HomeMy WebLinkAboutOV139866 STORAGE ARTHUR YEATES Director of Architecture Ms. Melissa Shaw Town of Oro Valley 680 West Calle Concordia Oro Valley, AZ 85737 Re: Storage USA Oracle Road Expansion Subject: Application for Development Review Project Architecture Dear Melissa, I have enclosed for the Design Review Submittal the following items: 1. A completed application form 1. 12 copies of the exterior building elevations 2. 12 copies of the project site plan 3. 1 copy of the building color palette 4. An updated copy of the photorealistic rendering 5. The application fee ($150.00) has been forwarded to your attention from Columbia, MD under separate cover. Please note the following: 1. The legend for the project's colors is shown on the back of the color board. Our objective in selecting colors was to integrate the new expansion with the existing where possible. The stucco at the exterior wall should be a close match to the existing. Interior wall and door colors are within the same palette as the existing project, though may be difficult to match with fading of the existing colors over the past few years. 2. The dimensions of the expansion are shown in two places. Vertical dimensions are shown on the exterior elevations. Building horizontal Y „_ dimensions are shown on the site plan. 3. The buildings in the new expansion are all one-story structures. Our J U N 2 6 1998 standard one story structure is 10'- 0" tall with a roof slope of 3/8" per foot. Placing the buildings on a sloped site will inevitably result in STORAGE USA, INC. SUITE 1300 • 165 MADISON AVENUE • MEMPHIS, TENNESSEE 38103 Phone: 901-252-2022 Fax: 901-252-2122 Email: ayeates@sus.com different heights at different locations at each structure. We also recognize that should fire walls be required they will extend above the roof, as required by code. Our larger structures, at the interior, are climate controlled and will be provided with mechanical units on the roof. Each mechanical unit is screened from the adjacent neighbors by a metal panel, with the color to match the color of the roof. 4. The project has either buildings or screen walls placed continuously at the exterior to screen the interior of the expansion from view from the adjacent properties. The screen wall at the front of the property, at Oracle Road, is shown as 6'-0"tall, but can be made higher if it is desirable. A taller wall will appear more massive, and with the landscaping design may not be necessary. We have, in summary, attempted to develop an expansion, which will follow the contour of the site, appear to be integral with the existing facility and provide both visual screening and security to its neighbors and users. We look forward to your comments and are able to respond if required with modifications prior to the July 14th meeting. Sincerely, Ciii4V%\,---4N Arthur Yeates, A.I.A. Director of Architecture TOWN OF ORO VALLEY APPLICATION FOR DEVELOPMENT REVIEW PROJECT ARCHITECTURE DATE: June 24, 1998 OV CASE N O: OV1�-96-9-7- 6\ 12) -C\ - (.) (office use only) PROJECT: Storage USA LOCATION: 8710 North Oracle Rd. Oro Valley APPLICANT: Arthur Yeates, Storage USA ADDRESS: 165 Madison Ave., Suite 1300, Memphis, TN., 38103 TELEPHONE NO: (901) 252-2022 PROPERTY OWNER: Cape Coral Land Co., L.L.C. ADDRESS: 1760 N. Tucson Blvd. Tucson, AZ. 85716 PHONE NO: (520) 326- 8059 PROJECT ARCHITECT/ENGINEER: Nadel Architects Inc. ADDRESS: 1760 Creekside Oaks Dr., Suite 140, Sacramento, CA 95833 DEVELOPMENT EVIE OAR HEARING DATE: July 14, 1998 SIGNATURE: 0- DATE: NOTE: This application must be accompanied by the required $150.00 fee and twelve copies of the plans, 11" x 17" in size, each to include dimensioned elevations of all structures from all four sides and a copy of the project's site plan. The submittal must also include a proposed color palette for the project in an 8.5" x 11" format, to include color chips of body and trim colors and tile color and style, if applicable. Building square footage is also required. AT THE MEETING, applicants must have on hand for presentation, colored prospective or rendered elevations of all four sides of the structures. SUBMITTALS MUST BE RECEIVED BY THE PLANNING DEPARTMENT AT LEAST 18 CALENDAR DAYS IN ADVANCE OF THE DESIRED DEVELOPMENT REVIEW BOARD HEARING DATE. STORAGE USA 98-237.OT TUC S ON, ARIZONA 1. METAL ROOF METAL PANEL ABOVE DOORS 2. METAL ROLL-UP DOORS 3. CEMENT PLASTER /!b/Utfl/:U/:1 b Fax From Steve c Arford Page 1 oil Fax Cover Page SUBJECT: Dear Mellissa: Pursuant to our conversation I am requesting that only the = Architectual portions of the Storage USA expansion be continued until July 28 1998 for further consideration by the Design Review Board. Steve Arford Managing Partner Cape Coral Land Co. for Storage USA and Arthur Yates 751-1119 To: Mellissa Shaw From : Steve C Arford For Information Call:751-1119 At: Pages: 1 My Fax Number :296-6295 Created using WinFax PRO 3.0 Delrina Technology Inc. i MINUTES OF THE ORO VALLEY DEVELOPMENT REVIEW BOARD MEETING Tuesday July 28, 1998 CALL TO ORDER: 6:05 p.m. STUDY SESSION: OVERVIEW OF DESIGN GUIDELINES PROCESS Valerie Feuer introduced Steve Kellogg who is with Cornoyer-Hendrick, Inc.and has been contracted with the Town to render professional land planning services. He briefly discussed the design guidelines such as building design, architecture, landscape design, site planning, parking, signage. Cornoyer-Hendrick takes these categories and look at land use type, such a commercial or residential. The Town's goal is to create criteria so the Board can use this to evaluate projects. Mr. Kellogg will bring before the Advisory Committee a statement of intent and suggestions on how to fill those intents Valerie Feuer briefly discussed the Current Planning work plan. Code issues will be addressed, Commercial district revisions, we are working on design guidelines, Adhoc code changes, amending the landscape ordinance is in process, along with sign code revisions. Valerie reviewed the code for Golf Course Design Standards to give the DRB direction in making a decision. The standards act to provide additional public safety and protection of private property. Valerie informed the Board they could approve smaller setbacks if they so choose and can require additional protection. REGULAR