HomeMy WebLinkAboutPackets - Stormwater Utillity Commission (205)AGENDA
STORMWATER UTILITY COMMISSION
REGULAR SESSION
JUNE 18, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
ROLL CALL
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
DIRECTORS REPORT (INFORMATIONAL ONLY)
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE MAY 21, 2026 MEETING MINUTES
2.DISCUSSION OF MEETINGS AND EVENTS
3.PRESENTATION AND DISCUSSION OF STORMWATER UTILITY DIVISION BUDGET FOR FISCAL
YEAR 2026-2027
4.PRESENTATION AND DISCUSSION OF THE STORMWATER UTILITY GRANT PURSUIT PROCESS
5.DISCUSSION AND POSSIBLE ACTION REGARDING CANCELLATION OF THE JULY 16, 2026
STORMWATER UTILITY COMMISSION REGULAR SESSION MEETING
ADJOURNMENT
POSTED: 6/12/26 at 5:00 pm by ck
POSTED: 6/12/26 at 5:00 pm by ck
When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours
prior to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability
needs any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission
meeting at 229-4700.
INSTRUCTIONS TO SPEAKERS
Members of the public have the right to speak during any posted public hearing. However, those items not
listed as a public hearing are for consideration and action by the Commission during the course of their
business meeting. Members of the public may be allowed to speak on these topics at the discretion of the
Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card located
on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to
Audience,” please specify what you wish to discuss when completing the blue speaker card.
Please step forward to the podium when the Chair announces the item(s) on the agenda which you are interested
in addressing.
1. For the record, please state your name and whether or not you are a Town resident.
2. Speak only on the issue currently being discussed by the Commission. Please organize your speech, you will
only be allowed to address the Commission once regarding the topic being discussed.
3. Please limit your comments to 3 minutes.
4. During “Call to Audience”, you may address the Commission on any issue you wish.
5. Any member of the public speaking must speak in a courteous and respectful manner to those present.
Thank you for your cooperation.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions and Committees: In accordance
with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the
Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board,
Stormwater Utility Commission, and Water Utility Commission may attend the above referenced meeting as a
member of the audience only.”
Stormwater Utility Commission 1.
Meeting Date:06/18/2026
Requested by: Dennis Roberts, Public Works Submitted By:Yarina Hynd, Public Works
SUBJECT:
REVIEW AND APPROVAL OF THE MAY 21, 2026 MEETING MINUTES
RECOMMENDATION:
Staff recommends approval.
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes), the May 21, 2026 Regular Session meeting minutes as presented.
Attachments
05-21-26 Draft Minutes
D R A F T
MINUTES
STORMWATER UTILITY COMMISSION
REGULAR SESSION
MAY 21, 2026
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 PM
CALL TO ORDER
Chair Mattson called the meeting to order at 4:01 P.M.
ROLL CALL
Present: Robert Aguayo, Vice Chair
David Atler, Commissioner
John McCauley, Commissioner
Gary Mattson, Chair
Absent: Tom Marek, Commissioner
Staff Present: Dennis Roberts, Stormwater Division Manager
Kevin King, Stormwater Utility Intern
Council Liaison Harry Greene arrived at 4:26 P.M.
CALL TO AUDIENCE
There were no speaker requests.
COUNCIL LIAISON COMMENTS (INFORMATIONAL ONLY)
Council Liaison Harry Greene was not present.
DIRECTORS REPORT (INFORMATIONAL ONLY)
Stormwater Division Manager Dennis Roberts commented on the following topics:
- In response to a topic where information was requested by a Commissioner regarding the installation by Pima
County of Trash Traps on the Santa Cruz River
- Clarification in response to a topic where information was requested by a Commissioner concerning local Water
Utilities Coordination
- Summer Meeting Schedule
- Open Meeting Law Speaking Procedures
5/21/26 Minutes, Stormwater Utility Commission Regular Session 1
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE MARCH 19, 2026 AND THE APRIL 16, 2026 MEETING MINUTES
Motion by Commissioner John McCauley, seconded by Vice Chair Robert Aguayo to approve the March 19,
2026 meeting minutes.
Vote: 3 - 0 Carried
Other:Commissioner David Atler (ABSTAINING)
Motion by Vice Chair Robert Aguayo, seconded by Commissioner John McCauley to approve the April 16, 2026
meeting minutes.
