HomeMy WebLinkAboutPackets - Council Packets (1683)Town Council Meeting
Regular and Study Session
January 19, 2022
Town Council Meeting
Announcements
Upcoming Meetings
Meetings are subject to change. Check the Town website for meeting status.
Stormwater Utility Commission
Jan. 20 at 4 p.m.
Hopi Conference Room
Board of Adjustment –CANCELED
Jan. 25 at 3 p.m.
Council Chambers
Planning and Zoning Commission
Feb. 1 at 6 p.m.
Council Chambers
Town Council Regular Session
Feb. 2 at 6 p.m.
Council Chambers
Town Council Meeting
Regular and Study Session
January 19, 2022
Amy Senkerik
11th grade student at Ironwood Ridge High School
Spotlight on Youth
Marcelo Ibarra
8th grade student at Pusch Ridge Christian Academy
Town Council Meeting
Regular and Study Session
January 19, 2022
Fiscal Year 2021/22
Financial Update Through November 2021
January 19, 2022
GENERAL FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Local Sales Taxes $ 21,157,707 $ 10,485,965 49.6%$ 23,538,980 Trending higher than expected; continued growth and
strong recovery in categories impacted by COVID
State Shared Revenues 13,729,923 5,659,989 41.2%13,729,923 Trending as expected
Charges for Services 2,387,776 1,023,893 42.9%2,527,191 Trending higher than expected; improvement in
recreation revenue
Licenses and Permits 1,849,000 673,082 36.4%1,849,000
Trending lower than expected as SFR permits have
slowed. Waiting to see how other permit sources
come in
Grant Revenue 6,065,290 85,340 1.4%8,260,785 Year -end estimate includes additional American
Rescue Plan Act (ARPA) funds
All Other 1,883,500 743,938 39.5%1,958,500 Includes other intergovernmental revenue, interest
income and miscellaneous revenue
TOTAL GENERAL FUND
REVENUES $ 47,073,196 $ 18,672,207 39.7%$ 51,864,379 Budget variance due to outperforming sales tax
collections and additional ARPA funds
GENERAL FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Personnel $ 30,775,632 $ 11,073,955 36.0%$ 30,785,192 Year to date actuals are slightly below budget due
to timing of payroll
Operations and
Maintenance 21,981,773 14,084,237 64.1%21,980,273 Includes $10M PSPRS payment from reserves
Capital 1,095,175 132,779 12.1%1,095,175 Budget includes Westward Look improvements, IT
needs and Parks and Recreation improvements
Transfers Out 7,408,264 2,685,314 36.2%6,262,832
Actuals reflect a transfer for debt service. No
principal payment due in FY 21/22 for pension
obligation bonds
TOTAL GENERAL FUND
EXPENDITURES $ 61,260,844 $ 27,976,285 45.7%$ 60,123,472 Budget variance mainly due to debt service
transfer for pension obligation bonds
Budgeted Deficit/Use of Fund
Balance: ($14.2M)
Estimated Deficit/Use of Fund
Balance = ($8.3M)
Estimated Ending Fund
Balance: $24.1M
44.8% of budgeted expenditures
Exceeds Council 25% Policy by
$10.7M
GENERAL FUND
HIGHWAY FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Licenses and Permits $ 25,000 $ 11,814 47.3%$ 25,000 Trending higher than expected. Revised year-end
estimate likely
State Shared Revenues 3,614,922 1,600,957 44.3%3,614,922 Trending higher than expected. Revised year-end
estimate likely
All Other 8,000 6,835 85.4%12,069 Additional revenues attributable to insurance
recoveries
TOTAL HIGHWAY FUND
REVENUES $ 3,647,922 $ 1,619,606 44.4%$ 3,651,991 Major revenue sources trending higher than
expected. Revised year-end estimate likely
HIGHWAY FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Personnel $ 1,208,870 $ 458,824 38.0%$ 1,208,870 Trending as expected; % of budget reflects timing of
payrolls
Operations and
Maintenance 616,655 187,091 30.3%616,655
Trending as expected; larger line-items include
striping, field supplies, electricity and traffic signal
maintenance
Capital 2,265,000 611,352 27.0%2,265,000 Trending as expected; timing of pavement
preservation program
TOTAL HIGHWAY FUND
EXPENDITURES $ 4,090,525 $ 1,257,267 30.7%$ 4,090,525 No budget variance projected at this time
Budgeted Deficit/Use of Fund
Balance: ($0.4M)
Estimated Ending Fund
Balance: $0.8M
HIGHWAY FUND
COMMUNITY CENTER FUND REVENUES
REVENUE SOURCE Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Contracted Operating
Revenues $ 3,622,385 $ 1,496,796 41.3%$ 3,940,742
All revenues sources trending higher than expected.
