HomeMy WebLinkAboutPackets - Stormwater Utillity Commission (212)
AGENDA
STORMWATER UTILITY COMMISSION
REGULAR SESSION
MAY 21, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
ROLL CALL
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
DIRECTORS REPORT (INFORMATIONAL ONLY)
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE MARCH 19, 2026 AND THE APRIL 16, 2026 MEETING MINUTES
2.DISCUSSION OF MEETING AND EVENTS
3.DISCUSSION OF APRIL 16, 2026 STORMWATER UTILITY COMMISSION FIELD TRIP
4.DISCUSSION OF 2025/2026 TOWN OF ORO VALLEY MS4 COMPLIANCE SCHEDULE, THIRD
QUARTER REPORT
5.PRESENTATION AND DISCUSSION OF ORO VALLEY MONSOON PREPAREDNESS
6.PRESENTATION, DISCUSSION, AND POSSIBLE ACTION REGARDING RECOMMENDATION TO
FORWARD AMENDMENTS TO TOWN CODE CHAPTER 17 TO THE MAYOR AND COUNCIL FOR
CONSIDERATION AND ADOPTION
ADJOURNMENT
POSTED: 5/15/26 at 5:00 pm by ck
When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours
prior to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability
needs any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission
meeting at 229-4700.
INSTRUCTIONS TO SPEAKERS
Members of the public have the right to speak during any posted public hearing. However, those items not
listed as a public hearing are for consideration and action by the Commission during the course of their
business meeting. Members of the public may be allowed to speak on these topics at the discretion of the
Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card located
on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to
Audience,” please specify what you wish to discuss when completing the blue speaker card.
Please step forward to the podium when the Chair announces the item(s) on the agenda which you are interested
in addressing.
1. For the record, please state your name and whether or not you are a Town resident.
2. Speak only on the issue currently being discussed by the Commission. Please organize your speech, you will
only be allowed to address the Commission once regarding the topic being discussed.
3. Please limit your comments to 3 minutes.
4. During “Call to Audience”, you may address the Commission on any issue you wish.
5. Any member of the public speaking must speak in a courteous and respectful manner to those present.
Thank you for your cooperation.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions and Committees: In accordance
with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the
Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board,
Stormwater Utility Commission, and Water Utility Commission may attend the above referenced meeting as a
member of the audience only.”
Stormwater Utility Commission 1.
Meeting Date:05/21/2026
Requested by: Dennis Roberts, Public Works Submitted By:Yarina Hynd, Public Works
SUBJECT:
REVIEW AND APPROVAL OF THE MARCH 19, 2026 AND THE APRIL 16, 2026 MEETING MINUTES
RECOMMENDATION:
Staff recommends approval.
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes), the March 19, 2026 Regular Session meeting minutes as presented.
I MOVE to approve (approve with changes), the April 16, 2026 Study Session meeting minutes as presented.
Attachments
03-19-26 Draft Minutes
04-16-26 Draft Minutes
D R A F T
MINUTES
STORMWATER UTILITY COMMISSION
REGULAR SESSION
MARCH 19, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
Chair Mattson called the meeting to order at 4:02 P.M.
ROLL CALL
Present: Robert Aguayo, Vice Chair
Tom Marek, Commissioner
John McCauley, Commissioner
Gary Mattson, Chair
Absent: David Atler, Commissioner
Staff Present: Dennis Roberts, Stormwater Division Manager
Mike Ortiz, Senior Engineering Associate
Attendees: Harry Greene, Council Liaison
Commissioner David Atler was excused.
CALL TO AUDIENCE
There were no speaker requests.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
There were no comments at this time.
DIRECTORS REPORT (INFORMATIONAL ONLY)
Mr. Roberts commented on the following topics:
- Project Delivery and Capital Improvements
- System Maintenance and Field Operations
- Regional Coordination and Compliance
- Community Engagement and Commission Support
- Financial Stewardship
REGULAR SESSION AGENDA
3/19/26 Minutes, Stormwater Utility Commission Regular Session 1
1.REVIEW AND APPROVAL OF THE FEBRUARY 19, 2026 MEETING MINUTES
Motion by Commissioner John McCauley, seconded by Vice Chair Robert Aguayo to approve the
February 19, 2026 meeting minutes.
Vote: 4 - 0 Carried
2.DISCUSSION OF MEETINGS AND EVENTS
Mr. Roberts discussed recent and upcoming meetings and events. Commissioner McCauley stated that
he had seen on recent news reports that Pima County had placed trash traps in the Santa Cruz River to
keep debris out of the waterway. He asked if the staff was familiar with the action and has Oro Valley
considered the use of trash traps to mitigate debris in the washes. Mr. Roberts advised that he was not
familiar with the project and would look into such traps being in use in Pima County and report back to
the commission.
3.PRESENTATION AND DISCUSSION OF STORMWATER UTILITY PROJECTS COMPLETED TO DATE
Mr. Roberts provided a presentation that included the following:
- Sierra Wash at Via Mandarina
- Canada del Oro Tributary Oro Valley Drive 425 Northwest of W Oro Valley Dr.
- N Ranch Wash at W Limewood Dr.
- South Facing Slope at OV Marketplace on E Tangerine Rd.
- Sierra Wash at W Naranja Dr.
- Catalina Ridge Channel Access at N Avenida Vallejo
- Unknown Tributary Northeast of El Conquistador Tennis Courts
- Lambert Lane Improvements
During the presentation discussion ensued among the commission and staff.
4.PRESENTATION AND DISCUSSION OF STORMWATER UTILITY CURRENT AND UPCOMING
PROJECTS
Mr. Roberts commented on the following Stormwater Utility current and upcoming projects:
- Rooney Wash Tributary at E Pusch View Ln.
- Nanini Wash at N Paseo Del Norte
- Unknown Wash along southbound N Avenida Vallejo
- Sierra Wash at W Glover Rd.
- Storm Drain 89 at E Rancho Vistoso Blvd
- Sierra Wash at N La Cholla Blvd (Weir)
- Sierra Wash at N La Cholla Blvd (Channel)
- Gravel Pit Wash at N Pomegranate Dr.
- Highlands Wash W Appalachian St. to W Matterhorn St.
- Mutterers Wash E El Conquistador Wy. to W Greenock Dr.
- Carmack Wash at N Shadow Mountain Dr. 300 Feet North of W Spring Valley Dr.
- Unknown Wash along southbound N La Canada Dr. (La Canada Noise Wall)
Discussion ensued among the commission and staff.
5.DISCUSSION OF THE UPCOMING COMMISSION FIELD TRIP – THURSDAY, APRIL 16, 2026
Mr. Roberts identified the following draft list of proposed field trip stops and requested feedback from the
3/19/26 Minutes, Stormwater Utility Commission Regular Session 2
Mr. Roberts identified the following draft list of proposed field trip stops and requested feedback from the
Commission:
- Nanini Wash at N Paseo Del Norte
- Access Ramp at the Catalina Ridge Channel
- Sierra Wash at Naranja
- Sierra Wash at Via Mandarina
- Sierra Wash at Glover
- Storm Drain 89 at E Rancho Vistoso Blvd
- Gravel Pit at Pomegranante Dr.
- Carmack Wash at N Shadow Mountain Drive near W Spring Valley Dr.
Discussion ensued among the commission and staff. Highlands Wash was suggested as a location of
interest to be visited on the field trip. Another suggestion was to tour a completed project that had serious
problems and that the staff considered to be well done. Mr. Roberts would take the suggestions into
consideration.
ADJOURNMENT
Motion by Vice Chair Robert Aguayo, seconded by Commissioner John McCauley to adjourn the
meeting.
Vote: 4 - 0 Carried
Chair Mattson adjourned the meeting at 5:01 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 19 day of March, 2026. I
further certify that the meeting was duly called and held and that a quorum was present.
___________________________
Yarina Hynd
Senior Office Specialist
3/19/26 Minutes, Stormwater Utility Commission Regular Session 3
D R A F T
MINUTES
STORMWATER UTILITY COMMISSION
STUDY SESSION
APRIL16, 2026
FIELD LOCATIONS
STUDY SESSION AT OR AFTER 7:30 AM
CALL TO ORDER
The study session was called to order at 7:43 a.m.
ROLL CALL
Present: Robert Aguayo, Vice Chair
David Atler, Commissioner
John McCauley, Commissioner
Gary Mattson, Chair
Absent: Tom Marek, Commissioner
Staff Present: Dennis Roberts, Stormwater Division Manager
Mike Ortiz, Senior Engineering Associate
Scott Bennett, Stormwater Utility Analyst
Jane Hutchins, Stormwater Utility Inspector
Kevin King, Stormwater Utility Intern
Attendees: Harry Greene, Council Liaison
Commissioner Marek was excused.
STUDY SESSION AGENDA
1.DISCUSSION DURING TOUR OF STORMWATER RELATED SITES THROUGHOUT THE TOWN
The following locations were toured:
- Unknown Wash Along Southbound N La Cañada Dr (La Cañada Noise Wall)
- Lambert Lane Improvements at La Cholla and Sierra Wash
- Sierra Wash at Glover
- Sierra Wash at Via Mandarina
- Sierra Wash at Naranja Dr
- Catalina Ridge Channel Ramp and New Ramp Location
4/16/26 Minutes, Stormwater Utility Commission Study Session Meeting 1
- Highland Mobile Home Park
- Gravel Pit Wash at N Pomegranate Dr
- Mutterers Wash at Greenock Dr
- Shadow Mountain Dr, 300' North of W Spring Valley Dr
- Nanini Wash at N Paseo Del Norte
Mr. Roberts presented project information on the field trip locations listed below:
- Unknown Wash Along Southbound N La Cañada Dr.
- Lambert Lane Improvements at La Cholla and Sierra Wash
- Sierra Wash at Glover
- Sierra Wash at Via Mandarina
- Sierra Wash at Naranja Dr
- Catalina Ridge Channel Ramp and New Ramp Location
- Highland Mobile Home Park
- Gravel Pit Wash at N Pomegranate Dr
- Mutterers Wash at Greenock Dr
- Shadow Mountain Dr, 300' North of W Spring Valley Dr
- Nanini Wash at N Paseo Del Norte
Discussion ensued between the commissioners and staff at each project location.
Lunch followed the last field trip location.
ADJOURNMENT
Chair Mattson adjourned the meeting at 12:47 p.m.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 16th day of April, 2026. I
further certify that the meeting was duly called and held and that a quorum was present.
___________________________
Yarina Hynd
Senior Office Specialist
4/16/26 Minutes, Stormwater Utility Commission Study Session Meeting 2
Stormwater Utility Commission 2.
Meeting Date:05/21/2026
Requested by: Dennis Roberts, Public Works Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION OF MEETING AND EVENTS
RECOMMENDATION:
This item is presented for information and discussion only. No action is requested.
EXECUTIVE SUMMARY:
The following is a list of immediate past, and upcoming, stormwater-related meetings and events:
April 14, 2026 – PCRFCD–TOV SWU Partnering Opportunities
April 15, 2026 – Kickoff Meeting: HMGP DR-4524-06-04 Sierra Wash Drainage Improvement at Glover
Road
April 16, 2026 – Oro Valley Stormwater Utility Commission 2026 Field Trip
April 24, 2026 – HMGP FM-5493-7-7R Pomegranate Drive Drainage Improvement Project – BCA
Coordination Meeting with DEMA/FEMA
April 27, 2026 – Pre-Construction Meeting: Pusch View Lane CMP Replacement Project
April 28, 2026 – Oro Valley Stormwater IDDE, Municipal Good Housekeeping, and CGP Training
May 5, 2026 – ADEQ Surface Water Stakeholder Presentation
May 7, 2026 – PAG Environmental Planning Advisory Committee (EPAC) Meeting
May 15, 2026 – Tucson Area Flood Insurance Meeting
May 20, 2026 – Regional Flood Control Advisory Committee Meeting
May 21, 2026 – Oro Valley Stormwater Utility Commission Meeting
May 27, 2026 – HMGP FM-5385-002-002R Sierra Wash Drainage Improvement at Via Mandarina – DEMA
Annual Grant Recipient Site Inspection
June 17, 2026 – Regional Flood Control Advisory Committee Meeting
TBD – PAG Environmental Planning Advisory Committee (EPAC) Meeting
BACKGROUND OR DETAILED INFORMATION:
Since the Commission’s last regular meeting, staff have continued participating in project-specific coordination,
regional committee discussions, stakeholder outreach, and regulatory engagement activities. These meetings
support collaboration with partner agencies, advance active capital and grant-funded stormwater projects, and
ensure alignment with regional watershed management priorities. Staff will provide brief verbal updates on key
discussions and outcomes during the meeting.
FISCAL IMPACT:
There is no fiscal impact associated with this informational item. Participation in these meetings is part of the
Stormwater Utility Division’s routine operations.
SUGGESTED MOTION:
No motion required. This item is for information and discussion only.
Stormwater Utility Commission 3.
Meeting Date:05/21/2026
Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION OF APRIL 16, 2026 STORMWATER UTILITY COMMISSION FIELD TRIP
RECOMMENDATION:
Report is for disussion purposes only.
EXECUTIVE SUMMARY:
On April 16, 2026, the Stormwater Utility Commission conducted its annual field tour of stormwater infrastructure
sites throughout the Town. Eleven project locations were visited, including active capital improvements,
completed post storm restoration projects, and areas identified for future design and maintenance considerations.
The purpose of this agenda item is to share field trip photos, provide brief status updates, review the project
handout, and offer Commissioners an opportunity to reflect on observations made during the tour.
Field trip locations are documented in the meeting minutes and map of stops.
BACKGROUND OR DETAILED INFORMATION:
The Commission met at Town Hall at 7:30 a.m. and toured 11 stormwater project locations across the community,
as reflected in the April 16, 2026 minutes . Staff provided on site briefings for each project, including current
status, recent construction efforts, hydraulic issues, scour and erosion conditions, and expected next steps.
Projects visited included:
• Unknown Wash along southbound N La Cañada Dr – active scour and proposed channel realignment and bank
protection
• Lambert Lane Improvements at La Cholla and Sierra Wash – completed phases with erosion control and
structural improvements
• Sierra Wash at Glover – downcutting issues and stabilization needs
• Sierra Wash at Via Mandarina – completed drop structure and gabion improvements
• Sierra Wash at Naranja Dr – completed energy dissipation and erosion control work
• Catalina Ridge Channel Access at N Avenida Vallejo – erosion and sedimentation concerns and new
maintenance ramp design
• Highlands Wash at Appalachian / Matterhorn – undersized channel and proposed capacity increase
• Gravel Pit Wash at N Pomegranate Dr – active drainage and erosion mitigation project
• Mutterer’s Wash at Greenock Dr – proposed channel stabilization and capacity improvements
• Shadow Mountain Dr / Carmack Wash – downstream erosion, utility exposure, and proposed energy dissipation
and bank protection
• Nanini Wash at Paseo Del Norte – erosion risks, undersized culverts, and proposed guardrail, headwall, and
scour protection improvements
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
SUGGESTED MOTION:
No formal action is required.
No formal action is required.
Attachments
2026 Field Trip Map
2026 Field Trip Recap
^_
INA
ORACLE
LA CHOLLA
LA CANADA
MAGEE
SHANNON
LAMBERT
1ST
TANGERINE
NARANJA
OVERTON
HARDY
CHRISTIE
NORTHERN
LINDA VISTA
MONA LISA
CALLE CONCORDIA
PUSCH VIEW
CORTARO FARMS
1ST
HARDY
MAGEE
1 9
8 7
6
3
4
5
2
11
10
2026 Stormwater Utility Field Trip Stops
Starting PointOro Valley Town Hall
Legend
Field Trip Stops
Stop Number
1: Unknown Wash Along Southbound N. La Canada Dr.
2: Lambert Lane Improvements at La Cholla and Sierra Wash
3: Sierra Wash at Glover
4: Sierra Wash at Via Mandarina
5: Sierra Wash at Naranja Dr.
6: Catalina Ridge Channel Ramp and New Ramp Location
7: Highland Mobile Home Park
8: Gravel Pit Wash at N. Pomegranate Dr.
9: Mutterer's Wash at Greenock Dr.
10: Shadow Mountain Dr. 300 feet North of W Spring Valley Dr
11: Nanini Wash at N Paseo Del Norte
^_Starting Point (Oro Valley Town Hall)
Major Streets ¯Miles00.5 1
2026 Field Trip Recap
& Commissioner Discussion
Dennis E. Roberts, P.E., CFM
Stormwater Utility Division Manager
Stormwater Utility - Public Works Department
Purpose of Today’s Recap
• Refresh key locations visited on April 16
• Share field trip photos
• Summarize notable conditions observed in the field
• Provide brief updates on active projects
• Invite Commissioners to share reflections and ask
questions.
Field Trip Locations Visited
1. Unknown Wash – scour at noise wall
2. Lambert Lane – completed erosion-control
improvements
3. Sierra Wash at Glover – downcutting &
outlet stabilization
4. Sierra Wash at Via Mandarina –
completed drop structure and energy
dissipation improvements
5. Sierra Wash at Naranja – completed drop
structure and energy dissipation
improvements
6. Catalina Ridge Channel Access –
sediment removal and new maintenance
access
7. Highlands Wash – undersized channel
capacity constraints
8. Gravel Pit Wash – active curb/drainage and
spillway improvements
9. Mutterer’s Wash – containment and slope
stability concerns
10.Carmack Wash Upper Tributary C -
Severe erosion and exposed utilities
11.Nanini Wash – roadway undermining &
culvert concerns
Key Observations from the Field
• Scour and downcutting at multiple culvert outlets
• Sediment buildup limiting culvert capacity
• Need for improved access for maintenance
• Erosion related utility exposure at several sites
• Successful stabilization work at completed projects.
Unnamed Wash at
the Noise Wall
along La Canada
Erosion Mitigation
Project
Status: Active
Last Revised: 5/7/26
Why This Site Matters:
Scour is undermining the noise wall and threatens adjacent
infrastructure
What We Saw in the Field:
• 5–6 ft scour below wall footing
• Lack of bank protection and vegetation
• Channel bend directing flow toward the wall
Where We Are Now:
Design concept includes realigning the channel and adding bank
armor.
Next Steps:
Finalize alternatives, develop cost estimate, determine permitting
needs, and continue developing project prioritization to identify the
appropriate fiscal year for construction.
La Cholla Wash
and Sierra Wash
at Lambert Lane
Erosion Mitigation
Project
Status: Complete Phase 1 June 2019, Phase 2 April 2020
Last Revised: 5/7/26
Why This Site Matters:
Protects roadway, utilities, and shoulder from overtopping flows.
What We Saw in the Field:
• Completed erosion-control features
• Energy dissipaters and stabilized shoulders
• Post-storm conditions look consistent with design intent
Where We Are Now:
Project is complete; Phase 1 was finished in June 2019 and
Phase 2 in April 2020, with all funded phases now fully closed
out.
Next Steps:
Continue periodic monitoring during monsoon events.
BEFORE
AFTER
Why This Site Matters
Significant downcutting at the culvert outlet threatens long-term culvert
performance and reliable access. Stabilization is needed to protect infrastructure
and maintain safe passage.
What We Saw in the Field
• Downcutting at the outlet
• Erosion undermining riprap and curb
• Limited access for construction equipment
Where We Are Now
Funding and permits have been secured, quarterly reporting is underway with the
first report submitted, and project funding is programmed for FY26/27.
Next Steps
• Project bidding expected to open in late July to early August.
• Contract award and pre-construction meeting anticipated after monsoon season,
around September 15.
• Construction scheduling to follow award.
Sierra Wash
at W Glover Rd.
Erosion Mitigation
Project
In partnership with
Status: Active
Last Revised: 5/7/26
Why This Site Matters:
Reduces downstream scour and protects the culvert.
What We Saw in the Field:
• Completed concrete drop structure
• Gabion mattress and end sill
• Stable outlet conditions (after photos)
Where We Are Now:
Fully constructed (June 2025).
Next Steps:
Routine monitoring and sediment checks.
Status: Completed June 2025
Last Revised: 5/7/26
Sierra Wash at
Via Mandarina
Erosion
Mitigation Project
In partnership with
BEFORE
AFTER
Why This Site Matters:
Addresses 4–5 ft outlet drop that previously caused severe
erosion.
What We Saw in the Field:
• Completed drop structure
• Gabion energy dissipation
• Improved flow stability
Where We Are Now:
Completed May 2023.
Next Steps:
Monitor performance after high-flow events.
Status: Complete May 2023
Last Revised: 5/7/26
Sierra Wash at
W Naranja Dr.
Erosion
Mitigation Project
In partnership with
BEFORE
AFTER
Catalina Ridge
Channel Access at
N Avenida Vallejo
Status: Complete May 2023
Last Revised: 5/7/26
Why This Site Matters
Sediment accumulation reduces culvert capacity and limits
access needed for routine maintenance.
What We Saw in the Field
• Heavy sediment buildup at the RCBC
• Access limitations
• Channel-bottom erosion potential, including scour erosion
Where We Are Now
Design for the maintenance ramp was completed, and the
project was fully constructed and closed out in May 2023.
Next Steps
No further construction actions required; site will transition to
routine maintenance monitoring.
BEFORE
AFTER
Catalina Ridge
Channel Access
at N Naranja Dr.
Status: Active
Last Revised: 5/7/26
Why This Site Matters
Fast, concentrated flows erode the channel bottom, and lack of maintenance
access prevents the Town from managing sediment or protecting adjacent
property.
What We Saw in the Field
• Heavy sediment buildup at the RCBC
• Access limitations
• Channel-bottom erosion potential, including scour erosion
Where We Are Now
The 70% plans are currently in staff review, and project funding is programmed
for FY26/27.
Next Steps
• Staff to complete the plan set for permitting.
• Project bidding expected to open late July to early August.
• Contract award and pre-construction meeting anticipated after monsoon
season, around September 15.
• Construction scheduling to follow award.
CATALINA RIDGE CHANNEL
SWUC FIELD TRIP SITE VISIT
2026
Why This Site Matters
The channel is undersized through the mobile home park, and upstream basin
improvements will tie into this reach.
What We Saw in the Field
• Capacity constraints
• Steep downstream drop structures
• Elevation limitations
Where We Are Now
PCRFCD reaffirmed the 10% local match; OPCC ≈ $2.37M. Town will update
the OPCC and pursue FEMA/DEMA for inflation-related funding. Public notice
is complete. Programmed for FY28/29 pending on funding availability.
Next Steps
• Update design plans and OPCC; coordinate with DEMA on inflation funding.
• Submit revised costs to FEMA/DEMA.
• Continue coordination with PCRFCD on potential additional participation.
• Integrate funding outcomes into the final design.
Lower Highland
Wash Flood Control
and Channel
Improvement Project
In partnership with
Status: Active
Last Revised: 5/7/26
LOWER HIGHLAND WASH
SWUC FIELD TRIP SITE VISIT
2026
Gravel Pit Wash
at N Pomegranate
Dr. Erosion
Mitigation Project
Why It Matters
Improves roadside drainage and reduces erosion along Pomegranate Road.
What We Saw in the Field
• Need for curb and formed drainage
• Flow consolidation at spillway location
• Erosion at existing channel
Where We Are Now
• FEMA EHP review ongoing (≈200 days into 90–270 window).
• DEMA accepted budget-increase request; updated BCA in progress.
• 70% plans and drainage report ready for review.
• OPCC: $433,921.50.
• Exploring Pima County for local match; may fit County bond program.
• Programmed for FY27/28.
Next Steps
• Complete updated BCA + documentation for DEMA/FEMA.
• Review 70% plans.
• Continue funding coordination with DEMA, FEMA, and Pima County.
In partnership with
Status: Active
Last Revised: 5/7/26
Why This Site Matters
Undersized slopes and unstable banks create overtopping and flood risks for
nearby homes.
What We Saw in the Field
• Shallow west slope
• Areas needing bank elevation
• Tree line and utilities limiting design space
Where We Are Now
PCRFCD has identified this as a high-priority project for the 2027 Flood
Control Bond Program. County will lead the CLOMR/LOMR process. Survey
is complete; drainage easement documentation and BRIC BCA work
underway. Current OPCC: $2.56M; DEMA/FEMA is considering to fund 75%.
Town will seek PCRFCD partnership for the 25% local match (≈$640k).
Construction anticipated in FY29–30, pending FEMA approval and County
match coordination.
Next Steps
• Finalize drainage easement and supporting survey documents.
• Complete BCA and FEMA/DEMA submittals.
• Continue coordination with PCRFCD on bond program and match.
• Advance toward permitted plan set and FEMA approvals.
Mutterer’s Wash Flood
Control and Channel
Improvement Project
In partnership with
Status: Active
Last Revised: 5/7/26
MUTTERER’S WASH SWUC
FIELD TRIP SITE VISIT 2026
Carmack Wash Upper
Tributary C Flood
Control and Channel
Improvement Project
Why This Site Matters
Severe erosion and exposed utilities create safety and infrastructure risks.
What We Saw in the Field
• 30-inch downcutting at RCBC
• Exposed waterline
• Threatened utility pole
• Erosion several hundred feet downstream
Where We Are Now
A Notice of Intent has been submitted to DEMA for BRIC consideration.
Updated OPCC: $3.38M. If approved, FEMA would fund 75%; Town would
seek PCRFCD support for the 25% match (≈$845k).
Project is in early technical development and was not advanced for the current
bond cycle. Coordination with PCRFCD will continue as design progresses and
downstream needs are defined.
Construction is tentatively targeted for FY30–31.
Next Steps
• Continue BRIC application coordination with DEMA/FEMA.
• Advance early design and erosion-protection concepts.
• Work with PCRFCD on potential match participation.
• Refine project scope as downstream mitigation needs are evaluated.Status: Active
Last Revised: 5/7/26
In partnership with
Nanini Wash at N
Paseo Del Norte
Erosion Mitigation
Project
Why This Site Matters
Roadway undermining and deep scour pose immediate safety and
infrastructure risks.
What We Saw in the Field
• 5-foot vertical drop near pavement
• Scour 14–18 inches below pipes
• Exposed utilities and collapsed slope
Where We Are Now
Preliminary assessment indicates the need to evaluate whether the
existing culverts require resizing, along with potential guardrail and scour
protection improvements.
Preliminary OPCC is $125K, and the project is programmed for FY26/27.
Next Steps
• Complete hydraulic analysis.
• Verify culvert sizing and design headwall + scour protection.
Status: Active
Last Revised: 5/7/26
WE APRECIATE YOUR SUPPORT
AND COLLABORATION
THROUGHOUT THE TOUR.
THANK YOU FOR JOINING
THE 2026 STORMWATER FIELD TRIP
Stormwater Utility Commission 4.
Meeting Date:05/21/2026
Requested by: Dennis Roberts, Public Works Submitted By:Scott Bennett, Public Works
SUBJECT:
DISCUSSION OF 2025/2026 TOWN OF ORO VALLEY MS4 COMPLIANCE SCHEDULE, THIRD QUARTER
REPORT
RECOMMENDATION:
This report is for discussion purposes only.
EXECUTIVE SUMMARY:
The Town of Oro Valley’s Stormwater Management Program and Annual Report to ADEQ identify the Minimum
Control Measures (MCMs) used to manage and improve stormwater quality from the MS4. This quarterly update
summarizes activities completed during the third quarter of the 2025–2026 reporting period (January 1–March
31), including ongoing and annual Best Management Practices (BMPs). A summary table of MCMs and
associated BMPs is included and shows that the Town is current with required compliance activities.
During this reporting period, staff also completed several outreach and training initiatives that support MS4
program implementation, including participation in the STREAM Night event at Wilson K–8 School, annual Illicit
Discharge Detection & Elimination (IDDE) training for municipal employees, and distribution of targeted
educational materials to local businesses whose activities may affect stormwater quality. These efforts enhance
community engagement, improve pollutant prevention practices, and reinforce compliance across municipal and
private operations.
The Town will soon transition to a new MS4 permit, scheduled for adoption in September. ADEQ is expected to
release a draft for review in the coming months, and staff will provide comments as appropriate.
BACKGROUND OR DETAILED INFORMATION:
The Town manages stormwater quality in accordance with the Arizona Pollutant Discharge Elimination System
(AZPDES) Permit AZG2021-002 that authorizes the discharge of stormwater from the municipal separate storm
sewer system (MS4) to receiving waters, including Waters of the United States (WOTUS). The MS4 generally
consists of roads, storm drains, and infrastructure carrying runoff into drainage ways or ephemeral stream
channels. The Town has a Stormwater Management Program (SWMP) that describes the control measures it
uses to manage the quality of discharges from the MS4. These Best Management Practices (BMPs) are:
MCM-1. Public Education and Outreach
MCM-2. Public Participation and Involvement
MCM-3. Illicit Discharge Detection and Elimination
MCM-4. Construction Site Runoff Control
MCM-5. Post-Construction Runoff Control
MCM-6. Pollution Prevention/Good Housekeeping for Municipal Operations
The Town’s Stormwater Management Program describes specific practices it uses to achieve compliance with
Part 6.4 of the AZPDES Permit related to Minimum Control Measures, including specific implementation dates
and frequencies, measurable goals, and responsible departments. Our staff keeps track of these targeted
responsibilities and has prepared the attached summary table showing project implementation in terms of
completed tasks that are either (A) ongoing or continuous, or (B) to be done a minimum of once each year. This
attached summary Table shows that the Stormwater Utility is fully up to date and has met this quarter’s goals for
implementing BMP’s that are ongoing and continuous. The next scheduled update will be the MS4 Annual Report
summarizing the MS4 activities of reporting year 2025/2026.
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
3rd Quarter MS4 Compliance Schedule
2025/2026 Town of Oro Valley Quarter 3 MS4 Compliance Schedule
July - Sept Oct - Dec Jan - Mar Apr - June
MCM-1 Public Education and Outreach
BMP 1.1 Create and update informational brochures (A)x x x
BMP 1.2 Distribution of informational brochures to the general public (A)x x x
BMP 1.3 Distribution of brochures to businesses that potentially affect stormwater quality (B) Scheduled Qtr 4
BMP 1.4 Stormwater content in the Oro Valley Vista Newsletter (B)x
BMP 1.5 Outreach events at Town of Oro Valley schools (B)
BMP 1.6 Display of outreach materials on Town owned Sun Shuttle buses. (A)x x x
BMP 1.7 Stormwater content on the Town of Oro Valley website (A)x x x
BMP 1.8 Effective response to public inquiries (A)x x x
MCM-2 Public Participation and Involvement
BMP 2.1 Public participation through the Stormwater Utility Commission (SWUC) (A)x x x
BMP 2.2 Public involvement through notification of monthly SWUC meetings (A)x x x
BMP 2.3 Public interaction with SWU Staff (A)x x x
BMP 2.4 Solicitation of public comments regarding key components of utility operations (A)x x x
BMP 2.5 Encouragement of public participation via volunteer groups sponsored by the TOV (A)x x x
BMP 3.1 Implementation of an IDDE program (A)x x x
BMP 3.2 Identification and Mapping of the MS4 (A)x x x
BMP 3.3 Identification and mapping of the Town's Municipal Outfall Inventory (A)x x x
BMP 3.4 Annual Municipal Employee Illicit Discharge Training Program (B)Done: April 2026
BMP 3.5 Training of Town volunteers (A)x x x
BMP 3.6 Written IDDE Procedures (A)x x x
BMP 4.1 Comprehensive pre-construction site plan review (A)x x x
BMP 4.2 Erosion and sediment control for capital improvement projects (A)x x x
BMP 4.3 Establishment and review of Town ordinances regarding disposal of hazardous construction site
waste, sediment control, and erosion control (A)x x x
BMP 4.4 Documentation of procedures (A)x x x
BMP 4.5 Personnel Qualifications and Education of Private Contractors/Developers (A)x x x
BMP 4.6 Establish Procedures for Receipt and Consideration of Constituent Submittals (A)x x x
BMP 5.1 Creation, review and enforcement of post-construction stormwater pollution prevention
regulatory mechanisms and standard operating procedures (A)x x x
BMP 5.2 Comprehensive GIS Inventory of Active and Finished Construction Projects (A)x x x
BMP 5.3 Implement Standard Operating Procedure on Post-Construction Inspections (A)x x x
BMP 5.4 Site Plan Reviews (A)x x x
BMP 6.1 Inspection of Town of Oro Valley Municipal Operations, Storage, and Maintenance Facilities (A)x x x
BMP 6.2 Street Sweeping (A)x x x
BMP 6.3 Implementation of SPCC and Operation and Maintenance Plans for Town Maintenance
Facilities (A)x x x
BMP 6.4 Municipal Employee Training Program (B)Done: April 2026
BMP 6.5 Town of Oro Valley Municipal Vehicle and Heavy Equipment Washing Procedures (A) x x x
BMP 6.6 Town of Oro Valley Fleet Maintenance Schedule (A)x x x
BMP 6.7 Facility Safety Data Sheet Inventory (A)x x x
(A) Ongoing and Continuous
(B) Done Only Once Per Fiscal Year
x means task completed during indicated quarter
S. Bennett 5/1/2026
Quarter
MCM-5 Post-Construction Runoff Control
MCM-6 Pollution Prevention and Good Housekeeping for Municipal Operations
MCM-4 Construction Site Stormwater Run-Off Control
MCM-3 Illicit Discharge Detection and Elimination
Stormwater Utility Commission 5.
Meeting Date:05/21/2026
Requested by: Dennis Roberts, Public Works Submitted By:Dennis Roberts, Public Works
SUBJECT:
PRESENTATION AND DISCUSSION OF ORO VALLEY MONSOON PREPAREDNESS
RECOMMENDATION:
For discussion purposes only.
EXECUTIVE SUMMARY:
As the summer rainy season approaches, the Town of Oro Valley Stormwater Utility is committed to promoting
monsoon awareness and safety. While these seasonal storms offer a refreshing break from the heat, they also
bring heavy rainfall, powerful lightning, strong winds, and dust, creating the potential for dangerous flash floods.
Flash flooding remains the leading weather-related cause of death in the United States, with nearly half of these
fatalities involving vehicles caught in rising waters.
In anticipation of the upcoming monsoon season, the Oro Valley Stormwater Utility has proactively engaged in
outreach efforts, collaborating with partnering agencies, residents, and internal staff. Through these coordinated
initiatives, we aim to enhance preparedness and safety, ensuring that our community can enjoy the monsoon
season while minimizing risks. By staying informed and taking precautionary measures, we can make this summer’s
rainy season both enjoyable and secure for everyone.
BACKGROUND OR DETAILED INFORMATION:
Explore the following online links which are valuable resources for expert insights and practical tips on staying
informed and prepared during the monsoon season.
• Oro Valley Monsoon Preparedness Guide
• Oro Valley CodeRED Alerts
• Pima County Regional Flood Control District Monsoon Safety Guide
• Arizona Emergency Information Network Monsoon Awareness
• National Weather Service Monsoon Safety
• Oro Valley Sandbag Program
• Tucson Electric Power Monsoon Safety
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
Monsoon preparedness guide
TEP Monsoon Safety
Register CodeRED
Sandbags for Oro Valley Residents
Monsoon Preparedness Presentation
Questions? Call us at 520-229-4850 or email PW@orovalleyaz.gov.
DRIVING DURING MONSOON SEASON
Thunderstorms, thick dust storms and flash floods are all very
common during Southern Arizona’s monsoon season. They also
create hazardous conditions for motorists. Given the many washes
and hills located within Oro Valley, it is critical to reacquaint
ourselves with how best to handle adverse weather conditions
while on the road.
Heavy Rain
•Ensure a safe following distance between cars—four seconds
is ideal for stormy weather. Tires lose traction on wet surfaces,
which can make it harder to stop suddenly.
