AGENDA
WATER UTILITY COMMISSION
REGULAR SESSION
August 14, 2023
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 5:00 PM
CALL TO ORDER
ROLL CALL
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the Commission on any
issue not listed on today’s agenda. Pursuant to the Arizona open meeting law, individual Commission
members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Commission may not discuss or take legal action on
matters raised during "Call to Audience." In order to speak during "Call to Audience", please specify what
you wish to discuss when completing the blue speaker card.
REGULAR SESSION AGENDA
1.REVIEW AND APPROVAL OF THE MAY 05, 2023 STUDY SESSION MEETING MINUTES
2.REVIEW AND APPROVAL OF THE MAY 08, 2023 REGULAR SESSION MEETING MINUTES
3.UPDATE AND DISCUSSION ON WATER CONSERVATION (K. BOYCE)
4.UPDATE AND DISCUSSION ON CAPITAL IMPROVEMENT PROJECTS (L. JACOBS)
5.UPDATE AND DISCUSSION ON WATER UTILITY FINANCIALS (M. RALLIS)
6.UPDATE AND DISCUSSION ON WATER OPERATIONS ACTIVITIES (D. ALLRED)
7.UPDATE AND DISCUSSION ON WATER RESOURCE USAGE (P. ABRAHAM)
8.UPDATE AND DISCUSSION ON RECLAIMED WATER SYSTEM (P. ABRAHAM)
9.TOWN COUNCIL MEETINGS/COMMUNICATIONS (COUNCILMEMBER BOHEN)
10.DIRECTOR'S REPORT (P. ABRAHAM)
CALL TO AUDIENCE - at this time, any member of the public is allowed to address the
Commission on any issue not listed on today’s agenda. Pursuant to the Arizona open meeting
law, individual Commission members may ask Town staff to review the matter, ask that the
matter be placed on a future agenda, or respond to criticism made by speakers. However, the
Commission may not discuss or take legal action on matters raised during "Call to Audience." In
order to speak during "Call to Audience", please specify what you wish to discuss when
completing the blue speaker card.
ADJOURNMENT
POSTED: 08/09/2023 at 5:00 pm by dt
When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours prior
to the Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. – 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs
any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission meeting
at 229-4700.
INSTRUCTIONS TO SPEAKERS
Members of the public have the right to speak during any posted public hearing. However, those items not
listed as a public hearing are for consideration and action by the Commission during the course of their
business meeting. Members of the public may be allowed to speak on these topics at the discretion of the
Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card located
on the Agenda table at the back of the room and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to
Audience,” please specify what you wish to discuss when completing the blue speaker card.
Please step forward to the podium when the Chair announces the item(s) on the agenda which you are interested in
addressing.
1. For the record, please state your name and whether or not you are a Town resident.
2. Speak only on the issue currently being discussed by the Commission. Please organize your speech, you will only
be allowed to address the Commission once regarding the topic being discussed.
3. Please limit your comments to 3 minutes.
4. During “Call to Audience”, you may address the Commission on any issue you wish.
5. Any member of the public speaking must speak in a courteous and respectful manner to those present.
Thank you for your cooperation.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions and Committees: In accordance
with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the
Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board,
Stormwater Utility Commission, and Water Utility Commission may attend the above referenced meeting as a
member of the audience only.”
Water Utility Commission 1.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
REVIEW AND APPROVAL OF THE MAY 05, 2023 STUDY SESSION MEETING MINUTES
RECOMMENDATION:
Staff recommends approval
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes), the May 8, 2023 draft meeting minutes.