Strong performance particularly in member dues
and food and beverage
Town Operating Revenues 697,580 477,380 68.4%963,000 Strong recovery in recreation program revenue
Other Revenues 3,078,300 1,328,351 43.2%3,409,834
Includes 1/2 cent sales tax revenues, HOA
contributions, interest income and other
miscellaneous revenues. Higher than expected local
sales tax
TOTAL COMM. CENTER
FUND REVENUES $ 7,398,265 $ 3,302,527 44.6%$ 8,313,576
Total revenues projected to exceed budget by
$915,311 or 12.4%, due to sales tax, recreation
program revenue, and golf revenue
COMMUNITY CENTER FUND EXPENDITURES
EXPENDITURE CATEGORY Budget Actuals
Thru 11/2021 % of Budget Year -End
Estimate Notes
Contracted Operating
Expenditures $ 4,701,528 $ 1,957,701 41.6%$ 4,495,975
Trending better than expected. O&M and personnel
costs are expected to come in under budget by
$205,000 and $50,000 respectively, per contractor
Town Operating
Expenditures 1,086,581 485,409 44.7%1,102,666 Trending as expected
Capital Outlay 132,500 35,286 26.6%132,500 Projected on budget at this time
Transfers Out 1,868,519 168,519 9.0%168,519 Actuals reflect a transfer for debt service. Interest
only payment due on Parks and Recreation bonds
TOTAL COMM. CENTER
FUND EXPENDITURES $ 7,789,128 $ 2,646,915 34.0%$ 5,899,660
Budget savings of $1.7 million in transfers out.
Outperformance in contracted operating
expenditures
COMMUNITY CENTER FUND
Budgeted Deficit/Use of Fund
Balance: ($0.4M)
Estimated Surplus: $2.4M
Estimated Ending Fund
Balance: $5.1M
MONTHLY FINANCIAL UPDATE
QUESTIONS?
Town Council Meeting
Regular and Study Session
January 19, 2022
Town of Oro Valley, Arizona
Independent Auditors’ Report
Presentation to the Town Council
Year Ended June 30, 2021
Offering You More
Required Communications with
Town Council and Management
•Auditors’ Report on the Financial
Statements
–Unmodified opinion
•Reasonable assurance the financial statements
are fairly presented in accordance with GAAP
•Report on Compliance and on Internal
Control over Financial Reporting
–Unmodified opinion
Offering You More
Communications with Town
Council and Management
•Henry + Horne’s Responsibility under U.S. General Accepted Auditing Standards (GAAS)
–Stated in engagement letter dated May 3, 2021
–Reasonable assurance
–Internal control properly designed and implemented
•Significant Accounting Policies and Issues Discussed
–Note 1 of Financial Statements
–Difficulties Encountered in Performing the Audit –None encountered
–Corrected and Uncorrected Misstatements –No uncorrected misstatements
–Disagreements with Management –No disagreements
–Management Consultations with Other Auditors “Audit Shopping” -None noted
Offering You More
Communications with Town
Council and Management
•Other Reports
–Annual Expenditure Limitation Report (AELR)
•Issued to the Arizona State Auditor General timely
EEC Expenditure Limitation $105,435,626
Town Expenditures Subject to Limitation 88,865,786
Amount under the expenditure Limitation $ 16,569,840
–Single Audit
•Town expended $10,200,670 of federal funds in fiscal year 2021
•Major Program was CARES Act and American Rescue Plan Act
•Town received an unmodified opinion on the federal single audit
Offering You More
Findings and Recommendations
•Findings
–2021-001: Contributed Capital Assets
•There was one material contribution in a prior fiscal year that was not properly identify and captured. The value of the asset being contributed resulting in a material adjustment necessary to properly state the financial statements
•A prior period adjustment was required to properly report the beginning balances for capital assets and net position for the Governmental Activities on the Government-Wide Statements
Offering You More
Findings and Recommendations
•Recommendations
1.Contributed Capital Assets
•We recommend all assets being contributed and accepted by the Town Council are reviewed and reconciled by the finance department to ensure that they are accurately captured in the Town capital asset schedules and reports
Offering You More
Financial Highlights
-
50
100
150
200
250
Assets Liabilities Net Position Revenues Expenses
Total Government-Wide (In Millions)
2020
2021
Offering You More
Financial Highlights
-
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
2019 2020 2021
Fund Balance -Governmental
All Governmental Funds
General Fund
Offering You More
Financial Highlights
-
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
Water Non-Major Enterprise Fund
Fund Balance -Enterprise Funds
2019
2020
2021
Offering You More
QUESTIONS?
