AGENDA
STORMWATER UTILITY COMMISSION
REGULAR SESSION
FEBRUARY 19, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
ROLL CALL
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
DIRECTORS REPORT (INFORMATIONAL ONLY)
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE OCTOBER 14, 2025 AND JANUARY 15, 2026 MEETING MINUTES
2.DISCUSSION OF MEETINGS AND EVENTS
3.DISCUSSION AND PRESENTATION ON THE ARIZONA DEPARTMENT OF ENVIRONMENTAL
QUALITY (ADEQ) 2025 CONSTRUCTION GENERAL PERMIT (CGP) AND ITS IMPLICATIONS FOR
THE TOWN OF ORO VALLEY’S STORMWATER UTILITY PROGRAM, DEVELOPMENT COMMUNITY,
AND INTERNAL MUNICIPAL PROCESSES
4.DISCUSSION AND PRESENTATION ON A STATUS REPORT ON PRIORITIZATION OF
STORMWATER PROJECTS WITHIN PUBLIC WORKS
ADJOURNMENT
POSTED: 2/11/26 at 5:00 p.m. by ck
POSTED: 2/11/26 at 5:00 p.m. by ck
When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours
prior to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability
needs any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission
meeting at 229-4700.
INSTRUCTIONS TO SPEAKERS
Members of the public have the right to speak during any posted public hearing. However, those items not
listed as a public hearing are for consideration and action by the Commission during the course of their
business meeting. Members of the public may be allowed to speak on these topics at the discretion of the
Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card located
on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to
Audience,” please specify what you wish to discuss when completing the blue speaker card.
Please step forward to the podium when the Chair announces the item(s) on the agenda which you are interested
in addressing.
1. For the record, please state your name and whether or not you are a Town resident.
2. Speak only on the issue currently being discussed by the Commission. Please organize your speech, you will
only be allowed to address the Commission once regarding the topic being discussed.
3. Please limit your comments to 3 minutes.
4. During “Call to Audience”, you may address the Commission on any issue you wish.
5. Any member of the public speaking must speak in a courteous and respectful manner to those present.
Thank you for your cooperation.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions and Committees: In accordance
with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the
Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board,
Stormwater Utility Commission, and Water Utility Commission may attend the above referenced meeting as a
member of the audience only.”
Stormwater Utility Commission 1.
Meeting Date:02/19/2026
Requested by: Dennis Roberts, Public Works Submitted By:Yarina Hynd, Public Works
SUBJECT:
REVIEW AND APPROVAL OF THE OCTOBER 14, 2025 AND JANUARY 15, 2026 MEETING MINUTES
RECOMMENDATION:
Staff recommends approval.
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes), the October 14, 2025 meeting minutes.
I MOVE to approve (approve with changes), the January 15, 2026 meeting minutes.
Attachments
10-14-25 Draft Minutes
01-15-26 Draft Minutes
D R A F T
MINUTES
STORMWATER UTILITY COMMISSION
SPECIAL SESSION
OCTOBER 14, 2025
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
SPECIAL SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
The meeting was called to order at 4:00 P.M.
ROLL CALL
Present: Robert Aguayo, Commissioner
Robert Schlicher, Commissioner
Richard Crocker, Chair
Staff Present: Paul Keesler, Public Works Director - Town Engineer
Dennis Roberts, Stormwater Division Manager
Commissioner Schlicher attended via telephone.
Council Liaison Harry Greene was excused.
SPECIAL SESSION AGENDA
1.DISCUSSION AND POSSIBLE ACTION REGARDING RECONSIDERATION OF RECOMMENDED
STORMWATER UTILITY RATE INCREASE TO MAYOR AND COUNCIL FOR FISCAL YEAR 2025/26
Stormwater Utility Division Manager Dennis Roberts provided a presentation that included the following:
- Stormwater Utility proposed Fee Increase
- Existing Rate vs. Proposed Rate
- Rate Increase Drivers & Timeline
- Rate Increase Summary
- Implementation of Rate Increase
Discussion ensued among the Commission and Staff.
Motion by Commissioner Robert Aguayo, seconded by Chair Richard Crocker to approve a
recommendation to the Mayor and Council to support a Stormwater Utility base rate increase following a
multi-year fee schedule, effective beginning with the fiscal year commencing July 1, 2026:
1. Fiscal Year 2027: All applicable fees shall be increased by 15% to a base rate of $5.17 beginning July
1, 2026.
2. Fiscal Year 2028: All applicable fees shall be increased by an additional 13% to a base rate of $5.84
beginning July 1, 2027.
10/14/25 Minutes, Stormwater Utility Commission Special Session 1
3. Fiscal Year 2029: All applicable fees shall be increased by an additional 11% to a base rate of $6.50
beginning July 1, 2028.
Vote: 3 - 0 Carried
2.PRESENTATION AND UPDATE ON THE COMMUNITY COMMENT (60%) DRAFT OF THE
COMMUNITY'S NEXT 10-YEAR ACTION PLAN, KNOWN AS OV'S PATH FORWARD
Community and Economic Development Planner Rene Olvera provided a presentation that included the
following:
- Introduction
- OV's Path Forward — Phase 2 Let's Think
- 10-year action plan
- Going from 30% to 60% Draft — Clarifying and broadening actions
- Community Comment (60%) Draft Plan — What's in the plan:
Plan Format — Four main chapters:
Community, Sustainability, Economy, and Development
Areas of Interest
The Stormwater Management goals, policies, and actions
- Draft Policies & Actions — Sustainability Chapter
Goal M: Stormwater Management
Promote the conservation of natural resources through thoughtful design, sustainable
construction practices, and proactive management strategies.