Attachments
WUC 5-5-23 Draft Minutes
D R A F T
MINUTES
WATER UTILITY COMMISSION
STUDY SESSION
May 5, 2023
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
STUDY SESSION AT OR AFTER 1:00 PM
CALL TO ORDER
Vice Chair Forrest called the meeting to order at 1:01 pm
ROLL CALL
Present: Alan Forrest, Vice Chair
Patricia Olson, Commissioner
Niranjan Vescio, Commissioner
Kay Lantow, Commissioner
Tom Marek, Commissioner
Absent: David Atler, Commissioner
Greg Hitt, Chair
Staff Present:Peter A. Abraham, Water Utility Director
STUDY SESSION AGENDA
1.DISCUSSION REGARDING THE TRES RIOS WATER RECLAMATION FACILITY TOUR
Discussion on tour sights was initiated by Water Utility Director Peter Abraham, followed by Vice Chair
Forrest. Discussion ensued amongst the commission. Water Utility Director Peter Abraham thanked the
commission for their attendance and participation in the tour.
ADJOURNMENT
Motion by Commissioner Tom Marek, seconded by Vice Chair Alan Forrest Motion to adjourn the meeting
at 1:18 p.m.
Vote: 5 - 0 Carried
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the study session of the
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the study session of the
Town of Oro Valley Water Utility Commission of Oro Valley, Arizona held on the 5th day of May, 2023. I further
certify that the meeting was duly called and held and that a quorum was present.
___________________________
Maritza M Valenzuela
Senior Office Specialist
Water Utility Commission 2.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
REVIEW AND APPROVAL OF THE MAY 08, 2023 REGULAR SESSION MEETING MINUTES
RECOMMENDATION:
Staff recommends approval
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
I MOVE to approve (approve with changes), the May 5, 2023 draft study session minutes.
Attachments
WUC 5-8-23 Draft Minutes
D R A F T
MINUTES
WATER UTILITY COMMISSION
REGULAR SESSION
May 8, 2023
HOPI CONFERENCE ROOM
11000 N. LA CAÑADA DRIVE
REGULAR SESSION AT OR AFTER 5:00 PM
CALL TO ORDER
Vice Chair Alan Forrest called the meeting to order at 5:00 pm
ROLL CALL
Present: Alan Forrest, Vice Chair
Patricia Olson, Commissioner
Niranjan Vescio, Commissioner
David Atler, Commissioner
Kay Lantow, Commissioner
Tom Marek, Commissioner
Absent: Greg Hitt, Chair
Staff Present:Peter A. Abraham, Water Utility Director
Lee Jacobs, Engineering Division Manager
David Allred, Operations Manager
Attendees: Councilmember Bohen, Town Council Liaison
REGULAR SESSION AGENDA
CALL TO AUDIENCE - There were no public comments.
1.REVIEW AND APPROVAL OF THE MARCH 13, 2023 REGULAR SESSION MEETING MINUTES
Motion by Commissioner Tom Marek, seconded by Commissioner Niranjan Vescio to approve March
13, 2023 minutes.
Vote: 6 - 0 Carried
2.UPDATE AND DISCUSSION ON CAPITAL IMPROVEMENT PROJECTS (L. JACOBS)
Engineering Division Manager Lee Jacobs updated the commissioners on the current Capital
Improvement Projects for this fiscal year. Discussion ensued amongst Commission members and staff
regarding item #2.
3.UPDATE AND DISCUSSION ON WATER UTILITY FINANCIALS (M. RALLIS)
Water Utility Director Peter Abraham, for Mary Rallis, provided an update on the Water Utility Financials
from April until the end of June as follows:
Service fees
Expenses
Main breaks
Debt services
Customer Service & water audits
Commissioner Marek commented on the fluctuation of revenues. Vice Chair Forrest elaborated on the
fluctuation of revenues.
Discussion ensued among commissioners.
4.UPDATE AND DISCUSSION ON WATER OPERATIONS ACTIVITIES (D. ALLRED)
Operations Manager David Allred provided an update on the Water Operations by providing an
overview, including data and statistics, of the Operations process.
Vice Chair Forrest inquired about water sampling and requirements. Discussion ensued amongst the
Commission and Operations Manager David Allred.