Vote: 4 - 0 Carried
2.DISCUSSION OF MEETING AND EVENTS
Stormwater Division Manager Dennis Roberts discussed past, current and upcoming meetings and events
in which the Stormwater Utility has participated or will participate.
Discussion ensued among the commission and staff.
3.DISCUSSION OF APRIL 16, 2026 STORMWATER UTILITY COMMISSION FIELD TRIP
Stormwater Division Manager Dennis Roberts provided a presentation that included the following:
- Purpose of Today's Recap
- Refresh key locations visited on April 16
- Share field trip photos
- Summarize notable conditions observed in the field
- Provide brief updates on active projects
- Invite Commissioners to share reflections and ask questions
- 2026 Stormwater Utility Field Trip Stops
- Key Observations from the Field
- Scour and downcutting at multiple culvert outlets
- Sediment buildup limiting culvert capacity
- Need for improved access for maintenance
- Erosion related utility exposure at several sites
- Successful stabilization work at completed projects
- Unnamed Wash at the Noise Wall along La Canada Erosion Mitigation Project
- La Cholla Wash and Sierra Wash at Lambert Lane Erosion Mitigation Project
- Sierra Wash at W Glover Rd Erosion Mitigation Project
- Sierra Wash at Via Mandarina Erosion Mitigation Project
- Sierra Wash at W Naranja Dr Erosion Mitigation Project
- Catalina Ridge Channel Access at N Avenida Vallejo
- Catalina Ridge Channel Access at N Naranja Dr
- SWUC Photo of Catalina Ridge Channel SWUC Field Trip Site Visit 2026
- Lower Highland Wash Flood Control and Channel Improvement Project
- SWUC Photo of Lower Highland Wash SWUC Field Trip Site Visit 2026
- Gravel Pit Wash at N Pomegranate Dr Erosion Mitigation Project
- Mutterer's Wash Flood Control and Channel Improvement Project
- SWUC Photo of Mutterer's Wash SWUC Field Trip Site Visit 2026
- Carmack Wash Upper Tributary C Flood Control and Channel Improvement Project
- Nanini Wash at N Paseo Del Norte Erosion Mitigation Project
5/21/26 Minutes, Stormwater Utility Commission Regular Session 2
- Nanini Wash at N Paseo Del Norte Erosion Mitigation Project
- SWUC Photo - We Appreciate Your Support and Collaboration Throughout the Tour
- SWUC Group Photo - Thank You For Joining the 2026 Stormwater Field Trip
4.DISCUSSION OF 2025/2026 TOWN OF ORO VALLEY MS4 COMPLIANCE SCHEDULE, THIRD
QUARTER REPORT
Stormwater Division Manager Dennis Roberts reported on the Third Quarter, from January 1, 2026
through March 31, 2026, of the Town's 2025/2026 MS4 (Municipal Separate Storm Sewer System)
Compliance Schedule. The Stormwater Utility is fully up-to-date and has met this quarter's goals.
5.PRESENTATION AND DISCUSSION OF ORO VALLEY MONSOON PREPAREDNESS
Stormwater Division Manager Dennis Roberts provided a presentation that included the following:
- Protecting Oro Valley Residents
- What are Monsoons?
- How do Monsoons Impact Oro Valley?
- Heavy Rainfall
- Flash Flood Dangers
- How Stormwater Management Keeps Oro Valley Safe
- Regional Collaboration for Monsoon Readiness
- Spreading the Message
- Be Ready for Monsoon Season: Resources & Tips for Oro Valley
- Protect Your Property: Oro Valley's Free Sandbag Program
- Monsoon Preparedness Starts With You
6.PRESENTATION, DISCUSSION, AND POSSIBLE ACTION REGARDING RECOMMENDATION TO
FORWARD AMENDMENTS TO TOWN CODE CHAPTER 17 TO THE MAYOR AND COUNCIL FOR
CONSIDERATION AND ADOPTION
Stormwater Division Manager Dennis Roberts provided a presentation that included the following:
- Purpose proposed amendments to Town Code Chapter 17
- Present proposed amendments to Town Code Chapter 17
- Background
- What the CAV (Community Assistance Visit) Identified
- Overview of Revisions
- What Did NOT Change
- Why Adoption is Important
- Documents Provided to Commission — Included in the agenda packet:
- ADWR (Arizona Department of Water Resources) CAV (Community Assistance Visit) comments
summary
- Redline version of Chapter 17
- Clean version of Chapter 17 (formatted for adoption)
- Staff report and supporting materials - Commission is asked to review and provide feedback
- Next Steps in the Process
- Questions and Feedback
- Thank you
Discussion ensued among the Commission and staff.