Policy M.1. Integrate green infrastructure to effectively capture and manage stormwater in a way
that prioritizes groundwater recharge, enhances recreational opportunities, and supports the
preservation of wildlife habitats.
118. Review and update the Drainage Criteria Manual and related standards to incorporate
best practices, new research, and regulatory updates.
- The BIG Community Review: From September 22nd to October 31st! — Spreading the Word
- Next Steps — The top priority is creating a draft plan that honors the direction provided by residents in
Phase 1.
ADJOURNMENT
Motion by Chair Richard Crocker, seconded by Commissioner Robert Aguayo to adjourn the meeting.
Vote: 3 - 0 Carried
The meeting was adjourned at 4:27 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 14th day of October 2025. I
further certify that the meeting was duly called and held and that a quorum was present.
___________________________
Yarina Hynd
Senior Office Specialist
10/14/25 Minutes, Stormwater Utility Commission Special Session 2
D R A F T
MINUTES
STORMWATER UTILITY COMMISSION
REGULAR SESSION
JANUARY 15, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:02 PM
CALL TO ORDER
The meeting was called to order at 4:00 p.m.
ROLL CALL
Present: Robert Aguayo, Commissioner
David Atler, Commissioner
Gary Mattson, Commissioner
John McCauley, Commissioner
Absent: Tom Marek, Commissioner
Staff Present: Paul Keesler, Public Works Director - Town Engineer
Dennis Roberts, Stormwater Division Manager
John Lynch, Stormwater Project Manager
Mike Ortiz, Senior Engineering Associate
Scott Bennett, GIS Analyst
Attendees: Harry Greene, Council Liaison
Commissioner Tom Marek was excused.
Paul Keesler was excused at 4:15 p.m.
CALL TO AUDIENCE
There were no speaker requests.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
Council Liaison Harry Greene provided an update regarding the Town Council's vote at the January 14, 2026
Public Hearing to authorize and approve the Stormwater Utility Base Rate Increase over a three-year period.
DIRECTORS REPORT (INFORMATIONAL ONLY)
DIRECTORS REPORT (INFORMATIONAL ONLY)
Stormwater Division Manager Dennis Roberts commented on the following:
Purpose of the Director's Report
Welcome and Commission's Role
Acknowledgment of Outgoing Commissioners
Introduction of the Stormwater Utility Team
Department Update
At the January 14, 2026, Town Council Meeting, the Mayor and Council approved a three-year
incremental increase to the Stormwater Utility base rate.
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE MAY 15, 2025 MEETING MINUTES
Motion by Commissioner Robert Aguayo, seconded by Commissioner John McCauley to approve the
meeting minutes as written.
Vote: 4 - 0 Carried
2.DISCUSSION OF MEETINGS AND EVENTS
Mr. Roberts discussed recent meetings and events.
3.PRESENTATION AND DISCUSSION OF AN OVERVIEW OF THE STORMWATER UTILITY
Mr. Roberts provided a presentation that included the following:
- Stormwater Utility Overview: Purpose, Responsibilities & Challenges
- Welcome & Purpose of Today's Presentation
- What is the Stormwater Utility?
- Why Stormwater Management Matters
- Regulatory Framework
- MS4 Permit: Six Minimum Control Measures
- Stormwater Utility Fund (Town Code 15-24-13)
- What We Do: Core Responsibilities
Operations & Maintenance
Regulatory Compliance
- What We Do: Core Responsibilities
Planning & Capital Projects
Customer Service & Public Engagement
- Challenges Facing the Utility
- Examples of Typical Stormwater Utility
- How the Utility Interacts with the Commission
- Looking Ahead
- Transition to Next Presentation
Presentation and Discussion of the Oro Valley Stormwater Utility Fee Structure
- Questions
Discussion ensued among the Commissioners and Staff regarding the clarification of detention and
retention basins.
4.PRESENTATION AND DISCUSSION OF THE ORO VALLEY STORMWATER UTILITY FEE
STRUCTURE
Mr. Roberts provided a presentation that included the following:
- Purpose of Today's Discussion
- Why a Fee Structure?
- Fee History and Current Fee
- Fee Calculation Example
- Fee Calculation Example
- Stormwater Active Accounts
- Rate Review & NOI Process
- Why Consider an Increase?
- Current Status
- Next Steps
- Discussion Questions
Discussion ensued among the Commissioners and Staff regarding
The Commission asked for confirmation of the breakdown of the increased rate for residential and
commercial properties from $4.50 monthly (25/26 fy) to $6.50 monthly (28/29 fy).
Mr. Roberts confirmed that statement is correct.
The Commission asked for clarification of whether the Stormwater Utility Budget is under the
Public Works Budget.
Mr. Roberts stated that the Stormwater Utility is an enterprise and is not included in the
Public Works Budget. The revenue for the Stormwater Utility is generated from the
Stormwater Utility Fee.
The Commission would like to know what this year's Stormwater Utility Budget is compared to
what it will be at the end of the 3 years of rate increase?