Operations Manager David Allred also provided an update on the following:
SCADA System
Arizona Department of Corrections Inmate Work Program
SpryPoint
Data on water meter changeouts
5.UPDATE AND DISCUSSION ON WATER RESOURCE USAGE (P. ABRAHAM)
Water Utility Director Peter Abraham referenced a graphical depiction for the water resource usage that
demonstrated reclaimed production, Oro Valley CAP water, and Groundwater. Information on
Countryside water was also presented.
6.DISCUSSION AND POSSIBLE ACTION ON CANCELLATION OF JUNE AND JULY WATER UTILITY
COMMISSION MEETINGS
Motion by Commissioner Niranjan Vescio, seconded by Commissioner David Atler to cancel June and
July 2023 commission meetings.
Vote: 6 - 0 Carried
Discussion between Water Utility Director Peter Abraham and the Commissioners occurred regarding
the standard practice for meeting cancelation.
7.TOWN COUNCIL MEETINGS/COMMUNICATIONS (COUNCILMEMBER BOHEN)
Councilmember Bohen informed the Commission of the upcoming Town Council Study Session and
Councilmember Bohen informed the Commission of the upcoming Town Council Study Session and
the Town's budget review. He informed the Commission that the May Council meeting has been
moved to the 24th of May. Councilmember Bohen extended an invitation to the Commissioners to
attend May's Council meeting.
8.DIRECTOR'S REPORT
Water Utility Director Peter Abraham reported on upcoming meeting and water news.
CALL TO AUDIENCE -There were no public comments.
FUTURE AGENDA ITEMS
No future agenda items discussed as the next meeting is canceled.
ADJOURNMENT
Motion by Commissioner Patricia Olson, seconded by Commissioner Kay Lantow to adjourn the
meeting at 6:11 p.m.
Vote: 6 - 0 Carried
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular session of the
Town of Oro Valley Water Utility Commission of Oro Valley, Arizona held on the 8th day of May, 2023. I further
certify that the meeting was duly called and held and that a quorum was present.
___________________________
Maritza M Valenzuela
Senior Office Specialist
Water Utility Commission 3.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON WATER CONSERVATION (K. BOYCE)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Water Utility Commission 4.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON CAPITAL IMPROVEMENT PROJECTS (L. JACOBS)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
ITEM 04-UPDATE AND DISCUSSION ON CIP
Oro Valley Water Utility
Update and Discussion on
Capital Improvement Projects
Lee Jacobs, P.E., C.P.M.
Engineering Division Manager
Water Utility Commission
August 14, 2023
Rehabilitation of Well Casing, Pump, Well Head & Motor
Completed rehabilitation work for this FY 2023- 2024- brush, bail, and swab casing
Evaluation and selection and installation of new pump assembly
Gyroscope survey to determine deviation from center
Assessment of motor for rehabilitation or complete replacement
New well discharge for Well C-9 ordered and delivered to accommodate sounders and
level sensors
Rehabilitation of Wells E-2 & C-9
Construction
Supplementing well field within the 10-164 system (TOV limits)
Civil is 100% complete
Well equipping design complete – control panel design 100%
100% discharge line to existing water system
Continue to work with all stake holders to bring electricity to site
Project anticipated to go to bid in late second quarter of FY 23-24
Nakoma Sky Production Well Equipping
Construction
Supplementing well field within the 10-164 system (TOV limits)
Drill production well to 780 feet below surface 16” diameter casing
Supplement “D” Zone water
Remaining work is to complete well design, electrical and control panel design and
integration, and perimeter wall coordination with Historical Society