Motion by Commissioner David Atler, seconded by Commissioner John McCauley to recommend forwarding the
5/21/26 Minutes, Stormwater Utility Commission Regular Session 3
Motion by Commissioner David Atler, seconded by Commissioner John McCauley to recommend forwarding the
proposed motion of Chapter 17 Amendments to Mayor and Council for consideration and possible adoption.
Vote: 4 - 0 Carried
ADJOURNMENT
Motion by Vice Chair Robert Aguayo, seconded by Commissioner John McCauley to adjourn the meeting.
Vote: 4 - 0 Carried
Chair Mattson adjourned the meeting at 4:55 P.M.
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Stormwater Utility Commission of Oro Valley, Arizona held on the 21st day of May, 2026. I
further certify that the meeting was duly called and held and that a quorum was present.
___________________________
Yarina Hynd
Senior Office Specialist
5/21/26 Minutes, Stormwater Utility Commission Regular Session 4
Stormwater Utility Commission 2.
Meeting Date:06/18/2026
Submitted By:Dennis Roberts, Public Works
SUBJECT:
DISCUSSION OF MEETINGS AND EVENTS
RECOMMENDATION:
This item is presented for information and discussion only. No action is requested.
EXECUTIVE SUMMARY:
The following is a list of immediate past, and upcoming, stormwater-related meetings and events:
June 17, 2026 – Regional Flood Control Advisory Committee Meeting
June 18, 2026 – Oro Valley Stormwater Utility Commission Meeting
July 15, 2026 – Regional Flood Control Advisory Committee Meeting
July 16, 2026 - Oro Valley Stormater Utility Commission Meeting (Canceled)
August 19, 2026 – Regional Flood Control Advisory Committee Meeting
August 20, 2026 - Oro Valley Stormater Utility Commission Meeting
BACKGROUND OR DETAILED INFORMATION:
Since the Commission’s last regular meeting, staff have continued participating in project-specific coordination,
regional committee discussions, stakeholder outreach, and regulatory engagement activities. These meetings
support collaboration with partner agencies, advance active capital and grant-funded stormwater projects, and
ensure alignment with regional watershed management priorities. Staff will provide brief verbal updates on key
discussions and outcomes during the meeting.
FISCAL IMPACT:
There is no fiscal impact associated with this informational item. Participation in these meetings is part of the
Stormwater Utility Division’s routine operations.
SUGGESTED MOTION:
No motion required. This item is for information and discussion only.
Stormwater Utility Commission 3.
Meeting Date:06/18/2026
Submitted By:Dennis Roberts, Public Works
SUBJECT:
PRESENTATION AND DISCUSSION OF STORMWATER UTILITY DIVISION BUDGET FOR FISCAL YEAR
2026-2027
RECOMMENDATION:
This item is for discussion purposes only. No action is requested at this time.
EXECUTIVE SUMMARY:
The Town Manager’s Recommended Budget for Fiscal Year 2026–2027 was tentatively approved on
June 3, 2026, and is scheduled for final adoption on June 17, 2026. As part of the annual budget
process, the Stormwater Utility Division is presenting its FY 26–27 budget to the Commission for
review, questions, and discussion.
For FY 26–27, the Stormwater Utility is projected to receive $2,084,742 in revenue and expend
$2,374,474 across personnel, operations and maintenance, and capital projects. Although expenditures
exceed annual revenues, the Utility begins the fiscal year with a strong fund balance of $1,643,746,
which functions similarly to a savings account. This balance carries forward from prior years and allows
the Utility to fund multi-year capital improvements and respond to unforeseen needs. After planned
expenditures, the Utility is expected to end FY 26–27 with $1,354,014 remaining.
This presentation provides a high-level overview of the FY 26–27 budget and a brief status update on
the Utility’s 10-Year Financial Plan. A more detailed discussion of long-range financial needs and the
upcoming stormwater rate review will be brought to the Commission in August.
