
Pastor Barrier commented that the Church is willing to do whatever it takes to work with the
Town and the traffic issues.
MOTION: Moved,seconded(Underwood/Mager) and carried by a 6-0 vote to recommend
approval of OV12-99-4 Casas Adobes Baptist Church Amended Development Plan subject
to staff's conditions.
PLANNING STAFF CONDITIONS:
1. The architecture for all permanent and temporary buildings must be approved by
the Development Review Board(DRB).
2. General note 19 must be changed to the "Town of Oro Valley."
3. Delete "Engineer" in general note 23.
4. Time frame of modular(s) is five years and option to renew must be approved by
Planning and Zoning Administration.
5. Traffic Management Plan with the Town Staff and the Church for long term traffic
study.
OV13-99-14 TOWN HALL ADDITION ARCHITECTURE, 11000 NORTH LA
CANADA
Sakellar Associates, representing the Town of Oro Valley, request DRB approval of the
proposed architecture for the Town Hall Addition. The new addition will be located in the north
of the existing Community Development and Court buildings, and when completed, will house
the Public Works and Community Development Departments. At present, the site of the
building consists of disturbed desert and sparse vegetation. The proposed building design is
similar to the existing Administration, Court and Community Development building on site.
The design may be described as Mission in architectural style, with stuccoed buildings, pitched
Spanish tile roofs, popouts, recessed windows and arched, covered walkways to connect the
buildings. The proposed design meets the Community Design Element policy 9.1F of the
General Plan, which states that "all sides of buildings may impact their surroundings and should
be coherently designed and treated." Staff finds that the proposed architecture for the Town Hall
Addition is consistent with the existing buildings on site, and recommends approval.
Member Underwood commented about the parking, would there be more parking spaces as they
are certainly needed. Valerie Feuer replied that was a concern and it is being dealt with for this
new building.
Deno Sakellar, Sakellar Associates, representing the Town, provided a colored visual for the
proposed project. He explained the building design is similar in style to the existing buildings on
site. There will be more parking spaces and the landscape will be addressed.
03-09-99 Development Review Board Minutes Page 5
MOTION: Moved, seconded (Mager/Vogelsberg) and carried by a 6-0 vote to recommend
approval of OV13-99-14 Town Hall Addition Architecture, 11000 North La Canada Drive
STAFF REPORT
Valerie Feuer informed the Board there would be a special meeting on March 16th, 1999 at 6:00
p.m. in the Court Building. The topic will be Inn at Vistoso development plan and landscape
plan. There will be a site tour April 8th at 5:30 to look at the Chimney Caps at the Boulders.
MOTION: Moved, seconded (Underwood/Vogesberg) and carried by a 6-0 vote to adjourn
the March 9th, 1999 Development Review Board Meeting at 7:40 p.m.
Shirley Gay
DRB Clerk
I
•
ORO VALLEY PLANNING & ZONING DEPARTMENT
DEVELOPMENT REVIEW BOARD
}
March 9, 1999
TO: DEVELOPMENT REVIEW BOARD
FROM: Valerie Feuer, Senior Planner
SUBJECT: OV13-99-22 The Boulders at La Reserve Request to Remove Chimney Caps
BACKGROUND:
The Boulders at La Reserve was approved in 1994 for 240 apartment units. The architectural approval
included the standard chimney cap detail. The Greystar Multi-family Services is now requesting that the
chimney cap be eliminated because they have become a serious liability to the ownership of the property.
SUMMARY:
Approximately six of the chimney caps that are installed over the spark arrestors have been torn loose by
high winds. This situation can pose extreme liability to the applicant and potential danger to residents.
The applicant has explored replacing the caps with a heavier gauge steel or different design. Due to the
replacement cost, the applicant is requesting that the DRB allow the chimney caps to be removed entirely,
exposing the spark arrestor.
The chimney cap has been required by DRB for aesthetics and is not a building code requirement.
RECOMMENDATION:
Staff recommends that DRB remove the condition for chimney caps for this project only.