•Watch for large vehicles traveling through puddles. They can
throw blinding sheets of water across your windshield.
•If you begin to hydroplane, remove your foot from the gas
pedal until you regain traction. Do not brake suddenly. If
you are sliding, turn the wheel in the direction of the slide to
straighten out.
Dust Storms
•Avoid driving during dust storms.
•Turn on your headlights and slow to a reasonable speed.
Never stop on the pavement during a dust storm.
•If the storm becomes too severe, pull off the road as far to the
right as possible, turn off all lights and set the parking brake.
• Do not turn on your hazards or keep your foot on the brake.
Other cars may think you are still in motion and try to follow
you.
Arizona Stupid Motorist Law
Many roads which flood during monsoon season have roadblocks
or barriers to keep drivers from entering. These signs and barriers
must be adhered to, otherwise you could be required to pay for
emergency services should you become stuck. Per Arizona State
Law A.R.S 28-910, any motorist who drives past a safety roadblock
into a flooded wash or channel may be liable for the expense of
emergency rescue services (up to $2,000).
EMERGENCY PREPAREDNESS
The severe storms brought on by monsoon season can lead to a
number of different emergencies, from power outages to flash
floods. It is vital that all households prepare a contingency plan in
case of an emergency.
Emergency Kits
Each household should put together an emergency kit. These kits
should reflect the size of the household and should be maintained
and updated regularly.
Formulate an Emergency Plan
•Identify meeting locations both inside and outside of the
neighborhood for your family/household.
•Identify non-local emergency locations where you will meet
if the inside/outside neighborhood meeting locations are not
accessible. This can be an out-of-town friend’s house, shelter,
or hotel.
•Name an out-of-town contact. This can be someone who
lives beyond the immediate area who will serve as the main
point of communication for your household. This person is
particularly important should your household get split up in
an emergency.
•Make sure everyone in your household is familiar with
alternative routes through town. The route you usually take
could become blocked, so it is important to know the area.
Evacuation
Though rare, there is a possibility that during monsoon weather
conditions, evacuations could become necessary. Follow the 5 P’s
of Immediate Evacuation in order to be prepared and remain safe.
•People and Pets and other livestock
•Papers and important documents
•Prescriptions like medications, eyeglasses, hearing aids, etc.
•Pictures - irreplaceable memories
•Personal computer and information on hard drives or disks
Oro Valley Monsoon Preparedness Guide
Town of Oro Valley Stormwater Utility
WHAT IS A MONSOON?
Every summer, Southern Arizona experiences a weather phenomenon known as monsoon season. From approximately June 15 to
September 30, monsoon season is marked by intense rain, lightning shows and thick dust storms.
While the rain provides a welcome relief from the usual arid heat, the high winds and thunderstorms that accompany this weather
shift often create treacherous conditions. Dust storms and flash floods are prevalent during this time of year, making it exceedingly
important to be prepared.
STORMWATER UTILITY
The Arizona monsoons provide unique and complex challenges for the Town of Oro Valley, which is why the Stormwater Utility was
developed in 2008. This division of the Town’s Public Works Department was established to protect Oro Valley’s working and natural
environments before, during and after the occurrence of storm events. Some activities where you can see Stormwater Utility in action
include, but are not limited to:street sweeping, storm cleanup, drainage channel vegetation maintenance, storm system inspections, and
Adopt-A-Wash Program.
The Stormwater Utility is an excellent resource for information about floodplains, stormwater quality, and illicit discharge control.
Information provided by TEP at tep.com/monsoon-safety
Monsoon Safety
10 Safety Tips
While short-term outages are an inconvenience, extended outages from monsoon storm
damage can have a larger impact. Just as Tucson Electric Power prepares all year long
for storm season by fortifying our electrical system, customers also can prepare to
ensure they’re safe and sound if the lights go out. Here are 10 steps to take so you’re
ready, no matter what the weather brings:
1. Ready an emergency kit
Long before our first severe storm, assemble an emergency kit with essential items your
family will need. Your kit should contain a battery-powered radio, flashlights, fresh
batteries, a first aid kit, nonperishable food and drinking water– one gallon a day for
each person in the household. And don’t forget that your pets also need food and fresh
water.
Good nonperishable food choices include crackers, dried fruit or trail mix, beef jerky,
canned or pouches of chicken or tuna and granola bars, all of which have a longer shelf
life. To avoid stumbling around in the dark and possibly hurting yourself, have several
light sources, such as a battery-powered flashlight and lantern. Don’t use candles,
which can tip over and start a fire.
“If you have an emergency kit already, this is the perfect time to update items by
checking expiration dates on food and the power levels of batteries,” said Brian
Herman, TEP’s Director of Corporate Safety.
2. Watch the weather
Follow weather forecasts on the TEP mobile app or tune into local radio and TV stations
so that you’ll be aware if severe weather is developing and can prepare. Before storms
hit, secure patio furniture and umbrellas and loose objects to prevent their damage and
flying debris. Sign up for free weather alerts from NOAA, the National Weather Service
and Pima County Emergency Management to stay informed of severe weather
warnings.
3. Have backup communications
If landline phones are out or your home’s wireless phone needs electricity, your cell
phone may be your only communication tool – until the battery runs out of juice.
Investing in a solar cell phone charger can help you recharge and make calls in an
emergency. Some devices store energy, while others can only provide a charge if the
sun is shining on the solar cell. Most devices cost less than $50.
To extend your phone’s battery life, turn off background applications, notifications and
streaming service or just power it down until you need to use it. In a pinch, use your
vehicle’s power outlet with your phone charger to boost your battery or to power other
electronics.
4. Turn off your AC
TEP recommends that you turn off your air conditioner during a power outage. Why?
Well, it’s not doing you any good without electricity anyway … but the real reason has to
do with what happens when the power comes back on.
When service is restored to a section of our grid that suffered an outage during hot
weather, every air conditioner in that area that wasn’t turned off starts up at the same
time, trying to get all those warm homes and business back to a comfortable
temperature. The problem is that AC units require additional power at the moment they
start – much more than they use while operating. The combine d impact of hundreds or
thousands of AC units starting up at the exact same moment can trigger reliability
problems that cause another outage or even damage your AC unit.
Turning off the AC helps protect your unit and our grid. It also provides an opportunity to
burn a few extra calories walking back to the thermostat to turn it back on after service
is restored.
5. Use surge protectors
Lightning strikes during a monsoon storm can sometimes cause power surges that can
damage electronics plugged into outlets. Using smart power or surge strips for your
television, gaming station and other electronics will protect them from these spikes.
You’ll also be protected from the impact that phantom energy can have on your electric
bill.
6. Stay away from downed power lines
Downed power lines can still be energized and deadly, even if they look harmless.
Always stay far away from downed lines, call 911 to report them and keep others away
from the area.
Never drive over a downed power line or attempt to get out of your car if a power line
has fallen on it. Call 911 and wait for help. If you must get out of the vehicle for some
reason, here’s how to do that safely:
“Open your door and jump out and away from the vehicle being careful not to touch the
car and the ground at the same time,” advised Roger Hall, TEP Manager of
Transmission & Distribution. “Both feet need to be touching and together when you land
or shuffle with your feet close together until you are at least 20 feet away from the
vehicle.”
7. Stay cool in extreme heat
Outages that occur during extreme heat can pose a real health concern without air
conditioning. Drink plenty of water to stay hydrated and wear loose clothing made of a
breathable fabric. Consider buying a few battery-powered fans, which are remarkably
effective at moving air to make it feel cooler. Using gel-filled cooling neck wraps also
can help lower your body temperature. Simply wet the wrap and slip it around your neck
for a cooling effect.
In extended outages, check TEP’s outage web page for updates, details about
community cooling centers that may have been set up and other services available in
affected areas.
8. Minimize food loss
Keeping the refrigerator and freezer closed will safely keep food cold for about four
hours. Adding bags of ice also will extend the cooling time. Once the freezer begins to
warm, transfer frozen foods into a cooler with ice. If the temperature of the foo d is
higher than 40 degrees for two or more hours, it’s best to throw out the food rather than
risk getting sick.
Here’s a trick to know whether your food may have spoiled during an extended
outage. Place a cup of water in your freezer. After the water freezes, place a coin on
top of the ice. If you later find that coin below the ice’s surface, you’ll know the food in
your freezer and fridge thawed at some point and the food is likely unsafe to consume.
When in doubt, throw it out!
Something you can do before an outage is to fill milk jugs with fresh water and place
them in your freezer. This will not only help keep your food cold during an outage, but
they also can be thawed to provide fresh drinking water.
9. Know your medical options
If you rely on an electronic medical device or have refrigerated medications, talk with
your medical provider about having a power outage plan. Find out how long your
medication can be stored at higher temperatures and get specific guidance for any
medications that are critical for life. Possible options might be having a backup
generator to power your refrigerator or medical device, using an ice chest for temporary
storage or going to the home of a friend who has power.
TEP customers with medical devices that require electricity are encouraged to enroll in
our Medical Device Alert program. Customers in this program are kept informed about
the status of service interruptions and the estimated time of restoration.
10. Prevent electrical hazards during flooding
Monsoon storms often are accompanied by heavy rains and flooding. “Never use
electric appliances or touch electric wires, switches or fuses when you're wet or when
you're standing in water,” Hall suggested. “Keep electric tools and equipment at least 10
feet away from wet surfaces and don’t use electric yard tools if it's raining or the ground
is wet. Electricity and water don’t mix well.”
Register for CodeRED
orovalleyaz.gov/Government/Departments/Town-Managers-
Office/Services/Register-for-CodeRED
CodeRED is a FREE emergency notification service provided to all residents within Oro
Valley that will notify you of emergency information through phone calls, text messages,
emails and social media. The system will be used to keep you informed of local events that
may immediately impact your safety. As a local resident, you are encouraged to take action
and register your cell phone for this service and verify your home location during the
enrollment process so you will receive notifications that directly impact your home or
business.
What is CodeRED and why is it important to me?
CodeRED is an emergency notification service that allows emergency officials to notify
residents and businesses by telephone, cell phone, text message, email and social media
regarding time-sensitive general and emergency notifications. Only authorized officials
have access to the CodeRED system.
When will CodeRED be used?
Any message regarding the safety, property or welfare of the community will be
disseminated using the CodeRED system. These may include AMBER alerts, notifications of
hazardous traffic or road conditions, boil water advisories or evacuation notices.
Registration
Now, before such an emergency happens, the Town of Oro Valley wants to ensure that we
have contact information for all of our residents and businesses.
Online
Step 1.Go to website to register your number in the CodeRED
community notification system
To ensure that the Town of Oro Valley has contact information for all of our residents and
businesses you must register cell phone or broadband/VOIP phone number.
Visit CodeRED
Step 2.Register for managed account or register as guest
Creating a managed account will allow you access to modify your existing notification
settings and contact information. You may also add an additional address for the CodeRED
system to monitor.
You may choose to receive text messages as well as general notifications in addition to the
Emergency Notifications.
Step 3.Check the keep my information private box and agree to
Terms and Conditions
This will ensure that your data is not shared with third parties and that you are accepting
telephone calls from the Town of Oro Valley.
Step 4.Click Verify information to complete process.
Sandbags for Oro Valley residents
Beginning June 15, the Town will provide free sandbags to residents who may need to protect areas of
their homes from storm runoff during the monsoon.
Sandbags can be picked up beginning mid June 2026 through the duration of the monsoon season,
ending September 30, 2026.
Due to a limited number of supplies, only Town residents are eligible, and there is a limit of 10 sandbags per
vehicle. See TIP to fill bags below.
Sandbags are self-service; please bring your own shovel, you will need to bag and load your own sand. If you
need assistance loading sandbags into your vehicle please call ahead of time to notify town staff of your
need.
TIP TO FILL BAGS: Fill sandbags half full using sand or local soil, fold the top of the sandbag down, and
then place the bag on its folded top.
Oro Valley Residents Pickup Location
The 2026 Sandbag Distribution Location will be at Naranja Park, in an empty lot 1,000 feet north of the
W Naranja Drive and N Mussette Drive intersection, on the east side of N Mussette Drive.
Residents who require assistance may make an appointment with Town Staff to pick up pre-bagged sand
at a designated time. For information on how to book your appointment, or for any questions, please
contact OV Stormwater Utility Staff 520-229-4850 option 3 or by email at pw@orovalleyaz.gov.
An important message from your Oro Valley Stormwater Utility
The Oro Valley Stormwater Utility continues to be proactive in managing washes and addressing potential
flood issues and is proud to offer this service to Oro Valley residents. The Utility would also like to remind
residents that we need your help to make sure our community stays safe and clean during the summer rainy
season. If you see any water quality/pollution or flooding issues please contact the OV Stormwater Utility
via phone at 520-229-4850 option 3 or via email at pw@orovalleyaz.gov.
Lastly, make sure you and your family are prepared for the monsoon! Take a look at Oro Valley's Monsoon
Preparedness Guide and sign up for safety alerts. Get started by visiting www.orovalleyaz.gov and typing
MONSOON in the search bar.
Monsoon Preparedness
for Oro Valley
Dennis E. Roberts, P.E., CFM
Stormwater Utility Division Manager
Stormwater Utility -Public Works Department
Monsoon Preparedness: Protecting Oro Valley Residents
•Understanding the Monsoon Season
•Let’s start with the basics—what is monsoon season?
•The Hazards Oro Valley Residents Face
•Without proper preparation, monsoons can lead to serious
consequences.
•How Can We Prepare?
•The good news is that there are easy steps we can take to stay safe
during monsoon season.
•Community Resources & Support
•Preparedness isn’t just an individual effort—it’s a community effort.
Monsoons may be inevitable, but disasters don’t have to be.
Town of Oro Valley
Definition: A monsoon is a seasonal wind shift that creates alternating wet
and dry periods, driven by temperature differences between land and ocean
What are Monsoons?
The Hazards Oro Valley Residents Face
How do Monsoons Impact Oro Valley?
Whiletherainprovidesawelcomerelieffromtheusualaridheat,thehighwinds
and thunderstormsthataccompanythisweathershiftoftencreatetreacherous
conditions.
Heavy rainfall leading to flash floods
Dust storms reducing visibility
Lightning risks during storms.
Safe Driving in Monsoon Conditions
Heavy Rainfall
•Flooded Roads
•Maintain a Safe Following Distance. Keep at least four seconds of space between
you and the car ahead. Wet roads reduce traction and increase stopping time.
•Watch for Water Splash Hazard
•Large vehicles can create blinding sheets of water, reduce visibility. Stay cautious
near puddles
•Hydroplane Recovery Tips
•If you start to hydroplane, lift your foot off the gas to regain traction.
•Avoid sudden braking – it can make skidding worse.
•If sliding, turn the wheel in the direction of the slide to straighten out safely.
•Heavy rainfall can turn dry washes into dangerous flood zones.
•Flooded roads can sweep away vehicles—"Turn Around, Don't Drown!"
Flash Flood Dangers
Stormwater Management & Our Role At The Stormwater Utility
How Stormwater Management Keeps Oro Valley Safe
In preparation for the upcoming monsoon season, the
StormwaterUtility undertakes specific operational and
maintenance actions to be ready forstormdebris and
runoff.
Asset InspectionsRoad closureSignage &
Coordination with First
Responders
Wash Maintenance
Regional Collaboration & Planning
Regional Collaboration for Monsoon Readiness
OroValley continues to work with localpartners
in preparing for monsoon season
The Pima County Multi-Jurisdictional Hazard Mitigation Plan is an
essential tool in preparing and mitigating disasters.The plan setsthe
stagefor coordination efforts to meet the challenges of the monsoon,
as well as other disasters,and allows the regional partnersthe
opportunity to applyforfederalassistancefunding.
Supporting Regional Monsoon Messaging Effort
Spreading the Message
The Stormwater Utility supports our
regional partners messaging efforts
Pima County and the National Weather Service continue to
push out messaging with their media partners reaching
residents through television, radio, and the internet.
Be Ready for Monsoon Season: Resources & Tips for Oro Valley
Public Outreach
The Stormwater Utility Monsoon
Preparedness Guide is available on the
Oro Valley webpage
Offering information and tips on how to
prepare and minimize threats from the
seasonal hazards
Protect Your Property: Oro Valley’s Free Sandbag Program
Starting June 15, the Town will provide free sandbags to residents at Naranja Park, in an
empty lot 1,000 feet north of the W Naranja Drive and N Mussette Drive intersection, on
the east side of N Mussette Drive. Residents may fill up to 10 bags through September 30
to help protect their property from potential storm damage.
Final Takeaways
Monsoon Preparedness Starts with You
•Monsoon season brings challenges, but preparedness minimizes risks.
•Oro Valley’s stormwater systems are in place, but residents play a crucial
role.
•Simple actions—clearing drains, securing property, and staying
informed—make a big difference.
•Together, we create a safer, stronger, and more resilient community.
•Questions or feedback?
Stormwater Utility Commission 6.
Meeting Date:05/21/2026
Requested by: Dennis Roberts, Public Works Submitted By:Dennis Roberts, Public Works
SUBJECT:
PRESENTATION, DISCUSSION, AND POSSIBLE ACTION REGARDING RECOMMENDATION TO FORWARD
AMENDMENTS TO TOWN CODE CHAPTER 17 TO THE MAYOR AND COUNCIL FOR CONSIDERATION AND
ADOPTION
RECOMMENDATION:
Staff recommends that the Stormwater Utility Commission review the proposed amendments and recommend
forwarding the revisions to the Town Council for formal consideration.
EXECUTIVE SUMMARY:
Town Code Chapter 17, Floodplain and Erosion Hazard Management, was last updated by Ordinance (O)21 06
on November 17, 2021.
In January 2023, the Arizona Department of Water Resources (ADWR) conducted a Community Assistance Visit
(CAV), a periodic compliance review under the National Flood Insurance Program (NFIP). The CAV identified
several recommended updates to better align Chapter 17 with the State of Arizona Floodplain Management
Model Ordinance (June 2023) and current state and federal best practices.
In response, staff prepared draft amendments that update terminology, clarify administrative procedures, and
incorporate all ADWR recommendations. The revisions have been formatted in both redline and clean copies for
Commission review.
Next Steps:
• The Stormwater Utility Commission reviews and provides feedback on the proposed amendments.
• If supported, the Commission recommends forwarding the revisions to the Mayor and Council.
• Town Legal will prepare the formal ordinance for Town Council consideration.
• Following Commission action, staff intends to place the item on the next available Mayor and Council Regular
Session agenda.
Adoption of these revisions will help ensure ongoing NFIP compliance, protecting the community’s eligibility for
federally backed flood insurance and post disaster assistance.
BACKGROUND OR DETAILED INFORMATION:
Under A.R.S. § 48 3610, municipalities may assume responsibility for floodplain management and adopt
regulations consistent with A.R.S. § 48 3609. Oro Valley has done so through multiple Chapter 17 updates,
including Ordinances (O)05 35 (2005), (O)17 04 (2017), and (O)21 06 (2021).
The 2023 ADWR CAV recommended a series of updates to modernize Chapter 17 and improve consistency with
state and federal requirements.
These include:
• Updating and clarifying definitions
• Aligning administrative procedures with current state standards
• Eliminating outdated language
• Improving technical clarity and internal consistency
Staff incorporated all recommendations, prepared a redline version showing proposed changes, and assembled a
clean final draft for adoption consideration.
FISCAL IMPACT:
No direct fiscal impact is anticipated. Staff time required for drafting, review, and coordination is included in the
Stormwater Utility operating budget.
SUGGESTED MOTION:
I MOVE to recommend forwarding the proposed amendments to Town Code Chapter 17, Floodplain and Erosion
Hazard Management, to the Mayor and Council for consideration and possible adoption.
Attachments
OV TC Ch 17_Showing Comments from ADWR CAV Reviewer
OV TC Ch 17_Showing Revisions
OV TC Ch 17_Final
Chapter 17 Amendments Presentations
APPENDIX B
ANNOTATED ORDINANCE
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 1 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
CHAPTER 17
FLOODPLAIN AND EROSION HAZARD MANAGEMENT
Articles:
17-1 Statutory Authorization, Findings of Fact, Purpose and Methods
17-2 Definitions
17-3 General Provisions
17-4 Administration
17-5 Provisions for Flood Hazard Reduction
17-6 Appeal and Variance Procedures
17-7 Ordinance Amendments
17-8 Fees
Article 17-1
STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND
METHODS
Sections:
17-1-1 Statutory Authorization
17-1-2 Findings of Fact
17-1-3 Statement of Purpose
17-1-4 Methods of Reducing Flood Losses
17-1-1 Statutory Authorization.
The Legislature of the State of Arizona has, in ARS § 48-3610, enabled the Town of Oro Valley to assume the
powers and duties for floodplain management and adopt regulations in conformance with ARS § 48-3609 that
are designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the Town
Council of Oro Valley, Arizona, does ordain as follows. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Commented [KK1]: In general, comments have priorities
ranging from recommended (highest) to suggested (lowest).
Additional comments and/or questions are also included for
discussion.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 2 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
so as to minimize blight areas caused by flooding;
G. To ensure the state mandated required regulatory floodplain information is available to potential buyers;
17-1-2 Findings of Fact.
A. The regulatory floodplains of Oro Valley are subject to periodic inundation that may result in loss of life
and property, health and safety hazards, disruption of commerce and governmental services, extraordinary
public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely
affect the public health, safety and general welfare.
B. These flood losses are caused by the cumulative effect of obstructions in regulatory floodplains, which
increase flood heights and velocities. Also, when these obstructions are inadequately anchored, they may cause
damage in other areas. Uses that are inadequately flood-proofed, elevated, or otherwise protected from flood
damage also contribute to the flood loss. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-3 Statement of Purpose.
It is the purpose of this chapter to promote the public health, safety, and general welfare, and to minimize
public and private losses due to flood conditions in specific areas by provisions designed:
A. To protect human life and health;
B. To minimize expenditure of public money for costly flood control projects;
C. To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the
expense of the general public;
D. To minimize prolonged business interruptions;
E. To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone, and
sewer lines, and streets and bridges located in regulatory floodplains;
F. To help maintain a stable tax base by providing for the sound use and development of the special flood
hazard areas and erosion hazard areas
H. To regulate activities within regulatory floodplains for both public and private properties;
I. To participate in and maintain eligibility for flood insurance and disaster relief. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Commented [KK2]: Not consistent, recommend
regulatory floodplain
Commented [KK3]: Suggested addition
Formatted: Highlight
Commented [KK4]: In addition to State model, no action
needed
Commented [KK5R4]: CRS related?
Formatted: Highlight
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 3 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-1-4 Methods of Reducing Flood Losses.
In order to accomplish its purposes, this chapter includes methods and provisions for:
A. Restricting or prohibiting uses which are dangerous to the public health, safety, and welfare as well as
public and private property, due to water or development hazards; or which result in increased damages to
development or increases in flood heights or velocities;
B. Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against
flood damage at the time of start of construction;
C. Controlling the alteration of natural floodplains, stream channels, and natural protective barriers, which
help to accommodate natural flood storage potential or the channelization of floodwaters;
D. Controlling filling, grading, dredging, and other development that may increase flood damage; and
E. Preventing or regulating the construction of flood barriers that unnaturally divert floodwaters, or that may
increase flood hazards in other areas. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-2
DEFINITIONS
Sections:
17-2-1 Definitions
17-2-1 Definitions.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted to give them the
meaning they have in common usage, and to give this chapter its most reasonable application.
“Accessory structure” means a structure that is on the same parcel of property as a principal structure, the use
of which is incidental to the use of the principal structure. For floodplain management purposes, the term
includes only accessory structures used for parking and storage.
“Appeal” means a request for a review of the Floodplain Administrator’s interpretation of any provision of this
chapter or a request for a variance. Appeals are heard and decided by the Floodplain Board.
“Area of shallow flooding” means a designated zone AO or AH on a community’s Flood Insurance Rate Map
(FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth of one (1) to three
Commented [KK6]: Recommend updating definition of
"Accessory Structure" based on FEMA TB P-2140 (Aug
2021):
For floodplain management purposes, accessory structures
are structures that are on the same parcel of property as a
principal structure, the use of which is incidental to the use
of the principal structure. Accessory structures must be
used for parking or storage, be small and represent a
minimal investment by owners, and have low damage
potential. FEMA considers “small” to mean not larger than a
one-story two-car garage. Examples of small accessory
structures include, but are not limited to, detached garages,
storage and tool sheds, and small boathouses.
Structure Size - The footprint of a typical two-car garage is
about 600 square feet in area.
Storage - Contents stored in wet floodproofed structures
will get wet during flooding.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 4 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
(3) feet where a clearly defined channel does not exist, where the path of flooding is unpredictable, and where
velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
“Base flood” means a flood having a one percent (1%) chance of being equaled or exceeded in any given year.
“Base flood elevation (BFE)” means the computed elevation to which floodwater is anticipated to rise during
the base flood.
“Basement” means any area of a structure with a subgrade floor (i.e., below the adjacent ground level) on all
sides.
Building. See “Structure.”
“Community” means any state or area or political subdivision thereof, or any Indian tribe, authorized tribal
organization, or authorized Native organization, which has authority to adopt and enforce floodplain
management regulations for the areas within its jurisdiction.
Critical Facility. Refer to Section 17-5-8(D).
“Detention system” means a type of flood control system which delays the downstream progress of
floodwaters in a controlled manner, generally through the combined use of a temporary storage area and a
metered outlet device, which causes a lengthening of the duration of the flow and thereby reduces downstream
flood peaks.
“Development” means any manmade change to improved or unimproved real estate, including but not limited
to structures, mining, dredging, filling, grading, paving, excavation or drilling operations, and storage of
materials and equipment.
“Dwelling” means a habitable structure.
“Elevation certificate” means an administrative tool of the National Flood Insurance Program (NFIP) that is
used to provide elevation information necessary to ensure compliance with community floodplain management
ordinances, to determine the proper insurance premium rate, and to support a request for a letter of map
amendment (LOMA) or letter of map revision based on fill (LOMR-F).
“Encroachment” means the advance or infringement of uses, landscape vegetation, fill, excavation, permanent
structures, or development into a floodplain that may impede or alter the flow capacity of a floodplain. An
equal degree of encroachment is a standard applied to the evaluation of the effects of the encroachment on
increases in flood heights. It assumes that an encroachment, if permitted, may confer on all property owners on
both sides of the watercourse an equal right to encroach to the same degree within that reach. Since the factors
affecting hydraulic efficiency are usually not uniform within a reach, this standard will usually not result in
equal measured distances between the regulatory floodway and the regulatory floodplain of the watercourse.
“Erosion” means the process of the gradual wearing away of landmasses. This peril is not, per se, covered
under the National Flood Insurance Program.
Commented [KK10]: Additional definition, no action
needed
Commented [KK9]: Verify 'landscape vegetation' is
anthropological and not natural.
Commented [KK8]: Additional definition, no action
needed
Commented [KK7]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 5 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Erosion hazard area” means lands adjoining a watercourse that is regulated by this chapter which are deemed
by the Town Engineer to be subject to flood-related erosion, pursuant to the Town’s adopted drainage criteria
manual.
“Erosion setback” means the minimum horizontal distance between a structure or permanent feature and the
channel bank necessary to protect the structure/feature from flood-related erosion damage. For method to be
used for determination of the erosion setback, see the adopted Town of Oro Valley drainage criteria manual.
“Existing manufactured home park or subdivision” means a manufactured home park or subdivision for which
the construction of facilities for servicing the lots on which the manufactured homes are affixed (including, at a
minimum, the installation of utilities, construction of streets, and either final site grading or the pouring of
concrete slabs) was completed before December 4, 1979, the effective date of the Flood Insurance Rate Maps
adopted by the Town of Oro Valley.
“Expansion to an existing manufactured home park or subdivision” means preparation of additional sites by
the construction of facilities for servicing the lots on which the manufactured homes are to be affixed
(including the installation of utilities, the construction of streets, and either final site grading or the pouring of
concrete pads).
“Federal Emergency Management Agency (FEMA)” means an agency of the Federal government responsible
for programs of disaster response and recovery, disaster preparedness, hazard mitigation, flood insurance, and
other programs of technical and financial assistance.
“Flood” or “flooding” means a general and temporary condition of partial or complete inundation of normally
dry land areas from: (1) the overflow of floodwaters; (2) the unusual and rapid accumulation or runoff of
surface waters from any source; and/or (3) the collapse or subsidence of land along the shore of a lake or other
body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated
cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by
a severe storm or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by
some similarly unusual and unforeseeable event which results in flooding as defined in this definition.
“Flood Insurance Rate Map (FIRM)” means the official map on which the Federal Emergency Management
Agency has delineated both the special flood hazard areas and the risk premium zones applicable to the
community.
“Flood Insurance Study (FIS)” means the official report provided by Federal Emergency Management Agency
that includes flood profiles, the Flood Insurance Rate Map, and the water surface elevation of the base flood.
“Flood protection system” means those physical structural works for which funds have been authorized,
appropriated, and expended; and which have been constructed specifically to modify flooding in order to
reduce the extent of the area within a community subject to designation as a regulatory floodplain as well as
the extent and depths of associated flooding. Such a system typically includes dams, reservoirs, levees or
Commented [KK13]: Additional definition, no action
needed
Commented [KK12]: Additional definition, no action
needed
Commented [KK11]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 6 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
dikes. These specialized flood-modifying works are those constructed in conformance with sound engineering
standards.
“Floodplain” or “flood-prone area” means any land area susceptible to being inundated by water from any
source (see “flood” or “flooding”).
“Floodplain Administrator” means the Town Engineer, or their designee, whose duty it is to oversee
administration and enforcement of the floodplain management regulations contained in this chapter.
“Floodplain Board” means the Town Council of Oro Valley, at such times as they are engaged in the
enforcement of this chapter.
“Floodplain management” means the operation of an integrated natural resource management program
encompassing corrective and preventive measures for reducing flood and erosion damage. Floodplain
management includes but is not limited to emergency preparedness planning, flood control works and
floodplain management regulations.
“Floodplain management regulations” means this chapter and other zoning ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such as grading and erosion
control), and other applications of legal and regulatory authority that control use of, and development in,
flood-prone areas. This term describes Federal, State, or local regulations, and any combination thereof, which
provide standards for preventing and reducing flood loss and damage.
“Floodplain use permit” (also “permit for development in a floodplain”) means an official document that
authorizes special activity within regulatory floodplains or erosion hazard areas of Oro Valley.
“Flood-proofed” means a watertight structure with walls substantially impermeable to the passage of water,
and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and the
effects of buoyancy, and by means other than elevation.
“Flood-proofing” means any combination of structural and nonstructural additions, changes, or adjustments to
nonresidential structures that reduces or eliminates flood damage to real estate or improved real property,
water and sanitary facilities, structures, and their contents by means other than elevation.
“Flood-related erosion” means the collapse or subsidence of land along the shore of a lake or other body of
water as a result of undermining caused by waves or currents of water exceeding anticipated cyclical levels or
suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm,
or by an unanticipated force of nature, such as a flash flood or an abnormal tidal surge, or by some similarly
unusual and unforeseeable event which results in flooding.
Floodway. See “regulatory floodway.”
“Floodway fringe” means that area of the floodplain lying on either side of a regulatory floodway where
encroachment may be permitted.
Commented [KK17]: Additional definition, no action
needed. Suggest including 'dry floodproof' in definition
Commented [KK16]: Additional definition, no action
needed
Commented [KK15]: Recommend including 'open space
plans'.
Commented [KK14]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 7 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Functionally dependent use” means a use which cannot perform its intended purpose unless it is located or
carried out in close proximity to water. The term includes only docking facilities, port facilities that are
necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, and
does not include long-term storage or related manufacturing facilities.
“Governing body” is the local governing unit (i.e., county or municipality) empowered to adopt and implement
regulations providing for the public health, safety, and general welfare of its citizenry.
“Hardship” means that the physical characteristics of the property in question are so unusual, exceptional, and
peculiar to the property that a variance regarding its use may be requested and granted. Mere economic or
financial hardship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps,
personal preferences, or the disapproval of one’s neighbors likewise cannot, as a rule, be construed to qualify
as an exceptional hardship. All of these problems can be resolved through other means without granting a
variance, even if the alternative is more expensive, requires the property owner to build elsewhere, or means
that the parcel must be put to a different use than originally intended.
“Highest adjacent grade” means the highest natural elevation of the ground surface immediately adjacent to a
structure prior to construction of the proposed walls of a structure.
“Historic structure” means any structure that is:
1. Listed individually in the National Register of Historic Places (a listing maintained by the Department
of the Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements
for individual listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical
significance of a registered historic district or a district preliminarily determined by the Secretary to
qualify as a registered historic district;
3. Individually listed on the State of Arizona inventory of historic places, as approved by the Secretary
of the Interior; or
4. Individually listed on the Town of Oro Valley’s inventory of historic places and that has been certified
by an approved State of Arizona program, as determined by the Secretary of the Interior.
“Levee” means a human-made structure, usually an earthen embankment designed and constructed in
accordance with sound engineering practices, for the purpose of containing, controlling, or diverting the flow
of water so as to provide protection from temporary flooding.
“Lowest floor” means the lowest floor of the lowest enclosed area including the basement (see “basement”
definition) or crawl space under a manufactured home if it is not vented. An unfinished or flood resistant
enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement
area, is not considered to be the lowest floor of a structure; provided, that such enclosure is not built so as to
render the structure in violation of the applicable nonelevation design requirements of this chapter.
Commented [KK18]: Suggest reference to 17-6-1
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 8 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Manufactured home” means a structure, transportable in one (1) or more sections, which is built on a
permanent chassis and is designed for use with or without a permanent foundation when attached to the
required utilities. The term “manufactured home” does not include a “recreational vehicle.”
“Manufactured home park or subdivision” means a parcel (or contiguous parcels) of land divided into two (2)
or more manufactured home lots for rent or sale.
“Market value” means the determination of the estimated cost to replace the structure in new condition and
adjusting that cost figure by the amount of depreciation that has accrued since the structure was constructed.
The cost of replacement of the structure shall be based on a square foot cost factor determined by reference to
a building cost estimating guide recognized by the building construction industry. The amount of depreciation
shall be determined by taking into account the age and physical deterioration of the structure and functional
obsolescence as approved by the Floodplain Administrator but shall not include economic or other forms of
external obsolescence. Use of replacement costs or accrued depreciation factors different from those contained
in recognized building cost estimating guides may be considered only if such factors are included in a report
prepared by an independent professional appraiser and supported by a written explanation of the differences.
Alternatively, the market value is the valuation made by the Pima County Assessor’s Office.
“Mean sea level” means, for purposes of the National Flood Insurance Program, the National Geodetic Vertical
Datum (NGVD) of 1929, North American Vertical Datum of 1988 (NAVD ’88), or other datum to which base
flood elevations shown on a community’s Flood Insurance Rate Map are referenced.
“National Flood Insurance Program (NFIP)” means a program administered by FEMA that makes Federally
backed flood insurance available for purchase by individuals that live in NFIP participating communities.
New Construction. For the purposes of determining insurance rates, structures for which the start of
construction commenced on or after the effective date of an initial Flood Insurance Rate Map or after
December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For
floodplain management purposes, “new construction” means structures for which the start of construction
commenced on or after the effective date of a floodplain management regulation adopted by a community and
includes any subsequent improvements to such structures.
“Obstruction” includes, but is not limited to, any dam, wall, embankment, levee, dike, pile, abutment,
protection, excavation, channelization, bridge, conduit, culvert, structure, wire, fence, rock, gravel, refuse, fill,
structure, vegetation, or other material in, along, across, or projecting into any watercourse which may alter,
impede, retard, or change the direction and/or velocity of the flow of water, or which due to its location
influences its propensity to snare or collect debris carried by the flow of water, thereby reducing its likelihood
of being carried downstream as well as reducing the channel’s ability to convey flow.
