HomeMy WebLinkAboutPackets - Historic Preservation Commission (80)
AGENDA
HISTORIC PRESERVATION COMMISSION
SPECIAL SESSION
February 10, 2020
COUNCIL CHAMBERS
11000 N. LA CAÑADA DRIVE
SPECIAL SESSION AT OR AFTER 5:00 PM
CALL TO ORDER
ROLL CALL
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
COUNCIL LIAISON COMMENTS
INFORMATIONAL ITEMS
1.Current information for Historic Preservation Commissioners
2.Report from Oro Valley Historical Society President
3.Report from Gail Munden, Historic Preservation Commission liaison to the Oro Valley Historical Society
SPECIAL SESSION AGENDA
1.REVIEW AND APPROVAL OF THE JANUARY 13, 2020 SPECIAL SESSION MEETING MINUTES
2.REVIEW AND APPROVAL OF THE 2019 ANNUAL REPORT
3.PROGRESS REPORT ON WORK PERFORMED RESULTING FROM THE 2014 STEAM PUMP RANCH
CONDITION ASSESSMENT
4.LOCAL REGISTRY REPORT
5.ELECTION OF CHAIR AND VICE CHAIR
6.DEPARTMENT REPORT
FUTURE AGENDA ITEMS
ADJOURNMENT
POSTED:
POSTED:
When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours prior
to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs
any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission meeting
at 229-4700.
INSTRUCTIONS TO SPEAKERS
Members of the public have the right to speak during any posted public hearing. However, those items not
listed as a public hearing are for consideration and action by the Commission during the course of their
business meeting. Members of the public may be allowed to speak on these topics at the discretion of the
Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card located
on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to
Audience,” please specify what you wish to discuss when completing the blue speaker card.
Please step forward to the podium when the Chair announces the item(s) on the agenda which you are interested in
addressing.
1. For the record, please state your name and whether or not you are a Town resident.
2. Speak only on the issue currently being discussed by the Commission. Please organize your speech, you will only
be allowed to address the Commission once regarding the topic being discussed.
3. Please limit your comments to 3 minutes.
4. During “Call to Audience”, you may address the Commission on any issue you wish.
5. Any member of the public speaking must speak in a courteous and respectful manner to those present.
Thank you for your cooperation.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions and Committees: In accordance
with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the
Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board,
Stormwater Utility Commission, and Water Utility Commission may attend the above referenced meeting as a
member of the audience only.”
Historic Preservation Commission 1.
Meeting Date:02/10/2020
Requested by: Maritza Valenzuela, Parks and Recreation
Submitted By:Maritza Valenzuela, Parks and Recreation
SUBJECT:
REVIEW AND APPROVAL OF THE JANUARY 13, 2020 SPECIAL SESSION MEETING MINUTES
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes) the 01/13/2020 Special Session Meeting minutes.
Attachments
01132020_DRAFT_MINUTES
D R A F T
MINUTES
HISTORIC PRESERVATION COMMISSION
SPECIAL SESSION
January 13, 2020
COUNCIL CHAMBERSS
11000 N. LA CAÑADA DRIVE
SPECIAL SESSION AT OR AFTER 5:00 PM
CALL TO ORDER
The Historic Preservation Commission Special Session was called to order at 5:00 p.m. by Chair Huff.
ROLL CALL
Present: Michael Wilson, Commissioner
Dan Huff, Chair
Dan Biel, Vice Chair
Steve Hannestad, Commissioner
Gail Munden, Commissioner
Eric Thomae, Commissioner
Absent: Timothy Bohen, Commissioner
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
Paul Loomis addressed the "Motion to Reconsider" and referenced the rules and guidelines of Robert
Rules, HPC Rules, and Town Council Rules. Mr. Loomis asked if the rules are still applicable and if the
any changes were approved by the Town Council.
COUNCIL LIAISON COMMENTS
Council Liaison Steve Solomon stated that Steam Pump Ranch will be discussed at the January 22, 2020
Council Meeting.
INFORMATIONAL ITEMS
1.Current information about Historic Preservation Commissioners
Mrs. Lynanne Dellerman-Silverthorne asked for a correction on the agenda, replacing the word about
Mrs. Lynanne Dellerman-Silverthorne asked for a correction on the agenda, replacing the word about
with for. Mrs. Dellerman-Silverthorne shared that due to her absence, she was not able to attach the Oro
Valley Historical Society newsletter.
Ms. Dellerman-Silverthorne reported the following:
Insurance estimates for weather damages at Steam Pump Ranch were received
Received estimates for the break-in damages at the Pusch House from Mario Durazo.
Additional lighting will be added by the entrance of the Steam Pump Ranch property to increase
safety
The straw maze at Steam Pump Ranch was replaced by Boy Scout Troops
Planning for the Celebrate Oro Valley event is ongoing
Next historic trip to the Arizona State Museum is scheduled for Saturday, January 18, 2020 at 9:00
a.m.
April 25 is this year's Arbor Day; planting of heritage trees will take place behind the Proctor Leiber
house
Reminded the commission of nominations for Chair and Vice Chair
Reminded the commissioners that volunteers are needed for judging of the student essays
2.Report from Oro Valley Historical Society President
Oro Valley Historical Society President Roxy Johnson reported the folllowing:
Their board meetings are currently held at the Library, however, the sessions will be held at the fire
station during the Spring.
Letters for donors for Z Mansion were sent out
Mentioned that Gail Munden asked the Town of Oro Valley Parks & Recreation for an update on
funds
Stated that the Pusch House is not safe and therefore, the projector and laptop should be secured
as they are at risk for theft
They have not received a report yet from the Christkindl event
Jim Click fundraiser is over
Catherine Barron, antique business owner, will be appraising the items that are brought in. This
will be a fundraising event at the Oro Valley Country Club
3.Report from Gail Munden, Historic Preservation Commission liaison to the Oro Valley Historical Society
Commissioner Gail Munden stated that Roxy Johnson covered most of the items. Stated that she would
like a timeline regarding the funds. Mrs. Dellerman-Silverthorne asked Commissioner Munden to hold off
her item for future agenda items.
SPECIAL SESSION AGENDA
1.WELCOME NEW COMMISSIONER ERIC THOMAE
Chair Huff introduced returning Commissioner Eric Thomae, and gave some enlightening words about
Commissioner Thomae. Commissioner Thomae stated that he is excited to be on board once again, and
is motivated with our Town Council's motivation for Steam Pump Ranch.
2.REVIEW AND APPROVAL OF THE DECEMBER 2, 2019, REGULAR SESSION MEETING MINUTES
Motion by Commissioner Gail Munden, seconded by Chair Dan Huff
Vote: 6 - 0 Carried
Other: Commissioner Eric Thomae (ABSTAIN)
3.REVIEW AND APPROVAL OF THE 2019 ANNUAL REPORT
Motion by Chair Dan Huff, seconded by Commissioner Steve Hannestad
Vote: 6 - 0 Carried
Other: Commissioner Eric Thomae (ABSTAIN)
Commissioner Gail Munden mentioned that Maritza Valenzuela was responsible for completing the 2019
Annual Report.
Chair Huff asked that this item be tabled for the next meeting.
Item was tabled.
4.DISCUSSION AND POSSIBLE ACTION TO APPROVE THE STAFF RECOMMENDED PRIORITIZATION
OF THE FY 19/20 STEAM PUMP RANCH CAPITAL IMPROVEMENTS WITH ADDITIONAL
INFORMATION
Town Attorney Tobin Sidles stated that if this is a reconsideration, this must be done by a member who
was on the prevailing side.
Attorney Sidles asked members for a reconsideration.
Chair Huff stated that he dissented at the September meeting.
Attorney Sidles asked the commission if they were willing to reconsider.
Vice Chair Biel voted No
Commissioner Michael Wilson voted no
Commissioner Stephen Hannestad voted no
Commissioner Gail Munden voted no
Chair Huff asked Oro Valley Resident Paul Loomis if he wanted to address this item, per his blue card.
Mr. Loomis asked any of the commissioners if they needed a copy of his letter. Commissioner Thomae
stated he did want a copy. Mr. Loomis asked the commission to reject staff's request to re-prioritize the
recommendation, and is asking for a reconsideration due to there being new information that has
occurred since the September HPC meeting, such as the damages that have recently occurred at Steam
Pump Ranch. Mr. Loomis also stated that the number of visitors at Steam Pump Ranch has increased.
Mr. Loomis stated that there are new exhibits erected at Steam Pump Ranch, which has helped bring in
larger numbers of visitors at the ranch, with new events such as Christkindl German Market. Mr. Loomis
referenced Oro Valley Historical Society reports by President Roxy Johnson. Mr. Loomis stated that there
is no guarantee that there will be money coming in for the repairs during next year's budget, which is why
the commission needs to work hard to have the funds approved by Town Council and allocated
accordingly. Mr Loomis also mentioned the deterioration of the houses that needs to be addressed.
FUTURE AGENDA ITEMS
Election of Chair and Vice Chair1.
Staff assessment2.
Window Treatments3.
Expansion on the Master Plan of 2008 and condition report and as a commission .4.
Status update on the staff's direction for the RFI of the outside interest and investment5.
Motion by Chair Dan Huff, seconded by Commissioner Michael Wilson
Vote: 7 - 0 Carried
ADJOURNMENT
Chair Huff adjourned the meeting at 5:50 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Historic Preservation Commission of Oro Valley, Arizona held on the ____ day of
____________________, 2019. I further certify that the meeting was duly called and held and that a quorum was
present.
Dated this _____ day of ____________________, 2019.
___________________________
Maritza Valenzuela
Senior Office Specialist
Historic Preservation Commission 2.
Meeting Date:02/10/2020
Submitted By:Maritza Valenzuela, Parks and Recreation
SUBJECT:
REVIEW AND APPROVAL OF THE 2019 ANNUAL REPORT
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes) the 2019 Annual Report.
Attachments
2019 HPC ANNUAL REPORT
Historic Preservation Commission 3.
Meeting Date:02/10/2020
Submitted By:Maritza Valenzuela, Parks and Recreation
SUBJECT:
PROGRESS REPORT ON WORK PERFORMED RESULTING FROM THE 2014 STEAM PUMP RANCH
CONDITION ASSESSMENT
RECOMMENDATION:
EXECUTIVE SUMMARY:
BACKGROUND OR DETAILED INFORMATION:
FISCAL IMPACT:
SUGGESTED MOTION:
Attachments
SPR 2014 ASSESSMENT
for the Town of Oro Valley
December, 19 2014
the architecture company
Steam Pump Ranch
Condition Assessment Report
at The Silverbell Ranch 2625 N. Silverbell Road Tucson, Arizona 85745 p. 520-622-4506 / f. 520-620-6097
p. 3
Steam Pump Ranch Condition Assessment | December 2014
Steam Pump Ranch
Condition Assessment Report
Table of Contents:
Project Team
I. Executive Summary
II. Introduction
III. Condition Assessment and Cost Estimate
1. Pump House
2. Pusch Ranch House
3. Bunk Houses
4. Garage / Workers Housing
5. Procter / Leiber Residence
6. Carlos’ House / Former Barbecue Pavilion
7. Chicken Coops
tac# 14046
p. 4
Table of Contents
Steam Pump Ranch Condition Assessment | December 2014
Table of Contents
p. 5
Steam Pump Ranch Condition Assessment | December 2014
Project Team
Oro Valley Parks and Recreation
i. Lynanne Dellerman, Recreation & Cultural Resources Manager
ii. James Gardner, Parks Manager
Consultants Team
The Architecture Company
i. Richard Fe Tom, AIA, Architectural Historian
ii. Kegan Tom, AIA, LEED AP BD+C
iii. Bernard Buford, Cost Estimator
Hess Structural Engineering
i. Steven Hess, PE
Steam Pump Ranch Condition Assessment | December 2014
p. 6
p. 7
Steam Pump Ranch Condition Assessment | December 2014
I. Executive Summary
Condition Assessment SummaryThis report provides an updated condition assess-ment report on all of the existing buildings within the historic core as established by the 2014 Oro Valley Cultural Heritage Preservation Plan and the 2008 - Steam Pump Ranch Master Plan. The report includes both current conditions and recommenda-tions for temporary structural stabilization to allow future restoration of the historic buildings.
