HomeMy WebLinkAboutStone Canyon Land Development, II - Contract#: Expire DT: 6/18/2034TOWN OF ORO VALLEY
LINE EXTENSION AGREEMENT
FOR CONSTRUCTION OF UNPROTECTED WATER FACILITIES
UNDER PRIVATE CONTRACT
THIS AGREEMENT, authorized by Chapter 15 of the Oro Valley Town Code is
made and entered into this 3rd day of September , 20 25 , by and
between the Town of Oro Valley (the "Town") and Stone Canyon Land Development, II,
(the, "Applicant") for the construction of Water Facilities. ----------,~.,
RECITALS
WITNESSETH:
WHEREAS, the Applicant desires to install the Water Facilities to provide service
to the project to be known as Stone Canyon VII Phase 5, Lots 420-427
_____ located on the parcel of land legally described in Exhibit "A", hereinafter
called the "Subject Property;" and
WHEREAS, the required plans, specifications, and materials for the Water
Facilities have been approved by the Town; and
WHEREAS, the Applicant understands that the project under this Agreement is not
eligible for any credits against any impact fees established and collected by the Town for
the cost of constructing the necessary onsite and/ or off site water infrastructure necessary
to provide domestic and fire protection water services to the development. hnpact fees
are due and payable at the time water meter(s) are purchased.
WHEREAS, the Applicant desires that the Town take possession of, operate and
service the Water Facilities; and
WHEREAS, the Town is willing to accept the Water Facilities and permit them to
be connected to the Town Water System provided the Water Facilities meet Town
standards and the work is done in accordance with Town requirements; and
WHEREAS, the estimated cost of the Water Facilities shall be seventy one
thousand nine hundred and fifteen dollars.
($71,915.00 ).
Now THEREFORE, in consideration of the matters and conditions set forth in this
Agreement, it is hereby agreed as follows:
F:\fonns\LEA fonns\Currcnt LEA's\Currcnl LEA\Unprolcctcd LEA rcvised_060~17.doc
\
COVENANTS
I. DEFINITIONS, FOR THE PURPOSE OF TIDS AGREEMENT ONLY
A. Service Connection means action taken by duly authorized Town
personnel resulting in actual delivery of water service to specific premises.
B. Water Facilities means those Water Facilities, OV Plan No. 12-05-25
to be constructed under this Agreement for the purpose of providing water
service and fire protection to the Subject Property as outlined in Exhibit
"A". The Water Facilities shall be outlined within Applicant's Water
Facilities Construction cost estimate, attached hereto as Exhibit "B", and
incorporated herein by this reference. Exhibit "A" shall show the
approximate location of the Water Facilities easement.
C. Water Infrastructure means any and all permanent or semi-permanent
machinery, equipment, water pipes and water mains installed for the
purpose of facilitating the delivery of water to customers of Oro Valley's
Water Utility.
D. Final Acceptance means that all construction has been completed and
inspected, and that all requirements to complete and sign off on this
Agreement shall be satisfied pursuant to the Final Acceptance of the
Water Facilities, attached hereto as Exhibit "D", and signed by both
parties. Once the project is complete, Applicant shall submit a signed
copy of Exhibit "D" within thirty (30) days to the Water Utility.
II. GENERAL
A. Upon approval by the Town and at Applicant's own expense, Applicant
shall design, and upon approval by the Town, install, at Applicant's own
expense, the Water Facilities as set forth in the Water Facilities
Construction Plan, Oro Valley Plan No. 12-05-25 , a true and correct
copy of which is on file with the Oro Valley Water Utility. By this
reference, the Water Facilities shall collectively refer to those facilities set
forth in·Oro Valley Plan No. 12-05-25
B. The Water Facilities shall be constructed by a contractor properly licensed
by the State of Arizona and all proper governmental authorities for the
type of work specified.
C. Before any service connections are made to the Water Facilities or the
Town's water system, all fees which are then due shall be paid to the
Town pursuant to this Agreement.