Town Council Meeting
Regular and Study Session
January 19, 2022
Proposed Changes to Town Code
January 19, 2022
James Hazel, Jr.
Presiding Magistrate
Why change the current code?
Create greater branding of Court within Town
Create more options to ensure compliance with Court orders
Create the authority to require Court users to pay a greater percentage of
court costs
Proposed Changes
Change the name of the Court to Oro Valley Town Court
This will create better branding with the Town
Proposed Changes
Increase fees to require Court users to pay a greater cost for use of the
justice system
This would allow for funds to be raised to help defer the costs of much-needed
improvements to the Court building
This would also allow the Prosecutor to recover a portion of the costs of
providing prosecution services to the Town
Proposed Changes
Provide authority to place defendants on home detention
Average cost of home detention is $20 a day
Average cost of a day in Pima County Jail is $400
Town Council must specifically authorize use of home detention
QUESTIONS?
Town Council Meeting
Regular and Study Session
January 19, 2022
Proposed New Use and Standards
for the Oro Valley Marketplace
Town Council Study Session
January 19, 2022
Purpose
Study applicant’s requests:
Item A: Reclassify the OV Marketplace wash to allow
development of the entertainment district
Item B: Permit apartments
Item C: Revise code standards by amending the zoning
(PAD)
Adjust height for the apartments and hotels, landscape buffers and
setbacks
Drive-thru use
Item D: Revised site and landscape design
New building placement and Entertainment District
Detailed parking and circulation design of undeveloped areas
Address Town Council Study Session
questions and comments
Formal Public Hearing February 16
Proposed applications
Subject Property
Brief history of Oro Valley Marketplace
Approved in 2006 and opened in 2008
Extensive public participation process
Master Development Plan, Architectural Design
Guidelines, Public Art Program and Master Sign
Program
803K square feet of retail, restaurant and office space
Multiuse path connecting to Loop trail
system
Restoration of significant open space areas
Ownership of Big Wash transferred to Pima
County for permanent protection
Tangerine Road
Pima County owned wash
Need for Revitalization
Current conditions
803K square feet planned
Remaining undeveloped pads: 239K
square feet (30%)
Vacant shell spaces: 22
Challenges
Online shopping or “Amazon” effect
Structural fundamentals
Traffic
Income levels
Demographics and density
Need for Revitalization
Average OV Marketplace
Size in sq. feet 570,789 803,011
Population within 5-7 miles 211,061 129,826
Population per sq. mile 41,739 18,547
Sq. feet per person 2.9 6.2
Comparison to other regional commercial centers in Arizona
OV Marketplace has too much supply and not enough people
Chandler
Gilbert
Glendale
Mesa
Oro Valley
Peoria
Phoenix
Scottsdale
Tempe
Queen Creek
Item A –ESL Zoning Map Amendment
Change type of open space
Critical Resource Area (CRA) -> Resource
Management Area (RMA)
General Plan Growth Area
Key Factors:
Meets CRA plant density
Constructed drainage channel
Low resource value
Fragmented by road crossings
Narrow
Bordered by asphalt parking lots
Maintains existing drainage into Big Wash
Central Open Space Area Only
Item A –ESL Zoning Map Amendment
Current Proposed
ESL Flexible Design Options
Item B –Request use of ESL Mixed-use Flexible Design Option
Requires minimum of 25% Environmentally
Sensitive Open Space (ESOS)
Permits “off-site” ESOS
Big Wash restoration: ~77 acres
Dedicated to Pima County as open space
Mixed -use option
“Residential uses that are functionally integrated,
including access, nonvehicular circulation and amenities,
with commercial or employment uses may be approved
within commercial zoning districts.”
Item B –Request to use ESL Mixed-use Flexible Design Option
-Well site
Tangerine Road Tangerine Road Tangerine Road
Prior to approval-2002 After approval-2008 Today -2021
Item C –Rancho Vistoso PAD Amendment
Policies for Neighborhood 4
ONLY –Oro Valley Marketplace
Building heights
Noise
Recreational amenities
Setbacks
Drive-thru uses
Floor Area Ratio (FAR)
Building heights are USE and
LOCATION specific
Item C –Rancho Vistoso PAD Amendment
Location Proposed Use Permitted
Height
Proposed
Height
Additional
Heigh for
Arch. Features
1 Apartment N/A 75’None
2 Hotel 39’49’10’
3
Hotel -
Entertainment
District
39’49’10’
4 Apartment N/A 59’None
5 Hotel 39’49’10’
~700 ft
1,000 ft +
~2,200 ft
~1,200 ft
~1,500 ft
Building heights for all other sites will remain the same
Tangerine Apartments
Height and Design Requirements
Oracle Apartments
75 feet: 20% of the building footprint
63 feet or less: 80% of the building footprint
59 feet: 50% of the building footprint
49 feet or less: 50% of the building footprint
Noise
Item C –Rancho Vistoso PAD Amendment
Noise areas
Patios in Entertainment District
Central courtyard
Study findings
Meets noise requirements
Conditions
Patios are oriented away from neighbors
Distributed sound system in courtyard
Courtyard music must be shut off at 10 p.m.
Recreation amenity integration
Item C –Rancho Vistoso PAD Amendment
Amenities throughout the center
Apartment only areas
Entertainment District
CDO Multiuse path
Item D –Revised Master Development Plan/CSP
Proposed site changes –5 Development Areas
Apartments (2)
Tangerine
500 units with parking underneath
Oracle
230 units with parking underneath
Hotels (3)
Tangerine
150 rooms
Entertainment District
108 rooms
Oracle Road
112 rooms
Entertainment District and community gathering space
Drive-thru use (1)
Tangerine/Oracle right-of-way acquisition in process (purple areas)
Tangerine Road
Tangerine Road
Key Map
Access
Access
Multi-use
path to
remain
Podium style with ground level parking
500 units
75 feet/5 stories above parking
Dog ParkClubhouse
Pool
Gym
Movie Theater
ADOT ROW
Development Area A –Tangerine Apartments
Tangerine Road
Tangerine Road
Key Map
150 rooms
49 feet/4 stories
PoolAccess
Entrance/Drop-off
ADOT ROW
Development Area B –Tangerine Hotel
Development Area C –
Entertainment District
Tangerine Road
Key Map
•Courtyard
•Hotel with pool
•Ground floor
Restaurant and Retail
•Retail space
•Restaurants
Tangerine Road
Key MapDevelopment
Area D –Oracle
Apartment and
Drive Thru
Access
Access
Access
Clubhouse
Pool
Apartments:
Podium style
with ground
level parking
230 units
59 feet/5
stories above
parking
Screening
Tangerine Road
Key MapDevelopment
Area E –
Oracle Hotel
112 rooms
49 feet/4 stories
Pool
Access
Entrance/Drop-off
Access
Item D –Revised Master Development Plan/CSP
ORO VALLEY MARKETPLACE TRAFFIC GENERATION
Traffic Generation Type Vehicle Trips Per Day (VTPD)
Built sites as of 2021 (e.g. Walmart, Movie Theater, etc.)16,184
Approved for entire center in 2005 for all building pads
(developed and undeveloped as of 2021)26,124
Projected for entire center with applicant’s proposed
uses 28,978
Projected difference 2,854
ORO VALLEY MARKETPLACE TRAFFIC GENERATION (ORACLE ROAD)
Traffic Generation Type Vehicle Trips Per Day (VTPD)
Existing traffic south of Water Harvest Way 33,477*
Full build-out based on approved design 39,441
Full build-out for applicant’s proposed design 41,153
Projected difference 1,712
Traffic
The importance of this comparison is that existing entitled development vs. this proposal
has a net impact of a 4% increase in overall traffic impact to Oracle Road.
Oracle Road only
Total Traffic Generation
Future applications
Conceptual Architecture
Apartments
Hotels
Public Art
Master Sign Program
General Plan, Strategic Leadership Plan and Zoning Conformance
General Plan
Vision, Guiding Principles, Goals and Policies
View Preservation
Environment Protection of Riparian Area
Economic Stability
Compatibility with neighbors
Fostering Social Gathering Spaces
Strategic Leadership Plan (SLP)
Objective on FY19/20 and FY21/22 SLP
“Work with the owners of the Oro Valley Village Center
[Marketplace] to develop a multi-faceted, mutually
agreeable approach to attract and retain new investment
and expanded customer base to that complex.”
Zoning Code
Neighborhood Meetings
Two Neighborhood Meetings
Informational video
Four Focus Area Meetings
Common themes:
Need for revitalization
View Impacts
Traffic
Noise
Proposed apartments
Planning and Zoning Commission
•Recommends approval of Item A and conditional
approval of Items B, C, and D
•Use of right-of-way
•Views
•Condition added: Building Height for Tangerine
Apartments
•Connectivity
•Condition added: CDO multiuse path lighting for
pedestrian use (yellow dashed line)
•Condition added: Address internal lighting gaps
on primary anticipated pedestrian route (red
dashed lines)
Summary and Timeline
Proposed site design changes:
Item A: ESL Zoning Map Amendment
Item B: Request to use Mixed-use
Item C: PAD Amendment
Item D: Revised Master Development Plan
Next steps
Town Council formal Public Hearing: February 16
PZC recommends approval of Item A and conditional
approval of Items B, C, and D. Key conditions:
Final Town and ADOT right-of-way acquisitions
Redesign internal circulation for Tangerine Hotel on Water Harvest Way
Tangerine Apartments building height
Pedestrian safety lighting
CDO multi-use path
Existing internal lighting gaps
Town Council Meeting
Regular and Study Session
January 19, 2022
Oro Valley Village Center
A Reimagining of Oro Valley Marketplace by Town West Realty, Inc.
January 19, 2022
Mayor and Council Study Session
The Team
Town West Realty
•Family-owned developer in
Tucson for over 40 years
•Many successful local
projects, owned,
developed and
reimagined
Town West Realty
The Town’s Vision: Aligned with Ownership
•Exciting and unrealized
opportunity at Oro Valley
Marketplace
•Attract retail
•Attract talent
•Attract tourism
•Create live, work, recreate,
dine and shop
Prime Location
•112 acres on SW corner of
Oracle and Tangerine Rd.
•Established area near
existing facilities –direct
connection to the Oro Valley
Hospital and Innovation Park
•Site was planned for dense
development and was
previously graded
•New developments to North
Challenges
A
B
C
D
E
F
G
H
I
J
K
VACANT PAD: PROPOSED APARTMENTS
VACANT PAD: PROPOSED HOTEL
VACANT PAD: PROPOSED RETAIL
VACANT DRAINAGE WAY: PROPOSED PARK
VACANT PAD: PROPOSED RESTAURANT
VACANT PAD: PROPOSED RESTAURANT
VACANT STOREFRONT: PROPOSED RETAIL
VACANT PAD: PROPOSED RETAIL
VACANT PAD: PROPOSED APARTMENTS
VACANT PAD: PROPOSED HOTEL
VACANT PAD: PROPOSED RETAIL
A B C
D
E
F G
H
I
J
K
Lifestyle, Entertainment, Dining, Special Events, Residential, Hospitality
Many national and international case studies have
proven mixing uses and providing entertainment,
dining, special events, multifamily, hospitality and
retail in an accessible setting is the recipe for a
vibrant and successful “Retaildential” center.
Reimagining
Opportunities
A
B
C
D
E
TANGERINE APARTMENTS
•500 units
•5 story building with corner loft units
TANGERINE HOTEL
•150 rooms
•4 stories
OASIS PARK LIFESTYLE & ENTERTAINMENT CENTER
•4 story building: 3 story hotel with 108 rooms and ground floor retail/restaurant
•Recreational water features, splash pads, sand beach/bar, shaded areas
•Flexible event space, new restaurants
ORACLE APARTMENTS
•229 units
•4 and 5 story building
•2 levels of parking
ORACLE HOTEL
•112 rooms
•4 stories
A B
C
D
E
Conditions and Heights
CONTEXT:
•ORACLE: 10 feet to 88 feet elevated. [South to North)
•TANGERINE: 10 /12 feet to 88 feet elevated [west to east]
•CLOSEST HOMES: To west –Over 800 to 1700 feet and 15-50 feet elevated
•VIEWS TO PUSCH RIDGE–from west are mainly OVER the site and will continue to be.
HEIGHTS:
•CURRENT PAD:39 feet plus 10 feet for architectural features = 49 feet
•HOTELS:49 feet plus 10 feet for architectural features = 59 feet
•APARTMENTS: Heights INCLUSIVE of architecture
•Oracle Road: 49 feet and no more than ½ of building at 59 feet to the north (as Oracle Road rises)
•Tangerine Road: Maximum 75 feet (same as Oro Valley Hospital)
Public Events
Recreational Opportunities
Restaurants
Hospitality
Retail
Pedestrian Connectivity
Oasis Park
Lifestyle & Entertainment
Center
N
Winter ice rink
Hotel and retail
Outdoor dining
Beach bar
Shaded water splashpad
Playground
Oasis Park
North
N
Town park
Restaurants and nightlife
Outdoor dining
Beer garden
Loop transit center
Oasis Park
South
N
Oro Valley Village Oasis Park
Inspiration Board
Oro Valley Village Oasis Park
View from the west
Recreational Water Feature
Oro Valley Village Oasis Park
View from the east
Hotel
Oro Valley Village Oasis Park
View from the northeast
Hotel
Luxury Apartments –Examples
Inspiration Board
Courtyard
Luxury Apartments
Views
Tangerine Road View Oracle Road View
Luxury Apartments –Tangerine Rd.
Approximately 500 units
in 5 stories with corner
loft units
75’ maximum height (only
20%)
909 covered podium
parking spaces
Connects to The Loop
Meets design guidelines
for Oro Valley
Marketplace
View from the southwest
All parking provided on site and under building
Luxury Apartments –Tangerine Rd.
Approximately 229 units
4 and 5 story building on a
lower elevation site
49’ with less than 50% of
building at 59’ maximum
height
Two floors secure parking
–434 spaces
Central courtyard with
swimming pool and
recreational facility
Meets design guidelines
for Oro Valley Marketplace
Luxury Apartments –Oracle Rd.
View from Northwest
Restaurant building in the foreground
Luxury Apartments –Oracle Rd.
• 150 rooms
• 4 stories
• Height: 49’
• 151 parking spaces at
ground level
Tangerine Hotel
Oracle Hotel
• 112 rooms
• 4 stories
• Height: 49’
• 114 parking spaces at
ground level
Economic Impact
Overall
Investment
1,816 jobs annually
$60.5 million in wages
annually
$165.6 million of
economic output
annually
Construction
Cost: $336 million
3,981 person years of
employment
$164 million in wages
$524.6 million in economic
impact throughout Pima
County
Apartments
(730 units)
261 jobs annually
$9.7 million in wages
annually
$24.6 million of
economic output
annually
Commercial &
Tourism
1,555 jobs annually
$50.8 million in wages
annually
Economic Output:
$141 million annually
Neighborhood Outreach
Six Neighborhood Meetings
•Two required
•Four that were focused on issues of closest neighbors
Primary Concerns
•Traffic
•Need for Apartments/Hotels
•Heights
•Water Conservation
•Outdoor Lighting
•Wildlife Movement
•Noise
•Drainage
Over 400 petition signatures in support of project
Our Vision
We are committed to re-imagining the
Oro Valley Marketplace into a vibrant place
where residents and visitors can gather to
work, play, shop, live and stay while enjoying
the beauty of Oro Valley.
Town Council Meeting
Regular and Study Session
January 19, 2022