Loading...
HomeMy WebLinkAboutPackets - Stormwater Utillity Commission (141)AGENDA ORO VALLEY STORMWATER UTILITY COMMISSION REGULAR SESSION NOVEMBER 15, 2018 HOPI CONFERENCE ROOM 11000 N. LA CANADA DRIVE REGULAR SESSION AT OR AFTER 4 P.M. CALL TO ORDER ROLL CALL CALL TO AUDIENCE - At this time, any member of the public is allowed to address the Commission on any issue not listed on today’s agenda. Pursuant to the Arizona Open Meeting Law, individual Commission members may ask Town staff to review the matter, ask that the matter be placed on a future agenda, or respond to criticism made by speakers. However, the Stormwater Utility Commission may not discuss or take legal action on matters raised during "Call to the Audience." In order to speak during "Call to the Audience" please specify what you wish to discuss when completing the blue speaker card. 1. Approval of the October 18, 2018 Regular Session minutes and Approval of the October 22, 2018 Work Study Session minutes 2. Discussion with Town Council Liaison to the Stormwater Utility Commission (SWUC) regarding recent Town Council meetings concerning Stormwater issues 3. Discussion of Stormwater meetings and events 4. Discussion of on-going Stormwater projects a. Stormwater Management Program Public Outreach & Education b. Status of the FEMA grant application for Highland Wash 5. Discussion of Stormwater Financials 6. Discussion and possible action regarding Work Study Session Strategic Plan topics 7. Discussion and possible action regarding an additional Work Study Session if determined necessary. Possible dates of Wednesday November 28, Thursday November 29 or Wednesday December 5, 2018 are available. 8. Discussion and possible action regarding cancellation of December 20, 2018 SWUC Regular Session meeting FUTURE AGENDA ITEMS NEXT MEETING: DECEMBER 20, 2018 LOCATION: HOPI CONFERENCE RM TIME: 4:00 P.M. ADJOURNMENT POSTED: 11/8/18 at 5:00 p.m. by pp When possible, a packet of agenda materials as listed above is available for public inspection at least 24 hours prior to the Stormwater Utility Commission meeting in the Town Clerk's Office between the hours of 8:00 a.m. and 5:00 p.m. The Town of Oro Valley complies with the Americans with Disabilities Act (ADA). If any person with a disability needs any type of accommodation, please notify the Town Clerk’s Office at least five days prior to the Commission meeting at 229-4700. INSTRUCTION TO SPEAKERS Members of the public have the right to speak during any posted public hearing. However, those items not listed as a public hearing are for consideration and action by the Stormwater Utility Commission during the course of their business meeting. Members of the public may be allowed to speak on these topics at the discretion of the Chair. If you wish to address the Commission on any item(s) on this agenda, please complete a blue speaker card and give it to the Recording Secretary. Please indicate on the speaker card which item number and topic you wish to speak on, or if you wish to speak during “Call to Audience,” please specify what you wish to discuss when completing the blue speaker card. “Notice of Possible Quorum of the Oro Valley Town Council, Boards, Commissions, and Committees: In accordance with Chapter 3, Title 38, Arizona Revised Statutes and Section 2-4-4 of the Oro Valley Town Code, a majority of the Town Council, Board of Adjustment, Historic Preservation Commission, Parks and Recreation Advisory Board, Planning and Zoning Commission, and Water Utility Commission may attend the above referenced meeting as a member of the audience only.” - -I ' r- r- r­l r ·ri rr r-1 ,..... ( r- - I - � II. w w OJ SEE FIG.8 PROPO SED MATTERHORN \ \ \ I PROPO SED ARMORED LEVEE RAISED a 1 ..;_._•.11 I I • NOTE: RECOMMENDED CHANNEL IMPROVEMENT S MUST CONTINU� II SOUTH BEYOND MATTERHORN DRIVE TO THE SOUTH PROP�RTY 11LINE OF THE HGHLANDS I I �. · en'lironmenraJ ,�,.. ·aclenl/lls, CDM !,lanners. & manegemen1 conau111111s . � fj J . -�-/ .. -- 6 2 .-.. r• -- - · � SCALE : 1•=100' PLAN VIEW PROPOSED LINED CHANNEL AND LEVEE •rHE HIGHLANDS• mobile ·home park FIGURE 7 V r ! r I -I ' f - : r - r r r·f I r r ' r- r I ( I EXIS T. OR RAISED TOP a• THICK CONC RETE w/WWF OJ w <> .. SECTION THROUGH ARMORED LEVEE 5' LANDSCAPE BUFFER 1' 80' PRIVATE DRAINAGEWAY 25'.. SECTrON THROUGH UNED CHANNEL envlronmenraJengJneers. sciwtliS/s, CDM planners, & management consu/lants 6-3 12' MAINT. ROAD & LANDSCAPE BUFFER DRAWINGS ARE NOT TO SCALE LEVEE AND CHANNEL IMPROVEMENTS •rHE HIGHLANDS• mobile home park FIGURE 8 2 5 6 1 .4 9 2570.413 2 5 5 6 .5 7 2 5 2 8 .6 6 2566.43 2 5 5 4 .5 8 4 2 5 4 7 .6 0 3 2609.258 2 5 6 3 .9 2 5 2 5 5 8 .6 8 8 2 5 5 3 .3 0 7 2573.139 2 5 5 1 .2 2 1 2537.747 2580.083 2642.155 2653.821 26 54 .1 2575.866 2578.402 2612.179 2631.25 2606.414 2616.231 2603.992 2624.009 2621.375 2628.231 2 6 5 8 .5 9 4 2 6 5 4 .5 2 5 2582.627 2585.79 2598.25 2637.297 2601.118 2634.705 2595.172 25 92 .14 8 2588.467 2 6 6 3 .4 4 1 2520.5326302 6 2 826262624 2622262026182616266025502 6 1 4 261026122608260625522 5 6 2 254825582 5 4 6 2536 25542544 25822600 25602 5 4 2 258 4 264 8 26042570 256 4 2646259826022586 25562644 257 2 258 8 25662596 264 2 263226382640 259225682538 265 8 257 8 2654 25942 5 9 02652 2580 2650 2656 2540 2 6 3 4 257426362576 2 5 3 4 2662 2 6 6 4 2 6 6 6 2 6 6 8 267026722674 267626782680 268 2 268426862688 2690 2 5 3 2 26922694269626982530 270027022528 252627042706 26982 6 8 8 253225822 5 7 22658 254226942 5 6 4 2 6 9 2 26922694 25282666266626902 5 6 6 25762660 2624267226722680 2530 2560259626902684261027042674 2 6 0 6 253 026002624 255226422688263026362556 26482686 2632 26862674 2672267826062638 2670 270025402590266825462 6 9 6 2 5 4 8 2564 25402644 2 6 9 0 258026842 5 9 8 2 5 7 6 2604 2 6 7 4 263626802 6 7 02678 2 5 7 62640 25562 6 3 4 2674260 2 2684 2646254026662680 2672 2 6 9 0 2 5 9 4 2676262026362 6 1 2 2686 2 5 6 4 2 6 7 8 2678 26282584 26242658 2668267825642572 25982 5 5 8 2574 2700 257826962 7 0 4 2 5 3 0 26262694 2622268 2 26382622253 2 27022 6 7 8 2576 2660263826402666 267 8 2648263626642 6 6 0 25462 6 8 8 260426782 6 7 6 2680253225522 6 82 267426342 5 3 8 26862676 2662 2 6 1 0 2 5 4 025582682 2 6 9 02696 27002 5 3 6 25422668 25782536268625342 6 1 02686 2540 260226342564 2 5 4 2 270226622 6 6 8 26002 6 7 8 25302554 26322682 26322538254826662 6282698 2618 26422 6 0 8 2566 25322 5 7 2 2 6 7 2 2560263425862 5 6 4 268 4 2 6 4 42688 2 6 2 4 267626982 6 9 0 2 6 2 426362700 2640 2694 2662 2536 26802660 268 8 2660 2706 26442668263625362558268226122680 26562642263626382670268 6 253426282526264825862 5 4 02 5382696 2692 26942622270026662 6 8 6 255226782684252825802 6 3 4 2676 26622632 2532 26262702 2630257425322 6 8 0 26362 6 7 8 2702 2 5 3 0 260426722676 2690 253826622682266026982612269226942 5 5 0 2 5 3 2 2662 269625742638 26942 5 3 6 268 0 2660 2702 2674 253226662688 25782 6 90 2 6 7 8 26842602 254425382 6 9 8 26002 5 4 2 26162 6 8 0 2 5 3 6 2 6 8 0 2634 2 6 8 8 25642660265826922688266826642678 269226342670 26262 6 9 0 2 6 2 6 2 5 3 8 26622572 269826342684259426022636 2 5 3 2 260225302638 26742 6 3 8 2 7 0 4 26902 5 2 8 2690 26802676 26322636267826322672 2 5 3 2 2656 2572 254426962576 2540 2564 2530 2696 2578 2684267026362672260026802542 2554 2662267625702688260825402672 26822690 26262680 2 6 9 2 26882 53 8 269026022 6 1 02662 2 6 3 2 25282568 2 6 9 0 2574 2636 268 2 2548269026902598 26602672 25562680 267 4 2 6 9 4 1 3 1 1 .1 2015.576 1 6 6 1 .7 8 3 1 5 4 0 .5 1 1 0 1 2 .9 6 6 3465.901 1 7 6 1 .8 9 9 2119.727 1 1 2 9 .4 7 2 1 4 3 3 .6 0 3 1 2 2 4 .8 9 3 1909.011 771.8843 2386.444 4639.645 4859.978 2245.066 2321.737 3568.721 3314.557 3680.413 3213.189 3916.786 3797.122 4088.801 5 2 5 0 .4 9 8 49 73 .53 4 4361.88 5 1 0 8 .9 9 3 4235.923 2475.215 2567.79 4477.557 3094.344 2887.977 2985.983 28 01 .04 6 2658.801 5 4 1 6 .3 5 1 W L A M B E R T L N W NARANJA DR E LAMBERT LNE NARANJA DR Pima County Regional Flood Control District97 E Congress - 3rd FloorTucson, Arizona 85701-1207(520) 243-1867, FAX: (520)243-1821http://www.rfcd.pima.gov The information depicted on this display is the result of digital analyses performed on a variety of databasesprovided and maintained by several governmental agencies.The accuracy of the information presented is limited tothe collective accuracy of these databases on the dateof the analysis. The Pima County Regional Flood Control District makes no claims regarding the accuracy of the informationdepicted herein. This product is subject to the GIS Division Disclaimerand Use Restrictions. Scale: © Highland Wash 100-yr Flood plain - Map 1 490 0 490245 Feet Map 1 Map 2 Map 3 Map 4 Legend Contours 2-ft Highland Wa sh C ross Secti ons Major Streets Study Limi ts 100-y r Floodpla in 2500 Water Surfac e Elevation NAVD 881000Cross Section Station 1:2,000 Map 5 Discussion of Stormwater Meetings and Events • October 19, 2018 – National Night Out for Safety Awareness. • October 22, 2018 – SWUC Work Study Session, Strategic Plan Initiative. • October 31, 2018 – SWPPP Inspector Refresher Course, full day class. • November 8, 2018 – Pima Association of Governments Stormwater Management Working Group meeting. • November 14, 2018 – Wilson K-8, Science, Technology, Engineering and Math (STEM) Fair. • November 15, 2018 – Stormwater Utility Commission, Regular Session Meeting. • November 21, 2018 – Pima County Flood Control District Advisory Committee Meeting. • Late November, 2018 – La Cholla Boulevard Road Widening Project, Pre- Construction Meeting (date TBD). • December 7, 2018 – Pima Association of Governments Environmental Planning and Action Committee Meeting. • December 19, 2018 – Pima County Flood Control District Advisory Committee Meeting (typically is cancelled). • December 20, 2018 – Stormwater Utility Commission, Regular Session Meeting. • January 8, 2019 – La Cholla Road Widening Project construction begins. • January 16, 2019 – Pima County Flood Control District Advisory Committee Meeting. • January 17, 2019 – Stormwater Utility Commission, Regular Session Meeting.