Attachments:
1, Letter from applicant with drawings
F:\OV\oV 13\1999\13-99-22\archchimneycap.doc
f:data\wp\forms\rpt-drb.p&z
'_7-11-77 ;4.4i v'Niui 4 1J 'VVLJVLJVJY•
• • 1
r 7 T
MULTI-FAMILY
SERVICES
February 19, 1999
Valerie Feuer
RE: Boulders at La Reserve
Chimney Terminations
FR: David B. Vanek
Dear Valerie,
Per our conversation Tuesday, February 16, 1999, I am submitting this report for your
review.
The pans that were designed and installed at The Boulders have become a serious liability
to the ownership of the property. To this date approximately six of the pans that are
installed over the spark arrestors have been torn loose by high winds. Luckily, the pans
have not hit anyone or damaged any personal property that we know of. The pans
measure approximately 54"x 38" and do catch a considerable amount of wind. They
apparently can sail quite a distance as evidenced by our inability to find three of the caps
that were lost during the last windstorm.
The problem with the pans seems to be inherent in the constzuction'design. The material
is of light gauge galvanized sheet metal, that actually rips free at several points. We have
secured all the existing tops using screws and straps. The efforts appear fruitless at this
time. The material shears at point of fastening, and flaps about in the wind.
Granted, the situation occurs only in high wind situations, but these events are
unpredictable, and due to the elevation of The Boulders,winds that don't affect other
parts of Oro Valley, may be a factor at The Boulders.
We have purchased replacement tops that are designed exactly as the existing tops, but
are of significantly greater gauge and strength. Of course, this quality retrofit comes at a
price, S 150.00 per unit plus the cost of a crane to lift the product to the roof
We have also explored the possibility of having a different design fabricated for us that
wouldn't be so susceptible to uplift. This is the "Mailbox"design that is utilized at many
other properties throughout Oro Valley. These are going to cost us S50.00 to $75.00 per
unit. We also have to factor in the cost of removal and disposal of the old tops, painting
the new ones and installation.
Due to the extreme liability that the current design poses, we need to make rapid
decisions and changes. I respectfully request of you and the Town of Oro Valley to allow
us to remove the existing caps completely. This would leave the spark arrestor at point of
termination. I have enclosed some perfunctory drawings that indicate what the unit would
look like without the galvanized pan.
2930 East Camelback Road,Suite 185,Phoenix,Arizona 85016 (602)952-8700 FAX(602)952-8834
E3-1-99 0:31 RCM-RE Y:'aa ,A,IGT 37.7S .602352333<i -033 03/15
MULTI-FAMILY
S ER VICE S
My basis for pleadings in this case are two-fold; one, the danger that the current desip
poses to residents and property of The Boulders, and the exposure to litigation that our
client faces. Two, the financial hardship that our client faces if a retrofit is our only
option.
If we are forced to stay with the original design and install a better quality product, we
are looking at expenditures of$12,000.00 based on real dollars spent, and loss of
maintenance technician time to remove and install. This also impacts our residents who
will suffer from lack of service during this period.
If we are mandated to install the"Mailbox" design,we have to spend $5,000.00 -
$6,500.00. This would also include the above-mentioned loss of maintenance personnel
time.
We also incur"down-time"of maintenance if allowed to remove the current system, but
if you would grant us this option, I consider this a minor inconvenience.
The geographic location of The Boulders would not, in my opinion, cause an eyesore if
the pans were removed. The site backs up to a hill to the East, and the elevation from the
West would likely preclude anyone from noticing the alteration. I cited to you the
example of Rock Ridge Apartments to the South and West of The Boulders that have
exposed spark arrestors. I will nor belabor this point further.
Please understand that I am not attempting to undermine the current standards that are set
by Oro Valley Planning and Design,but merely requesting that we be granted special
consideration for an extreme circumstance. I hope that it is apparent to you that we have
attempted to be faithful to the design parameters established by Oro Valley. We have
made an honest effort to remedy the current situation within these specifications.