MEETING CALL TO ORDER: 7:00 p.m. ROLL CALL: Present Patti Jo Lewis, Chair Barry Allen,Member Mary Glueck,Member Richard Underwood, Member Verlin Smith, Member 7-28-98 Development Review Board Minutes Page 2 Others Present: Valerie Feuer, Senior Planner David Marsh, Planner I Jim Hossley, Street and Road Maintenance Supervisor Shirley Gay, Clerk CONSENT AGENDA A OV12-98-03 Rancho Vistoso Neighborhood 7, Parcel F Landscape Plan has been continued until the next DRB meeting in August. B. OV13-98-71 Sun City Front Addition, 14245 N. Alyssum Way MOTION: Moved, seconded (Smith/Allen) and carried by a 5-0 vote to approve item B of Consent Agenda. REGULAR AGENDA (Note: Due to a malfunction with the PA System, parts of the discussions may not have been recorded in the following minutes) OV13-98-70 APPROVAL OF DOMINION HOMES MODEL FOR NARANJA RANCH I Valerie Feuer introduced the staff report into the record. Model 1950 has 2,050 square feet which will be consistent with other home models in this subdivision. Elevation A is designed as Tucson Barrio Style architecture. Elevation B is designed in the Pueblo architectural style and elevation C is designed as a modified Tucson Barrio Style architecture. Major architectural elements include window popouts along the front, left, and right elevations; glass-block windows along the right rear elevations; wainscot trim along the front and part of the right and left elevations, and stepped facias along all sides of the model. Elevation D is designed as Santa Barbara Mission Style architecture with window popouts along the front elevation, glass-block windows along the right and rear elevations, lintels above the windows along the left, right and rear elevations, stepped facias along all sides of the model, and tile roof. Dale Long, representing Dominion Homes, commented he had no problem with staff conditions but asked for clarification on item three. Valerie Feuer replied that the wainscot trim should be continued to the end of the garage on right side and first back corner on the left side. MOTION Moved, seconded (Glueck/Underwood) and carried by a 5-0 vote to recommend approval of OV13-98-70, Dominion Homes, Model 1950, Elevations A to D in Naranja Ranch I subject to staff conditions as follows. 7-28-98 Development Review Board Minutes Page 3 Planning and Zoning Conditions: 1. Chimneys shall be camouflaged with a cap, as approved by the DRB. 2. Ground-mounted mechanical equipment shall be enclosed by a wall to provide visual screening and noise mitigation, and shall respect all setbacks. 3. For Elevation D, wainsnot trim eould lie continued through the right nd_lef4 sides of the-model. wainscot trim will be continued to end of garage to right side and first back corner on left side. OV13-98-72 APPROVAL A. F. STERLING HOME BUILDERS MODELS FOR VISTOSO HEIGHTS Valerie Feuer introduced the staff report into the record. Formerly known as Diamond Ridge, Vistoso Heights is approximately 62 acres in size. It is bordered on the north by Rancho Vistoso Boulevard, on the east by the 100 foot wide WAPA line easement and Sun City, Unit 10. To the south is Parcel D, an undeveloped area designated for Medium Density Residential development. The Honeybee Canyon Park site, which will serve the future residents of Neighborhood 5, lies to the west. Parcel may be described as rolling terrain with steep slopes and ridgelines traversing the property generally from northwest to southeast. Th four models presented for the Board's consideration and approval are models 1803, 2036, and 2300, 2016 with 1 elevation. All models are single story, in a contemporary Spanish Colonial style, and feature stucco finish over frame construction and clay barrel tile roofs. The sizes of the models range from 1803 square feet to 2300 square feet. Staff finds that the builder's models will "mix", given that the color schemes proposed by A. F. Sterling Home Builders are those used by Stellar Homes. Barbara Parrish, and Rob Brack, were present representing A. F. Sterling. Chair Lewis asked if they had any problems with staff conditions and Mr. Brack commented he would like to have recessed windows only on the front of the house. Member Glueck replied she could not support that as the sides of the homes are very plain and the backs are plain. Recessed windows provide interest to the homes. PUBLIC HEARING OPENED Bob Keefe, 701 W Bangalor, expressed his concern regarding the integrity and value of the neighborhood. He added that he just wanted to make sure A.F. Sterling does a good job. Mr. Vale, 892 Bentwater, felt some of the models proposed looked like a downgrade to the neighborhood because the square footage was less. He asked what kind of reputation A. F. Sterling had, since he was not familiar with that developer. Mr. Vale stated he has invested a lot of money into his home and wants to make sure the value does not go down. Kelly Morrell, 13807 N. Silvercreek Place, commented he is a new homeowner and his concern was maintaining the value of the homes and the square footage in the neighborhood. He felt if 7-28-98 Development Review Board Minutes Page 4 smaller models were built, they would downgrade the neighborhood. He felt A. F. Sterling needed to come back with a proposal of homes that have more square footage and matched the values of the existing homes. PUBLIC HEARING CLOSED Barbara Parrish commented that A. F. Sterling Homes has been a homebuilder in Tucson for about 11 years. The company builds about 250 homes a year and has been named Southern Arizona Builder of the year twice. A. F. Sterling does believe that value is important. Ms. Parrish stated that A. F. Sterling plans to build the same homes Stellar has. The company looked at what the market would bear and felt they had to broaden their product line. A. F. Sterling intends to keep the value per square foot and a very similar price range to what is there now. The company is not building what Diamond Key has but are keeping what Stellar Homes has. Member Smith recommended continuance so the builder could work with the neighbors and get their input. Barbara Parrish felt that was a good idea. Other members of the Board agreed. MOTION: Moved, seconded (Smith/Glueck) and carried by a 5-0 vote to continue OV13-98- 72 