Mr. Roberts responded that he would bring those financial figures to the next meeting.
The Commission is interested in hearing about future projects.
Mr. Roberts stated that he will introduce projects at the next Stormwater Utility
Commission meeting.
5.DISCUSSION OF 2025/2026 TOWN OF ORO VALLEY MS4 COMPLIANCE SCHEDULE, SECOND
QUARTER REPORT
Mr. Roberts reported on the Second Quarter, from October 1 through December 31, 2025, of the
Town's 2025/2026 MS4 Compliance Schedule.
Purpose of the Report
- To keep stakeholders informed about the status of our Stormwater Management Program.
Regulatory Context
- The Town operates under the Arizona Pollutant Discharge Elimination System (AZPDES)
permit for small Municipal Separate Storm Sewer Systems (MS4).
Minimum Control Measures
- The Permit requires us to implement six Minimum Control Measures
Public Education and Outreach
Public Participation and Involvement
Illicit Discharge Detection and Elimination (IDDE)
Construction Site Runoff Control
Post Construction Runoff Control
Pollution Prevention and Good Housekeeping for Municipal Operations
Second Quarter Status
- The Stormwater Utility Team tracks 33 targeted responsibilities under these measures.
- The attached summary table shows that the SWUC is up-to-date and has met their goals this
quarter.
The Commission asked for clarification as to the definition of CIP. Staff responded CIP stands for
Capital Improvement Program.
6.DISCUSSION REGARDING THE STORMWATER UTILITY COMMISSION REGULAR SESSION
MEETING SCHEDULE FOR CALENDAR YEAR 2026
Mr. Roberts reported on the Stormwater Utility 2026 scheduled meeting dates.
Discussion ensued regarding the 2026 meeting dates. Questions brought up concerning the scheduled
meeting dates:
A question regarding the dates on the schedule with no agenda topics.
Mr. Roberts clarified that the agendas for those months have not been determined at this
time.
A question regarding the Field Trip Update and Discussion that was noted on the schedule for
the March meeting. Will the date of the field trip be discussed at the March 19th meeting or is the
field trip scheduled for the date of the April 16th meeting?
Mr. Roberts explained that the field trip can be discussed as part of the agenda at the
March 19th meeting and that in order to have full attendance the date of the field trip would
also be discussed. Mr. Roberts clarified that at this time, the April 16th date was scheduled
as the date for the field trip.
7.NOMINATION AND ELECTION OF STORMWATER UTILITY COMMISSION CHAIR EFFECTIVE
IMMEDIATELY
Discussion ensued among the Commissioners.
Motion by Commissioner Robert Aguayo, seconded by Commissioner John McCauley to elect Gary
Mattson as Stormwater Utility Commission Chair.
Vote: 4 - 0 Carried
8.NOMINATION AND ELECTION OF STORMWATER UTILITY COMMISSION VICE CHAIR EFFECTIVE
IMMEDIATELY
Motion by Commissioner David Atler, seconded by Commissioner John McCauley to elect Robert
Aguayo as Stormwater Utility Commission Vice Chair.
Vote: 4 - 0 Carried
ADJOURNMENT
Motion by Commissioner John McCauley, seconded by Commissioner David Atler to adjourn the
meeting.
Vote: 4 - 0 Carried
The meeting was adjourned at 5:04 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 15th day of January 2026. I
further certify that the meeting was duly called and held and that a quorum was present.
___________________________
Yarina Hynd
Senior Office Specialist
Stormwater Utility Commission 2.
Meeting Date:02/19/2026
Requested by: Dennis Roberts, Public Works Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION OF MEETINGS AND EVENTS
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
Since the Stormwater Utility Commission’s last regular meeting on January 15, 2026, several stormwater related
regional meetings have occurred. These meetings provided updates on flood control activities, watershed
planning, and interagency coordination. The following events took place during this period or are future upcoming
meetings:
January 21, 2026 - Regional Flood Control Advisory Committee Meeting
February 5, 2026 - PAG Environmental Planning Advisory Committee (EPAC) Meeting
February 18, 2026 - Regional Flood Control Advisory Committee Meeting
February 19, 2026 - Stormwater Utility Commission Meeting
March 18, 2026 - Regional Flood Control Advisory Committee Meeting
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Stormwater Utility Commission 3.
Meeting Date:02/19/2026
Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION AND PRESENTATION ON THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY
(ADEQ) 2025 CONSTRUCTION GENERAL PERMIT (CGP) AND ITS IMPLICATIONS FOR THE TOWN OF
ORO VALLEY’S STORMWATER UTILITY PROGRAM, DEVELOPMENT COMMUNITY, AND INTERNAL
MUNICIPAL PROCESSES
RECOMMENDATION:
This report is for discussion and feedback purposes only.
EXECUTIVE SUMMARY:
ADEQ has issued the 2025 Construction General Permit (CGP), replacing the 2020 permit and updating
requirements for construction activities that disturb one acre or more or are part of a larger common plan of
development. As a regulated Municipal Separate Storm Sewer System (MS4), the Town of Oro Valley is federally
obligated under the Clean Water Act to ensure that construction activities within its jurisdiction comply with the
CGP.
