HomeMy WebLinkAboutMinutes - Development Review Board - 10/12/2010 MINUTES
ORO VALLEY DEVELOPMENT REVIEW BOARD
REGULAR MEETING
October 12, 2010
ORO VALLEY COUNCIL CHAMBERS
11000 N. LA CANADA DRIVE
CALL TO ORDER REGULAR MEETING AT OR AFTER 6:00 P.M.
Chairman Schoeppach called the meeting to order at 6:00 p.m.
ROLL CALL
PRESENT: Michael Schoeppach, Member
Gene Wowk, Member
Richard Luckett, Member
Dennis Ottley, Member
EXCUSED: Ray Shelton, Member
PRESENT: Michael Schoeppach, Chairman
Eugene Wowk, Vice Chair
Richard Luckett, Member
Dennis Ottley, Member
EXCUSED: Ray Shelton, Member
PLEDGE OF ALLEGIANCE
Chairman Schoeppach led the audience in the Pledge of Allegiance.
CALL TO THE AUDIENCE
Opened and closed without comment.
1. Approval of the September 14, 2010, DRB minutes.
Item 1
MOTION: A motion was made by Member Ottley and seconded by Member
Luckett postpone consideration of the September 14, 2010 minutes until the next
meeting.
MOTION carried, 4-0
2. AT&T Mobility, represented by Chad Blunt, requests approval of a Tier II
Minor wireless communications facility on a replacement Tucson Electric
Power (TEP) utility pole on La Canada Drive and Red Creek Drive, with a
15' x 20' equipment compound to be located within the adjacent Copper
Creek HOA common area, 0V609-010.
Chad Blunt, OV resident and applicant, presented coverage locations and went
on to state that the Town made it clear that the antennas needed to be placed in
a canister and there are some limitations. AT&T believes this site provides the
least impact to the neighborhood. AT&T has struggled with vaults and it's a
safety hazard for the cell techs. Landscape plans that were submitted have
been improved to help provide screening on La Canada and the
neighborhood. Mr. Blunt believes this is the least obtrusive location to provide
coverage to customers.
Matt Michels, OV Senior Planner, presented the following:
- Location Map
- Zoning Map
- Project Location - Aerial View
- Slope and Topography
- Equipment Compound Detail
- Pole Detail
- Existing and Proposed Pole
- Summary
- Public Comments & Questions
Paul Keesler, OV Permitting Division Manager, said if they were to slide it south,
it would be in the slope of the basin and that would eat up some of the available
volume of the basin. The basin would need to be re-graded to mitigate the
loss of volume. Per Town requirements, there needs to be a zero loss in
volume. Another issue the applicant would have is access to their
equipment. The equipment would be located on the side of the slope. These are
engineering issues that can be resolved. The Town's standpoint regarding the
basin is whatever volume currently exists needs to remain once completed.
Member Ottley asked if any thought had been given to placing an oak
tree between the structure and the homeowners in order to mitigate the noise.
Mr. Michels said when discussing this issue with the applicant and neighbors,
one of the initial concerns was the view from the adjacent residents. One of the
issues was not creating any view impediments and it was the option of the folks
involved that having any vegetation that would have a mature height significantly
higher than the proposed equipment compound would be undesirable.
Member Ottley commented that he thought the backyards would not be visually
impaired.
Member Luckett said from a design perspective baffles could be placed inside
this enclosure or moving it further south may help the neighbors. Member
Luckett presented some pictures that he took of the site and went onto say the
last time Mr. Blunt was here there was mention that the vault could not be
placed in a detention basin. Mr. Blunt said that his client has concerns regarding
placing a vault in the retention area.
Member Luckett commented that you can water proof vaults. Mr. Blunt said you
can but there are problems associated with doing so.
Member Luckett commented that there is new technology associated
with placing equipment in a vault.