A. F. Sterling HomeBuilders to the DRB meeting of August 11, 1998. OV13-98-66, Storage USA EXPANSION ARCHITECTURE Valerie Feuer introduced the staff report into the record. The architecture elevations submitted consist primarily of exterior screen wall designs, as screen walls will enclose the entire project. The walls surrounding the storage units will be stepped to follow the stepped grade of the development, and range in height from 10' 6" to approximately 12'. The 12' tall storage units will be constructed of metal, with roll-up doors and flat roofs. Several issues have been raised with the applicant as to the colors selected for the building and roofs. Although the interior of the facility will be significantly screened with the wall and landscaping, a portion of the top edge will be visible. It is recommended that a color palette, in keeping with the Oracle Road Scenic Corridor District which requires that buildings be painted in desert colors be used. Staff had additional recommendations to supplement the original report. First,the facades of the storage units should be changed from metal louvered panels to masonry block. As a second choice, the louvered panels should be changed to a flat finish with stucco-textured, non-glare paint. If a stucco-textured paint is used, the colors of the storage units and roofs be compatible with the mountain background, such as a light granite. Author Yates, Architect representing the applicant, commented he was in agreement with staffs conditions. Another issue was the high contrast between the walls and the doors. The doors are red and are dark; staff wanted to reduce that contrast which was acceptable to them. Mr.Yates stated he would like to keep the color of the roof to the expansion facility the same as the existing facility. Member Smith asked what was the color of the existing facility and Mr. Yates replied white. 7-28-98 Development Review Board Minutes Page 5 Member Underwood suggested using the desert color and making the existing roofs the same color. Mr. Yates commented he would do whatever staff suggested. MOTION: Moved, seconded (Allen/Smith) and carried by a 5-0 vote to recommend approval of OV13-98-66, Storage USA Expansion Architecture subject to staff conditions. Planning and Zoning Conditions: 1. The facades of the storage units shall be changed from metal louvered panels to masonry block. Alternatively, but as a second choice, the louvered panels shall be changed to a flat finish with stucco-textured, non-glare paint. If a stucco-textured paint is used, the colors of the storage units and roofs be compatible with the mountain background, such as a light granite. 2. All roof or ground mounted mechanical equipment shall be fully shielded from view (including from above) by parapets, walls or other methods as approved by the DRB. Details shall be provided with the construction documents. 3. If upon completion screening is not adequate, additional review by the DRB and approval of architectural elements will be added to the wall along Oracle Road as approved by the DRB,prior to issue of occupancy permit. 4. Conditions 1 thru 3, listed above, and any additional DRB conditions, shall be incorporated into the architectural elevations of the construction documents, for staff verification. OV12-98-11 UMC HEALTH CARE AT LA RESERVE DEVELOPMENT PLAN Member Glueck excused herself due to a conflict of interest David Marsh introduced the staff report into the record. Harrington&Associates proposes to build a one story medical office facility, with a total area of 15,000 square feet. The development will have vehicular access off of La Reserve Drive, and features a campus like office environment. Ninety-seven parking spaces are provided and focused about a small access ring road, and the development plan possesses numerous landscaping elements, resulting in a pleasing environment for employees and visitors. The UMC development plan conforms with all aspects of the La Reserve PAD, and also meets all OVZCR requirements for development plans. Jim Hossley introduced the Engineers report into the record. Access to this site will be from a single entrance to La Reserve Drive. The driveway will line up with a median break in Lad Reserve Drive and will be approximately 300 feet easterly of the Oracle Road centerline. The projects will generate 1092 average daily trips. No offsite road improvements are required for this project. No local offsite drainage flow enters this property. Onsite drainage currently flows westerly into two culverts under La Reserve Drive. The landscape retention area will be 2 feet deep and will be constructed on either side of the driveway entrance. The grading done during the development of 7-28-98 Development Review Board Minutes Page 6 the site will be for building site,parking lot, driveway, retention basins and utility construction. No grading waiver will be required to construct this project. Jim Harrington,representing the applicant, stated there were no problems with staff conditions. Member Smith commented that there is a lot of lush vegetation on the property and hopes only a minimal amount would be disturbed. Mr. Harrington replied the site was walked with staff and they will try and place building on least desirable ground. MOTION: Moved, seconded (Underwood/Smith) and carried by a 4-0 vote (Glueck excused) to recommend approval of OV12-98-11, the UMC Health Care at La Reserve Development Plan subject to staff conditions. Planning and Zoning Conditions: 1. A letter has been given to the applicant listing several minor revisions that are required to be made to the Development Plan. These revisions shall be corrected to Staffs satisfaction prior to scheduling the plan for Town Council. 2. The 48" landscape planter located on the outer southwestern portions of the parking area adjacent to La reserve Drive shall be widened to preserve a cluster of velvet mesquite trees on the edge of the property. 3. Conditions 1 and 2, and any additional DRB conditions, shall be submitted with revised development and landscape plans, prior to scheduling the plan for Town Council. Town Engineer's Conditions: 1. Final grading design of the P.A.A.L. shall meet all applicable standards including, but not limited to, Town of Oro Valley Subdivision Street Standards. 