BACKGROUND OR DETAILED INFORMATION:
FY 26–27 Budget Overview
Stormwater Utility revenues total $2,084,742, consisting of:
$1,758,800 in charges for service
$280,942 in federal grant revenue
$45,000 in interest income
Expenditures total $2,624,474, including:
$982,013 for personnel
$456,445 for operations and maintenance
$936,016 for capital outlay
$250,000 for contingency
These expenditures support the Utility’s core responsibilities, including MS4 compliance, NPDES
requirements, drainage system maintenance, vegetation and debris removal, infrastructure inspections,
storm event response, and floodplain management.
Capital Projects Included in FY 26–27
The FY 26–27 capital outlay supports the following projects:
Catalina Ridge Access Ramp and Channel Improvement Project
Sierra Wash at Glover Road Erosion Mitigation Project
General Drainage Infrastructure Maintenance
These projects address high-priority erosion, access, and stabilization needs identified through field
inspections and long-range planning.
10-Year Financial Plan Status
The Stormwater Utility maintains a 10-Year Financial Plan, currently updated through FY 30–31. Key
trends include:
Gradual revenue increases based on the adopted fee structure
Significant growth in capital needs beginning in FY 28–29
Cash balances rising in years preceding major projects and declining as construction begins
Continued reliance on federal grant funding as part of long-term financial strategy
This overview is provided for context. A detailed review of long-range needs and rate implications will
be presented in August.
FISCAL IMPACT:
The FY 26–27 Stormwater Utility Budget includes $2,084,742 in revenues and $2,374,474 in
expenditures, resulting in a projected ending fund balance of $1,354,014. No fiscal action is required by
the Commission at this time.
SUGGESTED MOTION:
This item is for discussion purposes only.
Attachments
SWU Budget FY 26-27 Presentation
Stormwater Utility Division Budget:
Fiscal Year 2026-2027
Stormwater Utility Commission Meeting
June 18, 2026
Dennis E. Roberts, P.E., CFM
Stormwater Utility Division Manager
Purpose of Today’s Presentation
• Introduce the Stormwater Utility’s FY 26-27 budget
• Review major revenues and expenditures
• Explain fund balance in simple terms
• Clarify how this year’s budget positions the Utility for long-
range capital needs.
• Provide a short update on the 10-Year financial plan
• Prepare the Commission for an in-depth discussion in
August
Stormwater Utility Overview.
• MS4 Compliance & NPDES requirements
• Required to maintain permit coverage and avoid enforcement actions.
• Ensuring compliance with federal stormwater regulations, including inspections,
reporting, and public education.
• Drainage System Maintenance
• Routine clearing of sediment, debris, and vegetation to maintain system capacity
and conveyance.
• Culvert, Channel & Basin Inspections
• Regular inspection of Town-maintained drainage infrastructure for erosion,
blockages, safety issues, and repairs.
• Floodplain Management
• Enforcement of floodplain regulations, review of floodplain use permits, and
coordination with FEMA/DEMA processes.
Stormwater Utility Overview.
• Engineering Review
• Technical review of drainage reports, development plans, grading plans,
and hydrology/hydraulics submittals.
• Storm Event Response
• Field response during and after storm events, including wash checks,
sediment removal, and hazard mitigation.
• Capital Project Delivery
• Planning, designing, and implementing wash stabilization, erosion control,
and drainage-system improvement projects
• Long-Range Financial and Infrastructure Planning
• Managing the Stormwater Utility’s Fund Balance, 10-year capital forecasts,
grants, and future rate evaluations.
Overview of Fiscal Year 2026-2027 Budget
The FY 26-27 budget includes:
• Total revenue: $2,084,742
• Total expenditures: $2,374,474
• Beginning fund balance: $1,643,746
• Estimated ending fund balance: $1,354,014
• The Utility remains financially stable despite drawdown for
capital work.
What is Fund Balance
• Fund balance works like a savings account
• Money not spent in prior years carries forward
• This balance allows the Utility to cover large projects and unexpected
needs
• Even though FY 26-27 expenses exceed revenue, the Utility ends the
year with over $1.35 million available
• A temporary drawdown is expected and planned for in the 10-year
forecast
Revenue Breakdown (FY 26-27)
Total revenue: $2,084,742
Revenue sources:
• Charges for service: $1,758,800
• Federal grants: $280,942
• Interest earnings: $45,000
• Charges for service remain the primary revenue source,
while capital outlay drives the expenditure increase.
Expenditure Breakdown (FY 26-27)
Total expenditures: $2,624,474
Expenditure categories:
• Personnel: $982,013
• Operations and Maintenance: $456,445
• Capital Projects: $936,016
• Contingency Reserve: $250,000
Year-Over-Year Comparison (FY 25-26 VS FY 26-27)
ChangeFY 26-27 (Budgeted)FY 25-26 (Projected)Category
+$282,322$2,084,742$1,802,420Revenue
+$1,229,068$2,624,474$1,395,406Expenditures
-$289,732$1,354,014$1,643,746Ending Fund Balance
• Revenue increases due to ERU growth, utility rate increase
and grant funding.
• Expenditures increase due to capital project timing and
inflation of construction cost.
• Fund Balance remains healthy and above reserve
requirements.
FY 26-27 Capital Projects Summary
Stormwater Utility Capital Outlay Total: $936,016
Projects included in the FY26-27 Recommended Budget:
•Catalina Ridge Access Ramp and Channel Improvement Project
• CIP Budget: $448,858
•Sierra Wash at Glover Road Erosion Mitigation Project
• CIP Budget: $312,158
•Nanini Wash at N Paseo Del Norte Erosion Mitigation Project
• CIP Budget: $125,000
•General Infrastructure Maintenance
• CIP Budget: $50,000
• These projects address high-priority erosion and access issues identified
in field inspections.
Catalina Ridge
Access Ramp and
Channel Improvement
Project
Status: Active
Last Revised: 06/10/26
Project Overview
Fast, concentrated storm flows are eroding the channel bottom, creating long-term
stability concerns. Heavy sediment buildup at the RCBC and limited maintenance access
prevent the Town from managing sediment effectively or protecting adjacent property.
Field observations also show potential for scour and continued channel-bottom erosion,
underscoring the need for improved access and sediment management.
Proposed Improvements
Construct Maintenance Access Ramp: Construct an access ramp near Naranja Drive
to enable safe channel maintenance.
Salvage and Rebuild Channel Protection: Salvage riprap between the Naranja Drive
RCBC outlet and the proposed ramp, remove existing fabric, regrade the channel, and
install new filter fabric with a 12-inch gabion mattress.
Evaluate Concrete Bottom Alternative: Request an alternate bid for a concrete
channel bottom.
Project Cost and Schedule:
Opinion of Probable Construction Cost (OPCC): $448,858 (as of March 31, 2026)
Current Status: 70% plans are in staff review; funding is programmed for FY 26/27
Next Steps: Complete plan set and submit for permitting. Open project bidding in late
July to early August. Contract award and pre-construction meeting expected after
monsoon season (around September 15)
(32.407372, -110.963693)
Project Overview
Significant downcutting at the culvert outlet is threatening long-term culvert performance
and infrastructure reliability. Erosion is undermining existing riprap and access for
construction remains limited, with the nearest feasible entry point located approximately
120 feet from the culvert centerline. Stabilization is needed to restore channel function
and protect the site.
Proposed Improvements
Channel Stabilization: Reconstruct the culvert outlet to eliminate downcutting and limit
erosion.
Riprap Repair: Reinforce or replace stormwater-undermined riprap
Construction Access: Establish access from approximately 120 feet downstream to
allow safe equipment mobilization.
Project Cost and Schedule
Federal Funding: $234,117
Town of Oro Valley Contribution: $78,040
Total Estimated Cost: $312,157
Funding and permits have been secured; quarterly reporting is in progress with the first
report submitted. Bidding is expected to open in late July to early August. Contract award
and pre-construction meeting are anticipated after monsoon season (around September
15).
(32.416993, -111.007363)
Sierra Wash
at
W Glover Rd.
Mitigation Project
In partnership with
Status: Active
Last Revised: 06/10/26
Nanini Wash at
N Paseo Del
Norte Erosion
Mitigation
Project
Project Overview
The site has significant safety concerns, including a 5 foot vertical drop near the pavement edge,
14–18 inches of scour below the culverts, a collapsed slope, and exposed utilities. One of the two 44
inch CMPs is partially filled with concrete, reducing capacity. Roadway undermining is ongoing and
requires mitigation.
Proposed Improvements
Guardrail installation -A guardrail is needed along the roadway to address the vertical drop and
protect the traveling public.
Hydraulic analysis -A hydraulic analysis is required to confirm whether the existing culverts are
adequately sized or if larger culverts are needed.
Headwall installation -Construct a headwall with rock faced slope paving to stabilize the
embankment and prevent further slope degradation.
Scour protection -Install gabion baskets or a riprap splash pad below the culverts to protect
against continued scour and channel erosion.