D. No water meter shall be sold and /or installed until the following have
been met:
2
1. A "Certificate of Approval of Construction" has been issued by Pima
County Department of Environmental Quality and received by the Oro
Valley Water Utility.
2. The Water Facilities as set for in the Water Facilities Construction Plan,
Oro Valley Plan No. 12-05-25 have been connected to the existing
water system.
3. A building permit has been issued by the Town of Oro Valley, Pima
County, or any other appropriate jurisdictional agency.
4. Development impact fees, meter fees, plan review fees and inspection fees
have been paid in full.
E. Once the provision of Section II.(D)(2) has been satisfied, the Town of
Oro Valley Water Utility shall be the sole entity to operate and maintain
the system as set forth in the Water Facilities Construction Plan, Oro
Valley Plan No. 12-05-25 . The Applicant shall be responsible
for any and all construction activities including, but not limited to, Blue
Staking until the project has been finally accepted per Exhibit "D" herein.
Until the project is finally accepted in accordance with Exhibit "D", the
Applicant shall be responsible for repairing any leaks and/or damages to
the existing system stemming from the work performed by the Applicant
on the Water Facilities as set forth in the Water Facilities Construction
Plan, Oro Valley Plan No. 12-05-25 . In the event the Applicant does
not perform the repair work for any leaks and/or damages, the Water
Utility shall make the repairs and the Applicant shall be responsible for all
costs incurred for the repairs by the Water Utility.
F. The amount of the Assurances required for the Water Facilities to be
constructed under this Agreement and specified in Chapter 26, Section
26,6 of the Oro Valley Town Code shall remain in affect throughout the
two (2) year warranty period and will not be released by the Town until
after the warranty period.
Ill. APPLICABLE FEES
The Town will require certain applicable fees and charges to be paid pursuant to
Oro Valley Town Code Chapter 15 and other applicable Arizona State law as amended
from time to time, prior to providing water service under this Agreement. The Town will
take all of the necessary and legal steps to protect its interest, including refusal to provide
water service, if Applicant fails to pay fees when due.
IV. ENGINEERING AND INSPECTION
A. Applicant shall employ a Civil Engineer registered in the State of Arizona
to design the system and implement the design. Applicant will ensure that
3
an Engineer's Certificate of Completion, for the purpose of obtaining an
Approval of Construction from the Pima County Department of
Environmental Quality, are both completed for the project prior to any
water being delivered through the improvements. Title 18, Environmental
Quality, Chapter 4, Department of Environmental Quality, Safe Drinking
Water.
B. Notice is hereby provided for any and all notices required under any state
and/or local laws for the inspection and the procedure for inspections of
any water facilities constructed under this agreement. The Work to be
performed under this agreement shall be subject to Town Inspection to any
and all times. Any inspector authorized by the Town shall have full
inspection authority over the work to be performed under this Agreement.
The Applicant shall furnish the Town Inspector with reasonable access to
the Water Facilities for obtaining full information concerning the work.
Defective work shall be corrected in a manner satisfactory to the Town
Inspector. Inspection by the Town does not guarantee the safety or
engineering soundness of plans prepared by the Applicant's engineer.
C. In the event that Applicant requests and the Town elects to provide a
Town Inspection outside of the normal 40 hours in a work period, or on a
Saturday, Sunday or legal holiday as defined in Arizona Revised Statutes,
Title 1, the Applicant shall compensate the Town for any additional
salaries, expenses or employee benefits relating to such overtime or
holiday work. Any inspection requests that are met shall be considered
adequate notice of inspection under any state and/or local laws.
Additional inspection costs will be billed to the Applicant. A normal work
period shall be defined as 40 hours in a seven (7) day work week, usually
worked on an eight (8) hour day, five (5) day basis, commencing on
Monday and ending on Friday, continuing in seven (7) day increments.
Nothing in this paragraph shall require the Town to provide inspection on
weekends and holidays. If the Town declines to provide inspection on
weekends and holidays, Applicant shall not have a right to damages
against the Town as the result of Town's decision not to perform such
weekend and holiday inspections.