2. Improvement plans shall include more grading detail, construction details and typical sections as well as striping/signing information. 3. A second tie from a boundary point to a section corner or quarter section shall be provided. 4. The waterline easement and the cable television easement noted in Schedule B of the Title Report shall be shown on the plan. 5. Any conflicts with the curb opening rip rap and the landscaping shown in the landscape plan shall be addressed prior to Town Council approval of the plan. 6. Median landscape shall be trimmed to accommodate appropriate sight visibility. 7. The volume of the retention basin shall be corrected. 8. La Reserve Drive shall be noted as "Public". 9. Curb access ramps shall be provided at all locations serving pedestrian traffic from park areas. 10. The final design for the access ramps at the handicapped parking shall meet ADA standards. 11. The entrance radii shall be revised to accommodate the design vehicle. 12. The complete boundary shall be shown. 7-28-98 Development Review Board Minutes Page 7 13. Boundary curve data near the well site shall be provided. 14. The Q100 at the 2-30" pipe-crossing outlet shall be noted on the plan. OV12-98-11 UMC HEALTH CARE AT LA RESERVE LANDSCAPE PLAN David Marsh introduced the staff report into the record. OVZCR Buffer Yard standards require a Buffer Yard A along La Reserve Drive, and a Buffer Yard D along the perimeter of the development. In addition, the La Reserve PAD requires a minimum of 25% of the site be landscaped or open space, and ORSCOD requires a 100' significant vegetation preservation buffer along the property frontage on Oracle Road. The applicant has met these requirements. A 100' preservation buffer has been utilized in the area of the site immediately adjacent to Oracle Road in an effort to preserve several large stands of velvet mesquite trees, which is a requirement of the ORSCOD ordinance. The landscape plan for the parking lot area of the site meets all requirements of the OVZCR. Peter Rumney, Landscape Architect for The Planning Center, explained that the 48" planter that staff asked to have increased has been provided and he pointed out on the plan where it would be located. A request was made to amend the site boundary on the eastern parking lot and that has been done. MOTION: Moved, seconded (Underwood/Allen) and carried by a 4-0 (Glueck excused) to recommend approval of OV12-98-11, UMC Health Care at La Reserve Landscape Plan subject to staff conditions. Planning and Zoning Conditions: 1. A letter has been given to the applicant listing several minor revisions that are required to be made to the landscape plan. These revisions shall be corrected to Staffs satisfaction prior to scheduling the plan for Town Council. 2. The 48" landscape planter located on the outer southwestern portion of the parking area adjacent to La Reserve Drive shall be widened to preserve a cluster of velvet mesquite trees on the edge of the property. 3. A letter of approval for the Oracle Road R.O.W. landscaping must be received from ADOT. 4. Conditions 1 thru 3, listed above, and any additional DRB conditions, shall be submitted with a revised landscape plan, prior to scheduling the plan for Town Council. RECESS Member Glueck rejoined the meeting. 7-28-98 Development Review Board Minutes Page 8 OV12-98-10 RANCHO VISTOSO NEIGHBORHOOD 11, PARCEL AF, LOTS 1-75 PRELIMINARY PLAT (CONTINUED FROM July 14, 1998 MEETING) Valerie Feuer introduced the staff report into the record. This case was continued pending specific recommendations from the Golf Course Architect retained by the Town to review the project. WLB sought a reduction in the setbacks along the golf course and has a letter of support from Mr. Weiskopf, the golf course architect for the golf course. Lots 17 and 34 are a particular safety concern to staff in this development because of their locations and relationship to the golf course. The Town has retained a golf course architect, David Druzisky, whose recommendation regarding the request for the reduced setbacks is consistent with the findings of the planning staff Regarding golf hole #3, Mr. Druzisky mentions that the 300 foot corridor is unacceptable. 300 foot corridors are inconsistent with Oro Valley's requirements and are also in direct conflict with the current standards for the golf course design industry. In complying with Focus 2020 in promoting high quality residential neighborhoods, Policy 4.1A mentions the use of appropriate buffers to protect the integrity and aesthetic context of neighborhoods. Parcel AF does not comply with this policy by ensuring those proper buffers will exist between the golf course and the residential development. Charles Hulsey, WLB Group, representing the applicant Fairfield Homes, explained to the Board that a portion of lot 33 and 34 has been cut off Four lots overall have been lost. Fairfield Homes is asking to be allowed to increase the vegetation at par 5 and keep it just as it is instead of losing more lots. Mr. Hulsey pointed out to the Board walls, trees, vegetation and areas of conflict. Member Underwood asked what the distance was for the setback from the center fairway. Mr. Hulsey replied 154 feet. Member Smith asked what the code required. Patti Lewis replied 200 feet. Valerie Feuer reminded the Board that condition 3 requires a buffer yard be used, but if DRB wanted to accept the setbacks in the area that are in question or a hazard the Board needs to specify that the landscaping be thicker. Member Allen expressed his concern about lots 22-26, and 32 and felt that more vegetation needs to be provided to protect homeowners. Member Glueck felt uncomfortable about lot 32 as it is still 46 feet short of the code. Mr. Hulsey replied that lot 32 could be reduced and more vegetation be provided to adequately screen the lot. Member Glueck commented if the areas that do not meet the setbacks be heavily vegetated,that would help protect the area. In regard to the engineer's conditions 6, 7 8, Mr. Hulsey asked if the could be revised or taken out. Mr. Hossley replied they would work with WLB to revise them. Motion: Moved, seconded (Glueck/Smith) and carried by a 5-0 vote to forward this item to Council recommending approval of OV12-98-10 Rancho Vistoso Neighborhood 11, Parcel AF, Lots 1-75 and Common Are A & B, Preliminary Plat Plan B subject to staff conditions 7-28-98 Development Review Board Minutes Page 9 and stipulating vegetation be planted in the setback violations on areas in eastern boundary, ribbon curb subject to engineers drainage concerns, road easement subject to engineer's approval, design speed posted subject to engineer's approval of site visibility, engineers condition items 8, 9, and 23 in consultation with engineering staff, 10 ft. easement where there is sidewalk. Planning and Zoning Conditions: 1. General Note#24, change the total number of lots from 77 to 75. 