Respectfully,
David B. Vanek
Construction Mar.
Greystar Management Services
2930 East Camelt,acr Road,Suite 135,Phoenix,.Arizona 35016 (602)952-3700 FAX(602)952-3834
rr6-19-99 1U:.ii r?iUM-GREYJiAht MMbi JKVJ •bUCVUld.14 I-U,iU )' USIUS r-9Ub
• •
1 ••t ••
r I _r:ia =I -- - - -----—
II Ir.ill t. .ti
_ .. _ . a s -1 .. -a a ._. --- - —-- — — — —
a s a a 4
. •f * s a •• •• —'- —
i
-- --- -. - - - _-- *•••••=01/ �..."-_J - _ --- --'- - --
II TUIC.. .. - -
1
-
• r,
. ..- 1(• ' S ' E\ it:\ "A\/
gek LI rreS4-Cc--
. - — - . ._ • . -• • �•� I i
.............0,...,4 - a • a •
. '
.7 .i
17_') . •, /, //If , ..
. • . • •
• • • 0 i ,
. .._..._ • _.. - -• - - -—
a 4 i a
1 I
. . _ _... .. . ._
. . . . . . .._ w ____ ._ __ •_ _ • • _
. , ;.„.„,,..... . ....., , . .....,. ...
..,
. _. .. . . . . . .. ..
. --,. , , .
--- - -
/ . ✓� . _ _ . .
i'��
. • --7 ..- -///„---_/-/,
r c ,; v Pc. . ...... . .. . _ .. .
FEB-i9-99 i0:32 }RCM-GREYSTAR 4!MGT SRVS +50Z95Z8834 T-030 P 04/05 F-906
•
.1... 'A. ' S + ' r\ 5
_ . , . • • Spark L1rrt'S4 (
.................4 .. • • . •
7
1
-/-
j i r
- --- --.-------•- --••-----. .. - - - - -- 4 - -- - . ..-- - - - -- - ---
• • • • •
• • • • •
- --. . ft ,, zy'
. ..___.__. _ _ _. _____7
: 1 ? , 1-,.... ,_
•
fi
- -
'-'9H'-
/ r
7
. � c' o o 's .e __ .. .
MINUTES OF THE
ORO VALLEY DEVELOPMENT REVIEW BOARD MEETING
Tuesday April 13th, 1999
CALL TO ORDER: 6:07 p.m.
ROLL CALL:
Present
Patti Jo Lewis, Chair
Mary Glueck, Vice Chair
Richard Underwood,Member
Jim Vogelsberg,Member
Verlin Smith,Member
Absent:
Nancy Mager, Member
Others Present:
Valerie Feuer, Senior Planner
Paul Nzomo, Engineer
Shirley Gay, Clerk
MOTION: MOVED, Seconded (Underwood/Vogelsberg) and carried by a 5-0 vote
(Mager absent) to approve the March 9th and March 16th 1999, Development Review
Board Meeting as written.
CONSENT AGENDA
A. OV13-99-24 Custom Home, C&C Construction,Desert Vista,Lot 107
B. OV13-98-59 Horton Homes, Rancho Vistoso 7F, Model 1602
C. OV13-99-29 Miller Custom Home, Rancho Vistoso 11 H&N, Lot 63
D. OV13-99-30 Pennell Custom Home, Ironwood Canyon, Lot 18
E. OV13-99-31 Garcia Custom Home, Fairway Village, Lot 56
F. OV13-99-26 Sigma Technologies Expansion Architecture
G. OV13-97-49 Oro Valley Retail Center Architecture Revision
H. OV13-97-40 Rancho Vistoso Ambulatory Center Architecture Revision
I. OV12-98-19 CDO Riverfront Park Landscape Plan Addendum (This item
withdrawn)
J. OV12-93-13 Canada Verde Apts (AKA OV Golf Villas) Garage Architecture
Valerie Feuer commented that item I had been pull and will be on the next DRB agenda.