General Conditions and Recommendations:
The most at-risk building to the least at-risk building
is as follows:
i. Pump House
ii. Chicken Coops
iii. Bunk House
iv. Procter / Leiber House
v. Carlos’ House / BBQ and Garage / Workers
Housing
vi. Pusch Ranch House
All recommendations provided for the buildings, un-
less noted specifically in the condition assessment
section of the report are for temporary stabilization
in which restoration and permanent stabilization of
the structures would occur by the end of 2017.
In all buildings, adobe walls were being destroyed
by animals. For all of the structures we recommend
locating hardware cloth along the perimeter of the
buildings to prevent the rodents burrowing into the
walls. This detail is provided in the Pusch Ranch
House Section. For buildings that are vacant, we
recommend locating traps to catch the rodents that
come inside.
For all buildings, we also recommend keeping wa-
ter 2’ to 3’ away from the building to prevent further
basal coving and settlement. Some of the cracks
developing in the walls are due to water collecting
near the base of the building.
Locations of exposed adobe should be covered
with tarp or a thin lime plaster 1/8” to 1/4” thick to
prevent further erosion of the adobe. Tops of adobe
walls are critical to protect and keep water out to
prevent the entire wall from eroding.
Windows and doors should be sealed wherever
there are cracks or openings that are allowing water
to enter and deteriorate adobe walls. Where adobe
has cracked around windows or deteriorated under
windows, is where water is entering around the
window frame.
With the site being located close to the Canada del
Oro Wash and with so many cracks in the existing
buildings, we recommend a soils report and drain-
age study prior to any long term stabilization per-
formed to the buildings. A soils report is not neces-
sary for the temporary stabilization of the buildings.
Each section of this report should be reviewed for
more in-depth conditions, recommendations and
cost options specific to each structure.
Cost Estimate:
Below is the cost range for each structure. This
range reflects the spread from the total sum of criti-
cal costs to the combined sum of critical costs and
recommended repair costs:
i. Pump House: $24,500 to $178,500
ii. Pusch Ranch House: $3,500 to $5,000
iii. Bunk Houses: $10,000 to $14,700
iv. Garage / Workers Housing: $4,000 to
$6,500
v. Procter / Leiber House: $11,500 to $22,000
vi. Carlos’ House / Former BBQ: $4,000 to
$4,500
vii. Chicken Coops: $19,500 to $23,000
p. 8
Steam Pump Ranch Condition Assessment | December 2014
Steam Pump Ranch Site Plan
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/1/2014 3:25:14 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pump House Existing Floor Plan
4' 0' 4'16'8'
1/8" = 1' - 0"
Tac#:
Date:p. 520.62
2.
4
5
0
6 | f.
520.
6
2
0.
6
0
9
7 | 26
2
5
n
ort
h silv
er
b
ell r
o
a
d | t
u
cs
o
n,
ari
z
o
n
a
8
5
7
4
5 |
at
T
h
e
Silv
er
b
ell
Ranc
h
the arc
hit
ect
ur
e c
o
m
pa
ny
Scale:
12/1/
2
0
1
4
3:
2
5:
1
4
P
M
1/8" = 1'-
0"
14046
Steam
P
u
m
p
R
a
n
c
h 1/8" = 1'-0"1Pump House Existing Floor Plan4'
0'
4'
16'
8'
1/8" =
1' -
0"
Project North True North
Oracle
Pump House
Ruins
Pusch Ranch House
Bunk Houses
Procter Leiber
House
Carlos’ House,
Former BBQ
Garage /
Worker’s House
Chicken
Coops
p. 9
Steam Pump Ranch Condition Assessment | December 2014
II: Introduction
Scope of WorkThe Architecture Company was commissioned to provide an updated condition assessment report on all of the existing buildings within the historic core as established by the 2014 Oro Valley Cultural Heritage Preservation Plan and the 2008 - Steam Pump Ranch Master Plan. The buildings in the historic core include the following structures: i. Pump House
ii. Pusch Ranch House
iii. Bunk Houses
iv. Garage / Workers Housing
v. Procter / Leiber Residence
vi. Carlos’ House / Former Barbecue Pavilion
vii. Chicken Coops
This assessment addresses areas of critical work
and recommendations for temporary structural
stabilization for the next two to three years on
those portions of the buildings that Oro Valley has
determined to be preserved. The portions of the
buildings that are not to be preserved were not
reviewed. The Pusch Ranch House and the Procter
/ Leiber House were also assessed for previous
work performed.
The cost estimates are presented where the items
with the highest priority are listed first and the least
priority are listed last. The cost estimate items are
also separated by Critical Repairs and Recom-
mended Repairs. This will allow the Town of Oro
Valley to address the most critical repairs first and
proceed with the recommended repairs as funding
allows.
Capital Needs Assessment Process
Richard Fe Tom, AIA and Kegan Tom, AIA with The
Architecture Company (TAC) held a kick off meet-
ing on November 20, 2014 with Oro Valley Parks
and Recreation, James Gardner, Parks Manager
and Lynanne Dellerman, Recreation & Cultural Re-
sources Manager to allow TAC to understand the
general intent of the master plan, possible changes
to the master plan and where critical areas of dete-
rioration have been noted.
An on-site meeting on November 25, 2014 with all
of the above mentioned parties and Steven Hess,
structural engineer, met to assess the 7 historic
structures on site. An additional site meeting was
performed on December 3, 2014 by TAC to review
the Steam Pump House with the tarp removed. A
final site meeting was performed on December 16, 2014 to verify all items were identified.
The current conditions and deficiencies have been identified through photo documentation for each structure. A floor plan, based on the floor plans provided in the Steam Pump Ranch Master Plan and our visual assessment, have been provided for all structures except the chicken coops. The floor plans have been provided to identify locations of photos and areas of repairs only.
The recommendations provided in this report are not intended for long-term stabilization. The long-term solutions will be resolved when each structure starts to be fully restored. The critical issues and recommendations throughout this report focus on retaining as much of the original buildings as identified by Oro Valley to be preserved. The recommendations are based on keeping the repair and maintenance costs low with the practicality of solutions and the understanding that future preser-vation and construction for long term stabilization will be performed within one to three years.
There are many locations where the cracks in the walls and deterioration of the adobe are not ad-dressed in this report as they are not deemed criti-cal to the structural stability of the building.
Once the recommendations were established, a cost estimate for each item identified was deter-mined. The cost estimate, provided in the assess-ment of each building, includes labor, material cost, project management and structural engineering fees where applicable. The cost does not include archeological costs as there can be a wide range for archeological fees depending on what is dis-covered. Estimates for archeological fees should be verified with archeologists if SHPO requires archeological research to be completed prior to any grading.
The Architecture Company (TAC) applies diligence and judgment in locating and using reliable sources of information. This statement of probable cost is made on TAC’s knowledge of this project and past experience. TAC has no control over the costs of labor, equipment of materials or the contrac-tor’s method of pricing and makes no warranty expressed or implied as to the accuracy of such opinions as compared to the bid or actual costs.
A review of the report with James, Lynanne and TAC was completed on December 18, 2014.
Steam Pump Ranch Condition Assessment | December 2014
p. 10
II. Introduction
Historic OverviewMuch of the general history of Steam Pump Ranch can be found in the Steam Pump Ranch Master Plan and the National Register of Historic Places. The history of this site and the historic buildings should continue to be preserved to allow the story and history of the site to be told.
Any work to the buildings, especially to the exte-rior, must meet the Secretary of Interior’s Standard for Treatment of Historic Properties as the site is currently registered under the National Register of Historic Places.
Definitions
1. Definitions of Conditions:
Excellent: Component of system is in “as new”
condition, requiring no rehabilitation and
should function in accordance with expected
performance.
Good: Component or system is sound and
performing its function, although it may show
signs of normal wear and tear. Some minor
rehabilitation work may be required.
Fair: Component or system falls into one or
more of the following categories: a) Work-
manship not in compliance with commonly
accepted standards, c) Obsolete, and/or d)
Approaching end of expected performance.
Repair or replacement is required to prevent
further deterioration or to prolong expected
life.
Poor: Component or system has either failed
or cannot be relied upon to continue perform-
ing its original function as a result of having
exceeded its expected performance, exces-
sive deferred maintenance, or state of dis-
repair. Present condition could contribute to
or cause the deterioration of other adjoining
elements or systems. Repair or replacement
is required.
Resources:
The following resources were used in developing
this report
i. Poster Frost Associates, Steam Pump
Ranch Master Plan, Draft Final Report,
April 2008.
ii. Town of Oro Valley and Oro Valley Historic
Preservation Commission, Oro Valley Cul-
tural Heritage Preservation Plan: Develop-
ing and Sustaining a Community Sense of
Place, Revised 2014.
iii. National Register of Historic Places, July
24, 2009.
p. 11
Steam Pump Ranch Condition Assessment | December 2014
II. Introduction
Steam Pump Ranch Condition Assessment | December 2014
p. 12
Current Floor PlanTac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranchthe architecture companyScale:12/1/2014 3:25:14 PM 1/8" = 1'-0"14046Steam Pump Ranch 1/8" = 1'-0"1Pump House Existing Floor Plan4' 0' 4'16'8'1/8" = 1' - 0"Adobe walls still standing
Estimated locations of failed
and removed adobe walls
Fig. 1.01 Southwest Corner of the Pump Room Fig. 1.02 Southeast Corner of the Pump Room and South RoomTac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/1/2014 3:25:14 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pump House Existing Floor Plan
4'0'4'16'8'
1/8" = 1' - 0"
Project North
Pump Room254 sf
Engine Room131 sf
Blacksmith Room
410 sf
p. 13
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe Pump House, built around 1875 is one of the oldest structures on the site and one of the most historically signifi-cant. It is also in the most critical condi-tion of all of the buildings.
Oro Valley’s Proposed Treatment
The Town of Oro Valley is planning to
work on the Pump House in two phases.
Phase 1 will stabilize the adobe struc-
ture. Phase 2 will construct a protec-
tive structure or “ghosted” structure that
allows the existing adobe structure to
stay intact while remaining protected.
Stabilization of the structure is expected
to start by April of 2015. Once stabiliza-
tion is complete the construction of the
“ghosted” structure will begin. The Town
of Oro Valley expects this project to be
on-going into July of 2015.
Permanent stabilization of the adobe,
stabilization of the adobe during and after construc-
tion of the new protective structure is not covered
in this report and will be determined by others.
Summary of Current Conditions and
Deficiencies
There has been minimal work performed on the
Pump House. The roof has collapsed and a small
portion of the East, South and West walls of the
Pump Room are still standing. Currently plywood
caps are placed at the top of the remaining para-
pets and plastic tarp has been attached around
these remaining adobe walls to help prevent water
from eroding the remaining adobe wall. Wood
bracing supports have been added to the East wall
to prevent the adobe from further collapse. These
wood bracing supports have failed and are not
sufficient. See additional notes in the Photo Docu-
mentation of Current Conditions, Deficiencies and
Recommendations section on the following pages.
The existing tarp has been moderately adequate
and has deteriorated. New tarp needs to be added
with care to ensure no water enters from the top of
the walls or if water or moisture enters, the mois-
ture can be released until permanent stabilization
can occur. Plywood boards located on the top of
the parapet have dried and are cupping.