The 2025 CGP introduces updated standards for erosion and sediment control, pollution prevention, dewatering,
inspections, and Stormwater Pollution Prevention Plan (SWPPP) development and maintenance. It also clarifies
permit coverage criteria, expands requirements for support activities, and aligns more closely with the EPA
federal CGP.
This agenda item provides an overview of the changes, outlines the Town’s responsibilities, and identifies the
steps needed to update internal procedures and support the regulated community.
BACKGROUND OR DETAILED INFORMATION:
Regulatory Context
The Town of Oro Valley operates under an ADEQ-issued MS4 permit, which requires the Town to enforce
the Construction General Permit for qualifying construction activities.
The 2025 CGP became effective in late 2024 and applies to all covered construction activities beginning in
2025.
Permit coverage applies only when a project both:
disturbs one acre or more (or is part of a larger common plan), and
discharges to a Water of the United States (WOTUS) or an MS4 that leads to WOTUS.
The 2025 CGP aligns closely with the EPA federal CGP, including requirements for SWPPPs, BMPs,
inspections, and corrective actions.
ADEQ received significant public input during the CGP update process, signaling strong stakeholder
interest and the potential for future refinements.
Key Changes in the 2025 CGP
1. Permit Submittal & Coverage
Notice of Intent (NOI) remains the standard authorization mechanism.
No Discharge Certificate (NDC) is available only for sites capable of retaining the full 100-year, 2-hour
storm without discharge, conditions uncommon in Oro Valley.
SWPPPs are required for all CGP-covered sites but are not submitted to ADEQ; they must be kept on-site
or electronically accessible.
Projects that discharge to impaired waters or Outstanding Arizona Waters (OAWs) must implement
additional BMPs and meet enhanced requirements.
The 2025 CGP does not include proximity-based triggers (e.g., ¼-mile buffers). Enhanced requirements
apply only when a project directly discharges to an impaired water or OAW.
Support activities such as temporary concrete or asphalt plants serving a permitted project are explicitly
covered under the CGP.
2. Erosion & Sediment Control
New requirements for slopes ≥15%.
Expanded BMP options, including hydraulic mulch, geotextiles, compost blankets, and velocity dissipation
devices.
Stockpile setbacks: 50 feet from drainage features, stormwater conveyances, and streets draining to
conveyances.
Updated stabilization timelines, including non-vegetative stabilization within 14 days during dry or
unforeseen conditions.
3. Pollution Prevention
Concrete washout: leak-proof containment, 50-foot setbacks, and proper disposal.
Chemical storage: spill kits, secondary containment, and 50-foot setbacks.
Waste handling: closed lids, secondary containment for lidless containers, and placement outside
drainage features.
Requirements mirror EPA’s pollution-prevention standards.
4. Dewatering Requirements
Dewatering discharges are prohibited unless treated through approved sediment-removal systems.
Hydrocarbon sheen must be removed through filtration.
Chlorine must be reduced to <4 mg/L.
Only low-flow discharges are allowed.
Requirements align with EPA’s dewatering and non-stormwater discharge provisions.
Emerging contaminants such as PFAS are not yet regulated under the CGP but are increasingly relevant
for dewatering oversight.
5. Inspection Protocols
Standard schedule: every 14 days and within 24 hours of a 0.5-inch rainfall event.
Arid/frozen schedule: monthly and within 24 hours of a 0.25-inch rainfall event.
Expanded inspection scope includes flow paths, deposition areas, and identification of non-compliance.
Requirements are consistent with EPA’s federal CGP structure.
6. Stormwater Team & Training
SWPPPs must list stormwater team members, qualifications, and training records.
Training must cover BMPs, stabilization, pollution prevention, inspections, and corrective actions.
This aligns with EPA’s emphasis on qualified personnel and documented training.
7. SWPPP Review Updates
SWPPPs must incorporate new requirements related to slopes, stockpiles, washouts, dewatering, and
stormwater team qualifications.
SWPPPs must be updated whenever site conditions or BMPs change, consistent with EPA’s SWPPP
maintenance requirements.
Additional Regulatory Considerations
The Town has verified that the Santa Cruz River is the nearest qualifying receiving water under current
federal definitions of Waters of the U.S. (WOTUS), following recent rule changes affecting ephemeral
desert washes.
EPA is proposing updates to federal stormwater permits for 2025–2026, which may influence future ADEQ
permit cycles.
Local erosion control standards, enforcement procedures, or municipal code provisions may require
updates to align with the 2025 CGP.
Town Responsibilities
To comply with the 2025 CGP and MS4 obligations, the Town must:
Update internal Standard Operating Procedures (SOPs) for SWPPP review, inspections, and
documentation.
Communicate regulatory changes to developers, engineers, and contractors.
Provide training and technical assistance to Town departments responsible for capital projects.
Evaluate whether local ordinances or technical standards require updates.
Implement changes immediately, as the 2025 CGP is already in effect.
FISCAL IMPACT:
The 2025 CGP does not impose direct fees on the Town; however, compliance may require:
Additional staff time for updated reviews, inspections, and documentation.
Training costs for stormwater team members.
Potential increases in enforcement or corrective action oversight.
Minor administrative costs for updated forms, SOPs, and outreach materials.
No significant capital expenditures are anticipated.
SUGGESTED MOTION:
This report is for discussion and feedback purposes only no action is required.