Mary Glueck has a question on item B regarding the window on elevation A, B, and C in the
,
04-13-99 Development Review Board Minutes Page 2
front. There needs to be an arch or some architecture detail to match the style of other Horton
homes. Perhaps a condition could be added to add those features.
MOTION: Moved, seconded(Underwood/Smith) and carried by a 5-0 vote to recommend
approval of Consent Agenda items A, C thru H and item J subject to staff conditions.
MOTION: Moved, seconded (Smith/Glueck) and carried by a 5-0 to recommend approval
of Consent item B subject to staff conditions and stipulating on elevations A, B, and C add
architectural detail to front window.
REGULAR AGENDA
PREVIEW: OV13-99-25 THE INN AT VISTOSO ARCHITECTURE
The applicant had asked this item be withdrawn and expects to submit the architecture for
approval at the May 11 th DRB meeting..
OV13-99-22 THE BOULDERS AT LA RESERVE REQUEST TO REMOVE CHIMNEY
CAPS (CONTINUED FROM MARCH 9TH, 1999 MEETING)
Valerie Feuer introduced the staff report into the record. She reminded the Board the applicant
is requesting that the DRB allow the chimney caps to be removed entirely, exposing the spark
arrestor. The DRB members took a site tour to the property to determine if the chimney caps
needed to be removed. Staff did not have a problem with the chimney caps being removed
however; they would support the DRB with the decision they made.
Member Vogelsberg commented that the caps did not add any architectural flavor to the building
and he felt they could be removed. He explained that the Town needed to find an approved
detail plan for future purposes. Member Smith supported the caps and felt they needed to be on,
he thought they looked good he commented the Town needed to have a plan approved for future
projects. Chair Lewis agreed with Member Smith, she felt the caps needed to stay on. Member
Glueck stated that the old caps need to come off and an better-engineered cap needs to go on.
Member Underwood was in agreement that the caps need to stay on.
MOTION: Moved, seconded (Smith/Vogelsberg) and carried by a 5-0 vote(Mager absent)
to recommend denial of OV13-99-22 The Boulders at La Reserve to remove chimney caps.
OV13-99-28 CASAS ADOBES BAPTIST CHURCH PORTABLE RELOCATION
Valerie Feuer introduced the staff report into the record. The applicant proposes to relocate six
portables that are illustrated on the amended development plan. The portables will be moved
from the Church's current location at Ina/La Cholla. The site plan gives the specific locations of
04-13-99 Development Review Board Minutes Page 3
the portables. There will be an 8' wide sidewalk between Building I, J, N, and 0, which will be
finished to match all other sidewalks in this development. In relation to the overall site, the
portables do not detract from the aesthetics of the surrounding area. Staff recommends approval
of the architecture for the Casas Adobes Baptist Church Portable Relocation, with the condition
that the windows along all elevations be either recessed or popped out.
Jay Hanson, The Hanson Group, was present for any questions the DRB may have. He provided
a colored visual of the site and where the portables would be located. He briefly explained there
would be mini courts between the buildings and how the colors would tie into the existing
school.
MOTION: Moved, seconded (Underwood/Vogelsberg) and carried by a 5-0 vote (Mager
absent) to recommend approval of OV13-99-28 Casas Adobes Baptist Church portable
relocation subject to staff condition all windows along all elevations be either recessed or
popped out.
Note for record: Applicant for item 2 joined meeting approximately 6:30 p.m. The Chair
allowed him to speak based on the Boards motion. Mr. Vanek, Construction Manager, Greystar
Services commented he would remove the chimney caps because of the liability but would agree
to putting on new chimney caps provided Oro Valley provide an engineered drawing detail and
secondly he will commence with the caps when other residents in the area had chimney caps
installed. Valerie Feuer commented Staff could not agree to those conditions but would talk
with the Planning Administrator and the Building Administrator and then get back to Mr. Vanek.
