HomeMy WebLinkAboutMinutes - Stormwater Utility Commission - 6/18/2026MINUTES
STORMWATER UTILITY COMMISSION
REGULAR SESSION
JUNE 18, 2026
HOPI CONFERENCE ROOM
11000 N. LA CANADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
Chair Mattson called the meeting to order at 4:08 PM.
ROLL CALL
Present: David Atler, Commissioner
John McCauley, Commissioner
Gary Mattson, Chair
Absent: Robert Aguayo, Vice Chair
Tom Marek, Commissioner
Staff Present: Dennis Roberts, Stormwater Division Manager
Mike Ortiz, Senior Engineering Associate
Scott Bennett, Stormwater Utility Analyst
Jane Hutchins, Stormwater Utility Inspector
Kevin King, Stormwater Utility Intern
Vice Chair Aguayo and Commissioner Marek asked to be excused.
Council Liaison Greene asked to be excused.
Senior Engineering Associate Mike Ortiz was excused at 4:57 P.M.
CALL TO AUDIENCE
Oro Valley resident Bill Jackson had questions and concerns about the Highland Wash at the Highland Mobile
Home Park regarding:
- FEMA funding and timeframe of construction
- How future runoff will interact with the existing drainage system
- Watershed conditions related to upstream subdivision grading
- Soil movement and channel behavior.
- If re -analysis was going to take place before construction.
Stormwater Division Manager Dennis Roberts stated that these questions and concerns will be addressed as a
future agenda item.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
Council Liaison was not present.
06-18-26 Minutes, Stormwater Utility Commission Regular Session
DIRECTORS REPORT (INFORMATIONAL ONLY)
Stormwater Division Manager Dennis Roberts commented on the following topics:
• Town Code Chapter 17 Amendments - Unanimously approved by Mayor and Council.
• Sierra Wash Drainage at Via Mandarina - Reimbursement update from DEMA.
• Gravel Pit Wash at Pomegranate Drive - Updated subapplication submitted: project continues advancing
through federal review.
• BRIC (Building Resilient Infrastructure and Communities) Grant Progress - Two grant subapplicatons have
advanced past DEMA's Stage 1 competitive review:
• Mutterer's Wash at Greenock Drive Flood Control and Channel Improvement Project, at 2.5M with a
75% federal share and a 25% local match
• Carmack Wash - Upper Tributary C Flood Control and Channel Improvement Project, at 3AM with a
75% federal share and a 25% local match
REGULAR SESSION AGENDA
REVIEW AND APPROVAL OF THE MAY 21, 2026 MEETING MINUTES
Discussion was held between Commissioners and Staff regarding whether discussion was allowed during
Regular Session Items. It was found that it was stated that only the Council Liaison Comments and the
Directors Report, which are informational only, were no discussion allowed. All regular Session Agenda
Items allowed for discussion.
Motion by Commissioner John McCauley, seconded by Commissioner David Atler to approve the May 21, 2026
meeting minutes.
Vote: 3 - 0 Carried
2. DISCUSSION OF MEETINGS AND EVENTS
Stormwater Division Manager Dennis Roberts discussed past, current and upcoming meetings and events
in which the Stormwater Utility has participated or will participate.
Discussion ensued among the commission and staff. There was a question whether the members of the
Commission could attend the Flood Control Meetings. Mr. Roberts advised that the Regional Flood
Control Advisory Committee Meetings are open to the public with an option being online access.
PRESENTATION AND DISCUSSION OF STORMWATER UTILITY DIVISION BUDGET FOR FISCAL
YEAR 2026-2027
Stormwater Division Manager Dennis Roberts provided a presentation to the Commission that included
the following:
- Purpose of Today's Presentation
- Stormwater Utility Overview
- Stormwater Utility Overview
- Overview of Fiscal Year 2026-2027 Budget
- What is Fund Balance
- Revenue Breakdown (FY 26-27)
- Expenditure Breakdown (FY 26-27)
- Year -Over -Year Comparison (FY 25-26 VS FY 26-27)
- FY 26-27 Capital Projects Summary
• Catalina Ridge Access Ramp and Channel Improvement Project
06-18-26 Minutes, Stormwater Utility Commission Regular Session
• Sierra Wash at W Glover Rd Mitigation Project
• Nanini Wash at N Paseo Del Norte Erosion Mitigation Project
- Brief Status of the 10-Year Financial Plan
- Ten -Year Forecast Scenario
- Upcoming Rate Review - August 2026 Preview: Why a Rate Review is Required
- Upcoming Rate Review - August 2026 Preview: What Triggers a Rate Review
- Upcoming Rate Review - August 2026 Preview: What Commissioners will Evaluated in August
- Upcoming Rate Review - August 2026 Preview: Commissioners Should Expect in August
- Summary
- Questions
Discussion ensued among the commission and staff.
4. PRESENTATION AND DISCUSSION OF THE STORMWATER UTILITY GRANT PURSUIT PROCESS
GIS Analyst Scott Bennett provided a presentation to the Commission that included the following:
- How Our Process Began
- What We Learned From the PDM Grant Program
- The Work Starts To Pay Off in 2019: State Emergency Council (SEC) funds managed by the Arizona
Department of Emergency and Military Affairs (DEMA)
- The Work Starts To Pay Off in 2019: Lambert Lane Dip Crossing Reconstruction: Phase 2 - Before
- The Work Starts To Pay Off in 2019: Lambert Lane Dip Crossing Reconstruction: Phase 2 - After
- Lower Highland Wash PDM Submittals in 2019 & 2020
- The Hazard Mitigation Grant Program (HMGP)
- The Hazard Mitigation Grant Program (HMGP)
- Current Stormwater Utility HMGP Projects & Status
- Moving Ahead: (Future Programs, Projects & Challenges)
- Stormwater Utility Grant Pursuit Process: Thank you. Questions?
- Contact Information
Discussion ensued among the commission and staff.
DISCUSSION AND POSSIBLE ACTION REGARDING CANCELLATION OF THE JULY 16, 2026
STORMWATER UTILITY COMMISSION REGULAR SESSION MEETING
Motion by Commissioner John McCauley, seconded by Chair Gary Mattson to cancel the July 16, 2026
Stormwater Utility Commission Meeting.
Vote: 3 - 0 Carried
ADJOURNMENT
Motion by Commissioner David Atler, seconded by Commissioner John McCauley to adjourn the meeting.
Vote: 3 - 0 Carried
Chair Mattson adjourned the meeting at 5:08 P.M.
06-18-26 Minutes, Stormwater Utility Commission Regular Session
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 18th day of June, 2026. 1
further certify that the meeting was duly called and held and that a quorum was present.
E-SIGNED by Yarina Hynd
on 2026-08-25 15:56:00 GMT
Yarina Hynd
Senior Office Specialist
06-18-26 Minutes, Stormwater Utility Commission Regular Session 4