2. Lot 34 must be revised or combined with lot 35. Proposed lots at the second dogleg of hole#2 must be revised to be consistent with required golf overlay zone setbacks. 3. The Golf Course Buffer is noted on the preliminary plat, Moreover, Section 14- 206A.5.b states that additional plant material must be used to provide a buffer between the golf course and the subdivision as necessitated by a subsequent development. Bufferyard D shall be used in this development. 4. Width of existing golf course landscape buffers must be shown on the preliminary plat. 5. As stated in the Building Code, all buildings must be a least 6 feet apart. 6. Show No Access Easement along Vistoso Highlands Drive. 7. All conditions listed above, numbers 1-6, shall be addressed in a revised preliminary plat and submitted for Staff review, prior to scheduling the Town Council hearing of this project. Town Engineer's Conditions: 1. The design speed shall be revised to 25 mph. 20 mph subject to engineer's approval of site visibility. 2. The soils report information in General Note 29 shall be completed. 3. The Sight Visibility Triangles shall be revised to meet the design speed requirements. 4. Proposed easements shall include a statement "by Final Plat" or "by separate easement" whichever applies. 5. The existing easements and their recordation data from Schedule B of the Title Report shall be identified on the plat. 6. The 6' PUE shall be expanded to 10' PUE and Pedestrian Easement". 7. Sidewalks shall be provided on beth one side of the street within the pedestrian easement. 8. . Ribbon curb on condition of Town engineer approval. 9. Typical Section C and Detail G shall be deleted from the plat. 10. The 1' NAE shall be extended to 20' beyond the curb BCR/ECR on all corner lots. No driveway construction shall be allowed within the 1' NAE. 11. Tangents per City of Tucson standards shall be provided within 'knuckle' design. 12. The Concentration Point table shall be revised to reflect the values noted in the Hydrology addendum. 13. All grading that will occur outside of the sire boundary lines shall be shown on the plat. 7-28-98 Development Review Board Minutes Page 10 14. Drainage easements shall be provided for all offsite drainage channel and channel outlet construction. 15. Slope easements shall be provided for all offsite grading. 16. Detail F shall be expanded to include the relationship of the channel to the common access drive for lots 17 through 20. 17. Detail L shall be expanded to show what portion of the channel will be constructed within the Vistoso Highlands Drive right-of-way and a note shall be provided that assigns the responsibility of channel maintenance to the appropriate association. 18. .A note shall be added to assign the maintenance of the entrance drainage pipes to the appropriate association. 19. Access to provide maintenance of channels and drainage pipes shall be addressed. 20. A letter from a representative of the Golf Course allowing the diversion of drainage flows onto the Golf Course shall be provided prior to Town Council approval of this plat. 21. Drainage structures and channel design shown o the plat shall be revised to agree with the Final Hydrology report. 22. Drainage channel sections carrying flows exceeding 50 c.f.s. shall indicate a 100 year water surface elevation. 23. Lot access locations for lots adjacent to drainage channels shall be on the side of the lot opposite of the channel and shall be noted with the appropriate symbol on the plat. 24. A Final Hydrology Report that consolidates the sire drainage information and addresses the following items shall be provided for Department of Public Works review prior to Town Council approval of this plat: Hydraulic calculations for all final drainage structures and drainage channels shall be included in the report. An accounting of the Golf Course retention credits shall be provided OV12-98-13 ORO VALLEY RETAIL CENTER PRELIMINARY BLOCK PLAT Valerie Feuer introduced the staff report into the record. This preliminary block plat for the Oro Valley Retail Center will remain consistent with the development plan that was approved in 1997. This new commercial center, featuring Target as the anchor store, is conveniently located at the southwest corner of the intersection of Oracle Road and First Avenue. The Native Plant Salvage and Landscape Plan was approved in 1997. This development area has been divided into eight parcels, which the Barclay Group will be selling off to potential retailers. Amended development plans will need to be submitted for each pad as they become developed. The Oro Valley Retail Center, which is also known as Development Area D in the Rooney Ranch PAD document is exempt from all provisions of the Oracle Road Scenic Corridor Overlay District, except, Section 10-406B.9, Right-of-way landscaping. Jim Hossley introduced the Town Engineer's report into the record. The proposed block plat of Oro Valley Retail Center will create 8 blocks. The Department of Public Works staffs primary 7-28-98 Development Review Board Minutes Page 11 concerns are access issues. The Arizona Department of Transportation has not yet approved this new access point. Staff recommends that the entire driveway width be constructed with the development of the Target store on block 2. Staff also recommends that all access points necessary per the final traffic report for the Oro Valley Retail Center be constructed with the development of Target in block 2. Charles Hulsey, WLB Group represented the applicant, The Barclay Group, stated that the only issue in question is item 2, parking aisles shall be revised not to exceed 300 feet in length. The plans exceeded 300 feet when they were submitted initially. If a pedestrian path with additional landscaping and double islands is added would that meet the intent of the ordinance. Valerie Feuer replied she would accept that unless she finds otherwise in her review of previous reports. Member Glueck asked if there be an agreement between block 2 , 1, and 3 for cross access. Mr. Hulsey replied yes. Member Glueck questioned if the PAD requirements applied to all blocks? Mr. Hulsey replied yes. MOTION: Moved, seconded (Smith/Underwood) and carried by a 5-0 vote to recommend approval of OV12-98-13, Oro Valley Retail Center Preliminary Block Plat subject to staff conditions. Planning and Zoning Conditions: 1. It shall be mentioned in the general notes that the landscape and salvage plans have been approved in the development plan phase. 2. The parking aisles shall be revised no to exceed 300 feet maximum length. Subject to staff review 3. The applicant shall verify for planing staff that twenty-six handicapped accessible spaces are provided. Only twenty-two handicapped accessible spaces are illustrated in the preliminary block plat. 4. Revise building 9 into two buildings if it will be split between blocks 6 and 7. 5. Blocks shall have access from the Target block (#2). Access easements will be needed for blocks 3 and 7. 6. Conditions for the development plan need to be addressed. 7. Uses on excluded parcel should be corrected. Town Engineer's Conditions: 1. Language/notes shall be provided on the block plat document providing access/easement across each lot to benefit all other lots within the plat. 2. The individual block property lines shall not preclude the owner of a particular block from constructing the full width of the necessary parking area access lane across another (other) block(s). a note indicating the same shall be provided o the block plat document. 3. All access points necessary (pursuant to the final traffic impact analysis currently under revision and subject to approval by the Town of Oro Valley and the Arizona Department of Transportation) to be constructed for the Oro Valley Retail Center, 7-28-98 Development Review Board Minutes Page 12 shall be constructed with the Target project located on block 2. These access driveways shall be constructed to the full width shown on the development plan or as amended in the approved traffic impact analysis. 4. The excluded vacant lot shall be shown as Wells Fargo Bank on sheets 1 and 2. 5. The word 'proposed' shall be struck from the Pizza Hut and Burger King on sheet 1 and 2. Planning Staff Report: Valerie commented a site tour is scheduled on Thursday August 6th for Brake Max and Canada Crossroads. The Town Council will soon be appointing two new DRB members, MOTION: Moved, seconded (Smith/Underwood) and carried by a 5-0 vote to adjourn the Development Review Board meeting at 9:46 PM. Shirley Gay DRB Clerk ORO VALLEY PLANNING AND ZONING DEPARTMENT DEVELOPMENT REVIEW BOARD MEETING DATE: July 28, 1998 TO: Development Review Board FROM: Melissa Shaw, AICP, Planner II SUBJECT: OV13-98-66, Storage USA Expansion Architecture, Supplemental Report BACKGROUND: This is report is an addendum to the staff report submitted to DRB last week for the Storage USA expansion architecture. Since the earlier report, the applicant has submitted a revised viewshed analysis (photocopy attached) and upon review, staff felt that additional clarification and recommendations were required. SUMMARY: As noted in the earlier report, because the site slopes upward from Oracle Road to the east, a significant portion of the storage units will be visible from Oracle Road. Although the applicant has designed an attractive wall that initially appeared to screen the storage units, the view analysis clearly shows otherwise. Staff has additional recommendations to supplement the original report. One, that the facades of the storage units be changed from metal louvered panels to masonry block. Alternatively, but as a second choice, change the louvered panels to a flat finish with stucco-textured, non-glare paint. And two, that if a stucco-textured paint is used, the colors of the storage units and roofs be compatible with the mountain background, such as a light granite. GENERAL PLAN COMPLIANCE: In keeping with the Community Design Element of the General Plan, all sides of this facility should be coherently designed and treated; the color palette should be of earth tones to blend with the natural surroundings. RECOMMENDATION: Planning staff recommends approval of the proposed project architecture for the Storage USA Expansion Architecture,with the conditions listed in Exhibit A. SUGGESTED MOTION: The DRB may wish to consider one of the following motions: I move to approve OV 13-98-66, Storage USA Expansion Architecture with those conditions listed in Exhibit"A" attached herewith. OR I move to approve OV 13-98-66, Storage USA Expansion Architecture, with those conditions listed in Exhibit "A", and the following added condition(s): OR I move to deny OV13-98-66, Storage USA Expansion Architecture, finding that: Attachment: 1. Exhibit A 2. Photocopy of the viewshed analysis Ov 13\13-98-66\2drbarch.rpt 2 r EXHIBIT A CONDITIONS OF APPROVAL OV13-98-66 STORAGE USA EXPANSION ARCHITECTURE 1. The facades of the storage units shall be changed from metal louvered panels to masonry block. Alternatively, but as a second choice, the louvered panels shall be changed to a flat finish with stucco-textured, non-glare paint. If a stucco-textured paint is used, the colors of the storage units and roofs be compatible with the mountain background, such as a light granite. 2. All roof or ground mounted mechanical equipment shall be fully shielded from view (including from above) by parapets, walls or other methods as approved by the DRB. Details shall be provided with the construction documents. 3. If upon completion screening is not adequate, additional review by the DRB and approval of architectural elements will be added to the wall along Oracle Road as approved by the DRB, prior to issue of occupancy permit. 4. Conditions 1 thru 3, listed above, and any additional DRB conditions, shall be incorporated into the architectural elevations of the construction documents, for staff verification. 3 ORO VALLEY PLANNING AND ZONING DEPARTMENT DEVELOPMENT REVIEW BOARD MEETING DATE: July 28, 1998 TO: Development Review Board FROM: Melissa Shaw, Planner II SUBJECT: OV13-98-66, Storage USA Expansion Architecture BACKGROUND: Storage USA has submitted for DRB review architecture elevations related to the expansion of the facility. The development plan was recommended for approval by the DRB on July 14, 1998. The applicant scheduled the architecture for tonight's meeting and has made adjustments to the design to address visibility concerns apparent in the viewshed analysis. The property is located on the east side of Oracle Road, approximately 400' south of Hardy, and-carries C-1 zoning designation. SUMMARY: The architecture elevations submitted consist primarily of exterior screen wall designs, as screen walls will enclose the entire project. As described in the development plan report, the site slopes upward to the east from Oracle Road with a total rise of approximately 17'. The walls to surrounding the storage units will be stepped to follow the stepped grade of the development, and range in height from 10'6" to approximately 12'. The walls will be constructed of cement plaster, textured to appear like stucco. Architectural features include pilasters located at points where the wall changes direction or height, and decorative scored arches that mimic the arched windows of the existing office and apartment building. It should be noted that the exterior elevation from the Oracle Road view, as shown in two dimensions, appears to be simply a straight wall when in fact a significant amount of relief due to the site design will serve to break the linearity. The exterior elevations and site plan attached designate the locations where the wall sections vary. The 12' tall storage units will be constructed of metal, with roll-up doors and flat roofs. Several issues have been raised with the applicant as to the colors selected for the buildings and roofs. Although the interior of the facility will be significantly screened with the wall and landscaping, a portion of the top edge will be visible. We have recommended a color palette in keeping with the Oracle Road Scenic Corridor District, which requires that buildings bea}ipted in desert colors. The colors will be presented to the DRB during the meeting. C l7 GENERAL PLAN COMPLIANCE In keeping with the Community Design Element of the General Plan, all sides of this facility are coherently designed and treated; the color palette should be of earth tones to blend with the natural surroundings. RECOMMENDATION: Planning staff recommends approval of the proposed project architecture for the Storage USA Expansion Architecture, subject to the conditions listed in Exhibit"A", and other conditions as approved by the Board. SUGGESTED MOTION: The DRB may wish to consider the following motion: I move to approve OV 13-98-66, Storage USA Expansion Architecture with those conditions listed in Exhibit "A" attached herewith. OR I move to approve OV13-98-66, Storage USA Expansion Architecture, with those conditions listed in Exhibit "A", and the following added condition(s): OR I move to deny OV13-98-66, Storage USA Expansion Architecture, finding that: Attachments: 1. Exhibit A 2. Architecture Elevations for Storage USA Ov 13\13-98-66\drbarch.rpt 2 EXHIBIT A CONDITIONS OF APPROVAL OV13-98-66 STORAGE USA EXPANSION ARCHITECTURE 1. Paint colors of the exterior walls, interior doors, metal buildings and roofs shall pe presented for DRB approval and color samples provided for the permanent file. 0E ColOv5 2. All roof or ground mounted mechanical equipment shall be fully shielded from view (including from above) by parapets, walls or other methods as approved by the DRB. Details shall be provided with the construction documents. 3. Conditions 1 and 2, listed above, and any additional DRB conditions, shall be incorporated into the architectural elevations of the construction documents, for staff verification. 3 n ~ P NI irigarrl,.....n Ur prira'1r1171lar'114) VW MIMI/ Ih. 01004'MUM IL fV3.11,ii UM WWI Ur 111.1 WIMP, 11111111.1.111.1 B III IIIIIIIMIII OVERALL ELEVATION FROM NORTH EAST Net ToScale II i I g 1al 1 ..........,......., SWIM aggrAtato la 40 lig J . is witsa.Om Meta lo(q STK 01��? ■ PARTIAL ELEVATION FROM NORTH EAST y � l0it • ScaIs V ■ -'•• a°�ria°tM1aMa�on --maa.aty rages tagia wi t� curt anti •••-•...�._. VaaM WOWS tit 1CItA" • + _ 1� -.., ____--_ rare „n /y rn n _.� ;7 kr PARTIAL ELEVATION FROM NORTH EAST Seale r ■ w'w' ►iuiocti 11T4ngit. ws^t+ Ai artaVr wt to wrM► t s T 4 7 . • .�.r� a 3 • D 7 V d N a D ,-• 1 11.w.e. C*IIT1116 arm(,/". (0 IL J'usciumaco 0 SCAU11 14411 At A/ARTMC`41 PAT O -mil _ � a "0 . a 1 , 1 T171fli 10 to 0 : . a ♦--- o Z tle . R MAAR SCREEN META !AIM WLJL. D1ivWAu1 W7M1 AT 0 TO colAt1lt MO PATTI' W I` EXTERIOR ELEVATION FROM NORTH %NEX II) . S PAW PIt11SICgS Y11[A[ TO MAI 4 10 v044 usAITAS DUC,Coom TO RE1UM11 rwlllUAIGCD lig SCREEN vALI 1 \ . CnthlrrlCt G+1Kc I 1 StMALE I tl(4jutlo 9t ax it Kr STMAGt AULDNG 10 PF�CA 1 T URt r` NO .a T 1\ i�li Intlr t t _i, 140 ,- ....,-, .'▪--5-A - )11 ----sk _ 'L.---1' - * _ • ,l, 1t.LM sowttaate DASTAIG rAttlutr ^ 0 ITa10Al"L VW.OIACDMIL wAIL MOLOri VAL.L AT IoArApo IUJLIlI& TA ORACLE AMID OAAOL.0 1R1A0 PA110 0.rrr.•*10r R4▪06.o ILA EXTERIOR ELEVATION FROM ORACLE ROADOP I. tem r — rt-86 1 i s J I 10 I r REVISIONS , portion of Lots 1 and 2 of SUNNYSLOPE, according to the pl ,cord in the NOTE: ILLUSTRATIONS SHOWN HERE ARE FOR INFORMATIC _ DATE DESCRIPTION the County Recorder of Pima County, Arizona, recorded in ', of Maps, Page ' 27; and abandoned Oracle Road as set forth in Docket 7660, Page 1011; more particularly PURPOSES ONLY. FINAL DESIGN 15 SUBJECT TO 6/11/91 K.PATEL described as follows: ARCHITECTURAL AND ENGINEERING MODIFICATIONS. 8/1/9l K.PATEL COMMENCING at the Northeast corner of Section 25, Township 12 South, Range 13 East, Gila and Salt River Base and Meridian, Pima County, Arizona; 9/22/91 D.LOGKWOOD THENCE along the North Line of said Section, South 89 degrees 51 minutes 55 seconds 10/8/9i J.KLOSTERMAN West, 1,886.39 feet; 10/15/9-7 K.PATEL THENCE leaving said North Line. South 00 degrees 08 minutes 05 seconds East, 75.00 feet; 11/24/91 K.PATEL THENCE South 11 degrees 20 minutes 18 seconds West. 667.62 feet to the TRUE POINT OF 12/18/'91 K.PATEL BEGINNING for this description; THENCE along the West line of a 20.00 foot alley as recorded in Book 17 of Maps, Page 27, South 11 degrees 20 minutes 18 seconds West, 150.43 feet; being the Northeast corner LL of Storage Lockers; Z THENCE along North line of Storage Lockers, North 52 degrees 42 minutes 12 seconds West, 747.19 feet; _IQ THENCE North 83 degrees 13 minutes 42 seconds East. 194.46 feet; 00 cz THENCE South 52 degrees 42 minutes 12 seconds East, 541.62 feet to the TRUE POINT OF I tj BEGINING. J d0 � v� SITE TABULATIONS O o z Expansion Site Area - 65,655 SF. DL Z•OO Existing Floor Area (Pre Demo) - 55,465 SF. v Proposed Building Area - 2S,756 SF. 0 F Proposed Demolition - 1,315 SF. < c \ / Required Greenspace - 15% LOCATION MAP IY / Proposed Greenspace - 21.1% \ O C- DRA I NA AREA Proposed Parking Spaces - 16 �� 1 / Greenspace West of Point A - 5,ci16 SF ZONING: RI-56 \ 15,02 5.f. X ZONING: Cl a0 �. ‘\'6' r41 \ , A o -‘) O Tc 510'-0" A — SPA}�f }� I V J( I`l S I TE / POINT " A„ 611.06'. S52 38'38"E \ EXTEND EQUAL 65,655 S. LANDSCAPING ALONG — / / BUILDING A -6 256 SF. REAR OF EXPANSION � I I I I I I I I I I I I I I ��4�� � o SCE!- _1�i. \ '�/ -(b)PARKING a(b)PARKING `� r'� , U.1 N .g y BIKE SPACES m SPACES �,:..kq \ \ \ Q \ �� RACK \� \ 1 / `� �` 220'-0" 10'-O" 230-O '\m GATE AGGE� �ZwI Q t / e`O O t4 TO LANDSCAPE X m RELOCATE 51GI4 �^/ I —Spy Imo' BUILDING B _� BUILDING G (I)P 5: AREA FOR Q ' t PLANTER r, MANA&ER5 CLIMATE CONTROL 2 CLIMATE CONTROLSPA \ MAINTENANCE ` YARD i - I— — _— — — — 11,000 SF 59 17 - CC 11.1 v N .7C' c �a w I 11,500 SF `I -I!' \,r IOF�.C8 2 SiDE�BI ILDINS SET6AGK I ISTI 211: i I EXIST I \- l ` \ ♦- \ \ . PING f OFFICE/if -S"r 10'X 15'DUMPSTER P/�f3 \. ; !"AGES I APART. WITH SCREEN WALI,;: \ O r /� '•; EXIST.DRI Y I _, ^'1 I F— ✓`; . FM. L"✓ w_..i ENTRANCE GATE I— + I 1 �\ f . ", TO BE WIDENED %i/ 1 �,._. EXIST.SELF STORAGE BUILDINGS �[�"" (lin f \ 1 �� � v ♦♦♦�� I I 1 I' I I I I, I I I I �� ► 1 ♦j,1,,, - I I I'l I I I l 1 I I I I I I I I I I I I I I , _ �j♦+ \c".".) � � i coPYwsHr PROTECTED ♦W*Sigt .�li i� 1/ \ i docv :t,are Ow a-opery a C bp�d dy A a''` .._,: _ or t,cawctbn w1hsrO1xA6E�� I I litilititi x�.x..�.. �.���:w��_ use,.None or ouch w.a.. , \ '1A. FA 9 `�4' ,� f LEGEND • �.a a data'r«:i.a - _:.:�9 ?cam' < -` _ aLDG "`�l ,,� o ay person.firm `orporatkritf wk`y purposo UNITS TO BE REMOVED permission ZONING: R6 of sroFtAee USA.. LI 1 '` U 1998 i] TREES TO MATCH EXISTING CHECKED BY:D.CHAMBERLAIN \ \ SUNNYSLOPE TOWNHOUSES DRAWN BY: D.THORNTON L......] TO BE LANDSCAPED DATE: 11/25/1994 AUTOCAD FILE: P86F SCALE: I"= 50' JOB NO. SHEET SITE PLAN D itcA 1 • • ! i i ( • . i' ,' • . _ .. REYISIDN3 :.. i (' ! • DATE DESCAIPTI : • • EXISTING OFFICE • '• ' • • - •• . . TO REMAIN UNCHANGED • - , ;� SCREEN WALL AT • { 4,• APARTMENT PATIO J 1 00 a) CO (1403 0 latig:t CC N i W E ___10 uJ J C 1'' STORAGE SCREEN SCREEN 0 D '� BUILDING WALL DIAGONAL WALL AT H z d TO ORACLE ROAD PATIO si W h• EXTERIOR ELEVATION FROM NORTH x W Q • (Jr) R • F- WZ STUCCO PILASTERS WHERE EXISTING OFFICE ►' ii WALL CHANGES DIRECTION TO REMAIN UNCHANGED '1 . • • • Z • CC • SCREEN WALL ENTRANCE GATE 2 y : STORAGE BUILDING ADJACENT EXISTING STORAGE BUILDING - . TO PROPERTY LINE N• /• • .' . � • -I A 023YRICHT PROTECTEQ 'e—i Atl..ru►Aowgn..�onrrrr. ay/doom r�s■t�on d»■o • I,� A , �� a m= - , ' 0 ... t 1111 e0 . 11110 11.111111111 01111 �Ol+, 'ems ....... IIF IL Jf■ w�l+aut Mai ri `�- 1. ........ pororonon of STORAGE USA. sn L AWN sY.A.Ysessa oaT��n �e i, AUTOCAD MEI P -. • •• ' �� SCALE*I'■28'-a SCREEN . - SCREEN SCREEN EXISTING FACILITY • STORAGE WALL DIAGONAL WALL FACING WALL AT JOB NO. SHEET BUILDING TO ORACLE ROAD ORACLE ROAD PATIO • 'EXTERIOR ELEVATION FROM . ORACLE ROAD P- ss 1 y. A s c, cam]O ^TOT 5FR O e .rn c) iO y 2,--- / oa:`o cD r c c0 U S C: U C G =:S / ` V tC C: 24-c 11i1_ `_ . - i iris . , . ' aC NORTH ELEVATION : i 2 Q C.M.U.WITH CEM.PLASTER FINISH FENCE F ORNAMENTAL IRON GRILLS m - 5,,- 'Z I ��^� I S REVISIONS 11 I. nil 1 il.—II i! IIIII 11 _��_III��_..1LL���� SOUTH (END) n L WEST (END) E>(�T.aOFFICE BIJM.DN1G. WEST ELEVATION EAST ELEVATION ELEVATION FIaICE AND STORAGE BLDG. ELEVATION G G • l I lj _`_ �- I - III I I SOUTH ELEVATION C.M.U.PARAPET BEYOND PRECISION C.M.U. (WHITE) METAL ROOFING (WHITE) METAL PANEL(WHITE) Z - IT METAL GUTTER(WHITE) METAL ROLL-UP DOOR (BLUE) SCORE LIMES METAL COPING - C PLASTER FINISH DYER C.M.U.`(WHITE) MA.........m.1 u ralfir / a N i LU CC CC ... ... lifilliff. am. g -i - 0WQ —0— CC 0 C UaSNum: 4;_ ME' a,r V - o �,; a Ir. • M: OM TYPICAL PARTIAL BLOW-UP FRONT ELEVATION TYPICAL PARTIAL BLOW—UP REAR ELEVATION • BUILDING 'A' EXTERIOR ELEVATIONS SCALE 1/ir=l'-0' 1/4%-.V-0' Z 0 a - W J Q W Z—CC G W a >x f co W f Y. Z S DATE el 1.98 JOB NO. 98-237.OT SHEET B DI ahe•ts I I T F I , ALL DRAWINGS AND WR.TTEN MATEP41 APPEARING HEREIN CONS T RUTE THE ORIGINAL AND UNPOBL,SHED WORK OF THE ARCHITECT ANO THE SAME MAY NOT BE DUPLICATED.USED OR DISCLOSED WITHOUT THE WRRTEN CONSENT OF THE ARCHITECT.COPYRIGHT NADEL ARCHITECTS WC.ALL RIGHTS RESERVED. _1 t I I I . , o M O r O O v. Oc r,M t\ CO iC•... .--,Vi,,UCl NMI.PAPIELEQUIPMENT_SCREEN.. :_� i J.9'N y 5 -- ,llt,LII PIII(iIIIII lAI 4 a nrnul nnn } - .{ . me r ii....om ...wri lw:u.Ruw! U In E BUILDING 'C' NORTH ELEVATION BUILDING 'B' NORTH ELEVATION a M Q_U EXISTING BUILDING EXISTING BUILDING :_— REVISIONS .,_ L • n o BLDG. 'C' EAST BLDG. 'B'WEST 0 n (END) ELEVATION C.M.U.PARAPET MONO (END) ELEVATION n L (WEST SIM.,OPP.HAND) METAL ROOFING (EAST SIM.,OPP.HAND) LI L METAL GUTTER / ,PRECISION C.M.U. / _ 3'PARAPET — iLm..4 I I� _ �1�IJtlE! 1 1 .I. o Q = LL oc _ _ Q Q Z _ -.r-- — -T a N WCCE 0 W e J PARTIAL BLOW-UP ELEVATION, BUILDING 'B' CC a 0 OCC Hon (n I- _ BUILDINGS 'B' & 'C' EXTERIOR ELEVATIONS SCALE 1/1E'=1'-0' 1/4'=1'-0' Z oa Ea W ci) cc Z Ed CI W W 5xJ (f co W Z I Q DATE 6.1 1.96 JOB NO 98-237.OT SHEET C l 1 i I ALL DRAWM38 AND WRITTEN MATERIAL ARREARiNG NE...CONSTTNTE THE ORIOR.L ANO UNWBLISHE0 WORN OF THE ARCHITECT AND THE SAME MAT NOT SE OORUCATED.USED OR DISCLOSED WITH°,TNE WRITTEN CONSENT OF THE ARCHITECT.CORTRIGHT NADEL ARCHITECTS ILO.KL RgwiS RESERVED.