OV12-99-01 VILLAGES OF LA CANADA BLOCK A PRELIMINARY PLAT
Valerie Feuer introduced the staff report into the record. The proposed preliminary plat
illustrates 80 single-family residential lots designed with a similar lot size as the adjacent
existing Villages of La Canada. The proposed plat will be accessed from Congressional Way
and consists of a 55' buffer area along the western boundary. The western boundary will
include a Bufferyard D and part of the recreation area, which links to the main recreation area
at the southwest corner of the proposed plat. A 16' maintenance easement is located along the
northern boundary of the development. The 16' maintenance easement also runs along the
eastern property boundary of this development.
A 20' pedestrian access common area between lots 20 and 21 is implemented which will
provide a linkage between the proposed residential development and future commercial
development to the north.
The property development standards for the proposed plat are as follows: the setbacks are
front — 20', side — 5', and rear— 5'. The existing zoning is PAD High Density Residential
with a conditional zoning of Medium Density Residential. The maximum permitted
building height for this subdivision is 25' two (2) stories. Valerie Feuer commented that a
condition needed to be added regarding the pedestrian pathway be designed in such a way to
04-13-99 Development Review Board Minutes Page 4
provide privacy to homeowners.
Paul Nzomo introduced the engineer's report into the record. Traffic impact analysis has not
been submitted yet. But in accordance with the standard traffic trip generation rates, this
proposed subdivision of 80 lots will generate 800 daily trips, compared to 1890 daily trips
from currently zoned, and approved development plan, for a 270 unit apartment. Two access
points will be constructed off Congressional Way, which will be connected with three internal
proposed streets. This project site generally drains from north to south with onsite generated
Stormwater runoff entering Congressional Way and the soil-cement to the east with both
flows ultimately reaching the CDO Wash. This project is affected by 361-cfs from vacant
land at north property line. This offsite runoff will be diverted into the soil-cement channel
along the east property line through earthen channel. The earthen channel will be lined with a
soil erosion blanket, covered with a thin layer of topsoil and hydroseed. The channel will be
irrigated to ensure vegetative growth. The onsite-generated runoff will be collected by slotted
drain at three onsite locations and conveyed into the soil-cement channel. Only 37cfs will be
discharged into Congressional Way, which is a better situation than pre-developed condition.
A grading waiver was approved in 1994 by DRB with the following conditions:
1. All cut slopes shall be benched every eight- (8) feet,providing a three- (3) feet bench.
2. Add a note to the general note stating that the proposed earthen channel will be irrigated to
ensure vegetative growth and shall be maintained by the HOA.
3. All cut slopes shall be undulating to match the natural terrain.
4. Slopes shall not exceed 3:1, nor shall slopes require jute mat, grouted riprap, or mechanical
means to hold slopes in place.
Mr. Nzomo stated that the grading waiver is still valid.
Charlie Hulsey, WLB Group representing the applicant commented he had no problems with
staff conditions and was available for questions. Member Smith asked about the common area,
what kind of path would be provided? Mr. Hulsey commented it would be DG and the path
would allow access to the future shopping center on the corner. Member Underwood asked
about the water runoff at the entrance of the Villages, he felt water seems to collect at that
entrance and he wanted to know how the drainage would be handled. Mr. Hulsey pointed out on
the site plan how the water would be channeled and how that should help that particular area.
MOTION: Moved, seconded (Glueck/Smith) and carried by a 5-0 vote (Mager absent) to
recommend approval of OV12-99-01 Villages of La Canada Block A Preliminary Plant
subject to staff conditions.
PLANNING AND ZONING CONDITIONS:
1. An addendum for the traffic impact analysis report is required.
2. All existing or proposed easements that affect or benefit this property shall be shown
on the plat.
3. All utilities lying outside of the road right-of-way shall be placed in utility and
maintenance easements.
4. Any offsite sewer easements benefiting this property shall be executed and recorded
04-13-99 Development Review Board Minutes Page 5
prior to recordation of the final plat.