Project Cost and Schedule
Preliminary OPCC is $125K, programmed for FY26/27
(32.340946, -110.982974)
Status: Active
Last Revised: 05/11/26
Brief Status of the 10-Year Financial Plan
Stormwater Utility’s 10-Year plan is currently updated
through FY 30-31
Key trends:
• Revenue increases gradually based on the adopted fee structure
• Capital project needs increase significantly beginning FY 28-29
• Cash balances rise in years before major projects begin, then decline
as work starts
• Grant funding remains an important part of long-term financial Strategy
• The August rate review will evaluate whether current rates sustain
long-term capital needs.
Ten-Year Forecast Scenario
Upcoming Rate Review – August 2026 Preview
Why a Rate Review is Required
• Required annually under Town Code 15-24-13-H-3 to ensure
long-term financial health.
• Ensures the Utility continues to meet operational, maintenance,
and capital needs.
• Confirms compliance with cash reserve requirements in Town
Code 15-24-10.
• The Utility is a self-funded enterprise — it receives no General
Fund support.
• Rates must support MS4 compliance, drainage infrastructure
maintenance, and capital improvements.
Upcoming Rate Review – August 2026 Preview
What Triggers a Rate Review
• Updated 10-year financial plan identifying revenue needs,
capital pressures, and reserve trends.
• Projected increases in CIP costs, such as wash stabilization,
culvert rehabilitation, erosion mitigation.
• Inflation, increased O&M workload, and rising regulatory
demands.
• Growth in ERUs due to ongoing residential and commercial
development.
• Ensuring rates remain equitable and consistent with impervious
area–based billing.
Upcoming Rate Review – August 2026 Preview
What Commissioners will Evaluated in August
• Updated 10-year forecast of revenues, expenses, cash
balances, and reserve levels.
• FY 25–26 actuals and updated FY 26–27 projections.
• Operating costs: personnel, O&M, administrative, professional
services.
• Capital needs: drainage repair, channel improvements, studies,
equipment, vehicle replacement.
• Growth in stormwater accounts
• Rate structure consistency and equity across property types.
• Benchmarking against local stormwater utilities.
Upcoming Rate Review – August 2026 Preview
Commissioners Should Expect in August
• Updated scenarios reflecting new revenue, cost, and capital
data for FY 26/27 budget planning.
• Analysis of whether the current ERU rate remains sufficient or
requires adjustment.
• Options for maintaining compliance with reserve policy and
long-range capital needs.
• Discussion of rate design principles (e.g., impervious area
equity, predictability, affordability).
• Staff recommendation for rate direction, prior to Town Council’s
FY 27/28 budget cycle.
Summary
• The Stormwater Utility remains financially stable
• FY 26-27 expenses exceed revenue, but strong balance
covers the difference
• Essential stormwater and floodplain services are fully
funded
• Long-range planning continues to guide future rate and
project decisions
• More detailed analysis will be presented in August
• The FY 26-27 budget aligns with the long-range plan and
maintains compliance with Town Code reserve
requirements.
Questions
Thank you!
Questions from the Commission?
Stormwater Utility Commission 4.
Meeting Date:06/18/2026
Submitted By:Dennis Roberts, Public Works
SUBJECT:
PRESENTATION AND DISCUSSION OF THE STORMWATER UTILITY GRANT PURSUIT PROCESS
RECOMMENDATION:
This item is for discussion purposes only.
EXECUTIVE SUMMARY:
This report provides an overview of the grant pursuit process of the Stormwater Utility, including lessons
learned, active grant-funded projects, and future opportunities. Several major stormwater infrastructure
projects, ranging from approximately $293,000 to more than $2.5 million, have been successfully
positioned for federal Hazard Mitigation Grant Program (HMGP) funding. These grants represent
substantial financial benefit to the community.
The Stormwater Utility is also working with Pima County to explore opportunities for partnership on the
required local match contributions. This presentation is intended to inform the Commission and the
public of how the Stormwater Utility strategically leverages external funding to maximize stormwater
improvements while minimizing the financial impact on ratepayers.
BACKGROUND OR DETAILED INFORMATION:
The Stormwater Utility’s structured grant pursuit process began in 2017 with submittals to the Federal
Emergency Management Agency's (FEMA’s) Pre-Disaster Mitigation (PDM) program. Early efforts
were not funded, but the process resulted in a strong working relationship with the Arizona Department
of Emergency and Military Affairs (DEMA). This relationship led to successful State Emergency Council
funding in 2019 in the amount of $202,910 for improvements at the Lambert Lane dip crossing.
The Hazard Mitigation Grant Program has since become the Town’s most successful and dependable
source of external funding. Current HMGP projects and their budgets include:
Sierra Wash at Via Mandarina Erosion Mitigation Project, estimated at $293,973 and substantially
completed
Lower Highland Wash Flood Control and Channel Improvement Project, estimated at $2,368,007
Sierra Wash at Glover Road Erosion Mitigation Project, estimated at $312,158
Gravel Pit Wash at Pomegranate Drive Erosion Mitigation Project, estimated at $300,000
These projects offer significant local benefit, with federal cost share ratios ranging from 75 percent to
90 percent.
The Stormwater Utility has also submitted Notices of Intent for additional large-scale projects. These
include the Mutterer’s Wash Flood Control and Channel Improvement Project, estimated at $2,561,528,
and the Carmack Wash Upper Tributary C Flood Control and Channel Improvement Project, estimated
at $3,380,314. These submittals were made under both the Building Resilient Infrastructure and
Communities (BRIC) and Hazard Mititgation Assistance (HMA) programs. Eligibility for the HMA
program will depend on DEMA’s verification of National Flood Insurance Program (NFIP)-insured
structures within the project areas.
To strengthen the financial position for future grant opportunities, the Stormwater Utility is in
discussions with Pima County to request assistance with meeting local match requirements. This
reflects a commitment to fiscal stewardship and ongoing collaboration with regional partners.
FISCAL IMPACT:
There is no fiscal impact. Any approved grant awards or financial commitments will be presented
separately for Town Council consideration during the annual budget review and cycle.
SUGGESTED MOTION:
This item is for discussion purposes only.
Attachments
Stormwater Utility Grant Pursuit Process Presentation
Stormwater Utility Grant Pursuit
Process
Town of Oro Valley Stormwater Utility
June 18, 2026
How Our Process Began
• Catalina Ridge - FEMA Pre-Disaster Mitigation Grant Program (PDM)
1. Process began in May 2017 with a grant workshop and Notice of Intent Submittal. (Not Ranked
Highly)
2. October 2017, Received a phone call from the AZ Department of Emergency and Military
Affairs (DEMA), asking that we fill out an application for Catalina Ridge with only 3 days to
deliver
3. Our prompt and detailed response facilitated a good working relationship with DEMA. They
appreciated our efforts as this helped keep them in good standing with FEMA.
What We Learned From the PDM Grant Program
• Very competitive on a national level.
• FEMA review process is very stringent
• Due to the high level of competition, projects have a very low likelihood
of being funded.
• Catalina Ridge was ultimately labeled a maintenance issue and not a
design issue by the FEMA reviewers and deemed ineligible.
• Moving On to Lambert Lane Dip Crossing Phase 2, Lower Highland
Wash and Sierra Wash.
The Work Starts To Pay Off In 2019
• State Emergency Council (SEC) funds managed by the
Arizona Department of Emergency and Military Affairs
(DEMA)
I would like to congratulate the Applicants listed below on being
awarded funding through the State Emergency Council (SEC)
•
The above message was received by
the Town of Oro Valley on July 8,
2019. The Stormwater Utility was
awarded $202,909.50 to reconstruct
a hazardous dip crossing on Lambert
Lane just west La Cholla Blvd.
The Work Starts To Pay Off In 2019
Before
The Work Starts To Pay Off In 2019
After
Lower Highland Wash PDM Submittals in 2019 & 2020
• This project made it through the State
review and ranking and was submitted to
FEMA via the PDM program both years.
• Due to the competitive nature and stringent
FEMA review process of the PDM program,
the project was not chosen by FEMA to
move forward.
• This submittal had a high level of detail and
was put together very thoroughly, and that
was recognized by DEMA.
• However, when one door closes a new one
opens. DEMA appreciated our efforts and
asked the we resubmit this application into
the Hazard Mitigation Grant Program
(HMGP).
The Hazard Mitigation Grant Program (HMGP)
• FEMA’s Hazard Mitigation Grant Program (HMGP)
provides funding to state, local, tribal and territorial
governments to develop hazard mitigation plans
and rebuild in ways that reduce or mitigate future
disaster losses in their communities. This funding
becomes available following a Presidentially
declared disaster.
• To receive HMGP funding, all local, governments
must develop and adopt hazard mitigation plans,
and they must apply as a sub-applicant via the
State agency liaison with FEMA (DEMA).
• This is the program that has produced the highest
degree of success for the Town of Oro Valley
Stormwater Utility.
• Eligible risk reduction projects include, planning &
enforcement, flood protection, retrofitting, and
construction projects.
The Hazard Mitigation Grant Program (HMGP)
• As previously noted, the Hazard Mitigation Grant
Program has been the program providing the
highest degree of success in bringing additional
funding to the Town of Oro Valley Stormwater
Utility for infrastructure projects.
• The Town currently has 1 project that has been
successfully completed via this program, and 3
more projects that will be funded provided that they
meet FEMA’s review for eligibility.
• However, decision makers considering the
utilization of this program for their needs must be
aware of 2 important factors.
1. Timeframe: If the project must be completed
immediately then this is not the program to use. 3 to
4 years to substantially complete a project.
2. Inflation: Given the 3 to 4-year timeframe, sub-
applicants are responsible for any dollar amounts
above the submitted project cost estimate on the
application.
Current Stormwater Utility HMGP Projects & Status
1. Sierra Wash At Via Mandarina Erosion Mitigation Project (75/25 Split)
• Submittal Date: 4/29/2022
• Project Cost: $293,973
• Status: Substantially completed in June of 2025 (only $12,000 above original 2022 estimate)
2. Lower Highland Wash Flood Control and Channel Improvement Project (90/10 Split)
• Submittal Date: 4/22/2022
• Project Cost: $2,368,007
• Status: Public notice of impending project period (Apr 14–29) completed.
3. Sierra Wash At Glover Road Erosion Mitigation Project (90/10 Split)
• Submittal Date: 4/1/2022
• Project Cost: $312,158
• Status: Set to begin construction in September 2026
4. Sierra Wash at Pomegranate Drive Erosion Mitigation Project (75/25 Split)
• Submittal Date: 10/18/2024
• Project Cost: $300,000
• Status: Under review for eligibility. Will be funded if it meets the eligibility criteria.
Moving Ahead: (Future Programs, Projects & Challenges)
• The Hazard Mitigation Grant Program still exists, and there were 10 presidentially declared disasters in the
state of Arizona for the 2-year period covering 2024 & 2025. We are awaiting notices of funding opportunity
associated with these disaster declarations.
• The Pre-Disaster Mitigation has been replaced with a new program called Building Resilient Infrastructure
and Communities (BRIC). Submittals into this program face the same competitive, and stringent review
challenges as it’s predecessor (PDM).
• DEMA announced a notice of funding opportunity for the BRIC program in April of 2026, and the Stormwater
Utility submitted notices of intent into this pool for 2 potential projects.
1. Mutterer’s Wash Flood Control and Channel Improvement Project, with a projected cost of
$2,561,528
2. Carmack Wash Upper Tributary C Flood Control and Channel Improvement Project, with a projected
cost of $3,380,313.50
• DEMA also announced a notice of funding opportunity in April of this year for a program called Hazard Mitigation
Assistance (HMA), and the Stormwater Utility also submitted the 2 projects listed above into this potential funding
resource. However, to be eligible for this program the sub-applicant must have at least 1 property within the project
benefitting area that carries a National Flood Insurance Program (NFIP) insurance policy. This is yet to be
determined as the best available data we have is from 2017. DEMA will make this determination.
Stormwater Utility Grant Pursuit Process
Thank You
Questions?
Contact Information
Dennis Roberts – Division Manager
520-229-5044
Scott Bennett – Stormwater GIS Analyst
520-229-4879
Stormwater Utility Commission 5.
Meeting Date:06/18/2026
Requested by: Dennis Roberts, Public Works Submitted By:Yarina Hynd, Public Works
SUBJECT:
DISCUSSION AND POSSIBLE ACTION REGARDING CANCELLATION OF THE JULY 16, 2026
STORMWATER UTILITY COMMISSION REGULAR SESSION MEETING
RECOMMENDATION:
Staff recommends approval.
EXECUTIVE SUMMARY:
The Stormwater Utility is requesting to cancel the July 16, 2026 Stormwater Utility Commission Regular Session
Meeting as a summer break.
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (or deny) cancellation of the July 16, 2026 Stormwater Utility Commission Regular Session
Meeting.