HomeMy WebLinkAboutOV131105 oQOP�1.EYggi�o2-v
At\WTA
°UNDED 191 A
DEV REVIEW BOARD
COMMERCIAL Resubmittal? N
Development Review Transmittal
Town of Oro Valley Planning and Zoning Division
11000 N. La Canada Drive
Oro Valley,AZ 85737
Review Agency: DEVELOPMENT REVIEW BOARD
Transmittal Out: Friday, February 18, 2011
Transmittal Due: Friday, March 18, 2011
Project Information INREVU
Project Number: OV1311-05 Parcel Number: 22424009U
Project Title: COLOR CHANGE
Lots (if applies):
Location: LA CANADA&NARANJA
Applicant: CHOI W J LLC Phone: 520-877-7767
Zoning:
Oro Valley Planner:
Date Information (as applies)
DRB Hearing:
2nd DRB Hearing:
Additional Comments:
Written comments need to be returned to Development Coordinator, Shirley Gay. If you
have no comments,please sign and date this form, and return it via FAX(520) 742-1022.
For questions or comments, call (520) 229-4849, (520) 229-4816 or email sgay@orovalley.net.
Friday, February 18,2011
DEVELOPMENT REVIEW BOARD
Approved Without Comments By: Date:
o ,PLLEY
M ,
� 5 20W
atfr
°UNDED'01 Planning &Zoning Division
11000 N. La Canada Drive, Oro Valley AZ 85737
Phone: (520) 229-4800 Fax: (520) 742-1022
www.orovalleyaz.gov
APPLICATION FOR DEVELOPMENT REVIEW PROJECT ARCHITECTURE
DATE: t.S' k\ OV CASE NO.: MTh (office use only)
PROJECT NAME : SUBDIVISION LOT#
LOCATION I ADDRESS: City St Zip
ZONING PARCEL NUMBER: LOT SIZE
REASON FOR SUBMITTAL:
.M..-_ .. .. , ��-,.{..-,. . --
--..... .... I ,I
APPLICANT: W - Chi i -ae 1Ct,.�c�,,c1I ci ( .A1>4 \l c�ti� �e 14 A f
ADDRESS: I( I 3 3 1\1. Le„ e,Kt_etc, (7\-. City 0kZ1 V_ 7
11r St A2. Zip ?'l 3 7
PHONE NO.: 5?-‘' - 1 161 FAX NO.: 5?-' ' 7 1 1`1 c
Email address: 0YvV4-Iley �5&c&+- . ('ow(
PROPERTY OWNER: kiJ i . Cho
ADDRESS: /°' ?3 N. ?aa(( U City 0)7) V6-(( St A z. Zip 877 31
PHONE NO.: 5 Xi - 1 161 FAX NO: �)4'
SIGNATURE: ----- - - DATE: ' - ' � I
Submittal Requirements:
- Fees
:One copy of 24x36 elevations and floor plan 1/4 or 1/8 scale
:One copy of 24x36 site plan 40 scale(Custom Lots Only)
:Typical lot lay out for subdivision
:Models-Lot fit analysis for subdivisions
:Electronic submittal in CAD or shp format or pdf form of submittal materials. Submittal will not be accepted without the disk.
Eighteen(18)copies of the following:
Dimensioned Elevations of all four sides of all buildings and floor plan(11"x 17"format)
Elevation sheet must show wall for screening mechanical equipment
List square footage of buildings
Site Plan(11"x 17"format)
Color chips of body,trim and roof tiles(81/2"by 11"format)Commercial and Residential
this may be included with the elevations if you chose to do so.
• Applications will not be accepted without all required materials.
• PLEASE COLLATE AND FOLD SUBMITTAL
DEVELOPMENT SERVICES FEE SCHEDULE
REVISED JANUARY 21, 2009
GENERAL POLICIES FOR ALL APPLICATIONS
As specified in the OVZCR, all fees must be paid in full prior to acceptance of an application. Fees identified after
submittal are due as determined by the Planning and Zoning Director (Public Works Director for rights-of-way fees).
All fees must be paid prior to the issuance of permits and/or release of assurances. Bond release inspections may
be deducted from the appropriate bond if this is part of the language of the bond.
Charges for partial review of any project will be based on the stage of review and staff time already dedicated to the
project. The Planning and Zoning Director may refund up to 80% of the fee.
The Planning & Zoning Director may waive fees if an undue hardship has been created by the Town. All other fee
waiver requests must be approved by the Town Council.
Fees will not be applied to applications or events initiated or sponsored by the Planning & Zoning Commission or
Town Council.
GIS fees are charged per development project. For example, GIS fees charged for a rezoning would be credited
toward the GIS fees specified for a related development plan and/or plat.
Whenever independent consultant review is provided for in the OVZCR (Golf Course Overlay, Communications
facilities, Riparian analysis etc.), the applicant must reimburse the Town for all consultant fees incurred.
Fees related to Development Review Board (DRB)
DEVELOPMENT REVIEW BOARD FEES
Model Homes(first model) $220
,"dchtionai Mace s S 100 per mode
Custom Homes.General Architecture,Additions $220
Commercial Architecture(first building pad) $270
A.dditionai Building Pads $1 00 per build=rqg pad
Grading Exception $1,300
Phased Grading Plan Included in Plat or Plan Submittal
See the Development Services fee schedule for a complete list of fees.
1 -
TOWN OF ORO VALLEY
DEVELOPMENT REVIEW BOARD MEETING DATE: April 12, 2011
TO: DEVELOPMENT REVIEW BOARD
FROM: David Ronquillo, Senior Planner
SUBJECT: Architectural exterior color change for the existing ATA Blackbelt Academy
building, located at 11133 N. La Canada Drive, represented by W. J. Choi, OV1311-05.
SUMMARY:
The Development Review Board (DRB) is required to review color change and alterations to commercial
architecture. There are five existing buildings within the larger commercial center. Two of the buildings are
located within this portion of the parcel. The ATA Blackbelt Academy building located on the east side of
parcel is the only building to be repainted.
The existing building is currently painted a pink tone and is proposed to be repainted darker brown and tan
shades. The other building on this same parcel will remain the same.
Site Conditions
• Property is 1.05 acres
• Zoning is El Conquistador Planned Area Development (PAD) Commercial
• Two existing buildings totaling 9,600 square feet located at 11133 and 11143 N. La Canada Drive.
Proposed Improvements
The applicant has submitted two options for color palettes for DRB review and consideration:
1. Building colors:
a. "Strata color" (#1257D) for pop-outs, tower and fascia
b. "Verdant color" (#1262W) for sign band and walkways
c. "Tephra color" (#2356D) for tower top and archway
2. Building colors:
a. "Old Washer color" (#2902W) for pop-outs, walkways, tower top and archway
b. "Sephia color" (#2687N) for fascia
c. "Pinesap color" (#2915D) for sign band
d. "Dingo color" (#2744D) for tower
BACKGROUND:
Approvals to Date
• August 2001: Development Review Board approval of architectural elevations and colors.
• September 2001: Town Council approval of Development Plan.
ANALYSIS OF OVZCR SECTION 22.6.B - DEVELOPMENT REVIEW CRITERIA:
The following is a list of noteworthy criteria (in italics) followed by staff commentary.
Section 22.6, DRB Review Criteria
TOWN OF ORO VALLEY
DEVELOPMENT REVIEW BOARD Page 2 of 2
• Chapter 22.6.B. 6, "The character of the proposed design shall be in harmony with, and compatible
to, those structures in the neighboring environment and the design character adopted for any given
area avoiding excessive variety or monotonous repetition."
The existing building color is pink in tone. Both proposed color schemes provide muted earth tones
that are more compatible with the adjacent buildings.
• Chapter 22.6.B.10, "All exterior materials and colors including roofs, walls and fences shall be
predominantly muted earth and plant tones and shall minimize contrast and glare."
The exterior colors will blend well with the surrounding environment. All the proposed colors meet
the required 60% reflectivity.
The proposed color shade will be consistent with the building to the north which has darker tones;
however, the adjacent buildings to the west and south are pink with brighter tones. In general, there
will be a difference between the building colors in the commercial center. The proposed darker and
muted colors are preferred and will be more consistent with the surrounding area.
Addendum A Design Guidelines
• Addendum A, Design Guidelines, C.2.a(iv): Use materials and colors that minimize heat absorption
without reflecting.
The proposed earth tone colors help minimize building glare and reflectivity. The use of brown and tan
colors blend with the adjacent buildings.
CONCLUSION/RECOMMENDATION:
The architectural color revisions are in conformance with the Zoning Code and Design Guidelines. The
proposed colors are compatible with the existing buildings and surrounding area.
Staff recommends approval of either color palette#1 or#2 for this building. Both are compatible in the
commercial center.
SUGGESTED MOTION:
The DRB may wish to consider one of the following suggested motions:
I move to [approve, approve with conditions, OR deny], architectural color changes for the existing building.
Attachments:
1. Building Photo with existing colors
2. Elevations and color palette#1 and #2
3. Site Plan
cc: Hyong Kim, ATA Blackbelt
Project Manager: David Ronquillo, Senior Planner /
Dab I:Williams, PlanningDivision Manager
ager
t 1
m , "
x P ,-t k 1,\.* Convex'Group
.. ,,
,
i i y y t t .1,
11114111/1t
---
1111
a
'
v , ,
, 4 41111 I I 4'
I fa i
..,
1 1
! S
., .
C)rrtrunal Olin++.
11133 Building Tucson
ii (Viani-iqpniinnt
John Roether
sales.Reprecentritive
Frazee Paint
,P0 u bile:520-940-0394
roether@frazee.rotn
Color Wheel Paint General Paint Razee Paint Parker Paint )(limed Paint Canso(
r...,,,,„.„,,ritii*tierurieuetio tr IS+,bmix*Iire 4+e roorAms"+++vmr,C4041 Irffy..Aatio'ciaiiir*IP be v Or?t1,04,eV teittire.ftiirlath-ciinditiciiii*, 41Abettlitiesi,fteri1/424i 0.1'nAviktitr)Vtilit*rttiV
-I et:+tritium a ti arititi eixt.J11 rthut at!beyorkilhe i iiv„ii Lit,al CaottleoutAp.44iiirii a**ithkott1/41o1 tr,leo tho 41,(41,tootrux rtie0 ottodar i 04104,7.1 by the ile'yOrolitf Linder a.tiu*lioti esineitio-u,
Scherer*1 Comex"Gre:oup
D3 21,2011
•
„
L
t F
41k
ft
po tit
„0,4.0•0 404,6 100 4ier 400,sok^ Am,
_ .
•
• "
.4
, • '• ,
Sign Band and Walkways Pop nuts artdrOWel and Fa5cia.CIC 1200 Strata
Tow,tr Top and A t< ay t.,:LC I oQ iepn-
11133 Building Tucson
I P,'II 1 I
Color Wheel mint Gellifiral Paint Frtnee Paint PaticierPviint golistaiPgshit Cornet
wurtsi thn nrcletticr appiracrl Ill',(dims nosy titrtit0 mitif i1ito! dut re)Pierfarf,44144,tor 4orteetform condAit mettInd oirppt*iitirAtArrY,tvoil
Aeretryclori and wher"two%OW.titf 430;104 ritte‹.,14 reu444(ctifile,Gevutp,fvtol Euivr vek into/Joe maul.A UM fichratowila r 447,00,11 by Itktroofifoiff* i4 ritia Comilttoott
. .
Set'leave,2„ awrieiltGist7oup
.,,-.
.., _......,...._...,:_ .._. ., -...,,.. ..,..._.„,..,,....,, „........,..,,,......,,.._ . , , .,...,.. „..,
, .
W '''''.". "....'''''' ''''''' .' '"". '''r.1..ra'.. '''''''''''' ';''''';* T--7 7 7 , -•,
: • . ,,_ .., ,• : . ,
r,_,:,. .. . _,. •.L
,,,Rief • IP"t''' "i'fr ."'"' .'"wr"'''.*''' 1'-'-'-''" ,-,--,.*---------.-','-----",''''''-''''"'"--,--""':', .;., f-r,- '-' '1 '- 1
- -- ....:-......_....... '..... -- ° -
....,..,
„,
.,.. .,„., ,............„..... „.. -.. „
1 , ,
. . ,
., . ,., ........" • r .........
L. .. ..,,
. . .......-.. , ,
i , '.L. ' ---''T ::t 1•:''•:"A ' ' :
.:Iri'''''''r'''' '-''':' . 4' •I
1 '.'' .', ,'''' : ..1 4•,‘•e ..i.-....., . , ..., .,:.
,-., . -a ,..,.....„.„,,,.,.....,..,....
, I •. . °,, -li . ,,, . ::;°:,,--. .,, °°, ,7---,,,-:,-7:-7.,,,-::,-:'„,•
. ,.... • ..,., '''',4:V;''''.:"''-',.:' ",,,,- , , _,,
,. .
'r:[..,....'.,...,--,.-:',.•-.,,,„ ,,,
Sign Band CL 29;•••SD Pinesap Walle,h,---ays and Pppouts a nci,Tower. 7,'"i7.o. _!,,a,,ri<1,A Tchway:CL 2c.10021/ii k...,'Ild Washer
'rover 744D 1.,)Intijo F 4C4:100:( ( )(44, 74 ,I.I "
11133 Bui1ding Tucson
.,, ,...
ciit t.
Color Wheel Paint. General Paint Frazee Paint f)tli*Vitty Paint Klivai Paint
Cams*
PV#ref VW tilY0Y-1*,,%419044410eleilt AM tto,m briX"ol.dre 4 4 ,,,Mq..),Xf--e,t.4,10101'1,
t.mtv144-1,*45.ord tairkt ktrews ri A*in letitt oa, frJrkiA'o $,
that " lezrciY Pmkr teo mt ttvci w f,twthrive,iteorletkap,(p4rie174;t1ierocomlVft.00,,o,9
SiteFo 1 /sa) ‘1'
an
, ems„,.r
7.7
!jsjSSF,= _ }t_
.
•r
a I- 1` .r
- 111, 4V al-
e.Y.. a I .,,
) ..i :' .„. tr. ' :' 7- .
•�� .-
1 '.
4 f'' ly. •
•
{ 1 ,. ■
y ,
o
5 •
z
44
�t
1 . ..
-.
ti -
; 4 1 _
.9, rip . .
_.....11„ _.,
,_ ,, .;
..
`
`
,z
1L, ... i eS r;
We--',ft 4` Altkr;:, -: .,-,-7. ....._2__.
girt
a'
I
F*iii- s --
.
t
IL " . - ,
. .
, A iau.
e
I'''
k