Attachments
2025_CGP Update Presentation
2025 Construction General Permit (CGP)
Key Changes from 2020 CGP & Local Implementation
Town of Oro Valley Stormwater Utility
February 19, 2026
Why does the 2025 CGP Matter?
• The Town is federally and state-mandated to enforce the
2025 CGP under EPA and ADEQ regulations.
• Updated requirements strengthen protections for water
quality and reduce construction-related pollution.
• Compliance is required for all qualifying construction
activities within Oro Valley.
Who is Affected?
Construction activities disturbing ≥1 acre or part of a common
plan of development
• Developers
• Construction Site Operators
• Engineers & Plan Reviewers
• Municipal Capital Project Teams
• Inspectors & Compliance Personnel
What Changed in the 2025 CGP?
• Permit submittal & coverage criteria
• Erosion & sediment control requirements
• Pollution prevention (P2) standards
• Dewatering requirements
• Inspection protocols
• Stormwater team qualifications & training
• SWPPP content and maintenance requirements
Permit Submittal & Coverage
Permit Types
•Notice of Intent (NOI): Required for most sites
•No Discharge Certificate (NDC): Only for sites retaining
the full 100-year, 2-hour storm – rare in Oro Valley
Coverage Criteria
A project requires CGP coverage only if it:
1. Disturbed ≥ 1 acre (or part of a common plan, and
2. Discharge to a WOTUS or an MS4 that drains to a
WOTUS
Local Note:
• The Santa Cruz River is the nearest qualifying WOTUS
under current federal definitions.
SWPPP Requirements
• Required for all CGP-covered sites.
• Must be kept onsite or electronically accessible.
• Must reflect actual site conditions and be updated as
conditions change.
• Must include stormwater team qualifications and
training records.
• ADEQ no longer uses proximity-based triggers (e.g.,
¼-mile rule).
• The Town may require a SWPPP for projects near
sensitive washes.
Erosion & Sediment Control: Steep Slopes
Slopes ≥ 15% require
enhanced BMPs:
• Preserve existing
vegetation
• Hydraulic mulch
• Geotextiles or mats
• Compost blankets
• Earth dikes or drainage
swales
• Terraces & velocity
dissipation devices
Erosion & Sediment Control: Stockpiles
Stockpiles must be ≥50 feet
from:
• Protected surface waters
• Stormwater conveyances
• Streets draining to
conveyances
Additional Requirements:
• Stabilize or cover when
inactive
• Protect from wind and
stormwater erosion
Stabilization Requirements
Stabilization Timelines:
• Non-vegetative stabilization: Within 14 days of
temporary or permanent cessation.
• Vegetative stabilization: As soon as practicable.
• Documentation required for delays due to drought or
unforeseen conditions.
Pollution Prevention (P2) Requirements
Concrete Washout
• Leak-proof containment with freeboard
• ≥50-ft from drainage features
Chemical Storage
• Spill kit onsite
• Secondary containment
• ≥50-ft setback from drainage features
Waste Handling
• Keep lids closed
• Secondary containment for lidless containers
• Keep outside drainage paths and conveyances
Dewatering Requirements
Discharges prohibited unless treated through:
• Sediment basins or traps
• Dewatering tanks
• Tube settlers or weir tanks
• Filtration systems
• Chemical treatment (if needed)
Additional Requirements
• Hydrocarbon sheen removal
• No floating solids or foam
• Chlorine ≤4 mg/L
• Only low-flow discharges allowed
Emerging Issues
• PFAS not yet regulated but increasingly relevant for dewatering
oversight.
Inspection Protocols
Standard Schedule:
• Every 14 days
• Within 24 hours of ≥0.5” rainfall
Arid/Frozen Schedule:
• Monthly
• Within 24 hours of ≥0.25” rainfall
• Must document arid conditions
Expanded Inspection Scope:
• Unstabilized Areas
• All stormwater flow paths
• Sediment deposition areas
• Identification of non-compliance
Stormwater Team Requirements
Roles Include:
• BMP design, installation, and maintenance
• Chemical handling
• Inspections
• Corrective Actions
• Documentation
SWPPP Must Include:
• Names, titles, qualifications
• Training certificates
Training Must Cover:
• Permit requirements
• BMP installation & maintenance
• Pollution prevention
• Inspection procedures
• Corrective action processes
SWPPP Review Updates
SWPPPs must now include:
• NOI confirmation
• Steep slope BMPs (≥15%)
• Stockpile 50-ft setbacks
• Concrete washout 50-ft setbacks
• Stormwater team qualifications
• Updated site maps and BMP locations
• Procedures for SWPPP updates
Local Relevance
•14 active construction
sites in Oro Valley
currently under the CGP
• Most common compliance
issues:
• Track-out
• Concrete washout
mismanagement
• Waste disposal
• Town inspections must now
reflect updated CGP
requirements
Next Steps & Department Responsibilities
•SOP Updates
• Integrate new CGP requirements into SWPPP review, inspection, and
documentation procedures
•Interdepartmental Coordination
• Capital projects and development review teams should coordinate with
Storm
•Implementation Timeline
• The 2025 CGP is already in effect.
• Updated procedures must be implemented immediately.
Future Training Opportunities
•Planned workshop
• In-depth SWPPP review training
• Inspection protocol deep dive
• BMP selection and field application
Questions & Discussion
1. Which new CGP requirements will be most
challenging locally?
2. What support or training does the development
community need?