Mr. Blunt said he can't argue that point, but a retention pond is designed to
percolate water, reduce the water flow into the ground table, and control water
flow from the rain storms. If we had a retention pond that was designed to
contain water within itself and a vault designed to keep the water out it could be
done.
Chairman Schoeppach asked Mr. Keesler to provide more information on moving
the location to the south and what it would entail. Mr. Keesler said depending on
how far south it is moved parallel to the TEP pole, that location would be clearly
inside of the basin. That would bring up two issues. The Town would lose
the volume in the basin which would need to be replaced. If moved even further
south, at the absolute bottom of the common area you're essentially out of the
basin.
Chair Schoeppach asked what technical issues are involved in moving the
building.
Mr. Blunt said they were trying to stay far away from the retention area.
Chair Schoeppach asked if the only issue was the curb cuts. Mr. Blunt said the
south end was not considered for that reason.
Chairman Schoeppach asked if there was another potential solution.
Mr. Blunt said he was open to any suggestions.
Chairman Schoeppach asked for a time frame.
Mr. Keesler said the applicant will need to demonstrate there are no drainage
impacts if moved further south. If so, they will need to mitigate drainage
impacts. Mr. Andrews, OV Attorney, said they have a couple of choices. You
can amend your motion to move something to that corner and let it go forward or
you can continue this for another meeting.
Chairman Schoeppach said rather than push anybody into a decision he would
prefer a motion to continue so the applicant and the Town can consider this
possibility and come back with another proposal.
Mr. Williams said in consideration of projects moving forward and minimizing
delays, if the board prefers the southern location, a motion can be made to
approve contingent that it be worked out.
Member Ottley made the comment that it needs to be moved forward and asking
the applicant to go to a vault is unrealistic.
Charles Black, OV resident, said he had a petition from fifteen other
residents opposing the current site. Anther site location might be on Tangerine
and Musset which is away from houses. Seven of the twenty cell sites in
OV belong to AT&T.
Scott Maxwell, OV resident, said he lives in the same cul-de-sac as Mr. Black.
Sound is only a guideline and there are materials that can dampen sound. The
specifications that Mr. Blunt keeps bringing up appear to be changing.
Sam Silverstein, OV resident, said he is a neighbor of Mr. Black and Mr. Maxwell
and is happy to hear that the site is be moved. Mr. Silverstein asked if it has to
be a part of the HOA and where is the money going.
Chairman Schoeppach said that would be a question he would need to ask the
HOA.
MOTION: A motion was made by Member Ottley to recommend approval of
OV609-010, be moved to the south corner of the HOA property. Contingent
upon the ability of the applicant and Town staff to work out an arrangement to
construct a Tier II Minor wireless communications facility on a replacement
Tucson Electric Power (TEP) utility pole on La Canada Drive and Red Creek
Drive, with a 15' X 20' equipment compound to be located within the adjacent
Copper Creek HOA common area subject to the conditions in Exhibit A.
Member Ottley commented that changes have taken place and there is a need
for additional capacity in the cellular network. It might behoove the Town to look
at the future planning of cell sites because they are going to increase. There
needs to be a plan in place for orderly cell phone equipment growth.
Member Luckett said he has been an AT&T customer since they first came to
Tucson and agrees with Member Ottley's comment. He urges the applicant to
shield or change the architecture to make this building look appropriate.
MOTION carried, 4-0
3. Planning Division Manager update.
'#
r
Mr. Williams commented that the next DRB meeting on Tuesday, November 9,
2010 has only one item on the agenda. The normally scheduled Art Review
Commission meeting is Tuesday, October 19, 2010. The normally scheduled
Planning and Zoning Commission meeting has been moved from Election Day to
Monday, November 8, 2010.
ADJOURNMENT
MOTION: A motion was made by Member Luckett and seconded by Member
Wowk adjourn at 6:57 p.m.
MOTION carried, 4-0
repared by,
/20/i7a) r f 1!
Roseanne Flores
Recording Secretary