Steam Pump Production Well Equipping
Catalina Shadows and Palisades Area
Palisades Water Distribution Redundancy Project
Benefits:
Redundancy
Elimination of dead ends
Improved water quality
Reduced maintenance
Env., Arch, and NPP complete
TCSS to assist with native plant removal
Design is 100% complete
El Conquistador Subdivision Design Project this Fiscal Year
Redundancy Water Line & Pressure Reducing Valve
Benefits
Redundancy
Elimination of dead ends
Improved water quality
Reduced maintenance
Emergency preparedness
Increased Wheeling Capacity to Countryside Service Area
Countryside Wheeling Station Upgrades
Benefits:
Redundancy
Additional capacity
Use of Telemetry (monitoring & ability to operate remotely)
Rancho Vistoso Booster Rehabilitation
Replacement of booster pumps, motors, control panels, security and associated
piping per OVWU Standard Detail
New tank is ASME or Board Certified to operate as a pressure vessel - installed
Improve safety for operators
High efficiency vertical multistage centrifugal pumps (energy savings)
Rancho Vistoso Booster Station Construction
Provides additional capacity to “F” & “G” pressure zones
Facilitates the distribution of Central Arizona Project Water to higher pressure zones
Procurement expected to advertise Fall of 2023
Construction expected to start late Fall 2023
La Canada Booster Station Construction
Construction of tank foundation and footer started
Pump cans completed
NWRRDS Independent Reservoir & Booster Station Construction
“E” Zone Discharge Line to Naranja & “D” Zone Blending Line
“D” Zone Blending line to feed reservoir and “E” Zone discharge main to “E” zone and
La Canada feed expected to begin in winter of 2023-2024
“E” Zone Discharge Line to Naranja and “D” Zone Blending Line
“D” Zone Blending line to feed reservoir and “E” Zone discharge main to “E” zone
and La Canada feed expected to begin in winter of 2023-2024
Discussion
Water Utility Commission 5.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON WATER UTILITY FINANCIALS (M. RALLIS)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
ITEM 05- UPDATE AND DISCUSSION ON WATER UTILITY FINANCIALS
Water Utility Commission Meeting
August 14, 2023
Oro Valley Water Utility
Update & Discussion on Water Utility
Financials
Mary Rallis, C.P.A.
Water Utility Administrator
Financial Update – Fiscal Year 2022/23 - Revenues
REVENUES Actuals
Thru 6/30/23 Budget Notes
Potable Water Sales $11,969,000 $14,009,000
Did not meet budget by $2,040,000 due to
near record low water usage due to higher
than average rainfall in fiscal year 22/23
Reclaimed Water
Sales $1,069,000 $1,374,000
Did not meet budget by $305,000 due to near
record low water usage due to higher than
average rainfall in fiscal year 22/23
Groundwater
Preservation Fees $2,008,000 $2,400,000
Did not meet budget by $392,000 due to near
record low water usage due to higher than
average rainfall in fiscal year 22/23
Service Fees $795,000 $824,000
Did not meet budget by $29,000 primarily due
to new service establishment fees and
reconnect fees.
TOTAL REVENUES $15,841,000 $18,607,000 Revenues did not meet budget by $2,766,000 at
fiscal year end.
Financial Update – Fiscal Year 2022/23 - Expenses
EXPENSES Actuals
Thru 6/30/23 Budget Notes
Personnel $3,505,484 $3,653,064 Below budget by $147,580 due to vacancy
savings.
Operations &
Maintenance $9,839,139 $10,609,551 Below budget by $770,412 due to cost
savings in several divisions.
Capital $804,973 $1,150,000 Below budget by $345,027 due to projects
carried forward into next fiscal year.
Debt Service $4,645,695 $4,645,695 Debt service paid on 7/1/22.
TOTAL EXPENSES $18,795,291 $20,058,310 Total expenses were below budget by
$1,263,019 at fiscal year end.