3. Where should the Town prioritize SOP updates?
4. How can departments better coordinate on SWPPP
reviews and inspections?
5. Are there local washes or sensitive areas where we
should consider requiring SWPPPs even when ADEQ
does not?
6. What enforcement challenges should we anticipate
with the new requirements?
Contact Information
Dennis Roberts – Division Manager
520-229-5044
Mike Ortiz – Senior Engineer Associate/SWPPP Reviewer
520-229-4818
Scott Bennett – Stormwater GIS Analyst
520-229-4879
Jane Hutchins – Stormwater Utility Inspector
520-373-4729
Stormwater Utility Commission 4.
Meeting Date:02/19/2026
Requested by: Dennis Roberts, Public Works Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION AND PRESENTATION ON A STATUS REPORT ON PRIORITIZATION OF
STORMWATER PROJECTS WITHIN PUBLIC WORKS
RECOMMENDATION:
For information purposes only.
EXECUTIVE SUMMARY:
The Stormwater Utility Division is actively developing a comprehensive prioritization framework for drainage
improvement projects. This process includes conceptual planning, cost estimation, and evaluation based on key
criteria: safety, value, cost, scope, and time. A GIS-based interactive map has been created to visualize all
identified projects, providing location details, photos, and preliminary cost estimates. The prioritization tool will
help rank projects objectively and align them with strategic goals, grant opportunities, and regional partnerships.
This effort is ongoing, and staff will return with finalized rankings and recommendations for implementation.
BACKGROUND OR DETAILED INFORMATION:
The Stormwater Utility Division has identified multiple drainage improvement projects across the Town. To ensure
resources are allocated effectively, staff is implementing a prioritization process based on the following criteria:
Safety: Addresses hazards and risks to life, property, and infrastructure.
Value: Long-term benefits, alignment with Town goals, and co-benefits.
Cost: Estimated project cost, funding opportunities, and scalability.
Scope: Technical feasibility, coordination needs, and constraints.
Time: Urgency, scheduling, and regulatory considerations.
Strategic Alignment: Regional collaboration and grant competitiveness.
A GIS-based map has been developed to support this process. Each project includes:
Location and aerial map
Photos of drainage issues
Project description and conceptual plan
Preliminary cost estimate
Indicators for grant opportunities and county partnerships
Staff is currently refining the decision matrix and updating project data to ensure accurate scoring. This includes
adding placeholders for estimated costs, symbols for grant and partnership opportunities, and standardizing
naming conventions. The prioritization calculator will allow transparent and data-driven decision-making.
FISCAL IMPACT:
No immediate fiscal impact. Final prioritization will inform future budget allocations and potential grant applications.
SUGGESTED MOTION:
For informational purposes only, no action is required.
Attachments
Stormwater Project Prioritization Presentation
Stormwater Utility Project Prioritization Update
Town of Oro Valley Stormwater Utility
February 19, 2026
Purpose of Update
• Provide status on prioritization efforts
• Explain methodology and tools
• Outline next steps
Why Prioritization Matters
• Efficient allocation of resources
• Address critical drainage issues
• Align projects with community needs, strategic goals, and
grant opportunities
Prioritization Criteria
• Safety – Public hazard reduction
• Value – Long-term benefits & co-benefits
• Cost – Estimates, funding opportunities
• Scope – Technical feasibility & constraints
• Time – Urgency & scheduling
• Strategic Alignment
Disclaimer: Draft Materials
• The GIS map, project cards and prioritization spreadsheet
shown are in draft form.
• For discussion purposes only – not final
• Data will be refined before public release
GIS Map Overview
• Interactive map of all identified projects
• Features: Location & aerial map, photos, project description,
conceptual plan, preliminary cost estimate
• Link allow zoom-in to specific projects
Enhancements in Progress
• Adding cost placeholders
• Indicating grant opportunities & county partnerships
• Standardizing naming conventions
• Improving GIS usability: dynamic project list, click-to-zoom,
split-screen for map + slides
Decision Matrix Development
• Evaluates: Safety, Value, Cost, Scope, Time
• Supports transparent, data-driven ranking
• Includes diagnostic questions for each criterion
Next Steps
• Finalize conceptual plans & cost estimates
• Complete scoring for all projects
• Return with prioritized list for implementation
• Explore grant funding & partnerships
Summary
• Prioritization process is in progress
• GIS map and decision matrix are key tools
• Goal: Transparent, strategic project selection
Questions
Thank you for your attention. I’m happy to answer any
questions.
5 Safety
4 Value
3 Cost Benefit
2 Scope
1 Time
Balancing these criteria can be challenging, but with careful consideration and a focus on what benefits
society the most, the Town can make decisions that truly matter.
The impact of a project on society should be significant. It's important to
measure the benefits to the community and ensure long-term positive effects.
Financial feasibility is important, but not at the expense of safety and value.
Effective budgeting and resource management are key to sustainable projects.
A decision matrix is way to evaluate and prioritize various projects to unemotionally and logically choose
the best one. This is done by rating each project by a set of criteria. The criteria is safety, value, cost,
scope, and time. Each criterion is rated on a scale of one to five, with one being the least favorable and
five being the most favorable. This structured approach helps in making informed and balanced decisions.
Prioritizing criteria safety, value, cost, scope, and time is crucial. Here's how I believe we should weigh
these:
Clear definition and management of the scope can help avoid unnecessary
complications and ensure that objectives are met efficiently.
This should be top priority. The well-being of citizens cannot be compromised.
Any project or initiative must ensure that people are protected and safe.
While timely completion is important, rushing projects should never come at
the cost of thoroughness and quality.
NO.OLD PROJECT NAME
1 Mutterer's Wash E El Conquistador Wy. to W Greenock Dr.
2 Sierra Wash at W Glover Rd.
3 Gravel Pit Wash at N Pomegranate Dr.
4 Carmack Wash at N Calle Buena Vista
5 Unnamed Wash at N Pistachio Ave.
6 North Ranch Wash at W Limewood Dr.
7 Shadow Mountain Estates 1
8 Shadow Mountain Estates 2
9 Shadow Mountain Estates 3
10 Shadow Mountain Estates 4
11 Shadow Mountain Estates 5
12 Shadow Mountain Estates 6
13 Shadow Mountain Estates 7
14 Shadow Mountain Estates 8
15 Dip Crossing 1 at Moore Rd
16 Dip Crossing 2 at Moore Rd
17 Dip Crossing 3 at Moore Rd
18 Dip Crossing 4 at Moore Rd
19 Dip Crossing 5 at Moore Rd
20 Dip Crossing 6 at Moore Rd
21 Culvert on Monterra Vista Dr and Highland Wash Tributary
22 Highland Wash (W Appalachian St. to W Matterhorn St.)
23 Carmack Wash at Hardy Road Between N calle Loma Linda and Northern Ave.
24 W Valle Del Oro Rd at the Oro Valley Country Club
25 North Ranch Wash at Shannon Road
26 CUL08300 at Tangerine Rd
27 Paseo Del Norte
28 Sun City Vistoso Unit 17 (1-276)
29 Unnamed Wash (W. Cactus Moon Pl. to N Lambert Ln.)
30 Catalina Ridge
31 La Canada Noise Wall
32 Calle Buena Vista Dip Crossing 1
33 Calle Buena Vista Dip Crossing 2
34 Northern Ave Dip Crossing 1
35 Northern Ave Dip Crossing 2
36 Northern Ave Dip Crossing 3
37 Northern Ave Dip Crossing 4
38 Naranja Park 1
39 Naranja Park 2
40 Naranja Park 3
41 Naranja Park 4
42 Naranja Park 5
43 La Canada golf course hole 6
44 Hole 9 El Conquistador Golf Course
45 Pusch Wash Tributary (Pusch Ridge Golf Course Hole No. 9)
46 Canada Golf Course Hole 12
47 Canada Golf Course Hole 11
48 Tangerine and Oro Valley Marketplace
49 Carmack Wash Tributary at W Linda Vista Bl
50 La Cholla Wash at W Glover Rd
51 Canada Hills Wash at W Lambert Ln
52 Rooney Wash Tributary at E Pusch View Ln
53 Storm Drain 89 at E Rancho Vistoso Blvd
54 Sierra Wash at N La Cholla Blvd
1
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
2
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
3
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
4
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
5
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
6
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
7
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
8
Rating Weighted Score Reason for Rating
Safety 5 0 0
Value 4 0 0
Cost 3 0 0
Scope 2 0 0
Time 1 0 0
Total 0
9
Rating Weighted Score Reason for Rating
Safety 5 0 0
Mutterer's Wash E El Conquistador Wy. to W Greenock Dr.Weighted RatingCriteria
Criteria Weighted Rating
North Ranch Wash at W Limewood Dr.
Criteria Weighted Rating
Carmack Wash at N Calle Buena Vista
Criteria Weighted Rating
Unnamed Wash at N Pistachio Ave.
Criteria Weighted Rating
Sierra Wash at W Glover Rd.
Criteria Weighted Rating
Gravel Pit Wash at N Pomegranate Dr.
Criteria Weighted Rating
Shadow Mountain Estates 3
Criteria Weighted Rating
Shadow Mountain Estates 1
Criteria Weighted Rating
Shadow Mountain Estates 2
CIP Project Prioritization
February 19, 2026
Project Overview:
The existing west slope of Mutterer’s Wash, with a height ranging from 1.5 to 2.5 feet,
is insufficient to contain stormwater flows during peak events. This limitation poses a
risk of overflow and erosion, particularly during monsoon season.
Proposed Improvements
Hydrologic Assessment: Conduct a detailed evaluation of approximately 590 linear feet
of the wash to determine the required channel capacity enhancements.
Slope Stabilization: Armor the west slope and elevate the east bank by 2.5 feet to
improve containment and reduce erosion.
Infrastructure Enhancements:
•Extend the headwall at the culvert inlet by approximately 45 linear feet.
•Construct a spillway to connect with the existing 36-inch storm drainpipe.
Design Considerations:
•Preserve the existing tree line and avoid disruption to utilities.
•Integrate drainage from the adjacent pedestrian path, which currently
discharges into the wash via six-inch pipes.
Cost Estimate: TBD
(32.392483, -110.964584)
Mutterer's Wash
E El Conquistador Wy.
to W Greenock Dr.
In partnership with
Status: Active
Last Revised: 12/1/25
Project Overview
The outlet of the existing box culvert is experiencing downcutting and erosion, which
compromises channel stability and increases long-term maintenance needs. Access to the
channel is approximately 120 feet from the culvert centerline, presenting logistical challenges
for construction.