The remaining walls are in critical condition and a
large wind storm could blow down the remaining
walls. Repairs and remediation must occur as soon
as possible to prevent losing the remaining adobe
structure. Repairs identified in the recommendation
section are for temporary stabilization only. The
permanent stabilization will be determined by the
design team providing the long term stabilization
plan.
Summary of Recommendations
The recommendations listed below are critical and
in order of priority. These recommendations should
be completed as soon as possible.
i. Provide new temporary wall bracing sup-
ports on all walls to prevent the structure
from falling to either side. Refer to the
following pages for additional explanation
of required supports and Fig. 1.13. Pro-
vide additional support for the East wall at
the lintel where the lintel has lost support
on one side and is very fragile. The lintel
needs additional supports to stabilize it.
This includes better vertical support for the
cantilevered lintel along with the horizon-
tal bracing. These wall bracing supports
should remain in place until permanent
stabilization of the walls occur.
ii. Provide new tarp over the top of the
structure to prevent the top of the wall from
getting wet and melting the wall. Carefully
adjust the tarp to allow some relief along
the sides of the wall to permit the walls to
breath.
If construction of the ghosted structure and the
III. Condition Assessment|1. Pump House
Fig. 1.03 View Looking at the Existing Pump Room of the Pump House
Steam Pump Ranch Condition Assessment | December 2014
p. 14
III. Condition Assessment | 1. Pump House
permanent stabilization of the adobe walls does not
occur by April of 2015, we recommend the follow-
ing repair:
i. Repair the basal coving and provide a new
concrete footing and stem wall under the
existing adobe wall. Locate the top of stem
wall 6” above the highest finish grade. Lay
adobe block on the stem wall and up to the
portion of adobe removed to pour in the
new footing. This is typically completed in
3’ lengths. Use unstabilized adobe from the
surrounding site. This repair, unlike the rec-
ommendations above, will provide a long
term stabilization to the adobe structure.
We strongly recommend using a contractor
that is familiar with unstabilized adobe and
has successfully completed similar work on
other historic projects. Additional long-term
stabilization items need to be determined
by the design team providing the long-term
stabilization repairs. Because the basal
coving has a critical impact to the struc-
tural stability and has a high cost, we are
recommending this repair only if long term
stabilization does not start by April of 2015.
ii. If funding is not available to provide the
permanent foundation as described above
prior to the construction of the ghosted
structure, the work done around the re-
maining adobe walls must be completed
with care. Vibrations and grading near the
structure can damage the ruins and poten-
tially cause the adobe walls to fall down.
The contractor should also work closely
with a structural engineer, a contractor who
understands how to work with adobe and
the architect to determine if minimal areas,
such as the corners where there is basal
coving, should be fixed prior to starting
construction to ensure that the remaining
walls will not be damaged during construc-
tion.
Additional recommendations that are not critical,
but should be considered if construction does not
start by April of 2015 and if erosion of the adobe
starts to appear:
i. Regrade around the small corner walls at
the Blacksmith Room if water appears to
be flowing towards or ponding near the
adobe walls
ii. Regrade around the Pump Room walls
only if water appears to flow towards those
walls.
Summary Cost Estimates
Critical Repair Costs:
i. Temporary wall bracing supports: $19,000
ii. New tarp: $5,500
Critical Repair Costs (If construction of the ghosted
structure will not start by April 2015):
i. Repair the basal coving and provide a new
concrete footing and stem wall: $151,000
Optional Repair Costs (If construction of the ghosted
structure will not start by April 2015):
i. Regrade around the small corner walls at
the Blacksmith Room: $500
ii. Regrade around the Pump Room walls:
$2,500
III. Condition Assessment | 1. Pump House
Steam Pump Ranch Condition Assessment | December 2014
p. 15
Conditions/
Deficiencies
Recommendations
Fig 1.04: Pump Room, Looking at the Southeast Corner
Fig 1.05: Pump Room East Wall
Wall: Existing wood
support is not touch-
ing the ground,
preventing support
from fully supporting
building.
See recommenda-
tion above.
Wall: Major wall separation due to East wall pulling away from structure.
See recommenda-tion above.
Roof: Roof is
completely gone.
Remaining joists
are in fair condition.
Due to roof hav-
ing fallen down the
adobe walls have
lost support at the
top of the wall and
are more susceptible
to collapse from a
windstorm.
Provide new, im-
proved wall bracing
on the East, South
and West Walls. See
Stabilization detail,
Fig. 1.13.
Wall: Horizontal 2x
bracing support is
falling down and is
not sized or located
correctly.
See recommenda-
tion in Fig. 1.04.
Wall: Existing para-
pet is covered with
plywood cap. Adobe
has separated from
the bond beam /
plate and adjoining
wall.
Not critical to short
term structural stabil-
ity.
Photo Documentation of Current Conditions, Deficiencies and Recommendations
Wall: Evidence of
wall deterioration
from water leaks
from roof. Portions
of adobe wall not
covered with tarp
during the initial visit.
Loosely cover walls
with tarp to prevent
adobe from erod-
ing from driving
rain. Attach tarp in
a manner to allow
water and moisture
to escape.
Steam Pump Ranch Condition Assessment | December 2014
p. 16
III. Condition Assessment | 1. Pump House
Conditions/
Deficiencies
Recommendations
Wall: Top of adobe
wall is not covered
with tarp.
Any tops of parapets
that are exposed,
cover with tarp to
make sure the top of
the wall is protected
to prevent further
erosion.
Walls: Basal coving
occurring along the
base of all walls.
Repair the basal
coving and provide a
new concrete footing
and stem wall under
the existing adobe
wall. Locate the stem
wall 6” above the
highest finish grade.
Lay adobe block on
the stem wall and
up to the portion
of adobe removed
to pour in the new
footing. This is typi-
cally completed in
3’ lengths. Use new
unstabilized adobe
made with soils from
the surrounding site.
Because the basal
coving has a critical
long term impact to
the structural stabil-
ity, we are recom-
mending this repair
only if long term
stabilization does not
start by April of 2015.
Fig 1.07: Existing Corners at Blacksmith Room
Fig 1.08: Typical Basal Coving, Image from South Wall of Pump Room
Fig 1.06: Pump Room East Wall Door Header and Current Supports
Door: Minimal sup-
port under existing
door header at the
East wall. Supports
are standing on a
barrel.
Provide 2 additional
wood 4x posts under
door header and
horizontal bracing to
provide support of
the header and wall
above the header.
Door: Header at
doorway and door
frame are not stable.
Adobe under the
header has separat-
ed from the adobe.
See recommenda-
tion below.
Grade: Water might
be ponding around
adobe walls.
Carefully grade dirt
away from adobe
walls so water does
not flow near walls.
III. Condition Assessment | 1. Pump House
Steam Pump Ranch Condition Assessment | December 2014
p. 17
Conditions/
Deficiencies
Recommendations
Fig 1.09: Southwest Corner at Joists
Roof: Existing joists See recommenda-
tions from Fig. 1.04.
Wall: Existing, origi-
nal tie rods to hold
adjacent structure
that has since fallen.
The steel rods used
to anchor wall has
little value against
lateral resistance.
Fig 1.10: South Wall of Pump Room, Looking into the Pump Room
Wall: Basal coving
occurring along the
full length of the wall
See recommenda-
tions in Fig. 1.04 and
1.08.
Fig 1.11: South Wall of Pump Room, Looking into the Pump Room
Wall: Plywood cap
at top of adobe wall
appears to be pro-
tecting the top of the
adobe.
Continue to cover
the top of the wall
with tarp to help
keep water out.
Roof and Walls: Southwest corner appears to be in fair condition. Minor de-terioration of adobe from water getting in at the top of the parapet.
See recommenda-tions from Fig. 1.05.
Door: Header and
frame supports ap-
pear to be stable.
Steam Pump Ranch Condition Assessment | December 2014
p. 18
III. Condition Assessment | 1. Pump House
Fig 1.13: Bracing DetailH (height of wall)3/4 (H)Existing adobe wall
4x6 wood post
4x6 wood
Thru bolts
Temporaryconcretefooter
Post base
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/5/2014 10:06:43 AM
1/2" = 1'-0"
14046
Steam Pump Ranch
1/2" = 1'-0"1 Pump House Stabilization Detail
Fig 1.12: West Wall of Pump Room, Looking East
Wall: Cracks in adobe wall Stabilize wall as indi-cated in detail below in Fig. 1.13.
Wall: Plywood cap
at top of adobe wall
appears to be pro-
tecting the top of the
adobe.
Continue to cover
the top of the wall
with tarp to help
keep water out.
Wall: No stucco on
any of the adobe
walls.
Cover with tarp, see
recommendation in
Fig. 1.05.
Grade: Dirt appears
to slope away from
the building.
If water is ponding
within 2’ of adobe
walls, carefully re-
grade to prevent wa-
ter from sitting near
or flowing towards to
adobe walls.
Stabilization Detail
Note: Locate bracing every 8’-10’ O.C. on all walls. Provide bracing at the end of each wall, each side of
openings and at corners. Contractor to work closely with a Structural Engineer on-site to help identify the
best locations for supports and have the Structural Engineer design the bracing.
III. Condition Assessment | 1. Pump House
Steam Pump Ranch Condition Assessment | December 2014
p. 19
Steam Pump Ranch Condition Assessment | December 2014
p. 20
Current Floor Plan
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/2/2014 11:07:17 AM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pusch Ranch House Existing
4' 0' 4'16'8'
1/8" = 1' - 0"
Fig. 2.01 Southeast Corner
Fireplace
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/2/2014 11:07:17 AM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pusch Ranch House Existing
4'0'4'16'8'
1/8" = 1' - 0"
Project North
West Open
Porch
Entry
219 sf
Pusch / Ranching
Exhibits
219 sf
Basement
Below
Rotating Exhibits /
Office Space
450 sf
Meeting Room
219 sf
Research Library
232 sf
East Open
Porch
p. 21
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe Pusch Ranch House is a Sonoran Style House built out of adobe around the 1880s. It was the second structure built on the Steam Pump Ranch and served as the Pusch Family Residence.
Over the years, the open porch was enclosed and several additions were made to the house. In 2010, work began to return the Pusch Ranch house back to the original core. Six rooms and the basement were restored, where 2 of the rooms were combined, the porches were re-opened and the newer additions were removed.
Assessment of Previous Work Performed
The recent work completed, around 2010 at the
Pusch Ranch House appears to be in good condi-
tion, however there are cracks that have developed
since the recent construction.
Summary of Current Conditions and
Deficiencies
The structural condition of the house is stable.
There are cracks developing on the South wall,
West wall and North wall. These cracks do not
appear to impact the structural stability of the
house at this time. There is rodent activity around
the house, which is creating damage to the exte-
rior walls. There is deterioration under the South
window at the Research Library, which might be
caused from water leaking through the window.
Summary of Recommendations
We have identified three critical repair items in
order of priority:
i. The recommendation with the highest
priority for this building is to stop the rodent
damage. Close all openings in the base-
ment with wire hardware cloth and install
wire hardware cloth with 1/2” x 1/2” holes
or smaller located along the perimeter of
the building that is adjacent to dirt (mostly
the North and South elevations) to prevent
the rodents from digging into the walls. The
cloth should be at least 8” to 12” below
and above the ground and extend 12” to
24” away from the building. See detail in
Fig. 2.09. Keep the grade lower than the
finished floor elevation and allow the water
to flow away from the building.
ii. Some of the cracks at the Pusch Ranch
House have been hand marked. These
marks/crack detectors need to be able to
identify the date and size of the crack and
the extent of movement in the wall over
time.