Customer Service Update – Thru 6/30/23
FY 2021/22 Thru 6/30/23
New meters installed 148 186
Customer base 21,114 21,300
Water audits performed 37 34
Water Smart Registered Accounts 7,095 7,300
Customer Portal (Start 8/29/22)-8,200
Discussion
Water Utility Commission 6.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON WATER OPERATIONS ACTIVITIES (D. ALLRED)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
ITEM 06- UPDATE AND DISCUSSION ON WATER OPERATIONS ACTIVITIES
David E. Allred
Water Operations Manager
Water Utility Commission
August 14, 2023
Oro Valley Water Utility
Update and Discussion on
Water Operations Activities
OVWU Water Operations
24 ADEQ certified operators are responsible for the O&M of the
Oro Valley & Countryside potable water service areas:
46 active sites (wells, reservoirs, booster stations & CAP wheeling stations)
375 miles of water mains
2,394 fire hydrants
8,605 valves
36 PRV stations
Over 21,000 metered service connections with AMI technology
149 water sampling stations
Operations is responsible for the reclaimed water system:
7 active sites (reservoir, booster, lake feeds, & park irrigation)
15 miles of reclaimed water main
OVWU Water Operations
Additional core functions:
Operate and monitor the SCADA system for potable and reclaimed systems
Manage AZ811 locate request (11,461 for 2022)
Complete customer service work order requests (new meter installs,
re-reads, customer inquiries, and other request from CSC)
Maintain drinking water compliance sampling and reporting in accordance
with SDWA
Work closely with other OVWU groups (Engineering and Admin) and Town
Departments
Water Operations Administration
SCADA Upgrade to Ignition Software Update:
90% completion as of 8/4/2023
Live as of July 1, 2023
QA/QC of each display and settings
Major Changes
Faster login time
Graphics are easier to read and interact with
True historian-customizable reports
Reduced licensing costs
Director’s view
Water Operations Administration
Screen shots: Current vs Proposed
Water Operations Administration
Live View of New SCADA System
Water Operations Administration
Remote 900MHz Radio Communications Upgrade:
Upgrade needed to replace obsolete GE MDS 9810 to GE MDS Orbit
Partnership with IT
Advantage of the Orbit Radio is increased communication channels
Includes cellular communication capability – can be used for cameras
Ethernet connectivity vs serial interface = faster response
Water Production Activities
Maintaining Productions Sites:
Water Plant 16 booster pump #2 repair
Water Production Activities-ADC Inmate Work Program
Program Obstacles:
Public Works experienced a decline in inmate participation
OVWU down to one day a week with 1 or 2 inmates
Difficult to schedule and complete projects
Water Control Systems Activities
Programmable Logic Controller and Instrumentation Upgrades:
Project is needed to replace “legacy” remote instrumentation and PLCs
~48 remote sites require this upgrade
5–10-year replacement plan, approximately $5 million
Water Distribution Activities
Main Line Repair:
Staff repaired 8” main break at 10111 N Bighorn Butte
Water Meter Operations Activities
Water Meter Warranty Changeout:
Over 300 meters changed out since January 2023
Staff utilizes SpryPoint software to update accounts in real-time
Water Quality Activities
SAMS Water Compliance Portal:
The software manages water quality compliance sampling
Sampling schedules are auto generated
Results imported directly from the laboratory
Ability to report compliance directly to the USEPA
OVWU Water Operations
Discussion
Water Utility Commission 7.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON WATER RESOURCE USAGE (P. ABRAHAM)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
ITEM 07- UPDATE AND DISCUSSION ON WATER RESOURCE USAGE
Peter A. Abraham, P.E.
Water Utility Director
Water Utility Commission
August 14, 2023
Oro Valley Water Utility
Update & Discussion on
Water Resource Usage
Oro Valley Main Service Area January – June 2023
Water Use by Type
Countryside Service Area January – June 2023
Discussion
Discussion
Water Utility Commission 8.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
UPDATE AND DISCUSSION ON RECLAIMED WATER SYSTEM (P. ABRAHAM)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
N/A
FISCAL IMPACT:
N/A
SUGGESTED MOTION:
N/A
Attachments
ITEM 08- UPDATE & DISCUSSION ON RECLAIMED WATER SYSTEM
Peter A. Abraham, P.E.