Proposed Improvements
Channel Stabilization: Address downcutting at the culvert outlet to restore hydraulic function
and prevent further erosion.
Riprap & Curb Replacement: Replace damaged riprap and curb sections to reinforce channel
protection.
Access Considerations: Develop construction access approximately 120 feet downstream to
facilitate equipment mobilization.
Construction Plans: Plans are submitted to CED for permitting, ensuring readiness for
implementation once funding is secured.
Cost Estimate
Federal Funding: $234,117
Town of Oro Valley Contribution: $78,040
Total Estimated Cost: $312,157
(32.416993, -111.007363)
Sierra Wash
at
W Glover Rd.
In partnership with
Status: Active
Last Revised: 12/1/25
Gravel Pit Wash
at
N Pomegranate Dr.
Project Overview
This project addresses stormwater management needs at Gravel Pit Wash near North
Pomegranate Drive. The existing roadside drainage requires improvements to ensure
proper flow control and erosion mitigation.
Proposed Improvements
Curb & Roadside Provisions: Install approximately 220 linear feet of curb and roadside
drainage infrastructure.
Drainage Control: Direct stormwater into a single spillway for more efficient flow
management.
Erosion Mitigation: Construct a drop spillway with a gabion basket to dissipate energy
and reduce erosion.
Grading: Perform approximately 110 linear feet of grading perpendicular to the
roadway to stabilize the channel and improve flow capacity.
Cost Estimate
Federal Funding: $209,019
Town of Oro Valley Contribution: $69,673
Total Estimated Cost: $278,692
(32.401918, -110.980594)
In partnership with
Status: Active
Last Revised: 12/1/25
Status: Active
Last Revised: 12/1/25
Project Overview
At Carmack Wash near North Calle Buena Vista, the existing dip crossing has
developed approximately tinches of scour beneath and 55 feet around the
concrete apron. Scour depth measures 22 inches deep towards the edge of
the ROW limits.This condition compromises structural integrity and
increases the risk of further erosion if not addressed promptly.
Proposed Improvements
Erosion Control: Implement measures to prevent future scour and maintain
long-term functionality of the crossing.
Drainage Management: Ensure stormwater continues to flow safely through
the wash without undermining roadway infrastructure.
Cost Estimate
Total Estimated Cost: [Insert total once confirmed]
(32.370108, -110.978640)
Carmack Wash
at
N Calle Buena Vista
Status: Active
Last Revised: 12/1/25
Project Overview
The Town has previously implemented improvements at this site; however, excessive
sediment transport from upstream sources continues to cause frequent accumulation in the
concrete channels and adjacent street. This recurring issue requires regular excavation and
maintenance, increasing costs and reducing efficiency.
Proposed Improvements
Street Protection: Add curbing to prevent sediment from entering the roadway. This will also
direct the flows more efficiently into the drop structure and culvert before allowing flow to
enter the road. Without a curb, sediment fills the channels and the flows cross the road.
Excavation Efficiency: Replace the existing rock-faced slope with a cutoff wall to streamline
sediment removal.
Source Control: Investigate and implement measures to reduce sediment transport at the
upstream source, which may involve coordination with private property owners.
Cost Estimate: [Insert total once confirmed]
(32.400544, -110.985154)
Unnamed Wash
at
N Pistachio Av.
Status: Active
Last Revised: 12/1/25
Status: Complete
Last Revised: 12/1/25
Project Overview
At the downstream end of three 36-inch culverts, there is significant downcutting of
approximately 2–3 feet. While the upstream inlet remains in good condition, the outlet
currently lacks channel or bank protection. This erosion issue threatens long-term stability
and requires corrective measures. The channel width should be expanded to approximately
15 feet, transitioning to 10 feet over a downstream length of 50 feet.
Proposed Improvements
Channel Protection: Install stabilization measures at the culvert outlet to prevent further
downcutting and erosion.
Bank Reinforcement: Provide structural protection along the channel banks to maintain
integrity.
Channel Grading: Adjust channel width to 15 feet with transitions to 10 feet downstream
over 50 feet.
Field Investigation: Conduct detailed site analysis to refine design requirements and confirm
appropriate protection methods.
Cost Estimate
Total Estimated Cost: $XX,XXX.XX (Completed)
(32.427422, -111.019262)
N Ranch Wash
at
W Limewood Dr.
Status: Complete
Last Revised: 12/1/25
Project Description
Undersized channel through the mobile home park requires increased capacity and
concrete lining. A large sediment basin has been recently installed upstream of the site at
the Naranja Trails subdivision site, and the improvements for this CIP project will tie into the
sediment basin. There are several steep drop structures downstream of the site. The
elevation difference in the channel between the sediment basin and W Matterhorn St will
be a limiting factor for the design.
Proposed Improvements
Increase channel capacity.Increase channel depth, reinforce banks, and line the channel
with concrete through the project site. Sediment basin upstream and concrete lining will
limit the amount of sediment accumulation in the new channel.
Cost Estimate:
Total Estimated Cost:[Insert total once confirmed]
(32.402085, -110.972977)
Highlands Wash
W Appalachian St. to
W Matterhorn St.
In partnership with
Status: Active
Last Revised: 12/1/25