5. All existing R.O.W.(s)/Easement(s) adjacent to the site shall be labeled. The
dimensions and recording information shall be specified.
6. All R.O.W and easements to be dedicated for this project shall be clearly identified on
the preliminary plat.
7. All offsite grading and construction of drainage channel shall require a written
permission from the adjacent property owner.
8. The applicant's engineer shall ensure that vertical and horizontal street design meets
the Town of Oro Valley Subdivision Street Standards.
9. Two copies of lot boundary closures calculations are required.
10. The applicant's engineer shall ensure all boundary survey bearings and distances
shown on the plan are consistent with the title report.
11. At least two ties with survey data to section or quarter corners shall be provided on the
plat.
12. Cross section A-A shall be revised to reflect 361-cfs offsite runoff as shown in the
drainage exhibit.
13. Recheck and correct the drainage area for concentration point 3E on the drainage
tables.
14. A revised drainage report is required,which shall address all drainage conditions.
15. Preliminary plat, grading plan and drainage exhibit shall be consistent with drainage
report.
16. Page 11 of drainage report shall be revised to reflect 361 cfs entering the site and a total
of 37-cfs only being conveyed into congressional Way.
17. Call out handicap ramps at all streets intersection.
18. The 35-cfs conveyed through 30" SRP pipe in to Congressional Way shall be
discharged within Common area A with an energy dissipater at the outlet, and allowed
to sheet flow into Congressional way as in pre-developed condition. No concentration
of flows is allowed.
19. Call out drainage easement between lots 32 and 33.
20. The grades for the street profile shall be adjacent to meet 14% driveway slope as per
zoning code.
21. Label all manholes and catch basins on the plat and grading plan.
22. Call out sizes of all storm drain on the drainage exhibit.
23. The length of storm drainpipe called out in the drainage report does not match those
shown on the plat,correct where necessary.
24. Call out size and length for the storm drainpipe at concentration point 2.3.
25. Indicate the type of lot drainage for each lot on the plat.
26. The lot drainage shown on the plat does not match drainage exhibit, revise
accordingly. Call out 10' maintenance access easement for the proposed drainage
earthen channel.
Illustrate on the plat how the access will be connected to the main streets.
27. Common Area "C" in general note 1 shall be changed to "Recreation Area."
28. General Note 2 shall state the Conditional Zoning as Medium Density Residential.
04-13-99 Development Review Board Minutes Page 6
29. General Note 12 shall be changed to 25' two (2) stories as the maximum building
height.
30. General Note 13 shall be amended to state; "Typical lot size is 7,085 square feet.
31. Pedestrian access is designed in such a way to provide privacy to adjacent
homeowners.
OV13-99-27 KAUFMAN & BROAD ARCHITECTURE, THREE MODELS, VILLAGES
OF LA CANADA,BLOCK A
Valerie Feuer introduced the staff report into the record. The three models proposed are plans
1579, 2045, and 2166, which are all single-story homes. All three models are designed in the
Santa Barbara Mission style architecture with the differences being in front façades and size. Plan
1579 has seven (7) different elevations. The difference in each elevation is the front façade.
Architectural elements include a wainscot trim along the front elevation, window popouts along all
elevations, gable vents, popout trim along the garage, and tile roofs. This model is well within the
maximum height requirement of 25'. The optional fireplaces show an approved Oro Valley
chimney cap.
The three models proposed are plans 1579, 2045, and 2166, which are all single-story homes. All
three models are designed in the Santa Barbara Mission style architecture with the differences
being in front façades and size. Plan 1579 has seven (7) different elevations. The difference in
each elevation is the front façade. Architectural elements include a wainscot trim along the front
elevation, window popouts along all elevations, gable vents,popout trim along the garage, and tile
roofs. This model is well within the maximum height requirement of 25'. The optional fireplaces
show an approved Oro Valley chimney cap.