The cracks in this building are not con-
sidered a critical stabilization item for
the Steam Pump Ranch Site, however
the movement in the building should be
continuously monitored. If large movement
occurs, a structural engineer should review
this structure in more depth and review a
soils report to determine if the soils under
the building needs to be modified to pre-
vent further damage to the structure.
iii. Repair water infiltrating at office window.
An additional item that is recommended, but not
critical is:
i. After the hardware cloth is installed as
described in Critical Repair Item i, pro-
vide large rocks to match the color of the
decomposed granite around the perimeter
of the building to hide the hardware cloth.
This will reduce the visual impact of the
metal screen while allowing access to the
metal screen when maintenance is re-
quired.
Summary Cost Estimates
Critical Repair Costs:
i. Prevent rodent damage: $2,500
ii. Installation of crack detectors: $500
iii. Repair South window at Office: $500
Recommended Repair Costs:
i. Rocks to cover hardware cloth: $1,500
III. Condition Assessment|2. Pusch Ranch House
Fig. 2.02 Northwest Corner
Steam Pump Ranch Condition Assessment | December 2014
p. 22
III. Condition Assessment | 2. Pusch Ranch House
Conditions/
Deficiencies
Recommendations
Fig 2.03: Southeast Corner
Roof: Built up roof,
no leaks apparent.
Roof appears to be
in good shape.
Wall: Crack in wall.
Markings on wall
indicate that crack
on wall is being mea-
sured.
Continue to monitor
crack. This crack is
not seen as a critical
repair.
Fig 2.06: West Open Porch
Fig 2.05: East Open Porch
Floor: Minor cracks
in concrete floor.
Roof: LED Lights.
Window/Wall: Crack
in wall at window al-
lowing water to enter
adobe.
Seal any cracks
around the window
and patch stucco to
prevent water from
entering.
Fig 2.04: South Window at Research Library
Photo Documentation of Current Conditions, Deficiencies and Recommendations
III. Condition Assessment | 2. Pusch Ranch House
Steam Pump Ranch Condition Assessment | December 2014
p. 23
Conditions/
Deficiencies
Recommendations
Fig 2.08: North Wall Rodent Damage
Fig 2.09: Suggested Location of Wire Hardware Cloth
Fig 2.07: North Wall Rodent Damage
Wall: Rodents dig-
ging holes at base
of wall. This hole
appears to lead into
the basement.
Cracks on the
interior wall by fire
place are possibly
caused from fire-
place settling due to
rodent activity under
fireplace.
Replace torn screen
in basement to
prevent rodents from
entering. Locate
wire hardware cloth,
similar to material
installed near the
basement stairs,
along perimeter of
wall. See detail be-
low. Refill hole.8" - 12"8" - 12"12" - 24"
Existing adobe wall
Existing foundation insome locations
Existing floor slab
Wire hardware cloth with1/4"x 1/4" holes, minimum
Slope grade away frombuilding
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/18/2014 2:32:02 PM
1/2" = 1'-0"
14046
Steam Pump Ranch
1/2" = 1'-0"1 Hardware screen detail
Provide large rocks
to match the color
of the surrounding
decomposed granite
to reduce the visual
impact of the metal
screen at the Pusch
Ranch House.
Steam Pump Ranch Condition Assessment | December 2014
p. 24
III. Condition Assessment | 2. Pusch Ranch House
Conditions/
Deficiencies
Recommendations
Fig 2.11: South Wall in Rotating Exhibits / Office Space
Fig 2.10: Southeast Corner in Rotating Exhibits / Office Space
Wall: Crack at
intersection of wall
and ceiling along
south exterior wall
and East wall of the
Research Library.
Monitor crack for
movement.
Doors: Basement
access door.
Fig 2.12: Access to Basement in Rotating Exhibits / Office Space
Basement: Holes
under beam covered
with hardware cloth.
Appears to be keep-
ing rodents out.
Floor: Wood floor in
good condition.
III. Condition Assessment | 2. Pusch Ranch House
Steam Pump Ranch Condition Assessment | December 2014
p. 25
Conditions/
Deficiencies
Recommendations
Fig 2.14: Baseboard at Wall in the Pusch / Ranching Exhibits
Fig 2.15: Baseboard at Wall in the Meeting Room
Fig 2.13: View Above Fire Place in the Pusch / Ranching Exhibits
Wall: Crack above
fire place due to pos-
sible settlement at
fire place.
Fill rodent hole and
grade water to flow
away from building
to help prevent water
from getting into the
base of the build-
ing. See additional
recommendations in
Fig. 2.07 and 2.08.
Wall: Baseboard
is separating along
the north wall in the
Meeting Room and
the Pusch Family
and Ranching Ex-
hibit room. Possibly
due to settlement
occurring or rodent
activity along that
wall. Current separa-
tion of baseboard
appears minor.
Not a critical repair
at this time.
Wall: Wall
Wall: Baseboard
Steam Pump Ranch Condition Assessment | December 2014
p. 26
III. Condition Assessment | 2. Pusch Ranch House
Conditions/
Deficiencies
Recommendations
Fig 2.17: South Wall in the Meeting Room
Fig 2.16: East Wall in the Pusch / Ranching Exhibits
Wall: Crack along
east wall near fire-
place.
Fig 2.18: Southeast Corner in the Research Library
Wall: Crack on south
wall in the Research
Library.
Crack on the South
wall above the door
III. Condition Assessment | 2. Pusch Ranch House
Steam Pump Ranch Condition Assessment | December 2014
p. 27
Conditions/
Deficiencies
Recommendations
Fig 2.20: Northwest Corner in Basement
Fig 2.19: North Wall Basement
Basement: Screen
in Basement along
North wall is torn.
Other openings in
basement have been
secured.
Replace torn screen
in Basement with
wire hardware cloth
to prevent rodents
from entering.
Basement: Dirt
collecting at base of
wood column. Pos-
sible Rodent activity.
Clean debris and
close opening and
any cracks to pre-
vent animals from
coming in.
Steam Pump Ranch Condition Assessment | December 2014
p. 28
Current Floor Plan
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/2/2014 1:11:38 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Bunk House Existing
4' 0' 4'16'8'
1/8" = 1' - 0"
Fig. 3.01 South Elevations of Bunk HousesTac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/2/2014 11:07:17 AM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pusch Ranch House Existing
4'0'4'16'8'
1/8" = 1' - 0"
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/2/2014 1:11:38 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Bunk House Existing
4'0'4'16'8'
1/8" = 1' - 0"
Fig. 3.02 North and East Elevations of Bunk Houses, Pusch Ranch House Beyond
Project North
Bunk House A
339 sf
Bunkroom
154 sf
North Bunkroom
104 sf
Bunk House B
336 SF
Bathroom
45 sf
South Bunkroom
104 sf
Shared
Bathroom
42 sf
p. 29
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe bunk houses are two small adobe structures, built around the 1940s and originally constructed for worker housing. A ramada was originally con-structed between the two houses.
Summary of Current Conditions and
Deficiencies
Both bunk houses are in poor condition and should
be the top priority in terms of stabilization.
The roof was recently redone. Due to the short roof
eave, the water from the roof appears to be landing
near the base of the wall and causing additional
water damage at the base of the wall.
Basal coving is occurring on both structures and
water appears to be coming in through the doors
and windows. Stucco has fallen off in some loca-
tions, creating pockets to allow water to enter the
adobe walls. Due to water entering the adobe
walls, portions of the adobe walls have started to
erode.
Due to the lack of a concrete or rock foundation,
rodent activity around both of these buildings are
significant and is adding to the deterioration of the
exterior adobe walls.
The interior walls appear to be 2x4 wood construc-
tion and seem to be in fair condition. The North
Bunkroom of Bunk House B was not entered. The
Shared Bathroom in Bunk House B was also dif-
ficult to see due to the debris and the amount of
items currently stored in Bunk House B. The floor
in both bunks was difficult to observe due to debris
on the floor. There is evidence of water coming
in through the front doors of both Bunk Houses
into the interior rooms. The wood roof structure is
exposed on the interior.
Summary of RecommendationsThese recommendations are to provide temporary stabilization of the structure for the next 2-3 years. We have identified the following critical repair items in order of priority:i. Provide gutters with downspouts on both bunk houses. Locate downspouts with ex-tensions away from the building such that water flows away from the building.
ii. Make windows and door frames water tight
by resealing around all doors and windows.
If windows continue to leak after sealing
providing flashing above the windows and
doors where windows appear to continue
leaking. This should be done prior to ap-
plying the thin lime plaster.
iii. Install wire hardware cloth along the perim-
eter of the building. We would recommend
the same solution described in the Pusch
Ranch House (see Fig. 2.09) without the
rocks to hide the wire mesh. After the
hardware cloth is installed, set rodent traps
inside to reduce additional damage.
iv. Provide a thin lime plaster, 1/8” to 1/4” thick
on exposed, interior and exterior adobe
walls of both bunk houses. Apply plaster
over flashing to help make windows and
doors watertight. Make patches obvious
to indicate where the temporary repair has
occurred to indicate future repair is re-
quired in that location.
Additional items that are recommended, but not as
critical are:
i. Remove all of the dirt, debris and items
stored inside the bunk houses to allow the
interior of the building to be monitored for
stabilization, termites and rodent activity.
ii. Lower grade around both Bunk Houses
to be slightly lower than the finish floor of
the house, especially at the exterior doors.
Due to the lack of foundation, this must be
graded very carefully to prevent the walls
from moving or getting damaged. Regrade
around building to ensure good drainage
away from buildings so that water does not
collect within 2’ -3’ of the building.
iii. Reattach blocking that is falling out at the
roof/wall location.
Summary Cost Estimates
Critical Repair Costs:
i. Gutters and downspouts: $2,000
ii. Seal and flash windows and door frames:
$1,500
iii. Prevent rodent damage: $3,500
iv. Lime plaster: $3,000
Recommended Repair Costs:
i. Remove debris: $2,000
ii. Lower grade: $2,500
iii. Reattach blocking: $200
III. Condition Assessment|3. Bunk Houses
Steam Pump Ranch Condition Assessment | December 2014
p. 30
III. Condition Assessment | 3. Bunk Houses
Conditions/
Deficiencies
Recommendations
Fig 3.04: Bunk House A, North Elevation
Roof: New roof
Walls: Stucco start-
ing to fall off and cre-
ating a pocket where
water can enter.
Patch stucco with
a 1/8” to 1/4” lime
based stucco, typical
for the exterior of
both bunk houses
where adobe is
exposed. Make
patches obvious
for future repairs to
know where patches
have been made.
Fig 3.06: Bunk House A, East Elevation
Fig 3.05: Bunk House A, North Elevation
Windows / Walls:
Water leaking along
window and creating
erosion at header
and under the win-
dow. This is typical at
all windows in both
bunk houses.
Add plaster to
reduce any gaps or
cracks. Seal around
window frame to
prevent water from
entering and/or
provide flashing
at the head of the
window to reduce
the amount of water
getting trapped into
the wall. Both flash-
ing and sealing the
frame of the window
will create the most
water tight system. If
budget will not allow
for both, at a mini-
mum seal around the
windows to reduce
the water into the
walls. This is typical
for all windows and
doors on both bunk
houses.
Roof: New roof.Provide gutters and
downspout along the
eaves of both roofs
to drain water away
from building.
Openings: Water
appears to be getting
in around vent.
Provide flashing at
top of vent.
Fig 3.07: Bunk House A, East Elevation Base detail
Walls: Basal coving
and rodent activity.
Place a thin lime
plaster 1/8” to 1/4”
thick over exposed
walls at base. This
is a temporary patch.
Install wire hardware
cloth along perimeter
of the building.
Photo Documentation of Current Conditions, Deficiencies and Recommendations
III. Condition Assessment | 3. Bunk Houses
Steam Pump Ranch Condition Assessment | December 2014
p. 31
Conditions/
Deficiencies
Recommendations
Fig 3.09: Bunk House A at South Elevation Door, View from Inside Looking Out
Fig 3.10: Bunk House A, Southwest corner
Fig 3.08: Bunk House A, South Elevation
Openings: Water
infiltrating around
openings.
See recommenda-
tions from Fig. 3.04
and 3.05
Grading: Grade
around both Bunk
Houses is higher
than the interior fin-
ish floors.
Re-grade exterior
dirt to be slightly low-
er than interior finish
floor. Grade dirt so
water flows away
from adobe walls.
Walls: Adobe miss-
ing at corner.
Patch stucco with
a 1/8” to 1/4” lime
based stucco. Refer
to recommendation
in Fig. 3.04.
Doors: Cracks
around door frame
due to water get-
ting in around door
frame.
Refer to recommen-
dations on Fig. 3.05.
Steam Pump Ranch Condition Assessment | December 2014
p. 32
III. Condition Assessment | 3. Bunk Houses
Conditions/
Deficiencies
Recommendations
Fig 3.13: Bunk House A, Near Southwest Corner
Fig 3.12: Bunk House A, West Elevation Walls: Vegetation
near adobe walls.
Remove the larger
bushes and trees
whose trunks are
within 2’ of the build-
ing. Smaller plants
(aloe vera, agave,
etc) might hinder
drainage. Remove
smaller plants adja-
cent to adobe.
Walls: Damaged
adobe. Same loca-
tion as Fig. 3.11.
See recommenda-
tion in Fig. 3.07.
Fig 3.11: Bunk House A, Northwest Corner
Walls: Large amount
of adobe missing at
corner.
See recommenda-
tion in Fig. 3.07.
III. Condition Assessment | 3. Bunk Houses
Steam Pump Ranch Condition Assessment | December 2014
p. 33
Conditions/
Deficiencies
Recommendations
Fig 3.15: Bunk House A, South Elevation, Interior of Bunkroom
Fig 3.16: Bunk House A, Bunkroom Floor
Fig 3.14: Bunk House A, South Elevation, Interior of Bunkroom
Walls: Crack near
South door.
Patch with a 1/8”
to 1/4” lime based
stucco, typical for the
interior of both bunk
houses where adobe
is exposed. Make
patches obvious
for future repairs to
know where patches
have been made, in-
dicating a damaged
area that needs
further repair.
Walls: Crack by
South window and
crack by South door.
Caused by water
collecting at base
of wall and/or water
leaking from window
Refer to recommen-
dations in Fig. 3.14
Floor: Floor is full
of dirt. Difficult to
full see condition of
floor.
Refer to recommen-
dation in Fig. 3.09.
Remove debris and
dirt from the interior.
Floor: Cracks in
concrete floor.
Not critical to stabili-
zation.
Steam Pump Ranch Condition Assessment | December 2014
p. 34
III. Condition Assessment | 3. Bunk Houses
Conditions/
Deficiencies
Recommendations
Fig 3.18: Bunk House B, North Elevation
Fig 3.17: Bunk House A, Closet and Bunkroom
Floor / Walls: Large
amount of dirt, pos-
sibly from rodent
activity.
Refer to recommen-
dations in Fig. 3.07
and 3.14.
Fig 3.19: Bunk House B, East Elevation
Roof: Mesquite tree
can hit roof during
wind storms.
Trim lower tree
branches so no
branches within 2’ to
3’ of the roof.
Stored items located
throughout the Bunk-
room and Closet
Remove all unused
items to allow space
to be maintained.
Windows / Walls:
Possible water dam-
age to adobe under
window from water
getting in around
window frame.
Refer to Fig. 3.05 for
recommendations.
Walls: Possible ro-
dent damage. Dirt is
located higher than
floor interior.
Refer to Fig. 3.07,
3.08 and 3.09 for
recommendations.
Walls: Erosion at
corner from water
damage.
Refer to Fig. 3.06 for
recommendations.
Roof: New roof.
III. Condition Assessment | 3. Bunk Houses
Steam Pump Ranch Condition Assessment | December 2014
p. 35
Conditions/
Deficiencies
Recommendations
Fig 3.21: Northwest Corner in Basement
Fig 3.20: Bunk House B, Southwest Corner
Walls: Stucco falling
off due to water leak-
ing around windows.
For recommenda-
tions refer to Fig.
3.04.
Walls: Stucco falling
off.
For recommenda-
tions refer to Fig.
3.06 and 3.07.
Roof / Walls: Tree
branches hitting
building.
For recommenda-
tions refer to Fig.
3.19.
Walls: Not able to
see behind plywood
support. Erosion at
corner possibly due
water coming off of
room and lack of gut-
ter and downspout.
Support seems suf-
ficient for now.
Roof: Blocking is
starting to fall out.
Replace or reattach
where possible to
prevent animals from
entering.
Fig 3.22: Northwest Corner in Basement
Steam Pump Ranch Condition Assessment | December 2014
p. 36
III. Condition Assessment | 3. Bunk Houses
Conditions/
Deficiencies
Recommendations
Fig 3.18: Bunk House B, South Bunkroom, Northwest Corner
Fig 3.17: Bunk House B, South Bunkroom Window on East wall
Walls / Windows:
Cracks due to water
infiltrating around
window.
Refer to recommen-
dation in Fig. 3.05
and 3.14.
Floor: Dirt and
stored items. Unable
to see condition of
floor.
Remove dirt, debris
and stored items to
reduce places for
rodents to live.
Walls: Vinyl wall
covering.
Remove to ensure
there is no dam-
age to adobe under
covering.
III. Condition Assessment | 3. Bunk Houses
Steam Pump Ranch Condition Assessment | December 2014
p. 37
Fig 3.17: Bunk House B, Shared Bathroom
Floors / Walls: Dirt
and stored items.
Possible rodent
activity.
Remove dirt, debris
and stored items to
reduce places for
rodents to live.
Steam Pump Ranch Condition Assessment | December 2014
p. 38
Current Floor Plan
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/18/2014 4:27:03 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Garage Workers Housing
4'0'4'16'8'
1/8" = 1' - 0"
Existing Adobe walls to remain
Walls to be demolished in the future
Project North
Entry / Exhibits208 sf
Classroom / Western Movies Room526 sf
Restroom / Storage
66 sf
Site Storage
135 sf
Small Kitchen
97 sf
Native American
Exhibits
179 sf
Natural History
Exhibits
135 sf
Building Storage /
Utilities
110 sf
Closet
p. 39
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe Garage / Workers’ Housing was built in multiple stages between the 1930s to the 1960s. It was originally constructed as the garage for the Procter / Leiber House
Summary of Current Conditions and
Deficiencies
The Classroom / Western Movies, Entry
/ Exhibits and Restroom / Storage rooms
were reviewed for stabilization to prevent
future deterioration. The adjacent rooms
were only reviewed if they impacted the
structure of the rooms to be preserved.
Previous stabilization issues appeared
to have been addressed at an earlier
time. The critical issue in this building
are the damages from rodent activity.
Summary of Recommendations
These recommendations are to provide
temporary stabilization to the structure
that will remain only. We have identified
the following critical repair items in order
of priority:
i. Clean up debris and board up
small openings in the walls if
rodent holes are apparent after
cleaning. Install wire hardware
cloth along the perimeter of the portion of
the building that will be preserved where
possible. We would recommend the same
solution described in the Pusch Ranch
House (see Fig. 2.09) without the large
rocks to hide the hardware cloth. Install
rodent traps to help reduce the number of
rodents.
ii. Water appears to be collecting along the
North exterior wall of the Restroom / Stor-
age. Provide a thin lime plaster, 1/8” to
1/4” thick on exposed adobe. Make patch
obvious to indicate where the temporary
repair has occurred and that future repair is
required in that location.
iii. Direct water away from the corner by the
Restroom / Storage and the Site Storage
by adding gutters and downspouts to the
roof around the portion of the building to
be kept. Locate downspouts to direct water
away from the building. Remove vine grow-
ing in that corner.
The following repair items are not critical to the
stabilization of the structure, but should be consid-
ered if rodent activity in the portion of the building
to remain continues:
i. The wall and structure between the Class-
room / Western Movies Room and the
Entry where an earlier roof leak deterio-
rated the wall is currently stable, however if
rodents begin to dig into that wall, provide
a temporary thin lime stucco 1/8” to 1/4”
thick on the exposed adobe wall.
ii. Board up the West opening in the Class-
room / Western Movies Room if rodents
continue to enter the space after hardware
cloth is installed around the perimeter of
the building to be preserved.
Summary Cost EstimatesCritical Repair Costs:
i. Prevent rodent damage: $2,000
ii. Lime plaster: $500
iii. Gutter and downspout: $1,500
Recommended Repair Costs:
i. Repair damaged wall: $2,000
ii. Board up openings: $500
III. Condition Assessment|4. Garage / Workers’ Housing
Fig. 4.01: Southeast Corner
Fig. 4.02: North Elevation
Steam Pump Ranch Condition Assessment | December 2014
p. 40
III. Condition Assessment | 4. Garage / Workers Housing
Conditions/
Deficiencies
Recommendations
Fig 4.03: North Elevation looking East
Majority of the North
elevation will be
demolished in the
future.
Fig 4.04: Northeast Elevation
Location of building
that will be pre-
served. Interior is in
fair condition.
Fig 4.05: North Elevation by Restroom / Storage, looking West
Walls: Water collect-
ing in the corner and
eroding base of wall.
Possible rodent
activity, see Fig. 4.11
for view of this loca-
tion at the interior.
Place thin lime plas-
ter, 1/8” to 1/4” thick
over missing stucco.
Add gutters to roof
line above the area
of the building that
will be restored and
locate downspouts to
flow away from build-
ing. Remove vine.
Portion of building
that will be demol-
ished in the future.
Photo Documentation of Current Conditions, Deficiencies and Recommendations
III. Condition Assessment | 4. Garage / Workers Housing
Steam Pump Ranch Condition Assessment | December 2014
p. 41
Conditions/
Deficiencies
Recommendations
Fig 4.07: South Elevation
Fig 4.08: Southwest Corner of the Classroom / Western Movies Room
Fig 4.06: South and East Elevations, looking Northwest
Portion of building to
be preserved. In fair
condition.
Portion of building
to be preserved.
This portion appears
structurally stable.
Wall: Crack in wall Not a critical repair
at this time.
Floors / Walls: Pile
of dirt, appears to be
rodent activity.
Doors: Opening to the Native American Exhibit to the West.
If the Native Ameri-can Exhibits Room to the West of the Classroom / Western Movies Room is hav-ing rodent problems, we recommend blocking the opening to prevent rodents from entering the Classroom.
Roof: Roof in good
condition.
Lower building will
be demolished in the
future.
Steam Pump Ranch Condition Assessment | December 2014
p. 42
III. Condition Assessment | 4. Garage / Workers Housing
Conditions/
Deficiencies
Recommendations
Fig 4.11: Bathtub in Restroom / Storage
Fig 4.10: Northeast Corner of Classroom / Western Movies Room
Structure: Column
added to support the
beam.
Support appears suf-
ficient at this time.
Walls: Adobe dete-
riorated from earlier
roof leak. Roof leak
appears to be fixed.
Stucco finish from
other side still stand-
ing.
Wall is stable as
is for short term. If
rodent damage in
wall creates more
damage, provide
a thin lime plaster
1/8” to 1/4” thick to
prevent rodents from
entering the wall.
Fig 4.09: Northwest Corner of Classroom / Western Movies Room
Floor: Cracks in
concrete floor.
Not critical to repair
at this time.