Water Utility Director
Water Utility Commission
August 14, 2023
Oro Valley Water Utility
Update & Discussion on the
Reclaimed Water System
Council Direction & Need For Information
On February 17, 2021 Town Council directed staff to:
Return with a plan for operating the Pusch Ridge golf course to be evaluated within
three years as to its continued feasibility, capital improvement requirements while also
looking at alternatives to look at water usage, potential new configurations and a third-
party lease.
In subsequent meetings, Council inquired about the cost to extend
the reclaimed water system to Riverfront Park, Pusch Ridge golf
course and JDK park
Understanding the importance of water resource utilization with
respect to the future of turf irrigation, the Water Utility reached out
to the consultant community to help determine the costs associated
with extending the reclaimed system to Riverfront Park, Pusch Ridge
golf course and JDK park
Reclaimed Water System History 2004 Thru 2007
2004 – 2005 (Phase I)
Phase I serves Sun City, Stone Canyon and Vistoso Highlands
Construction included:
•14 miles of transmission and distribution mains
•3 booster stations, 1.5 million gallon reservoir and 3 metering stations
Financing
•$11,421,088 funded as part of the 2003 $31.75M 25-year traditional bond
•$3,663,963 was funded with cash reserves from Utility’s Operating Fund
•$2,156,299 was cash funded to pay for Tucson Water Infrastructure improvements
2006 – 2007 (Phase II)
Phase II serves El Conquistador North & South, Naranja Park & Painted Sky
Construction included:
•1.6 miles of transmission and distribution mains
•3 metering stations
Financing:
•$4,584,652 funded as the 2007 20-year WIFA Loan
•Debt for phases I & II were refinanced as part of the Town’s 2021 bond issuance
•As of June 30, 2023 the outstanding debt is $2.8 million
Graphical Representation of Phases I & II
Phase III Reclaimed Water Main Alignment “A”
Service to Riverfront Park:
Construction: $4,109,950.00
Engineering & Permitting: $493,194.00
Contingency: $1,027,487.50
Total: $5,630,631.50
Service to Pusch Ridge 9-Hole
Golf Course:
Construction: $9,219,200.00
Engineering & Permitting: $1,106,304.00
Contingency: $2,304,800.00
Total: $12,630,304.00
Service to JDK Park:
Construction: $11,132,200.00
Engineering & Permitting: $1,335,864.00
Contingency: $2,783,050.00
Total: $15,251,114
Phase III Reclaimed Water Main Alignment “B”
Service to Riverfront Park:
Construction: $4,231,350.00
Engineering & Permitting: $507,762.00
Contingency: $1,057,837.68
Total: $5,796,949.68
Service to Pusch Ridge 9-Hole
Golf Course:
Construction: $9,319,700.00
Engineering & Permitting: $1,096,426.95
Contingency: $2,329,925.40
Total: $12,746,052.35
Service to JDK Park:
Construction: $11,547,050.00
Engineering & Permitting: $1,385,646.00
Contingency: $2,886,763.00
Total: $15,819,459
Phase III Estimated Reclaimed Water Demands
Naranja Park Expansion: 50 Acre-ft./Yr.
Riverfront Park: 30 Acre-ft./Yr.
JDK Park: 30 Acre-ft./Yr.
Pusch Ridge 9 - Hole GC: 150 Acre-ft./Yr.
Sub - total: 260 Acre-ft./Yr.
For context: The loss of the Vistoso 18-hole golf course resulted in a
reduction of reclaimed water deliveries between 325 – 375 acre-ft./yr.
Discussion
Water Utility Commission 10.
Meeting Date:08/14/2023
Submitted By:Maritza Valenzuela, Water
SUBJECT:
DIRECTOR'S REPORT (P. ABRAHAM)
RECOMMENDATION:
N/A
EXECUTIVE SUMMARY:
N/A
BACKGROUND OR DETAILED INFORMATION:
FISCAL IMPACT:
SUGGESTED MOTION: