HomeMy WebLinkAboutPackets - Stormwater Utillity Commission (77)AGENDA
ORO VALLEY STORMWATER UTILITY COMMISSION
REGULAR SESSION
MAY 15, 2014
HOPI CONFERENCE ROOM
11000 N. LA CANADA DRIVE
REGULAR SESSION AT OR AFTER 4:00 P.M.
CALL TO ORDER
ROLL CALL
CALL TO THE AUDIENCE - At this time, any member of the public is allowed to
address the Commission on any issue not listed on today’s agenda. Pursuant to
the Arizona Open Meeting Law, individual Commission members may ask Town
staff to review the matter, ask that the matter be placed on a future agenda, or
respond to criticism made by speakers. However, the Stormwater Utility
Commission may not discuss or take legal action on matters raised during "Call
to the Audience." In order to speak during "Call to the Audience" please specify
what you wish to discuss when completing the blue speaker card.
1. APPROVAL OF THE APRIL 10, 2014 REGULAR SESSION MINUTES
2. MEETING, EVENTS AND WORK STUDY UPDATES
3. DISCUSS AND APPROVE STORMWATER CREDIT APPLICATIONS
4. PRESENTATION FROM A PIMA COUNTY FLOOD CONTROL DISTRICT
REPRESENTATIVE
5. DISCUSS THE YOUR VOICE, OUR FUTURE COMMITTEE MEETING
6. DISCUSS STORMWATER FINANCIALS
7. DISCUSS ON-GOING STORMWATER PROJECTS
8. SET JUNE MEETING DATE AND TIME
9. SET JUNE PROPOSED AGENDA ITEMS
ADJOURNMENT
POSTED: 5/7/14 at 5:00 p.m. by mrs
When possible, a packet of agenda materials as listed above is available for public
inspection at least 24 hours prior to the Stormwater Utility Commission meeting in the
Town Clerk's Office between the hours of 8:00 a.m. and 5:00 p.m.
The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any
person with a disability needs any type of accommodation, please notify the Town
Clerk’s Office at least five days prior to the Commission meeting at 229-4700.
INSTRUCTION TO SPEAKERS
Members of the public have the right to speak during any posted public hearing.
However, those items not listed as a public hearing are for consideration and
action by the Stormwater Utility Commission during the course of their business
meeting. Members of the public may be allowed to speak on these topics at the
discretion of the Chair.
If you wish to address the Commission on any item(s) on this agenda, please complete
a blue speaker card and give it to the Recording Secretary. Please indicate on the
speaker card which item number and topic you wish to speak on, or if you wish to speak
during “Call to Audience,” please specify what you wish to discuss when completing the
blue speaker card.
“Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions, and
Committees: In accordance with Chapter 3, Title 38, Arizona Revised Statutes and
Section 2-4-2 of the Oro Valley Town Code, a majority of the Town Council, Board of
Adjustment, Conceptual Design Review Board, Historic Preservation Commission,
Parks and Recreation Advisory Board, Planning and Zoning Commission, and Water
Utility Commission may attend the above referenced meeting as a member of the
audience only.”
April YTD Financial Status FY 2013/2014
Stormwater Utility Fund
% Budget Completion through April - 83.3%
Actuals
thru 3/2014
Budget
%
Actuals
to
Budget
Year End
Estimate *
YE %
Variance to
Budget
REVENUES:
STATE GRANTS - 450,000 0.0%- -100.0%
CHARGES FOR SERVICES 645,609 771,500 83.7%771,500 0.0%
INTEREST INCOME 1,104 500 220.8%1,500 200.0%
MISCELLANEOUS 23 - 0.0%23 0.0%
TOTAL REVENUES 646,736 1,222,000 52.9%773,023 -36.7%
Actuals
thru 3/2014
Budget
%
Actuals
to
Budget
Year End
Estimate *
YE %
Variance to
Budget
EXPENDITURES:
PERSONNEL 244,984 319,843 76.6%319,843 0.0%
OPERATIONS & MAINTENANCE (A)347,225 427,983 81.1%427,983 0.0%
CAPITAL 22,130 586,550 3.8%66,550 -88.7%
TOTAL EXPENDITURES 614,339 1,334,376 46.0%814,376 -39.0%
Does not include non-cash outlays for depreciation
SURPLUS / (DEFICIT)32,397 (112,376) (41,353)
BEGINNING RESERVE BALANCE 490,794
Plus: Surplus / (Deficit)(41,353)
ENDING RESERVE BALANCE **449,441
* Year-end estimates are subject to further revision
** Ending cash reserve amounts are estimates and are subject to further revision
(A) Includes chargeout from Highway Fund for storm cleanup of streets:
FY 13/14 Budget = $129,493
YTD Actuals = $107,868
STORMWATER UTILITY
STAFF REPORT
Current workload Future workload/projects
Operations Division Manager: Phil Trenary, EIT, CFM
General Stormwater Administration
Help secure future funding sources Coordinate & prioritize future stormwater
projects and equipment purchases
Stormwater Budget for FY14/15 complete(awaiting
Council Approval)
Stormwater Engineer/Utility Manager: Michael D Todnem, P.E.
Stormwater staff Administration Stormwater fee administration
New Annexation Questions Regular SWUC meeting
Stormwater 15 year CIP list working with Pima County on drainage studies
(Linda Vista, Northern @ Chapala area)
SWUC Study Session
Contracted with Psomas to complete Lomas De
Oro LOMR (Prepare as-built surface geometry in
Civil 3D, model as-built conditions in HEC-RAS,
prepare documents, prepare formal work map,
Technical Data Notebook for FEMA Submittal.
Currently PSOMAS is gathering survey data for
the report. $18,664
Expect return of MS4 Audit withn the next few
weeks (end of May early June). Items expected
to require response have been initiated with
SOP's.
working with Kimley-horn on Linda Vista drainage
repairs. On-Hold until FY14/15
working with citizens on stormwater repair issues
(Sun City, Highlands)
GIS database update/project to coordinate SW
infrastructure, work order system, and mapping
issues to include basins, outfalls, and
drainageways
Coordinating Northern Drainage improvement
project/working with Pima County & Utility
Companies, Locates complete and will finalize
drawings in the next week. Once complete will
setup up neighborhood meeting
Drainage Easement for Kerman residence check
with Fritz/Rob
construct business plan for SWU
tracking all monthly data (costs, revenue,
performance indicators, etc.)
Update Hotspot map
PCRFCD advisory board meetings
continue with Delinquent bill collection
Update of Town's commercial accounts
Apr-14
STORMWATER UTILITY
STAFF REPORT
Current workload Future workload/projects
Civil Engineer: Fritz Laos, CFM
Coordinating Community Assist Visit with ADWR.
Recieved feedback from ADWR and working on
completing Elevation Certs and Other
requirements
Evaluate results of CAV to prepare for Final
submittal of Community Rating System
application
Conducting drainage reviews Reviewing Town Stormwater Ordinance
Conduct SWPPP reviews
PCFCD is conducting a study on the North
Ranch Wash basin in preparation for a LOMR
submittal. This reach begins north of Stone
Canyon and for purposes of this study will
terminate at Shannon Rd.
ArcView 9, AutoCAD 3D 2013, HEC-RAS
interfacing training with small modeling projects CRS Coordinator duties
Integration of floodplain inspection procedures
(prepare SOP) between building inspections,
Stormwater review, and permiting. (ADWR CRS
Requirement
Preparing GIS maps and impermeable area
calculations for new and existing TOV
businesses for billing purposes. This is the first
time we have had a highly accurate calculation
of impermeable areas along with a diagram/map
showing the area used in the calculations. (See
attached)
Process Floodplain Status Requests primarily
from residents and realtors
Prepare 404 PJD permits for submittal to ACOE
(Naranja Park 100%)
Maintain, prepare, issue and sign off on Floodplain
Use Permits
Identify critical local floodplains, determine
actions, i.e.: convert to FEMA SFHA, hazard
mitigation grants. (Highlands Wash most critical)
Assist and review LOMCs by residents and
consultants
Field residential drainage complaints
Review/Revise Town Floodplain Ordinance. Sent
to ADWR
Prepare 404 PJD permits for submittal to ACOE
(Naranja Road 100%) Sent to ACoE
STORMWATER UTILITY
STAFF REPORT
Current workload Future workload/projects
Civil Engineering Technician: Rob Wilson, CFM
Outfall inspections/Basin inspections to begin Future Outreach Events (Farmer's market 2014)
Future Community outreach mailouts
misc. Stormwater quality issues
Completed design for Verbinita Improvements to
include extruded curb in phase 1 and Phase 2 to
include valley gutter.
PAG Stormwater working group/LID Liason Quantitative inspection development for basins,
outfalls, drainage channels, etc.
ROW Buffelgrass work Stormwater Credit Application follow up
SWPPP inspections - Commercial construction
Pool discharge concerns
GIS Analyst: Abdo Abdelrasoul
working on SW infrastructure database setup
dynamic hotspot map (linked to work orders to
display costs, man power, etc at each respective
location)
working with developing infrastructure dynamic
maps commercial accounts database linked to map
Office Specialist: Carmen Ryan
Coordinating and documenting all SWUC
meetings
Help upgrade work order system as pertaining to
Stormwater
Stormwater Billing Tucson/Metro Water billing agreement project
input/tracking of Stormwater work orders
provides office assistance to Stormwater Staff
Answers calls and relays to appropriate
Stormwater Staff
Tracks invoices and all billing
Stormwater Schedule - Work Plan Apr-14
Annual Summary Daily Monthly Quarterly Annually As Needed Assigned
Hours
Required
Hours Comments
Stormwater Sr. Civil Engineer
Staff
Hours
to
Complete
FEMA/ADEQ Coordination floodplain issues X 140 140
PCFCD meetings X 53 60
Government Agency coordinations/meetings X 84 84
Stormwater Utility Commission Meetings X 42 48
Stormwater Utility Administration/Management 3 days/wk 911 1,048
Stormwater Utility Billing and Monthly Update Reports X 421 484
Answer Questions related to Stormwater utility X 35 35
Spill Incident Inspections/Reports X 42 42
Special Projects X 263 302
Site visits and reports for violations X 35 40
Site visits and reports for property damage X 70 81
Site visits and reports for in-house projects X 100 115
2,196 2,480
Stormwater Civil Engineer
Floodplain Status Inquiries X 142 142 Includes GIS Map Preparation
Stormwater Utility Mapping X 14 14 Calculation of impervious areas GIS Mapping
Floodplain Use Permits (FPUP)X 107 89 Required to meet MS4 Best Management Practice
Residential drainage complaints/field visits X 107 107
Drainage Review and Drainage Report Reviews X 489 489 Required to meet MS4 Best Management Practice
SWPPP reviews and field inspections 3 days/wk 739 739 Required to meet MS4 Best Management Practice
In-house Hydro/Hydraulic Analysis X 178 178
404 JD Prep and Management X 178 178
Local floodplain modeling and mapping X - 200 Local Floodplain Accounting
In house drainage design/modeling using CAD X - 150 Local Floodplain Accounting
FEMA LOMC Preparation (not single residence)X 71 71 LOMC = LOMR, LOMA, CLOMR etc…
Community Rating System Management X 28 28 Completing CAV W/ADWR
Professional training (conferences, training)X 43 43
2,096 2,428
Stormwater Civil Technician
Vegetation Control X 59 59
Drainage Channel/Easement Inspections & mapping - - Recomended to meet MS4 Best Management Practice
Basin Structure Inspections X 177 177
Recommended to meet MS4 Best Management
Practice
Public Information and Outreach X includes weekends 125 125 Required to meet MS4 Best Management Practice
Outfall Inspections X X 177 177 Required to meet MS4 Best Management Practice
Mosquito control Trapping/ Insecticide Jun - Aug 138 138 Required to meet MS4 Best Management Practice
Buffelgrass control/management includes weekends 263 263
IGA w/PAG and Southern Az Buffelgrass
Coordination Center
SWPPP field inspections - Commercial 236 236 Required to meet MS4 Best Management Practice
In-Kind Project Construction Field Inspection 6 Weeks 35 35
Post construction field inspections - 120 Required to meet MS4 Best Management Practice
SWPPP field inspections - Residential - 200 Required to meet MS4 Best Management Practice
Drainage control and Water Harvesting Projects 427 427
Resident drainage issues 167 167
Stormwater Schedule - Work Plan Apr-14
Meetings w/PAG (LID, Stormwater Group),
Southern Az Buffelgrass Coordination Center,
West Nile Virus taskforce 147 147
In-house design of minor projects 118 118
Misc. research 88 88
2,156 2,476
Senior Office Specialist
Stormwater Utility Administration /Secretarial 2 hrs 8 hrs 524 524
Stormwater Utility Commission Meetings 12 hrs 144 144
Quarterly Billing information 6 hrs 26 26
Answer Questions related to Stormwater Utility .5 hr 131 131
825 825
-
Stormwater facilities inspection X - Required to meet MS4 Best Management Practice
Vehicle Wash Rack upkeep -
Street Sweeping -
Annual 7273 8210
Stormwater Sr. Civil Engineer 1 1 FTE 3.47 3.92
Stormwater Civil Engineer 1 1 Training 160 216
Stormwater Civil Technician 1 1 14 Days Vacation 403.2 345.6
Senior Office Specialist 0.6 0.6 13 Holidays Holidays 374.4 374.4
0 0 6 Sick days PTO 172.8 172.8
ADC Crew 0 0 Annual 8383 9318
3.6 3.6 FTE 4.00 4.48
Stormwater Administration % Complete Req'd Date Status
Provide Guidance for the day-to-day work of the Stormwater Utility Team On Going On Going See monthly staff reports
Develop a five year Stormwater utility business plan, which includes all
headings of this work plan, but developed for the next five years. This will
include the SW CIP as well as routine operations maintenance.
On Going 10/1/2014 updated annually
Prepare draft Fiscal Year work plan by December of preceding FY 0 12/1/2014 working draft document for
FY2014/2015
Have the Town of Oro Valley join the Community Rating System program 80 6/1/2014 Community Assist Visit in final
stages with ADWR
Further Stormwater infrastructure inspection program to provide
continuous updates and better reporting to the GIS inventory. To include
all Town Stormwater infrastructure including but not limited to: Basins,
outfalls, all drainage channels.
25 On Going
Basin Inspections in Fall, Outfall
Inspections in Spring, Drainage
structures/channels in fall & spring
and as warranted
Notice of Audit received 31 Jan 2013. ADEQ and US EPA will be
conducting an audit of the Town of Oro Valley's MS4 permit February 26
and 27, 2014. The audit will consist of office interviews, in-field reviews
and verification of primary components of stormwater program.
100 Feb 26,2014
Review components of MS4.
Compile required documentation
and initiate SOP's in anticipation of
Audit receipt.
Stormwater Commission % Complete Req'd Date Status
review Stormwater credit applications As Needed On Going See attached applications
review the SWU revenue requirement and recommend rate adjustments
as necessary.On Going 6/1/14 review quarterly
Serve as appeal board for issues regarding Stormwater fees and
violations As Needed On Going
helps staff in developing short and long term CIP to mitigate high
maintenance storm areas (hotspots) within the Town NA NA
Review effectiveness of Town's Best Management Practices to meet the
6 minimum requirements for the Town's MS4 status and make
suggestions for new BMPs.
NA On Going Review/suggestions quarterly
WORK PLAN
Review monthly performance indicators and measureable goals reports
and makes suggestions for adjustments NA On Going See Monthly Measureable Goals
Report
General Plan update is in initial stages. The SWUC will be a critical
component of the GP update by review of the Existing General Plan and
discussing relevant issues that may or may not have been addressed.
Additionally, examine existing parameters of OV Stormwater and evaluate
for future expectations of the utility to be integrated into the General Plan.
NA
On Going
throughout
GP update
Phase Two tentatively begins the
end of May and Committee work
will begin the end of August.
Continuing Study Sessions for SWU fee increase. Subsequent to
parameter evaluations obtained from the Updated General Plan, explore
trigger mechanisms for increased fees required by the utility to complete
required responsibilities.
NA On Going
Stormwater Financials % Complete Req'd Date Status
Monthly reports for the SWUC 100 5/9/2014 complete
Continue to work with Pima County Regional Flood Control District to fund
SW drainage improvement projects (Northern Ave, Naranja, Etc. See
CIP project priority list)
NA On Going
Northern Ave Drainage
Improvements tentatively
scheduled for completion FY13/14
Continue to evaluate the Oro Valley Stormwater fee at $2.90/eru and the
deliverables associated with the fee NA On Going quarterly review by SWUC
Provide a 2014/2015 Work Plan by March 2014 to the Public Works
Director for planning the Town' next Budget Year.complete
Stormwater Improvement Program % Complete Req'd Date Status
complete/revise the draft five-year Capital Improvement Project list NA On Going Move to a 15 year cip list
Northern Ave. Drainage improvements 80 NA
Revised plan to contain 100 year
flow, potholing completed 5/7/2014.
Finalize plans expected no later
than week of 5/19/2014
complete in-house study for Naranja drainage improvements 100 NA Fritz completed model
Prepare for future Naranja drainage improvements 90 NA Working with Engineering
Department
Improve Stormwater infrastructure throughout Town by completion of
small works projects. 10 working on List of small works
projects
Stormwater Operations Program % Complete Req'd Date Status
Provide project management of the Town's sweeping, vegetation control,
and stormwater cleanup NA On Going
Document sweeping program plan and include reasons for the program,
priorities, equipment required, map of areas swept, and measuring
success.
NA On Going see Measureable goals report for
tracking sweeping activities
Annual Monsoon report 0 10/1/2014
Stormwater Maintenance Program (in-house)% Complete Req'd Date Status
Repair of Stormwater infrastructure that is identified as needing repair NA On Going
Stormwater Compliance Programs % Complete Req'd Date Status
Update Stormwater Web Pages NA semi-annually
Work with Pima Association of Governments (PAG) to develop a
conjunctive work plan to help cover the Town's Stormwater public
education and outreach needs.
NA On Going
Town rep attends PAG SW
Management working group
meetings
Submit annual MS4 permit/report to AZPDES 0 10/1/2014
Working with PCRFCD Study for North Ranch Wash Basin complete
reach - TDN Technical Data Notebook for FEMA 10 Collecting Data for Study
Stormwater Schedule - Work Plan Apr-14
Annual Summary Daily Monthly Quarterly Annually As Needed Assigned
Hours
Required
Hours Comments
Stormwater Sr. Civil Engineer
Staff
Hours
to
Complete
FEMA/ADEQ Coordination floodplain issues X 140 140
PCFCD meetings X 53 60
Government Agency coordinations/meetings X 84 84
Stormwater Utility Commission Meetings X 42 48
Stormwater Utility Administration/Management 3 days/wk 911 1,048
Stormwater Utility Billing and Monthly Update Reports X 421 484
Answer Questions related to Stormwater utility X 35 35
Spill Incident Inspections/Reports X 42 42
Special Projects X 263 302
Site visits and reports for violations X 35 40
Site visits and reports for property damage X 70 81
Site visits and reports for in-house projects X 100 115
2,196 2,480
Stormwater Civil Engineer
Floodplain Status Inquiries X 142 142 Includes GIS Map Preparation
Stormwater Utility Mapping X 14 14 Calculation of impervious areas GIS Mapping
Floodplain Use Permits (FPUP)X 107 89 Required to meet MS4 Best Management Practice
Residential drainage complaints/field visits X 107 107
Drainage Review and Drainage Report Reviews X 489 489 Required to meet MS4 Best Management Practice
SWPPP reviews and field inspections 3 days/wk 739 739 Required to meet MS4 Best Management Practice
In-house Hydro/Hydraulic Analysis X 178 178
404 JD Prep and Management X 178 178
Local floodplain modeling and mapping X - 200 Local Floodplain Accounting
In house drainage design/modeling using CAD X - 150 Local Floodplain Accounting
FEMA LOMC Preparation (not single residence)X 71 71 LOMC = LOMR, LOMA, CLOMR etc…
Community Rating System Management X 28 28 Completing CAV W/ADWR
Professional training (conferences, training)X 43 43
2,096 2,428
Stormwater Civil Technician
Vegetation Control X 59 59
Drainage Channel/Easement Inspections &
mapping - - Recomended to meet MS4 Best Management Practice
Basin Structure Inspections X 177 177
Recommended to meet MS4 Best Management
Practice
Public Information and Outreach X includes weekends 125 125 Required to meet MS4 Best Management Practice
Outfall Inspections X X 177 177 Required to meet MS4 Best Management Practice
Mosquito control Trapping/ Insecticide Jun - Aug 138 138 Required to meet MS4 Best Management Practice
Buffelgrass control/management includes weekends 263 263
IGA w/PAG and Southern Az Buffelgrass
Coordination Center
SWPPP field inspections - Commercial 236 236 Required to meet MS4 Best Management Practice
In-Kind Project Construction Field Inspection 6 Weeks 35 35
Post construction field inspections - 120 Required to meet MS4 Best Management Practice
SWPPP field inspections - Residential - 200 Required to meet MS4 Best Management Practice
Drainage control and Water Harvesting Projects 427 427
Resident drainage issues 167 167
Stormwater Schedule - Work Plan Apr-14
Meetings w/PAG (LID, Stormwater Group),
Southern Az Buffelgrass Coordination Center,
West Nile Virus taskforce 147 147
In-house design of minor projects 118 118
Misc. research 88 88
2,156 2,476
Senior Office Specialist
Stormwater Utility Administration /Secretarial 2 hrs 8 hrs 524 524
Stormwater Utility Commission Meetings 12 hrs 144 144
Quarterly Billing information 6 hrs 26 26
Answer Questions related to Stormwater Utility .5 hr 131 131
825 825
Annual 7273 8210
Stormwater Sr. Civil Engineer 1 1 FTE 3.47 3.92
Stormwater Civil Engineer 1 1 Training 160 216
Stormwater Civil Technician 1 1 14 Days Vacation 403.2 345.6
Senior Office Specialist 0.6 0.6 13 Holidays Holidays 374.4 374.4
0 0 6 Sick days PTO 172.8 172.8
ADC Crew 0 0 Annual 8383 9318
3.6 3.6 FTE 4.00 4.48