“One hundred (100) year flood” means the flood having a one percent (1%) chance of being equaled or
exceeded in any given year (see “base flood”). Also referred to as the one percent (1%) annual exceedance
probability flood (one percent (1%) AEP flood). Commented [KK21]: Additional definition, no action
needed
Commented [KK20]: Additional definition, no action
needed
Commented [KK19]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 9 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Permit for development in a floodplain” (also referred to as a “floodplain use permit”) is an official document
issued by the Town of Oro Valley authorizing performance of specific activity in any regulatory floodplain or
erosion hazard area after it has been determined to be reasonably safe from flooding and erosion. These
permits are required to ensure that proposed development projects meet the requirements of the NFIP and the
provisions of this chapter. Examples include grading permits, building permits, and floodplain use permits.
“Person” means an individual, firm, partnership, association or corporation, or agent of the aforementioned
groups, or the State of Arizona or its agencies or political subdivisions.
“Program” means the National Flood Insurance Program authorized by 42 U.S.C. 4001 through 4128, or as
authorized by subsequent Federal statutes.
“Reach” is a hydraulic engineering term to describe longitudinal segments of a stream or watercourse. A reach
will generally include the segment of the flood hazard area where flood heights are primarily controlled by
manmade or natural obstructions or constrictions. In an urban area, an example of a reach would be the
segment of a stream or watercourse between two (2) consecutive bridge crossings.
“Recreational vehicle” means a vehicle that is:
1. Built on a single chassis;
2. Four hundred (400) square feet or less in area, when measured at the largest horizontal projection;
3. Designed to be self-propelled or permanently towable by a light duty truck; and
4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
“Regulatory flood elevation” means an elevation that is one (1) foot above the calculated water surface
elevation of the base flood, as established by the State of Arizona for floodplain management purposes.
“Regulatory floodplain or flood-prone area” means that portion of the geologic floodplain associated with a
watercourse, including its channel, or any other floodplain or flood-prone area that would be inundated by the
base flood, including all base floods where the base flood peak discharge is one hundred (100) cubic feet per
second or greater, those areas that are subject to sheet flooding except when the maximum potential
contributing watershed area is less than twenty (20) acres, those areas identified on subdivision plats or
development plans, those areas designated by FEMA, including areas designated as shaded Zone X as well as
those areas that the Floodplain Administrator, using the best available data, has determined is subject to a flood
hazard during the base flood.
“Regulatory floodway” means the channel of a watercourse and the adjacent land areas that must be reserved
in order to discharge the base flood without cumulatively increasing the water surface elevation more than a
designated amount.
Commented [KK26]: Higher standard, additional
definition, no action needed
Commented [KK25]: Suggest rewording, varies from ARS.
Commented [KK24]: Additional definition, no action
needed
Commented [KK23]: Additional definition, no action
needed
Commented [KK22]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 10 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Remedy a violation” means to bring the structure or other development into compliance with State or local
floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance.
Ways that impacts may be reduced include protecting the structure or other affected development from flood
damages, implementing the enforcement provisions of this chapter, otherwise deterring future similar
violations, or reducing Federal financial exposure with regard to the structure or other development.
“Repetitive loss structure” means a structure, covered by a contract for flood insurance issued pursuant to the
National Flood Insurance Act, that has incurred flood-related damage on two (2) occasions during any ten (10)
year period ending on the date of the event for which a second claim is made, and for which the cost of
repairing the flood damage, on average, equaled or exceeded twenty-five percent (25%) of the market value of
the structure at the time of each such flood event. In addition to the current claim, the NFIP must have paid the
previous qualifying claim.
“Retention system” means a type of flood control system that stops the downstream progress of floodwater by
employing methods of total containment which generally involve creation of storage areas that incorporate
infiltration devices, such as dry wells, to dispose of stored waters, principally by percolation over some
specified period of time, thereby eliminating basin contributions to downstream flood peaks or flood volumes.
“Riverine” means relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.
Sheet Flow Area. See “area of shallow flooding.”
“Special flood hazard area (SFHA)” means an area in the regulatory floodplain subject to a one percent (1%)
or greater chance of flooding in any given year. SFHAs are shown on a Flood Insurance Rate Map as Zone A,
AO, AE, AH or A0.
“Start of construction” includes substantial improvement or other proposed new development, and means the
date the building permit was issued, provided the actual start of construction, repair, reconstruction,
rehabilitation, addition, placement, or other improvement was within the time period when the permit was
active. The “actual start” means either the first placement of permanent construction of a structure on a site,
such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work
beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent
construction does not include land preparation such as the installation of streets and/or walkways, the
installation on the property of accessory structures, such as garages or sheds not occupied as dwelling units or
not part of the main structure. For a substantial improvement, the “actual start of construction” means the first
alteration of any wall, ceiling, floor or other structural part of a structure, whether or not that alteration affects
the external dimensions of the structure.
“Structure” means a walled and roofed building, including gas or liquid storage tanks, principally above
ground and affixed to a permanent site. This term also refers to a manufactured home on a permanent
foundation.
Commented [KK29]: Additional definition, no action
needed
Commented [KK28]: Additional definition, no action
needed
Commented [KK27]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 11 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Substantial damage” means damage of any origin sustained by a structure whereby the cost of restoring the
structure to its before-damaged condition would equal or exceed fifty percent (50%) of the market value of the
structure before the damage occurred.
“Substantial improvement” means any reconstruction, rehabilitation, addition, or other improvement to a
structure, the total cost of which equals or exceeds fifty percent (50%) of the market value of the structure
before the “start of construction” of the improvement. This term includes structures which have incurred
“substantial damage,” regardless of the actual repair work performed. The term does not, however, include
either:
1. Any project for improvement of a structure to correct existing violations of State or local health,
sanitary, or safety code specifications which have been identified by the local Code Enforcement Official
and which are the minimum necessary to assure safe living conditions; or
2. Any alteration of a “historic structure”; provided, that the alteration will not preclude the structure’s
continued designation as a “historic structure.”
“Variance” means a grant of relief from the requirements of this chapter that is granted by the Floodplain
Administrator or the Floodplain Board (for FEMA floodplains) upon a finding that strict enforcement of the
provisions would cause undue hardship owing to circumstances unique to the individual property for which the
variance is granted, and not caused by the applicant for said variance.
“Violation” means the failure of a structure or other development to be fully compliant with the Town of Oro
Valley floodplain management regulations. A structure or other development without the elevation certificate,
other certifications, or other evidence of compliance required by this chapter is presumed to be in violation
until such time as such documentation is provided. “Violation” also means unauthorized construction, grading,
encroachment, diversion, or lack of maintenance of private drainage structures.
“Water surface elevation” means the height, in relation to the National Geodetic Vertical Datum (NGVD) of
1929 or the North American Vertical Datum (NAVD) of 1988 (or other datum, where specified), of floods of
various magnitudes and frequencies in the floodplains of riverine and sheetflow areas.
“Watercourse” means a lake, river, creek, stream, wash, arroyo, channel, or other topographic feature on or
over which waters flow at least periodically. “Watercourse” includes specifically designated areas in which
substantial flood damage may occur, including regulatory floodplains as designated by FEMA or the Town of
Oro Valley.
“Zone A (unnumbered)” is a special flood hazard area identified by FEMA that is subject to inundation from a
one hundred (100) year flood event. Because detailed hydraulic analyses have not been performed, no base
flood elevation or depths are shown. Mandatory flood insurance requirements apply.
“Zone AE” is a special flood hazard areas subject to inundation by the one hundred (100) year flood
determined by a Flood Insurance Study (FIS). Base flood elevations are shown within these zones and
mandatory flood insurance requirements apply.
Commented [KK30]: Additional definition, no action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 12 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
“Zone AH” is a special flood hazard area subject to inundation by one hundred (100) year shallow flooding
(usually areas of ponding) with average depths between one (1) and three (3) feet. Base flood elevations
derived from detailed hydraulic analyses are shown in this zone. Mandatory flood insurance requirements
apply.
“Zone AO” is a special flood hazard area subject to inundation by one hundred (100) year shallow flooding,
usually resulting from sheet flow on sloping terrain, with average depths between one (1) and three (3) feet.
Average flood depths derived from detailed hydraulic analyses are shown within this zone. Mandatory flood
insurance requirements apply.
“Zone X shaded” (or “shaded Zone X”) is an area determined by a Flood Insurance Study as having moderate
or minimal hazard from flooding. There are four classifications depending on location: (1) area of one hundred
(100) year flood with average depths of less than one (1) foot; (2) area with drainage areas less than one (1)
square mile; (3) area protected by an accredited levee from one hundred (100) year flood; and (4) area of five
hundred (500) year flood. Buildings or other improvements in this zone could be flooded by severe,
concentrated rainfall, in the absence of adequate drainage systems. Flood insurance is available in participating
communities, but it is not required. In the Town of Oro Valley only the third classification applies (i.e.,
protected by levees). ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-3
GENERAL PROVISIONS
Sections:
17-3-1 Lands to Which This Chapter Applies
17-3-2 Basis for Establishing the Regulatory Floodplain Areas
17-3-3 Compliance
17-3-4 Abrogation and Greater Restrictions
17-3-5 Interpretation
17-3-6 Statutory Exceptions
17-3-7 Floodplain Violations
17-3-8 Abatement of Violations
17-3-9 Unlawful Acts
17-3-10 Remedies
17-3-11 Severability
17-3-12 Warning and Disclaimer of Liability
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 13 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-3-1 Lands to Which This Chapter Applies.
This chapter shall apply to all regulatory floodplain areas within the corporate limits of the Town of Oro
Valley, including special flood hazard areas, floodplains shown on recorded subdivision plat maps, as well as
those areas identified by the Floodplain Administrator, using the best available data. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-2 Basis for Establishing the Regulatory Floodplain Areas.
The special flood hazard areas identified by the Federal Emergency Management Agency (FEMA) in a
scientific and engineering report entitled “The Flood Insurance Study (FIS) for Pima County, Arizona and
Incorporated Areas,” revised September 28, 2012, with accompanying Flood Insurance Rate Maps (FIRMs)
dated June 16, 2011, and all subsequent amendments and/or revisions, are hereby adopted by reference and
declared to be a part of this chapter. This Flood Insurance Study (FIS) and attendant mapping are the minimum
area of applicability of this chapter and may be supplemented by studies for other areas which allow
implementation of this chapter and which are recommended to the Floodplain Board by the Floodplain
Administrator. The Floodplain Board, within the incorporated limits of the Town of Oro Valley, shall require
developers of land to delineate, within areas where development is ongoing or imminent, floodplains
consistent with the criteria developed by FEMA, the Arizona Director of Water Resources, and the Town
Engineer, pursuant to the Town’s adopted drainage criteria manual. The Flood Insurance StudyFIS and FIRMs
are on file at the Town of Oro Valley Public Works Department.
A. Regulatory floodplains shall be subject to requirements in Section 17-5-8 (Floodway Fringe Area
Requirements).
B. Elevation and Boundary Refinements.
1. The determination of elevations (water surface, lowest finished floor, and adjacent land) and
regulatory floodway and regulatory floodplain boundaries is an engineering function with calculations
and decisions made in accordance with the concepts and policies set forth in this chapter. The best
technical data available shall be used for such calculations and decisions. Initial determinations shall be
based on floodplain information reports of the Pima County Flood Control District, U.S. Corps of
Engineers, U.S. Bureau of Reclamation, U.S. Geological Survey, and/or other general data that are
pertinent for the conditions of the streams or the watercourses at the time the data are obtained.
2. Additional and more detailed technical analysis will, from time to time, become available through
private or governmental studies and activities. This data will permit refinements in the elevations and
boundaries of the regulatory floodway and regulatory floodplains in the respective reaches of the streams
or watercourses.
Commented [KK31]: Higher standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 14 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
3. Whenever such additional data become available and it seems desirable to make refinements, i.e.,
letter of map amendments (LOMAs) or letter of map revisions (LOMRs), such refinements or revisions
may be made at the request of the property owners or developers or by the Town Engineer. The necessary
engineering calculations shall be made for the property owner or developer by an Arizona registered
professional engineer (at the owner’s/developer’s expense) in conformance with requirements of this
chapter, the FEMA, and the Arizona Department of Water Resources (ADWR). These findings will need
approval of the Town Engineer. Following the Town’s approval of these refinements to regulatory
floodplain areas identified on FIRMs, the property owner shall have calculations and forms forwarded to
FEMA for review and approval.
4. The Town Engineer or their duly designated representative shall have the authority and responsibility
to revise and refine elevations and boundaries of regulatory floodways and regulatory floodplains
whenever such revisions and refinements are for the purpose and in accordance with the conditions set
forth in Sections 17-4-3(B)(1)(d), 17-5-8(B)(3), (4), and (5).
a. The Flood Insurance Rate Map for Pima County and incorporated areas shall be revised to show
the refined area boundaries and/or elevations.
b. The Town Engineer shall notify the owner of each property for which area boundaries and/or
elevations have been revised or refined, as well as those owners of adjoining property immediately
upstream and downstream, by first class mail following a duly noticed public hearing on the property
involved.
c. An appeal to the Floodplain Board may be taken by any person aggrieved, in accordance with
Article 17-6. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-3 Compliance.
All development of land, construction of residential, commercial, or industrial structures, or future
development within regulatory floodplain areas is subject to the terms of this chapter and any other applicable
regulations. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-4 Abrogation and Greater Restrictions.
The provisions of this chapter are not intended to interfere with, abrogate, or annul any ordinance, rule,
regulations, or permit previously adopted or issued, and not be in conflict with any provision of this chapter or
any regulation that shall be adopted or issued pursuant to law relating to the use of structure or ordinance not in
conflict with this chapter; nor is it intended by this chapter to interfere with or abrogate or annul any easement,
Commented [KK33]: In addition to State model, no
action needed
Commented [KK32]: Recommend adding acronym ADWR
here
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 15 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
covenant, or other agreement between parties, except when this chapter imposes a greater restriction, this
chapter shall control. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-5 Interpretation.
In the interpretation and application of this chapter, all provisions shall be:
A. Considered as minimum requirements;
B. Liberally constructed in favor of the governing body; and
C. Deemed neither to limit nor repeal any other powers granted under State statutes. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-6 Statutory Exceptions.
A. In accordance with ARS § 48-3609(I), unless expressly provided this and any regulations adopted
pursuant to this article do not affect:
1. Existing legal uses of property or the right to continuation of such legal use. However, if a
nonconforming use of land or a structure is discontinued for twelve (12) months or destroyed to the extent
of fifty percent (50%) or more of its market value, as determined by a competent appraiser, or the
valuation made by the Pima County Assessor’s Office, any further use shall comply with this article and
regulations of the Town of Oro Valley.
2. Reasonable repair or alteration of property for the purposes for which the property was legally used on
August 3, 1984, or any regulations affecting such property takes effect, except that any alteration,
addition, or repair to a nonconforming structure which would result in increasing its flood damage
potential by fifty percent (50%) or more shall be either flood-proofed or elevated to or above the
regulatory flood elevation.
3. Reasonable repair of structures constructed with the written authorization required by ARS § 48-3613.
4. Facilities constructed or installed pursuant to a certificate of environmental compatibility issued
pursuant to ARS Title 40, Chapter 2, Article 6.2.
B. Before the following types of construction authorized by ARS § 48-3613(B) may begin, the responsible
person must submit grading plans and a grading permit application for review and comment. Written
authorization is not required for, nor shall the floodplain board prohibit, the following pursuant to ARS
§ 48-3613(C):
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 16 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
1. The construction of bridges, culverts, dikes, and other structures necessary for the construction of
public highways, roads, and streets intersecting or crossing a watercourse.
2. The construction of storage dams for watering livestock or wildlife, structures on banks of a
watercourse to prevent erosion of, or damage to, adjoining land, if the structure will not divert, retard or
obstruct the natural channel of the watercourse, or dams for the conservation of floodwaters as permitted
by ARS Title 45, Chapter 6.
3. The construction of tailing dams and waste disposal areas for use in connection with mining and
metallurgical operations. This subsection does not exempt those sand and gravel operations that will
divert, retard or obstruct the flow of waters in any watercourse from complying with, and acquiring
authorization from, the Town Engineer or the Floodplain Board pursuant to regulations adopted by the
Floodplain Board under this article.
4. Other construction, if it is determined by the Town Engineer that a floodplain use permit is
unnecessary.
5. Any flood control district, county, city, town, or other political subdivision from exercising powers
granted to it under ARS Title 48, Chapter 21, Article 1.
6. The construction, by a public agency or political subdivision, of streams, waterways, lakes, and other
auxiliary facilities in conjunction with development of public parks and recreation facilities.
7. The construction and erection of poles, towers, foundations, support structures, guy wires, and other
facilities related to power transmission as constructed by any utility, whether a public service corporation
or a political subdivision.
C. In accordance with ARS § 48-3613(D), in addition to other penalties or remedies otherwise provided by
law, the State of Arizona, a political subdivision thereof, or a person who may be damaged or has been
damaged as a result of the unauthorized diversion, retardation, or obstruction of a watercourse has the right to
go through an administrator/board to commence, maintain, and prosecute any appropriate action or pursue any
remedy to enjoin, abate, or otherwise prevent any person from violating or continuing to violate this section or
regulations adopted pursuant to ARS Title 48, Chapter 21, Article 1. If a person is found to be in violation of
this section, the administrator/board shall require the violator either to comply with this section, if authorized
by the Floodplain Board for FEMA regulated floodplains (the Town Engineer for non-FEMA regulated
floodplains), or to remove the obstruction and restore the watercourse to its original state. The court may also
award such monetary damages as are appropriate to the injured parties resulting from the violation, including
reasonable costs and attorney fees. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 17 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-3-7 Floodplain Violations.
A. Declaration of Public Nuisance. All development located or maintained within any regulatory floodplain
area after August 8, 1973, in violation of this chapter, and without written authorization from the Floodplain
Board for FEMA regulated floodplains (the Town Engineer for non-FEMA regulated floodplains), is a public
nuisance per se, and may be abated, prevented or restrained by action of the Floodplain Board. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-8 Abatement of Violations.
Upon discovery of a violation to this chapter, the Floodplain Administrator shall either:
A. Take any necessary action to effect the abatement of such violation; or
B. Order the owner of the property upon which the violation exists to provide whatever additional
information may be required for determination by the Floodplain Administrator. Such information must be
provided to the Floodplain Administrator within thirty (30) days of such order. Within thirty (30) days, the
Floodplain Administrator shall either order the abatement of said violation or shall grant a variance in
accordance with the provisions of Section 17-6-4; or
C. For FEMA regulated floodplains (SFHAs), submit to the Federal Emergency Management Agency a
declaration for denial of insurance, stating that the property is in violation of a cited State or local law,
regulation or ordinance, pursuant to Section 1316 of the National Flood Insurance Act of 1968, and as
amended. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-9 Unlawful Acts.
A. It is unlawful for a person to engage in any development or to divert, retard, or obstruct the flow of waters
in a watercourse if it creates a hazard to life or property without securing the written authorization required by
ARS § 48-3613. Where the watercourse is a delineated floodplain, it is unlawful to engage in any development
affecting the flow of waters without securing written authorization required by ARS § 48-3613.
B. When drainage improvements are associated with an approved development plan, subdivision plat or
approved engineering report, and are constructed to provide flood protection to remove or reduce flood
hazards, including those identified by FEMA or for stormwater quality control, and where those improvements
are privately owned, then it shall be the responsibility of the property owner(s) to perform maintenance as
necessary to ensure the integrity of said drainage improvements and maintenance of the flood carrying capacity
to the designed discharge. For purposes of this chapter, a private drainage improvement is considered a
Commented [KK34]: Recommend removal of A. since
there is no B.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 18 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
structure. It is unlawful for any person or entity to neglect maintenance responsibilities on private drainage
improvements.
C. Any person violating the provisions of this section shall be subject to appeal and variance procedures
pursuant to Article 17-6, and penalties pursuant to Article 1-8, Penalties.
D. The Town may issue a written notice to correct to any person who has violated or is in violation of this
section.
E. Failure to comply with actions described in and required by the notice to correct may result in a notice of
violation and/or stop work order. The written notice shall state the nature of the violation, the corrective action
required, the time frame for the corrective action, and penalties for continued noncompliance. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-10 Remedies.
All remedies provided for herein shall be cumulative and not exclusive. The conviction and punishment of any
person hereunder shall not relieve such person from the responsibility to correct prohibited conditions or to
remove prohibited structures, obstructions, or improvements; nor prevent the enforcement, correction, or
removal thereof. In addition to the other penalties or remedies provided in this article, the State of Arizona, any
political subdivision thereof, or any person who may be damaged as a result of the diversion, retardation, or
obstruction of a watercourse shall have the right to commence, maintain, and prosecute any appropriate action
or pursue any remedy to enjoin, abate, or otherwise prevent any person from violating or continuing to violate
any provision of this chapter. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-11 Severability.
This chapter, and its various parts thereof, is hereby declared to be severable. Should any section of this
chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect the validity of
the chapter as a whole, or any portion thereof, other than the section so declared to be unconstitutional or
invalid. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-12 Warning and Disclaimer of Liability.
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes, and is
based on scientific and engineering considerations. Larger floods can and will occur on rare occasions. Flood
heights may be increased by manmade or natural causes. This chapter does not imply that land outside the
Commented [KK35]: Higher Standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 19 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
regulatory floodplain areas or uses permitted within such areas will be free from flooding or flood damages.
This chapter shall not create liability on the part of the Town of Oro Valley, any officer or employee thereof,
the State of Arizona, or the Federal Emergency Management Agency, for any flood damages that result from
reliance on this chapter or any administrative decision lawfully made hereunder. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
Article 17-4
ADMINISTRATION
Sections:
17-4-1 Establishment of Floodplain Use Permits
17-4-2 Enforcement and Inspection
17-4-3 Duties of Floodplain Administrator and Use Permit Procedures
17-4-4 Designation of the Floodplain Administrator
17-4-1 Establishment of Floodplain Use Permits.
A. Responsibility for Permits. It shall be the duty of the Town Engineer acting as the Floodplain
Administrator, and all departments, officials, and public employees vested with the duty or authority to issue
permits or licenses, to enforce the provisions of this chapter; and no such license or permit shall be issued for
uses or buildings where the same would be in conflict with the provisions of this chapter. Any such license or
permit, if issued in conflict with the provisions of this chapter, shall be null and void.
B. Floodplain Use Permits. It shall be unlawful to erect, construct, reconstruct, alter, or change the use of any
structure within any regulatory floodplain area covered by this chapter without first applying for and obtaining
a floodplain use permit from the Town Engineer.
C. Application for Floodplain Use Permit. Application for a floodplain use permit shall be made on forms
furnished by the Town Engineer, and must include, without limitation, plans in duplicate drawn to scale
showing the nature, location, dimensions, and elevation of the areas in question; existing or proposed
structures including walls, bank protection, fill, storage of materials, drainage facilities; and the location of the
foregoing. Specifically, the following information is required:
1. Proposed elevation, in relation to mean sea level, of the lowest floor of all structures. In a designated
Zone AO, elevation of existing highest adjacent natural grade and proposed elevation of lowest floor of
all structures must be obtained;
Commented [KK37]: Suggest adding '(including
basement)'
Commented [KK36]: Higher Permit Standards, No action
needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 20 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
2. Proposed elevation, in relation to mean sea level, to which any nonresidential structure will be
flood-proofed;
3. Certification by an Arizona registered professional engineer or an Arizona registered professional
architect that the flood-proofing methods for any nonresidential structure meet the flood-proofing criteria
in Section 17-5-1(C);
4. Base flood elevation data shall be provided for subdivisions or other developments greater than fifty
(50) lots or five (5) acres, whichever is the lesser; and
5. Description of the extent to which any watercourse will be altered or relocated as a result of proposed
development. Each such application shall be accompanied by an application fee, as set forth by the Town,
payable to the Town of Oro Valley. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-4-2 Enforcement and Inspection.
A. Enforcement. It shall be the duty of the Floodplain Administrator and officials of the Town otherwise
charged with the enforcement of the law, to enforce this chapter and all of the provisions of the same.
B. Inspections. Inspections shall be made by officials of the Town duly appointed by the Town Engineer or
by a duly appointed Floodplain Administrator.
C. Cooperation. The Town Floodplain Administrator may request, and shall receive so far as may be
necessary in the discharge of their duties, the assistance and cooperation of all departments, agencies, officials,
and public employees vested with the duty or authority to issue permits, licenses, or to enforce the regulations
of this chapter.
D. Town of Oro Valley Administration. Hydrologic, hydraulic, and related floodplain regulations, as well as
engineering matters pertaining to the administration and direction of this chapter, shall be referred to the Town
of Oro Valley Town Engineer or their designated representative, who shall be responsible for such reviews,
advice, and recommendations.
E. Cooperation Agreements and Consultants. The Floodplain Administrator, through the applicable
procurement and/or intergovernmental agreement procedures, may retain consultants and experts; and may
enter into cooperative agreements for the delineation of floodplains and floodways as well as for such other
assistance and guidance considered appropriate and necessary to obtain maximum reasonable protection and
benefits under this chapter. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Commented [KK38]: In addition to State model, no
action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 21 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-4-3 Duties of Floodplain Administrator and Use Permit Procedures.
A. The Floodplain Administrator shall issue floodplain use permits required by this section.
B. The following procedure shall be used by the Floodplain Administrator in considering issuance of
floodplain use permits:
1. Upon receiving an application for a floodplain use permit involving the use of fill, construction of
structures, or the storage of materials, and prior to rendering a decision thereon the Floodplain
Administrator may:
a. Require the applicant to submit, where applicable, plans in triplicate drawn to scale showing the
nature, location, dimensions, and elevations of the lot; existing or proposed structures, fill, storage of
materials, flood-proofing measures; and the relationship of the above to the location of the channel,
regulatory floodway, regulatory floodplain, the regulatory floodplain with base flood elevations, the
proposed project in relation to flood heights and velocities, and the plans for flood protection. The
applicant shall provide a new delineation of all regulatory floodplains affected by the project. The
new delineation and reports shall be prepared in conformance with FEMA requirements and this
chapter. The delineation shall show pre- and post-project floodplain limits and water surface
elevations upstream, adjacent, and downstream of the project.
b. Require, where circumstances necessitate more detailed information, the applicant to furnish as
much of the following additional information as is deemed necessary by the Floodplain
Administrator for the evaluation of the effects of the proposed use upon flood flows and the
consideration of other factors necessary to render a decision on suitability of the proposed use:
i. A typical valley cross-section showing the floodway, floodway fringe area, and the
floodplain of the watercourse; elevation of land areas adjoining each side of the channel;
cross-sectional areas to be occupied by the proposed development; and high water information;
ii. A plan (surface view) showing elevations or contours of the ground; pertinent structure, fill
or storage elevations; size, location, and spatial arrangement of all proposed and existing
structures on the site; location and elevations of streets, water supply, sanitary facilities;
photographs showing existing land uses and vegetation upstream and downstream, and soil
types, as well as other pertinent information;
iii. A profile showing the slope of the bottom of the channel or flow line of the watercourse;
iv. Specifications for building construction and materials, flood-proofing, filling, dredging,
grading, channel improvement, storage of materials, water supply, and sanitary facilities.
c. Ensure that the proposed development does not adversely affect the carrying capacity of channels
at locations where base flood elevations have been determined but a floodway has not been
designated.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 22 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
d. For FEMA regulated floodplains (SFHAs), require the applicant to submit appropriate (e.g.,
CLOMR, CLOMR-F, LOMR, etc.) applications, forms, and information to FEMA for review and
approval. A floodplain use permit shall not be issued by the Town of Oro Valley until after receiving
acknowledgement from FEMA of the acceptance of the CLOMR. Additionally, final building permit
inspections shall not be made, nor shall certificates of occupancy be given, until after receiving
acknowledgement from FEMA that the LOMR has become effective.
e. Ensure other related State of Arizona and Federal permits have been issued.
2. No permit shall be issued for any development that is not in conformance with this chapter, FEMA
regulations, or some other provision of law relating to such development. A floodplain use permit may be
denied if the proposed development constitutes a danger or hazard to life or property.
C. The Floodplain Administrator shall be responsible for the following duties:
1. Obtain and maintain for public inspection and make available the following:
a. Certification of the regulatory flood elevation required in Sections 17-5-1(C)(1), 17-5-1(C)(2),
and 17-5-5;
b. The Zone AO certification required in Section 17-5-1(C)(2);
c. The flood-proofing certification required in Section 17-5-1(C)(3);
d. The certified opening elevation required in Section 17-5-1(C)(4);
e. Review all development permits for improvements and/or damages to existing structures to
determine if the application of the substantial improvement rules apply, including establishing a
definition of market value determination and verifying that the estimated improvement and/or repair
costs are less than fifty percent (50%) of the market value of the structure;
f. Certification of elevation for subdivisions required by Section 17-5-4(E);
g. Certification for floodway encroachments required by Section 17-5-7(A);
h. Records of all variance actions, including justification for their issuance required by Section
17-6-3(C).
2. Notification of other entities:
a. Notify adjacent communities and ADWR prior to such alteration or relocation of a watercourse,
and submit evidence of such notification to FEMA through appropriate notification means; and
b. Require that the flood carrying capacity of the altered or relocated portion of said watercourse be
maintained.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 23 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
3. Within one hundred twenty (120) days after completion of construction of any flood control protective
works which change the rate of flow during the flood or the configuration of the floodplain upstream or
downstream from or adjacent to the project, the person or agency responsible for installation of the project
shall provide to the governing bodies of all jurisdictions affected by the project a new delineation of all
floodplains affected by the project. The new delineation shall be done according to the criteria adopted by
the ADWR.
4. Advise the Pima County Regional Flood Control District and any adjunct jurisdiction having
responsibility for floodplain management in writing and provide a copy of a development plan of all
applications for floodplain use permits or variances to develop land in a floodplain or floodway within
one (1) mile of the corporate limits of the Town of Oro Valley, Arizona. Also, advise the Pima County
Regional Flood Control District in writing and provide a copy of any development plan of any major
development proposed within a floodplain or floodway, which could affect floodplains, floodways or
watercourses within the district’s area of jurisdiction. Written notice and a copy of the plan of
development shall be sent to the district no later than three (3) working days after having been received by
Town of Oro Valley.
5. Notify FEMA of acquisition by means of annexation, incorporation or otherwise, of additional areas
of jurisdiction.
6. A community’s base flood elevations may increase or decrease resulting from physical changes
affecting flooding conditions. As soon as practicable, but not later than six (6) months after the date such
information becomes available, a community shall notify FEMA of the changes by submitting technical
or scientific data in accordance with 44 CFR 65.3. Such a submission is necessary so that upon
confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain
management requirements will be based upon current data.
7. Use of Other Base Flood Data. When base flood elevation data has not been provided in accordance
with Section 17-3-2 (Basis for Establishing the Regulatory Floodplain Areas), the Floodplain
Administrator shall obtain, review and reasonably utilize any base flood elevation data available from a
Federal, State, or other source, in order to administer Section 17-5-1 (Standards of Construction). Any
such information shall be consistent with the requirements of the Federal Emergency Management
Agency and the Director of the Arizona Department of Water Resources and may be submitted to the
Floodplain Board for adoption.
8. Make map interpretations, where needed, as to the exact location of the boundaries of the special
flood hazard areas (e.g., where there appears to be a conflict between a mapped boundary and actual field
conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to
appeal the interpretation as provided in Article 17-6 (Appeal and Variance Procedures).
9. Take remedial actions on violations of this chapter as required in Section 17-3-8 (Abatement of
Violations). ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Commented [KK39]: In addition to State model, no
action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 24 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-4-4 Designation of the Floodplain Administrator.
The Town Engineer or their designee is hereby appointed to administer, implement, and enforce this chapter
and guidelines set forth in this article by processing floodplain use permits in accordance with its provisions.
((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-5
PROVISIONS FOR FLOOD HAZARD REDUCTION
Sections:
17-5-1 Standards of Construction
17-5-2 Standards for Storage of Materials and Equipment
17-5-3 Standards for Water Supply and Waste Disposal Systems
17-5-4 Standards and Submittal Requirements for Subdivisions
17-5-5 Standards for Manufactured Homes
17-5-6 Standards for Recreational Vehicles
17-5-7 Floodways
17-5-8 Floodway Fringe Area Requirements
17-5-9 Flood-Related Erosion-Prone Area
17-5-1 Standards of Construction.
In all regulatory floodplain areas, the following standards are required:
A. Anchoring.
1. All new construction and substantial improvements shall be anchored to prevent flotation, collapse, or
lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the
effects of buoyancy.
2. All manufactured homes shall meet the anchoring standards of Section 17-5-5(B).
B. Construction Materials and Methods.
1. All new construction and substantial improvements shall be constructed with materials and utility
equipment resistant to flood damage.
2. All new construction and substantial improvements shall be constructed using methods and practices
that minimize flood damage.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 25 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
3. All new construction, substantial improvements, and other proposed new development shall be
constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment, as well as
other service facilities that are designed and/or located so as to prevent water from entering or
accumulating within the components during conditions of flooding.
4. Within Zone AH or AO, adequate drainage paths around structures on slopes are required to guide
floodwaters around and away from proposed structures.
C. Elevation and Flood-Proofing.
1. New construction and substantial improvement of any structure shall have the lowest floor, including
basement, elevated at or above the regulatory flood elevation. In areas without a detailed study but within
regulatory floodplain boundaries, the applicant shall have an Arizona registered professional engineer
prepare a detailed study to determine the depth of the base flood. Nonresidential structures may meet the
standards in subsection (C)(3) of this section. Upon the completion of the structure, the elevation of the
lowest floor, including basement, shall be certified by an Arizona registered professional engineer or an
Arizona registered professional land surveyor, and provided to the Floodplain Administrator and the
Town Building Official.
2. New construction and substantial improvement of any structure in Zone AO shall have the lowest
floor, including basement, higher than the highest adjacent grade at least one (1) foot higher than the
depth number on the FIRM, or at least two (2) feet if no depth number is specified. Nonresidential
structures may meet the standards in subsection (C)(3) of this section. Upon completion of the structure
an Arizona registered professional engineer or Arizona registered professional land surveyor shall certify
to the Floodplain Administrator that the elevation of the structure meets this standard.
3. Nonresidential construction and new and substantial improvement of any structure shall either be
elevated in conformance with subsections (C)(1) and (2) of this section, or together with attendant utility
and sanitary facilities:
a. Be flood-proofed so that below the regulatory flood elevation the structure is watertight with
walls substantially impermeable to the passage of water;
b. Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects
of buoyancy; and
c. Be certified by an Arizona registered professional engineer or an Arizona registered professional
architect that the standards of this subsection are satisfied. Such certifications shall be provided to
the Floodplain Administrator and the Town Building Official.
4. Require, for all new construction and substantial improvements of nonresidential structures, that have
fully enclosed areas below the regulatory flood elevation that are usable solely for parking of vehicles,
building access, or storage in an area other than a basement, and which are subject to flooding, shall be
constructed of flood resistant materials to the regulatory flood elevation, have all service facilities
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 26 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
elevated at or above the regulatory flood elevation, and be designed to automatically equalize hydrostatic
flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this
requirement must either be certified by an Arizona registered professional engineer or an Arizona
registered professional architect or meet or exceed the following minimum criteria:
a. A minimum of two (2) openings, on different sides of each enclosed area, shall be provided
having a total net area of not less than one (1) square inch for every square foot of enclosed area
subject to flooding. Smaller engineered openings may be allowed if the design is supported by a
certification report issued by ICC-ES (International Code Council Evaluation Service), or an
equivalent product certification organization.
b. The bottom of all openings shall be no higher than one (1) foot above grade.
c. Openings may be equipped with screens, louvers, valves, or other coverings or devices; provided,
that they permit the automatic entry and exit of floodwaters.
5. Manufactured homes shall meet the standards in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-5-2 Standards for Storage of Materials and Equipment.
A. The storage or processing of materials is prohibited if they are, in time of flooding: buoyant, flammable,
explosive, or could be noxious, deadly, or injurious to human, animal, or plant life.
B. Storage of other material or equipment may be allowed if they are not subject to major damage by floods,
or if they are firmly anchored to prevent flotation, or if they are readily removable from the area within the
time available after flood warning. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-3 Standards for Water Supply and Waste Disposal Systems.
A. All new or replacement water supply and sanitary sewage systems shall be designed to minimize or
eliminate infiltration of floodwaters into the system and discharge from systems into floodwaters.
B. On-site waste disposal systems shall not be installed wholly or partially in a regulatory floodway, erosion
setback, or as established by ADEQ, whichever is most restrictive.
C. On-site waste disposal systems shall be located to avoid impairment to them or contamination from them
during flooding. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Commented [KK40]: Higher standard, no action needed
Commented [KK41R40]: ADEQ acronym defined?
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 27 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-5-4 Standards and Submittal Requirements for Subdivisions.
A. All new subdivision proposals and other proposed development (including proposals for manufactured
home parks and subdivisions), greater than fifty (50) lots or five (5) acres, whichever is the lesser, shall:
1. Identify the regulatory floodplain area and the elevation of the base flood; and
2. Identify on the final plans the elevation(s) of the proposed structure(s) and pads. If the site is filled
above the base flood elevation, the final lowest floor and grade elevations shall be certified by an Arizona
registered professional engineer or Arizona registered professional land surveyor and provided to the
Floodplain Administrator.
B. All subdivision proposals shall be consistent with the need to minimize flood damage.
C. All subdivision proposals (also referred to as a final site plan) shall have all public utilities and facilities,
including but not limited to sewer, gas, electrical, and water systems, located and constructed to minimize
flood damage.
D. All subdivisions shall provide adequate drainage to reduce exposure to flood hazards (see adopted
drainage criteria manual).
E. Suitability of the Land. Land that has been found by the Floodplain Board to be unsuitable for development
with permanent structures based on hydrological and engineering studies of flooding can be platted and used
only for open space and greenbelt uses such as those identified in Section 17-5-7(B)(1). This includes land
which is:
1. Physically unsuitable because of flooding, poor drainage, and other features which may endanger
health, life, or property, aggravate erosion, increase the flood hazard, or increase the burden imposed on
the community, its governmental units, and its citizens;
2. Subject to flooding because of its proximity to the stream or watercourse; or because of low elevation.
In applying this provision, the Floodplain Board, with technical support and recommendations from the
Town Engineer, shall consider:
a. Land subject to flooding by the base flood shall not be platted for residential occupancy, or
building sites, or for any other uses that may increase the flood hazard or endanger health, life, or
property, unless each lot contains a building site that meets requirements set forth below, in
subsections (G) and (H) of this section, and within other pertinent sections of this chapter;
b. Fill shall not be used to raise land within the regulatory floodway. In other areas subject to
flooding by the base flood, fill may be used; provided, that the proposed fill does not restrict the flow
of water and increase flood heights or velocities in the regulatory floodway, according to the same
standards established in Section 17-5-8; and provided, that compensatory flood storage is provided.
F. Flood Situation to Be Shown on Plat. Plats submitted shall show the following:
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 28 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
1. Conceptual site development plans (plats) shall show the location, by survey, of watercourses,
channels, irrigation laterals, private ditches, culverts, lakes, or other water features, including direction of
flow, water level elevations, and the location and extent of areas subject to frequent inundation;
2. All preliminary subdivision proposals shall identify the special flood hazard areas, regulatory
floodplain, the elevation of the base flood, pre- and post-development water surface elevations, and pre-
and post-development floodplain limits;
3. All conceptual and final subdivision plans will provide the elevation(s) of proposed structure(s) and
pads. If the site is filled above the base flood elevation, the final lowest floor and pad elevation shall be
certified by an Arizona registered professional engineer or an Arizona registered professional land
surveyor and provided to the Floodplain Administrator and the Town Building Official;
4. Final plats shall show the limits of the regulatory floodplain and the regulatory floodway, as well as
the corresponding one hundred (100) year flood peaks, and their contributing drainage areas, entering and
exiting the development;
5. Conceptual and final site plans shall show proposed improvements for areas subject to flooding and/or
for areas which contain extremely poor drainage facilities such that the proposed improvements make the
areas safe from flooding for the respective type of occupancy.
G. Street Elevations.
1. Refer to the Town’s adopted drainage criteria manual and subdivision street standards for additional
information and requirements.
2. Fill used for the streets in areas subject to flooding shall not increase flood heights more than a
designated amount as defined in Section 17-5-8(A)(1)(b).
3. The developer shall provide pre- and post-developed water surface elevation for streets proposed for
placement in or adjacent to areas subject to flooding. Headwater ponding limits and water surface
elevations shall be shown upstream of all culvert crossings.
H. Building Site.
1. Residential lots shall contain a building site, either natural or manmade, which is not subject to
flooding by the base flood.
2. In areas subject to flooding by the base flood, where no fill is proposed, the building line shall be
located no closer to the watercourse or channel than the edge of the area subject to flooding by the base
flood. In areas where fill is used to raise the elevation of the building site, no fill shall be placed in the
regulatory floodway. Further, where fill is used, the erosion setback shall not be less than twenty-five (25)
feet from an unprotected bank, and not less than fifteen (15) feet for protected banks.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 29 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
I. Setback from Channels. Along reaches of all regulated watercourses, erosion setback requirements from
banks of washes shall be established in accordance with the Town’s adopted drainage criteria manual or
standards accepted by the Town Engineer.
J. Easements for Drainage. Whenever any watercourse is located in the area being subdivided, an easement
or common area encompassing each side of the watercourse shall be provided for the purpose of protecting
and/or maintaining the watercourse for flood and drainage purposes, and such further width for construction of
bank protection, physical access for maintenance, or for allowing for natural meander of the stream or
watercourse that may be reasonably expected, or for all these as will be adequate for the purpose, as
determined by the Town Engineer.
K. Detention/Retention Systems. See Town’s adopted drainage criteria manual for requirements pertaining to
detention/retention systems by visiting the administrative offices of the Town of Oro Valley. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-5 Standards for Manufactured Homes.
All manufactured homes that are placed within or substantially improved while located within a regulatory
floodplain shall apply for and obtain a floodplain use permit summarizing site conditions including base flood
elevation, depth of the base flood, and minimum prudent erosion setback. The application for a floodplain use
permit shall be accompanied by a site plan, prepared by an Arizona registered engineer, that conforms to the
State of Arizona Office of Manufactured Housing, “Minimum Standards for Manufactured Housing
Foundations in Floodplains,” dated October 14, 2009, or as subsequently amended. Accessory structures
attached to a manufactured home must meet the provisions of this chapter unless its uses are limited to parking
of vehicles or storage. Furthermore, manufactured homes shall:
A. Be elevated so that the lowest structural member or the lowest point of any attached appliances, whichever
is lower, is at or above the regulatory flood elevation. Pit-set installations are prohibited whenever the lowest
structural member or appliance is below the regulatory flood elevation;
B. Be securely anchored to an adequately anchored foundation system to resist flotation, collapse, or lateral
movement. This anchoring requirement is in addition to applicable State and local anchoring requirements for
resisting wind forces; and
C. Upon completion of installation of the manufactured home, certification by an Arizona registered
professional engineer or Arizona registered professional land surveyor that the elevation requirements of this
section have been satisfied shall be provided to the Floodplain Administrator for verification. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Commented [KK44]: Recommend deleting. In general,
pit-set installations are prohibited in SFHAs.
Commented [KK43]: Higher standard, no action needed
Commented [KK42]: Higher standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 30 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-5-6 Standards for Recreational Vehicles.
All recreational vehicles placed within a regulatory floodplain area will either:
A. Be on site for fewer than one hundred eighty (180) consecutive days, and be fully licensed and ready for
highway use, to the extent that they are not prohibited by any other ordinance. A recreational vehicle is ready
for highway use if it is on its wheels or jacking system, is attached to the site only by quick-disconnect type
utilities and security devices, and has no permanently attached additions; or
B. Meet the permit requirements of Article 17-4, and the elevation and anchoring requirements for
manufactured homes in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-7 Floodways.
Located within regulatory floodplain areas, established in Section 17-3-2, are areas designated as regulatory
floodways. Since the floodway is an extremely hazardous area due to the velocity of floodwaters that carry
debris, potential projectiles, and increase erosion potential, the following provisions apply:
A. Encroachments, including fill, new construction, substantial improvements, and other development are
prohibited in floodways. The Floodplain Administrator will consider encroachments where certification by an
Arizona registered professional engineer is provided demonstrating that encroachments will result in no
increase whatsoever in flood levels during the occurrence of the base flood discharge, and that the
encroachment will not pose a threat to life or property.
B. Floodway Requirements.
1. Uses Permitted. The following open space uses shall be permitted to the extent that they are not
prohibited by any other ordinance or State or Federal permit requirements, nor conflict with uses
permitted in adjoining zones, and provided they do not require structures, fill, or storage of materials or
equipment:
a. Agricultural uses, including general farming, pasture, grazing or outdoor plant nurseries,
horticulture, viticulture, truck farming, sod farming, wild crop harvesting, and restoration of native
vegetation;
b. Private and public recreational uses;
c. Accessory residential uses, including lawns, gardens, and play areas.
C. Limitations.
1. No use shall be allowed within a regulatory floodway which:
Commented [KK45]: Higher standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 31 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
a. Acting alone or in combination with existing or future uses creates a danger or hazard to life or
property;
b. Increases the water surface elevation of the base flood; or
c. Adversely affects groundwater recharge.
D. If this section is satisfied, all new construction and substantial improvements shall comply with all other
applicable flood hazard reduction provisions in this article. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
17-5-8 Floodway Fringe Area Requirements.
A. Floodway fringe areas shall be subject to the following regulations:
1. The following uses shall be permitted within a floodway fringe area to the extent that they are not
prohibited by any other ordinance, and only upon issuance of a floodplain use permit:
a. Any use permitted in Section 17-5-7, Floodways;
b. Any other use not involving structures, provided it is elevated above the regulatory base flood
elevation and a determination is made by the Town Engineer that the use will not increase the base
flood elevation more than one (1) foot where the owner of the land doing the development owns both
sides of the floodway, and not more than one-tenth (0.1) foot where only one (1) side is owned. In no
case shall the development increase the water surface elevation more than one-tenth (0.1) foot on the
property owned by others upstream and downstream, nor unduly restrict the capacity of the channels
or floodway of tributaries to the main stream or watercourse, drainage ditches, or other drainage
facilities or systems. The aforementioned water surface elevation increases apply to all watercourse
channels in Oro Valley except the Canada del Oro Wash where the elevation of the existing levee
system and bank protection will allow for no water surface elevation increases due to encroachment.
Additionally, when main channel floodflow velocities are greater than four (4) feet per second (fps),
a land use/development activity shall not increase floodflow velocities immediately downstream of
the activity by more than one (1) fps or ten percent (10%), whichever is less, in the regulatory
floodway. Any velocity increase greater than the aforementioned criteria must be reviewed and
approved by the Town Engineer;
c. Structures, including dwellings, may be erected or moved, provided the lowest floor or basement
floor is placed at or above the regulatory flood elevation. Land may be filled; provided, that the top
of such fill shall be at or above the regulatory flood elevation for the particular area, and unless
structurally protected from erosion shall extend at such elevations at least twenty-five (25) feet
beyond the limits of any structure erected or placed thereon. Where structural protection from
erosion is provided, the minimum extent to which tops of the fill pad must extend shall not be less
Commented [KK47]: Higher standard, no action required
Commented [KK46]: Higher standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 32 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
than fifteen (15) feet. The placement of structures and any accompanying fill shall not affect base
flood elevation beyond the limits set in subsection (A)(1)(b) of this section.
B. The following minimum requirements apply to all uses located within a regulatory floodplain:
1. All new construction (including prefabricated structures and mobile homes) and substantial
improvements shall be anchored to prevent flotation and lateral movement, and be constructed with flood
resistant materials and methods.
2. All proposed plats and proposals for other developments, including their utilities, streets, and drainage
structures, shall be located and designed to be consistent with the need to minimize flood damage.
3. All tentative development plans, site plans, final site plans, improvement plans, and final plats, and
other proposed new developments shall include base flood elevation data or as otherwise directed by the
Town Engineer.
4. If in a riverine situation, all adjacent communities and the State Coordinating Office must be notified
prior to any alteration or relocation of the watercourse, and copies of such notifications must be sent to the
FEMA. Within the proposed altered or relocated portion of any watercourse, the flood carrying capacity
shall be maintained.
5. Within one hundred twenty (120) days after completion of construction of any flood control protective
works which changes the rate of flow during the flood, or changes the configuration of the floodplain, the
person or agency responsible for installation of the protective works shall provide to the governing bodies
of all jurisdictions affected by the protective works a new delineation of all floodplains affected. The new
floodplain delineation shall be done according to the criteria adopted by the State of Arizona Director of
Water Resources.
C. Limitations.
1. No use shall be allowed within a floodway fringe which:
a. Acting alone or in combination with existing or future uses creates danger or hazard to life or
property;
b. Increases the water surface elevation for the base flood by more than that allowed under
subsection (A)(1)(b) of this section;
c. Adversely affects groundwater recharge.
D. Critical Facilities.
1. “Critical facility” means any of the following:
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 33 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
a. A structure or facility that produces, uses or stores highly volatile, flammable, explosive, toxic,
and/or water-reactive materials;
b. Hospitals, emergency medical facilities, nursing homes and/or housing facilities likely to have
occupants who may not be sufficiently mobile to avoid injury or death during a flood;
c. Essential emergency response facilities, such as police stations, fire stations, emergency shelters
and/or operation centers that are needed for public safety and/or flood response activities before,
during and after a flood; and
d. Public and private utility facilities, such as but not limited to power, water and wastewater
treatment, and/or communications, that are vital to maintaining or restoring normal services to
flooded areas before, during and after a flood.
2. Applicability. The critical facility requirements shall only apply along watercourses which have
FEMA designated floodplains. Where the two-tenths percent (0.2%) chance floodplain has not been
established, the Town Engineer may require that this floodplain be delineated by the applicant.
3. Critical facilities shall be located outside of the two-tenths percent (0.2%) annual chance (five
hundred (500) year) floodplain, if possible. If a critical facility must be located in a two-tenths percent
(0.2%) annual chance (five hundred (500) year) floodplain, it must be demonstrated that there is either a
critical need to locate it within the floodplain, or that there is not a suitable alternative site, as justified by
an Arizona registered professional engineer. Any critical facility located within a two-tenths percent
(0.2%) annual chance (five hundred (500) year) floodplain shall be protected from that event.
“Protection” includes, but is not limited to, elevating the lowest floor and all utilities and mechanical
services to a minimum of one (1) foot above the base flood or to the two-tenths percent (0.2%) annual
chance (five hundred (500) year) floodplain water surface elevation, whichever is greater, providing
elevated access ramps, if appropriate, adequately protecting the facility from both lateral and vertical
erosion associated with the two-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain,
providing all weather access during the base flood and developing an emergency response plan.
4. Existing critical facilities within the two-tenths percent (0.2%) annual chance (five hundred (500)
year) floodplain that propose substantial improvements and/or repairs shall be protected from the
two-tenths percent (0.2%) annual chance (five hundred (500) year) flood event. “Protection” includes, but
is not limited to, elevating or flood-proofing the lowest floor and all utilities and mechanical services to a
minimum of one (1) foot above the base flood or to the two-tenths percent (0.2%) annual chance (five
hundred (500) year) floodplain water surface elevation, whichever is greater, providing elevated access
ramps, if appropriate, adequately protecting the facility from both lateral and vertical erosion associated
with the two-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain, providing
all-weather access to the base flood and developing an emergency response plan. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 34 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-5-9 Flood-Related Erosion-Prone Area.
The protection of Town residents and their property from injury and damage that can occur as a result of
streambank lateral migration due to erosion and scour is of primary importance in the administration of this
chapter and the following criteria apply:
A. The Floodplain Administrator shall require Floodplain Use Permits for proposed construction and other
development within all flood-related erosion-prone areas, as determined by lateral migration analysis described
in the Town’s drainage criteria manual or in other predetermined, documented evidence. Areas generally most
susceptible to lateral erosion and scour include, but are not limited to, locations of historical stream/wash
meandering, locations where poorly defined or poorly consolidated banks occur, wash reaches characterized by
changes in the direction, velocity, or amount of streamflow, and locations in the proximity of stabilizing
features or structures such as rock outcrops or bridges. Alternative safe limits for erosion setbacks may be
considered if approved in writing by the Floodplain Administrator based on an acceptable engineering study
prepared and sealed by an Arizona registered professional engineer. However, at no time shall a setback be less
than twenty-five (25) feet from an unprotected bank, and not less than fifteen (15) feet for a protected bank.
B. Permit applications shall be reviewed to determine whether the proposed site alterations and improvements
will be reasonably safe from flood-related erosion, and will not cause flood-related erosion hazards or
otherwise aggravate the existing hazard.
C. If a proposed development or structure including associated permanent features such as a patio wall or
swimming pool or any other feature is found to be in the path of flood-related erosion, or would increase the
erosion hazard, such improvements shall be relocated or adequate protective measures shall be taken to avoid
aggravating the existing erosion hazard.
D. Areas within the erosion setback may be used for suitable open space purposes, such as for outdoor
recreation and wildlife habitat areas, and for other activities using temporary and portable structures only.
((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-6
APPEAL AND VARIANCE PROCEDURES
Sections:
17-6-1 Nature of Variances
17-6-2 Floodplain Board
17-6-3 Appeals and Request for Variance Considerations
17-6-4 Conditions for Variances
Commented [KK48]: Higher standard, no action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 35 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
17-6-1 Nature of Variances.
The variance criteria set forth in this article are based on the general principle of zoning law that variances
pertain to a piece of property and are not personal in nature. A variance may be granted for a parcel of property
with physical characteristics so unusual that complying with the requirements of this chapter would create an
exceptional hardship to the applicant or the surrounding property owners. The characteristics must be unique to
the property and not be shared by adjacent parcels. The unique characteristic must pertain to the land itself, not
to the structure, its inhabitants, or the property owners.
It is the duty of the Town of Oro Valley to help protect its citizens from flooding. This need is so compelling
and the implications of the cost of insuring a structure built below the regulatory flood elevation are so serious
that variances from the regulatory flood elevation shall not be granted. Variances from other requirements in
the floodplain management ordinance are quite rare. The long-term goal of preventing and reducing flood loss
and damage can only be met if variances are strictly limited. Therefore, the variance guidelines provided in this
chapter are detailed and contain multiple provisions that must be met before a variance can be properly
granted. The criteria are designed to screen out those situations in which alternatives other than a variance are
more appropriate. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-2 Floodplain Board.
A. The Floodplain Board of Oro Valley shall hear and decide requests for variances from the requirements of
this chapter to FEMA regulated floodplains, as well as hear appeals to decisions from previous determinations
or actions on non-FEMA regulated floodplains by the Floodplain Administrator or the Town Engineer.
B. The Floodplain Board shall hear and decide appeals when it is alleged there is an error in any requirement,
decision, or determination made by the Floodplain Administrator in the enforcement or administration of this
chapter with regard to FEMA regulated floodplains and floodplains identified on the Town’s Flood Insurance
Rate Maps. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-3 Appeals and Request for Variance Considerations.
A. In considering appeals and requests for variance, the Floodplain Board shall consider all technical
evaluations, all relevant factors, and all standards specified in other sections of this chapter, and also consider:
1. The danger that materials may be swept onto other lands to the injury of others;
2. The danger of life and property due to flooding or erosion damage;
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 36 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
3. The susceptibility of the proposed facility and its contents to flood damage, and the effect of such
damage on the individual owner;
4. The importance of the services provided by the proposed facility to the community;
5. The necessity to the facility of a waterfront location, where applicable;
6. The availability of alternative locations for the proposed use that are not subject to flooding or erosion
damage;
7. The compatibility of the proposed use with existing and anticipated development;
8. The relationship of the proposed use to the comprehensive plan and floodplain management program
for the area encompassing the proposed use;
9. The safety of access to the property in time of flood for ordinary and emergency vehicles;
10. The expected heights, velocity, duration, rate of rise, and sediment transport of the floodwaters
expected at the site; and
11. The costs of providing governmental services during and after flood conditions, including
maintenance and repair of public utilities and facilities such as sewer, gas, electrical, water system, and
streets and bridges.
B. Upon consideration of the factors of subsection (A) of this section and the purposes of this chapter, the
Floodplain Board may attach such conditions to the granting of appeals and variances as it deems necessary to
further the purposes of this chapter.
C. The Floodplain Administrator shall maintain a record of all variance actions, including justification for
their issuance, and shall report any such variances that are issued in FEMA regulated floodplains in its biennial
report, which is also submitted to the Federal Emergency Management Agency.
D. Any applicant to whom a variance is granted shall be given written notice over the signature of the
Floodplain Administrator, or their designee, that:
1. The issuance of a variance to construct a structure below the base flood elevation will result in
increased premium rates for flood insurance up to amounts as high as twenty-five dollars ($25.00) for one
hundred dollars ($100.00) of insurance coverage; and
2. Such construction below the regulatory flood elevation increases risks to life and property; and
3. The land upon which the variance is granted shall be ineligible for exchange of State land pursuant to
the flood relocation and land exchange program provided by ARS § 37-610. A copy of the notice shall be
recorded in the office of the Pima County Recorder and shall be recorded in a manner so that it appears in
the chain of title of the affected parcel of land. Commented [KK49]: Recommend deleting. State land
exchange program is no longer active.
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 37 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
E. A person aggrieved in any manner by an action of the Floodplain Board may within thirty (30) days appeal
to the Floodplain Board. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-4 Conditions for Variances.
A. Variances shall only be issued upon:
1. A showing of good and sufficient cause;
2. A determination that the variance is the minimum necessary, considering the flood hazard, to afford
relief;
3. A determination that failure to grant the variance would result in exceptional hardship to the applicant;
4. A showing that the use cannot perform its intended purpose unless it is located or carried out in close
proximity to water. This includes only facilities defined in Article 17-2 in the definition of “functionally
dependent use” (which is unlikely due to the Town of Oro Valley’s arid climate); and
5. A determination that the granting of a variance will not result in increased flood heights, additional
threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of
the public, or conflict with existing local laws or ordinances.
B. Variances shall not be issued within any regulatory floodway if any increase in the base flood elevation
would result.
C. Variances may be issued for the repair, rehabilitation, or restoration of structures listed in the National
Register of Historic Places or the State Inventory of Historic Places upon a determination that the proposed
repair or rehabilitation will not preclude the structure’s continued designation as a historic structure, and that
the variance is the minimum necessary in order to preserve the historic character and design of the structure.
D. The Floodplain Administrator, at his/her discretion, may grant a variance for non-FEMA regulated flood
hazard areas.
E. Generally, variances may be issued for new construction and substantial improvements to be erected on a
lot of one-half (0.5) acre or less in size contiguous to and surrounded by lots with existing structures
constructed below the regulatory flood elevation, provided the procedures of Articles 17-4 and 17-5 have been
fully considered. As the lot size increases beyond one-half (0.5) acre, the technical justification required for
issuing the variance increases. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 38 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
Article 17-7
ORDINANCE AMENDMENTS
Sections:
17-7-1 Procedures
17-7-1 Procedures.
A. The Floodplain Board may from time to time, after a public hearing required by law (ARS § 38-431.01,
and other open meeting laws), amend, supplement, or change the regulations set forth herein or subsequently
established. Any amendment, supplement, or change may be initiated by the Floodplain Board or by petition of
affected persons hereafter provided.
B. The procedures established by this article are to provide for appropriate and timely ordinance amendments,
with due consideration of the purpose of this article. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Article 17-8
FEES
Sections:
17-8-1 Fee Schedule
17-8-1 Fee Schedule.
Fees for floodplain use permits will be charged based on the fee schedule approved by the Town Council.
((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
Disclaimer: The Town Clerk’s Office has the official version of the Oro Valley Town Code. Users should
contact the Town Clerk’s Office for ordinances passed subsequent to the ordinance cited above.
Commented [KK51]: In addition to State model, no
action needed
Commented [KK50]: In addition to State model, no
action needed
Chapter 17 Floodplain and Erosion Hazard Management | Oro Valley Town Code Page 39 of 39
The Oro Valley Town Code is current through Ordinance (O)22-09, passed October 5, 2022.
Town Website: www.orovalleyaz.gov
Code Publishing Company
Created: 2023-03-06
By:
Status:
Transaction ID:
Keith Krukowski (kkrukowski@azwater.gov)
Signed
CBJCHBCAABAA_tZEmMhT7srl_m3GcJlkGqxa096zwRyl
20230119OroValleyCAV_ReportFinal
Final Audit Report 2023-03-06
"20230119OroValleyCAV_ReportFinal" History
Document created by Keith Krukowski (kkrukowski@azwater.gov)
2023-03-06 - 6:29:03 PM GMT
Document e-signed by Keith Krukowski (kkrukowski@azwater.gov)
Signature Date: 2023-03-06 - 6:30:15 PM GMT - Time Source: server
Document emailed to Brian Cosson (btcosson@azwater.gov) for signature
2023-03-06 - 6:30:17 PM GMT
Email viewed by Brian Cosson (btcosson@azwater.gov)
2023-03-06 - 6:48:19 PM GMT
Document e-signed by Brian Cosson (btcosson@azwater.gov)
Signature Date: 2023-03-06 - 6:53:53 PM GMT - Time Source: server
Agreement completed.
2023-03-06 - 6:53:53 PM GMT
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 1 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
CHAPTER 17
FLOODPLAIN AND EROSION HAZARD MANAGEMENT
Articles:
17-1 Statutory Authorization, Findings of Fact, Purpose and Methods
17-2 Definitions
17-3 General Provisions
17-4 Administration
17-5 Provisions for Flood Hazard Reduction
17-6 Appeal and Variance Procedures
17-7 Ordinance Amendments
17-8 Fees
Article 17-1
STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND
METHODS
Sections:
17-1-1 Statutory Authorization
17-1-2 Findings of Fact
17-1-3 Statement of Purpose
17-1-4 Methods of Reducing Flood Losses
17-1-1 Statutory Authorization.
The Legislature of the State of Arizona has, in ARS § 48-3610, enabled the Town of Oro Valley to
assume the powers and duties for floodplain management and adopt regulations in conformance
with ARS § 48-3609 that are designed to promote the public health, safety, and general welfare of its
citizenry. Therefore, the Town Council of Oro Valley, Arizona, does ordain as follows. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-2 Findings of Fact.
A. The regulatory floodplains of Oro Valley are subject to periodic inundation that may result in loss
of life and property, health and safety hazards, disruption of commerce and governmental services,
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 2 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all
of which adversely affect the public health, safety and general welfare.
B. These flood losses are caused by the cumulative effect of obstructions in regulatory floodplains,
which increase flood heights and velocities. Also, when these obstructions are inadequately
anchored, they may cause damage in other areas. Uses that are inadequately flood-proofed,
elevated, or otherwise protected from flood damage also contribute to the flood loss. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-3 Statement of Purpose.
It is the purpose of this chapter to promote the public health, safety, and general welfare, and to
minimize public and private losses due to flood conditions in specific areas by provisions designed:
A. To protect human life and health;
B. To minimize expenditure of public money for costly flood control projects;
C. To minimize the need for rescue and relief efforts associated with flooding and generally
undertaken at the expense of the general public;
D. To minimize prolonged business interruptions;
E. To minimize damage to public facilities and utilities such as water and gas mains, electric,
telephone, and sewer lines, and streets and bridges located in regulatory floodplains;
F. To help maintain a stable tax base by providing for the sound use and development of the
regulatory floodplain special flood hazard areas and erosion hazard areas so as to minimize blight
areas caused by flooding;
G. To ensure the state mandated required regulatory floodplain information is available to potential
buyers;
H. To regulate activities within regulatory floodplains for both public and private properties;
I. To participate in and maintain eligibility for flood insurance and disaster relief. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-4 Methods of Reducing Flood Losses.
In order to accomplish its purposes, this chapter includes methods and provisions for:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 3 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
A. Restricting or prohibiting uses which are dangerous to the public health, safety, and welfare as
well as public and private property, due to water or development hazards; or which result in
increased damages to development or increases in flood heights or velocities;
B. Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected
against flood damage at the time of start of construction;
C. Controlling the alteration of natural floodplains, stream channels, and natural protective barriers,
which help to accommodate natural flood storage potential or the channelization of floodwaters;
D. Controlling filling, grading, dredging, and other development that may increase flood damage;
and
E. Preventing or regulating the construction of flood barriers that unnaturally divert floodwaters, or
that may increase flood hazards in other areas. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Article 17-2
DEFINITIONS
Sections:
17-2-1 Definitions
17-2-1 Definitions.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted to give
them the meaning they have in common usage, and to give this chapter its most reasonable
application.
“Accessory structure” means a structure that is on the same parcel of property as a principal
structure, the use of which is incidental to the use of the principal structure. For floodplain
management purposes, the term must be used only for parking or storage, must be small, represent
a minimal investment, and have low damage potential. FEMA considers ‘small’ to mean not larger
than a one-story two-car garage. Examples include detached garages, storage sheds, tool sheds,
and small boathouses.
“Appeal” means a request for a review of the Floodplain Administrator’s interpretation of any
provision of this chapter or a request for a variance. Appeals are heard and decided by the
Floodplain Board.
“Area of shallow flooding” means a designated zone AO or AH on a community’s Flood Insurance
Rate Map (FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 4 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
of one (1) to three (3) feet where a clearly defined channel does not exist, where the path of flooding
is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding
or sheet flow.
“Base flood” means a flood having a one percent (1%) chance of being equaled or exceeded in any
given year.
“Base flood elevation (BFE)” means the computed elevation to which floodwater is anticipated to rise
during the base flood.
“Basement” means any area of a structure with a subgrade floor (i.e., below the adjacent ground
level) on all sides.
Building. See “Structure.”
“Community” means any state or area or political subdivision thereof, or any Indian tribe, authorized
tribal organization, or authorized Native organization, which has authority to adopt and enforce
floodplain management regulations for the areas within its jurisdiction.
Critical Facility. Refer to Section 17-5-8(D).
“Detention system” means a type of flood control system which delays the downstream progress of
floodwaters in a controlled manner, generally through the combined use of a temporary storage area
and a metered outlet device, which causes a lengthening of the duration of the flow and thereby
reduces downstream flood peaks.
“Development” means any manmade change to improved or unimproved real estate, including but
not limited to structures, mining, dredging, filling, grading, paving, excavation or drilling operations,
and storage of materials and equipment.
“Dwelling” means a habitable structure.
“Elevation certificate” means an administrative tool of the National Flood Insurance Program (NFIP)
that is used to provide elevation information necessary to ensure compliance with community
floodplain management ordinances, to determine the proper insurance premium rate, and to support
a request for a letter of map amendment (LOMA) or letter of map revision based on fill (LOMR-F).
“Encroachment” means the advance or infringement of uses, human-installed or human-maintained
landscape vegetation, fill, excavation, permanent structures, or development into a floodplain that
may impede or alter the flow capacity of a floodplain. An equal degree of encroachment is a
standard applied to the evaluation of the effects of the encroachment on increases in flood heights. It
assumes that an encroachment, if permitted, may confer on all property owners on both sides of the
watercourse an equal right to encroach to the same degree within that reach. Since the factors
affecting hydraulic efficiency are usually not uniform within a reach, this standard will usually not
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 5 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
result in equal measured distances between the regulatory floodway and the regulatory floodplain of
the watercourse.
“Erosion” means the process of the gradual wearing away of landmasses. This peril is not, per se,
covered under the National Flood Insurance Program.
“Erosion hazard area” means lands adjoining a watercourse that is regulated by this chapter which
are deemed by the Town Engineer to be subject to flood-related erosion, pursuant to the Town’s
adopted drainage criteria manual.
“Erosion setback” means the minimum horizontal distance between a structure or permanent feature
and the channel bank necessary to protect the structure/feature from flood-related erosion damage.
For method to be used for determination of the erosion setback, see the adopted Town of Oro Valley
drainage criteria manual.
“Existing manufactured home park or subdivision” means a manufactured home park or subdivision
for which the construction of facilities for servicing the lots on which the manufactured homes are
affixed (including, at a minimum, the installation of utilities, construction of streets, and either final
site grading or the pouring of concrete slabs) was completed before December 4, 1979, the effective
date of the Flood Insurance Rate Maps adopted by the Town of Oro Valley.
“Expansion to an existing manufactured home park or subdivision” means preparation of additional
sites by the construction of facilities for servicing the lots on which the manufactured homes are to
be affixed (including the installation of utilities, the construction of streets, and either final site grading
or the pouring of concrete pads).
“Federal Emergency Management Agency (FEMA)” means an agency of the Federal government
responsible for programs of disaster response and recovery, disaster preparedness, hazard
mitigation, flood insurance, and other programs of technical and financial assistance.
“Flood” or “flooding” means a general and temporary condition of partial or complete inundation of
normally dry land areas from: (1) the overflow of floodwaters; (2) the unusual and rapid accumulation
or runoff of surface waters from any source; and/or (3) the collapse or subsidence of land along the
shore of a lake or other body of water as a result of erosion or undermining caused by waves or
currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high
water level in a natural body of water, accompanied by a severe storm or by an unanticipated force
of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and
unforeseeable event which results in flooding as defined in this definition.
“Flood Insurance Rate Map (FIRM)” means the official map on which the Federal Emergency
Management Agency has delineated both the special flood hazard areas and the risk premium
zones applicable to the community.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 6 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Flood Insurance Study (FIS)” means the official report provided by Federal Emergency
Management Agency that includes flood profiles, the Flood Insurance Rate Map, and the water
surface elevation of the base flood.
“Flood protection system” means those physical structural works for which funds have been
authorized, appropriated, and expended; and which have been constructed specifically to modify
flooding in order to reduce the extent of the area within a community subject to designation as a
regulatory floodplain as well as the extent and depths of associated flooding. Such a system typically
includes dams, reservoirs, levees or dikes. These specialized flood-modifying works are those
constructed in conformance with sound engineering standards.
“Floodplain” or “flood-prone area” means any land area susceptible to being inundated by water from
any source (see “flood” or “flooding”).
“Floodplain Administrator” means the Town Engineer, or their designee, whose duty it is to oversee
administration and enforcement of the floodplain management regulations contained in this chapter.
“Floodplain Board” means the Town Council of Oro Valley, at such times as they are engaged in the
enforcement of this chapter.
“Floodplain management” means the operation of an integrated natural resource management
program encompassing corrective and preventive measures for reducing flood and erosion damage.
Floodplain management includes but is not limited to emergency preparedness planning, flood
control works, floodplain management regulations, and open space plans.
“Floodplain management regulations” means this chapter and other zoning ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such as grading and
erosion control), and other applications of legal and regulatory authority that control use of, and
development in, flood-prone areas. This term describes Federal, State, or local regulations, and any
combination thereof, which provide standards for preventing and reducing flood loss and damage.
“Floodplain use permit” (also “permit for development in a floodplain”) means an official document
that authorizes special activity within regulatory floodplains or erosion hazard areas of Oro Valley.
“Flood-proofed” or Dry Floodproofed means a building or structure that has been made watertight
with walls substantially impermeable to the passage of water, and structural components capable of
resisting hydrostatic and hydrodynamic loads and the effects of buoyancy, accomplished by means
other than elevation.
“Flood-proofing” means any combination of structural and nonstructural additions, changes, or
adjustments to nonresidential structures that reduces or eliminates flood damage to real estate or
improved real property, water and sanitary facilities, structures, and their contents by means other
than elevation.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 7 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Flood-related erosion” means the collapse or subsidence of land along the shore of a lake or other
body of water as a result of undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of
water, accompanied by a severe storm, or by an unanticipated force of nature, such as a flash flood
or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in
flooding.
Floodway. See “regulatory floodway.”
“Floodway fringe” means that area of the floodplain lying on either side of a regulatory floodway
where encroachment may be permitted.
“Functionally dependent use” means a use which cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities, port
facilities that are necessary for the loading and unloading of cargo or passengers, and ship building
and ship repair facilities, and does not include long-term storage or related manufacturing facilities.
“Governing body” is the local governing unit (i.e., county or municipality) empowered to adopt and
implement regulations providing for the public health, safety, and general welfare of its citizenry.
“Hardship” means that the physical characteristics of the property in question are so unusual,
exceptional, and peculiar to the property that a variance regarding its use may be requested and
granted in accordance with Section 17-6-1. Mere economic or financial hardship alone is not
exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or
the disapproval of one’s neighbors likewise cannot, as a rule, be construed to qualify as an
exceptional hardship. All of these problems can be resolved through other means without granting a
variance, even if the alternative is more expensive, requires the property owner to build elsewhere,
or means that the parcel must be put to a different use than originally intended.
“Highest adjacent grade” means the highest natural elevation of the ground surface immediately
adjacent to a structure prior to construction of the proposed walls of a structure.
“Historic structure” means any structure that is:
1. Listed individually in the National Register of Historic Places (a listing maintained by the
Department of the Interior) or preliminarily determined by the Secretary of the Interior as
meeting the requirements for individual listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic district or a district preliminarily determined by the
Secretary to qualify as a registered historic district;
3. Individually listed on the State of Arizona inventory of historic places, as approved by the
Secretary of the Interior; or
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 8 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
4. Individually listed on the Town of Oro Valley’s inventory of historic places and that has been
certified by an approved State of Arizona program, as determined by the Secretary of the
Interior.
“Landscape vegetation” means vegetation that is installed, planted, irrigated, maintained, or
otherwise placed or modified by human activity. Naturally occurring native vegetation within the
floodplain is not considered landscape vegetation.
“Levee” means a human-made structure, usually an earthen embankment designed and constructed
in accordance with sound engineering practices, for the purpose of containing, controlling, or
diverting the flow of water so as to provide protection from temporary flooding.
“Lowest floor” means the lowest floor of the lowest enclosed area including the basement (see
“basement” definition) or crawl space under a manufactured home if it is not vented. An unfinished or
flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area
other than a basement area, is not considered to be the lowest floor of a structure; provided, that
such enclosure is not built so as to render the structure in violation of the applicable non-elevation
design requirements of this chapter.
“Manufactured home” means a structure, transportable in one (1) or more sections, which is built on
a permanent chassis and is designed for use with or without a permanent foundation when attached
to the required utilities. The term “manufactured home” does not include a “recreational vehicle.”
“Manufactured home park or subdivision” means a parcel (or contiguous parcels) of land divided into
two (2) or more manufactured home lots for rent or sale.
“Market value” means the determination of the estimated cost to replace the structure in new
condition and adjusting that cost figure by the amount of depreciation that has accrued since the
structure was constructed. The cost of replacement of the structure shall be based on a square foot
cost factor determined by reference to a building cost estimating guide recognized by the building
construction industry. The amount of depreciation shall be determined by taking into account the age
and physical deterioration of the structure and functional obsolescence as approved by the
Floodplain Administrator but shall not include economic or other forms of external obsolescence.
Use of replacement costs or accrued depreciation factors different from those contained in
recognized building cost estimating guides may be considered only if such factors are included in a
report prepared by an independent professional appraiser and supported by a written explanation of
the differences. Alternatively, the market value is the valuation made by the Pima County Assessor’s
Office.
“Mean sea level” means, for purposes of the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum of 1988 (NAVD ’88), or
other datum to which base flood elevations shown on a community’s Flood Insurance Rate Map are
referenced.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 9 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“National Flood Insurance Program (NFIP)” means a program administered by FEMA that makes
Federally backed flood insurance available for purchase by individuals that live in NFIP participating
communities.
New Construction. For the purposes of determining insurance rates, structures for which the start of
construction commenced on or after the effective date of an initial Flood Insurance Rate Map or after
December 31, 1974, whichever is later, and includes any subsequent improvements to such
structures. For floodplain management purposes, “new construction” means structures for which the
start of construction commenced on or after the effective date of a floodplain management regulation
adopted by a community and includes any subsequent improvements to such structures.
“Obstruction” includes, but is not limited to, any dam, wall, embankment, levee, dike, pile, abutment,
protection, excavation, channelization, bridge, conduit, culvert, structure, wire, fence, rock, gravel,
refuse, fill, structure, vegetation, or other material in, along, across, or projecting into any
watercourse which may alter, impede, retard, or change the direction and/or velocity of the flow of
water, or which due to its location influences its propensity to snare or collect debris carried by the
flow of water, thereby reducing its likelihood of being carried downstream as well as reducing the
channel’s ability to convey flow.
“One hundred (100) year flood” means the flood having a one percent (1%) chance of being equaled
or exceeded in any given year (see “base flood”). Also referred to as the one percent (1%) annual
exceedance probability flood (one percent (1%) AEP flood).
“Permit for development in a floodplain” (also referred to as a “floodplain use permit”) is an official
document issued by the Town of Oro Valley authorizing performance of specific activity in any
regulatory floodplain or erosion hazard area after it has been determined to be reasonably safe from
flooding and erosion. These permits are required to ensure that proposed development projects
meet the requirements of the NFIP and the provisions of this chapter. Examples include grading
permits, building permits, and floodplain use permits.
“Person” means an individual, firm, partnership, association or corporation, or agent of the
aforementioned groups, or the State of Arizona or its agencies or political subdivisions.
“Program” means the National Flood Insurance Program authorized by 42 U.S.C. 4001 through
4128, or as authorized by subsequent Federal statutes.
“Reach” is a hydraulic engineering term to describe longitudinal segments of a stream or
watercourse. A reach will generally include the segment of the flood hazard area where flood heights
are primarily controlled by manmade or natural obstructions or constrictions. In an urban area, an
example of a reach would be the segment of a stream or watercourse between two (2) consecutive
bridge crossings.
“Recreational vehicle” means a vehicle that is:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 10 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Built on a single chassis;
2. Four hundred (400) square feet or less in area, when measured at the largest horizontal
projection;
3. Designed to be self-propelled or permanently towable by a light duty truck; and
4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
“Regulatory flood elevation” means the base flood elevation plus one (1) foot of freeboard as
required by this chapter.
“Regulatory floodplain or flood-prone area” means that portion of the geologic floodplain associated
with a watercourse, including its channel, or any other floodplain or flood-prone area that would be
inundated by the base flood, including all base floods where the base flood peak discharge is one
hundred (100) cubic feet per second or greater, those areas that are subject to sheet flooding except
when the maximum potential contributing watershed area is less than twenty (20) acres, those areas
identified on subdivision plats or development plans, those areas designated by FEMA, including
areas designated as shaded Zone X as well as those areas that the Floodplain Administrator, using
the best available data, has determined is subject to a flood hazard during the base flood.
“Regulatory floodway” means the channel of a watercourse and the adjacent land areas that must be
reserved in order to discharge the base flood without cumulatively increasing the water surface
elevation more than a designated amount.
“Remedy a violation” means to bring the structure or other development into compliance with State
or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its
noncompliance. Ways that impacts may be reduced include protecting the structure or other affected
development from flood damages, implementing the enforcement provisions of this chapter,
otherwise deterring future similar violations, or reducing Federal financial exposure with regard to the
structure or other development.
“Repetitive loss structure” means a structure, covered by a contract for flood insurance issued
pursuant to the National Flood Insurance Act, that has incurred flood-related damage on two (2)
occasions during any ten (10) year period ending on the date of the event for which a second claim
is made, and for which the cost of repairing the flood damage, on average, equaled or exceeded
twenty-five percent (25%) of the market value of the structure at the time of each such flood event. In
addition to the current claim, the NFIP must have paid the previous qualifying claim.
“Retention system” means a type of flood control system that stops the downstream progress of
floodwater by employing methods of total containment which generally involve creation of storage
areas that incorporate infiltration devices, such as dry wells, to dispose of stored waters, principally
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 11 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
by percolation over some specified period of time, thereby eliminating basin contributions to
downstream flood peaks or flood volumes.
“Riverine” means relating to, formed by, or resembling a river (including tributaries), stream, brook,
etc.
Sheet Flow Area. See “area of shallow flooding.”
“Special flood hazard area (SFHA)” means an area in the regulatory floodplain subject to a one
percent (1%) or greater chance of flooding in any given year. SFHAs are shown on a Flood
Insurance Rate Map as Zone A, AO, AE, AH or A0.
“Start of construction” includes substantial improvement or other proposed new development, and
means the date the building permit was issued, provided the actual start of construction, repair,
reconstruction, rehabilitation, addition, placement, or other improvement was within the time period
when the permit was active. The “actual start” means either the first placement of permanent
construction of a structure on a site, such as the pouring of slab or footings, the installation of piles,
the construction of columns, or any work beyond the stage of excavation; or the placement of a
manufactured home on a foundation. Permanent construction does not include land preparation
such as the installation of streets and/or walkways, the installation on the property of accessory
structures, such as garages or sheds not occupied as dwelling units or not part of the main structure.
For a substantial improvement, the “actual start of construction” means the first alteration of any wall,
ceiling, floor or other structural part of a structure, whether or not that alteration affects the external
dimensions of the structure.
“Storage” Contents stored in wet floodproofed structures will get wet during flooding.
“Structure” means a walled and roofed building, including gas or liquid storage tanks, principally
above ground and affixed to a permanent site. This term also refers to a manufactured home on a
permanent foundation.
“Structure Size” The footprint of a typical two-car garage is about 600 square feet in area.
“Substantial damage” means damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before-damaged condition would equal or exceed fifty percent (50%) of
the market value of the structure before the damage occurred.
“Substantial improvement” means any reconstruction, rehabilitation, addition, or other improvement
to a structure, the total cost of which equals or exceeds fifty percent (50%) of the market value of the
structure before the “start of construction” of the improvement. This term includes structures which
have incurred “substantial damage,” regardless of the actual repair work performed. The term does
not, however, include either:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 12 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Any project for improvement of a structure to correct existing violations of State or local
health, sanitary, or safety code specifications which have been identified by the local Code
Enforcement Official and which are the minimum necessary to assure safe living conditions; or
2. Any alteration of a “historic structure”; provided, that the alteration will not preclude the
structure’s continued designation as a “historic structure.”
“Variance” means a grant of relief from the requirements of this chapter that is granted by the
Floodplain Administrator or the Floodplain Board (for FEMA floodplains) upon a finding that strict
enforcement of the provisions would cause undue hardship owing to circumstances unique to the
individual property for which the variance is granted, and not caused by the applicant for said
variance.
“Violation” means the failure of a structure or other development to be fully compliant with the Town
of Oro Valley floodplain management regulations. A structure or other development without the
elevation certificate, other certifications, or other evidence of compliance required by this chapter is
presumed to be in violation until such time as such documentation is provided. “Violation” also
means unauthorized construction, grading, encroachment, diversion, or lack of maintenance of
private drainage structures.
“Water surface elevation” means the height, in relation to the National Geodetic Vertical Datum
(NGVD) of 1929 or the North American Vertical Datum (NAVD) of 1988 (or other datum, where
specified), of floods of various magnitudes and frequencies in the floodplains of riverine and sheet-
flow areas.
“Watercourse” means a lake, river, creek, stream, wash, arroyo, channel, or other topographic
feature on or over which waters flow at least periodically. “Watercourse” includes specifically
designated areas in which substantial flood damage may occur, including regulatory floodplains as
designated by FEMA or the Town of Oro Valley.
“Zone A (unnumbered)” is a special flood hazard area identified by FEMA that is subject to
inundation from a one hundred (100) year flood event. Because detailed hydraulic analyses have not
been performed, no base flood elevation or depths are shown. Mandatory flood insurance
requirements apply.
“Zone AE” is a special flood hazard areas subject to inundation by the one hundred (100) year flood
determined by a Flood Insurance Study (FIS). Base flood elevations are shown within these zones
and mandatory flood insurance requirements apply.
“Zone AH” is a special flood hazard area subject to inundation by one hundred (100) year shallow
flooding (usually areas of ponding) with average depths between one (1) and three (3) feet. Base
flood elevations derived from detailed hydraulic analyses are shown in this zone. Mandatory flood
insurance requirements apply.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 13 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Zone AO” is a special flood hazard area subject to inundation by one hundred (100) year shallow
flooding, usually resulting from sheet flow on sloping terrain, with average depths between one (1)
and three (3) feet. Average flood depths derived from detailed hydraulic analyses are shown within
this zone. Mandatory flood insurance requirements apply.
“Zone X shaded” (or “shaded Zone X”) is an area determined by a Flood Insurance Study as having
moderate or minimal hazard from flooding. There are four classifications depending on location: (1)
area of one hundred (100) year flood with average depths of less than one (1) foot; (2) area with
drainage areas less than one (1) square mile; (3) area protected by an accredited levee from one
hundred (100) year flood; and (4) area of five hundred (500) year flood. Buildings or other
improvements in this zone could be flooded by severe, concentrated rainfall, in the absence of
adequate drainage systems. Flood insurance is available in participating communities, but it is not
required. In the Town of Oro Valley only the third classification applies (i.e., protected by levees).
((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-3
GENERAL PROVISIONS
Sections:
17-3-1 Lands to Which This Chapter Applies
17-3-2 Basis for Establishing the Regulatory Floodplain Areas
17-3-3 Compliance
17-3-4 Abrogation and Greater Restrictions
17-3-5 Interpretation
17-3-6 Statutory Exceptions
17-3-7 Floodplain Violations
17-3-8 Abatement of Violations
17-3-9 Unlawful Acts
17-3-10 Remedies
17-3-11 Severability
17-3-12 Warning and Disclaimer of Liability
17-3-1 Lands to Which This Chapter Applies.
This chapter shall apply to all regulatory floodplain areas within the corporate limits of the Town of
Oro Valley, including special flood hazard areas, floodplains shown on recorded subdivision plat
maps, as well as those areas identified by the Floodplain Administrator, using the best available
data. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 14 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-3-2 Basis for Establishing the Regulatory Floodplain Areas.
The special flood hazard areas identified by the Federal Emergency Management Agency (FEMA) in
a scientific and engineering report entitled “The Flood Insurance Study (FIS) for Pima County,
Arizona and Incorporated Areas,” revised September 28, 2012, with accompanying Flood Insurance
Rate Maps (FIRMs) dated June 16, 2011, and all subsequent amendments and/or revisions, are
hereby adopted by reference and declared to be a part of this chapter. This Flood Insurance Study
(FIS) and attendant mapping are the minimum area of applicability of this chapter and may be
supplemented by studies for other areas which allow implementation of this chapter and which are
recommended to the Floodplain Board by the Floodplain Administrator. The Floodplain Board, within
the incorporated limits of the Town of Oro Valley, shall require developers of land to delineate, within
areas where development is ongoing or imminent, floodplains consistent with the criteria developed
by FEMA, the Arizona Director of Water Resources, and the Town Engineer, pursuant to the Town’s
adopted drainage criteria manual. The Flood Insurance Study FIS and FIRMs are on file at the Town
of Oro Valley Public Works Department.
A. Regulatory floodplains shall be subject to requirements in Section 17-5-8 (Floodway Fringe Area
Requirements).
B. Elevation and Boundary Refinements.
1. The determination of elevations (water surface, lowest finished floor, and adjacent land) and
regulatory floodway and regulatory floodplain boundaries is an engineering function with
calculations and decisions made in accordance with the concepts and policies set forth in this
chapter. The best technical data available shall be used for such calculations and decisions.
Initial determinations shall be based on floodplain information reports of the Pima County Flood
Control District, U.S. Corps of Engineers, U.S. Bureau of Reclamation, U.S. Geological Survey,
and/or other general data that are pertinent for the conditions of the streams or the
watercourses at the time the data are obtained.
2. Additional and more detailed technical analysis will, from time to time, become available
through private or governmental studies and activities. This data will permit refinements in the
elevations and boundaries of the regulatory floodway and regulatory floodplains in the
respective reaches of the streams or watercourses.
3. Whenever such additional data become available and it seems desirable to make
refinements, i.e., letter of map amendments (LOMAs) or letter of map revisions (LOMRs), such
refinements or revisions may be made at the request of the property owners or developers or by
the Town Engineer. The necessary engineering calculations shall be made for the property
owner or developer by an Arizona registered professional engineer (at the owner’s/developer’s
expense) in conformance with requirements of this chapter, the FEMA, and the Arizona
Department of Water Resources (ADWR). These findings will need approval of the Town
Engineer. Following the Town’s approval of these refinements to regulatory floodplain areas
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 15 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
identified on FIRMs, the property owner shall have calculations and forms forwarded to FEMA
for review and approval.
4. The Town Engineer or their duly designated representative shall have the authority and
responsibility to revise and refine elevations and boundaries of regulatory floodways and
regulatory floodplains whenever such revisions and refinements are for the purpose and in
accordance with the conditions set forth in Sections 17-4-3(B)(1)(d), 17-5-8(B)(3), (4), and (5).
a. The Flood Insurance Rate Map for Pima County and incorporated areas shall be
revised to show the refined area boundaries and/or elevations.
b. The Town Engineer shall notify the owner of each property for which area boundaries
and/or elevations have been revised or refined, as well as those owners of adjoining
property immediately upstream and downstream, by first class mail following a duly noticed
public hearing on the property involved.
c. An appeal to the Floodplain Board may be taken by any person aggrieved, in
accordance with Article 17-6. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-3 Compliance.
All development of land, construction of residential, commercial, or industrial structures, or future
development within regulatory floodplain areas is subject to the terms of this chapter and any other
applicable regulations. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-4 Abrogation and Greater Restrictions.
The provisions of this chapter are not intended to interfere with, abrogate, or annul any ordinance,
rule, regulations, or permit previously adopted or issued, and not be in conflict with any provision of
this chapter or any regulation that shall be adopted or issued pursuant to law relating to the use of
structure or ordinance not in conflict with this chapter; nor is it intended by this chapter to interfere
with or abrogate or annul any easement, covenant, or other agreement between parties, except
when this chapter imposes a greater restriction, this chapter shall control. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-5 Interpretation.
In the interpretation and application of this chapter, all provisions shall be:
A. Considered as minimum requirements;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 16 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
B. Liberally constructed in favor of the governing body; and
C. Deemed neither to limit nor repeal any other powers granted under State statutes. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-6 Statutory Exceptions.
A. In accordance with ARS § 48-3609(I), unless expressly provided this and any regulations
adopted pursuant to this article do not affect:
1. Existing legal uses of property or the right to continuation of such legal use. However, if a
nonconforming use of land or a structure is discontinued for twelve (12) months or destroyed to
the extent of fifty percent (50%) or more of its market value, as determined by a competent
appraiser, or the valuation made by the Pima County Assessor’s Office, any further use shall
comply with this article and regulations of the Town of Oro Valley.
2. Reasonable repair or alteration of property for the purposes for which the property was
legally used on August 3, 1984, or any regulations affecting such property takes effect, except
that any alteration, addition, or repair to a nonconforming structure which would result in
increasing its flood damage potential by fifty percent (50%) or more shall be either flood-proofed
or elevated to or above the regulatory flood elevation.
3. Reasonable repair of structures constructed with the written authorization required by ARS
§ 48-3613.
4. Facilities constructed or installed pursuant to a certificate of environmental compatibility
issued pursuant to ARS Title 40, Chapter 2, Article 6.2.
B. Before the following types of construction authorized by ARS § 48-3613(B) may begin, the
responsible person must submit grading plans and a grading permit application for review and
comment. Written authorization is not required for, nor shall the floodplain board prohibit, the
following pursuant to ARS § 48-3613(C):
1. The construction of bridges, culverts, dikes, and other structures necessary for the
construction of public highways, roads, and streets intersecting or crossing a watercourse.
2. The construction of storage dams for watering livestock or wildlife, structures on banks of a
watercourse to prevent erosion of, or damage to, adjoining land, if the structure will not divert,
retard or obstruct the natural channel of the watercourse, or dams for the conservation of
floodwaters as permitted by ARS Title 45, Chapter 6.
3. The construction of tailing dams and waste disposal areas for use in connection with mining
and metallurgical operations. This subsection does not exempt those sand and gravel
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 17 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
operations that will divert, retard or obstruct the flow of waters in any watercourse from
complying with, and acquiring authorization from, the Town Engineer or the Floodplain Board
pursuant to regulations adopted by the Floodplain Board under this article.
4. Other construction, if it is determined by the Town Engineer that a floodplain use permit is
unnecessary.
5. Any flood control district, county, city, town, or other political subdivision from exercising
powers granted to it under ARS Title 48, Chapter 21, Article 1.
6. The construction, by a public agency or political subdivision, of streams, waterways, lakes,
and other auxiliary facilities in conjunction with development of public parks and recreation
facilities.
7. The construction and erection of poles, towers, foundations, support structures, guy wires,
and other facilities related to power transmission as constructed by any utility, whether a public
service corporation or a political subdivision.
C. In accordance with ARS § 48-3613(D), in addition to other penalties or remedies otherwise
provided by law, the State of Arizona, a political subdivision thereof, or a person who may be
damaged or has been damaged as a result of the unauthorized diversion, retardation, or obstruction
of a watercourse has the right to go through an administrator/board to commence, maintain, and
prosecute any appropriate action or pursue any remedy to enjoin, abate, or otherwise prevent any
person from violating or continuing to violate this section or regulations adopted pursuant to ARS
Title 48, Chapter 21, Article 1. If a person is found to be in violation of this section, the
administrator/board shall require the violator either to comply with this section, if authorized by the
Floodplain Board for FEMA regulated floodplains (the Town Engineer for non-FEMA regulated
floodplains), or to remove the obstruction and restore the watercourse to its original state. The court
may also award such monetary damages as are appropriate to the injured parties resulting from the
violation, including reasonable costs and attorney fees. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017;
(O)05-35, 10/05/2005)
17-3-7 Floodplain Violations.
A. Declaration of Public Nuisance. All development located or maintained within any regulatory
floodplain area after August 8, 1973, in violation of this chapter, and without written authorization
from the Floodplain Board for FEMA regulated floodplains (the Town Engineer for non-FEMA
regulated floodplains), is a public nuisance per se, and may be abated, prevented or restrained by
action of the Floodplain Board. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 18 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-3-8 Abatement of Violations.
Upon discovery of a violation to this chapter, the Floodplain Administrator shall either:
A. Take any necessary action to effect the abatement of such violation; or
B. Order the owner of the property upon which the violation exists to provide whatever additional
information may be required for determination by the Floodplain Administrator. Such information
must be provided to the Floodplain Administrator within thirty (30) days of such order. Within thirty
(30) days, the Floodplain Administrator shall either order the abatement of said violation or shall
grant a variance in accordance with the provisions of Section 17-6-4; or
C. For FEMA regulated floodplains (SFHAs), submit to the Federal Emergency Management
Agency a declaration for denial of insurance, stating that the property is in violation of a cited State
or local law, regulation or ordinance, pursuant to Section 1316 of the National Flood Insurance Act of
1968, and as amended. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-9 Unlawful Acts.
A. It is unlawful for a person to engage in any development or to divert, retard, or obstruct the flow
of waters in a watercourse if it creates a hazard to life or property without securing the written
authorization required by ARS § 48-3613. Where the watercourse is a delineated floodplain, it is
unlawful to engage in any development affecting the flow of waters without securing written
authorization required by ARS § 48-3613.
B. When drainage improvements are associated with an approved development plan, subdivision
plat or approved engineering report, and are constructed to provide flood protection to remove or
reduce flood hazards, including those identified by FEMA or for stormwater quality control, and
where those improvements are privately owned, then it shall be the responsibility of the property
owner(s) to perform maintenance as necessary to ensure the integrity of said drainage
improvements and maintenance of the flood carrying capacity to the designed discharge. For
purposes of this chapter, a private drainage improvement is considered a structure. It is unlawful for
any person or entity to neglect maintenance responsibilities on private drainage improvements.
C. Any person violating the provisions of this section shall be subject to appeal and variance
procedures pursuant to Article 17-6, and penalties pursuant to Article 1-8, Penalties.
D. The Town may issue a written notice to correct to any person who has violated or is in violation
of this section.
E. Failure to comply with actions described in and required by the notice to correct may result in a
notice of violation and/or stop work order. The written notice shall state the nature of the violation,
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 19 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
the corrective action required, the time frame for the corrective action, and penalties for continued
noncompliance. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-10 Remedies.
All remedies provided for herein shall be cumulative and not exclusive. The conviction and
punishment of any person hereunder shall not relieve such person from the responsibility to correct
prohibited conditions or to remove prohibited structures, obstructions, or improvements; nor prevent
the enforcement, correction, or removal thereof. In addition to the other penalties or remedies
provided in this article, the State of Arizona, any political subdivision thereof, or any person who may
be damaged as a result of the diversion, retardation, or obstruction of a watercourse shall have the
right to commence, maintain, and prosecute any appropriate action or pursue any remedy to enjoin,
abate, or otherwise prevent any person from violating or continuing to violate any provision of this
chapter. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-11 Severability.
This chapter, and its various parts thereof, is hereby declared to be severable. Should any section of
this chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect
the validity of the chapter as a whole, or any portion thereof, other than the section so declared to be
unconstitutional or invalid. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-12 Warning and Disclaimer of Liability.
The degree of flood protection required by this chapter is considered reasonable for regulatory
purposes, and is based on scientific and engineering considerations. Larger floods can and will
occur on rare occasions. Flood heights may be increased by manmade or natural causes. This
chapter does not imply that land outside the regulatory floodplain areas or uses permitted within
such areas will be free from flooding or flood damages. This chapter shall not create liability on the
part of the Town of Oro Valley, any officer or employee thereof, the State of Arizona, or the Federal
Emergency Management Agency, for any flood damages that result from reliance on this chapter or
any administrative decision lawfully made hereunder. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-
35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 20 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
Article 17-4
ADMINISTRATION
Sections:
17-4-1 Establishment of Floodplain Use Permits
17-4-2 Enforcement and Inspection
17-4-3 Duties of Floodplain Administrator and Use Permit Procedures
17-4-4 Designation of the Floodplain Administrator
17-4-1 Establishment of Floodplain Use Permits.
A. Responsibility for Permits. It shall be the duty of the Town Engineer acting as the Floodplain
Administrator, and all departments, officials, and public employees vested with the duty or authority
to issue permits or licenses, to enforce the provisions of this chapter; and no such license or permit
shall be issued for uses or buildings where the same would be in conflict with the provisions of this
chapter. Any such license or permit, if issued in conflict with the provisions of this chapter, shall be
null and void.
B. Floodplain Use Permits. It shall be unlawful to erect, construct, reconstruct, alter, or change the
use of any structure within any regulatory floodplain area covered by this chapter without first
applying for and obtaining a floodplain use permit from the Town Engineer.
C. Application for Floodplain Use Permit. Application for a floodplain use permit shall be made on
forms furnished by the Town Engineer, and must include, without limitation, plans in duplicate drawn
to scale showing the nature, location, dimensions, and elevation of the areas in question; existing or
proposed structures including walls, bank protection, fill, storage of materials, drainage facilities; and
the location of the foregoing. Specifically, the following information is required:
1. Proposed elevation, in relation to mean sea level, of the lowest floor (including basement) of
all structures. In a designated Zone AO, elevation of existing highest adjacent natural grade and
proposed elevation of the lowest floor (including basement) of all structures must be obtained;
2. Proposed elevation, in relation to mean sea level, to which any nonresidential structure will
be flood-proofed;
3. Certification by an Arizona registered professional engineer or an Arizona registered
professional architect that the flood-proofing methods for any nonresidential structure meet the
flood-proofing criteria in Section 17-5-1(C);
4. Base flood elevation data shall be provided for subdivisions or other developments greater
than fifty (50) lots or five (5) acres, whichever is the lesser; and
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 21 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
5. Description of the extent to which any watercourse will be altered or relocated as a result of
proposed development. Each such application shall be accompanied by an application fee, as
set forth by the Town, payable to the Town of Oro Valley. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-4-2 Enforcement and Inspection.
A. Enforcement. It shall be the duty of the Floodplain Administrator and officials of the Town
otherwise charged with the enforcement of the law, to enforce this chapter and all of the provisions
of the same.
B. Inspections. Inspections shall be made by officials of the Town duly appointed by the Town
Engineer or by a duly appointed Floodplain Administrator.
C. Cooperation. The Town Floodplain Administrator may request, and shall receive so far as may
be necessary in the discharge of their duties, the assistance and cooperation of all departments,
agencies, officials, and public employees vested with the duty or authority to issue permits, licenses,
or to enforce the regulations of this chapter.
D. Town of Oro Valley Administration. Hydrologic, hydraulic, and related floodplain regulations, as
well as engineering matters pertaining to the administration and direction of this chapter, shall be
referred to the Town of Oro Valley Town Engineer or their designated representative, who shall be
responsible for such reviews, advice, and recommendations.
E. Cooperation Agreements and Consultants. The Floodplain Administrator, through the applicable
procurement and/or intergovernmental agreement procedures, may retain consultants and experts;
and may enter into cooperative agreements for the delineation of floodplains and floodways as well
as for such other assistance and guidance considered appropriate and necessary to obtain
maximum reasonable protection and benefits under this chapter. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-4-3 Duties of Floodplain Administrator and Use Permit
Procedures.
A. The Floodplain Administrator shall issue floodplain use permits required by this section.
B. The following procedure shall be used by the Floodplain Administrator in considering issuance of
floodplain use permits:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 22 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Upon receiving an application for a floodplain use permit involving the use of fill, construction
of structures, or the storage of materials, and prior to rendering a decision thereon the
Floodplain Administrator may:
a. Require the applicant to submit, where applicable, plans in triplicate drawn to scale
showing the nature, location, dimensions, and elevations of the lot; existing or proposed
structures, fill, storage of materials, flood-proofing measures; and the relationship of the
above to the location of the channel, regulatory floodway, regulatory floodplain, the
regulatory floodplain with base flood elevations, the proposed project in relation to flood
heights and velocities, and the plans for flood protection. The applicant shall provide a new
delineation of all regulatory floodplains affected by the project. The new delineation and
reports shall be prepared in conformance with FEMA requirements and this chapter. The
delineation shall show pre- and post-project floodplain limits and water surface elevations
upstream, adjacent, and downstream of the project.
b. Require, where circumstances necessitate more detailed information, the applicant to
furnish as much of the following additional information as is deemed necessary by the
Floodplain Administrator for the evaluation of the effects of the proposed use upon flood
flows and the consideration of other factors necessary to render a decision on suitability of
the proposed use:
i. A typical valley cross-section showing the floodway, floodway fringe area, and the
floodplain of the watercourse; elevation of land areas adjoining each side of the
channel; cross-sectional areas to be occupied by the proposed development; and high
water information;
ii. A plan (surface view) showing elevations or contours of the ground; pertinent
structure, fill or storage elevations; size, location, and spatial arrangement of all
proposed and existing structures on the site; location and elevations of streets, water
supply, sanitary facilities; photographs showing existing land uses and vegetation
upstream and downstream, and soil types, as well as other pertinent information;
iii. A profile showing the slope of the bottom of the channel or flow line of the
watercourse;
iv. Specifications for building construction and materials, flood-proofing, filling,
dredging, grading, channel improvement, storage of materials, water supply, and
sanitary facilities.
c. Ensure that the proposed development does not adversely affect the carrying capacity
of channels at locations where base flood elevations have been determined but a floodway
has not been designated.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 23 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
d. For FEMA regulated floodplains (SFHAs), require the applicant to submit appropriate
(e.g., CLOMR, CLOMR-F, LOMR, etc.) applications, forms, and information to FEMA for
review and approval. A floodplain use permit shall not be issued by the Town of Oro Valley
until after receiving acknowledgement from FEMA of the acceptance of the CLOMR.
Additionally, final building permit inspections shall not be made, nor shall certificates of
occupancy be given, until after receiving acknowledgement from FEMA that the LOMR has
become effective.
e. Ensure other related State of Arizona and Federal permits have been issued.
2. No permit shall be issued for any development that is not in conformance with this chapter,
FEMA regulations, or some other provision of law relating to such development. A floodplain
use permit may be denied if the proposed development constitutes a danger or hazard to life or
property.
C. The Floodplain Administrator shall be responsible for the following duties:
1. Obtain and maintain for public inspection and make available the following:
a. Certification of the regulatory flood elevation required in Sections 17-5-1(C)(1), 17-5-
1(C)(2), and 17-5-5;
b. The Zone AO certification required in Section 17-5-1(C)(2);
c. The flood-proofing certification required in Section 17-5-1(C)(3);
d. The certified opening elevation required in Section 17-5-1(C)(4);
e. Review all development permits for improvements and/or damages to existing
structures to determine if the application of the substantial improvement rules apply,
including establishing a definition of market value determination and verifying that the
estimated improvement and/or repair costs are less than fifty percent (50%) of the market
value of the structure;
f. Certification of elevation for subdivisions required by Section 17-5-4(E);
g. Certification for floodway encroachments required by Section 17-5-7(A);
h. Records of all variance actions, including justification for their issuance required by
Section 17-6-3(C).
2. Notification of other entities:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 24 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
a. Notify adjacent communities and ADWR prior to such alteration or relocation of a
watercourse, and submit evidence of such notification to FEMA through appropriate
notification means; and
b. Require that the flood carrying capacity of the altered or relocated portion of said
watercourse be maintained.
3. Within one hundred twenty (120) days after completion of construction of any flood control
protective works which change the rate of flow during the flood or the configuration of the
floodplain upstream or downstream from or adjacent to the project, the person or agency
responsible for installation of the project shall provide to the governing bodies of all jurisdictions
affected by the project a new delineation of all floodplains affected by the project. The new
delineation shall be done according to the criteria adopted by the ADWR.
4. Advise the Pima County Regional Flood Control District and any adjunct jurisdiction having
responsibility for floodplain management in writing and provide a copy of a development plan of
all applications for floodplain use permits or variances to develop land in a floodplain or
floodway within one (1) mile of the corporate limits of the Town of Oro Valley, Arizona. Also,
advise the Pima County Regional Flood Control District in writing and provide a copy of any
development plan of any major development proposed within a floodplain or floodway, which
could affect floodplains, floodways or watercourses within the district’s area of jurisdiction.
Written notice and a copy of the plan of development shall be sent to the district no later than
three (3) working days after having been received by Town of Oro Valley.
5. Notify FEMA of acquisition by means of annexation, incorporation or otherwise, of additional
areas of jurisdiction.
6. A community’s base flood elevations may increase or decrease resulting from physical
changes affecting flooding conditions. As soon as practicable, but not later than six (6) months
after the date such information becomes available, a community shall notify FEMA of the
changes by submitting technical or scientific data in accordance with 44 CFR 65.3. Such a
submission is necessary so that upon confirmation of those physical changes affecting flooding
conditions, risk premium rates and floodplain management requirements will be based upon
current data.
7. Use of Other Base Flood Data. When base flood elevation data has not been provided in
accordance with Section 17-3-2 (Basis for Establishing the Regulatory Floodplain Areas), the
Floodplain Administrator shall obtain, review and reasonably utilize any base flood elevation
data available from a Federal, State, or other source, in order to administer Section 17-5-1
(Standards of Construction). Any such information shall be consistent with the requirements of
the Federal Emergency Management Agency and the Director of the Arizona Department of
Water Resources and may be submitted to the Floodplain Board for adoption.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 25 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
8. Make map interpretations, where needed, as to the exact location of the boundaries of the
special flood hazard areas (e.g., where there appears to be a conflict between a mapped
boundary and actual field conditions). The person contesting the location of the boundary shall
be given a reasonable opportunity to appeal the interpretation as provided in Article 17-6
(Appeal and Variance Procedures).
9. Take remedial actions on violations of this chapter as required in Section 17-3-8 (Abatement
of Violations). ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-4-4 Designation of the Floodplain Administrator.
The Town Engineer or their designee is hereby appointed to administer, implement, and enforce this
chapter and guidelines set forth in this article by processing floodplain use permits in accordance
with its provisions. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-5
PROVISIONS FOR FLOOD HAZARD REDUCTION
Sections:
17-5-1 Standards of Construction
17-5-2 Standards for Storage of Materials and Equipment
17-5-3 Standards for Water Supply and Waste Disposal Systems
17-5-4 Standards and Submittal Requirements for Subdivisions
17-5-5 Standards for Manufactured Homes
17-5-6 Standards for Recreational Vehicles
17-5-7 Floodways
17-5-8 Floodway Fringe Area Requirements
17-5-9 Flood-Related Erosion-Prone Area
17-5-1 Standards of Construction.
In all regulatory floodplain areas, the following standards are required:
A. Anchoring.
1. All new construction and substantial improvements shall be anchored to prevent flotation,
collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic
loads, including the effects of buoyancy.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 26 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
2. All manufactured homes shall meet the anchoring standards of Section 17-5-5(B).
B. Construction Materials and Methods.
1. All new construction and substantial improvements shall be constructed with materials and
utility equipment resistant to flood damage.
2. All new construction and substantial improvements shall be constructed using methods and
practices that minimize flood damage.
3. All new construction, substantial improvements, and other proposed new development shall
be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment, as
well as other service facilities that are designed and/or located so as to prevent water from
entering or accumulating within the components during conditions of flooding.
4. Within Zone AH or AO, adequate drainage paths around structures on slopes are required to
guide floodwaters around and away from proposed structures.
C. Elevation and Flood-Proofing.
1. New construction and substantial improvement of any structure shall have the lowest floor,
including basement, elevated at or above the regulatory flood elevation. In areas without a
detailed study but within regulatory floodplain boundaries, the applicant shall have an Arizona
registered professional engineer prepare a detailed study to determine the depth of the base
flood. Nonresidential structures may meet the standards in subsection (C)(3) of this section.
Upon the completion of the structure, the elevation of the lowest floor, including basement, shall
be certified by an Arizona registered professional engineer or an Arizona registered professional
land surveyor, and provided to the Floodplain Administrator and the Town Building Official.
2. New construction and substantial improvement of any structure in Zone AO shall have the
lowest floor, including basement, higher than the highest adjacent grade at least one (1) foot
higher than the depth number on the FIRM, or at least two (2) feet if no depth number is
specified. Nonresidential structures may meet the standards in subsection (C)(3) of this section.
Upon completion of the structure an Arizona registered professional engineer or Arizona
registered professional land surveyor shall certify to the Floodplain Administrator that the
elevation of the structure meets this standard.
3. Nonresidential construction and new and substantial improvement of any structure shall
either be elevated in conformance with subsections (C)(1) and (2) of this section, or together
with attendant utility and sanitary facilities:
a. Be flood-proofed so that below the regulatory flood elevation the structure is watertight
with walls substantially impermeable to the passage of water;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 27 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
b. Have structural components capable of resisting hydrostatic and hydrodynamic loads
and effects of buoyancy; and
c. Be certified by an Arizona registered professional engineer or an Arizona registered
professional architect that the standards of this subsection are satisfied. Such certifications
shall be provided to the Floodplain Administrator and the Town Building Official.
4. Require, for all new construction and substantial improvements of nonresidential structures,
that have fully enclosed areas below the regulatory flood elevation that are usable solely for
parking of vehicles, building access, or storage in an area other than a basement, and which are
subject to flooding, shall be constructed of flood resistant materials to the regulatory flood
elevation, have all service facilities elevated at or above the regulatory flood elevation, and be
designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the
entry and exit of floodwaters. Designs for meeting this requirement must either be certified by an
Arizona registered professional engineer or an Arizona registered professional architect or meet
or exceed the following minimum criteria:
a. A minimum of two (2) openings, on different sides of each enclosed area, shall be
provided having a total net area of not less than one (1) square inch for every square foot of
enclosed area subject to flooding. Smaller engineered openings may be allowed if the
design is supported by a certification report issued by ICC-ES (International Code Council
Evaluation Service), or an equivalent product certification organization.
b. The bottom of all openings shall be no higher than one (1) foot above grade.
c. Openings may be equipped with screens, louvers, valves, or other coverings or devices;
provided, that they permit the automatic entry and exit of floodwaters.
5. Manufactured homes shall meet the standards in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-2 Standards for Storage of Materials and Equipment.
A. The storage or processing of materials is prohibited if they are, in time of flooding: buoyant,
flammable, explosive, or could be noxious, deadly, or injurious to human, animal, or plant life.
B. Storage of other material or equipment may be allowed if they are not subject to major damage
by floods, or if they are firmly anchored to prevent flotation, or if they are readily removable from the
area within the time available after flood warning. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 28 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-5-3 Standards for Water Supply and Waste Disposal Systems.
A. All new or replacement water supply and sanitary sewage systems shall be designed to
minimize or eliminate infiltration of floodwaters into the system and discharge from systems into
floodwaters.
B. On-site waste disposal systems shall not be installed wholly or partially in a regulatory floodway,
erosion setback, or as established by the Arizona Department of Environmental Quality (ADEQ),
whichever is most restrictive.
C. On-site waste disposal systems shall be located to avoid impairment to them or contamination
from them during flooding. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-4 Standards and Submittal Requirements for Subdivisions.
A. All new subdivision proposals and other proposed development (including proposals for
manufactured home parks and subdivisions), greater than fifty (50) lots or five (5) acres, whichever
is the lesser, shall:
1. Identify the regulatory floodplain area and the elevation of the base flood; and
2. Identify on the final plans the elevation(s) of the proposed structure(s) and pads. If the site is
filled above the base flood elevation, the final lowest floor and grade elevations shall be certified
by an Arizona registered professional engineer or Arizona registered professional land surveyor
and provided to the Floodplain Administrator.
B. All subdivision proposals shall be consistent with the need to minimize flood damage.
C. All subdivision proposals (also referred to as a final site plan) shall have all public utilities and
facilities, including but not limited to sewer, gas, electrical, and water systems, located and
constructed to minimize flood damage.
D. All subdivisions shall provide adequate drainage to reduce exposure to flood hazards (see
adopted drainage criteria manual).
E. Suitability of the Land. Land that has been found by the Floodplain Board to be unsuitable for
development with permanent structures based on hydrological and engineering studies of flooding
can be platted and used only for open space and greenbelt uses such as those identified in Section
17-5-7(B)(1). This includes land which is:
1. Physically unsuitable because of flooding, poor drainage, and other features which may
endanger health, life, or property, aggravate erosion, increase the flood hazard, or increase the
burden imposed on the community, its governmental units, and its citizens;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 29 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
2. Subject to flooding because of its proximity to the stream or watercourse; or because of low
elevation. In applying this provision, the Floodplain Board, with technical support and
recommendations from the Town Engineer, shall consider:
a. Land subject to flooding by the base flood shall not be platted for residential occupancy,
or building sites, or for any other uses that may increase the flood hazard or endanger
health, life, or property, unless each lot contains a building site that meets requirements set
forth below, in subsections (G) and (H) of this section, and within other pertinent sections of
this chapter;
b. Fill shall not be used to raise land within the regulatory floodway. In other areas subject
to flooding by the base flood, fill may be used; provided, that the proposed fill does not
restrict the flow of water and increase flood heights or velocities in the regulatory floodway,
according to the same standards established in Section 17-5-8; and provided, that
compensatory flood storage is provided.
F. Flood Situation to Be Shown on Plat. Plats submitted shall show the following:
1. Conceptual site development plans (plats) shall show the location, by survey, of
watercourses, channels, irrigation laterals, private ditches, culverts, lakes, or other water
features, including direction of flow, water level elevations, and the location and extent of areas
subject to frequent inundation;
2. All preliminary subdivision proposals shall identify the special flood hazard areas, regulatory
floodplain, the elevation of the base flood, pre- and post-development water surface elevations,
and pre- and post-development floodplain limits;
3. All conceptual and final subdivision plans will provide the elevation(s) of proposed
structure(s) and pads. If the site is filled above the base flood elevation, the final lowest floor
and pad elevation shall be certified by an Arizona registered professional engineer or an
Arizona registered professional land surveyor and provided to the Floodplain Administrator and
the Town Building Official;
4. Final plats shall show the limits of the regulatory floodplain and the regulatory floodway, as
well as the corresponding one hundred (100) year flood peaks, and their contributing drainage
areas, entering and exiting the development;
5. Conceptual and final site plans shall show proposed improvements for areas subject to
flooding and/or for areas which contain extremely poor drainage facilities such that the proposed
improvements make the areas safe from flooding for the respective type of occupancy.
G. Street Elevations.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 30 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Refer to the Town’s adopted drainage criteria manual and subdivision street standards for
additional information and requirements.
2. Fill used for the streets in areas subject to flooding shall not increase flood heights more
than a designated amount as defined in Section 17-5-8(A)(1)(b).
3. The developer shall provide pre- and post-developed water surface elevation for streets
proposed for placement in or adjacent to areas subject to flooding. Headwater ponding limits
and water surface elevations shall be shown upstream of all culvert crossings.
H. Building Site.
1. Residential lots shall contain a building site, either natural or manmade, which is not subject
to flooding by the base flood.
2. In areas subject to flooding by the base flood, where no fill is proposed, the building line
shall be located no closer to the watercourse or channel than the edge of the area subject to
flooding by the base flood. In areas where fill is used to raise the elevation of the building site,
no fill shall be placed in the regulatory floodway. Further, where fill is used, the erosion setback
shall not be less than twenty-five (25) feet from an unprotected bank, and not less than fifteen
(15) feet for protected banks.
I. Setback from Channels. Along reaches of all regulated watercourses, erosion setback
requirements from banks of washes shall be established in accordance with the Town’s adopted
drainage criteria manual or standards accepted by the Town Engineer.
J. Easements for Drainage. Whenever any watercourse is located in the area being subdivided, an
easement or common area encompassing each side of the watercourse shall be provided for the
purpose of protecting and/or maintaining the watercourse for flood and drainage purposes, and such
further width for construction of bank protection, physical access for maintenance, or for allowing for
natural meander of the stream or watercourse that may be reasonably expected, or for all these as
will be adequate for the purpose, as determined by the Town Engineer.
K. Detention/Retention Systems. See Town’s adopted drainage criteria manual for requirements
pertaining to detention/retention systems by visiting the administrative offices of the Town of Oro
Valley. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-5 Standards for Manufactured Homes.
All manufactured homes that are placed within or substantially improved while located within a
regulatory floodplain shall apply for and obtain a floodplain use permit summarizing site conditions
including base flood elevation, depth of the base flood, and minimum prudent erosion setback. The
application for a floodplain use permit shall be accompanied by a site plan, prepared by an Arizona
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 31 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
registered engineer, that conforms to the State of Arizona Office of Manufactured Housing,
“Minimum Standards for Manufactured Housing Foundations in Floodplains,” dated October 14,
2009, or as subsequently amended. Accessory structures attached to a manufactured home must
meet the provisions of this chapter unless its uses are limited to parking of vehicles or storage.
Furthermore, manufactured homes shall:
A. Be elevated so that the lowest structural member or the lowest point of any attached appliances,
whichever is lower, is at or above the regulatory flood elevation.
B. Be securely anchored to an adequately anchored foundation system to resist flotation, collapse,
or lateral movement. This anchoring requirement is in addition to applicable State and local
anchoring requirements for resisting wind forces; and
C. Upon completion of installation of the manufactured home, certification by an Arizona registered
professional engineer or Arizona registered professional land surveyor that the elevation
requirements of this section have been satisfied shall be provided to the Floodplain Administrator for
verification. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-6 Standards for Recreational Vehicles.
All recreational vehicles placed within a regulatory floodplain area will either:
A. Be on site for fewer than one hundred eighty (180) consecutive days, and be fully licensed and
ready for highway use, to the extent that they are not prohibited by any other ordinance. A
recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the
site only by quick-disconnect type utilities and security devices, and has no permanently attached
additions; or
B. Meet the permit requirements of Article 17-4, and the elevation and anchoring requirements for
manufactured homes in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-7 Floodways.
Located within regulatory floodplain areas, established in Section 17-3-2, are areas designated as
regulatory floodways. Since the floodway is an extremely hazardous area due to the velocity of
floodwaters that carry debris, potential projectiles, and increase erosion potential, the following
provisions apply:
A. Encroachments, including fill, new construction, substantial improvements, and other
development are prohibited in floodways. The Floodplain Administrator will consider encroachments
where certification by an Arizona registered professional engineer is provided demonstrating that
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 32 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
encroachments will result in no increase whatsoever in flood levels during the occurrence of the
base flood discharge, and that the encroachment will not pose a threat to life or property.
B. Floodway Requirements.
1. Uses Permitted. The following open space uses shall be permitted to the extent that they are
not prohibited by any other ordinance or State or Federal permit requirements, nor conflict with
uses permitted in adjoining zones, and provided they do not require structures, fill, or storage of
materials or equipment:
a. Agricultural uses, including general farming, pasture, grazing or outdoor plant nurseries,
horticulture, viticulture, truck farming, sod farming, wild crop harvesting, and restoration of
native vegetation;
b. Private and public recreational uses;
c. Accessory residential uses, including lawns, gardens, and play areas.
C. Limitations.
1. No use shall be allowed within a regulatory floodway which:
a. Acting alone or in combination with existing or future uses creates a danger or hazard to
life or property;
b. Increases the water surface elevation of the base flood; or
c. Adversely affects groundwater recharge.
D. If this section is satisfied, all new construction and substantial improvements shall comply with
all other applicable flood hazard reduction provisions in this article. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-5-8 Floodway Fringe Area Requirements.
A. Floodway fringe areas shall be subject to the following regulations:
1. The following uses shall be permitted within a floodway fringe area to the extent that they
are not prohibited by any other ordinance, and only upon issuance of a floodplain use permit:
a. Any use permitted in Section 17-5-7, Floodways;
b. Any other use not involving structures, provided it is elevated above the regulatory base
flood elevation and a determination is made by the Town Engineer that the use will not
increase the base flood elevation more than one (1) foot where the owner of the land doing
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 33 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
the development owns both sides of the floodway, and not more than one-tenth (0.1) foot
where only one (1) side is owned. In no case shall the development increase the water
surface elevation more than one-tenth (0.1) foot on the property owned by others upstream
and downstream, nor unduly restrict the capacity of the channels or floodway of tributaries
to the main stream or watercourse, drainage ditches, or other drainage facilities or systems.
The aforementioned water surface elevation increases apply to all watercourse channels in
Oro Valley except the Canada del Oro Wash where the elevation of the existing levee
system and bank protection will allow for no water surface elevation increases due to
encroachment. Additionally, when main channel floodflow velocities are greater than four
(4) feet per second (fps), a land use/development activity shall not increase floodflow
velocities immediately downstream of the activity by more than one (1) fps or ten percent
(10%), whichever is less, in the regulatory floodway. Any velocity increase greater than the
aforementioned criteria must be reviewed and approved by the Town Engineer;
c. Structures, including dwellings, may be erected or moved, provided the lowest floor or
basement floor is placed at or above the regulatory flood elevation. Land may be filled;
provided, that the top of such fill shall be at or above the regulatory flood elevation for the
particular area, and unless structurally protected from erosion shall extend at such
elevations at least twenty-five (25) feet beyond the limits of any structure erected or placed
thereon. Where structural protection from erosion is provided, the minimum extent to which
tops of the fill pad must extend shall not be less than fifteen (15) feet. The placement of
structures and any accompanying fill shall not affect base flood elevation beyond the limits
set in subsection (A)(1)(b) of this section.
B. The following minimum requirements apply to all uses located within a regulatory floodplain:
1. All new construction (including prefabricated structures and mobile homes) and substantial
improvements shall be anchored to prevent flotation and lateral movement, and be constructed
with flood resistant materials and methods.
2. All proposed plats and proposals for other developments, including their utilities, streets, and
drainage structures, shall be located and designed to be consistent with the need to minimize
flood damage.
3. All tentative development plans, site plans, final site plans, improvement plans, and final
plats, and other proposed new developments shall include base flood elevation data or as
otherwise directed by the Town Engineer.
4. If in a riverine situation, all adjacent communities and the State Coordinating Office must be
notified prior to any alteration or relocation of the watercourse, and copies of such notifications
must be sent to the FEMA. Within the proposed altered or relocated portion of any watercourse,
the flood carrying capacity shall be maintained.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 34 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
5. Within one hundred twenty (120) days after completion of construction of any flood control
protective works which changes the rate of flow during the flood, or changes the configuration of
the floodplain, the person or agency responsible for installation of the protective works shall
provide to the governing bodies of all jurisdictions affected by the protective works a new
delineation of all floodplains affected. The new floodplain delineation shall be done according to
the criteria adopted by the State of Arizona Director of Water Resources.
C. Limitations.
1. No use shall be allowed within a floodway fringe which:
a. Acting alone or in combination with existing or future uses creates danger or hazard to
life or property;
b. Increases the water surface elevation for the base flood by more than that allowed
under subsection (A)(1)(b) of this section;
c. Adversely affects groundwater recharge.
D. Critical Facilities.
1. “Critical facility” means any of the following:
a. A structure or facility that produces, uses or stores highly volatile, flammable, explosive,
toxic, and/or water-reactive materials;
b. Hospitals, emergency medical facilities, nursing homes and/or housing facilities likely to
have occupants who may not be sufficiently mobile to avoid injury or death during a flood;
c. Essential emergency response facilities, such as police stations, fire stations,
emergency shelters and/or operation centers that are needed for public safety and/or flood
response activities before, during and after a flood; and
d. Public and private utility facilities, such as but not limited to power, water and
wastewater treatment, and/or communications, that are vital to maintaining or restoring
normal services to flooded areas before, during and after a flood.
2. Applicability. The critical facility requirements shall only apply along watercourses which
have FEMA designated floodplains. Where the two-tenths percent (0.2%) chance floodplain has
not been established, the Town Engineer may require that this floodplain be delineated by the
applicant.
3. Critical facilities shall be located outside of the two-tenths percent (0.2%) annual chance
(five hundred (500) year) floodplain, if possible. If a critical facility must be located in a two-
tenths percent (0.2%) annual chance (five hundred (500) year) floodplain, it must be
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 35 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
demonstrated that there is either a critical need to locate it within the floodplain, or that there is
not a suitable alternative site, as justified by an Arizona registered professional engineer. Any
critical facility located within a two-tenths percent (0.2%) annual chance (five hundred (500)
year) floodplain shall be protected from that event. “Protection” includes, but is not limited to,
elevating the lowest floor and all utilities and mechanical services to a minimum of one (1) foot
above the base flood or to the two-tenths percent (0.2%) annual chance (five hundred (500)
year) floodplain water surface elevation, whichever is greater, providing elevated access ramps,
if appropriate, adequately protecting the facility from both lateral and vertical erosion associated
with the two-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain, providing
all weather access during the base flood and developing an emergency response plan.
4. Existing critical facilities within the two-tenths percent (0.2%) annual chance (five hundred
(500) year) floodplain that propose substantial improvements and/or repairs shall be protected
from the two-tenths percent (0.2%) annual chance (five hundred (500) year) flood event.
“Protection” includes, but is not limited to, elevating or flood-proofing the lowest floor and all
utilities and mechanical services to a minimum of one (1) foot above the base flood or to the two
-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain water surface
elevation, whichever is greater, providing elevated access ramps, if appropriate, adequately
protecting the facility from both lateral and vertical erosion associated with the two-tenths
percent (0.2%) annual chance (five hundred (500) year) floodplain, providing all-weather access
to the base flood and developing an emergency response plan. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-5-9 Flood-Related Erosion-Prone Area.
The protection of Town residents and their property from injury and damage that can occur as a
result of streambank lateral migration due to erosion and scour is of primary importance in the
administration of this chapter and the following criteria apply:
A. The Floodplain Administrator shall require Floodplain Use Permits for proposed construction and
other development within all flood-related erosion-prone areas, as determined by lateral migration
analysis described in the Town’s drainage criteria manual or in other predetermined, documented
evidence. Areas generally most susceptible to lateral erosion and scour include, but are not limited
to, locations of historical stream/wash meandering, locations where poorly defined or poorly
consolidated banks occur, wash reaches characterized by changes in the direction, velocity, or
amount of streamflow, and locations in the proximity of stabilizing features or structures such as rock
outcrops or bridges. Alternative safe limits for erosion setbacks may be considered if approved in
writing by the Floodplain Administrator based on an acceptable engineering study prepared and
sealed by an Arizona registered professional engineer. However, at no time shall a setback be less
than twenty-five (25) feet from an unprotected bank, and not less than fifteen (15) feet for a
protected bank.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 36 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
B. Permit applications shall be reviewed to determine whether the proposed site alterations and
improvements will be reasonably safe from flood-related erosion, and will not cause flood-related
erosion hazards or otherwise aggravate the existing hazard.
C. If a proposed development or structure including associated permanent features such as a patio
wall or swimming pool or any other feature is found to be in the path of flood-related erosion, or
would increase the erosion hazard, such improvements shall be relocated or adequate protective
measures shall be taken to avoid aggravating the existing erosion hazard.
D. Areas within the erosion setback may be used for suitable open space purposes, such as for
outdoor recreation and wildlife habitat areas, and for other activities using temporary and portable
structures only. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-6
APPEAL AND VARIANCE PROCEDURES
Sections:
17-6-1 Nature of Variances
17-6-2 Floodplain Board
17-6-3 Appeals and Request for Variance Considerations
17-6-4 Conditions for Variances
17-6-1 Nature of Variances.
The variance criteria set forth in this article are based on the general principle of zoning law that
variances pertain to a piece of property and are not personal in nature. A variance may be granted
for a parcel of property with physical characteristics so unusual that complying with the requirements
of this chapter would create an exceptional hardship to the applicant or the surrounding property
owners. The characteristics must be unique to the property and not be shared by adjacent parcels.
The unique characteristic must pertain to the land itself, not to the structure, its inhabitants, or the
property owners.
It is the duty of the Town of Oro Valley to help protect its citizens from flooding. This need is so
compelling and the implications of the cost of insuring a structure built below the regulatory flood
elevation are so serious that variances from the regulatory flood elevation shall not be granted.
Variances from other requirements in the floodplain management ordinance are quite rare. The long-
term goal of preventing and reducing flood loss and damage can only be met if variances are strictly
limited. Therefore, the variance guidelines provided in this chapter are detailed and contain multiple
provisions that must be met before a variance can be properly granted. The criteria are designed to
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 37 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
screen out those situations in which alternatives other than a variance are more appropriate. ((O)21-
06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-2 Floodplain Board.
A. The Floodplain Board of Oro Valley shall hear and decide requests for variances from the
requirements of this chapter to FEMA regulated floodplains, as well as hear appeals to decisions
from previous determinations or actions on non-FEMA regulated floodplains by the Floodplain
Administrator or the Town Engineer.
B. The Floodplain Board shall hear and decide appeals when it is alleged there is an error in any
requirement, decision, or determination made by the Floodplain Administrator in the enforcement or
administration of this chapter with regard to FEMA regulated floodplains and floodplains identified on
the Town’s Flood Insurance Rate Maps. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
17-6-3 Appeals and Request for Variance Considerations.
A. In considering appeals and requests for variance, the Floodplain Board shall consider all
technical evaluations, all relevant factors, and all standards specified in other sections of this
chapter, and also consider:
1. The danger that materials may be swept onto other lands to the injury of others;
2. The danger of life and property due to flooding or erosion damage;
3. The susceptibility of the proposed facility and its contents to flood damage, and the effect of
such damage on the individual owner;
4. The importance of the services provided by the proposed facility to the community;
5. The necessity to the facility of a waterfront location, where applicable;
6. The availability of alternative locations for the proposed use that are not subject to flooding
or erosion damage;
7. The compatibility of the proposed use with existing and anticipated development;
8. The relationship of the proposed use to the comprehensive plan and floodplain management
program for the area encompassing the proposed use;
9. The safety of access to the property in time of flood for ordinary and emergency vehicles;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 38 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
10. The expected heights, velocity, duration, rate of rise, and sediment transport of the
floodwaters expected at the site; and
11. The costs of providing governmental services during and after flood conditions, including
maintenance and repair of public utilities and facilities such as sewer, gas, electrical, water
system, and streets and bridges.
B. Upon consideration of the factors of subsection (A) of this section and the purposes of this
chapter, the Floodplain Board may attach such conditions to the granting of appeals and variances
as it deems necessary to further the purposes of this chapter.
C. The Floodplain Administrator shall maintain a record of all variance actions, including justification
for their issuance, and shall report any such variances that are issued in FEMA regulated floodplains
in its biennial report, which is also submitted to the Federal Emergency Management Agency.
D. Any applicant to whom a variance is granted shall be given written notice over the signature of
the Floodplain Administrator, or their designee, that:
1. The issuance of a variance to construct a structure below the base flood elevation will result
in increased premium rates for flood insurance up to amounts as high as twenty-five dollars
($25.00) for one hundred dollars ($100.00) of insurance coverage; and
2. Such construction below the regulatory flood elevation increases risks to life and property;
and
3. The land upon which the variance is granted shall be ineligible for exchange of State land
pursuant to the flood relocation and land exchange program provided by ARS § 37-610. A copy
of the notice shall be recorded in the office of the Pima County Recorder and shall be recorded
in a manner so that it appears in the chain of title of the affected parcel of land.
E. A person aggrieved in any manner by an action of the Floodplain Board may within thirty (30)
days appeal to the Floodplain Board. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-4 Conditions for Variances.
A. Variances shall only be issued upon:
1. A showing of good and sufficient cause;
2. A determination that the variance is the minimum necessary, considering the flood hazard, to
afford relief;
3. A determination that failure to grant the variance would result in exceptional hardship to the
applicant;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 39 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
4. A showing that the use cannot perform its intended purpose unless it is located or carried
out in close proximity to water. This includes only facilities defined in Article 17-2 in the definition
of “functionally dependent use” (which is unlikely due to the Town of Oro Valley’s arid climate);
and
5. A determination that the granting of a variance will not result in increased flood heights,
additional threats to public safety, extraordinary public expense, create nuisances, cause fraud
on or victimization of the public, or conflict with existing local laws or ordinances.
B. Variances shall not be issued within any regulatory floodway if any increase in the base flood
elevation would result.
C. Variances may be issued for the repair, rehabilitation, or restoration of structures listed in the
National Register of Historic Places or the State Inventory of Historic Places upon a determination
that the proposed repair or rehabilitation will not preclude the structure’s continued designation as a
historic structure, and that the variance is the minimum necessary in order to preserve the historic
character and design of the structure.
D. The Floodplain Administrator, at his/her discretion, may grant a variance for non-FEMA
regulated flood hazard areas.
E. Generally, variances may be issued for new construction and substantial improvements to be
erected on a lot of one-half (0.5) acre or less in size contiguous to and surrounded by lots with
existing structures constructed below the regulatory flood elevation, provided the procedures of
Articles 17-4 and 17-5 have been fully considered. As the lot size increases beyond one-half (0.5)
acre, the technical justification required for issuing the variance increases. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-7
ORDINANCE AMENDMENTS
Sections:
17-7-1 Procedures
17-7-1 Procedures.
A. The Floodplain Board may from time to time, after a public hearing required by law (ARS § 38-
431.01, and other open meeting laws), amend, supplement, or change the regulations set forth
herein or subsequently established. Any amendment, supplement, or change may be initiated by the
Floodplain Board or by petition of affected persons hereafter provided.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 40 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
B. The procedures established by this article are to provide for appropriate and timely ordinance
amendments, with due consideration of the purpose of this article. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
Article 17-8
FEES
Sections:
17-8-1 Fee Schedule
17-8-1 Fee Schedule.
Fees for floodplain use permits will be charged based on the fee schedule approved by the Town
Council. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18,
2024.
Disclaimer: The Town Clerk’s Office has the official version of the Oro Valley Town Code. Users
should contact the Town Clerk’s Office for ordinances passed subsequent to the ordinance cited
above.
Town Website: www.orovalleyaz.gov
Hosted by General Code.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 1 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
CHAPTER 17
FLOODPLAIN AND EROSION HAZARD MANAGEMENT
Articles:
17-1 Statutory Authorization, Findings of Fact, Purpose and Methods
17-2 Definitions
17-3 General Provisions
17-4 Administration
17-5 Provisions for Flood Hazard Reduction
17-6 Appeal and Variance Procedures
17-7 Ordinance Amendments
17-8 Fees
Article 17-1
STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND
METHODS
Sections:
17-1-1 Statutory Authorization
17-1-2 Findings of Fact
17-1-3 Statement of Purpose
17-1-4 Methods of Reducing Flood Losses
17-1-1 Statutory Authorization.
The Legislature of the State of Arizona has, in ARS § 48-3610, enabled the Town of Oro Valley to
assume the powers and duties for floodplain management and adopt regulations in conformance
with ARS § 48-3609 that are designed to promote the public health, safety, and general welfare of its
citizenry. Therefore, the Town Council of Oro Valley, Arizona, does ordain as follows. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-2 Findings of Fact.
A. The regulatory floodplains of Oro Valley are subject to periodic inundation that may result in loss
of life and property, health and safety hazards, disruption of commerce and governmental services,
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 2 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all
of which adversely affect the public health, safety and general welfare.
B. These flood losses are caused by the cumulative effect of obstructions in regulatory floodplains,
which increase flood heights and velocities. Also, when these obstructions are inadequately
anchored, they may cause damage in other areas. Uses that are inadequately flood-proofed,
elevated, or otherwise protected from flood damage also contribute to the flood loss. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-3 Statement of Purpose.
It is the purpose of this chapter to promote the public health, safety, and general welfare, and to
minimize public and private losses due to flood conditions in specific areas by provisions designed:
A. To protect human life and health;
B. To minimize expenditure of public money for costly flood control projects;
C. To minimize the need for rescue and relief efforts associated with flooding and generally
undertaken at the expense of the general public;
D. To minimize prolonged business interruptions;
E. To minimize damage to public facilities and utilities such as water and gas mains, electric,
telephone, and sewer lines, and streets and bridges located in regulatory floodplains;
F. To help maintain a stable tax base by providing for the sound use and development of the
regulatory floodplain and erosion hazard areas so as to minimize blight areas caused by flooding;
G. To ensure the state mandated required regulatory floodplain information is available to potential
buyers;
H. To regulate activities within regulatory floodplains for both public and private properties;
I. To participate in and maintain eligibility for flood insurance and disaster relief. ((O)21-06, 11/17/2021;
(O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-1-4 Methods of Reducing Flood Losses.
In order to accomplish its purposes, this chapter includes methods and provisions for:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 3 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
A. Restricting or prohibiting uses which are dangerous to the public health, safety, and welfare as
well as public and private property, due to water or development hazards; or which result in
increased damages to development or increases in flood heights or velocities;
B. Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected
against flood damage at the time of start of construction;
C. Controlling the alteration of natural floodplains, stream channels, and natural protective barriers,
which help to accommodate natural flood storage potential or the channelization of floodwaters;
D. Controlling filling, grading, dredging, and other development that may increase flood damage;
and
E. Preventing or regulating the construction of flood barriers that unnaturally divert floodwaters, or
that may increase flood hazards in other areas. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Article 17-2
DEFINITIONS
Sections:
17-2-1 Definitions
17-2-1 Definitions.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted to give
them the meaning they have in common usage, and to give this chapter its most reasonable
application.
“Accessory structure” means a structure that is on the same parcel of property as a principal
structure, the use of which is incidental to the use of the principal structure. For floodplain
management purposes, the term must be used only for parking or storage, must be small, represent
a minimal investment, and have low damage potential. FEMA considers ‘small’ to mean not larger
than a one-story two-car garage. Examples include detached garages, storage sheds, tool sheds,
and small boathouses.
“Appeal” means a request for a review of the Floodplain Administrator’s interpretation of any
provision of this chapter or a request for a variance. Appeals are heard and decided by the
Floodplain Board.
“Area of shallow flooding” means a designated zone AO or AH on a community’s Flood Insurance
Rate Map (FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 4 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
of one (1) to three (3) feet where a clearly defined channel does not exist, where the path of flooding
is unpredictable, and where velocity flow may be evident. Such flooding is characterized by ponding
or sheet flow.
“Base flood” means a flood having a one percent (1%) chance of being equaled or exceeded in any
given year.
“Base flood elevation (BFE)” means the computed elevation to which floodwater is anticipated to rise
during the base flood.
“Basement” means any area of a structure with a subgrade floor (i.e., below the adjacent ground
level) on all sides.
Building. See “Structure.”
“Community” means any state or area or political subdivision thereof, or any Indian tribe, authorized
tribal organization, or authorized Native organization, which has authority to adopt and enforce
floodplain management regulations for the areas within its jurisdiction.
Critical Facility. Refer to Section 17-5-8(D).
“Detention system” means a type of flood control system which delays the downstream progress of
floodwaters in a controlled manner, generally through the combined use of a temporary storage area
and a metered outlet device, which causes a lengthening of the duration of the flow and thereby
reduces downstream flood peaks.
“Development” means any manmade change to improved or unimproved real estate, including but
not limited to structures, mining, dredging, filling, grading, paving, excavation or drilling operations,
and storage of materials and equipment.
“Dwelling” means a habitable structure.
“Elevation certificate” means an administrative tool of the National Flood Insurance Program (NFIP)
that is used to provide elevation information necessary to ensure compliance with community
floodplain management ordinances, to determine the proper insurance premium rate, and to support
a request for a letter of map amendment (LOMA) or letter of map revision based on fill (LOMR-F).
“Encroachment” means the advance or infringement of uses, human-installed or human-maintained
landscape vegetation, fill, excavation, permanent structures, or development into a floodplain that
may impede or alter the flow capacity of a floodplain. An equal degree of encroachment is a
standard applied to the evaluation of the effects of the encroachment on increases in flood heights. It
assumes that an encroachment, if permitted, may confer on all property owners on both sides of the
watercourse an equal right to encroach to the same degree within that reach. Since the factors
affecting hydraulic efficiency are usually not uniform within a reach, this standard will usually not
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 5 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
result in equal measured distances between the regulatory floodway and the regulatory floodplain of
the watercourse.
“Erosion” means the process of the gradual wearing away of landmasses. This peril is not, per se,
covered under the National Flood Insurance Program.
“Erosion hazard area” means lands adjoining a watercourse that is regulated by this chapter which
are deemed by the Town Engineer to be subject to flood-related erosion, pursuant to the Town’s
adopted drainage criteria manual.
“Erosion setback” means the minimum horizontal distance between a structure or permanent feature
and the channel bank necessary to protect the structure/feature from flood-related erosion damage.
For method to be used for determination of the erosion setback, see the adopted Town of Oro Valley
drainage criteria manual.
“Existing manufactured home park or subdivision” means a manufactured home park or subdivision
for which the construction of facilities for servicing the lots on which the manufactured homes are
affixed (including, at a minimum, the installation of utilities, construction of streets, and either final
site grading or the pouring of concrete slabs) was completed before December 4, 1979, the effective
date of the Flood Insurance Rate Maps adopted by the Town of Oro Valley.
“Expansion to an existing manufactured home park or subdivision” means preparation of additional
sites by the construction of facilities for servicing the lots on which the manufactured homes are to
be affixed (including the installation of utilities, the construction of streets, and either final site grading
or the pouring of concrete pads).
“Federal Emergency Management Agency (FEMA)” means an agency of the Federal government
responsible for programs of disaster response and recovery, disaster preparedness, hazard
mitigation, flood insurance, and other programs of technical and financial assistance.
“Flood” or “flooding” means a general and temporary condition of partial or complete inundation of
normally dry land areas from: (1) the overflow of floodwaters; (2) the unusual and rapid accumulation
or runoff of surface waters from any source; and/or (3) the collapse or subsidence of land along the
shore of a lake or other body of water as a result of erosion or undermining caused by waves or
currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high
water level in a natural body of water, accompanied by a severe storm or by an unanticipated force
of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and
unforeseeable event which results in flooding as defined in this definition.
“Flood Insurance Rate Map (FIRM)” means the official map on which the Federal Emergency
Management Agency has delineated both the special flood hazard areas and the risk premium
zones applicable to the community.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 6 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Flood Insurance Study (FIS)” means the official report provided by Federal Emergency
Management Agency that includes flood profiles, the Flood Insurance Rate Map, and the water
surface elevation of the base flood.
“Flood protection system” means those physical structural works for which funds have been
authorized, appropriated, and expended; and which have been constructed specifically to modify
flooding in order to reduce the extent of the area within a community subject to designation as a
regulatory floodplain as well as the extent and depths of associated flooding. Such a system typically
includes dams, reservoirs, levees or dikes. These specialized flood-modifying works are those
constructed in conformance with sound engineering standards.
“Floodplain” or “flood-prone area” means any land area susceptible to being inundated by water from
any source (see “flood” or “flooding”).
“Floodplain Administrator” means the Town Engineer, or their designee, whose duty it is to oversee
administration and enforcement of the floodplain management regulations contained in this chapter.
“Floodplain Board” means the Town Council of Oro Valley, at such times as they are engaged in the
enforcement of this chapter.
“Floodplain management” means the operation of an integrated natural resource management
program encompassing corrective and preventive measures for reducing flood and erosion damage.
Floodplain management includes but is not limited to emergency preparedness planning, flood
control works, floodplain management regulations, and open space plans.
“Floodplain management regulations” means this chapter and other zoning ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such as grading and
erosion control), and other applications of legal and regulatory authority that control use of, and
development in, flood-prone areas. This term describes Federal, State, or local regulations, and any
combination thereof, which provide standards for preventing and reducing flood loss and damage.
“Floodplain use permit” (also “permit for development in a floodplain”) means an official document
that authorizes special activity within regulatory floodplains or erosion hazard areas of Oro Valley.
“Flood-proofed” or Dry Floodproofed means a building or structure that has been made watertight
with walls substantially impermeable to the passage of water, and structural components capable of
resisting hydrostatic and hydrodynamic loads and the effects of buoyancy, accomplished by means
other than elevation.
“Flood-proofing” means any combination of structural and nonstructural additions, changes, or
adjustments to nonresidential structures that reduces or eliminates flood damage to real estate or
improved real property, water and sanitary facilities, structures, and their contents by means other
than elevation.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 7 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Flood-related erosion” means the collapse or subsidence of land along the shore of a lake or other
body of water as a result of undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of
water, accompanied by a severe storm, or by an unanticipated force of nature, such as a flash flood
or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in
flooding.
Floodway. See “regulatory floodway.”
“Floodway fringe” means that area of the floodplain lying on either side of a regulatory floodway
where encroachment may be permitted.
“Functionally dependent use” means a use which cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities, port
facilities that are necessary for the loading and unloading of cargo or passengers, and ship building
and ship repair facilities, and does not include long-term storage or related manufacturing facilities.
“Governing body” is the local governing unit (i.e., county or municipality) empowered to adopt and
implement regulations providing for the public health, safety, and general welfare of its citizenry.
“Hardship” means that the physical characteristics of the property in question are so unusual,
exceptional, and peculiar to the property that a variance regarding its use may be requested and
granted in accordance with Section 17-6-1. Mere economic or financial hardship alone is not
exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or
the disapproval of one’s neighbors likewise cannot, as a rule, be construed to qualify as an
exceptional hardship. All of these problems can be resolved through other means without granting a
variance, even if the alternative is more expensive, requires the property owner to build elsewhere,
or means that the parcel must be put to a different use than originally intended.
“Highest adjacent grade” means the highest natural elevation of the ground surface immediately
adjacent to a structure prior to construction of the proposed walls of a structure.
“Historic structure” means any structure that is:
1. Listed individually in the National Register of Historic Places (a listing maintained by the
Department of the Interior) or preliminarily determined by the Secretary of the Interior as
meeting the requirements for individual listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic district or a district preliminarily determined by the
Secretary to qualify as a registered historic district;
3. Individually listed on the State of Arizona inventory of historic places, as approved by the
Secretary of the Interior; or
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 8 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
4. Individually listed on the Town of Oro Valley’s inventory of historic places and that has been
certified by an approved State of Arizona program, as determined by the Secretary of the
Interior.
“Landscape vegetation” means vegetation that is installed, planted, irrigated, maintained, or
otherwise placed or modified by human activity. Naturally occurring native vegetation within the
floodplain is not considered landscape vegetation.
“Levee” means a human-made structure, usually an earthen embankment designed and constructed
in accordance with sound engineering practices, for the purpose of containing, controlling, or
diverting the flow of water so as to provide protection from temporary flooding.
“Lowest floor” means the lowest floor of the lowest enclosed area including the basement (see
“basement” definition) or crawl space under a manufactured home if it is not vented. An unfinished or
flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area
other than a basement area, is not considered to be the lowest floor of a structure; provided, that
such enclosure is not built so as to render the structure in violation of the applicable non-elevation
design requirements of this chapter.
“Manufactured home” means a structure, transportable in one (1) or more sections, which is built on
a permanent chassis and is designed for use with or without a permanent foundation when attached
to the required utilities. The term “manufactured home” does not include a “recreational vehicle.”
“Manufactured home park or subdivision” means a parcel (or contiguous parcels) of land divided into
two (2) or more manufactured home lots for rent or sale.
“Market value” means the determination of the estimated cost to replace the structure in new
condition and adjusting that cost figure by the amount of depreciation that has accrued since the
structure was constructed. The cost of replacement of the structure shall be based on a square foot
cost factor determined by reference to a building cost estimating guide recognized by the building
construction industry. The amount of depreciation shall be determined by taking into account the age
and physical deterioration of the structure and functional obsolescence as approved by the
Floodplain Administrator but shall not include economic or other forms of external obsolescence.
Use of replacement costs or accrued depreciation factors different from those contained in
recognized building cost estimating guides may be considered only if such factors are included in a
report prepared by an independent professional appraiser and supported by a written explanation of
the differences. Alternatively, the market value is the valuation made by the Pima County Assessor’s
Office.
“Mean sea level” means, for purposes of the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum of 1988 (NAVD ’88), or
other datum to which base flood elevations shown on a community’s Flood Insurance Rate Map are
referenced.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 9 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“National Flood Insurance Program (NFIP)” means a program administered by FEMA that makes
Federally backed flood insurance available for purchase by individuals that live in NFIP participating
communities.
New Construction. For the purposes of determining insurance rates, structures for which the start of
construction commenced on or after the effective date of an initial Flood Insurance Rate Map or after
December 31, 1974, whichever is later, and includes any subsequent improvements to such
structures. For floodplain management purposes, “new construction” means structures for which the
start of construction commenced on or after the effective date of a floodplain management regulation
adopted by a community and includes any subsequent improvements to such structures.
“Obstruction” includes, but is not limited to, any dam, wall, embankment, levee, dike, pile, abutment,
protection, excavation, channelization, bridge, conduit, culvert, structure, wire, fence, rock, gravel,
refuse, fill, structure, vegetation, or other material in, along, across, or projecting into any
watercourse which may alter, impede, retard, or change the direction and/or velocity of the flow of
water, or which due to its location influences its propensity to snare or collect debris carried by the
flow of water, thereby reducing its likelihood of being carried downstream as well as reducing the
channel’s ability to convey flow.
“One hundred (100) year flood” means the flood having a one percent (1%) chance of being equaled
or exceeded in any given year (see “base flood”). Also referred to as the one percent (1%) annual
exceedance probability flood (one percent (1%) AEP flood).
“Permit for development in a floodplain” (also referred to as a “floodplain use permit”) is an official
document issued by the Town of Oro Valley authorizing performance of specific activity in any
regulatory floodplain or erosion hazard area after it has been determined to be reasonably safe from
flooding and erosion. These permits are required to ensure that proposed development projects
meet the requirements of the NFIP and the provisions of this chapter. Examples include grading
permits, building permits, and floodplain use permits.
“Person” means an individual, firm, partnership, association or corporation, or agent of the
aforementioned groups, or the State of Arizona or its agencies or political subdivisions.
“Program” means the National Flood Insurance Program authorized by 42 U.S.C. 4001 through
4128, or as authorized by subsequent Federal statutes.
“Reach” is a hydraulic engineering term to describe longitudinal segments of a stream or
watercourse. A reach will generally include the segment of the flood hazard area where flood heights
are primarily controlled by manmade or natural obstructions or constrictions. In an urban area, an
example of a reach would be the segment of a stream or watercourse between two (2) consecutive
bridge crossings.
“Recreational vehicle” means a vehicle that is:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 10 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Built on a single chassis;
2. Four hundred (400) square feet or less in area, when measured at the largest horizontal
projection;
3. Designed to be self-propelled or permanently towable by a light duty truck; and
4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
“Regulatory flood elevation” means the base flood elevation plus one (1) foot of freeboard as
required by this chapter.
“Regulatory floodplain or flood-prone area” means that portion of the geologic floodplain associated
with a watercourse, including its channel, or any other floodplain or flood-prone area that would be
inundated by the base flood, including all base floods where the base flood peak discharge is one
hundred (100) cubic feet per second or greater, those areas that are subject to sheet flooding except
when the maximum potential contributing watershed area is less than twenty (20) acres, those areas
identified on subdivision plats or development plans, those areas designated by FEMA, including
areas designated as shaded Zone X as well as those areas that the Floodplain Administrator, using
the best available data, has determined is subject to a flood hazard during the base flood.
“Regulatory floodway” means the channel of a watercourse and the adjacent land areas that must be
reserved in order to discharge the base flood without cumulatively increasing the water surface
elevation more than a designated amount.
“Remedy a violation” means to bring the structure or other development into compliance with State
or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its
noncompliance. Ways that impacts may be reduced include protecting the structure or other affected
development from flood damages, implementing the enforcement provisions of this chapter,
otherwise deterring future similar violations, or reducing Federal financial exposure with regard to the
structure or other development.
“Repetitive loss structure” means a structure, covered by a contract for flood insurance issued
pursuant to the National Flood Insurance Act, that has incurred flood-related damage on two (2)
occasions during any ten (10) year period ending on the date of the event for which a second claim
is made, and for which the cost of repairing the flood damage, on average, equaled or exceeded
twenty-five percent (25%) of the market value of the structure at the time of each such flood event. In
addition to the current claim, the NFIP must have paid the previous qualifying claim.
“Retention system” means a type of flood control system that stops the downstream progress of
floodwater by employing methods of total containment which generally involve creation of storage
areas that incorporate infiltration devices, such as dry wells, to dispose of stored waters, principally
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 11 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
by percolation over some specified period of time, thereby eliminating basin contributions to
downstream flood peaks or flood volumes.
“Riverine” means relating to, formed by, or resembling a river (including tributaries), stream, brook,
etc.
Sheet Flow Area. See “area of shallow flooding.”
“Special flood hazard area (SFHA)” means an area in the regulatory floodplain subject to a one
percent (1%) or greater chance of flooding in any given year. SFHAs are shown on a Flood
Insurance Rate Map as Zone A, AO, AE, AH or A0.
“Start of construction” includes substantial improvement or other proposed new development, and
means the date the building permit was issued, provided the actual start of construction, repair,
reconstruction, rehabilitation, addition, placement, or other improvement was within the time period
when the permit was active. The “actual start” means either the first placement of permanent
construction of a structure on a site, such as the pouring of slab or footings, the installation of piles,
the construction of columns, or any work beyond the stage of excavation; or the placement of a
manufactured home on a foundation. Permanent construction does not include land preparation
such as the installation of streets and/or walkways, the installation on the property of accessory
structures, such as garages or sheds not occupied as dwelling units or not part of the main structure.
For a substantial improvement, the “actual start of construction” means the first alteration of any wall,
ceiling, floor or other structural part of a structure, whether or not that alteration affects the external
dimensions of the structure.
“Storage” Contents stored in wet floodproofed structures will get wet during flooding.
“Structure” means a walled and roofed building, including gas or liquid storage tanks, principally
above ground and affixed to a permanent site. This term also refers to a manufactured home on a
permanent foundation.
“Structure Size” The footprint of a typical two-car garage is about 600 square feet in area.
“Substantial damage” means damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before-damaged condition would equal or exceed fifty percent (50%) of
the market value of the structure before the damage occurred.
“Substantial improvement” means any reconstruction, rehabilitation, addition, or other improvement
to a structure, the total cost of which equals or exceeds fifty percent (50%) of the market value of the
structure before the “start of construction” of the improvement. This term includes structures which
have incurred “substantial damage,” regardless of the actual repair work performed. The term does
not, however, include either:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 12 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Any project for improvement of a structure to correct existing violations of State or local
health, sanitary, or safety code specifications which have been identified by the local Code
Enforcement Official and which are the minimum necessary to assure safe living conditions; or
2. Any alteration of a “historic structure”; provided, that the alteration will not preclude the
structure’s continued designation as a “historic structure.”
“Variance” means a grant of relief from the requirements of this chapter that is granted by the
Floodplain Administrator or the Floodplain Board (for FEMA floodplains) upon a finding that strict
enforcement of the provisions would cause undue hardship owing to circumstances unique to the
individual property for which the variance is granted, and not caused by the applicant for said
variance.
“Violation” means the failure of a structure or other development to be fully compliant with the Town
of Oro Valley floodplain management regulations. A structure or other development without the
elevation certificate, other certifications, or other evidence of compliance required by this chapter is
presumed to be in violation until such time as such documentation is provided. “Violation” also
means unauthorized construction, grading, encroachment, diversion, or lack of maintenance of
private drainage structures.
“Water surface elevation” means the height, in relation to the National Geodetic Vertical Datum
(NGVD) of 1929 or the North American Vertical Datum (NAVD) of 1988 (or other datum, where
specified), of floods of various magnitudes and frequencies in the floodplains of riverine and sheet-
flow areas.
“Watercourse” means a lake, river, creek, stream, wash, arroyo, channel, or other topographic
feature on or over which waters flow at least periodically. “Watercourse” includes specifically
designated areas in which substantial flood damage may occur, including regulatory floodplains as
designated by FEMA or the Town of Oro Valley.
“Zone A (unnumbered)” is a special flood hazard area identified by FEMA that is subject to
inundation from a one hundred (100) year flood event. Because detailed hydraulic analyses have not
been performed, no base flood elevation or depths are shown. Mandatory flood insurance
requirements apply.
“Zone AE” is a special flood hazard areas subject to inundation by the one hundred (100) year flood
determined by a Flood Insurance Study (FIS). Base flood elevations are shown within these zones
and mandatory flood insurance requirements apply.
“Zone AH” is a special flood hazard area subject to inundation by one hundred (100) year shallow
flooding (usually areas of ponding) with average depths between one (1) and three (3) feet. Base
flood elevations derived from detailed hydraulic analyses are shown in this zone. Mandatory flood
insurance requirements apply.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 13 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
“Zone AO” is a special flood hazard area subject to inundation by one hundred (100) year shallow
flooding, usually resulting from sheet flow on sloping terrain, with average depths between one (1)
and three (3) feet. Average flood depths derived from detailed hydraulic analyses are shown within
this zone. Mandatory flood insurance requirements apply.
“Zone X shaded” (or “shaded Zone X”) is an area determined by a Flood Insurance Study as having
moderate or minimal hazard from flooding. There are four classifications depending on location: (1)
area of one hundred (100) year flood with average depths of less than one (1) foot; (2) area with
drainage areas less than one (1) square mile; (3) area protected by an accredited levee from one
hundred (100) year flood; and (4) area of five hundred (500) year flood. Buildings or other
improvements in this zone could be flooded by severe, concentrated rainfall, in the absence of
adequate drainage systems. Flood insurance is available in participating communities, but it is not
required. In the Town of Oro Valley only the third classification applies (i.e., protected by levees).
((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-3
GENERAL PROVISIONS
Sections:
17-3-1 Lands to Which This Chapter Applies
17-3-2 Basis for Establishing the Regulatory Floodplain Areas
17-3-3 Compliance
17-3-4 Abrogation and Greater Restrictions
17-3-5 Interpretation
17-3-6 Statutory Exceptions
17-3-7 Floodplain Violations
17-3-8 Abatement of Violations
17-3-9 Unlawful Acts
17-3-10 Remedies
17-3-11 Severability
17-3-12 Warning and Disclaimer of Liability
17-3-1 Lands to Which This Chapter Applies.
This chapter shall apply to all regulatory floodplain areas within the corporate limits of the Town of
Oro Valley, including special flood hazard areas, floodplains shown on recorded subdivision plat
maps, as well as those areas identified by the Floodplain Administrator, using the best available
data. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 14 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-3-2 Basis for Establishing the Regulatory Floodplain Areas.
The special flood hazard areas identified by the Federal Emergency Management Agency (FEMA) in
a scientific and engineering report entitled “The Flood Insurance Study (FIS) for Pima County,
Arizona and Incorporated Areas,” revised September 28, 2012, with accompanying Flood Insurance
Rate Maps (FIRMs) dated June 16, 2011, and all subsequent amendments and/or revisions, are
hereby adopted by reference and declared to be a part of this chapter. This (FIS) and attendant
mapping are the minimum area of applicability of this chapter and may be supplemented by studies
for other areas which allow implementation of this chapter, and which are recommended to the
Floodplain Board by the Floodplain Administrator. The Floodplain Board, within the incorporated
limits of the Town of Oro Valley, shall require developers of land to delineate, within areas where
development is ongoing or imminent, floodplains consistent with the criteria developed by FEMA, the
Arizona Director of Water Resources, and the Town Engineer, pursuant to the Town’s adopted
drainage criteria manual. The FIS and FIRMs are on file at the Town of Oro Valley Public Works
Department.
A. Regulatory floodplains shall be subject to requirements in Section 17-5-8 (Floodway Fringe Area
Requirements).
B. Elevation and Boundary Refinements.
1. The determination of elevations (water surface, lowest finished floor, and adjacent land) and
regulatory floodway and regulatory floodplain boundaries is an engineering function with
calculations and decisions made in accordance with the concepts and policies set forth in this
chapter. The best technical data available shall be used for such calculations and decisions.
Initial determinations shall be based on floodplain information reports of the Pima County Flood
Control District, U.S. Corps of Engineers, U.S. Bureau of Reclamation, U.S. Geological Survey,
and/or other general data that are pertinent for the conditions of the streams or the
watercourses at the time the data are obtained.
2. Additional and more detailed technical analysis will, from time to time, become available
through private or governmental studies and activities. This data will permit refinements in the
elevations and boundaries of the regulatory floodway and regulatory floodplains in the
respective reaches of the streams or watercourses.
3. Whenever such additional data become available and it seems desirable to make
refinements, i.e., letter of map amendments (LOMAs) or letter of map revisions (LOMRs), such
refinements or revisions may be made at the request of the property owners or developers or by
the Town Engineer. The necessary engineering calculations shall be made for the property
owner or developer by an Arizona registered professional engineer (at the owner’s/developer’s
expense) in conformance with requirements of this chapter, the FEMA, and the Arizona
Department of Water Resources (ADWR). These findings will need approval of the Town
Engineer. Following the Town’s approval of these refinements to regulatory floodplain areas
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 15 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
identified on FIRMs, the property owner shall have calculations and forms forwarded to FEMA
for review and approval.
4. The Town Engineer or their duly designated representative shall have the authority and
responsibility to revise and refine elevations and boundaries of regulatory floodways and
regulatory floodplains whenever such revisions and refinements are for the purpose and in
accordance with the conditions set forth in Sections 17-4-3(B)(1)(d), 17-5-8(B)(3), (4), and (5).
a. The Flood Insurance Rate Map for Pima County and incorporated areas shall be
revised to show the refined area boundaries and/or elevations.
b. The Town Engineer shall notify the owner of each property for which area boundaries
and/or elevations have been revised or refined, as well as those owners of adjoining
property immediately upstream and downstream, by first class mail following a duly noticed
public hearing on the property involved.
c. An appeal to the Floodplain Board may be taken by any person aggrieved, in
accordance with Article 17-6. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-3 Compliance.
All development of land, construction of residential, commercial, or industrial structures, or future
development within regulatory floodplain areas is subject to the terms of this chapter and any other
applicable regulations. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-4 Abrogation and Greater Restrictions.
The provisions of this chapter are not intended to interfere with, abrogate, or annul any ordinance,
rule, regulations, or permit previously adopted or issued, and not be in conflict with any provision of
this chapter or any regulation that shall be adopted or issued pursuant to law relating to the use of
structure or ordinance not in conflict with this chapter; nor is it intended by this chapter to interfere
with or abrogate or annul any easement, covenant, or other agreement between parties, except
when this chapter imposes a greater restriction, this chapter shall control. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-5 Interpretation.
In the interpretation and application of this chapter, all provisions shall be:
A. Considered as minimum requirements;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 16 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
B. Liberally constructed in favor of the governing body; and
C. Deemed neither to limit nor repeal any other powers granted under State statutes. ((O)21-06,
11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-6 Statutory Exceptions.
A. In accordance with ARS § 48-3609(I), unless expressly provided this and any regulations
adopted pursuant to this article do not affect:
1. Existing legal uses of property or the right to continuation of such legal use. However, if a
nonconforming use of land or a structure is discontinued for twelve (12) months or destroyed to
the extent of fifty percent (50%) or more of its market value, as determined by a competent
appraiser, or the valuation made by the Pima County Assessor’s Office, any further use shall
comply with this article and regulations of the Town of Oro Valley.
2. Reasonable repair or alteration of property for the purposes for which the property was
legally used on August 3, 1984, or any regulations affecting such property takes effect, except
that any alteration, addition, or repair to a nonconforming structure which would result in
increasing its flood damage potential by fifty percent (50%) or more shall be either flood-proofed
or elevated to or above the regulatory flood elevation.
3. Reasonable repair of structures constructed with the written authorization required by ARS
§ 48-3613.
4. Facilities constructed or installed pursuant to a certificate of environmental compatibility
issued pursuant to ARS Title 40, Chapter 2, Article 6.2.
B. Before the following types of construction authorized by ARS § 48-3613(B) may begin, the
responsible person must submit grading plans and a grading permit application for review and
comment. Written authorization is not required for, nor shall the floodplain board prohibit, the
following pursuant to ARS § 48-3613(C):
1. The construction of bridges, culverts, dikes, and other structures necessary for the
construction of public highways, roads, and streets intersecting or crossing a watercourse.
2. The construction of storage dams for watering livestock or wildlife, structures on banks of a
watercourse to prevent erosion of, or damage to, adjoining land, if the structure will not divert,
retard or obstruct the natural channel of the watercourse, or dams for the conservation of
floodwaters as permitted by ARS Title 45, Chapter 6.
3. The construction of tailing dams and waste disposal areas for use in connection with mining
and metallurgical operations. This subsection does not exempt those sand and gravel
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 17 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
operations that will divert, retard or obstruct the flow of waters in any watercourse from
complying with, and acquiring authorization from, the Town Engineer or the Floodplain Board
pursuant to regulations adopted by the Floodplain Board under this article.
4. Other construction, if it is determined by the Town Engineer that a floodplain use permit is
unnecessary.
5. Any flood control district, county, city, town, or other political subdivision from exercising
powers granted to it under ARS Title 48, Chapter 21, Article 1.
6. The construction, by a public agency or political subdivision, of streams, waterways, lakes,
and other auxiliary facilities in conjunction with development of public parks and recreation
facilities.
7. The construction and erection of poles, towers, foundations, support structures, guy wires,
and other facilities related to power transmission as constructed by any utility, whether a public
service corporation or a political subdivision.
C. In accordance with ARS § 48-3613(D), in addition to other penalties or remedies otherwise
provided by law, the State of Arizona, a political subdivision thereof, or a person who may be
damaged or has been damaged as a result of the unauthorized diversion, retardation, or obstruction
of a watercourse has the right to go through an administrator/board to commence, maintain, and
prosecute any appropriate action or pursue any remedy to enjoin, abate, or otherwise prevent any
person from violating or continuing to violate this section or regulations adopted pursuant to ARS
Title 48, Chapter 21, Article 1. If a person is found to be in violation of this section, the
administrator/board shall require the violator either to comply with this section, if authorized by the
Floodplain Board for FEMA regulated floodplains (the Town Engineer for non-FEMA regulated
floodplains), or to remove the obstruction and restore the watercourse to its original state. The court
may also award such monetary damages as are appropriate to the injured parties resulting from the
violation, including reasonable costs and attorney fees. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017;
(O)05-35, 10/05/2005)
17-3-7 Floodplain Violations.
A. Declaration of Public Nuisance. All development located or maintained within any regulatory
floodplain area after August 8, 1973, in violation of this chapter, and without written authorization
from the Floodplain Board for FEMA regulated floodplains (the Town Engineer for non-FEMA
regulated floodplains), is a public nuisance per se, and may be abated, prevented or restrained by
action of the Floodplain Board. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 18 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-3-8 Abatement of Violations.
Upon discovery of a violation to this chapter, the Floodplain Administrator shall either:
A. Take any necessary action to effect the abatement of such violation; or
B. Order the owner of the property upon which the violation exists to provide whatever additional
information may be required for determination by the Floodplain Administrator. Such information
must be provided to the Floodplain Administrator within thirty (30) days of such order. Within thirty
(30) days, the Floodplain Administrator shall either order the abatement of said violation or shall
grant a variance in accordance with the provisions of Section 17-6-4; or
C. For FEMA regulated floodplains (SFHAs), submit to the Federal Emergency Management
Agency a declaration for denial of insurance, stating that the property is in violation of a cited State
or local law, regulation or ordinance, pursuant to Section 1316 of the National Flood Insurance Act of
1968, and as amended. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-9 Unlawful Acts.
A. It is unlawful for a person to engage in any development or to divert, retard, or obstruct the flow
of waters in a watercourse if it creates a hazard to life or property without securing the written
authorization required by ARS § 48-3613. Where the watercourse is a delineated floodplain, it is
unlawful to engage in any development affecting the flow of waters without securing written
authorization required by ARS § 48-3613.
B. When drainage improvements are associated with an approved development plan, subdivision
plat or approved engineering report, and are constructed to provide flood protection to remove or
reduce flood hazards, including those identified by FEMA or for stormwater quality control, and
where those improvements are privately owned, then it shall be the responsibility of the property
owner(s) to perform maintenance as necessary to ensure the integrity of said drainage
improvements and maintenance of the flood carrying capacity to the designed discharge. For
purposes of this chapter, a private drainage improvement is considered a structure. It is unlawful for
any person or entity to neglect maintenance responsibilities on private drainage improvements.
C. Any person violating the provisions of this section shall be subject to appeal and variance
procedures pursuant to Article 17-6, and penalties pursuant to Article 1-8, Penalties.
D. The Town may issue a written notice to correct to any person who has violated or is in violation
of this section.
E. Failure to comply with actions described in and required by the notice to correct may result in a
notice of violation and/or stop work order. The written notice shall state the nature of the violation,
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 19 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
the corrective action required, the time frame for the corrective action, and penalties for continued
noncompliance. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-10 Remedies.
All remedies provided for herein shall be cumulative and not exclusive. The conviction and
punishment of any person hereunder shall not relieve such person from the responsibility to correct
prohibited conditions or to remove prohibited structures, obstructions, or improvements; nor prevent
the enforcement, correction, or removal thereof. In addition to the other penalties or remedies
provided in this article, the State of Arizona, any political subdivision thereof, or any person who may
be damaged as a result of the diversion, retardation, or obstruction of a watercourse shall have the
right to commence, maintain, and prosecute any appropriate action or pursue any remedy to enjoin,
abate, or otherwise prevent any person from violating or continuing to violate any provision of this
chapter. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-11 Severability.
This chapter, and its various parts thereof, is hereby declared to be severable. Should any section of
this chapter be declared by the courts to be unconstitutional or invalid, such decision shall not affect
the validity of the chapter as a whole, or any portion thereof, other than the section so declared to be
unconstitutional or invalid. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-3-12 Warning and Disclaimer of Liability.
The degree of flood protection required by this chapter is considered reasonable for regulatory
purposes, and is based on scientific and engineering considerations. Larger floods can and will
occur on rare occasions. Flood heights may be increased by manmade or natural causes. This
chapter does not imply that land outside the regulatory floodplain areas or uses permitted within
such areas will be free from flooding or flood damages. This chapter shall not create liability on the
part of the Town of Oro Valley, any officer or employee thereof, the State of Arizona, or the Federal
Emergency Management Agency, for any flood damages that result from reliance on this chapter or
any administrative decision lawfully made hereunder. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-
35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 20 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
Article 17-4
ADMINISTRATION
Sections:
17-4-1 Establishment of Floodplain Use Permits
17-4-2 Enforcement and Inspection
17-4-3 Duties of Floodplain Administrator and Use Permit Procedures
17-4-4 Designation of the Floodplain Administrator
17-4-1 Establishment of Floodplain Use Permits.
A. Responsibility for Permits. It shall be the duty of the Town Engineer acting as the Floodplain
Administrator, and all departments, officials, and public employees vested with the duty or authority
to issue permits or licenses, to enforce the provisions of this chapter; and no such license or permit
shall be issued for uses or buildings where the same would be in conflict with the provisions of this
chapter. Any such license or permit, if issued in conflict with the provisions of this chapter, shall be
null and void.
B. Floodplain Use Permits. It shall be unlawful to erect, construct, reconstruct, alter, or change the
use of any structure within any regulatory floodplain area covered by this chapter without first
applying for and obtaining a floodplain use permit from the Town Engineer.
C. Application for Floodplain Use Permit. Application for a floodplain use permit shall be made on
forms furnished by the Town Engineer, and must include, without limitation, plans in duplicate drawn
to scale showing the nature, location, dimensions, and elevation of the areas in question; existing or
proposed structures including walls, bank protection, fill, storage of materials, drainage facilities; and
the location of the foregoing. Specifically, the following information is required:
1. Proposed elevation, in relation to mean sea level, of the lowest floor (including basements)
of all structures. In a designated Zone AO, elevation of existing highest adjacent natural grade
and proposed elevation of lowest floor (including basement) of all structures must be obtained;
2. Proposed elevation, in relation to mean sea level, to which any nonresidential structure will
be flood-proofed;
3. Certification by an Arizona registered professional engineer or an Arizona registered
professional architect that the flood-proofing methods for any nonresidential structure meet the
flood-proofing criteria in Section 17-5-1(C);
4. Base flood elevation data shall be provided for subdivisions or other developments greater
than fifty (50) lots or five (5) acres, whichever is the lesser; and
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 21 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
5. Description of the extent to which any watercourse will be altered or relocated as a result of
proposed development. Each such application shall be accompanied by an application fee, as
set forth by the Town, payable to the Town of Oro Valley. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-4-2 Enforcement and Inspection.
A. Enforcement. It shall be the duty of the Floodplain Administrator and officials of the Town
otherwise charged with the enforcement of the law, to enforce this chapter and all of the provisions
of the same.
B. Inspections. Inspections shall be made by officials of the Town duly appointed by the Town
Engineer or by a duly appointed Floodplain Administrator.
C. Cooperation. The Town Floodplain Administrator may request, and shall receive so far as may
be necessary in the discharge of their duties, the assistance and cooperation of all departments,
agencies, officials, and public employees vested with the duty or authority to issue permits, licenses,
or to enforce the regulations of this chapter.
D. Town of Oro Valley Administration. Hydrologic, hydraulic, and related floodplain regulations, as
well as engineering matters pertaining to the administration and direction of this chapter, shall be
referred to the Town of Oro Valley Town Engineer or their designated representative, who shall be
responsible for such reviews, advice, and recommendations.
E. Cooperation Agreements and Consultants. The Floodplain Administrator, through the applicable
procurement and/or intergovernmental agreement procedures, may retain consultants and experts;
and may enter into cooperative agreements for the delineation of floodplains and floodways as well
as for such other assistance and guidance considered appropriate and necessary to obtain
maximum reasonable protection and benefits under this chapter. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-4-3 Duties of Floodplain Administrator and Use Permit
Procedures.
A. The Floodplain Administrator shall issue floodplain use permits required by this section.
B. The following procedure shall be used by the Floodplain Administrator in considering issuance of
floodplain use permits:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 22 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Upon receiving an application for a floodplain use permit involving the use of fill, construction
of structures, or the storage of materials, and prior to rendering a decision thereon the
Floodplain Administrator may:
a. Require the applicant to submit, where applicable, plans in triplicate drawn to scale
showing the nature, location, dimensions, and elevations of the lot; existing or proposed
structures, fill, storage of materials, flood-proofing measures; and the relationship of the
above to the location of the channel, regulatory floodway, regulatory floodplain, the
regulatory floodplain with base flood elevations, the proposed project in relation to flood
heights and velocities, and the plans for flood protection. The applicant shall provide a new
delineation of all regulatory floodplains affected by the project. The new delineation and
reports shall be prepared in conformance with FEMA requirements and this chapter. The
delineation shall show pre- and post-project floodplain limits and water surface elevations
upstream, adjacent, and downstream of the project.
b. Require, where circumstances necessitate more detailed information, the applicant to
furnish as much of the following additional information as is deemed necessary by the
Floodplain Administrator for the evaluation of the effects of the proposed use upon flood
flows and the consideration of other factors necessary to render a decision on suitability of
the proposed use:
i. A typical valley cross-section showing the floodway, floodway fringe area, and the
floodplain of the watercourse; elevation of land areas adjoining each side of the
channel; cross-sectional areas to be occupied by the proposed development; and high
water information;
ii. A plan (surface view) showing elevations or contours of the ground; pertinent
structure, fill or storage elevations; size, location, and spatial arrangement of all
proposed and existing structures on the site; location and elevations of streets, water
supply, sanitary facilities; photographs showing existing land uses and vegetation
upstream and downstream, and soil types, as well as other pertinent information;
iii. A profile showing the slope of the bottom of the channel or flow line of the
watercourse;
iv. Specifications for building construction and materials, flood-proofing, filling,
dredging, grading, channel improvement, storage of materials, water supply, and
sanitary facilities.
c. Ensure that the proposed development does not adversely affect the carrying capacity
of channels at locations where base flood elevations have been determined but a floodway
has not been designated.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 23 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
d. For FEMA regulated floodplains (SFHAs), require the applicant to submit appropriate
(e.g., CLOMR, CLOMR-F, LOMR, etc.) applications, forms, and information to FEMA for
review and approval. A floodplain use permit shall not be issued by the Town of Oro Valley
until after receiving acknowledgement from FEMA of the acceptance of the CLOMR.
Additionally, final building permit inspections shall not be made, nor shall certificates of
occupancy be given, until after receiving acknowledgement from FEMA that the LOMR has
become effective.
e. Ensure other related State of Arizona and Federal permits have been issued.
2. No permit shall be issued for any development that is not in conformance with this chapter,
FEMA regulations, or some other provision of law relating to such development. A floodplain
use permit may be denied if the proposed development constitutes a danger or hazard to life or
property.
C. The Floodplain Administrator shall be responsible for the following duties:
1. Obtain and maintain for public inspection and make available the following:
a. Certification of the regulatory flood elevation required in Sections 17-5-1(C)(1), 17-5-
1(C)(2), and 17-5-5;
b. The Zone AO certification required in Section 17-5-1(C)(2);
c. The flood-proofing certification required in Section 17-5-1(C)(3);
d. The certified opening elevation required in Section 17-5-1(C)(4);
e. Review all development permits for improvements and/or damages to existing
structures to determine if the application of the substantial improvement rules apply,
including establishing a definition of market value determination and verifying that the
estimated improvement and/or repair costs are less than fifty percent (50%) of the market
value of the structure;
f. Certification of elevation for subdivisions required by Section 17-5-4(E);
g. Certification for floodway encroachments required by Section 17-5-7(A);
h. Records of all variance actions, including justification for their issuance required by
Section 17-6-3(C).
2. Notification of other entities:
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 24 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
a. Notify adjacent communities and ADWR prior to such alteration or relocation of a
watercourse, and submit evidence of such notification to FEMA through appropriate
notification means; and
b. Require that the flood carrying capacity of the altered or relocated portion of said
watercourse be maintained.
3. Within one hundred twenty (120) days after completion of construction of any flood control
protective works which change the rate of flow during the flood or the configuration of the
floodplain upstream or downstream from or adjacent to the project, the person or agency
responsible for installation of the project shall provide to the governing bodies of all jurisdictions
affected by the project a new delineation of all floodplains affected by the project. The new
delineation shall be done according to the criteria adopted by the ADWR.
4. Advise the Pima County Regional Flood Control District and any adjunct jurisdiction having
responsibility for floodplain management in writing and provide a copy of a development plan of
all applications for floodplain use permits or variances to develop land in a floodplain or
floodway within one (1) mile of the corporate limits of the Town of Oro Valley, Arizona. Also,
advise the Pima County Regional Flood Control District in writing and provide a copy of any
development plan of any major development proposed within a floodplain or floodway, which
could affect floodplains, floodways or watercourses within the district’s area of jurisdiction.
Written notice and a copy of the plan of development shall be sent to the district no later than
three (3) working days after having been received by Town of Oro Valley.
5. Notify FEMA of acquisition by means of annexation, incorporation or otherwise, of additional
areas of jurisdiction.
6. A community’s base flood elevations may increase or decrease resulting from physical
changes affecting flooding conditions. As soon as practicable, but not later than six (6) months
after the date such information becomes available, a community shall notify FEMA of the
changes by submitting technical or scientific data in accordance with 44 CFR 65.3. Such a
submission is necessary so that upon confirmation of those physical changes affecting flooding
conditions, risk premium rates and floodplain management requirements will be based upon
current data.
7. Use of Other Base Flood Data. When base flood elevation data has not been provided in
accordance with Section 17-3-2 (Basis for Establishing the Regulatory Floodplain Areas), the
Floodplain Administrator shall obtain, review and reasonably utilize any base flood elevation
data available from a Federal, State, or other source, in order to administer Section 17-5-1
(Standards of Construction). Any such information shall be consistent with the requirements of
the Federal Emergency Management Agency and the Director of the Arizona Department of
Water Resources and may be submitted to the Floodplain Board for adoption.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 25 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
8. Make map interpretations, where needed, as to the exact location of the boundaries of the
special flood hazard areas (e.g., where there appears to be a conflict between a mapped
boundary and actual field conditions). The person contesting the location of the boundary shall
be given a reasonable opportunity to appeal the interpretation as provided in Article 17-6
(Appeal and Variance Procedures).
9. Take remedial actions on violations of this chapter as required in Section 17-3-8 (Abatement
of Violations). ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-4-4 Designation of the Floodplain Administrator.
The Town Engineer or their designee is hereby appointed to administer, implement, and enforce this
chapter and guidelines set forth in this article by processing floodplain use permits in accordance
with its provisions. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-5
PROVISIONS FOR FLOOD HAZARD REDUCTION
Sections:
17-5-1 Standards of Construction
17-5-2 Standards for Storage of Materials and Equipment
17-5-3 Standards for Water Supply and Waste Disposal Systems
17-5-4 Standards and Submittal Requirements for Subdivisions
17-5-5 Standards for Manufactured Homes
17-5-6 Standards for Recreational Vehicles
17-5-7 Floodways
17-5-8 Floodway Fringe Area Requirements
17-5-9 Flood-Related Erosion-Prone Area
17-5-1 Standards of Construction.
In all regulatory floodplain areas, the following standards are required:
A. Anchoring.
1. All new construction and substantial improvements shall be anchored to prevent flotation,
collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic
loads, including the effects of buoyancy.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 26 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
2. All manufactured homes shall meet the anchoring standards of Section 17-5-5(B).
B. Construction Materials and Methods.
1. All new construction and substantial improvements shall be constructed with materials and
utility equipment resistant to flood damage.
2. All new construction and substantial improvements shall be constructed using methods and
practices that minimize flood damage.
3. All new construction, substantial improvements, and other proposed new development shall
be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment, as
well as other service facilities that are designed and/or located so as to prevent water from
entering or accumulating within the components during conditions of flooding.
4. Within Zone AH or AO, adequate drainage paths around structures on slopes are required to
guide floodwaters around and away from proposed structures.
C. Elevation and Flood-Proofing.
1. New construction and substantial improvement of any structure shall have the lowest floor,
including basement, elevated at or above the regulatory flood elevation. In areas without a
detailed study but within regulatory floodplain boundaries, the applicant shall have an Arizona
registered professional engineer prepare a detailed study to determine the depth of the base
flood. Nonresidential structures may meet the standards in subsection (C)(3) of this section.
Upon the completion of the structure, the elevation of the lowest floor, including basement, shall
be certified by an Arizona registered professional engineer or an Arizona registered professional
land surveyor, and provided to the Floodplain Administrator and the Town Building Official.
2. New construction and substantial improvement of any structure in Zone AO shall have the
lowest floor, including basement, higher than the highest adjacent grade at least one (1) foot
higher than the depth number on the FIRM, or at least two (2) feet if no depth number is
specified. Nonresidential structures may meet the standards in subsection (C)(3) of this section.
Upon completion of the structure an Arizona registered professional engineer or Arizona
registered professional land surveyor shall certify to the Floodplain Administrator that the
elevation of the structure meets this standard.
3. Nonresidential construction and new and substantial improvement of any structure shall
either be elevated in conformance with subsections (C)(1) and (2) of this section, or together
with attendant utility and sanitary facilities:
a. Be flood-proofed so that below the regulatory flood elevation the structure is watertight
with walls substantially impermeable to the passage of water;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 27 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
b. Have structural components capable of resisting hydrostatic and hydrodynamic loads
and effects of buoyancy; and
c. Be certified by an Arizona registered professional engineer or an Arizona registered
professional architect that the standards of this subsection are satisfied. Such certifications
shall be provided to the Floodplain Administrator and the Town Building Official.
4. Require, for all new construction and substantial improvements of nonresidential structures,
that have fully enclosed areas below the regulatory flood elevation that are usable solely for
parking of vehicles, building access, or storage in an area other than a basement, and which are
subject to flooding, shall be constructed of flood resistant materials to the regulatory flood
elevation, have all service facilities elevated at or above the regulatory flood elevation, and be
designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the
entry and exit of floodwaters. Designs for meeting this requirement must either be certified by an
Arizona registered professional engineer or an Arizona registered professional architect or meet
or exceed the following minimum criteria:
a. A minimum of two (2) openings, on different sides of each enclosed area, shall be
provided having a total net area of not less than one (1) square inch for every square foot of
enclosed area subject to flooding. Smaller engineered openings may be allowed if the
design is supported by a certification report issued by ICC-ES (International Code Council
Evaluation Service), or an equivalent product certification organization.
b. The bottom of all openings shall be no higher than one (1) foot above grade.
c. Openings may be equipped with screens, louvers, valves, or other coverings or devices;
provided, that they permit the automatic entry and exit of floodwaters.
5. Manufactured homes shall meet the standards in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-2 Standards for Storage of Materials and Equipment.
A. The storage or processing of materials is prohibited if they are, in time of flooding: buoyant,
flammable, explosive, or could be noxious, deadly, or injurious to human, animal, or plant life.
B. Storage of other material or equipment may be allowed if they are not subject to major damage
by floods, or if they are firmly anchored to prevent flotation, or if they are readily removable from the
area within the time available after flood warning. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 28 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
17-5-3 Standards for Water Supply and Waste Disposal Systems.
A. All new or replacement water supply and sanitary sewage systems shall be designed to
minimize or eliminate infiltration of floodwaters into the system and discharge from systems into
floodwaters.
B. On-site waste disposal systems shall not be installed wholly or partially in a regulatory floodway,
erosion setback, or as established by the Arizona Department of Environmental Quality (ADEQ),
whichever is most restrictive.
C. On-site waste disposal systems shall be located to avoid impairment to them or contamination
from them during flooding. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-4 Standards and Submittal Requirements for Subdivisions.
A. All new subdivision proposals and other proposed development (including proposals for
manufactured home parks and subdivisions), greater than fifty (50) lots or five (5) acres, whichever
is the lesser, shall:
1. Identify the regulatory floodplain area and the elevation of the base flood; and
2. Identify on the final plans the elevation(s) of the proposed structure(s) and pads. If the site is
filled above the base flood elevation, the final lowest floor and grade elevations shall be certified
by an Arizona registered professional engineer or Arizona registered professional land surveyor
and provided to the Floodplain Administrator.
B. All subdivision proposals shall be consistent with the need to minimize flood damage.
C. All subdivision proposals (also referred to as a final site plan) shall have all public utilities and
facilities, including but not limited to sewer, gas, electrical, and water systems, located and
constructed to minimize flood damage.
D. All subdivisions shall provide adequate drainage to reduce exposure to flood hazards (see
adopted drainage criteria manual).
E. Suitability of the Land. Land that has been found by the Floodplain Board to be unsuitable for
development with permanent structures based on hydrological and engineering studies of flooding
can be platted and used only for open space and greenbelt uses such as those identified in Section
17-5-7(B)(1). This includes land which is:
1. Physically unsuitable because of flooding, poor drainage, and other features which may
endanger health, life, or property, aggravate erosion, increase the flood hazard, or increase the
burden imposed on the community, its governmental units, and its citizens;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 29 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
2. Subject to flooding because of its proximity to the stream or watercourse; or because of low
elevation. In applying this provision, the Floodplain Board, with technical support and
recommendations from the Town Engineer, shall consider:
a. Land subject to flooding by the base flood shall not be platted for residential occupancy,
or building sites, or for any other uses that may increase the flood hazard or endanger
health, life, or property, unless each lot contains a building site that meets requirements set
forth below, in subsections (G) and (H) of this section, and within other pertinent sections of
this chapter;
b. Fill shall not be used to raise land within the regulatory floodway. In other areas subject
to flooding by the base flood, fill may be used; provided, that the proposed fill does not
restrict the flow of water and increase flood heights or velocities in the regulatory floodway,
according to the same standards established in Section 17-5-8; and provided, that
compensatory flood storage is provided.
F. Flood Situation to Be Shown on Plat. Plats submitted shall show the following:
1. Conceptual site development plans (plats) shall show the location, by survey, of
watercourses, channels, irrigation laterals, private ditches, culverts, lakes, or other water
features, including direction of flow, water level elevations, and the location and extent of areas
subject to frequent inundation;
2. All preliminary subdivision proposals shall identify the special flood hazard areas, regulatory
floodplain, the elevation of the base flood, pre- and post-development water surface elevations,
and pre- and post-development floodplain limits;
3. All conceptual and final subdivision plans will provide the elevation(s) of proposed
structure(s) and pads. If the site is filled above the base flood elevation, the final lowest floor
and pad elevation shall be certified by an Arizona registered professional engineer or an
Arizona registered professional land surveyor and provided to the Floodplain Administrator and
the Town Building Official;
4. Final plats shall show the limits of the regulatory floodplain and the regulatory floodway, as
well as the corresponding one hundred (100) year flood peaks, and their contributing drainage
areas, entering and exiting the development;
5. Conceptual and final site plans shall show proposed improvements for areas subject to
flooding and/or for areas which contain extremely poor drainage facilities such that the proposed
improvements make the areas safe from flooding for the respective type of occupancy.
G. Street Elevations.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 30 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
1. Refer to the Town’s adopted drainage criteria manual and subdivision street standards for
additional information and requirements.
2. Fill used for the streets in areas subject to flooding shall not increase flood heights more
than a designated amount as defined in Section 17-5-8(A)(1)(b).
3. The developer shall provide pre- and post-developed water surface elevation for streets
proposed for placement in or adjacent to areas subject to flooding. Headwater ponding limits
and water surface elevations shall be shown upstream of all culvert crossings.
H. Building Site.
1. Residential lots shall contain a building site, either natural or manmade, which is not subject
to flooding by the base flood.
2. In areas subject to flooding by the base flood, where no fill is proposed, the building line
shall be located no closer to the watercourse or channel than the edge of the area subject to
flooding by the base flood. In areas where fill is used to raise the elevation of the building site,
no fill shall be placed in the regulatory floodway. Further, where fill is used, the erosion setback
shall not be less than twenty-five (25) feet from an unprotected bank, and not less than fifteen
(15) feet for protected banks.
I. Setback from Channels. Along reaches of all regulated watercourses, erosion setback
requirements from banks of washes shall be established in accordance with the Town’s adopted
drainage criteria manual or standards accepted by the Town Engineer.
J. Easements for Drainage. Whenever any watercourse is located in the area being subdivided, an
easement or common area encompassing each side of the watercourse shall be provided for the
purpose of protecting and/or maintaining the watercourse for flood and drainage purposes, and such
further width for construction of bank protection, physical access for maintenance, or for allowing for
natural meander of the stream or watercourse that may be reasonably expected, or for all these as
will be adequate for the purpose, as determined by the Town Engineer.
K. Detention/Retention Systems. See Town’s adopted drainage criteria manual for requirements
pertaining to detention/retention systems by visiting the administrative offices of the Town of Oro
Valley. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-5 Standards for Manufactured Homes.
All manufactured homes that are placed within or substantially improved while located within a
regulatory floodplain shall apply for and obtain a floodplain use permit summarizing site conditions
including base flood elevation, depth of the base flood, and minimum prudent erosion setback. The
application for a floodplain use permit shall be accompanied by a site plan, prepared by an Arizona
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 31 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
registered engineer, that conforms to the State of Arizona Office of Manufactured Housing,
“Minimum Standards for Manufactured Housing Foundations in Floodplains,” dated October 14,
2009, or as subsequently amended. Accessory structures attached to a manufactured home must
meet the provisions of this chapter unless its uses are limited to parking of vehicles or storage.
Furthermore, manufactured homes shall:
A. Be elevated so that the lowest structural member or the lowest point of any attached appliances,
whichever is lower, is at or above the regulatory flood elevation.
B. Be securely anchored to an adequately anchored foundation system to resist flotation, collapse,
or lateral movement. This anchoring requirement is in addition to applicable State and local
anchoring requirements for resisting wind forces; and
C. Upon completion of installation of the manufactured home, certification by an Arizona registered
professional engineer or Arizona registered professional land surveyor that the elevation
requirements of this section have been satisfied shall be provided to the Floodplain Administrator for
verification. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-6 Standards for Recreational Vehicles.
All recreational vehicles placed within a regulatory floodplain area will either:
A. Be on site for fewer than one hundred eighty (180) consecutive days, and be fully licensed and
ready for highway use, to the extent that they are not prohibited by any other ordinance. A
recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the
site only by quick-disconnect type utilities and security devices, and has no permanently attached
additions; or
B. Meet the permit requirements of Article 17-4, and the elevation and anchoring requirements for
manufactured homes in Section 17-5-5. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-5-7 Floodways.
Located within regulatory floodplain areas, established in Section 17-3-2, are areas designated as
regulatory floodways. Since the floodway is an extremely hazardous area due to the velocity of
floodwaters that carry debris, potential projectiles, and increase erosion potential, the following
provisions apply:
A. Encroachments, including fill, new construction, substantial improvements, and other
development are prohibited in floodways. The Floodplain Administrator will consider encroachments
where certification by an Arizona registered professional engineer is provided demonstrating that
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 32 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
encroachments will result in no increase whatsoever in flood levels during the occurrence of the
base flood discharge, and that the encroachment will not pose a threat to life or property.
B. Floodway Requirements.
1. Uses Permitted. The following open space uses shall be permitted to the extent that they are
not prohibited by any other ordinance or State or Federal permit requirements, nor conflict with
uses permitted in adjoining zones, and provided they do not require structures, fill, or storage of
materials or equipment:
a. Agricultural uses, including general farming, pasture, grazing or outdoor plant nurseries,
horticulture, viticulture, truck farming, sod farming, wild crop harvesting, and restoration of
native vegetation;
b. Private and public recreational uses;
c. Accessory residential uses, including lawns, gardens, and play areas.
C. Limitations.
1. No use shall be allowed within a regulatory floodway which:
a. Acting alone or in combination with existing or future uses creates a danger or hazard to
life or property;
b. Increases the water surface elevation of the base flood; or
c. Adversely affects groundwater recharge.
D. If this section is satisfied, all new construction and substantial improvements shall comply with
all other applicable flood hazard reduction provisions in this article. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-5-8 Floodway Fringe Area Requirements.
A. Floodway fringe areas shall be subject to the following regulations:
1. The following uses shall be permitted within a floodway fringe area to the extent that they
are not prohibited by any other ordinance, and only upon issuance of a floodplain use permit:
a. Any use permitted in Section 17-5-7, Floodways;
b. Any other use not involving structures, provided it is elevated above the regulatory base
flood elevation and a determination is made by the Town Engineer that the use will not
increase the base flood elevation more than one (1) foot where the owner of the land doing
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 33 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
the development owns both sides of the floodway, and not more than one-tenth (0.1) foot
where only one (1) side is owned. In no case shall the development increase the water
surface elevation more than one-tenth (0.1) foot on the property owned by others upstream
and downstream, nor unduly restrict the capacity of the channels or floodway of tributaries
to the main stream or watercourse, drainage ditches, or other drainage facilities or systems.
The aforementioned water surface elevation increases apply to all watercourse channels in
Oro Valley except the Canada del Oro Wash where the elevation of the existing levee
system and bank protection will allow for no water surface elevation increases due to
encroachment. Additionally, when main channel floodflow velocities are greater than four
(4) feet per second (fps), a land use/development activity shall not increase floodflow
velocities immediately downstream of the activity by more than one (1) fps or ten percent
(10%), whichever is less, in the regulatory floodway. Any velocity increase greater than the
aforementioned criteria must be reviewed and approved by the Town Engineer;
c. Structures, including dwellings, may be erected or moved, provided the lowest floor or
basement floor is placed at or above the regulatory flood elevation. Land may be filled;
provided, that the top of such fill shall be at or above the regulatory flood elevation for the
particular area, and unless structurally protected from erosion shall extend at such
elevations at least twenty-five (25) feet beyond the limits of any structure erected or placed
thereon. Where structural protection from erosion is provided, the minimum extent to which
tops of the fill pad must extend shall not be less than fifteen (15) feet. The placement of
structures and any accompanying fill shall not affect base flood elevation beyond the limits
set in subsection (A)(1)(b) of this section.
B. The following minimum requirements apply to all uses located within a regulatory floodplain:
1. All new construction (including prefabricated structures and mobile homes) and substantial
improvements shall be anchored to prevent flotation and lateral movement, and be constructed
with flood resistant materials and methods.
2. All proposed plats and proposals for other developments, including their utilities, streets, and
drainage structures, shall be located and designed to be consistent with the need to minimize
flood damage.
3. All tentative development plans, site plans, final site plans, improvement plans, and final
plats, and other proposed new developments shall include base flood elevation data or as
otherwise directed by the Town Engineer.
4. If in a riverine situation, all adjacent communities and the State Coordinating Office must be
notified prior to any alteration or relocation of the watercourse, and copies of such notifications
must be sent to the FEMA. Within the proposed altered or relocated portion of any watercourse,
the flood carrying capacity shall be maintained.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 34 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
5. Within one hundred twenty (120) days after completion of construction of any flood control
protective works which changes the rate of flow during the flood, or changes the configuration of
the floodplain, the person or agency responsible for installation of the protective works shall
provide to the governing bodies of all jurisdictions affected by the protective works a new
delineation of all floodplains affected. The new floodplain delineation shall be done according to
the criteria adopted by the State of Arizona Director of Water Resources.
C. Limitations.
1. No use shall be allowed within a floodway fringe which:
a. Acting alone or in combination with existing or future uses creates danger or hazard to
life or property;
b. Increases the water surface elevation for the base flood by more than that allowed
under subsection (A)(1)(b) of this section;
c. Adversely affects groundwater recharge.
D. Critical Facilities.
1. “Critical facility” means any of the following:
a. A structure or facility that produces, uses or stores highly volatile, flammable, explosive,
toxic, and/or water-reactive materials;
b. Hospitals, emergency medical facilities, nursing homes and/or housing facilities likely to
have occupants who may not be sufficiently mobile to avoid injury or death during a flood;
c. Essential emergency response facilities, such as police stations, fire stations,
emergency shelters and/or operation centers that are needed for public safety and/or flood
response activities before, during and after a flood; and
d. Public and private utility facilities, such as but not limited to power, water and
wastewater treatment, and/or communications, that are vital to maintaining or restoring
normal services to flooded areas before, during and after a flood.
2. Applicability. The critical facility requirements shall only apply along watercourses which
have FEMA designated floodplains. Where the two-tenths percent (0.2%) chance floodplain has
not been established, the Town Engineer may require that this floodplain be delineated by the
applicant.
3. Critical facilities shall be located outside of the two-tenths percent (0.2%) annual chance
(five hundred (500) year) floodplain, if possible. If a critical facility must be located in a two-
tenths percent (0.2%) annual chance (five hundred (500) year) floodplain, it must be
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 35 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
demonstrated that there is either a critical need to locate it within the floodplain, or that there is
not a suitable alternative site, as justified by an Arizona registered professional engineer. Any
critical facility located within a two-tenths percent (0.2%) annual chance (five hundred (500)
year) floodplain shall be protected from that event. “Protection” includes, but is not limited to,
elevating the lowest floor and all utilities and mechanical services to a minimum of one (1) foot
above the base flood or to the two-tenths percent (0.2%) annual chance (five hundred (500)
year) floodplain water surface elevation, whichever is greater, providing elevated access ramps,
if appropriate, adequately protecting the facility from both lateral and vertical erosion associated
with the two-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain, providing
all weather access during the base flood and developing an emergency response plan.
4. Existing critical facilities within the two-tenths percent (0.2%) annual chance (five hundred
(500) year) floodplain that propose substantial improvements and/or repairs shall be protected
from the two-tenths percent (0.2%) annual chance (five hundred (500) year) flood event.
“Protection” includes, but is not limited to, elevating or flood-proofing the lowest floor and all
utilities and mechanical services to a minimum of one (1) foot above the base flood or to the two
-tenths percent (0.2%) annual chance (five hundred (500) year) floodplain water surface
elevation, whichever is greater, providing elevated access ramps, if appropriate, adequately
protecting the facility from both lateral and vertical erosion associated with the two-tenths
percent (0.2%) annual chance (five hundred (500) year) floodplain, providing all-weather access
to the base flood and developing an emergency response plan. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
17-5-9 Flood-Related Erosion-Prone Area.
The protection of Town residents and their property from injury and damage that can occur as a
result of streambank lateral migration due to erosion and scour is of primary importance in the
administration of this chapter and the following criteria apply:
A. The Floodplain Administrator shall require Floodplain Use Permits for proposed construction and
other development within all flood-related erosion-prone areas, as determined by lateral migration
analysis described in the Town’s drainage criteria manual or in other predetermined, documented
evidence. Areas generally most susceptible to lateral erosion and scour include, but are not limited
to, locations of historical stream/wash meandering, locations where poorly defined or poorly
consolidated banks occur, wash reaches characterized by changes in the direction, velocity, or
amount of streamflow, and locations in the proximity of stabilizing features or structures such as rock
outcrops or bridges. Alternative safe limits for erosion setbacks may be considered if approved in
writing by the Floodplain Administrator based on an acceptable engineering study prepared and
sealed by an Arizona registered professional engineer. However, at no time shall a setback be less
than twenty-five (25) feet from an unprotected bank, and not less than fifteen (15) feet for a
protected bank.
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 36 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
B. Permit applications shall be reviewed to determine whether the proposed site alterations and
improvements will be reasonably safe from flood-related erosion, and will not cause flood-related
erosion hazards or otherwise aggravate the existing hazard.
C. If a proposed development or structure including associated permanent features such as a patio
wall or swimming pool or any other feature is found to be in the path of flood-related erosion, or
would increase the erosion hazard, such improvements shall be relocated or adequate protective
measures shall be taken to avoid aggravating the existing erosion hazard.
D. Areas within the erosion setback may be used for suitable open space purposes, such as for
outdoor recreation and wildlife habitat areas, and for other activities using temporary and portable
structures only. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-6
APPEAL AND VARIANCE PROCEDURES
Sections:
17-6-1 Nature of Variances
17-6-2 Floodplain Board
17-6-3 Appeals and Request for Variance Considerations
17-6-4 Conditions for Variances
17-6-1 Nature of Variances.
The variance criteria set forth in this article are based on the general principle of zoning law that
variances pertain to a piece of property and are not personal in nature. A variance may be granted
for a parcel of property with physical characteristics so unusual that complying with the requirements
of this chapter would create an exceptional hardship to the applicant or the surrounding property
owners. The characteristics must be unique to the property and not be shared by adjacent parcels.
The unique characteristic must pertain to the land itself, not to the structure, its inhabitants, or the
property owners.
It is the duty of the Town of Oro Valley to help protect its citizens from flooding. This need is so
compelling and the implications of the cost of insuring a structure built below the regulatory flood
elevation are so serious that variances from the regulatory flood elevation shall not be granted.
Variances from other requirements in the floodplain management ordinance are quite rare. The long-
term goal of preventing and reducing flood loss and damage can only be met if variances are strictly
limited. Therefore, the variance guidelines provided in this chapter are detailed and contain multiple
provisions that must be met before a variance can be properly granted. The criteria are designed to
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 37 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
screen out those situations in which alternatives other than a variance are more appropriate. ((O)21-
06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-2 Floodplain Board.
A. The Floodplain Board of Oro Valley shall hear and decide requests for variances from the
requirements of this chapter to FEMA regulated floodplains, as well as hear appeals to decisions
from previous determinations or actions on non-FEMA regulated floodplains by the Floodplain
Administrator or the Town Engineer.
B. The Floodplain Board shall hear and decide appeals when it is alleged there is an error in any
requirement, decision, or determination made by the Floodplain Administrator in the enforcement or
administration of this chapter with regard to FEMA regulated floodplains and floodplains identified on
the Town’s Flood Insurance Rate Maps. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35,
10/05/2005)
17-6-3 Appeals and Request for Variance Considerations.
A. In considering appeals and requests for variance, the Floodplain Board shall consider all
technical evaluations, all relevant factors, and all standards specified in other sections of this
chapter, and also consider:
1. The danger that materials may be swept onto other lands to the injury of others;
2. The danger of life and property due to flooding or erosion damage;
3. The susceptibility of the proposed facility and its contents to flood damage, and the effect of
such damage on the individual owner;
4. The importance of the services provided by the proposed facility to the community;
5. The necessity to the facility of a waterfront location, where applicable;
6. The availability of alternative locations for the proposed use that are not subject to flooding
or erosion damage;
7. The compatibility of the proposed use with existing and anticipated development;
8. The relationship of the proposed use to the comprehensive plan and floodplain management
program for the area encompassing the proposed use;
9. The safety of access to the property in time of flood for ordinary and emergency vehicles;
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 38 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
10. The expected heights, velocity, duration, rate of rise, and sediment transport of the
floodwaters expected at the site; and
11. The costs of providing governmental services during and after flood conditions, including
maintenance and repair of public utilities and facilities such as sewer, gas, electrical, water
system, and streets and bridges.
B. Upon consideration of the factors of subsection (A) of this section and the purposes of this
chapter, the Floodplain Board may attach such conditions to the granting of appeals and variances
as it deems necessary to further the purposes of this chapter.
C. The Floodplain Administrator shall maintain a record of all variance actions, including justification
for their issuance, and shall report any such variances that are issued in FEMA regulated floodplains
in its biennial report, which is also submitted to the Federal Emergency Management Agency.
D. Any applicant to whom a variance is granted shall be given written notice over the signature of
the Floodplain Administrator, or their designee, that:
1. The issuance of a variance to construct a structure below the base flood elevation will result
in increased premium rates for flood insurance up to amounts as high as twenty-five dollars
($25.00) for one hundred dollars ($100.00) of insurance coverage; and
2. Such construction below the regulatory flood elevation increases risks to life and property;
and
E. A person aggrieved in any manner by an action of the Floodplain Board may within thirty (30)
days appeal to the Floodplain Board. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
17-6-4 Conditions for Variances.
A. Variances shall only be issued upon:
1. A showing of good and sufficient cause;
2. A determination that the variance is the minimum necessary, considering the flood hazard, to
afford relief;
3. A determination that failure to grant the variance would result in exceptional hardship to the
applicant;
4. A showing that the use cannot perform its intended purpose unless it is located or carried
out in close proximity to water. This includes only facilities defined in Article 17-2 in the definition
of “functionally dependent use” (which is unlikely due to the Town of Oro Valley’s arid climate);
and
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 39 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
5. A determination that the granting of a variance will not result in increased flood heights,
additional threats to public safety, extraordinary public expense, create nuisances, cause fraud
on or victimization of the public, or conflict with existing local laws or ordinances.
B. Variances shall not be issued within any regulatory floodway if any increase in the base flood
elevation would result.
C. Variances may be issued for the repair, rehabilitation, or restoration of structures listed in the
National Register of Historic Places or the State Inventory of Historic Places upon a determination
that the proposed repair or rehabilitation will not preclude the structure’s continued designation as a
historic structure, and that the variance is the minimum necessary in order to preserve the historic
character and design of the structure.
D. The Floodplain Administrator, at his/her discretion, may grant a variance for non-FEMA
regulated flood hazard areas.
E. Generally, variances may be issued for new construction and substantial improvements to be
erected on a lot of one-half (0.5) acre or less in size contiguous to and surrounded by lots with
existing structures constructed below the regulatory flood elevation, provided the procedures of
Articles 17-4 and 17-5 have been fully considered. As the lot size increases beyond one-half (0.5)
acre, the technical justification required for issuing the variance increases. ((O)21-06, 11/17/2021; (O)17-
04, 04/05/2017; (O)05-35, 10/05/2005)
Article 17-7
ORDINANCE AMENDMENTS
Sections:
17-7-1 Procedures
17-7-1 Procedures.
A. The Floodplain Board may from time to time, after a public hearing required by law (ARS § 38-
431.01, and other open meeting laws), amend, supplement, or change the regulations set forth
herein or subsequently established. Any amendment, supplement, or change may be initiated by the
Floodplain Board or by petition of affected persons hereafter provided.
B. The procedures established by this article are to provide for appropriate and timely ordinance
amendments, with due consideration of the purpose of this article. ((O)21-06, 11/17/2021; (O)17-04,
04/05/2017; (O)05-35, 10/05/2005)
Oro Valley Town Code Chapter 17, Floodplain and Erosion Hazard Management Page 40 of 40
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18, 2024.
Article 17-8
FEES
Sections:
17-8-1 Fee Schedule
17-8-1 Fee Schedule.
Fees for floodplain use permits will be charged based on the fee schedule approved by the Town
Council. ((O)21-06, 11/17/2021; (O)17-04, 04/05/2017; (O)05-35, 10/05/2005)
The Oro Valley Town Code is current through Ordinance (O)24-08, passed September 18,
2024.
Disclaimer: The Town Clerk’s Office has the official version of the Oro Valley Town Code. Users
should contact the Town Clerk’s Office for ordinances passed subsequent to the ordinance cited
above.
Town Website: www.orovalleyaz.gov
Hosted by General Code.
Chapter 17 Amendments: Floodplain &
Erosion Hazard Management Amendments
Town of Oro Valley Stormwater Utility Commission
Presenter: Dennis Roberts, Stormwater Utility Division Manager
May 21, 2026
Purpose of Agenda Item
• Present proposed amendments to Town Code Chapter 17
• Summarize ADWR Community Assistance Visit (CAV)
findings
• Review how proposed revisions address State and FEMA
requirements
• Request Commission recommendation to forward
amendments to Mayor and Council
Background
• Chapter 17 was last updated in 2021
• ADWR completed a Community Assistance Visit in
January 2023
• CAV identified needed updates to align with:
• Arizona Floodplain Management Model Ordinance (June 2023)
• Current NFIP requirements
• State and federal best practices
• Staff incorporated all ADWR recommendations
What the CAV Identified
ADWR noted the need for:
• Updated and clarified definitions
• Consistency with State Model Ordinance language
• Clearer administrative and permitting procedures
• Removal of outdated, conflicting, or unclear sections
• Better alignment with FEMA requirements for:
• Floodplain use permits
• Elevation and certification
• Floodway and floodway fringe standards
• Variances and appeals
Overview of Revisions
Revisions include:
• Updated definitions throughout Article 17-2
• Clarified procedures for floodplain use
permits and map updates
• Updated standards for construction, utilities,
and subdivisions
• Clarified appeal and variance procedures
• Cleaned up outdated or redundant text
• Improved internal constancy and readability
• No new regulatory burdens beyond what
ADWR requires
What Did NOT Change
• No changes to FEMA-mapped floodplains
• No new fees or permitting requirements
• No expansion of regulatory areas
• No changes that affect homeowner insurance
requirements
• No new enforcement authorities beyond existing State
and NFIP rules
Why Adoption is Important
Adopting the Updates:
• Ensures compliance with State law (ARS §48-
3609/3610)
• Maintains NFIP good standing
• Protects community eligibility for:
• Federally backed flood insurance
• Post-disaster FEMA assistance
• Hazard mitigation grants
• Reduces liability exposure for the Town
• Demonstrates strong local floodplain management
capability
Documents Provided to Commission
Included in the agenda packet:
• ADWR CAV comments summary
• Redline version of Chapter 17
• Clean version of Chapter 17 (formatted for adoption)
• Staff report and supporting materials
Commission is asked to review and provide feedback
Next Steps in the Process
If supported by the Commission:
• Recommendation forwarded to
Mayor & Council
• Town Legal prepares final
ordinance language
• Staff schedules item for next
available Council Regular Session
• Upon Council adoption, Chapter 17
is updated in Town Code
• Staff transmits updated ordinance
to ADWR and FEMA
Questions and Feedback
Questions from the Commission
• Staff available for clarifications
• Feedback will be incorporated into the final package
Thank You
Town of Oro Valley
Stormwater Utility Division
Contact: Dennis Roberts, Division Manager
Email:droberts@orovalleyaz.gov
Phone:520-229-5044