Models 2045 and 2166 have similar architectural elements, but are larger pads. Each has five (5)
other elevations, which are similar with the exception of the front façade. The models shall
illustrate wainscot trims along the additional elevations.
Charles Hulsey, WLB Group,representing the applicant commented he had no problems with staff
conditions. He did ask staff could the wainscoting be dropped once they are past the rear yard
fence. Valerie Feuer replied yes. Chair Lewis asked Mr. Hulsey had he met with the homeowners
to work out any problems that may arise. Mr. Hulsey replied yes.
MOTION: Moved, seconded (Underwood/Smith) and carried by a 5-0 vote (Mager absent)
to recommend approval of OV13-99-27 Kaufman & Broad Architecture, Three Models
Villages of La Canada,Black A, subject to staff conditions.
PLANNING STAFF CONDITIONS:
1. The color scheme must be consistent with the colors of the existing homes in the
Villages of La Canada.
2. Ground mounted mechanical equipment shall be enclosed by a wall to
provide visual screening and noise mitigation, and shall respect all setbacks.
3. A wainscot trim where visible shall be provided along the side elevations of each
model to ensure coherent design and treatment on all four sided.
04-13-99 Development Review Board Minutes Page 7
OV12-99-5 ORO VALLEY TOWN HALL ADDITION DEVELOPMENT PLAN
Valerie Feuer introduced the staff report into the record. The Town of Oro Valley proposes to
develop a Town Hall Addition on-site. The Town Hall Addition is comprised of the
construction of a 9,650 square foot building, additional parking, and landscaping. The new
building will contain a public meeting hall, several conference rooms, and will house the offices
for the Community Development and Public Works Departments. The building itself will be
constructed adjacent to the Magistrate Court and the existing Community Development
Building. An additional 100 parking spaces will be added to the Town Hall complex. Ten Class
I bicycle lockers are to be added, which will allow for secure storage of bicycles for employees
who commute to work via that mode. All aspects of the development plan are in conformance
with the El Conquistador PAD. Staff recommends approval of the proposed Development Plan
for the Oro Valley Town hall Addition.
Paul Nzomo introduced the engineer's report into the record. Main access to this proposed
addition will be through existing driveway off La Canada Drive. Additionally the site will be
served by a future proposed right in/out driveway off La Canada drive,just north of the Police
station. The proposed addition will generate insignificant traffic. This project site generally
drains from north to south. The site is not impacted by any off site runoff. The commercial use
of the parcel will require 5-year threshold retention to be provided. That is the volumetric
difference of the pre and post 5-year developed flows. The pond shall discharge the 2-year
pre-developed flows to help maintain downstream riparian vegetation. This site is not
designated as being in a Balanced or Critical basin according to Pima County's current map
Dated 2-17-87; hence no detention is required. However, detention basin will be provided to
maintain post-developed runoff to its pre-developed conditions. This detention/ retention
basin will serve as a Master basin for proposed addition and any future expansion. Grading
will be limited to the location of the new building, parking lot and detention/retention basin.
The preliminary grading plans for the proposed addition meets the requirement of chapter 15
of the Zoning Code.
Dino Sakellar, Sakellar Associates, representing the Town was present for questions. Member
Smith commented would this driveway be compatible for the future library. Mr. Sakellar replied
we feel we have a traffic plan adequate for this particular project. Member Glueck commented
that the Town needs a master plan for future Town projects. She felt the Town needed to be
looking ahead. Valerie Feuer suggested that DRB might want to add that as a condition if they
so desired. Valerie commented this project needed to move ahead as staff is cramped for space.
MOTION: Moved, seconded (Vogelsberg/Smith) and carried by a 5-0 vote (Mager absent)
to recommend approval of OV12-99-5 Oro Valley Town Hall Addition Development Plan
subject to staff conditions and stipulating the Town works on providing a master plan and
traffic study for future projects at this site.
04-13-99 Development Review Board Minutes Page 8
OV12-99-5 ORO VALLEY TOWN HALL ADDITION LANDSCAPE PLAN
Valerie Feuer introduced the staff report into the record. The landscape plan presented is in
compliance with the requirements of the OVZCR. The landscaping for this project is focused
on the landscape planters in the parking areas and the area immediately around the new
structure to be constructed. The plan calls for the use of a variety of southwestern vegetation,
including palo verde, mesquite, acacia, ocotillo, red sage, and prickly pear.
As the proposed addition is a 25% or greater expansion of an existing facility, the Town is required to
bring the current parking lot in compliance with the OVZCR. Several landscape planters will be
added to the existing parking areas, as well as the new parking areas, and will feature mesquites, palo
verdes, and fairy dusters. Additional vegetation will also be placed around the new building.
Moreover, Staff has also requested that additional vegetation be placed between one of the new
parking areas and the retention basin to provide additional screening of the drainage structure. The
landscape plan submitted by the applicant is in general compliance with the Town of Oro Valley
General Plan. The plan presented by the applicant is in conformance with Policy 9.1H, "mitigate
negative visual impacts of buildings and parking lots...add aesthetic charm, interest, and character."
Planning staff recommends approval of the proposed Landscape Plan for the Oro Valley Town Hall
Addition.
MOTION: Moved, seconded (Smith/Vogelsberg) and carried by a 5-0 vote (Mager absent) to
recommend approval of OV12-99-5 Oro Valley Town Hall Addition Landscape Plan subject to
staff conditions.
PLANNING STAFF CONDITIONS:
1. Additional vegetation shall be added to screen the drainage basin from the new parking lot
on the south side of the site
2. The Class I bicycle locker area shall be identified on the landscape plan. A minimum 6'
clearance shall be maintained between the lockers and all vegetation.
3. Add plant type "LF" to the Landscape Schedule on Sheet#2.
4. The signature and seal of the registered landscape architect preparing the plans shall be
placed on all sheets.
STAFF REPORT
Valerie Feuer briefly discussed the issue of building additions that come before the DRB. The
Planning and Zoning Administrator interpreted that staff could make those decisions rather than the
Board. Member Glueck commented she would like to see the plans that are front or side additions.
Valerie reminded the Board of the upcoming Native Plant Salvage Ordnance Workshop on the 20th of
April.
04-13-99 Development Review Board Minutes Page 9
MOTION: Moved, seconded (Smith/Underwood) and carried by a 5-0 vote (Mager absent) to
adjourn the March 16th, 1999 Development Review Board Meeting at 7:30 p.m
Shirley Gay
DRB Clerk
ORO VALLEY PLANNING &ZONING DEPARTMENT
DEVELOPMENT REVIEW BOARD
April 13, 1999
TO: DEVELOPMENT REVIEW BOARD
FROM: Valerie Feuer, Senior Planner
SUBJECT: OV13-99-22 The Boulders at La Reserve Request to Remove Chimney Caps
(continued from March 9, 1999 meeting)
BACKGROUND:
The Boulders at La Reserve was approved in 1994 for 240 apartment units. The architectural approval
included the standard chimney cap detail. The Greystar Multi-family Services is now requesting that the
chimney cap be eliminated because they have become a serious liability to the ownership of the property.
This item was continued from the March 9, 1999 meeting to allow an on-site visual review for DRB
members prior to making a decision.
SUMMARY:
Approximately six of the chimney caps that are installed over the spark arrestors have been torn loose by
high winds. This situation can pose extreme liability to the applicant and potential danger to residents.
The applicant has explored replacing the caps with a heavier gauge steel or different design. Due to the
replacement cost, the applicant is requesting that the DRB allow the chimney caps to be removed entirely,
exposing the spark arrestor.
The chimney cap has been required by DRB for aesthetics and is not a building code requirement.
RECOMMENDATION:
Staff recommends that DRB remove the condition for chimney caps for this project only.
Attachments:
1. Letter from applicant with drawings
f:\data\wp\forms\rpt-drb.p&z