Walls: Cracks in at
corner and on the
North wall of Class-
room / Western Mov-
ies Room.
Not critical to repair
at this time.
Floor / Walls: Large
amount of dirt, pos-
sibly due to rodent
activity.
Remove dirt and
inspect adobe to
ensure that large
portions of adobe
wall aren’t missing.
Repair as needed
and close rodent
holes if any.
III. Condition Assessment | 4. Garage / Workers Housing
Steam Pump Ranch Condition Assessment | December 2014
p. 43
Conditions/
Deficiencies
Recommendations
Fig 4.13: Closet on the North Side of the Entry / Exhibits Room
Fig 4.14: Center of West Wall of Entry / Exhibit Room
Fig 4.12: Toilet in Restroom / Storage
Wall: Wall is dam-
aged near base.
Possibly from water
infiltrating from exte-
rior or rodent activity.
Refer to recommen-
dation in Fig. 4.05.
Walls / Floor: Closet
in the Entry / Exhib-
its Room is full of
dirt. Appears to be
same activity from
Northeast corner of
Classroom / Western
Movies Room.
Refer to recommen-
dations in Fig. 4.10.
Floor: Floor is full of
dirt.
Refer to recommen-
dation in Fig. 4.11.
Walls: Damage
to wall from water
leak. Same wall as
the East wall of the
Classroom / Western
Movies Room in Fig.
4.10.
Refer to recommen-
dation in Fig. 4.10.
Steam Pump Ranch Condition Assessment | December 2014
p. 44
Current Floor Plan
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/3/2014 11:07:48 AM
1/16" = 1'-0"
14046
Steam Pump Ranch
1/16" = 1'-0"1 Procter Leiber House
8'0'8'24'16'
1/16" = 1' - 0"
Existing walls to remain
Walls to be demolished in the future
Fig. 5.01: North Elevation Fig 5.02: Northwest Elevation, looking at Main Entrance into House
True North
Hank Leiber
Displays
441 sf
Food
Service
226 sf
Entry Porch
126 sf
Pantry
47 sf
Stairs to
roof
Open Porch
389 sf
Sun Porch
703 sf
Procter
Displays
566 sf
Sitting Room93 sf
Exhibit
Room
343 sf
Office /
Archive
373 sf
Hall
East Addition, 720 sf
Bath-
room
Bathroom Bathroom
Fireplace ShowerClosetCloset
Bath
Porch Addition
Closet
Closet
Powder Room
p. 45
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe Procter / Leiber house was originally built for John Procter and his family in 1933. The house was constructed out of adobe with a concrete foundation. Modi-fications were made to the interior of the house over the years. The East Addition was built in the 1980s.
Assessment of Previous Work
Performed
Recent repair work to the roof above the
Procter Displays Room and the North-
west wall of that room started in 2010.
The Procter / Leiber House appears to
be in fair condition. Settlement is occur-
ring in the north corner near the Sitting
Room. This might be due to water col-
lecting near that corner and/or unstable
soil under the building’s foundation. The
stucco on the parapet is cracking, allow-
ing water to infiltrate the adobe. Water appears to
be getting in around the Procter Displays Room
window. This might also be due to settlement in the
North corner. The new ceiling and beams in the
Living Room appear to be in good condition. The
ceiling in the Sitting Room is in poor condition from
a leak in the roof. The leak appears to have been
fixed.
Summary of Current Conditions and
Deficiencies
The Procter Leiber house is overall in fair condition.
There are cracks developing in the floors and walls
and some water infiltration at the doors, windows
and roof and areas of ponding water on the roof
and at the base of the building. There also ap-
pears to be some termite issues in the wood at the
open porch and some rotted 1x sheathing. Rodents
have caused damage to some interior walls.
Summary of Recommendations
The 2008 Master Plan proposed that the build-
ing be taken back to the original configuration,
with some of the interior rooms re-opened. The
master plan is currently being reassessed with the
possibility that the East Addition be preserved. At
this time, the only addition to be removed will be
the Porch Addition, to the South of the East Addi-
tion and Office / Archive. These assessments and
recommendations include all rooms except for the
Porch Addition.
These recommendations are to provide stabiliza-
tion for the next 2 to 3 years only to the portions
of the structure to remain. We have identified the
following critical repair items in order of priority:
i. The clay canales are dumping water near
the foundation of the building. This appears
to be causing some compromise to the
foundation in areas where the water is col-
lecting. We would recommend extending
canales, providing splash blocks and grad-
ing and channeling the water 3’ to 4’ away
from the building so water does not collect
near the building. If settlement continues,
provide a downspout or flexible downspout
extension at the canales to be able to bet-
ter control the water.
ii. The roof over the East Addition needs to
be built up more to allow water to flow out
of the canales correctly. Currently the roof
is lower than the canales, creating a pond-
ing area and allowing water to leak into the
sink in the Bathroom of the East Addition.
iii. Repair roof over the Food Service Room,
portions of that area of the roof appear to
be leaking.
iv. The window and door frames are start-
ing to deteriorate especially on the North
Elevation and allowing water to enter in be-
tween the frame and adobe walls. All gaps
between the adobe wall and frames should
be sealed to prevent deterioration of the
walls. This should be done as soon as
possible as it is critical to keep water from
entering into the walls. As water infiltrates
through the window and door frames, it can
deteriorate the adobe under and above the
III. Condition Assessment|5. Procter / Leiber House
Fig. 5.03: South Elevation, Looking at the Enclosed Porch
Shower
Steam Pump Ranch Condition Assessment | December 2014
p. 46
windows and doors.
v. Repair the stucco on the top of the parapet
at the Procter Displays Room to prevent
water from entering the top of the wall.
There are two options for repair:
Option 1: Apply a thin lime stucco, 1/8” to 1/4”
thick over all of the cracks and locations
of exposed adobe. The thin lime stucco is
only a temporary solution.
Option 2: Apply a full lime stucco system on
the parapet. The full lime stucco system
will provide protection for a longer period of
time. Due to the nature of stucco, espe-
cially on the tops of parapets, this will need
regular maintenance to ensure water is not
entering from the top of the parapet.
vi. Fix clay tile roofs over the Sun Porch so
that water will not enter the porch.
vii. Close open holes and pipes so that ro-
dents aren’t able to enter the building.
viii. Repair adobe site wall near the Porch Ad-
dition. Cover with tarp until repair occurs.
Additional items listed in priority that are recom-
mended, but not critical to the structural stability
are:
i. Inspect and treat the building for termites.
There is currently termite activity in the
Open Porch.
ii. Portions of the Open Porch appear to be
structural unsound. Be mindful of putting
additional load to the roof at the Open
Porch. If the porch needs to be accessed,
then the porch roof will need to be structur-
ally reinforced. At this time the clay tiles
over the Open Porch can be repaired so
that water no longer leaks over open porch.
iii. If rodent damage along the perimeter starts
to create significant damage, provide a
hardware cloth around the perimeter of the
building as described in the Pusch Ranch
House. The current damage from rodents
at the exterior of the house appears minor
in comparison to the other buildings on
site.
Summary Cost Estimates
Critical Repair Costs:
i. Grading and water control: $4,000
ii. East addition roof repairs: $2,000
iii. Roof repair at kitchen: $500
iv. Make windows and doors watertight along
the North elevation: $1,500
v. Parapet:
Option 1 thin lime stucco: $1,000
Option 2 full lime stucco system:
$2,500
vi. Clay roof tiles at Sun Porch: $1,000
vii. Close openings: $500
viii. Adobe site wall repair: $1,000
Recommended Repair Costs:
i. Termite treatment: $2,000
ii. Structurally reinforce Open Porch: $2,000
iii. Rodent prevention: $5,000
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 47
Fig 5.04: Stairs Leading to Roof
Fig 5.05: Northwest Elevation at Procter Displays Room Window
Conditions/
Deficiencies
Recommendations
Wall: Stucco dam-
aged on top of stair
wall.
Currently not critical
to the structure of
the building. Apply
a thin layer of lime
based stucco 1/4” to
1/8” thick to prevent
additional damage.
Apply stucco to allow
future work to know
location of patch.
Photo Documentation of Current Conditions, Deficiencies and Recommendations
Roof: Canales do
not extend very far
from the wall.
See recommenda-
tion below.
Site: Water is col-
lecting at base of
building. Interior of
living room is crack-
ing, possibly due to
settlement and water
collecting near the
corner of the build-
ing.
Grade dirt and chan-
nel ponding area
away from the build-
ing. Extend canales
to match other ca-
nales to direct water
further away from
the building. Provide
splash blocks at the
base of the building.
If settlement contin-
ues, provide a down-
spout at the canales
to be able to better
control the water.
Steam Pump Ranch Condition Assessment | December 2014
p. 48
III. Condition Assessment | 5. Procter / Leiber House
Fig 5.07: North Elevation, at Exhibit Room
Site: When water
falls from canales, a
depression in the dirt
is created, allowing
the water to collect
near the base of the
building.
Provide a splash
block and regrade to
get water away from
the building. If water
continues to pool
near the base of the
wall, provide down-
spouts at the cana-
les to better control
the water away from
the building.
Conditions/
Deficiencies
Recommendations
Fig 5.06: Northwest Elevation, at Procter Displays Room and Stairs to Roof.
Wall: Rodent activity
along the base of the
walls.
Install wire hard-
ware cloth along
the perimeter of the
building if rodent ac-
tivity begins to create
significant damage
around the perimeter
of the building. We
would recommend
the same solution
described in the
Pusch Ranch House
if that appears to
work. In addition to
the hardware cloth
we would recom-
mend installing
rodent traps in or
around the building.
Wall: Canales along
the North wall of the
Exhibit Room and
Office / Archive have
been extended.
See recommenda-
tions below.
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 49
Conditions/
Deficiencies
Recommendations
Fig 5.08: East Window in Sitting Room
Windows: Wood
framed windows
have deteriorated
allowing for water to
penetrate and com-
promise the adobe
wall. This promotes
additional problems
with termites and
rodents.
Seal cracks around
the window and
frames to make the
windows water tight.
This is typical for
all windows in the
Sitting Room, Exhibit
Room and Office /
Archive. This is a
critical repair and
should be done as
soon as possible.
If budget allows,
treat for termites.
Fig 5.09: North Window in Office / Archive Room
Fig 5.10: Northeast Corner
Wall: Canales have
been extended.
When water falls
from canales, a de-
pression in the dirt is
created, allowing the
water to be collected
near the base of the
building.
Refer to Fig. 5.07 for
recommendations.
Steam Pump Ranch Condition Assessment | December 2014
p. 50
III. Condition Assessment | 5. Procter / Leiber House
Conditions/
Deficiencies
Recommendations
Fig 5.11: North Wall near Powder Room Door in East Addition
Wall: Hole in wall
allows animals to
enter.
Fill hole with steel
wool or expandable
foam to keep ani-
mals out or attach a
metal screen
Wall: Hole in wall
allows animals to
enter. Pipe from
bathtub.
Fill hole with steel
wool or expandable
foam to keep ani-
mals out or attach a
metal screen. Cap
pipe.
Site: Dirt is above
finished floor
Regrade dirt so it is
below finish floor.
Fig 5.12: East Elevation at East Addition Bathroom
Fig 5.13: Site Wall to the South of the Porch Addition
Wall: Edge of wall is
damaged.
Repair adobe site
wall and re-stucco
to prevent additional
deterioration. Wrap
adobe with tarp until
able to repair wall to
prevent further de-
terioration of adobe
wall.
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 51
Conditions/
Deficiencies
Recommendations
Fig 5.14: North Elevation, Open Porch
Structure: Termite
damage
Inspect building for
termites and treat.
Repair structurally
damaged items.
Fig 5.15: Open Porch, Looking North
Roof: Structural
damage to porch.
Repair / replace
damaged wood and
fix clay tiles above.
Fig 5.16: Open Porch, Looking South
Fig 5.17: Open Porch, Near Front Door
Steam Pump Ranch Condition Assessment | December 2014
p. 52
III. Condition Assessment | 5. Procter / Leiber House
Conditions/
Deficiencies
Recommendations
Fig 5.19: Roof at Food Service and Hank Leiber Displays Rooms
Fig 5.20:Roof above Food Service Room
Fig 5.18: Roof at Open Porch
Roof: Debris on
roof.
Clean debris on roof
so water is able to
flow off of roof.
Large air handler,
appears to be locat-
ed above a bearing
wall.
Roof: Crack in roof.Repair roof, leak
showing in Food
Service Room.
Roof: Roof tiles
have shifted and are
not draining water
correctly.
Replace broken tiles,
and reset tiles that
have slipped.
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 53
Conditions/
Deficiencies
Recommendations
Fig 5.22: Parapet Wall at Procter Displays
Fig 5.23: Parapet Wall at Procter Displays Room
Fig 5.21: Roof at Procter Displays
Roof: Roll roofing
above appears to be
in good condition.
Wall: Stucco on top
of parapet is crack-
ing. Water is pen-
etrating into adobe
wall.
It is critical to repair
any cracked stucco
on the top of any of
the parapet walls
to prevent water
entering the wall
which will cause
deterioration of the
adobe wall. Most of
the damage appears
to be on the Procter
Displays Room
parapets. Provide a
thin lime stucco 1/8”
to 1/4” over cracks
to prevent water
from entering as a
temporary fix. Locate
patches to be obvi-
ous so future long
term stabilization
will know to repair
stucco.
Wall: Stucco on parapets is failing. Refer to the images below.
Steam Pump Ranch Condition Assessment | December 2014
p. 54
III. Condition Assessment | 5. Procter / Leiber House
Conditions/Deficiencies Recommendations
Fig 5.25 Roof at East Addition
Fig 5.26: East Addition Bathroom, View of Ceiling by Roof Leak
Fig 5.24: Roof at East Addition, Near Northeast Corner
Roof: Location of
roof drain. Located
higher than finish
level of roof.
Roof: Water is pond-
ing in this area.
Reroof in this area
and slope roof to
allow water to drain
correctly.
Roof / Ceiling: Damage to ceiling from rainwater pond-ing on roof.
Refer to recommen-dations above in Fig. 5.24 and 5.25.
Roof: Location of
roof drain. Located
higher than finish
level of roof.
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 55
Conditions/
Deficiencies
Recommendations
Fig 5.29: Roof at Sun Porch near Procter Displays Room Wall.
Fig 5.28: Roof at Sun Porch to Remain
Roof: Clay roof tiles
have shifted and
cracked.
Refer to recommen-
dation on Fig. 5.18.
Fig 5.27: Porch Addition to Demo
Wall: Adobe site wall
with damage at the
edge.
Refer to Fig. 5.13 for
recommendations.
Porch: Porch to be
demolished at a later
date.
Roof: Clay tiles are
starting to pull away
from the wall.
Re-attach or replace
clay tiles to prevent
water from leaking
through.
Steam Pump Ranch Condition Assessment | December 2014
p. 56
III. Condition Assessment | 5. Procter / Leiber House
Roof / Ceiling:
Water damage from
roof leaks at the light
fixture.
Repair roof leak,
refer to Fig. 5.20.
Conditions/
Deficiencies
Recommendations
Fig 5.30: Ceiling in Food Service Room
Fig 5.31: Water Heater Closet in Entry Porch
Walls: Rodent activ-
ity.
Clean up dirt to find
location of rodent
activity. Close any
holes.
Fig 5.32: Closet in the Hank Leiber Displays Room, Adjacent to the Water
Heater Closet
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 57
Conditions/
Deficiencies
Recommendations
Walls: Cracking in
North wall of living
room.
Refer to recommen-
dation on Fig. 5.05.
Floor: Cracks in
concrete floor.
Not critical to stability
of structure.
Wall: Wall deteriorat-
ing under window
due to water coming
in from window no
longer being water
tight and possibly
from ponding at the
exterior. Some dam-
age due to earlier
leak in the roof that
has since been
repaired.
Refer to recommen-
dations in Fig. 5.05
and 5.08.
Fig 5.35: North Window in Sitting Room
Fig 5.34: Procter Displays Room Looking Northeast at the Ceiling
Fig 5.33: Procter Displays, Looking Northeast
Steam Pump Ranch Condition Assessment | December 2014
p. 58
III. Condition Assessment | 5. Procter / Leiber House
Conditions/
Deficiencies
Recommendations
Walls: Rodent dam-
age.
Close holes and set
traps.
Wall: Cracks in wall
by window.
Cracks from wa-
ter leaking around
window. Make win-
dows and parapets
watertight. Refer to
recommendation in
Fig. 5.08 and 5.09.
Roof / Ceiling:
Damage from Roof
Leak.
Roof leak appears to
have been fixed.
Fig 5.36: Ceiling in Sitting Room above North Window
Fig 5.37: East Addition Power Room
Fig 5.38: Bathroom in Office / Archive
III. Condition Assessment | 5. Procter / Leiber House
Steam Pump Ranch Condition Assessment | December 2014
p. 59
Steam Pump Ranch Condition Assessment | December 2014
p. 60
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/4/2014 3:38:23 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Carlos' House Former BBQ
4'0'4'16'8'
1/8" = 1' - 0"
Current Floor Plan
Walls to remain
Areas to be removed
Fig. 6.01 South Elevation
Possibly original windows.
Barbecue / Gathering Space
550 sf
Hall65 sf
North Room250 SF
Restroom185 sf
Closet
35 sf
Closet
35 sf
Bath60 sf
Project North
Steam Pump Ranch Condition Assessment | December 2014
p. 61
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/4/2014 3:38:23 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1Carlos' House Former BBQ
4' 0' 4'16'8'
1/8" = 1' - 0"
HistoryThe Barbecue was originally constructed as a shade structure around the 1930s to 1950s. Over the years the structure has been added to and enclosed.
Summary of Current Conditions and
Deficiencies
The area of the building to be preserved
is in fair condition. There are some
joists missing in the roof of the Barbecue
/ Gathering Space. Erosion is occurring
under some of the windows. The roof ap-
pears to have been recently repaired for leaks.
The wall between the Restroom and the Bathroom
is an open stud wall. The exterior walls of the
rooms to the South of the Restroom (Hall, Clos-
ets, Bath) appear to be constructed of adobe and
might be part of the early adobe walls added to the
Barbecue. This structure should have additional
research to determine if the exterior adobe walls of
the closets and bath should be preserved.
Summary of Recommendations
These recommendations are to provide temporary
stabilization to the structure only. We have identi-
fied the following critical repair items:
i. Seal around windows to prevent further
erosion of adobe walls.
ii. Provide a thin lime plaster 1/8” to 1/4” thick
by the water heater where there is a large
area of exposed adobe. Make patches
obvious to indicate where the temporary
repair has occurred and that future repair is
required in that location. Cover any holes
in that area to prevent animals from enter-
ing and to reduce the amount of dirt from
coming inside.
iii. Provide a gutter and downspout on the
North Elevation of the building to be
preserved to prevent water from creating
basal erosion.
iv. Install wire hardware cloth along the perim-
eter of the building to prevent rodents from
entering. We would recommend the same
solution described in the Pusch Ranch
House (see Fig. 2.09) without the large
rocks to cover the wire. Provide rodent
traps on the interior after the perimeter is
secure.
An additional item that is recommended, but not as
critical is:
i. Provide sheathing on the South wall of the
Restroom which is currently an open wood
stud wall. If the adjacent rooms to the
South are demolished or if rodents appear
to be coming into the space from those
rooms, close the wall to decrease the num-
ber of animals from entering that room.
Summary Cost EstimatesCritical Repair Costs:i. Seal windows: $1,000
ii. Lime plaster and board openings on the
interior: $500
iii. Gutter and downspouts: $2,000
iv. Prevent rodents: $500
Recommended Repair Costs:i. Sheathing at Restroom: $500
III. Condition Assessment|6.Carlos’ House / Former BBQ
Fig. 6.03:Southwest Corner
Fig. 6.02 Northeast Corner
Steam Pump Ranch Condition Assessment | December 2014
p. 62
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Conditions/
Deficiencies
Recommendations
Fig 6.04:North Elevation of Portion to be preserved
Fig 6.06: South Elevation at the Barbecue
Fig 6.05: Southeast Corner
Windows: Water
might be leaking
along window and
creating erosion
under the window.
This is typical at all
windows along the
North Elevation.
Seal around the win-
dow frame to prevent
water from entering
This is typical for
all windows on the
North Elevation.
This portion will not
be preserved per the
2008 Master Plan.
Study this portion of
building to determine
if this section is part
of the early adobe
construction and
should be preserved.
Site: Water is col-
lecting at the base of
the building from the
roof.
Provide gutters and
downspouts and
drain water away
from the building.
Windows: Windows
to be removed and
salvaged at a later
date.
Roof: Chimney
for the barbecue.
Appears to extend
beyond the wall to
be preserved.
Not a critical stabi-
lization issue at the
moment.
Walls: Full length of
wall is adobe.
Additional research
should be performed
to determine if this
wall should be pre-
served
Photo Documentation of Current Conditions, Deficiencies and Recommendations
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Steam Pump Ranch Condition Assessment | December 2014
p. 63
Conditions/
Deficiencies
Recommendations
Fig 6.08: West Elevation at Water Heater
Fig 6.09: Restroom, East Window
Fig 6.07: West Elevation
Walls / Windows:
Deterioration of
adobe walls along
north elevation.
Seal any gaps
between the window
frame and adobe.
Portion of building
not to remain.
Walls: Large hole
in adobe and stucco
has been removed.
Close openings in
adobe wall with ex-
terior rated plywood.
Apply a thin lime
plaster 1/8” to 1/4”
thick to exposed
adobe.
Steam Pump Ranch Condition Assessment | December 2014
p. 64
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Conditions/
Deficiencies
Recommendations
Fig 6.12: West Wall in Restroom
Fig 6.11: Barbecue / Gathering Space, North Window
Roof / Wall: Pos-
sible leak in roof.
Fix leak in roof if not
yet repaired.
Fig 6.10: Restroom, East window
Walls / Windows:
Deterioration of
adobe walls under
windows.
Seal any gaps
between the window
frame and adobe.
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Steam Pump Ranch Condition Assessment | December 2014
p. 65
Conditions/
Deficiencies
Recommendations
Fig 6.15: Barbecue / Gathering Space, Looking East
Fig 6.14: Above Barbecue
Ceiling / Roof:
Joists missing above
barbecue
Structure appears to
be ok for now. Ad-
ditional joists can be
added once restora-
tion work occurs.
Floor: Large cracks
in concrete floor.
Not a critical repair
at this time.
Fig 6.13: Restroom, South Wall
Wall: Open 2x wood
framing.
Attach exterior rated
sheathing to one
side of 2x framing if
portion to be demol-
ished is removed.
Steam Pump Ranch Condition Assessment | December 2014
p. 66
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Conditions/
Deficiencies
Recommendations
Fig 6.16: West Wall of Barbecue / Gathering Space
Walls: Hole in wall
near water heater.
Refer to Fig. 6.07
and 6.08.
Refer to recommen-
dations in Fig. 6.07
and 6.08.
Window: Gaps
around window.
Seal gaps to make
window water tight
and to prevent dam-
age to the adobe
around the window.
Keep windows se-
curely closed.