V. PRE-CONSTRUCTION AND CONSTRUCTION PROCEDURE
A. The Applicant shall submit a written request to begin construction of the
Water Facilities to the Town within five (5) working days prior to the time
work is to commence.
B. No work shall commence until the Town has issued a Notice to Proceed
which will specify the starting date and a reasonable time for completion.
C. Applicant shall provide Town with an accurate, written schedule of
construction, which shall be updated in a manner sufficient to provide
Town the ability to schedule Town inspection personnel.
4
D. Applicant shall submit material certification at the pre-construction
meeting. Materials used in the construction shall be available for
sampling and testing prior to being used in construction of the Water
Facilities. Materials that fail to meet Town specifications shall not be
used in construction of the Water facilities as outlined in Exhibit "B".
E. The Applicant shall, at Applicant's expense, obtain all necessary permits
and licenses for work permitted herein, pay all fees and comply with all
laws, ordinances and regulations relating to the work, public health and
safety of Applicant's Contractors and employees.
F. The Applicant/Contractor shall apply to the Town for a construction water
service. All construction water will be metered with an appropriate size
water meter and back-flow prevention device. The Town shall install the
water meter and backflow device.
G. The work shall commence within five (5) days of the date specified in the
Notice to Proceed.
H. The Applicant, or Applicant's designated agent, shall be present at all
times during performance of the work. The name of the designated agent
and the contractor perfomiing the work shall be furnished to the Town
before commencement of the work. Instructions given to the designated
agent on the work site shall be deemed to have been given to the
Applicant.
I. The Applicant shall employ only competent and efficient laborers,
mechanics or artisans on the project and the Applicant agrees to perform
the work diligently to complete the work on or before the completion date
given in the Notice to Proceed.
J. The Applicant shall identify and locate all water valves prior to paving,
and set valve boxes to final grade after paving.
K. The Applicant shall, at Applicant's expense, make any and all alterations
to the existing water system, either on-site or off-site, necessitated by
paving, drainage or other improvements caused by the development.
L. The Applicant shall require all contractors and/or subcontractors to
comply with all safety requirements of the Occupational Safety and Health
Act as may be amended and as implemented by the State of Arizona. The
Applicant or Applicant's contractor shall be solely responsible for all fines
or other penalties provided for by law for any violations of the Act.
M. In accordance with the Oro Valley Town Code and policies relating to the
operation of domestic water utility companies, a true and complete copy of
5
the Certificate of Approval to Construct the work issued by the Arizona
Department of Environmental Quality or the Pima County Department of
Environmental Quality is attached as Exhibit "C", and incorporated herein
by this reference.
VI. RESERVED
VII. DEDICATION
A. The Applicant grants, bargains, sells, conveys, transfers and delivers the
Water Facilities as described in Exhibit "A" to the Town free and clear of
all liens, claims, charges or encumbrances by the time of acceptance of the
Water Facilities by the Town.
B. The Applicant agrees that the project under this Agreement is not eligible
for any credits against any impact fees established and collected by the
Town for the cost of constructing the necessary onsite and/or offsite water
infrastructure necessary to provide domestic and fire protection water
s~rvices to the development. Impact fees are due and payable at the time
water meter( s) are purchased.
C. The Water Facilities to be dedicated to the Town shall have an easement
extending a minimum of 7 .5 feet on either side of the center of, and
the full length of, the constructed water utility line.
D. The Applicant guarantees the Water Facilities to be free from all failures
and/or defects due to workmanship and or materials for a period of two (2)
years from the Town's final acceptance date.
E. The Applicant shall not construct any utility, building or other
improvement that would interfere with the operation or maintenance of the
Town's Water Facilities.
F. The Applicant further guarantees that all service lines, meters and meter
boxes will be to finish grade and the Applicant will remain responsible for
raising/lowering of said services as required until the area described has
been accepted_as complete by the Town.
G. Upon issuance of the certificate for "Approval of Construction" from Pima
County Department of Environmental Quality (ADEQ) and after final
acceptance of the Water Facilities is granted by the Town, attached hereto
as Exhibit "D", the Town's Water Utility shall begin to operate and
maintain the Water Facilities. The Town shall accept title to and take
possession of the Water Facilities described in Exhibit "A" at such time
that they are connected to the existing Town Water Facility.
6
H. The Parties agree that all requirements to complete and sign off on this
LEA shall be satisfied pursuant to the Final Acceptance of Water
Facilities, attached hereto as Exhibit "D", and signed by both Parties
before the two (2) year warranty period shall begin.
I. The amount of the Assurances required for the Water Facilities to be
constructed under this Agreement and specified in Chapter 26, Section
26.6 of the Oro Valley Town Code shall remain in affect throughout the
two (2) year warranty period and will not be released by the Town until
after the warranty period.
VIII. INDEMNIFICATION
Applicant agrees to indemnify, defend and hold the Town, its Mayor and Council,
the Town Water Utility Director, appointed boards and commissions, officials, officers,
employees and the Town's insurance carriers, individually and collectively, harmless
from all losses, claims, suits, demands, expenses, subrogations, attorney's fees, or actions
of any nature resulting from the actions of Applicant or Applicant's contractor or any
subcontractor employed by Applicant (including bodily injury and death) or damages to
any property or any other losses, claims, suits, demands, and/or expenses, arising or
alleged to have arisen out of the work to be performed, except any such injury or
damages arising out of the sole negligence of the Town, its officers, agents or employees.
The amount and type of insurance coverage carried by Applicant will in no way be
construed as limiting the scope of indemnity in this paragraph.
IX. ACCURACY OF THE RECITALS
The parties hereby acknowledge the accuracy of the Recitals, which are
incorporated herein by this reference.
X. NOTICES
All notices and communications required by this Agreement shall be in writing
and shall be given by personal delivery or mailed first class, registered or certified mail,
postage prepaid, and shall be deemed received upon the earlier of actual delivery or one
hundred twenty (120) hours after deposit in the United States Mail. Such notices and
communications should be sent to the following designated representatives of the
undersigned parties:
If to the APPLICANT: Stone Canyon Land Development, II
6405 N Campbell Ave
Tucson, AZ 85718
7
If to TOWN OF ORO VALLEY: Water Utility Director
Town of Oro Valley
11000 North La Canada Drive
Oro Valley, Arizona 85737-7016
CC: Town Attorney
Town of Oro Valley
XI. ATTORNEY FEES
11000 North La Canada Drive
Oro Valley, Arizona 85737-7016
Should the Town bring any legal or equitable action· for the purpose of protecting
or enforcing its rights under this Agreement, the Town shall recover in addition to all
other relief, its reasonable attorney fees and court costs to be fixed by the court.
XII. CANCELLATION
Under A.R.S. Section 38-511, as amended, the Town may cancel any contract it is
a party to within three (3) years after its execution without penalty or further obligation if
any person significantly involved in initiating, negotiating, securing, drafting, or creating
the contract on behalf of the Town is, at any time while the contract or any extension
thereof is in effect, an employee or agent of any other party to the contract in any
capacity or a consultant to any other party to the contract with respect to the subject
matter of the contract. In the event the Town elects to exercise its rights under A.R.S.
Section 38-511, as amended, the Town agrees to immediately give notice to Applicant.
XIII. COMPLIANCE WITH ALL LAWS
The parties to this Agreement shall comply with all federal, state and local laws,
rules, regulations, standards and Executive Orders, without limitation to those designated
within this Agreement. The laws and regulations of the State of Arizona shall govern the
rights of the parties, the performance of this Agreement and any disputes thereunder.
XIV. SEVERABILITY
If any provision of this Agreement or the application thereof to any person or
circumstance shall be held by a court to be unenforceable to any extent, the remainder of
this Agreement and the application thereof shall not be affected and shall be enforceable
to the fullest extent permitted by law.
XV. AMENDMENT
This Agreement shall not be amended except by written instrument mutually
agreed upon and executed by the parties.
8
XVI. LEGAL JURISDICTION
Jurisdiction for any legal dispute stemming from the performance of the terms of
this Agreement shall be limited to courts of competent jurisdiction within Pima County,
Arizona. This clause in no way limits the option of the parties' to resolve potential
disputes through alternative dispute resolution methods.
XVII. SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the successors and assigns of each of the
parties hereto. No assignment shall relieve either party of its obligations except an
assignment by Applicant in connection with the transfer of title to property to the Town.
Such transfer shall relieve Applicant of its obligations provided such transferee agrees to
be fully bound by the provisions hereof.
This Agreement shall be binding upon and inure to the benefit of the heirs,
executors, administrators, successors and assigns of the parties and Applicant may not
assign this Agreement without prior written consent of the Town.
XVIII. ENTIRE AGREEMENT
This Agreement constitutes the entire agreement between the parties with respect
to the matters covered by it and supersedes any prior understanding or agreements, oral
or written, with respect thereto. The parties shall not be bound by any understanding,
agreement, promise or representation, whether expressed or implied, which is not
specified in this Agreement.
IN WITNESS WHEREOF, the Applicant has executed or has caused this instrument
to be executed by its proper officers hereunto duly authorized, and the Town has caused
this instrument to be executed by its proper officers thereunto duly authorized, all as of
this day and year first above written. •
''TOWN"_
~~
PeterA.Abraham, P.E., Water Utility
Director
Date: ----'-~__.-li'-"~""'-----""'·2=-t:>=--------
9
ATTEST: DAS TO FORM:
~~
Andrew R. Votov/ Interim Legal Services Director
Date: q {Ii 2 5' ·
(·
II
STATE OF A -Z-) J ~ J/1.11 A )ss.
COUNTY OF J1' fl V'-)
SUBSCRIBED AND SWORN to before me this L day of ~ {;-,
2o~r-, by David J Williamson who is knOWtl() me or has
satisfactorily been identified as the Manager for the Applicant,
and is a duly authorized agent to sign on behalf of
Stone Canyon Land Development, II, LLC m which to bind and
obligate the Applicant.
My Commission Expires: {;; 1)-1 /;;g
11
RAELVM H,i.RRISON
Notary Public • Arizona
Pima County
Commission :/ 66 73 5 5
• • My Comm. Expires Jun 29 . 2028
EXHIBITS TO LINE EXTENSION AGREEMENT
A Legal description of the Subject Property
B Water Facilities Cost Estimate
C Certificate of Approval to Construct
D. Final Acceptance of Water Facilities
12
EXHIBIT "A"
LEGAL DESCRIPTION/MAP OF SUBJECT PROPERTY
13
10 11
STONE CA
1
STONE CANYON 1--+~~
NORTH
STONE CANYON I
SOUTH ------J~~
22 {1,.
12
STATE LAND STATE
PIMA COUNTY 11 12
14 13
LOCATION PLAN
A PORTION OF SECTION 14,
T-11-S., R-13-E., G.&S.R.M,
LAND
12 7
13 18
STATE LAND
PAD
OUNDARY
TOWN ORO VALLEY, PIMA COUNTY, ARIZONA
SCALE:3"=1 MILE
LAT:32.469229, LONG:-110.971327
EXHIBIT "B"
WATER FACILITIES COST ESTIMATE
14
COST ESTIMATE & MATERIAL TAKE-OFF
NAME: R. V. NEIGHBORHOOD 11 PLANNO. OV12--w
STONE CANYON VII-PHASE 5 Date: APRIL 8, 2025
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
This project is installing Potable Mains 719.00 L.F. Reclaimed Mains .... (..:..0_L_F..L) __ _
This project is located entirely/partly within the ORO VALLEY WATER service area.
This project is located entirely/partly within ORO VALLEY Cityfrown Limits.I
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Quanti!l: ·
101.00
245.00
~Z3.QQ
2
2
3
Size Item
--Pipe .............................. .
4" """----Pipe .............................. .
6" .....__Pipe .............................. .
8" -~-Pipe .............................. .
---Pipe .............................. .
---DJ.Pipe ........................... .
@
@
@
Cost
45.00
55.QQ
65.00 @ --"'-=-'-'=-=----
@ ____ _
@ ___ _
Valves, B & C . . . . . . . . . . . . . . . . . . . . . . . @ ---------~8_"_ Valves, B & C ...................... .
---=6'--"-Valves, B & C ...................... .
---Valves, B & C ...................... .
---Tapping Sleeve & Valve, B & C ........ .
___ Tapping Sleeve & Valve, B & C ........ .
___ Tapping Sleeve & Valve, B & C ........ .
2" Drain Valve Assembly (Paved Area) ........... .
2" Drain Valve Assembly (Unpaved Area) ......... .
Fire Hydrants (l(lcllJ des . Yol-x~~. & .. 01.P.). ........ .
Paving Rep!. 6''ABC 2" Asphalt ................. .
Paving Rep!. 6''Conc. 2" Asphalt ................ .
Air Release Valve Assembly .................... .
1,200.00 @ _..._ __ _
1,000.00 @ _..__ __ _
@ ___ _
@ ____ _
@ ____ _
@
@
@
@
@
2,500.00
2,500.00
2,750.00
@ ____ _
Total Cost
=
= 4.545.00
= 13.175,QQ
= 21215 QQ
=
=
2,400.00
= 1,000.00
=
=
= 2,500.00
= 5,000.00
= 8,250.00
=
=
Air Release Valve Assembly .... . . . . . . . . . . . . . . . . . _____ = ____ _
Estimate-( this sheet only)= 61.415.00
TOTALESTIMATE = 71,915.00
Total Estimate Includes, Items from Supplementary Sheet
Documents/Forms/Unit Fonm/Cost Estimate07
STONE CANYON VI I-PHASE ~
SUPPLEMENTARY SHEET
I ½" & 2" Copper Pipe with fittings .............. @
I" Copper Pipe with fittings ..................... @ =
2" Copper Pipe only without fittings .............. @ =
1 ½" Copper Pipe only without fittings ............ @ =
1" Copper Pipe only without fittings .............. @
l ½" & 2" Service Tie-Over ...................... @ =
3/4" & l" Service Tie-Over ..................... @
l ½" & 2" Service Renewals .................... @ =
3/4" & l" Service Renewals . -................ -. @ =
1" & 3/4" New Split Water Service Stub ........... @ =
2" New Water Service Stub ............. -....... @
I½" New Water Service Stub ................... @
7 l" New Water Service Stub ..................... @ 1,500.00 = 10,500.00
Cas1ng for Boring .................... @ =
Piling for River Crossing .............. @ =
Pressure Reducer Valve ............... @ =
Check Valve ......................... @ =
@ =
@ =
@
@
Total Estimate-(this sheet onlt)= 10,500.00
flnrumrnt<lfnrms/1 }nit Fonn<IC'n<1 F>.tirMt..07
EXHIBIT "C"
CERTIFICATE OF APPROVAL TO CONSTRUCT
15
PIMA COUNTY DEPARTMENT OF ENVIRONMENTAL QUALITY
WATER: APPROVAL TO CONSTRUCT
PIMAC:OUNTY
Record #: P23PW00090 Date Approved: 08/28/2023
Revised Approval On: 05/09/2025
Public Water System Name: Oro Valley Utility
Public Water System Number: 10-164
Project Owner: Fairfield Homes, David Williamson
Address: 6405 N Campbell Ave., Tucson, AZ 85718
Latitude: 32° 28' 40.22" N Longitude: -110° 59' 17.84" W
Description: Public Waterline Extension to Serve Stone Canyon VII -Phase 5, Lots 420 -427.
County: Pima
Approval to construct the above described facilities as represented in the approved plan on file with the Pima County
Development Services is hereby given subject to the following provisions:
AFTER COMPLETION OF CONSTRUCTION, A PROFESSIONAL ENGINEER, REGISTERED IN THE
STATE OF ARIZONA SHALL COMPLETE A FINAL INSPECTION AND SUBMIT AN ENGINEER'S
CERTIFICATE OF COMPLETION, ACCURATE "AS BUILT" PLANS, PRESSURE TEST RESULTS,
CHLORINATION RESULTS AND MICROBIOLOGICAL TESTING RESULTS TO PIMA COUNTY
DEPARTMENT OF ENVIRONMENTAL QUALITY IN ORDER TO OBTAIN AN APPROVAL OF
CONSTRUCTION. PLEASE SUBMIT THE REQUESTED DOCUMENTATION TO
SEWER@PIMA.GOV ~OR REVIEW.
The State law, A.RS. 49-353, requires that construction of the project must be in accordance with the rules and regulations
of the Arizona Department of Environmental Quality and the Pima County Department of Environmental Quality. For the
p~rposes of Licensing Time Frames, under AAC Title 18, Chapter I, Article 5, this Approval to Construct suspends the
licensing time frames and constitutes a Notice of Deficiencies. According to AAC Rl 8-9-A301(D)(t), the applicant, after
completion of construction of the facility specified herein, is required to submit all applicable documents. The submittal of
all the required documents restarts the licensing time frames. Construction shall conform with the approved design
documents.
If this project includes trenching. land stripping, earthmoving or mad construction, an air quality activity permit may be
required pursuant to P. C. C. Title 17.12.470. For inquires, regarding air quality activitx permits, please call (520) 724-7400.
If construction has not started within one year, this certificate will be void and a written extension of time shall be
required within 90 days of the expiration of the appa·oval date.
PIMA COUNTY DEVELOPMENT SERVICES
201 N. STONE AVENUE, TUCSON, AZ 85701
TELEPHONE: (520)724-9000 Page I of I
Water ATC Revised 09/2017
EXHIBIT "D"
FlNAL ACCEPTANCE OF UNPROTECTED WATER FACILITlES
Applicant requests final acceptance of the Water Facilities for the Project known as
Stone Canyon YU Phase 5, Lots 420-427 and
certifies that all of the items listed below are complete.
COMPLETED
Compaction test results have been completed and approved by the
Town.
All Water-related fees including inspection and testing fees have been
paid.
Any construction deficiencies have been corrected.
Post-paving continuity tests have been submitted and approved by the
Town.
Any and a ll easements required for the Water Facilities have been
recorded in the Pima County, Arizona Recorders Office.
STATEOF AZ-)
~ ~ )ss.
COUNTYOF l7m )
SUBSCRIBED AND SWORN to before me this ___d_ day of ~{:;--, 20;;).,-J ,
by David J Williamson who is known to me or has
satisfactorily been identified as the Manager for the Applicant,
and is a duly authorized agent to sign on behalf of Stone Canyon Land Development, 11
in which to bind and obligate the Applicant. ..,__ ___ ~~--JL----'-~---'-....::, ___ /--
I. !'14 !JES£-: T My Commission Expires: _CP~ .... ~..-=ccr_--'--'l /__,'--"L,_1.____..~--
1 ,... .... --................... _,,,
16
~I RAELYN HAAAISON
'/ir-\:;. Notary Public • Arizona ·-~~~,J ?Ima County \\~)'o/ Commission • 667355 ~ My Comm. Expirt s Ju~ 29, 2028
TOWN OF ORO VALLEY
The Town grants final acce tance of the Water Faci lities for the Project known as
n ~ -1 PhM~ 4 c -'-I a-7
and the two-year warranty period shall begin on 1 ""' e I ii~. 20.ifi..
ATTEST:
17