III. Condition Assessment | 6. Carlos’ House / Former BBQ
Steam Pump Ranch Condition Assessment | December 2014
p. 67
Steam Pump Ranch Condition Assessment | December 2014
p. 68
Fig 7.02: Northwest Corner of Long Chicken Coops
Fig 7.03: Southeast Corner of Long Chicken Coops
Fig 7.01: Aerial of Chicken Coops, Image from Pima County Map Guide, 2014 Imagery
Possible Hatchery
Long row of Chicken Coops
Restrooms
Tac#:Date:p. 520.622.4506 | f. 520.620.6097 | 2625 north silverbell road | tucson, arizona 85745 | at The Silverbell Ranch
the architecture companyScale:
12/1/2014 3:25:14 PM
1/8" = 1'-0"
14046
Steam Pump Ranch
1/8" = 1'-0"1 Pump House Existing Floor Plan
4' 0' 4'16'8'
1/8" = 1' - 0"
Tac#:
Date:
p. 520.622.
4
5
0
6 | f. 52
0.
6
2
0.
6
0
9
7 |
2
6
2
5
n
ort
h
sil
v
er
b
ell r
o
a
d | t
ucs
o
n,
arizona
8
5
7
4
5 |
at
T
h
e
Silv
er
b
ell
Ran
c
h
the arc
hit
ect
ur
e c
o
m
p
a
ny
Scale:
12/1
/
2
0
1
4
3:
2
5:
1
4
P
M
1/8" =
1'-
0"
14046
Steam
P
u
m
p
R
a
n
c
h 1/8" = 1'-0"1Pump House Existing Floor Plan
4'
0'
4'
16'8'1/8" = 1' -
0"
Project North True North
p. 69
Steam Pump Ranch Condition Assessment | December 2014
HistoryThe chicken coops were constructed around 1930s to the 1950s and were built to house the hens that laid the eggs sold to the Pioneer Hotel. Each coop in the long row of chicken coops are around 10’ x 12’ each. The smaller wood structure is believed to be the hatchery.
Summary of Current Conditions and
Deficiencies
The wood hatchery, is structurally un-
sound and in poor condition. The roof is
partially collapsed and the interior sup-
ports have fallen.
The long chicken coops are constructed
out of adobe and wood and also in poor
condition. The adobe is deteriorating and has col-
lapsed on the east end. The roof has collapsed
over most of the structure. Most of the doors, win-
dows and small trap doors are gone.
The concrete stem wall and concrete floor in the
long chicken coops appear to be in good condition.
The adobe walls appear to have a cement stucco
finish, which is not beneficial for adobe and should
be remediated once the long term stabilization and
restoration occurs.
Summary of Recommendations
These recommendations are to provide temporary
stabilization to the structure only. We have identified
the following critical repair items in order of priority:
i. The adobe requires protection to prevent
further deterioration. Each option can be
chosen based on each location of exposed
adobe. We recommend Option 1 in loca-
tions where the tarp can be securely at-
tached and Option 2 in smaller areas where
tarp would be difficult to locate.
Option 1: Cover the adobe with tarp to prevent
further deterioration of the adobe.
Option 2: Cover any exposed adobe with a thin
layer of lime plaster that is 1/8” to 1/4” thick.
Ensure the tops of the adobe walls are
protected. The wood on the long coops can
remain as is.
ii. The roof structure has deteriorated in many
locations and is collapsing. If funds are an
issue the roof can remain as is. However,
locating the tarp on the exposed adobe may
become more difficult. We strongly recom-
mend supporting the roof and stabilizing the
structure where no longer stable over the
full width of each coop. Stabilize the door
starting to fall down on the Long Chicken
Coops near the East end. This temporary
stabilization will prevent further collapse of
the roof and reduce the possibility of ad-
ditional portions of the building collapsing.
This will also allow the team that provides
the long term stabilization and restoration to
see the existing roof and be able to re-build
if necessary.
iii. Brace the four corners of the wooden chick-
en hatchery each way to prevent the coop
from collapsing. Do not cover the wood
roof with tarp as there is the potential for
ponding on the tarp, which could cause fur-
ther roof collapse. The latest the hatchery
should be braced is before the monsoons.
iv. Trim trees so no branches can hit the struc-
ture, remove all dead branches and remove
all mistletoe.
Summary Cost Estimates
The repair costs identified below are in the same
order as identified in the Summary of Recommen-
dation Section.
Critical Repair Costs:
i. Protect exposed adobe:
Option 1: $6,500
Option 2: $10,000
ii. Brace structure: $7,500
iii. Hatchery bracing: $4,000
iv. Trim trees: $1,500
III. Condition Assessment|7. Chicken Coops
Fig. 7.04: Northeast Corner of Hatchery
Steam Pump Ranch Condition Assessment | December 2014
p. 70
III. Condition Assessment | 7. Chicken Coops
Conditions/
Deficiencies
Recommendations
Fig 7.05: Northeast Corner of Hatchery
Fig 7.07: Northwest Corner of Hatchery
Fig 7.06: Southwest Interior Corner of the Hatchery
Roof: Partial col-
lapse of wood roof
structure and deck
with portions of
corrugated metal
roof missing. Cen-
ter wood support is
failing.
See recommenda-
tions above. Prop up
with posts portions
of roof starting to
collapse.
Walls: Overall struc-
ture is poor, walls
are tilted and the
entire structure could
fall during a severe
windstorm.
Support the 4 cor-
ners of the building
in both directions to
stabilize.
Structure: Building
structure is com-
posed of dimension-
al lumber. Lumber
appears to be in
poor condition.
See recommenda-
tions above.
Walls: Wood boards
are in fair condition.
Walls: Wall boards
in this area are
missing or may have
been connected with
chicken wire.
Door: Door is miss-ing from this loca-tion.
Floor: Concrete floor
is in fair condition
Floor: Possibly ex-
isting hatchery floor
with concrete stem
walls.
Photo Documentation of Current Conditions, Deficiencies and Recommendations
III. Condition Assessment | 7. Chicken Coops
Steam Pump Ranch Condition Assessment | December 2014
p. 71
Conditions/
Deficiencies
Recommendations
Fig 7.09: East End of Chicken Coops Looking North
Fig 7.10: East End of Chicken Coops Looking South
Fig 7.08: Southwest Corner of Hatchery
Walls: East end has
collapsed. Only por-
tions of adobe wall
remaining.
Cover tops of walls
where there is no
roof with tarp. En-
sure that the top of
the walls do not get
wet and that mois-
ture can still escape
from the tarps.
Walls: Tree limbs
hitting adobe walls.
Large mesquite tree
located near to base
of adobe walls.
Trim trees and re-
move mistletoe.
Windows: Window
frames are in poor
condition.
No repair, not critical
to structural stability.
Roof: roof is com-
pletely missing in
this area
Doors: Exposed adobe at failed lintel where door frames have twisted and are about to fall.
Cover adobe with tarp and support /brace lintel to prevent additional movement of lintel or remove adobe as it is a potential safety hazard.
Walls: The grey
colored stucco ap-
pears to be a cement
based stucco on a
large portion of the
interior and exterior,
which is not ideal for
adobe walls.
The concrete stucco
can remain as a
temporary finish,
for long-term stabi-
lization the cement
stucco should be
removed and replace
with a lime based
stucco.
Steam Pump Ranch Condition Assessment | December 2014
p. 72
III. Condition Assessment | 7. Chicken Coops
Conditions/
Deficiencies
Recommendations
Fig 7.13: North Elevation, near West End of Coops
Fig 7.11: North Elevation, Center of Coops
Roof: Wood roof is
collapsing.
Walls: Adobe walls
are exposed and
starting to erode.
Walls: The grey
colored stucco ap-
pears to be a cement
based stucco.
Option 1: Leave roof
structure as is.
Option 2: Prop up
roof areas that are
collapsing.
Option 1: Cover
exposed adobe walls
and tops of walls
with a thin layer of
lime stucco 1/8” to
1/4” thick.
Option 2: Carefully
cover and secure
tarp over exposed
adobe walls. Ensure
the tops of exposed
adobe walls are
covered to help
prevent water from
deteriorating adobe.
Avoid covering roof
with tarp.
Wall: Large, historic
mesquite to be pre-
served. Roots of tree
appear to be pushing
wall up.
Trim branches where
hitting the structure.
Walls: Possible
animal holes at the
base of the wall. Re-
cent activity appears
minimal.
See recommenda-
tions below.
Walls: Concrete
stem wall in good
condition.
Fig 7.12: North Elevation, Center of Coops Adjacent to Image Above
Walls: Wood frame
at chicken door
missing.
Put in new wood
frame around open-
ing to keep adobe
stabilized.
Walls: Adobe wall
has eroded. Only
stucco from interior
remaining.
Cover adobe with
tarp or thin lime plas-
ter to try to reduce
erosion.
Walls: Bolt to hold
down wood plate ex-
posed showing more
than half of adobe
wall has eroded.
Cover remaining
adobe with tarp to try
to save as much of
remaining adobe as
possible.
III. Condition Assessment | 7. Chicken Coops
Steam Pump Ranch Condition Assessment | December 2014
p. 73
Fig 7.14: West Elevation
Wall: Portions of
stucco have fallen
off.
See recommenda-
tions in Fig. 7.12.
Conditions/
Deficiencies
Recommendations
Fig 7.16: South Elevation near the West end
Tree is hitting struc-ture.Trim tree and remove all dead branches and mistle-toe.
Fig 7.15: South Elevation at West end
Walls: Wood boards
are in good condi-
tion.
Wall: Wall boards
are in fair condition
Openings: Windows
and doors are miss-
ing or boarded.
Floor: Concrete floor
in good condition.
Openings: Glass
window and frame in
place.
Walls: The grey colored stucco ap-pears to be a cement based stucco.
See recommenda-tions in Fig. 7.10.
Wall: Portions of
stucco have fallen
off.
See recommenda-
tions in Fig. 7.12.
Steam Pump Ranch Condition Assessment | December 2014
p. 74
III. Condition Assessment | 7. Chicken Coops
Conditions/
Deficiencies
Recommendations
Fig 7.19: Chicken Coop at East End
Roof: Wood roof has
collapsed.
Remove fallen
branches on top of
roof structure. See
recommendations in
Fig. 7.12.
Wall: Interior of
adobe wall appears
to be a good condi-
tion. Stucco might
be concrete based
stucco.
See recommenda-
tion in Fig. 7.10.
Wall: Wall boards
are in fair condition.
Interior view from
Fig. 7.14.
No temporary
structural stability
required due to short
height of boards.
Fig 7.18: South Elevation near East End
Trees are hitting
structure.
Trim trees, remove
dead branches and
mistletoe.
Fig 7.17: South Elevation in the Center of the Coops
Roof: Structure at
roof has collapsed.
See recommenda-
tions in Fig. 7.12.
Wall: Stucco miss-
ing.
See recommenda-
tions in Fig. 7.12.
III. Condition Assessment | 7. Chicken Coops
Steam Pump Ranch Condition Assessment | December 2014
p. 75
Fig 7.20: Interior of Chicken Coop near West End by Large Mesquite
Roof: Roof col-
lapsed, Support
provided to hold up
remaining roof.
Remove debris on
roof and trim dead
branches off of
mesquite tree. See
recommendations in
Fig. 7.12.
Wall: Wood wall in
fair condition.
Fig 7.21: Interior of Chicken Coop near Center of Coops
Wall: Wood wall and
roof collapsing.
See recommenda-
tions in Fig. 7.12.
Conditions/
Deficiencies
Recommendations
Fig 7.22: Interior of Coop Near Center of Chicken Coops
Roof: Roof collaps-
ing, coop is adjacent
to coop in image
above.
See recommenda-
tions in Fig. 7.12.
Floor: Concrete floor
in good condition.